National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For the State of Overall status of the State: I. Total Population: Urban Population & Rural Population separately:

Rural: 6,15,45,441, Urban: 5,08,27,531

II. Estimated Sewage Generation (MLD): 9758

III. Details of Sewage Treatment Plant:  Existing no. of STPs and Treatment Capacity (in MLD): 142 STPs with treatment capacity of 7747 MLD (3532.95 MLD Existing and 4214.29 ongoing)  Capacity Utilization of existing STPs: 4326.24 MLD  MLD of sewage being treated through Alternate technology: Faecal Sludge Treatment Plant- 15 FSTPs have been installed along polluted river stretches, with total capacity of 290 KLD.  Gap in Treatment Capacity in MLD: 2011  No. of Operational STPs:135  No. of Complying STPs: 100  No. of Non-complying STPs: 34

53 Rivers in Priority I - 9, II - 6, III - 14, IV - 10, V - 14. • MPR received for January, February, March, April, May, June, July, August, September, October, November, December 2020, January, February and March 2021. • Total sewage generation in PRS – 2728.65 MLD • No. of STPs-73 • Sewage treatment existing in PRS – 1982.9 MLD • Gap in Treatment Capacity-745.75 • Capacity Utilization – 1652.12 MLD • STPs proposed/ ongoing – 1320.96 MLD (Pls refer Annexure-I for river wise progress of STP work)

1

Details of each existing STP in the State

Sewage Treatment Status Compliance Plant (Operational / Present Status Name of the Location of the Sr. (STP) Non- capacity/ (Comply / Town with no. of Sewage Treatment No. Installed Operational / utilization Non-Comply / STP Plant (STP) Capacity Under (MLD) Partially (MLD) Construction) Comply) STP wise Colaba WWTF Nr Municipal Afgan Church 1. Corporation of 37 Operational 22.51 Comply Colaba Mumbai -05 Greater Mumbai Tel No.22150723 LGP WWTF-IPS Municipal 89,Dr.A.B. Road 2. Corporation of 757 Operational 374.78 Non-Comply Worli Mumbai 18. Greater Mumbai Tel No.24933697 Malad STP Municipal Marve Road, Mith 3. Corporation of Chawky, Malad 280 Operational 216.06 Non-Comply Greater Mumbai (W), Mumbai-95 Tel : 28820860 Charkop STP Municipal MHADA, Sector 8 & 4. Corporation of 9, Kandivali(W), 6 Operational 4.28 Comply Greater Mumbai Mumbai- 400067 Tel : 28681357 Bhandup WWTF Off eastern Express Municipal Highway Near Airoli 5. Corporation of 280 Operational 141.48 Comply Bridge Traffic Signal Greater Mumbai Bhandup East Tel No. 8286226994 Ghatkopar WWTF Off eastern Express Municipal Highway 6. Corporation of Near Pant Nagar 380 Operational 151.7 Comply Greater Mumbai Traffic Signal Ghatkopar East. Tel No. 9082820120 Versova STP J.P. Road Jn.,Link Road, Municipal Near Apnana Bazar, 7. Corporation of 180 Operational 108 Comply Andheri (W), Greater Mumbai Mumbai-53 Tel : 26366881 Influent Pumping Station Bandra, Opp Swami Vivekanand Municipal Garden, Mahim 8. Corporation of 797 Operational 531 Comply Causway, Mahim Greater Mumbai (West), Mumbai 400016.Tel. No. 24464750 Municipal TMC STP Kopri, 9. 120 Operational 70 Comply Corporation Thane Thane Municipal TMC STP Mumbra, 10. 32 Operational 12 Comply Corporation Thane Thane Municipal TMC STP Vartak 11. 0.9 Operational 0.25 Comply Corporation Nagar Thane Municipal 12. Vitava 8.4 Operational 2.5 Comply Corporation

2

Non- Thane Municipal Operational 13. Kharegoan 46.76 NA NA Corporation (Commissioning under progress) Thane Municipal Everest World, 14. 23.06 Operational 5 Comply Corporation Kolshet Thane Municipal 15. Lodha 22.02 Operational 5 Comply Corporation Non- Thane Municipal Operational 16. Nagla Bunder 7 NA NA Corporation (Commissioning under progress) Non- Thane Municipal Operational 17. Hiranandani 59 NA NA Corporation (Commissioning under progress) Mira- Bhaindar Bhayander (W) near 18. Municipal 8 Operational 8 Comply Garden Court Tower Corporation Mira- Bhaindar Golden Nest Road, 19. Municipal Bhayander (E) 12 Operational 12 Comply Corporation Goddev Mira- Bhaindar Kanakia, Mira Road 20. Municipal 17 Operational 17 Comply (E) Corporation Mira- Bhaindar Shanti Park - Mira 21. Municipal 13 Operational 13 Comply road - Sanghavinagar Corporation Mhada- shanti Mira- Bhaindar garden- Mira 22. Municipal 7 Operational 7 Comply Penkarpadagavthan Corporation (Mhada Colony) Mira- Bhaindar Shanti nagar Mira 23. Municipal road station, Near 11 Operational 11 Comply Corporation ayappamandir, Ghodbunder- Mira- Bhaindar Kashigaon, 24. Municipal Mashachhapada 14 Operational 14 Comply Corporation Bhayander, Survey No. 233 Mira- Bhaindar 25. Municipal Jesal park 2 Operational 2 Comply Corporation Mira- Bhaindar Shrushti complex, 26. Municipal 1.5 Operational 1.5 Comply Mira Road Corporation Vasai-Virar Bolinge Village STP 27. Municipal 30 Operational 19 Comply - 2, Corporation Kalyan Dombivali 28. Municipal Adharwadi 25 Operational 21 Comply Corporation Kalyan Dombivali 29. Municipal Barave 15 Operational 11 Comply Corporation Kalyan Dombivali 30. Municipal Motagaon 40 Operational 4 -- Corporation Kalyan Dombivali 31. Municipal Chinchpada 40 Operational 15 Comply Corporation

3

Kalyan Dombivali Manda Titwala 2.0 32. Municipal 2 Operational 1 Comply MLD.(E) Corporation Kalyan Dombivali Manda Titwala 1.0 33. Municipal 1 Operational 0.5 Comply MLD (W) Corporation Bhiwandi Nizampur 34. Katai-1 13 Operational 13 Comply Municipal Corporation Bhiwandi Nizampur Non- 35. Katai-2 17 - NA Municipal Operational Corporation Ambernath 36. Municipal Vadalgaon STP 45 operational 22 Comply Council Ambernath 37. Municipal Chikloli STP 9 Operational 6 Comply Council Kulgaon Badalapur 38. Badlapur STP 22 Operational 20 Comply Municipal Council Ulhasnagar 39. Municipal Vadholgaon 20.7 Operational 20.7 Comply Corporation Navi Mumbai 40. Municipal Sec-12 C.B.D. 19.00 Operational 12.00 Comply Corporation Navi Mumbai 41. Municipal Sec-50, Nerul 100.00 Operational 40.00 Comply Corporation Navi Mumbai 42. Municipal Sec-18, Vashi 100.00 Operational 40.00 Comply Corporation Navi Mumbai 43. Municipal Sec-20, Sanpada 37.50 Operational 18.00 Comply Corporation Navi Mumbai 44. Municipal Sec-15, Ghansoli 30.00 Operational 10.00 Comply Corporation Navi Mumbai Sec-14, 45. Municipal 87.50 Operational 45.00 Comply Koparkhairane Corporation Navi Mumbai 46. Municipal Sec-18, Airoli 80.00 Operational 35.00 Comply Corporation Panvel Municipal Bandar Road, 47. 14 Operational 12 Comply Corporation Panvel, Dist. Raigad. Sector-16, Kharghar, Panvel Municipal 48. Tal. Panvel, Dist. 25 Operational 23 Comply Corporation Raigad. Sector-16, Kharghar, Panvel Municipal 49. Tal. Panvel, Dist. 70 Operational 63 Comply Corporation Raigad. Sector-32, , Panvel Municipal 50. Kamothe, Tal. 85 Operational 79 Non-Comply Corporation Panvel, Dist. Raigad.

4

Sector-12,Kalamboli, Panvel Municipal 51. Tal. Panvel, Dist. 50 Operational 47 Comply Corporation Raigad. Panvel Municipal Sector-06, Ulwe, Tal. 52. 32 Operational 26 Comply Corporation Panvel, Dist. Raigad. Kalundre, Kalundre Panvel Municipal 53. Gaon, Panvel, Navi 2 Operational 1.7 Comply Corporation Mumbai Panvel Municipal 54. CIDCO Karanjade 28 Operational 15 Comply Corporation Nashik Municipal 55. Chehedi STP 22 Operational 22 Non-Comply Corporation Nashik Municipal 56. Chehedi STP 21 Operational 21 Non-Comply Corporation Nashik Municipal 57. Panchak 7.5 Operational 7.5 Non-Comply Corporation Nashik Municipal 58. Panchak 21 Operational 21 Non-Comply Corporation Nashik Municipal 59. Panchak 32 Operational 32 Non-Comply Corporation Nashik Municipal 60. Tapvan 78 Operational 78 Non-Comply Corporation Nashik Municipal 61. Tapvan 52 Operational 52 Non-Comply Corporation Nashik Municipal 62. Agar Takali 70 Operational 70 Non-Comply Corporation Nashik Municipal 63. Agar Takali 40 Operational 40 Non-Comply Corporation Nashik Municipal Municipal STP 64. 18 Operational 15 Non-Comply Corporation Gangapur Tryambakeshwar Municipal Council 65. Municipal 1 Operational 1 Comply Tryambak Council Municipal Council - Shirpur Municipal 66. Shirpur, Tq Shirpur 12.5 Operational 8.64 Comply Council Dist Dhule Nandurbar Municipal Council - 67. Municipal Nandurbar, Tq and 17.5 Operational 9.3 Comply Council Dist Nandurbar Shirdi Shirdi, Tal-- Rahata, 68. 16 Operational 9 Comply Nagarpanchyat Dist- Ahmednagar

Erandwane STP, Pune Municipal 69. S.No.3&4 50 Operational 50 Non-Comply corporation Erandwane Bopodi STP, Pune Municipal 70. S.No.2A, 2B, 2C, 2D 18 Operational 15 Non-Comply corporation &6 (P) Bopodi Pune Municipal Tanajiwadi S.No.24, 71. 17 Operational 13 Non-Comply corporation Shivajinagar Bhairoba STP, Final Pune Municipal plot No.330 72. 130 Operational 80 Non-Comply corporation S.No.33A, 33B Koregaon Park Mundhawa STP, Pune Municipal 73. S.No.2,3A,4 45 Operational 42 Non-Comply corporation Mundhawa Pune Municipal Vithalwadi STP, 74. 32 Operational 25 Non-Comply corporation S.No.20(P) Hingane Pune Municipal Old Naidu STP, Non- 75. 90 NA NA corporation S.No.439 To 444 Operational 5

Pune final Plot No. (STP of 98 Knndy Road capacity of 127 MLD is proposed at this STP) Pune Municipal Baner STP, S.No.221 76. 30 Operational 30 Non-Comply corporation To 227 Baner Pune Municipal Kharadi STP, 77. 40 Operational 40 Non-Comply corporation S.No.74, 75 Kharadi New Naidu STP, Pune Municipal S.No.439 To 444 78. 115 Operational 115 Non-Comply corporation Pune final Plot No. 98 Knndy Road Baramati Gunawadi Road, 79. Munucipal 11.5 Operational 11.5 Non-Comply Baramati council Non- Operational Daund Municipal Daund Municipal 80. 4.2 (Maintenance 0 NA Council Council STP work under progress) Saswad Municipal Saswad Municipal 81. 2 Operational 2 Non-Comply Council council STP Non- Operational (existing STP is Lonavala Capacity Dongar Gaon, dismantled for 82. Municipal 3.6 NA enhancement Lonavala capacity Council under progress enhancement to the tune of 6 MLD) Shirur Municipal Sr. No. 269, Sonar 83. 6 Operational 2.5 Comply Council Ali, Shirur Pune Cantonment 900 Boottee Street, 84. 20 Operational 9 Comply Board Pune-! Khadaki Gaddi Adda, Ward 85. Cantonment No. Tamela Chawl, 8 Operational 6 Non-Comply Board Khadaki. Khadaki East Khadali, Near 86. Cantonment Lokmanya Tilak 1.2 Operational 1.2 Non-Comply Board Highschool Pimpri Chinchwad 87. Chikhali Phase I 16 Operational 26.33 Comply Municipal Corporation Pimpri Chinchwad 88. Chikhali Phase II 16 Operational Comply Municipal Corporation Pimpri Chinchwad Chinchwad Phase I 89. 30 Operational 28.9 Comply Municipal (Bhatnagar) Corporation Pimpri Chinchwad 90. Chinchwad Phase II 30 Operational 28.08 Comply Municipal Corporation Pimpri Chinchwad 91. Sangvi Phase I 10 Operational 6.031 Comply Municipal Corporation

6

Pimpri Chinchwad 92. Kasarwadi I 40 Operational 85.312 Comply Municipal Corporation Pimpri Chinchwad 93. Kasarwadi II 40 Operational Comply Municipal Corporation Pimpri Chinchwad 94. Kasarwadi III 40 Operational Comply Municipal Corporation Pimpri Chinchwad 95. Pimple Nilekh 20 Operational 18.741 Comply Municipal Corporation Pimpri Chinchwad 96. Ravet 20 Operational 12.547 Comply Municipal Corporation Pimpri Chinchwad 97. Akurdi 30 Operational 26.514 Comply Municipal Corporation Pimpri Chinchwad Sangvi Phase II 98. 20 Operational 13.774 Comply Municipal (Dapodi) Corporation Pimpri Chinchwad 99. Chahroli Phase I 21 Operational 20.362 Comply Municipal Corporation Pimpri Chinchwad 100. Chahroli Phase II 20 Operational 14.30 Non-Comply Municipal Corporation Solapur Municipal 101. Degaon STP 75.00 Operational 52.12 Comply Corporation Solapur Municipal 102. Kumathe STP 12.50 Operational 5.39 Comply Corporation Solapur Municipal 103. Pratap Nagar STP 15.00 Operational 5.22 Comply Corporation Compartment no. 79(City Survey Mahabaleshwar no.257/1) behind 104. Municipal Karmachari Vasahat, 4 Operational 2 Comply Council At-Mahabaleshwar, Tal-Mahabaleshwar, Dist-Satara at Survey No.626, Mahabaleshwar near Dhobi Ghat,At- 105. Municipal Mahabaleshwar, Tal- 1 Operational 0.5 Comply Council Mahabaleshwar, Dist-Satara Survey No. 83/2 near Panchagani Siddharthnagar,At- 106. Municipal 0.65 Operational 0.65 Comply Panchgani, Tal- Council Mahabaleshwar, Dist-Satara

7

Plot no. 497/4 & 5 Panchagani near Shivajinagar,At- 107. Municipal Panchgani, Tal- 0.35 Operational 0.35 Comply Council Mahabaleshwar, Dist-Satara Hindu Panchagani Crematorium,At- 108. Municipal Panchgani, Tal- 1.5 Operational 1.5 Comply Council Mahabaleshwar, Dist-Satara Bara Dabari, Karad, Karad Municipal 109. Tal-Karad, Dist- 12.5 Operational 9.5 Comply Council Satara Malkapur A/p-Malkapur Tal 110. Municipal 5 Operational 5 Comply Karad Dist-Satara Council Malkapur ,A/p-Malkapur Tal 111. Municipal 3 Operational 3 Comply Karad Dist-Satara Council Pandharpur STP 112. Municipal 15.5 Operational 12 Comply Gopalpur,Pandharpur Council Pandharpur STP, 65 113. Municipal 2.5 Operational 0.5 Comply Acre,Pandharpur Council Kolhapur Kolhapur Municipal Municipal Corporation STP ( 76 114. 76 Operational 55 Comply Corporation, MLD )Kasaba Kolhapur Bavada, Kolhapur Kolhapur Kolhapur Municipal Municipal Corporation STP ( 17 115. 17 Operational 17 Comply Corporation, MLD )Dudhali, Kolhapur Kolhapur Dhulgaon STP 27 Sangli Municipal 116. MLD (Oxidation 27 Operational 27 Comply Corporation pond) STP at Miraj-9.2 Sangli Municipal 117. MLD (Oxidation 9.2 Operational 9.2 Comply Corporation pond) Hamumannagar STP Sangli Municipal 100 Footy road( 118. 23.5 Operational 13 Non-Comply Corporation Commising date- 23/7/2018) Ichalkaranji Ichalkaranji Municipal Council ( 119. Municipal STP 18 MLD ) Old 20 Operational 14 Comply Council Sangli Naka, Ichalkaranji Kanchanwadi, 120. Municipal 161 Operational 60 Comply Aurangabad Corporation Aurangabad 121. Municipal Padegaon 10 Operational 5 Comply Corporation Aurangabad 122. Municipal Salim Ali Lake 5 Operational 4 Comply Corporation Aurangabad 123. Municipal At Zalta, 35 Operational 15 Comply Corporation

8

Nanded Waghala 124. Municipal Elichpur 30 Operational 12 Non-Comply Corporation Nanded Waghala 125. Municipal Bondar 87 Operational 35 Non-Comply Corporation Nanded Waghala 126. Municipal Sangvi 15 Operational 10 Non-Comply Corporation Nagpur Municipal 127. Bhandewadi 200 Operational 200 Comply corporation Nagpur Municipal 128. Bhandewadi 130 Operational 130 Comply corporation Nagpur Municipal 129. Mankapur 5 Operational 5 Comply corporation Nagpur Municipal 130. Mokshadham 5 Operational 5 Comply corporation Nagpur Municipal 131. Kachimet (NIT) 1 Operational 1 Comply corporation Nagpur Municipal 132. Sonegaon (NIT) 0.3 Operational 0.3 Comply corporation Nagpur Municipal 133. Hazari Pahad (NIT) 4 Operational 4 Comply corporation Somalwada- Nagpur Municipal 134. 1(Ongoing work by 20 Operational NA Comply corporation NIT) Nagpur Municipal 135. Dabha(NIT) 5 Operational NA Comply corporation Amravati 136. Municipal STP-1 –Lalkhadi, 44.0 Operational 44 Comply Corporation Amravati 137. Municipal STP-2-Lalkhadi 30.5 Operational 30.5 Comply Corporation Shegaon S.No. 752/1, 138. Municipal Charmori, Shegaon, 7 Operational 3.5 Non-Comply Council Dist.-Buldana Opposite to Municipal Chamunda Devi 139. 8 Operational 4 Comply Council Washim Mandir, Nimazaga Washim Chandrapur 140. Municipal Pathanpura 45 Operational 24 Comply Corporation Chandrapur 141. Municipal Rehmat Nagar 25 Operational 22 Non-Comply Corporation Chandrapur 142. Municipal Azad Garden 0.5 Operational 0.5 Non-Comply Corporation

Details of under construction STPs along the Polluted River Stretches

Capacity Status of I&D or Sr. Name of the of the Physical Progress House sewer Completion No. City/Town Location plant in in % connections Timeline MLD 1550 km sewer Nashik Municipal STP network completed September-21 1. Municipal Pimpalgaon, 32 40% work completed 210km sewer network Corporation Baswant work under progress is 40% completed and 9

expected to complet March 2022 as informed by representative NMC Municipal Corporation of WSP Compound 8 70% work completed Dec-21 2. Greater Mumbai The underground drainage scheme is designed for the population left bak at old akola city 2.27km Shiloda 30 and nalla intercept (15No.), Right bak of The civil construction length Akola work of both these 10.93 km and nalla 3. May-21 Municipal STPs is completed up intercept 18 no., Bapu Corporation to 95% nagar to Kharap length 1.91km nalla interception 2 nos.,

Construction of PDKV 7 4. pumping station with Wetwell at Old city River Bak (Wet well at old city river bank) Work was stopped and Pimpri structure demolished by 5. Chinchwad Proposed STP 12 NGT Order, but work is April-22 Municipal started on alternative Corporation land parcel. Sangli Miraj Total 164.9 KM sewer SMKC Bedag road 100% work is line is proposed out of 6. Kupwad 22.5 May-21 Municipal Miraj completed that 116.5 KM wok Corporation completed Pili Mazid 7. Bhimnagar Ward, 10 Hinganghat 100% Civil work Hinganghat. May-21 Municipal completed. Hinganghat Council 3 8. Municipal Council

Excavation work is Jalgaon Gat No.413,390 48 completed. Civil work August-21 9. Municipal Jalgaon Shiwar Corporation is not yet started. Drainage network work Pachora Pachora Municipal 9 80% work completed is under progress. Oct-21 10. Municipal Council STP Council Kolhapur Municipal Corporation STP ( 6 10% work completed Kolhapur 6 11. MLD ) Bawda, (foundation Municipal Kolhapur Corporation, Dec-21 Kolhapur Kolhapur Municipal Corporation STP ( 4 4 55% work completed 12. MLD ) Dudhali, Kolhapur The work had begun. Ichalkaranji Funds of Rs. 82.60 Municipal Council ( Time line not Ichalkaranji crore have been STP 18 MLD 18 fixed due to 13. Municipal sanctioned from Council )Ichalkaranji STP litigation Takawade UIDSSMT scheme. But at present the work is 10

stopped due to legal issues.

Ulhasnagar 95%work completed 14. Municipal Shanti Nagar-1 15 Corporation

Ulhasnagar 90 % Khemani STP 15. Municipal Shanti Nagar-2 31.26 Aug-21 Corporation

Work order given to Ulhasnagar 16. Municipal Khadegovili STP 8 contractor Corporation Work awarded and Funds are available Right Bank at Survy Roha No. 128/3A at Vill. however contractor has 1 Mar-22 Municipal Ashtami, about 120 not yet started the Council construction work due 17. mtrs. away from Kundalika River. to GST issue. Excavation for Foundation of Sewage Nanded Pumping station Well is 18. Waghala Chunal Nalla 10 75% completed and the Dec-21 Municipal levelling of ground and Corporation other miscellaneous works are in progress.

As said area is having less population, underground network is Work order is awarded not proposed. Sewage Kalyan to agency and Dombivali collection is proposed 19. Vadavali STP 21 construction work is May-21 Municipal by nalla intersection at under progress Corporation Sewage pumping station followed by treatment at STP

40% work of main Work order for STP is drainage line has been just awarded to Gadchiroli Bormala Road, completed. The work of 20. Municipal 11.5 contractor. Foundation Oct-21 Gadchiroli internal drainage is yet Council work is just started. to start.

Work completed up to Khalapur Khalapur Nagar 21. 3 Mar-22 Nagar Panchayat STP PCC level. Panchayat Total Sewage network Amalner Amalner Municipal length is 80km, till date 22. 12.6 8% work completed Jul-21 Municipal Council STP work completed is Council 21km.

Dhule Dhule Municipal 23. 17 Municipal Corporation STP Corporation 10% STP construction 20% Underground completed drainage, completed Dec-21 Dhule Dhule Municipal 24. 40p Municipal Corporation STP Corporation

11

Drainage pipeline of Near Solid Waste Ballarpur 54.09 kms is proposed 25. Municipal Management Plant, 7.5 Survey No. 22 Work Order for STP in the zone-I of Council awarded and Ballarpur City. Zone-II excavation work in of Ballarpur City is Oct-21 Ballarpur Visapur Road, under progress having old drainage 26. 8.5 Municipal Survey No. 86/2 network & same will be Council utilized.

1.Hendrepada nalla- 2.5km Kulgaon Kulgaon Badalapur 2. Joveli nalla- 1km 27. Badalapur Municipal Council 12 Municipal Proposed STP 3. Eramjad nalla- Council Preliminary works in 550mtr. progress - Cleaning, survey, design, trial 4. Badlapur gaon nalla- Dec-21 bore etc 1.5km Kulgaon Kulgaon Badalapur 5. Sonivali Nalla- 28. Badalapur Municipal Council 10 700mtr. Municipal Proposed STP Council 6. Near WTP barrage road nalla-2km

10 % work SBR PCC Solapur and compund wall is Jun-21 29. Municipal Desai Nagar STP 20 completed Corporation

Details of Proposed STPs in the State

Status of Project (at Capacity of Likely DPR Stage/ Under Name of the Town with no. the STP Date of Sr. Tendering/ of STP Location proposed in Completio No. Work to be Awarded) MLD n

Municipal Corporation of Worli STP, 1. 500 Proposed Mar-26 Greater Mumbai MCGm, Mumbai

Municipal Corporation of Bandra STP, 2. 360 Proposed Mar-26 Greater Mumbai MCGM, Mumbai

Municipal Corporation of Dharavi STP, 3. 418 Proposed Mar-26 Greater Mumbai MCGM, Mumbai Municipal Corporation of Ghatkopar STP, 4. 337 Proposed Mar-25 Greater Mumbai MCGM, Mumbai Municipal Corporation of 5. Versova 180 Proposed Mar-25 Greater Mumbai Municipal Corporation of 6. Bhandup 215 Proposed Mar-25 Greater Mumbai Municipal Corporation of Malad STP, 7. 454 Proposed Mar-27 Greater Mumbai MCGM, Mumbai

Mira- Bhaindar Municipal 8. Bhayander West 8 Proposed Corporation

12

Mira- Bhaindar Municipal 9. Kharigaon 13 Proposed Corporation Vasai-Virar Municipal 10. Chikhal dongri 13 Proposed Corporation Vasai-Virar Municipal Nalla sopara 11. 30.5 Proposed Corporation (East) Vasai-Virar Municipal Nalla sopara 12. 49 Proposed Corporation (West) Vasai-Virar Municipal Navghar 13. 7.1 Proposed Corporation Manikpur Vasai-Virar Municipal Navghar 14. 33.85 Proposed Corporation Manikpur Vasai-Virar Municipal 15. Vasai 11.57 Proposed Corporation Bhiwandi Nizampur Municipal 16. Bhadwad 9 Proposed Corporation Bhiwandi Nizampur Municipal 17. Stepping Garden 31 Proposed Mar-22 Corporation Kulgaon Badalapur Kulgaon Badalapur Municipal 18. Municipal 10 Proposed Council Council Proposed STP CIDCO Taloja 19. Panvel Municipal Corporation 32 Proposed Phase-I CIDCO Pushpak 20. Panvel Municipal Corporation 45 Proposed Nagar Kundalika River Left Bank, at Survy No. 21. Roha Municipal Council 4 Proposed Mar-22 211/1/2/3/4/8/9/1 0/11(0.43A) at Roha. Ahmednagar, Tal Ahmednagar Muncipal 22. & Dist- 57 Proposed Corporation Ahmednagar Pune Municipal Corporation, 23. Pune Municipal corporation 10 Proposed 2023 Botanical Garden, Pune Pune Municipal 24. Pune Municipal corporation Corporation, 25 Proposed 2023 Baner, Pune Municipal 25. Pune Municipal corporation Corporation, 28 Proposed 2023 Warje, Pune Pune Municipal 26. Pune Municipal corporation Corporation, 26 Proposed 2023 Vadgaon, Pune Pune Municipal 27. Pune Municipal corporation Corporation, 15 Proposed 2023 Tanaji Wadi, Pune Municipal 28. Pune Municipal corporation Corporation,Naid 127 Proposed 2023 u, Pune Municipal 29. Pune Municipal corporation Corporation, 33 Proposed 2023 Dhanori, Pune Pune Municipal 30. Pune Municipal corporation Corporation, 75 Proposed 2023 Bhairoba, Pune

13

Pune Municipal 31. Pune Municipal corporation Corporation, 20 Proposed 2023 Mundhva, Pune Pune Municipal 32. Pune Municipal corporation Corporation, 30 Proposed 2023 Kharadi, Pune Pune Municipal Corporation, 33. Pune Municipal corporation 7 Proposed 2023 Matsyabij Kendra, Pune Pimpri Chinchwad Municipal 34. Bbhatnagar 15 Proposed Apr-22 Corporation Alandi Municipal 35. Alandi Municipal Council 4 Proposed -- Council STP 36. Satara Municipal Council 17.5 Proposed

Wai Municipal 37. Wai Municipal Council 6 Proposed Council STP Ashta Municipal 38. Ashta Municipal Council 5.5 Proposed Council STP Islampur 39. Islampur Municipal Council Municipal 7 Proposed Jun-21 Council STP Islampur 40. Islampur Municipal Council Municipal 5 Proposed Jun-21 Council STP 41. Malvan Municipal Council Malvan Council 4 Proposed Aurangabad Municipal 42. Banewadi 10 Proposed Corporation Municipal 43. Paithan Municipal Council 8.8 Proposed Council STP Beed Municipal 44. Beed Municipal Council 35 Proposed Council, STP Latur Municipal 45. Latur Municipal Corporation Corporation 40 Proposed Proposed STP Latur Municipal 46. Latur Municipal Corporation Corporation 32 Proposed Proposed STP Kamptee 47. Kamptee Municipal Council Municipal 12.5 Proposed Council STP Bhandara 48. Bhandara Municipal Council Municipal 15 Proposed Mar-22 Council STP Pauni Municipal 49. Pauni Municipal Council 7 Proposed Mar-22 Council STP Amravati Amravati Municipal Municipal 50. 16 Proposed Corporation Corporation Proposed STP Amravati Amravati Municipal Municipal 51. 12 Proposed Corporation Corporation Proposed STP Bramhapuri 52. Bramhapuri Municipal Council Municipal 7 Proposed Council STP Rajura Municipal Council Rajura Municipal 53. Municipal Corporation of 5.5 Proposed Council STP Greater Mumbai

14

Information of FSTPs-along polluted river stretches in Maharashtra State Sr. Capacity of FSTP River Stretch Name of city Technology used No. (KLD) 1 Kanhan Mouda 20 Sludge Drying Bed 2 Krishna Wai 70 MBBR 3 Bori Amalner 20 Sludge Drying Bed 4 Girna Jalgaon 20 Sludge Drying Bed 5 Krishna Islampur 15 Sludge Drying Bed 6 Darna Igatpuri 10 Sludge Drying Bed 7 Panzara Dhule 20 Sludge Drying Bed 8 Patalganga Khopoli 15 Sludge Drying Bed 9 Kundalika Roha 5 Sludge Drying Bed 10 Savitri Mahad -- -- 11 Wardha Ballarpur 45 Sludge Drying Bed, MBR 12 Bindusar Beed 20 Sludge Drying Bed 13 Godavari Gangakhed 10 Sludge Drying Bed 14 Gomai Shahada 10 Sludge Drying Bed 15 Rangavali Navapur 10 Sludge Drying Bed

IV. Details of Industrial Pollution:  No. of industries in the State:92081  No. of water polluting industries in the State: 16597  Quantity of effluent generated from the industries in MLD:2100 MLD  Quantity of Hazardous Sludge generated from the Industries in TPD: 2738.53  Number of industrial units having ETPs: 16597  Number of industrial units connected to CETP: 7856  Number and total capacity of ETPs (details of existing/ under construction / proposed) No. of ETPs- 16597 with capacity of 2100 MLD  Compliance status of the ETPs: 16417 complied and 180 non-complied  Number and total capacity of CETPs (details of existing/ under construction / proposed)- 26 Nos of CETPs with capacity of 244.85 MLD  Status of compliance and operation of the CETPs: 25 CETPs are complied, 1 non- complied.

15

Industrial Status of CETPs (existing, Sr. Town No. of Discharge under construction & No. industries (MLD) proposed) Additional Ambernath CETP, Dist. 1. Existing Thane 53 7.5 Butibori CETP Pvt. Ltd., Dist. 2. Existing Nagpur 450 5 SMS Waluj CETP Pvt Ltd, Dist. 3. Existing Aurangabad 224 10 Greenfield CET Plant P. Ltd, Dist. 4. Existing Solapur 27 1.5 Ichalkaranji Textile Development 5. Existing Cluster Ltd. (1 MLD), Dist. Kolhapur 11 1 Ichalkaranji Textile Development 6. Cluster Ltd. (12 MLD), Dist. 191 12 Existing Kolhapur Kagal-Hatkanangale C.E.T.P.,, 7. Existing Dist. Kolhapur 5 10 L.K. Akiwate Industrial Co Op, 8. Existing Estate Ltd, Dist. Kolhapur 15 0.8 Hydro Air Tectonics (PCD), Dist. 9. Existing Pune 1 4 Kurkumbh Environment Protection Co 10. Existing op Society, Dist. Pune 65 1 11. Ranjangaon CETP, Dist. Pune 117 3 Existing Lote Parshuram Environment 12. Protection Co-op Societ, Dist. 190 10 Existing Ratnagiri MMA-CETP Co Operative Society 13. Existing Ltd., Dist. Raigad 73 7.5 RIA CETP Co-op. Society Ltd., 14. Existing Dist. Raigad 41 22.5

15. PRIA CETP (I) Ltd., Dist. Raigad 18 15 Existing Taloja CETP Co Operative Society, 16. Existing Dist. Thane 941 22.5 Thane-Belapur Association, Dist. 17. Existing Thane 3309 27 Badlapur CETP Association, Dist. 18. Existing Thane 263 8 Chikhloli-Morivali Effluent 19. Existing Treatment, Dist. Thane 130 0.8 ACMA - CETP-Co-operative 20. Existing Society Ltd, Dist. Thane 61 0.25 Dombivli CETP (Chemical) (Phase- 21. Existing II), Dist. Thane 120 1.5 Dombivli Better Environment 22. Existing System Association, Dist. Thane 148 16 Tarapur Environment Protection 23. Existing Society CETP, Dist. Thane 1176 25

24. Akkalkot Cetp, Dist. 222 3 Existing Additional Amravati Industrial 25. Existing Area, Dist. Amravati 5 5

16

Tarapur Environmental Protection 26. Existing Society, Tarapur, Palghar - Phase II 25

27. Satpur in District Nashik 1 Proposed Krishna Valley Envirotech (P) Ltd. Plot No J-MIDC kupwada Block 28. Under Construction Sangali-Miraj Industrial Area Dist- 0.64 Sangali

29. Ichalkaranji in Kolhapur District 1.2 Proposed Butibori CETP Pvt. Ltd., Dist. 30. Under Construction Nagpur 5

V. Solid Waste Management:  Total number of Urban Local Bodies and their Population- No. of ULBs-392, Population- 5,08,27,531.  Current Municipal Solid Waste Generation-22945 (MT/D).  Current Municipal Solid Waste Treatment-16037 (MT/D)  Number, installed capacity and utilization of existing MSW processing facilities in TPD: ULBs installed 337 composting plants as a waste processing facility. Also 82 vermin-composing facilities are installed, 62 bio-methanization plants are installed, 01 waste to Energy plant and 26 RDF plant installed. The 320 landfill sites are identified and 18 sites under construction phase.  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction)- In Operation 1 with capacity 300 TPD Proposed 4 Nos with Capacity of 1750 TPD Sr. Plant capacity Name of Municipal Corporation Present Status No. (TPD) 1 Thane Municipal Corporation 300 In operation. Pimpri-Chinchwad Municipal Work order issued. 2 200 Corporation Proposed plant. 3 Navi Mumbai Municipal Corporation 150 Proposed plant. Municipal Corporation of Greater E-Tendered. Proposed 4 1200 Mumbai Plant. 5 Pune Municipal Corporation 200 Proposed Plant.

 Total no. of wards-12420, no. of wards having door to door collection service-12333, no. of wards practicing segregation at source -10229 VI. Bio-medical Waste Management:  Total Bio-medical generation: 62254.62 Kg/Day  No. of Hospitals and Health Care Facilities: 63642  Status of Treatment Facility/ CBMWTF: 30 CTFs are operating in Maharashtra State covering 36 Districts. 29 Incineration Based and 1 Deep burial. 17

VII. Hazardous Waste Management:  Total Hazardous Waste generation: 999565.96 MT  No. of Industries generating Hazardous waste: 7257  Treatment Capacity of all TSDFs: o Capacity of 03 Nos of Incinerator Facilities (MT/Hour) - 9.0 o Capacity of 04 Nos of Secured Landfill (MT/A)- 2,61,600  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated; 360505.3 MT  Details of on-going or proposed TSDF- NA. VIII. Plastic Waste Management:  Total Plastic Waste generation: 4.43 Lacs MT  Treatment/ Measures adopted for reduction or management of plastic waste: o From Oct 2018 to August 2020, Plastic Waste collected- 72600 MT. o Plastic waste recyclers- 88 Nos. o Plastic waste used in Cement Industry-27000 MT o Plastic to Fuel Plants- 05 Nos o 71 Extended Producers Responsibility (EPR) is granted by Urban Development Department for regulation of Plastic Waste. o Issued the GR to use waste plastic in to the construction of the road at the tune of 7%. IX. Details of Alternate Treatment Technology being adopted by the State/UT:

Faecal Sludge Treatment Plant- 15 FSTPs have been installed along polluted river stretches, with total capacity of 290 KLD.

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment: Polluting sources including drains have been identified contributing to river pollution. Demonstration project has been started by MPCB for in-situ treatment of wastewater at Kotwali village drain on Vashisthi River to explore the possibilities and viability of the interim measures as resources of the Government are very much limited.

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: Member Secretary, Maharashtra Pollution Control Board XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: Ten meetings were held under the chairmanship of Hon’ble Chief Secretary to take review of the compliance in the matter OA 673/2018. XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river.

18

Status of polluted river stretches

No. of stretches No. of stretches No. of stretches No. of stretches in Priority in 2020 (Jan to declared in 2018 in 2019 2021 (Jan to Feb) Dec)

Priority I 9 1 1 0 Priority II 6 6 3 1 Priority III 14 10 12 4 Priority IV 10 14 13 9 Priority V 14 21 21 23 Less Polluted - 1 3 3 Dry 13 Total 53 53 53 53

WATER QUALITY STATUS OF POLLUTED RIVER STRETCHES IN MAHARASHTRA (January and February 2021)

Sr. BOD (mg/l) NAME OF RIVER Current Priority No. Min Max

Priority I 1 GODAVARI 2.6 8.2 IV 2 KALU 3.8 3.8 V 3 KUNDALIKA 3.4 12 III 4 MITHI 23 23 II 5 MORNA Dry 6 MULA 8.2 8.6 IV 7 MUTHA 3.4 11.4 III 8 NIRA 4.2 8.2 IV 9 VEL Dry Priority II 1 BHIMA 5.2 9.4 IV 2 INDRAYANI 5.2 7.8 IV 3 MULA-MUTHA 10.4 11.5 III 4 PAWANA 3.2 9.5 IV 5 WAINGANGA 3 14 III 6 WARDHA 3.5 5 V Priority III 1 GHOD 5.4 5.4 V 2 KANHAN 3.5 6.5 IV 3 KOLAR (MAH) 4 4 V 4 KRISHNA 1.8 5.4 V 5 MOR Dry 6 PATALGANGA 3.4 10 IV 7 PEDHI Dry 8 PENGANGA 3 4.5 V 9 PURNA Dry 10 TAPI 2.8 3.8 V 11 URMODI 5.2 5.2 V 12 VENNA 3.4 5 V 19

13 WAGHUR 4 4 V 14 WENA 3.5 4.8 V Priority IV 1 BINDUSAR 4 4 V 2 BORI Dry 3 CHANDRABHAGA 5 7.6 IV 4 DARNA 3.2 4 V 5 GIRNA 4 4 V 6 HIWARA Dry 7 KOYNA 5 5 V 8 PELHAR 3.4 3.4 V 9 SINA 5.2 5.2 V 10 TITUR Dry Priority V 1 AMBA 3.4 3.4 V 2 BHATSA 3.4 3.4 V 3 GOMAI Dry 4 KAN Dry 5 MANJARA 4.6 4.6 V 6 PANCHGANGA 1.8 2.4 Less Polluted 7 PANZARA 4.2 4.2 V 8 RANGAVALI Dry 9 SAVITRI 1.8 2 Less Polluted 10 SURYA 3.4 3.6 V 11 TANSA Dry 12 ULHAS 3.4 3.6 V 13 VAITARNA Dry 14 VASHISHTHI 1.8 1.8 Less Polluted

XIV. Ground water regulation: o In Maharashtra State Ground Water is regulated under Maharashtra Groundwater (Development and Management) Act, 2009. Groundwater Surveys and Development Agency (GSDA). o GSDA concerned with groundwater surveys, exploration, assessment, monitoring, development, management and regulation of groundwater resources for irrigation, drinking and industrial needs. It also undertakes periodic ground water assessment in order to regulate the ground water use and guide ground water developmental activities on scientific basis. o GSDA also works towards ensuring sustainability of ground water resources, on a long-term basis. It acts as a custodian, for the implementation of ground water legislation, within the State of Maharashtra.

20

XV. Good irrigation practices being adopted by the State: o 82% of water is used for irrigation purpose in State. o As per MWRRA notification dated 25 Jun 2015, it is mandatory to supply water through micro-irrigation for selected irrigation projects in State. o Government of Maharashtra has adopted Piped Irrigation Network policy from Jan 2017, in which it is aimed to achieve 20 % increase in irrigation efficiency. Several projects are undertaken by the Government in order to supply water through piped net work. XVI. Rainwater Harvesting: o Maharashtra Govt. is implementing "Shivkalin Pani Sathawan Yojana", the scheme for augmentation the availability of water for Drinking and Domestic use and Strengthening of Drinking Water Sources by utilising Rainwater. o RRC has already requested to Water Resource Dept, GoM water shed management. All concerned local bodies located along the riverbanks are mandated to implement Water shed management, rain water harvesting, XVII. Demarcation of Floodplain and removal of illegal encroachments: Water resource Department and Local Bodies ensure Demarcation of Floodplain and removal of illegal encroachments. XVIII. Maintaining minimum e-flow of river: Rainwater Harvesting: RRC has already requested to Water Resource Dept, GoM for maintaining minimum E-flows the rivers. XIX. Plantation activities along the rivers: RRC has already requested to Water Resource Dept, GoM for plantation on both sides of the river. All concerned local bodies located along the riverbanks are mandated for plantation at both sides of the river and setting up biodiversity parks in their jurisdiction. XX. Development of biodiversity park: RRC has already requested to Water Resource Dept, GoM for setting up of biodiversity parks. All concerned local bodies located along the riverbanks are mandated for setting up biodiversity parks in their jurisdiction. XXI. Reuse of Treated Water: o Water resource department, GoM has prepared integrated State Water Plan, which includes recycling of Treated sewage. o MPCB has submitted Action plan for Utilization of Treated Sewage to CPCB, in which it is mandated to utilize treated sewage for different class of users like Thermal Power Plants, Industrial Units, Construction activities, non-potable municipal uses, Agriculture-Irrigation, etc. depending on its availability. o The Infrastructure Projects are mandated by MPCB to recycle 60% of treated sewage for secondary use by providing duel pipeline. 21

o The Local Bodies will be encouraged to reuse treated sewage for various purposes including construction and gardening. XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: GOM, has announced Namami Chandrabhaga Abhiyan on 18/03/2016 to revive and rejuvenate the river Chandrabhaga and to restore its historic glory. The aim of the Namami Chandrabhaga Abhiyan is to make the Chandrabhaga river pollution free and conserve its purity and sanctity up to year 2022 and others are as mentioned below:  To maintain the permanent minimum continuous flow of water in the river bed.  To construct weirs in the river bed for maintaining water level.  To maintain & keep minimum environmental flow of water.  To make available sufficient public bathrooms & toilets as well as mobile bio- toilets to the publics during Pandharpur yatras.  To install STP’s for treatment of domestic wastes and scientific disposal facilities for solid waste generated from the villages & cities located on the bank of Chandrabhaga river.  To carry out the beautification & forestation of river banks.  To make reuse/recycle of treated industrial water generated from the industries and industrial estates located in the catchment area of Chandrabhaga river.  As per the local need to work for public participation and development of pilgrimage area.

“Namami Chandrabhaga Pradhikaran” established under the Chairmanship of Hon’ble Chief Minister, GoM & Co-Chairmanship of Hon’ble Finance Minister, GoM, having Divisional Commissioner, Pune as Member Secretary.

“High Power Committee” established under the Chairmanship of Hon’ble Chief Secretary, GoM of Maharashtra having Divisional Commissioner, Pune as Member Secretary.

The Maharashtra Government intends to cleanse and make the holy river Chandrabhaga pollution free by the year 2022. XXIII. Status of Preparation of Action Plan by the 13 Coastal States: In compliance of the order dated 26/9/2019 passed by the Hon'ble NGT, Principal Bench, New Delhi in the matter of O.A. No. 360/2018 filed by Shree Nath Sharma V/s Union of , District Environment Plans for coastal Districts in Maharashtra State have been submitted to H’ble NGT and CPCB on 30.12.2019. Action Plan Comprises of Following- a. Waste management Plan b. Water Quality Management Plan c. Air Quality Management Plan, Mining Activity Management Plan d. Noise Action Plan 22

XXIV. Regulation of Mining Activities in the State/UT: All mining activities are regulated by issuing consent to Establish and consent to Operate along with post approval periodic monitoring of mining activities. All Coal mines are regulated by DGMS (Director General Mines and Safety), Dhanbad and other mines are regulated by Indian Bureau of Mines, Nagpur and Goa.

XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring:

MPC Board issued directions to 15 Municipal Corporations, 29 Municipal Councils and one Cantonment Board to provide adequate sewage treatment plant and to achieve the consented standards prescribed by MoEFCC, GoI and to implement short term and long term measures for treatment of sewage and restrict the discharge of untreated/partially treated sewage to the rivers.

In compliance with the Hon’ble NGT order dtd. 28.08.2019 in the matter of OA No. 593/2017 Paryavaran Suraksha Samiti v Union of India, the MPC Board has issued directions to 01 Mega city, 09 Million plus cities, 254 Class I cities/towns and 122 Nagar Panchayats as to why Environmental Compensation shall not be levied after the stipulated timeline.

23

Annexure-I River wise Gap Analysis in Sewage Generation & Treatment

Priority Sewage Gap in Timeline for Timeline for Sewage Gap in Capacity of Sr. Name of the CPCB Treatment Treatment Actual Stage of Under completion of completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Report Capacity Capacity Utilization construction STP STPs for current STPs for future drainage network (MLD) (MLD) STP (MLD) 2018 (MLD) (MLD) requirement. need.

1550 km sewer network 1) Chikhali Nalla 40% work of 32 MLD STP completed 210km sewer Nashik have 100% treatment 2) Gangapur Nalla for future requiremnt network work under progress capacity. Nashik Municipal 2 Municipal Corporation 3) Bardan phata Nalla. 290.00 360.00 0.00 290.00 0.00 32.00 NA proposed at Pimpalgaon Complied Sep-21 is 40% completed and All Sewage network line connected to Corporation 4) Someshwar Nalla. completed and will expected to complet March STP, Sump is pending the work will 5) Chopda Nalla Operational on Sept 21 2022 as informed by be complied by March 2022. representative NMC

North side Nalla - 1.Chunal Nalla 2.Bhimghat Nalla East 3.Shani Mandir Nalla. 4.Govardhan Ghat Nalla East 5. Govardhan Ghat Nalla Weast 6. Balgiri Nalla -1 7. Balgiri Nalla - 2 8. Gadipura Nalla Harijan Wasti 9. Gadipura Nalla Badi dargha There is gap of 13 MLD in sewage 10. Gadipura Habib Talkiz Excavation for Foundation treatment. Municipal corporation has DPR for renovation of existing 11. Sidhhi Ghat Nalla of Sewage Pumping station already installed 03 STPs of 132 Nalls, construction of newely 12. Killa Center Nalla Well is 75% completed MLDcapacity. But, to treat 10 MLD developed Nalls as well as 13.Killa East Nalla and the levelling of ground sewage coming from chunal Nalla, pollution free treatment 14. BurudGalli Nalla & materail collection for STP based on MBBR technology and Nanded Waghla stagnant water in 4 km of river 4 Municipal Corporation 15. NawGhat Nalla 70.00 132.00 0.00 57.00 13.00 10.00 stp work is in progress. Dec-21 Dec-21 with capacity of 10 MLD is under Municipal Corporation bank development and 16. Karbala Nalla STP based on MBBR construction on Chunal Nalla coimng plantation etc. of amount 77 17. Chouphala Nalla technology with 10 MLD from north side of city. Balnce 03 Cr. Is prepared and process of 18 Bialal nagar Nalla capacity. Likely Date of MLD sewage coimng from south side submission to Govt. is in 19 Kudbenagar Nalla Complition is 31 Dec. wil be diverted to extsing STP at progress. 20.Bhimghat Nalla weast 2021. Bondar. Pumpimng station is 21. Laxmi nagar Malli area proposed for the diversion. Nalla - 1 22. Laxmi nagar Malli area Nalla - 2 23. Laxmi nagar Malli area Nalla - 3

South side Nalla - 24 Vasarni Nalla - 1 25. Vasarni Nalla - 2 26. Saibaba Mandiar Nalla 27. Nawin pul Nalla 28. Vakaspur Nalla 29. Vrundawan Nalla

Construction of Vadavali STP is sanctioned under AMRUT PH-II project of Central Govt. Work order is awarded to agency and As said area is having less Construction of Vadavali STP is construction work is under 1) Neptune Nalla, population, under ground sanctioned under AMRUT PH-II progress. Amrut project 2) Balkrishna Paper Mill network is not proposed. project of Central Govt. Work order is Along Atale funding pattern is Central- 4 Kalu I Kalyan-Dombivali Municipal Corporation Nalla, 7.60 0.00 7.60 0.00 7.60 21.00 May-21 Sewage collection is proposed awarded to agency and construction village 35 %, State-15 %, ULB- 3) Shiv Mandir Nalla, by nalla intersection at Sewage work is under progress. Amrut 50%. Physical progress of 4) Balyani Nalla pumping station followed by project funding pattern is Central-35 STP 30 % . Proposed date treatment at STP %, State-15 %, ULB-50% of completion is May 2021. For the said STP, Sequential Batch Reactor technology (SBR) tenchology is proposed. River wise Gap Analysis in Sewage Generation & Treatment

Priority Sewage Gap in Timeline for Timeline for Sewage Gap in Capacity of Sr. Name of the CPCB Treatment Treatment Actual Stage of Under completion of completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Report Capacity Capacity Utilization construction STP STPs for current STPs for future drainage network (MLD) (MLD) STP (MLD) 2018 (MLD) (MLD) requirement. need.

Construction of STP of 8 MLD capacity and WSP compound. 144+134=278MLD will be diverted to existing STPs at Bandra and Ghatkopar by Dec-2023. Out of Total 286 MLD of Dry weather flow, the work of construction of STP of 8 MLD capacity from Filterpada to WSP Compound is in progress. Dry STP by Dec-2021 Powai to Mumbai Municipal Physical Progress – 70%. Weather Flow of 97 MLD (from WSP 6 Mithi I Municipal Corporation 1) Local Nallas 286.00 0.00 286.00 0.00 286.00 8.00 and Divesrion work Dharavi Corporation Financial Progress – 65% Compound to CST Bridge) and 37 by Dec-2023 MLD (from CST Bridge to Mahim Causeway) will be diverted to Bandra Treatment Zone through existing sewer network by proposing sewer interceptors, whereas, Dry Weather Flow of 144 MLD (from Bapat Nalla & Saphed Pool Nalla) will be diverted at Ghatkoapar WWTF through proposed Tunnel.

1) Khadki Nalla at Vidrupa river 2) Hingna Nalla 3) Khadan Nalla 4) Kailash tekdi 5) Nimwadi Nalla 6) Luxury Bus stand Nalla 7) Anicut Nalla 8) Kholeshwar nalla 9) Ganesh Ghat Nalla 10) Shalini Talkies Nalla 11) Savatram Nalla The civil construction work 12) Masum Shah baba of two STPs of capacity 30 The underground drainage Nalla MLD and 7 MLD scheme is designed for the 13) Mohata Mill Smashan respectively is completed. population left bak at old akola Nalla The commissioning of both city 2.27km and nalla intercept 14) najuk nagar Nalla the STPs was expected up (15No.), Right bak of morna 02 STPs of Capacity 37 MLD are 15) Naigaon nalla at to April, 2021. However, river length 10.93 km and nalla proposed. At present sewage Akola to Akola Municipal nagina masjid trust the work of express feeder 7 Morna I Municipal Corporation 27.60 0.00 27.60 0.00 27.60 37.00 …...... May-21 intercept 18 no., Bapu nagar to generation is 35 MLD. Takalijalam Corporation 16) River Junction for electricity required for Kharap length 1.91km nalla 45 MLD is projected value for next Naigaon Nalla the operation of STPs is interception 2 nos., ten years. 17. Shanawajpur Naigaon yet to be completed. The Construction of pumping Nalla said work is in progress. station with Wetwell at Old city 18. Najuk Nagar nalla Therefore, commissioning River Bak (Wet well at old city 19. Sidhatha nagar at of both these STPs is river bank) Idgah Nalla expected before 31 May 20. Rahul Nagar Harihar 2021. Peth nalla 21. Akkalkot Nalla 22. Khidki Pura Nalla 23. Takiya nagar nalla 24. Takiya Islampura Nalla 25. Kala maroti Nalla 26. Agar ves kala maroti nalla 27. Kumbhar wada dagadi Pul nalla

03 STPs with capacity 25. 15 & 10 MLD proposed and will be completed by 2023. Sewage generation from DPR prepared,project has Pune city is 744 MLD, destining 2 Bopodi to Pune Municipal 1) Botanical Garden been sanctioned by 8 Mula I Municipal Corporation 97.00 73.00 24.00 73.00 24.00 50.00 - 2023 STPs having capacity 567 MLD. MC Aundh Gaon Corporation Nallah in Pune City NRCD,Tendering Is in has proposed 11 STPs with capacity process. 396 MLD & Pune Cantonment Board has proposed one STP of capacity 20 MLD. River wise Gap Analysis in Sewage Generation & Treatment

Priority Sewage Gap in Timeline for Timeline for Sewage Gap in Capacity of Sr. Name of the CPCB Treatment Treatment Actual Stage of Under completion of completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Report Capacity Capacity Utilization construction STP STPs for current STPs for future drainage network (MLD) (MLD) STP (MLD) 2018 (MLD) (MLD) requirement. need.

03 STPs with capacity f 26, 28 & 33 are proposed & will be completed by 1)Warje nalla DPR prepared,project has 2023. Sewage generation from Pune 2)vadgaon bk nalla Shivaji Nagar to been sanctioned by city is 744 MLD, destining 2 STPs Pune Municipal 3) Hingne nalla 9 Mutha Khadakwasla I Municipal Corporation 151.00 94.00 57.00 94.00 57.00 87.00 NRCD,Tendering Is in 2023 having capacity 567 MLD. MC has Corporation 4)Erandwana nalla Dam process. Optional technology proposed 11 STPs with capacity 396 5)Nagzari nalla as per bidders choice MLD & Pune Cantonment Board has 6)Ambil odha nalla proposed one STP of capacity 20 MLD.

05 STPs with capacity of 127, 75, 30, 20, & 7 MLD have been proposed & DPR prepared,project has 1) Keshavnagar Nalla will be completed by 2023. Mula- Theur to been sanctioned by Pune Municipal 2) Nalla at Bhapkar Mala Mutha is formed after confluence of 10 Mula-Mutha Mundhwa II Municipal Corporation 496.00 400.00 96.00 400.00 96.00 259.00 NRCD,Tendering Is in 2023 Corporation 3) Rangicha Odha at rive Mula and Mutha rivers. Mula- Bridge process. Optional technology Bhapkar Mala Mutha pollution abetment (Jica) shall as per bidders choice be completed by 2023. Gap in the treatment capacity is 267 MLD.

1) Ravet Nalla Near Ravet STP 2) Garware Nalla Near Bhatnagar 3) DPR prepared for Kalasagar Nalla Augmenation of 30 MLD Proposed STP – Intercepted Sewer along the PCMC 4) Chinchwad Nalla Near Dapodi to Pimpri-Chinchwad Bahtnagar STP to 45 MLD. 15 MLD at side bank of river is in progress. 16 Pawana II Municipal Corporation SBR 30 MLD STP 205.80 260.00 0.00 205.80 0.00 15.00 Apr-22 Ravet Municipal Corporation DPR prepared and chinchwad Augmentation of STPs Work under 5) Gavade Colony Nalla submitted to Technical Bhatnagar progress at Pimpri Chinchwad Near Manikbag Committee for sanction. (Chinchwad Staion Nalla Nearby Bombay Selection) 1) Ravet Nala Near Ravet STP 2) Garware Nala Near Bhatnagar 3) Kalasagar Nala Work was stoped and 4) Chinchwad Nala Near Preparation of proposal for structure demolished by Work was stoped and structure Moshigaon to Pimpri-Chinchwad 17 Indrayani II Municipal Corporation SBR 30 MLD STP 88.20 73.00 15.20 73.00 15.20 12.00 STP out side of Blue line is NGT Order but work is Apr-22 demolished by NGT Order but work Alandigaon Municipal Corporation 5) Gavade Colony Nala under prgress started on alternative land is started on alternative land parcle. Near Manikbag parcle. (Chinchwad Staion Nala Near by Bombay Selection) 3 6) Nala Near Sandvik

03 STPs having capacity of 59.7 1) Sheri Nalla, Sangli. MLD (27, 9.2 & 23.5) are in operation 2) Sidharth Nagar Nalla, Total 164.9 KM sewer line is with actual utilization of 52.2 MLD ( Shindi to Sangli. STP is under construction. 34 Krishna III Sangli Miraj Kupwad Municipal Corporation 68.00 59.70 8.30 49.20 18.80 22.50 May-21 proposed out of that 116.5 KM 23.5 MLD STP at Hanuman Nagar is Kurundwad 3) Haripur Nalla, Sangli. 100% work is completed wok completed operating at 16 MLD)One STP of 4) Miraj Nalla, Miraj capacity 22.5 MLD STP is under 5) Other Major drain construction at Bedag Road,

1) Drain from Village Narayanpur 2) Drain from Village Bhatkuli 3) Amba Nalla from DPR preparation under progress for Amravati City DPR Prepard by MJP 02 STPs (16 + 12 MLD) at Amravati. Narayanpur to Amravati Municipal 4) Frizapura Nalla Amravati and submitted to Timeline not 43 Pedhi III Municipal Corporation 71.05 74.50 0.00 71.05 0.00 28.00 Bhatkuli Corporation 5) Prashant Nagar Nalla Higher Authorities of MJP for provided 34.5MLD for future expanction. land 6) Minor Nalla necessary approvals acquisition for STP is in process. 7) rathi nagar 8) Retigaon nalla 9) Nawethe nalla 10) Bhartiya Mahavidya Nalla STP Work has been started at site of work at Gat No.413,390 Jalgaon Malegaon to 1) Local nalla coming Construction of 48 MLD 62 Girnna IV Jalgaon Municipal Corporation 48.00 0.00 48.00 0.00 48.00 48.00 Aug-21 NA Shiwar having capacity of 48.00 Jalgaon from the Jalgaon city STP is started. MLD. FSTP of capacity 20 KL/Day is provided. River wise Gap Analysis in Sewage Generation & Treatment

Priority Sewage Gap in Timeline for Timeline for Sewage Gap in Capacity of Sr. Name of the CPCB Treatment Treatment Actual Stage of Under completion of completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Report Capacity Capacity Utilization construction STP STPs for current STPs for future drainage network (MLD) (MLD) STP (MLD) 2018 (MLD) (MLD) requirement. need.

06 STPs with capacity 145 MLD have been proposed.

60 MLD STP was granted and sanction. Revised DPR of proposed Length of sewage network - 46km 06 nos of STP having 170 Cr sanction from Govt. MJP for investment of Rs. 1232 Cr 60 MLD STP and Gap will address Pelhar Dam to 1) Sopara Nalla, was send to State Govt and Length of sewage network - 67 Pelhar IV Vasai Virar Municipal Corporation 105.00 30.00 75.00 30.00 75.00 145.00 -- Mar-22 15MLD. State Govt. accorded its Golani Naka 2) Tungar Nalla, State Govt. submutted for 46km. approval to JNNURM-UIDSST for 3) Waliv Nalla. further approval to Central Augmentation of Water Supply and Govt. Yet appproval not Under Ground Sewarage System of received. VVCMC and further recommended to Ministery of UDD of Govt. of India.UDD has directed to JNNURM- UIDSST to forward the above proposals to Govt. of India vide letter dtd. 17/02/2014.

1) 10 % work SBR PCC 2 STPs provided with treatment and compund wall is capacity of 75 MLD and 15 MLD Solapur to Degaon 15.5 MLD STP plan 68 Sina IV Solapur Municipal Corporation 1) Degaon Nalla. 90.00 92.00 0.00 62.73 27.27 35.50 completed at desai nagar Jun-21 respectively. 02 STPs proposed 1) Bankalagi survey under process 20 MLD STP desai nagar 20 MLD 2) Degaon 15.5 MLD

02 Nos of STPs with Capacity (40+32 MLD) 72 MLD have been Budget 139 Cr Sanctioned. proposed. 50%-GOI, 25%-GOM & The Latur Corporation provided water 25%-MC. Work Order once in a 15days at a tune of Latur to Latur Municipal 75 Manjara V Municipal Corporation 1) Siddheshwar Nalla 30.00 0.00 30.00 0.00 30.00 72.00 Issued dated 5th March Mar-22 30Million litre approximately water Nanded Bridge Corporation 2021. 5% work completion, supply is 2MLD. designing and drawing River Manjra is 7 km away from Latur submitted city, except monsoon water never meet to the river, it is being used by the farmers.

1) Lakshtirth Nall 2) Jayanti Nalla 3) Dudhali Nalla 4) Jamdar Club Nalla 5) Siddharth Nagar Nalla 6) CPR hospital Nalla 7) Rajhans Nalla !) STP- Dudhali- 6 MLD- 8) Ramanmala Nalla 10% work completed Work of balance 5 nallas 9) Dream World Nalla (foundation) (2) STP- Temprory measures by means of Shirol to diversion work to STP in 76 Panchganga V Kolhapur Municipal Corporation 10) Line Bazar Nalla 96.00 93.00 3.00 91.00 5.00 10.00 Kasaba Bavad- 4 MLD, Dec-21 bleeching powder dosing manually Kolhapur progress and expected 11) Kasaba Bavada Nalla 55% work completed and traditional Phytoremidation. to be completed by May 2021. 12) Bapat Camp Nalla Project is under Amrut 13) Kala Odha Nalla Yojana, Centrl Govt. 14) Gandhinagar Nalla 15) Valiwade Nalla 16) Tilawani/Rui Nalla 17) Hupri Nalla 18) Shirdhon Nalla 19) Shirol Nalla

Proposed sewerage network of Total sewage network length 147.56 Km, will be completed by May- 52% Undergroung from 6 major nalla is 26km 2021 AMRUT Budget 163Cr. drainage, 45% 1. Moti Nalla - 6km 1. Moti Nalla construction work of 40 2. Hagara Nalla- 3km Approved fund allocated Funding 2. Hagara Nalla MLD STP is complited 3. Sushi Nalla- 4km details- Varkhede to 3. Sushi Nalla And 42 % construction 4. Londhi Nalla- 4km GOI-65.76 Cr, 79 Panzara V Dhule Municipal corporation 36.00 0.00 36.00 0.00 36.00 57.00 Dec-21 Dhule 4. Londhi Nalla work of 17 MLD STP is 5. G.T.B Nalla- 3km GoM 32.88 Cr. & 5. G.T.B Nalla complited 6. Hamal Nalla- 5km ULB/MC-32.88 Cr. 6. Hamal Nalla Technology- SBR Sewage gen. 30MLD Total 131.62Cr. Funding details- Amrut Mission. Proposed sewerage Network of Amrut Mission implimentation Agency drain 147.56km maharshtra Jeevan pradhikaran Dhule. River wise Gap Analysis in Sewage Generation & Treatment

Priority Sewage Gap in Timeline for Timeline for Sewage Gap in Capacity of Sr. Name of the CPCB Treatment Treatment Actual Stage of Under completion of completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Report Capacity Capacity Utilization construction STP STPs for current STPs for future drainage network (MLD) (MLD) STP (MLD) 2018 (MLD) (MLD) requirement. need.

1) Vadol STP Capacity- Gap in treatment capacity is 20.70 MLD Commission. 2) 46.3MLD. Ulhasnagar MC has total Shantinagar STP capacity- 04 STPS with capacity of 74.96 MLD. 31.26 MLD 95%work Kalyan to and date of copletion completed.3) Khemani STP 91 Ulhas V Ulhasnagar Municipal Corporation 1) Local nallas 67.00 20.70 46.30 20.70 46.30 54.26 Aug-21 1 STP - 20.7 MLD Badlapur August 2021 Dec-2020 4) SBR 2 STP - 15 MLD sequencing batch reactor. 3 STP- 31.26 MLD 8MLD Khadegovili STP- 4 STP-8 MLD proposed for future Work order given to agency on dated 18.5.2020 River wise Gap Analysis in Sewage Generation & Treatment

Priority Sewage Gap in Timeline for Timeline for Sewage Gap in Capacity of Sr. Name of the CPCB Treatment Treatment Actual Stage of Under completion of completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Report Capacity Capacity Utilization construction STP STPs for current STPs for future drainage network (MLD) (MLD) STP (MLD) 2018 (MLD) (MLD) requirement. need.