National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For the State of Overall status of the State: I. Total Population: Urban Population & Rural Population separately:

Rural: 6,15,45,441, Urban: 5,08,27,531

II. Estimated Sewage Generation (MLD): 9758

III. Details of Sewage Treatment Plant:  Existing no. of STPs and Treatment Capacity (in MLD): 142 STPs with treatment capacity of 7747 MLD (3532.95 MLD Existing and 4214.29 ongoing)  Capacity Utilization of existing STPs: 4207 MLD  MLD of sewage being treated through Alternate technology: Faecal Sludge Treatment Plant- 15 FSTPs have been installed along polluted river stretches, with total capacity of 290 KLD.  Gap in Treatment Capacity in MLD: 2011  No. of Operational STPs:135  No. of Complying STPs: 101  No. of Non-complying STPs: 34

53 Rivers in Priority I - 9, II - 6, III - 14, IV - 10, V - 14. • MPR received for January, February, March, April, May, June, July, August, September, October, November and December 2020. • Total sewage generation in PRS – 2728.65 MLD • No. of STPs-73 • Sewage treatment existing in PRS – 1961.40 MLD • Gap in Treatment Capacity-767.25 • Capacity Utilization - 1637.57 MLD • STPs proposed/ ongoing – 1297.96 MLD (Details provided in the MPR) (Pls refer Annexure-I for river wise progress of STP work)

1

Details of each existing STP in the State

Sewage Status Compliance Treatment (Operational / Present Status Location of the Plant (STP) Sr. Name of the Town Non- capacity/ (Comply / Sewage Treatment Installed No. with no. of STP Operational / utilization Non-Comply / Plant (STP) Capacity Under (MLD) Partially (MLD) STP Construction) Comply) wise Colaba WWTF Nr Municipal Afgan Church Colaba 1. Corporation of 37 Operational 22.51 Comply Mumbai -05 Greater Mumbai Tel No.22150723 LGP WWTF-IPS Municipal 89,Dr.A.B. Road Worli 2. Corporation of 757 Operational 374.78 Non-Comply Mumbai 18. Greater Mumbai Tel No.24933697 Malad STP Municipal Marve Road, Mith 3. Corporation of Chawky, Malad (W), 240 Operational 216.06 Non-Comply Greater Mumbai Mumbai-95 Tel : 28820860 Charkop STP Municipal MHADA, Sector 8 & 9, 4. Corporation of Kandivali(W), 6 Operational 4.28 Non-Comply Greater Mumbai Mumbai- 400067 Tel : 28681357 Bhandup WWTF Off eastern Express Municipal Highway Near Airoli 5. Corporation of 280 Operational 141.48 Comply Bridge Traffic Signal Greater Mumbai Bhandup East Tel No. 8286226994 Ghatkopar WWTF Off eastern Express Municipal Highway 6. Corporation of Near Pant Nagar 386 Operational 151.7 Non-Comply Greater Mumbai Traffic Signal Ghatkopar East. Tel No. 9082820120 Versova STP J.P. Municipal Road Jn.,Link Road, 7. Corporation of Near Apnana Bazar, 180 Operational 108 Comply Greater Mumbai Andheri (W), Mumbai- 53 Tel : 26366881 Influent Pumping Station Bandra, Opp Swami Vivekanand Municipal Garden, Mahim 8. Corporation of 797 Operational 531 Comply Causway, Mahim Greater Mumbai (West), Mumbai 400016.Tel. No. 24464750 Municipal TMC STP Kopri, 9. 120 Operational 70 Comply Corporation Thane

Thane Municipal TMC STP Mumbra, 10. 32 Operational 12 Comply Corporation Thane

Thane Municipal TMC STP Vartak 11. 0.9 Operational 0.25 Comply Corporation Nagar

2

Thane Municipal 12. Vitava 8.4 Operational 2.5 Comply Corporation

Non-Operational Thane Municipal 13. Kharegoan 46.76 (Commissioning NA NA Corporation under progress)

Thane Municipal 14. Everest World, Kolshet 23.06 Operational 5 Comply Corporation Thane Municipal 15. Lodha 22.02 Operational 5 Comply Corporation

Non-Operational Thane Municipal 16. Nagla Bunder 7 (Commissioning NA NA Corporation under progress)

Non-Operational Thane Municipal 17. Hiranandani 59 (Commissioning NA NA Corporation under progress)

Mira- Bhaindar Bhayander (W) near 18. Municipal 8 Operational 8 Comply Garden Court Tower Corporation Mira- Bhaindar Golden Nest Road, 19. Municipal 12 Operational 12 Comply Bhayander (E) Goddev Corporation Mira- Bhaindar Kanakia, Mira Road 20. Municipal 17 Operational 17 Comply (E) Corporation Mira- Bhaindar Shanti Park - Mira road 21. Municipal 13 Operational 13 Comply - Sanghavinagar Corporation Mhada- shanti garden- Mira- Bhaindar Mira 22. Municipal 7 Operational 7 Comply Penkarpadagavthan Corporation (Mhada Colony) Mira- Bhaindar Shanti nagar Mira road 23. Municipal station, Near 11 Operational 11 Comply Corporation ayappamandir, Ghodbunder- Mira- Bhaindar Kashigaon, 24. Municipal Mashachhapada 14 Operational 14 Comply Corporation Bhayander, Survey No. 233 Mira- Bhaindar 25. Municipal Jesal park 2 Operational 2 Comply Corporation Mira- Bhaindar Shrushti complex, Mira 26. Municipal 1.5 Operational 1.5 Comply Road Corporation Vasai-Virar Bolinge Village STP - 27. Municipal 30 Operational 19 Comply 2, Corporation Kalyan Dombivali 28. Municipal Adharwadi 25 Operational 21 Comply Corporation Kalyan Dombivali 29. Municipal Barave 15 Operational 11 Comply Corporation

3

Kalyan Dombivali 30. Municipal Motagaon 40 Operational 4 -- Corporation Kalyan Dombivali 31. Municipal Chinchpada 40 Operational 15 Comply Corporation Kalyan Dombivali Manda Titwala 2.0 32. Municipal 2 Operational 1 Comply MLD.(E) Corporation Kalyan Dombivali Manda Titwala 1.0 33. Municipal 1 Operational 0.5 Comply MLD (W) Corporation Bhiwandi Nizampur 34. Katai-1 13 Operational 13 Comply Municipal Corporation Bhiwandi Nizampur 35. Katai-2 17 Non-Operational - NA Municipal Corporation Ambernath 36. Vadalgaon STP 45 operational 22 Comply Municipal Council

Ambernath 37. Chikloli STP 9 Operational 6 Comply Municipal Council

Kulgaon Badalapur 38. Badlapur STP 22 Operational 20 Comply Municipal Council Ulhasnagar 39. Municipal Vadholgaon 20.7 Operational 20.7 Comply Corporation Navi Mumbai 40. Municipal Sec-12 C.B.D. 19.00 Operational 12.00 Comply Corporation Navi Mumbai 41. Municipal Sec-50, Nerul 100.00 Operational 40.00 Comply Corporation Navi Mumbai 42. Municipal Sec-18, Vashi 100.00 Operational 40.00 Comply Corporation Navi Mumbai 43. Municipal Sec-20, Sanpada 37.50 Operational 18.00 Comply Corporation Navi Mumbai 44. Municipal Sec-15, Ghansoli 30.00 Operational 10.00 Comply Corporation Navi Mumbai 45. Municipal Sec-14, Koparkhairane 87.50 Operational 45.00 Comply Corporation Navi Mumbai 46. Municipal Sec-18, Airoli 80.00 Operational 35.00 Comply Corporation Panvel Municipal Bandar Road, Panvel, 47. 14 Operational 12 Comply Corporation Dist. Raigad. Sector-16, Kharghar, Panvel Municipal 48. Tal. Panvel, Dist. 25 Operational 23 Comply Corporation Raigad.

4

Sector-16, Kharghar, Panvel Municipal 49. Tal. Panvel, Dist. 70 Operational 63 Comply Corporation Raigad. Sector-32, , Kamothe, Panvel Municipal 50. Tal. Panvel, Dist. 85 Operational 79 Non-Comply Corporation Raigad.

Sector-12,Kalamboli, Panvel Municipal 51. Tal. Panvel, Dist. 50 Operational 47 Comply Corporation Raigad.

Panvel Municipal Sector-06, Ulwe, Tal. 52. 32 Operational 26 Comply Corporation Panvel, Dist. Raigad.

Kalundre, Kalundre Panvel Municipal 53. Gaon, Panvel, Navi 2 Operational 1.7 Comply Corporation Mumbai

Panvel Municipal 54. CIDCO Karanjade 28 Operational 15 Comply Corporation Nashik Municipal 55. Chehedi STP 22 Operational 22 Non-Comply Corporation Nashik Municipal 56. Chehedi STP 21 Operational 21 Non-Comply Corporation Nashik Municipal 57. Panchak 7.5 Operational 7.5 Non-Comply Corporation Nashik Municipal 58. Panchak 21 Operational 21 Non-Comply Corporation Nashik Municipal 59. Panchak 32 Operational 32 Non-Comply Corporation Nashik Municipal 60. Tapvan 78 Operational 78 Non-Comply Corporation Nashik Municipal 61. Tapvan 52 Operational 52 Non-Comply Corporation Nashik Municipal 62. Agar Takali 70 Operational 70 Non-Comply Corporation Nashik Municipal 63. Agar Takali 40 Operational 40 Non-Comply Corporation Nashik Municipal Municipal STP 64. 18 Operational 15 Non-Comply Corporation Gangapur Tryambakeshwar Municipal Council 65. 1 Operational 1 Non-Comply Municipal Council Tryambak Municipal Council - Shirpur Municipal 66. Shirpur, Tq Shirpur 12.5 Operational 8.64 Comply Council Dist Dhule Municipal Council - Nandurbar 67. Nandurbar, Tq and Dist 17.5 Operational 9.3 Comply Municipal Council Nandurbar Shirdi Shirdi, Tal-- Rahata, 68. 16 Operational 9 Comply Nagarpanchyat Dist- Ahmednagar

Pune Municipal Erandwane STP, 69. 50 Operational 50 Comply corporation S.No.3&4 Erandwane Bopodi STP, S.No.2A, Pune Municipal 70. 2B, 2C, 2D &6 (P) 18 Operational 15 Comply corporation Bopodi

Pune Municipal Tanajiwadi S.No.24, 71. 17 Operational 13 Non-Comply corporation Shivajinagar

5

Bhairoba STP, Final Pune Municipal 72. plot No.330 S.No.33A, 130 Operational 80 Comply corporation 33B Koregaon Park Mundhawa STP, Pune Municipal 73. S.No.2,3A,4 45 Operational 42 Comply corporation Mundhawa Pune Municipal Vithalwadi STP, 74. 32 Operational 25 Comply corporation S.No.20(P) Hingane Non-Operational Old Naidu STP, (STP of capacity Pune Municipal S.No.439 To 444 Pune 75. 90 of 127 MLD is NA NA corporation final Plot No. 98 proposed at this Knndy Road STP) Pune Municipal Baner STP, S.No.221 76. 30 Operational 30 Comply corporation To 227 Baner Pune Municipal Kharadi STP, S.No.74, 77. 40 Operational 40 Comply corporation 75 Kharadi New Naidu STP, Pune Municipal S.No.439 To 444 Pune 78. 115 Operational 115 Comply corporation final Plot No. 98 Knndy Road Baramati Gunawadi Road, 79. 11.5 Operational 11.5 Comply Munucipal council Baramati Non-Operational Daund Municipal Daund Municipal (Maintanance 80. 4.2 0 NA Council Council STP work under progress) Saswad Municipal Saswad Municipal 81. 2 Operational 2 Non-Comply Council council STP Non-Operational (existing STP is dismanteled for Capacity Lonavala Dongar Gaon, 82. 3.6 capacity NA enhancement Municipal Council Lonavala enhancement to under progress the tune of 6 MLD) Shirur Municipal Sr. No. 269, Sonar Ali, 83. 6 Operational 2.5 Comply Council Shirur Pune Cantonment 900 Boottee Street, 84. 20 Operational 9 Comply Board Pune-! Gaddi Adda, Ward No. Khadaki 85. Tamela Chawl, 8 Operational 6 Non-Comply Cantonment Board Khadaki. East Khadali, Near Khadaki 86. Lokmanya Tilak 1.2 Operational 1.2 -- Cantonment Board Highschool Pimpri Chinchwad 87. Municipal Chikhali Phase I 16 Operational 26.33 Comply Corporation Pimpri Chinchwad 88. Municipal Chikhali Phase II 16 Operational Comply Corporation Pimpri Chinchwad Chinchwad Phase I 89. Municipal 30 Operational 28.9 Comply (Bhatnagar) Corporation Pimpri Chinchwad 90. Municipal Chinchwad Phase II 30 Operational 28.08 Comply Corporation

6

Pimpri Chinchwad 91. Municipal Phase I 10 Operational 6.031 Comply Corporation Pimpri Chinchwad 92. Municipal Kasarwadi I 40 Operational 85.312 Comply Corporation Pimpri Chinchwad 93. Municipal Kasarwadi II 40 Operational Comply Corporation Pimpri Chinchwad 94. Municipal Kasarwadi III 40 Operational Comply Corporation Pimpri Chinchwad 95. Municipal Pimple Nilekh 20 Operational 18.741 Comply Corporation Pimpri Chinchwad 96. Municipal Ravet 20 Operational 12.547 Comply Corporation Pimpri Chinchwad 97. Municipal Akurdi 30 Operational 26.514 Comply Corporation Pimpri Chinchwad Sangvi Phase II 98. Municipal 20 Operational 13.774 Comply (Dapodi) Corporation Pimpri Chinchwad 99. Municipal Chahroli Phase I 21 Operational 20.362 Comply Corporation Pimpri Chinchwad 100. Municipal Chahroli Phase II 20 Operational 14.30 Non-Comply Corporation Solapur Municipal 101. Corporation Degaon STP 75.00 Operational 52.12 Comply Solapur Municipal 102. Corporation Kumathe STP 12.50 Operational 5.39 Comply Solapur Municipal 103. Corporation Pratap Nagar STP 15.00 Operational 5.22 Comply

Compartment no. 79(City Survey no.257/1) behind Mahabaleshwar 104. Karmachari Vasahat, 4 Operational 2 Comply Municipal Council At-Mahabaleshwar, Tal-Mahabaleshwar, Dist-Satara at Survey No.626, near Dhobi Ghat,At- Mahabaleshwar 105. Mahabaleshwar, Tal- 1 Operational 0.5 Comply Municipal Council Mahabaleshwar, Dist- Satara Survey No. 83/2 near Siddharthnagar,At- Panchagani 106. Panchgani, Tal- 0.65 Operational 0.65 Comply Municipal Council Mahabaleshwar, Dist- Satara Plot no. 497/4 & 5 near Shivajinagar,At- Panchagani 107. Panchgani, Tal- 0.35 Operational 0.35 Comply Municipal Council Mahabaleshwar, Dist- Satara

7

Hindu Crematorium,At- Panchagani 108. Panchgani, Tal- 1.5 Operational 1.5 Comply Municipal Council Mahabaleshwar, Dist- Satara

Karad Municipal Bara Dabari, Karad, 109. 12.5 Operational 9.5 Comply Council Tal-Karad, Dist-Satara

Malkapur A/p-Malkapur Tal 110. 5 Operational 5 Comply Municipal Council Karad Dist-Satara Malkapur ,A/p-Malkapur Tal 111. 3 Operational 3 Comply Municipal Council Karad Dist-Satara Pandharpur STP 112. 15.5 Operational 12 Comply Municipal Council Gopalpur,Pandharpur Pandharpur STP, 65 113. 2.5 Operational 0.5 Comply Municipal Council Acre,Pandharpur

Kolhapur Kolhapur Municipal Municipal Corporation STP ( 76 114. 76 Operational 55 Comply Corporation, MLD )Kasaba Bavada, Kolhapur Kolhapur

Kolhapur Kolhapur Municipal Municipal Corporation STP ( 17 115. 17 Operational 17 Comply Corporation, MLD )Dudhali, Kolhapur Kolhapur Sangli Municipal Dhulgaon STP 27 116. 27 Operational 27 Complied Corporation MLD (Oxidation pond)

Sangli Municipal STP at Miraj-9.2 MLD 117. 9.2 Operational 9.2 Complied Corporation (Oxidation pond)

Hamumannagar STP Sangli Municipal 100 Footy road( 118. 23.5 Operational 13 Non-Comply Corporation Commising date- 23/7/2018)

Ichalkaranji Municipal Council ( STP 18 MLD 119. 20 Operational 14 Comply Municipal Council ) Old Sangli Naka, Ichalkaranji

Aurangabad Kanchanwadi, 120. Municipal 161 Operational 60 Comply Corporation Aurangabad 121. Municipal Padegaon 10 Operational 5 Comply Corporation Aurangabad 122. Municipal Salim Ali Lake 5 Operational 4 Comply Corporation Aurangabad 123. Municipal At Zalta, 35 Operational 15 Comply Corporation Nanded Waghala 124. Municipal Elichpur 30 Operational 12 Non-Comply Corporation

8

Nanded Waghala 125. Municipal Bondar 87 Operational 35 Non-Comply Corporation Nanded Waghala 126. Municipal Sangvi 15 Operational 10 Non-Comply Corporation Nagpur Municipal 127. Bhandewadi 200 Operational 200 Comply corporation Nagpur Municipal 128. Bhandewadi 130 Operational 130 Comply corporation Nagpur Municipal 129. Mankapur 5 Operational 5 Comply corporation Nagpur Municipal 130. Mokshadham 5 Operational 5 Comply corporation Nagpur Municipal 131. Kachimet (NIT) 1 Operational 1 Comply corporation Nagpur Municipal 132. Sonegaon (NIT) 0.3 Operational 0.3 Comply corporation Nagpur Municipal 133. Hazari Pahad (NIT) 4 Operational 4 Comply corporation Nagpur Municipal Somalwada-1(Ongoing 134. 20 Operational NA …. corporation work by NIT) Nagpur Municipal 135. Dabha(NIT) 5 Operational NA …...... corporation Amravati 136. Municipal STP-1 –Lalkhadi, 44.0 Operational 44 Comply Corporation Amravati 137. Municipal STP-2-Lalkhadi 30.5 Operational 30.5 Comply Corporation S.No. 752/1, Shegaon Municipal 138. Charmori, Shegaon, 7 Operational 3.5 Non-Comply Coundil Dist.-Buldana Opposite to Chamunda Municipal Council 139. Devi Mandir, 8 Operational 4 NA Washim Nimazaga Washim Chandrapur 140. Municipal Pathanpura 45 Operational 24 Complied Corporation Chandrapur 141. Municipal Rehmat Nagar 25 Operational 22 Non-Comply Corporation Chandrapur 142. Municipal Azad Garden 0.5 Operational 0.5 Non-Comply Corporation

Details of under construction STPs along the Polluted River Stretches

Capacity Status of I&D or Sr. Name of the of the Physical Progress House sewer Completion No. City/Town Location plant in in % connections Timeline MLD 1550 km sewer network completed 210km sewer network Nashik Municipal STP work under progress is March-21 1. Municipal Pimpalgaon, 32 40% work completed 40% completed and Corporation Baswant expected to complet March 2022 as informed by 9

representative NMC

Municipal Corporation of WSP Compound 8 70% work completed May-21 2. Greater Mumbai The underground drainage scheme is designed for the population left bak at old akola city 2.27km Shiloda 30 and nalla intercept (15No.), Right bak of The civil construction length Akola work of both these 10.93 km and nalla 3. February-21 Municipal STPs is completed up intercept 18 no., Bapu Corporation to 95% nagar to Kharap length 1.91km nalla interception 2 nos.,

Construction of 4. PDKV 7 pumping station with Wetwell at Old city River Bak (Wet well at old city river bank) Work was stopped and Pimpri structure demolished by 5. Chinchwad Proposed STP 12 NGT Order, but work is April-22 Municipal started on alternative Corporation land parcel. Sangli Miraj Total 164.9 KM sewer SMKC Bedag road line is proposed out of 6. Kupwad 22.5 75% work is completed February-21 Municipal Miraj that 116.5 KM wok Corporation completed Pili Mazid 7. Bhimnagar Ward, 10 Hinganghat. Hinganghat 100% Civil work March-21 Municipal completed. Council Hinganghat 3 8. Municipal Council

Excavation work is Gat No.413,390 48 completed. Civil work August-21 9. Municipal Jalgaon Shiwar Corporation is not yet started. Drainage network work Pachora Municipal 9 80% work completed is under progress. March-21 10. Municipal Council STP Council Kolhapur Municipal Corporation STP ( 6 10% work completed Kolhapur 6 11. MLD ) Bawda, (foundation Municipal Kolhapur Corporation, March-21 Kolhapur Municipal Kolhapur Corporation STP ( 4 4 55% work completed 12. MLD ) Dudhali, Kolhapur Ichalkaranji The work had begun. Ichalkaranji Municipal Council ( Funds of Rs. 82.60 18 Mar-21 13. Municipal STP 18 MLD crore have been Council )Ichalkaranji STP sanctioned from 10

Takawade UIDSSMT scheme. But at present the work is stopped due to legal issues.

Ulhasnagar 95%work completed 14. Municipal Shanti Nagar-1 15 Corporation

Ulhasnagar 90 % Khemani STP 15. Municipal Shanti Nagar-2 31.26 Aug-21 Corporation

Work order given to Ulhasnagar 16. Municipal Khadegovili STP 8 contractor Corporation Work awarded and Funds are available Right Bank at Survy however contractor has Roha No. 128/3A at Vill. 1 Mar-22 Municipal Ashtami, about 120 not yet started the Council construction work due 17. mtrs. away from Kundalika River. to GST issue. Excavation for Foundation of Sewage Nanded Pumping station Well is 18. Waghala Chunal Nalla 10 75% completed and the Dec-21 Municipal levelling of ground and Corporation other miscellaneous works are in progress.

As said area is having less population, underground network is Work order is awarded not proposed. Sewage Kalyan to agency and Dombivali collection is proposed 19. Vadavali STP 21 construction work is May-21 Municipal by nalla intersection at under progress Corporation Sewage pumping station followed by treatment at STP

40% work of main Work order for STP is drainage line has been just awarded to Gadchiroli Bormala Road, completed. The work of 20. Municipal 11.5 contractor. Foundation Oct-21 Gadchiroli internal drainage is yet Council work is just started. to start.

Khalapur Khalapur Nagar Work completed up to 21. 3 Mar-22 Nagar Panchayat STP PCC level. Panchayat Total Sewage network length is 80km, till date Amalner Municipal 22. 12.6 8% work completed Jul-21 Municipal Council STP work completed is Council 21km.

Dhule Dhule Municipal 23. 17 Municipal Corporation STP 10% STP construction 20% Underground Corporation completed drainage, completed Mar-21 Dhule Municipal 24. Dhule 40 Municipal Corporation STP 11

Corporation Drainage pipeline of Near Solid Waste Ballarpur 54.09 kms is proposed 25. Municipal Management Plant, 7.5 Survey No. 22 Work Order for STP in the zone-I of Council awarded and Ballarpur City. Zone-II excavation work in of Ballarpur City is Oct-21 Ballarpur Visapur Road, under progress having old drainage 26. 8.5 Municipal Survey No. 86/2 network & same will be Council utilized.

1.Hendrepada nalla- 2.5km Kulgaon Kulgaon Badalapur 2. Joveli nalla- 1km 27. Badalapur Municipal Council 12 Municipal Proposed STP 3. Eramjad nalla- Council Preliminary works in 550mtr. progress - Cleaning, survey, design, trial 4. Badlapur gaon nalla- Dec-21 bore etc 1.5km Kulgaon Kulgaon Badalapur 5. Sonivali Nalla- 28. Badalapur Municipal Council 10 700mtr. Municipal Proposed STP Council 6. Near WTP barrage road nalla-2km

Details of Proposed STPs in the State

Status of Project (at Capacity of Likely DPR Stage/ Under Name of the Town with no. the STP Date of Sr. Tendering/ of STP Location proposed in Completio No. Work to be Awarded) MLD n

Municipal Corporation of Worli STP, 1. 500 Proposed Mar-26 Greater Mumbai MCGm, Mumbai

Municipal Corporation of Bandra STP, 2. 360 Proposed Mar-26 Greater Mumbai MCGM, Mumbai

Municipal Corporation of Dharavi STP, 3. 418 Proposed Mar-26 Greater Mumbai MCGM, Mumbai Municipal Corporation of Ghatkopar STP, 4. 337 Proposed Mar-25 Greater Mumbai MCGM, Mumbai Municipal Corporation of 5. Versova 180 Proposed Mar-25 Greater Mumbai Municipal Corporation of 6. Bhandup 215 Proposed Mar-25 Greater Mumbai Municipal Corporation of Malad STP, 7. 454 Proposed Mar-27 Greater Mumbai MCGM, Mumbai

Mira- Bhaindar Municipal 8. Bhayander West 8 Proposed Corporation

Mira- Bhaindar Municipal 9. Kharigaon 13 Proposed Corporation

12

Vasai-Virar Municipal 10. Chikhal dongri 13 Proposed Corporation Vasai-Virar Municipal Nalla sopara 11. 30.5 Proposed Corporation (East) Vasai-Virar Municipal Nalla sopara 12. 49 Proposed Corporation (West) Vasai-Virar Municipal Navghar 13. 7.1 Proposed Corporation Manikpur Vasai-Virar Municipal Navghar 14. 33.85 Proposed Corporation Manikpur Vasai-Virar Municipal 15. Vasai 11.57 Proposed Corporation Bhiwandi Nizampur Municipal 16. Bhadwad 9 Proposed Corporation Bhiwandi Nizampur Municipal 17. Stepping Garden 31 Proposed Mar-22 Corporation Kulgaon Badalapur Kulgaon Badalapur Municipal 18. Municipal 10 Proposed Council Council Proposed STP CIDCO Taloja 19. Panvel Municipal Corporation 32 Proposed Phase-I CIDCO Pushpak 20. Panvel Municipal Corporation 45 Proposed Nagar Kundalika River Left Bank, at Survy No. 21. Roha Municipal Council 4 Proposed Mar-22 211/1/2/3/4/8/9/1 0/11(0.43A) at Roha. Ahmednagar, Tal Ahmednagar Muncipal 22. & Dist- 57 Proposed Corporation Ahmednagar Pune Municipal Corporation, 23. Pune Municipal corporation 10 Proposed 2023 Botanical Garden, Pune Pune Municipal 24. Pune Municipal corporation Corporation, 25 Proposed 2023 Baner, Pune Municipal 25. Pune Municipal corporation Corporation, 28 Proposed 2023 Warje, Pune Pune Municipal 26. Pune Municipal corporation Corporation, 26 Proposed 2023 Vadgaon, Pune Pune Municipal 27. Pune Municipal corporation Corporation, 15 Proposed 2023 Tanaji Wadi, Pune Municipal 28. Pune Municipal corporation Corporation,Naid 127 Proposed 2023 u, Pune Municipal 29. Pune Municipal corporation Corporation, 33 Proposed 2023 Dhanori, Pune Pune Municipal 30. Pune Municipal corporation Corporation, 75 Proposed 2023 Bhairoba, Pune Pune Municipal 31. Pune Municipal corporation Corporation, 20 Proposed 2023 Mundhva, Pune

13

Pune Municipal 32. Pune Municipal corporation Corporation, 30 Proposed 2023 Kharadi, Pune Pune Municipal Corporation, 33. Pune Municipal corporation 7 Proposed 2023 Matsyabij Kendra, Pune Pimpri Chinchwad Municipal 34. Bbhatnagar 15 Proposed Apr-22 Corporation Alandi Municipal 35. Alandi Municipal Council 4 Proposed Mar-21 Council STP 36. Satara Municipal Council 17.5 Proposed

Wai Municipal 37. Wai Municipal Council 6 Proposed Council STP Ashta Municipal 38. Ashta Municipal Council 5.5 Proposed Council STP Islampur 39. Islampur Municipal Council Municipal 7 Proposed Council STP Islampur 40. Islampur Municipal Council Municipal 5 Proposed Council STP 41. Malvan Municipal Council Malvan Council 4 Proposed Aurangabad Municipal 42. Banewadi 10 Proposed Corporation Municipal 43. Paithan Municipal Council 8.8 Proposed Council STP Beed Municipal 44. Beed Municipal Council 35 Proposed Council, STP Latur Municipal 45. Latur Municipal Corporation Corporation 40 Proposed Proposed STP Latur Municipal 46. Latur Municipal Corporation Corporation 32 Proposed Proposed STP Kamptee 47. Kamptee Municipal Council Municipal 12.5 Proposed Council STP Bhandara 48. Bhandara Municipal Council Municipal 15 Proposed Mar-22 Council STP Pauni Municipal 49. Pauni Municipal Council 7 Proposed Mar-22 Council STP Amravati Amravati Municipal Municipal 50. 16 Proposed Corporation Corporation Proposed STP Amravati Amravati Municipal Municipal 51. 12 Proposed Corporation Corporation Proposed STP Bramhapuri 52. Bramhapuri Municipal Council Municipal 7 Proposed Council STP Rajura Municipal Council Rajura Municipal 53. Municipal Corporation of 5.5 Proposed Council STP Greater Mumbai

14

Information of FSTPs-along polluted river stretches in Maharashtra State Sr. Capacity of FSTP River Stretch Name of city Technology used No. (KLD) 1 Kanhan Mouda 20 Sludge Drying Bed 2 Krishna Wai 70 MBBR 3 Bori Amalner 20 Sludge Drying Bed 4 Girna Jalgaon 20 Sludge Drying Bed 5 Krishna Islampur 15 Sludge Drying Bed 6 Darna Igatpuri 10 Sludge Drying Bed 7 Panzara Dhule 20 Sludge Drying Bed 8 Patalganga Khopoli 15 Sludge Drying Bed 9 Kundalika Roha 5 Sludge Drying Bed 10 Savitri Mahad -- -- 11 Wardha Ballarpur 45 Sludge Drying Bed, MBR 12 Bindusar Beed 20 Sludge Drying Bed 13 Godavari Gangakhed 10 Sludge Drying Bed 14 Gomai Shahada 10 Sludge Drying Bed 15 Rangavali Navapur 10 Sludge Drying Bed

IV. Details of Industrial Pollution:  No. of industries in the State:92081  No. of water polluting industries in the State: 16597  Quantity of effluent generated from the industries in MLD:2100 MLD  Quantity of Hazardous Sludge generated from the Industries in TPD: 2738.53  Number of industrial units having ETPs: 16597  Number of industrial units connected to CETP: 7856  Number and total capacity of ETPs (details of existing/ under construction / proposed) No. of ETPs- 16597 with capacity of 2100 MLD  Compliance status of the ETPs: 16451 complied and 146 non-complied  Number and total capacity of CETPs (details of existing/ under construction / proposed)- 26 Nos of CETPs with capacity of 244.85 MLD  Status of compliance and operation of the CETPs: 23 CETPs are complied, 2 Nos are non-complied and one CETP is closed.

15

Industrial Status of CETPs (existing, Sr. Town No. of Discharge under construction & No. industries (MLD) proposed) Additional Ambernath CETP, Dist. 1. Existing Thane 53 7.5 Butibori CETP Pvt. Ltd., Dist. 2. Existing Nagpur 450 5 SMS Waluj CETP Pvt Ltd, Dist. 3. Existing Aurangabad 224 10 Greenfield CET Plant P. Ltd, Dist. 4. Existing Solapur 27 1.5 Ichalkaranji Textile Development 5. Existing Cluster Ltd. (1 MLD), Dist. Kolhapur 11 1 Ichalkaranji Textile Development 6. Cluster Ltd. (12 MLD), Dist. 191 12 Existing Kolhapur Kagal-Hatkanangale C.E.T.P.,, 7. Existing Dist. Kolhapur 5 10 L.K. Akiwate Industrial Co Op, 8. Existing Estate Ltd, Dist. Kolhapur 15 0.8 Hydro Air Tectonics (PCD), Dist. 9. Existing Pune 1 4 Kurkumbh Environment Protection Co 10. Existing op Society, Dist. Pune 65 1 11. Ranjangaon CETP, Dist. Pune 117 3 Existing Lote Parshuram Environment 12. Protection Co-op Societ, Dist. 190 10 Existing Ratnagiri MMA-CETP Co Operative Society 13. Existing Ltd., Dist. Raigad 73 7.5 RIA CETP Co-op. Society Ltd., 14. Existing Dist. Raigad 41 22.5

15. PRIA CETP (I) Ltd., Dist. Raigad 18 15 Existing Taloja CETP Co Operative Society, 16. Existing Dist. Thane 941 22.5 Thane-Belapur Association, Dist. 17. Existing Thane 3309 27 Badlapur CETP Association, Dist. 18. Existing Thane 263 8 Chikhloli-Morivali Effluent 19. Existing Treatment, Dist. Thane 130 0.8 ACMA - CETP-Co-operative 20. Existing Society Ltd, Dist. Thane 61 0.25 Dombivli CETP (Chemical) (Phase- 21. Existing II), Dist. Thane 120 1.5 Dombivli Better Environment 22. Existing System Association, Dist. Thane 148 16 Tarapur Environment Protection 23. Existing Society CETP, Dist. Thane 1176 25

24. Akkalkot Cetp, Dist. 222 3 Existing Additional Amravati Industrial 25. Existing Area, Dist. Amravati 5 5

16

Tarapur Environmental Protection 26. Existing Society, Tarapur, Palghar - Phase II 25

27. Satpur in District Nashik 1 Proposed Krishna Valley Envirotech (P) Ltd. Plot No J-MIDC kupwada Block 28. Under Construction Sangali-Miraj Industrial Area Dist- 0.64 Sangali

29. Ichalkaranji in 1.2 Proposed Butibori CETP Pvt. Ltd., Dist. 30. Under Construction Nagpur 5

V. Solid Waste Management:  Total number of Urban Local Bodies and their Population- No. of ULBs-392, Population- 5,08,27,531.  Current Municipal Solid Waste Generation-22945 (MT/D).  Number, installed capacity and utilization of existing MSW processing facilities in TPD: ULBs installed 337 composting plants as a waste processing facility. Also 82 vermin-composing facilities are installed, 62 bio-methanization plants are installed, 01 waste to Energy plant and 26 RDF plant installed. The 320 landfill sites are identified and 18 sites under construction phase.  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction)- In Operation 1 with capacity 300 TPD Proposed 4 Nos with Capacity of 1750 TPD Sr. Plant capacity Name of Municipal Corporation Present Status No. (TPD) 1 Thane Municipal Corporation 300 In operation. Pimpri-Chinchwad Municipal Work order issued. 2 200 Corporation Proposed plant. 3 Navi Mumbai Municipal Corporation 150 Proposed plant. Municipal Corporation of Greater E-Tendered. Proposed 4 1200 Mumbai Plant. 5 Pune Municipal Corporation 200 Proposed Plant.

 Total no. of wards-12420, no. of wards having door to door collection service-12333, no. of wards practicing segregation at source -10229 VI. Bio-medical Waste Management:  Total Bio-medical generation: 62254.62 Kg/Day  No. of Hospitals and Health Care Facilities: 63642

17

 Status of Treatment Facility/ CBMWTF: 30 CTFs are operating in Maharashtra State covering 36 Districts. 29 Incineration Based and 1 Deep burial. VII. Hazardous Waste Management:  Total Hazardous Waste generation: 999565.96 MT  No. of Industries generating Hazardous waste: 7257  Treatment Capacity of all TSDFs: o Capacity of 03 Nos of Incinerator Facilities (MT/Hour) - 9.0 o Capacity of 04 Nos of Secured Landfill (MT/A)- 2,61,600  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated; 360505.3 MT  Details of on-going or proposed TSDF- NA. VIII. Plastic Waste Management:  Total Plastic Waste generation: 4.43 Lacs MT  Treatment/ Measures adopted for reduction or management of plastic waste: o From Oct 2018 to August 2020, Plastic Waste collected- 72600 MT. o Plastic waste recyclers- 88 Nos. o Plastic waste used in Cement Industry-27000 MT o Plastic to Fuel Plants- 05 Nos o 71 Extended Producers Responsibility (EPR) is granted by Urban Development Department for regulation of Plastic Waste. o Issued the GR to use waste plastic in to the construction of the road at the tune of 7%. IX. Details of Alternate Treatment Technology being adopted by the State/UT:

Faecal Sludge Treatment Plant- 15 FSTPs have been installed along polluted river stretches, with total capacity of 290 KLD.

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment: Polluting sources including drains have been identified contributing to river pollution. Demonstration project has been started by MPCB for in-situ treatment of wastewater at Kotwali village drain on Vashisthi River to explore the possibilities and viability of the interim measures as resources of the Government are very much limited.

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: Member Secretary, Maharashtra Pollution Control Board XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: Ten meetings were held under the chairmanship of Hon’ble Chief Secretary to take review of the compliance in the matter OA 673/2018. XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river; 18

Status of polluted river stretches in 2020 (Jan to December 2020)

No. of stretches in 2020 Priority No. of stretches declared in 2018 No. of stretches in 2019 (Jan to Dec)

Priority I 9 1 1 Priority II 6 6 3 Priority III 14 10 12 Priority IV 10 14 13 Priority V 14 21 21 Less Polluted - 1 3 Total 53 53 53

WATER QUALITY STATUS OF POLLUTED RIVER STRETCHES IN MAHARASHTRA (January to December 2020 )

Fecal Coliform (MPN/100 BOD (mg/l) Current Sr. No. NAME OF RIVER ml) Priority Min Max Min Max Priority I 1 GODAVARI 3.6 8.8 2 150 IV 2 KALU 20 20 170 170 III 3 KUNDALIKA 4.4 12 21 240 III 4 MITHI 54 54 92000 92000 I 5 MORNA 8.8 8.8 39 39 IV 6 MULA 16 18 1600 1800 III 7 MUTHA 8 26 8 1800 II 8 NIRA 7 12 50 900 III 9 VEL 12 12 40 40 III Priority II 1 BHIMA 8 25 12 1600 II 2 INDRAYANI 10 12 170 550 III 3 MULA-MUTHA 20 20 70 900 III 4 PAWANA 7.5 28 10 1800 II 5 WAINGANGA 4 16 32 39 III 6 WARDHA 5 14 38 40 III Priority III 1 GHOD 10 10 250 250 IV 2 KANHAN 7.8 9 39 39 IV 3 KOLAR (MAH) 8.6 8.6 39 39 IV 4 KRISHNA 1.8 9.5 14 200 IV 5 MOR 3.8 3.8 25 25 V 6 PATALGANGA 4 12 110 540 III 7 PEDHI 5 5 39 39 V 8 PENGANGA 4.8 5 34 39 V 9 PURNA 5.4 6.8 39 39 IV 10 TAPI 3.8 7 17 25 IV 11 URMODI 6 6 50 50 V 12 VENNA 4.5 6.4 25 120 IV

19

13 WAGHUR 4.2 4.2 21 21 V 14 WENA 4 5.8 38 40 V Priority IV 1 BINDUSAR 8.5 8.5 2 2 IV 2 BORI 4.2 4.2 14 14 V 3 CHANDRABHAGA 8.5 11 230 1800 III 4 DARNA 3.8 10 17 40 IV 5 GIRNA 4.2 5 17 17 V 6 HIWARA 4 4 17 17 V 7 KOYNA 10 10 140 140 IV 8 PELHAR 4 4 21 21 V 9 SINA 13 13 50 50 III 10 TITUR 3.8 3.8 17 17 V Priority V 1 AMBA 4 4 110 110 V 2 BHATSA 3.4 4 17 130 V 3 GOMAI 4 4 22 22 V 4 KAN 3.2 3.2 14 14 V 5 MANJARA 7.4 7.4 IV 6 PANCHGANGA 2 2.2 11 21 Less Polluted 7 PANZARA 4 4 12 12 V 8 RANGAVALI 4 4 13 13 V 9 SAVITRI 2 2.8 14 21 Less Polluted 10 SURYA 4 4.2 21 23 V 11 TANSA 4 4 17 17 V 12 ULHAS 4 4.2 40 170 V 13 VAITARNA 4 4 27 27 V 14 VASHISHTHI 1.8 2 12 17 Less Polluted

XIV. Ground water regulation: o In Maharashtra State Ground Water is regulated under Maharashtra Groundwater (Development and Management) Act, 2009. Groundwater Surveys and Development Agency (GSDA). o GSDA concerned with groundwater surveys, exploration, assessment, monitoring, development, management and regulation of groundwater resources for irrigation, drinking and industrial needs. It also undertakes periodic ground water assessment in order to regulate the ground water use and guide ground water developmental activities on scientific basis. o GSDA also works towards ensuring sustainability of ground water resources, on a long-term basis. It acts as a custodian, for the implementation of ground water legislation, within the State of Maharashtra.

XV. Good irrigation practices being adopted by the State: o 82% of water is used for irrigation purpose in State. 20

o As per MWRRA notification dated 25 Jun 2015, it is mandatory to supply water through micro-irrigation for selected irrigation projects in State. o Government of Maharashtra has adopted Piped Irrigation Network policy from Jan 2017, in which it is aimed to achieve 20 % increase in irrigation efficiency. Several projects are undertaken by the Government in order to supply water through piped net work. XVI. Rainwater Harvesting: o Maharashtra Govt. is implementing "Shivkalin Pani Sathawan Yojana", the scheme for augmentation the availability of water for Drinking and Domestic use and Strengthening of Drinking Water Sources by utilising Rainwater. o RRC has already requested to Water Resource Dept, GoM water shed management. All concerned local bodies located along the riverbanks are mandated to implement Water shed management, rain water harvesting, XVII. Demarcation of Floodplain and removal of illegal encroachments: Water resource Department and Local Bodies ensure Demarcation of Floodplain and removal of illegal encroachments. XVIII. Maintaining minimum e-flow of river: Rainwater Harvesting: RRC has already requested to Water Resource Dept, GoM for maintaining minimum E-flows the rivers. XIX. Plantation activities along the rivers: RRC has already requested to Water Resource Dept, GoM for plantation on both sides of the river. All concerned local bodies located along the riverbanks are mandated for plantation at both sides of the river and setting up biodiversity parks in their jurisdiction. XX. Development of biodiversity park: RRC has already requested to Water Resource Dept, GoM for setting up of biodiversity parks. All concerned local bodies located along the riverbanks are mandated for setting up biodiversity parks in their jurisdiction. XXI. Reuse of Treated Water: o Water resource department, GoM has prepared integrated State Water Plan, which includes recycling of Treated sewage. o MPCB has submitted Action plan for Utilization of Treated Sewage to CPCB, in which it is mandated to utilize treated sewage for different class of users like Thermal Power Plants, Industrial Units, Construction activities, non-potable municipal uses, Agriculture-Irrigation, etc. depending on its availability. o The Infrastructure Projects are mandated by MPCB to recycle 60% of treated sewage for secondary use by providing duel pipeline. o The Local Bodies will be encouraged to reuse treated sewage for various purposes including construction and gardening.

21

XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: GOM, has announced Namami Chandrabhaga Abhiyan on 18/03/2016 to revive and rejuvenate the river Chandrabhaga and to restore its historic glory. The aim of the Namami Chandrabhaga Abhiyan is to make the Chandrabhaga river pollution free and conserve its purity and sanctity up to year 2022 and others are as mentioned below:  To maintain the permanent minimum continuous flow of water in the river bed.  To construct weirs in the river bed for maintaining water level.  To maintain & keep minimum environmental flow of water.  To make available sufficient public bathrooms & toilets as well as mobile bio- toilets to the publics during Pandharpur yatras.  To install STP’s for treatment of domestic wastes and scientific disposal facilities for solid waste generated from the villages & cities located on the bank of Chandrabhaga river.  To carry out the beautification & forestation of river banks.  To make reuse/recycle of treated industrial water generated from the industries and industrial estates located in the catchment area of Chandrabhaga river.  As per the local need to work for public participation and development of pilgrimage area.

“Namami Chandrabhaga Pradhikaran” established under the Chairmanship of Hon’ble Chief Minister, GoM & Co-Chairmanship of Hon’ble Finance Minister, GoM, having Divisional Commissioner, Pune as Member Secretary.

“High Power Committee” established under the Chairmanship of Hon’ble Chief Secretary, GoM of Maharashtra having Divisional Commissioner, Pune as Member Secretary.

The Maharashtra Government intends to cleanse and make the holy river Chandrabhaga pollution free by the year 2022. XXIII. Status of Preparation of Action Plan by the 13 Coastal States: In compliance of the order dated 26/9/2019 passed by the Hon'ble NGT, Principal Bench, New Delhi in the matter of O.A. No. 360/2018 filed by Shree Nath Sharma V/s Union of , District Environment Plans for coastal Districts in Maharashtra State have been submitted to H’ble NGT and CPCB on 30.12.2019. Action Plan Comprises of Following- a. Waste management Plan b. Water Quality Management Plan c. Air Quality Management Plan, Mining Activity Management Plan d. Noise Action Plan

22

XXIV. Regulation of Mining Activities in the State/UT: All mining activities are regulated by issuing consent to Establish and consent to Operate along with post approval periodic monitoring of mining activities. All Coal mines are regulated by DGMS (Director General Mines and Safety), Dhanbad and other mines are regulated by Indian Bureau of Mines, Nagpur and Goa.

XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring:

MPC Board issued directions to 15 Municipal Corporations, 29 Municipal Councils and one Cantonment Board to provide adequate sewage treatment plant and to achieve the consented standards prescribed by MoEFCC, GoI and to implement short term and long term measures for treatment of sewage and restrict the discharge of untreated/partially treated sewage to the rivers.

In compliance with the Hon’ble NGT order dtd. 28.08.2019 in the matter of OA No. 593/2017 Paryavaran Suraksha Samiti v Union of India, the MPC Board has issued directions to 01 Mega city, 09 Million plus cities, 254 Class I cities/towns and 122 Nagar Panchayats as to why Environmental Compensation shall not be levied after the stipulated timeline.

23

Annexure-I River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

Tryambakeshwar Municipal Council is having STP 1 Municipal Council 1) Local Nallas 1.00 1.00 0.00 1.00 0.00 0.00 NA Complied No Gap Municipal Council and is in working condition

1550 km sewer network 1) Chikhali Nalla completed 210km sewer Nashik have 100% treatment 40% work of 32 MLD STP for 2) Gangapur Nalla network work under progress capacity. Nashik Municipal future requiremnt proposed at 2 Municipal Corporation 3) Bardan phata Nalla. 290.00 360.00 -70.00 290.00 0.00 32.00 NA Complied is 40% completed and All Sewage network line connected Corporation Pimpalgaon completed and will 4) Someshwar Nalla. expected to complet March to STP, Sump is pending the work Operational on Sept 21 5) Nalla 2022 as informed by will be complied by March 2022. representative NMC

Since, there is constraint of land, type of STP of 8.8 MLD is Underground drainage required to change from scheme is sanctioned in Sept Biotower to MBBR. Proposal of 2012. Drainage network is technical changes is submitted under progress Total 49 km Budget 46 Cr Sanctioned. MC has Paithan Municipal to Govt. Tenders for balance 3 Municipal Council 1) Local Nallas 5.00 0.00 5.00 0.00 5.00 8.80 Mar-22 drainage network is complete been asked provide bar chart for Council subworks like rising main, wet and 6 km drainage net work completion up to April 2021 well, STP, pumping machinery is balance. Site for sump no.2 etc. will be called immediately is obtained from M.C. Paithan after approval to technical in june-2020. changes .Expected date of completion is march 2022.

Concil has approached to MAHARASHTRA JIVAN 02 STPS proposed with capacity of Gangakhed Municipal 3 Municipal Council 1) Local Nallas 1.50 0.00 1.50 0.00 1.50 5.00 PRADHIKARN for DPR NA -- 4 MLD at Kaplicha nala and 1 MLD Council Preparation for 2 nos of STP's of at Datta Mandir Nalla. capacity 1 & 4 MLD Someshwar Godavari Temple to Rahed North side Nalla - 1.Chunal Nalla 2.Bhimghat Nalla East 3.Shani Mandir Nalla. 4.Govardhan Ghat Nalla East 5. Govardhan Ghat Nalla Weast 6. Balgiri Nalla -1 7. Balgiri Nalla - 2 8. Gadipura Nalla Harijan Wasti 9. Gadipura Nalla Badi dargha 10. Gadipura Habib Talkiz 11. Sidhhi Ghat Nalla 12. Killa Center Nalla There is gap of 13 MLD in sewage 13.Killa East Nalla treatment. Municipal corporation has DPR for renovation of existing 14. BurudGalli Nalla Excavation for Foundation of already installed 03 STPs of 132 Nalls, construction of newely 15. NawGhat Nalla Sewage Pumping station Well is MLDcapacity. But, to treat 10 MLD developed Nalls as well as 16. Karbala Nalla 75% completed and the levelling sewage coming from chunal Nalla, pollution free treatment 17. Chouphala Nalla of ground & materail collection STP based on MBBR technology Nanded Waghla stagnant water in 4 km of river 4 Municipal Corporation 18 Bialal nagar Nalla 70.00 132.00 -62.00 57.00 13.00 10.00 for stp work is in progress. Dec-21 and with capacity of 10 MLD is Municipal Corporation bank development and 19 Kudbenagar Nalla STP based on MBBR technology under construction on Chunal Nalla plantation etc. of amount 77 20.Bhimghat Nalla weast with 10 MLD capacity. Likely coimng from north side of city. Cr. Is prepared and process of 21. Laxmi nagar Malli area Nalla - 1 Date of Complition is 31 Dec. Balnce 03 MLD sewage coimng from submission to Govt. is in 22. Laxmi nagar Malli area Nalla - 2 2021. south side wil be diverted to extsing progress. 23. Laxmi nagar Malli area Nalla - 3 STP at Bondar. Pumpimng station is proposed for the diversion. South side Nalla - 24 Vasarni Nalla - 1 25. Vasarni Nalla - 2 26. Saibaba Mandiar Nalla 27. Nawin pul Nalla 28. Vakaspur Nalla 29. Vrundawan Nalla 30.Kamalnagar Nalla 31. Kautha Nalla east 32. Kautha Nalla weast 33. Echo development Nalla 34. Vishnupuri -Asarjan Nalla River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

Construction of Vadavali STP is sanctioned under AMRUT PH-II project of Central Govt. Work order is awarded to agency and As said area is having less Construction of Vadavali STP is construction work is under population, under ground sanctioned under AMRUT PH-II 1) Neptune Nalla, progress. Amrut project funding network is not proposed. project of Central Govt. Work order Along Atale 2) Balkrishna Paper Mill Nalla, 4 Kalu Kalyan-Dombivali Municipal Corporation 7.60 0.00 7.60 0.00 7.60 21.00 pattern is Central-35 %, State-15 May-21 Sewage collection is proposed is awarded to agency and village 3) Shiv Mandir Nalla, %, ULB-50%. Physical progress by nalla intersection at construction work is under progress. 4) Balyani Nalla of STP 30 % . Proposed date of Sewage pumping station Amrut project funding pattern is completion is May 2021. For the followed by treatment at STP Central-35 %, State-15 %, ULB-50% said STP, Sequential Batch Reactor technology (SBR) tenchology is proposed.

construction of STP not yet Roha MC has stipulated the started. DPR,Technical sanction condition of provision of Septic tank approved.Funds are avilable & soak pit while granting the building however contrctor has not yet Drainage network 60% permission. Rest water is discharged 5 Kundalika Salav to Roha Roha Municipal Council Municipal Council 1) Local nallas 2.80 0.00 2.80 0.00 2.80 5.00 started the construction work Mar-22 completed. in to saline water zone of Kundalika. due to GST issue as per

information of given by MC 1MLD and 4 MLD capacity of STP Roha. They are in process to proposed. retendering the STP work.

Construction of STP of 8 MLD capacity and WSP compound. 144+134=278MLD will be diverted to existing STPs at Bandra and Ghatkopar by Dec-2023. Out of Total 286 MLD of Dry weather flow, the work of construction of STP of 8 MLD capacity from Filterpada to WSP STP by May-2021 Compound is in progress. Dry Powai to Mumbai Municipal Physical Progress – 70%. 6 Mithi Municipal Corporation 1) Local Nallas 286.00 0.00 286.00 0.00 286.00 8.00 and Divesrion Weather Flow of 97 MLD (from Dharavi Corporation Financial Progress – 65% work by Dec-2023 WSP Compound to CST Bridge) and 37 MLD (from CST Bridge to Mahim Causeway) will be diverted to Bandra Treatment Zone through existing sewer network by proposing sewer interceptors, whereas, Dry Weather Flow of 144 MLD (from Bapat Nalla & Saphed Pool Nalla) will be diverted at Ghatkoapar WWTF through proposed Tunnel. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

1) Khadki Nalla at Vidrupa river 2) Hingna Nalla 3) Khadan Nalla 4) Kailash tekdi 5) Nimwadi Nalla 6) Luxury Bus stand Nalla 7) Anicut Nalla 8) Kholeshwar nalla 9) Ganesh Ghat Nalla The two STPs of capacity 30 10) Shalini Talkies Nalla MLD and 7 MLD are under 11) Savatram Nalla construction. The civil The underground drainage 12) Masum Shah baba Nalla construction work of both these scheme is designed for the 13) Mohata Mill Smashan Nalla STPs is completed up to 95%. population left bak at old akola 14) najuk nagar Nalla The commissioning of both the city 2.27km and nalla intercept 15) Naigaon nalla at nagina masjid trust STPs was expected up to (15No.), Right bak of morna 02 STPs of Capacity 37 MLD are 16) River Junction Naigaon Nalla December, 2020. However, the river length 10.93 km and proposed. At present sewage Akola to Akola Municipal 7 Morna Municipal Corporation 17. Shanawajpur Naigaon Nalla 27.60 0.00 27.60 0.00 27.60 37.00 …...... work of express feeder for Feb-21 nalla intercept 18 no., Bapu generation is 35 MLD. Takalijalam Corporation 18. Najuk Nagar nalla electricity required for the nagar to Kharap length 45 MLD is projected value for next 19. Sidhatha nagar at Idgah Nalla operation of STPs is yet to be 1.91km nalla interception 2 ten years. 20. Rahul Nagar Harihar Peth nalla completed. The said work is in nos., Construction of pumping 21. Akkalkot Nalla progress. Therefore, station with Wetwell at Old city 22. Khidki Pura Nalla commissioning of both these River Bak (Wet well at old city 23. Takiya nagar nalla STPs is expected before river bank) 24. Takiya Islampura Nalla February 2021. The STPs are 25. Kala maroti Nalla based on MBR Technology. 26. Agar ves kala maroti nalla 27. Kumbhar wada dagadi Pul nalla 28. Gulzarpura Nalla Marghat of Gulzarpura Nalla 29. Zulpukar Nagar, Guljarpura Nalla 30. mothi umari Nalla 31 bapu Nagar Apatapa Road Nalla

03 STPs with capacity 25. 15 & 10 MLD proposed and will be completed by 2023. Sewage generation from DPR prepared,project has been Pune city is 744 MLD, destining 2 Bopodi to Pune Municipal 8 Mula Municipal Corporation 1) Botanical Garden Nallah in Pune City 97.00 73.00 24.00 73.00 24.00 50.00 sanctioned by NRCD,Tendering - 2023 STPs having capacity 567 MLD. Aundh Gaon Corporation Is in process. MC has proposed 11 STPs with capacity 396 MLD & Pune Cantonment Board has proposed one STP of capacity 20 MLD.

03 STPs with capacity f 26, 28 & 33 are proposed & will be completed by 1)Warje nalla 2023. Sewage generation from Pune Shivaji Nagar 2)vadgaon bk nalla DPR prepared,project has been city is 744 MLD, destining 2 STPs to Pune Municipal 3) Hingne nalla sanctioned by NRCD,Tendering 9 Mutha Municipal Corporation 151.00 94.00 57.00 94.00 57.00 87.00 2023 having capacity 567 MLD. MC has Khadakwasla Corporation 4)Erandwana nalla Is in process. Optional proposed 11 STPs with capacity 396 Dam 5)Nagzari nalla technology as per bidders choice MLD & Pune Cantonment Board has 6)Ambil odha nalla proposed one STP of capacity 20 MLD.

05 STPs with capacity of 127, 75, 30, 20, & 7 MLD have been proposed & will be completed by DPR prepared,project has been Theur to 1) Keshavnagar Nalla 2023. Mula-Mutha is formed after Pune Municipal sanctioned by NRCD,Tendering 10 Mula-Mutha Mundhwa Municipal Corporation 2) Nalla at Bhapkar Mala 496.00 400.00 96.00 400.00 96.00 259.00 2023 confluence of rive Mula and Mutha Corporation Is in process. Optional Bridge 3) Rangicha Odha at Bhapkar Mala rivers. Mula-Mutha pollution technology as per bidders choice abetment (Jica) shall be completed by 2023. Gap in the treatment capacity is 267 MLD.

Mula- further meets to Bhīma river. 11 STPs with capacity 1) Keshavnagar Nalla Pune Municipal 2023 of 396 MLD under Mula-Mutha 11 Municipal Corporation 2) Nalla at Bhapkar Mala 744.00 567.00 177.00 567.00 177.00 396.00 NA NA Corporation pollution abetment (Jica) shall be 3)Rangicha Odha at Bhapkar Mala completed by 2023. Gap in the treatment capacity is 177 MLD. Vithalwadi to Bhīma Takli River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement. Takli

DPR proposal for 5 MLD future work under preparation. Pandharpur Municipal 12 Municipal Council 1) Gopalpur Nalla-Pandharpur 18.50 18.50 0.00 12.50 6.00 5.00 Under DPR preparation Nil Complied Council Namame Chandrabhaga on the line of Namame Ganga announced by Govt. of Maharashtra

NEERI prepared Camus Soil Bio Gap in the Treatment capacity is 1.3 Technology Treatment base STP MLD. 8 MLD STPs is proposed in Timeline not 13 Akluj Gram Panchayat Gram Panchayat 1) local nallas 1.30 0.00 1.30 0.00 1.30 0.00 . The Proposal is submitted to Nil Phaltan. MPC Board will provide provided Jeevan Pradhikaran which is financial & technical assistance to under progress. Akluj in next three years.

Sangavi to Nira Shindewadi

Underground drainage network line work is under 8MLD (2 STPS: 2.5 + 5.5) grant Phaltan Municipal 1) Khadakhira nala from Phaltan Timeline not progress. Total 76 km sewage from Maharashtra suvarna jayanti 14 Municipal Council 7.00 0.00 7.00 0.00 7.00 8.00 DPR Preparation under progress NA Council 2) Dagadi khan nalla near dinti naka provided line is under development out nagarothan Mahaabhiyan yojana of of that 23 Km of sewage line is 72.76 Cr. completed.

Shikrapur is Gram panchayat & there is no proposal of STP. MPC Nhavare to Shikrapur Gram Timeline not 15 Vel Gram Panchayat 1) local nallas 2.00 0.00 2.00 0.00 2.00 0.00 NA NA Board will provide financial & Shikarpur Panchayat provided technical assistance to small towns to install STPs

1) Ravet Nalla Near Ravet STP 2) Garware Nalla Near Bhatnagar 3) Kalasagar Nalla DPR prepared for Augmenation Intercepted Sewer along the PCMC 4) Chinchwad Nalla Near SBR 30 MLD of 30 MLD Bahtnagar STP to 45 Dapodi to Pimpri-Chinchwad Municipal side bank of river is in progress. 16 Pawana STP 205.80 260.00 -54.20 205.80 0.00 15.00 MLD. DPR prepared and Apr-22 Ravet Municipal Corporation Corporation+F19:H21 Augmentation of STPs Work under 5) Gavade Colony Nalla Near Manikbag submitted to Technical progress at Pimpri Chinchwad (Chinchwad Staion Nalla Nearby Bombay Committee for sanction. Selection) 6) Nalla Near Sandvik

1) Ravet Nala Near Ravet STP 2) Garware Nala Near Bhatnagar 3) Kalasagar Nala 4) Chinchwad Nala Near SBR 30 MLD Preparation of proposal for STP Work was stoped and structure Pimpri-Chinchwad 17 Municipal Corporation STP 88.20 73.00 15.20 73.00 15.20 12.00 out side of Blue line is under Apr-22 demolished by NGT Order but work Municipal Corporation 5) Gavade Colony Nala Near Manikbag prgress is started on alternative land parcle. (Chinchwad Staion Nala Near by Bombay Selection) 3 6) Nala Near Sandvik

Moshigaon to Indrayani Alandigaon DPR prepared for STP at Alandi. DPR is prepared for Alandi Municipal council. Funds sanctioned under Proposed STP – 10 Pilgrimis Devlopment Scheme. Alandi Municipal Council interceptor Sewer along the PCMC Work order issued, 80 percent completed 80% work of side bank of river is in progress. 18 Alandi Municipal Council Municipal Council 1) local nallas 2.50 0.00 2.50 0.00 2.50 4.00 work of underground drainage -- underground sewage network Commencement of setting up STPs network has been complited. lines. by March 2021. Govt. had already STP plant construction is provided funds to Maharasgtra remaining. Jeevan Pradhikaran under Pilgrim Development Scheme will excuting and monitoring work.

DPR preparation is also yet not started. Project cost of 50 Cr Desaiganj Municipal Timeline not including the drainage network cost. 19 Municipal Council 1) local nallas 3.50 0.00 3.50 0.00 3.50 0.00 STP yet not proposed ------Council provided Proposal submitted by Municipal Council to UDD. But UDD has yet not given any approval. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

Received technical sanction from MJP. Tender floated. Work Order of Rs. 12.0 Crores given to STP contractor based at Gujarat. MJP is the overall Project Consultant for Foundation work is just started. 40% work of main drainage this. Project cost of 96.5 Cr Gadchiroli Municipal Work order for STP is just given line has been completed. The 20 Municipal Council 1) local nallas 5.00 0.00 5.00 0.00 5.00 11.50 Oct-21 including the drainage network cost Council to contractor. Cost of the Project work of internal drainage line and this is approved UDD. As on is Rs. 12.0 Crores. is yet not started. today, Rs. 20 Crore has already been spent. Out of 96.5 Crore, Rs. 12.0 Crore will be utilized for STP & remaining Rs. 84.5 Crore are for drainage work. Tumsar to Wainganga Ashti

STP Project cost of approx. 70 Cr including the drainage network cost. DPR is prepared by private agency through tender process. This DPR submitted to MJP for approval. MJP STP Project cost of approx. has yet not given approval. (Note:- Bramhapuri Municipal 7.0 MLD STP is proposed. DPR Timeline not 21 Municipal Council 1) local nallas 3.50 0.00 3.50 0.00 3.50 7.00 70 Cr including the drainage Distance of Bramhapuri City is Council is under consideration of MJP. provided network cost. approx. 10 km from . Part of Untreated sewage reaches upto Wainganga River through Bhuti Nalla. Part of untreated sewage is lifted by farmers for irrigation purpose.)

Land alloted for STP. DPR 1) Bhandara town drain coming from Sant Bhandara Municipal approved. Approved DPR has DPR has been submitted to MJP for 22 Municipal Council Tukdoji Ward, Town Bhandara, Dist- 5.50 0.00 5.50 0.00 5.50 15.00 Mar-22 Council been sent to MJP for technical technical approval. Bhandara. sanction.

Land alloted for STP. DPR DPR has been submitted to MJP for approved. Approved DPR has 23 Pauni Municipal Council Municipal Council 1) Pauni town drain 1.00 0.00 1.00 0.00 1.00 7.00 Mar-22 technical approval. FSTP of 5 KLD is been sent to MJP for technical provided sanction.

Chandrapur has Sewage Treatment Total sewage network length capacity of 70.5 MLD. But, is 176 km, completed 141km, 1) Confluence of Erai & inadequate drainage network. balance 35km. near Hadasti Village Presently 80% sewage Balance could not be 24 Chandrapur Municipal Corporation 35.00 70.50 -35.50 35.00 0.00 0.00 NA NA Complied generated is treated in STP and completed currently by CCMC 2) Tail end of Amal nalla meeting to balnace 20% alongwith the 80% due to no NOC from forest Wardha River near Sasti Opencast Mines treated sewage is discharged in Erai dept., Archelogical dept. and River, which later meets Wardha other gov. dept.. river.

Ballarpur has proposed 2 STPs of 7.5 and 8.5MLD with total capacity Ghuggus to 16 MLD. Total project cost of STP & Wardha Rajura E-Tender floated. Work Order Drainage pipeline of 54.09 undergruond sewage network is Rs. 1) Discharge of BILT Nalla in Ballarpur, for STP awarded on 27/04/2020. kms is proposed in the zone-I 57.19 Cr. Project cost of 7.5 MLD is behind Ballarpur Opencast Mines. Construction work will be started of Ballarpur City. Zone-II of 6.992 Crores & 8.5 MLD is 7.5906 25 Ballarpur Municipal Council 5.00 0.00 5.00 0.00 5.00 16.00 Oct-21 2) Local Nalla near crematorium meeting in this month only. 18 months Ballarpur City is having old Crores. The agency will complete to Wardha River at Ballarpur period will be required for drainage network & same will drainage pipeline of 54.09 kms. in completion of STP be utilized. the zone-I of Ballarpur City. Zone-II of Ballarpur City is having old drainage network & same will be utilized.

DPR prepared by MJP. Currently 3.2 MLD sewage generated and all is 1) Kapangaon Nalla meeting to Wardha Timeline not 26 Rajura Municipal Council 3.20 0.00 3.20 0.00 3.20 5.50 DPR Prepared discharged directly into Wardha River at Rajura provided River. Total project cost of STP plant + drainage system is 38 Cr. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

1) Nallah near Kathapur Village There is discharge from villages 2) Nallah near Hindu temple at Malawadi Shirur Municipal Council is Annapaur, Kathapur & Phakate.MPC Annapur to 27 Ghod Shirur Municipal Council 3) Ramling Grampanchayat Nallah 6.00 6.00 0.00 2.50 3.50 0.00 having STP from 2014 and is in Complied Board will provide financial & Shirur 4) Shirur Town nallahs working condition technical assistance to villages in 5) Shirur Gramin Nallahs next three years.

1) submitted proposal for provision of sewage Treatment plant of capacity 12.50 MLD to 1) JN Road Nalla MJP for Technical approval and 2) Akshok nagar Nalla Letter issued to Kamptee MC by RO, land approval proposal is Timeline not Lenth of Nalla is 7.5 km (3 28 Kamptee Municipal Council 3) lohiya layout Nalla. 10.80 0.00 10.80 0.00 10.80 12.50 Nagpur vide dated 14/08/2020 to pending at Collector Office, provided mtr. Avg.} 4) Bagdor Nalla submit details of DPR, Time line. Nagpur. 2) 5) Other 2 local nallas Applied for grant of consent under Water/Air Act and is under consideration.

Bhandara to Kanhan Nagpur submitted proposal for provision of sewage Treatment plant of Letter issued to Kanhan MC by RO, capacity 8.0 MLD estimating Timeline not 29 Kanhan Pimpri Municipal Council 1) Local Nallas 8.00 0.00 8.00 0.00 8.00 8.00 Nagpur vide dated 14/08/2020 to 32.42 Crs to the Govt of provided submit details of DPR, Time line. Maharashtra for further approval. Funding by Urban Development.

2 nos. of STP of capacity 0.5 MLD FSTP provided and is in each is proposed at 2 locations, operation having capacity 20 Lenth of Nalla is 7.5 km (3 which will be expected to be 30 Mouda Municipal Council 1) Local Nallas 1.50 0.00 1.50 0.00 1.50 1.00 KLPD. Tenders for submission Mar-22 mtr). Avg. completed by 2021. FSTP provided of DPR for proposed STP of and is in operation having capacity capacity 1.5 done 20 KLPD.

ZP CEO vide letter dated 14/08/2020 has submitted Estimate for Provision of MPC Board will provide financial & combined STP of 2 MLD Timeline not technical assistance to villages in 31 Chandkapur Gram Panchayat 1) Chandkapur village sub drain 0.25 0.00 0.25 0.00 0.25 0.00 capacity for Chankapur & provided next three years to comply with Chicholi and requested to waste management. sanction fund of Rs 3,56,92,459/- . MPCB Regional Officer, Nagpur vide letter dated

Kolar Along Koradi Timeline not 32 Chicholi Gram Panchayat 1) Chicholi Village Major Drain 0.25 0.00 0.25 0.00 0.25 0.00 provided

RO Nagpur, issued letter to 1) Drain coming from side pond No. 3 Timeline not Mahadula Nagr Panchayat vide 33 Mahadula Nagar Panchayat 1.40 0.00 1.40 0.00 1.40 0.00 Koradi TPS. provided dated 14/08/2020 to submit details of DPR, Time line.

03 STPs having capacity of 59.7 MLD (27, 9.2 & 23.5) are in 1) Sheri Nalla, Sangli. operation with actual utilization of 2) Sidharth Nagar Nalla, Sangli. Total 164.9 KM sewer line is 52.2 MLD ( 23.5 MLD STP at 34 Sangli Miraj Kupwad Municipal Corporation 3) Haripur Nalla, Sangli. 68.00 59.70 8.30 49.20 18.80 22.50 STP is under construction 75% work is completed Feb-21 proposed out of that 116.5 KM Hanuman Nagar is operating at 16 4) Miraj Nalla, Miraj wok completed MLD)One STP of capacity 22.5 MLD 5) Other Major drain STP is proposed at Bedag Road, 75% work completed, will complete by Feb. 2021. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

30% sewer network completed, land acquisition under progress for STP, 23.58 Cr grant from govt and 21.0 Cr aswell is received. 8 km distance from city Pumping station land 35 Islampur Municipal Council 9.00 0.00 9.00 0.00 9.00 12.00 Land acquisition under progress. NA Mar-21 Shindi to acquisition under process. 7MLD+4.5MLD STP by March 2021. Krishna 1) Islampur Municipal Council Local Nalla. Kurundwad No water is being discharged to river every drop of treated sewage is utised for agricultural use.

Connected all drains to RCC constructed Cannel. The 6 Km away from city Timeline not 36 Ashta Municipal Council 2.50 0.00 2.50 0.00 2.50 5.50 sent for Administrative approval NA cannel were block because of DPR sent for approval 1) Local Nallas provided farmas had diverted that water and the cannel is very narrow.

Land acquisition for STP is in process. Technical sanction of STP & underground networking is in 1) Gangapuri nalla DPR forwarded to MJP Pune for progress. Presently no fund Timeline not 37 Wai Municipal Council 2) Siddheshwar Nalla 4.00 0.00 4.00 0.00 4.00 6.00 technical sanctioning, sanctioned work will be commenced provided 3) Other small nalla under Maharashtra Suvarnjayanti Vojana. FSTP of 70 KLD Capacity has been installed and is in operation.

Timeline not 38 Marul Gram Panchayat 1) Local Nallas 0.45 0.00 0.45 0.00 0.45 0.00 No No Zilla Parishad, Jalgaon, given provided proposal for Financial & Technical Assistance from MPCB for provision of STP at the Marul, & Jalgaon to Timeline not 39 Mor Nhavi Gram Panchayat 1) Local Nallas 0.50 0.00 0.50 0.00 0.50 0.00 No No Padalse villages. MPCB given work Amoda provided order for Financial assistance to 03 Gram Panchayats for preparation of DPR for Sewage treatment facilities, Timeline not 40 Padalse Gram Panchayat 1) Local Nallas 0.26 0.00 0.26 0.00 0.26 0.00 No No 2 Lakhs each. provided

DPR preparation is under progress DPR approval is pending with 41 Khopoli Municipal Council 1) Bazarpeth Nalla 11.00 0.00 11.00 0.00 11.00 0.00 Mar-22 for STP at Khopoli. Rs. 98 Cr grant MJP for technical sanction is sanctioned.

Khadepada to Patalganga Kopoli

1) Lendi Nalla STP is under construction. Work 42 Khalapur Nagar Panchayat 1.60 0.00 1.60 0.00 1.60 3.00 Mar-22 2) Bazarpeth Nalla completed up to PCC level.

1) Drain from Village Narayanpur 2) Drain from Village Bhatkuli 3) Amba Nalla from Amravati City 4) Frizapura Nalla DPR preparation under progress for DPR Prepard by MJP Amravati 5) Prashant Nagar Nalla 02 STPs (16 + 12 MLD) at Amravati. Narayanpur to Amravati Municipal and submitted to Higher Timeline not 43 Pedhi Municipal Corporation 6) Minor Nalla 71.05 55.00 16.05 74.50 -3.45 28.00 Bhatkuli Corporation Authorities of MJP for necessary provided 7) rathi nagar 34.5MLD for future expanction. land approvals 8) Retigaon nalla acquisition for STP is in process. 9) Nawethe nalla 10) Bhartiya Mahavidya Nalla 11) Narsari malla

1. Drain from Village Asegaon Purna 2. Drain from Village Purna Nagar 3. Drain From Village Sawalapur DPR Prepard by MJP Amravati DPR Prepard by MJP Amravati and Asegaon to Amravati Municipal 4. Drain From Village Nerul Ganagamai and submitted to Higher Timeline not 44 Purna Municipal Corporation 0.00 0.00 submitted to Higher Authorities of Dhupeshwar Corporation 5. Drain From Village Nerul Wathoda Authorities of MJP for necessary provided MJP for necessary approvals Shukleshwar approvals 6. Drain From Village Darapur 7. Drain From Village Kholapur River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

MC appointed PMC to prepared Mehkar Municipal 45 Municipal Council 1) Mehekar to umarkhed Lendhi nalla 3.77 0.00 3.77 0.00 3.77 0.00 DPR Preparation under progress Mar-23 DPR for under ground drainage and Council STPs.

STP Project cost of 33 Cr including the drainage network cost was done by NEERI Nagpur. Then this proposal was submitted to MJP for technical sanction. MJP has not given technical sanction. Hence, administrative approval is not given by UDD. Then Municipal Council has worked out a proposal of Rs. 10.0 Mehkar to Lakhs based on Phyto-Plankton Penganga Full-fledged STP is not Umarkhed Technology. Now Municipal Council proposed. However, Municipal says that, Penganga River is 18 km. Council has worked out a Timeline not 46 Umarkhed Municipal Council 1) Mehekar to umarkhed Lendhi nalla 4.10 0.00 4.10 0.00 4.10 9.60 away from the city. Lendhi Nalla is proposal of Rs. 10.0 Lakhs provided just at the boundary of the city. based on Phyto-Plankton Presently, 4.1 MLD Sewage flows Technology. through this Lendhi Nalla but not reach upto Penganga River. After some distance Lendhi Nalla is mostly dry. Farmers had constructed small barrages on Lendhi Nalla. Nearby farmers are utilizing this untreated sewage by providing number of pumps & motors & thus the untreated sewage is utilized for irrigation purpose.

Gap in the treatment capacity is 11 Proposal for closed drain system MLD. At present no treatment facility Timeline not 47 Municipal Council 1) Local Nallas 11.00 0.00 11.00 0.00 11.00 12.50 and STP is submitted to No at Bhusawal, proposal for closed provided Government for approval. drain system and STP is submitted to Government for approval. Raver to Tapi Shahada

Shirpur Municipal Council is O&M technology of STP is SBR - Total exiating sewage network 48 Shirpur Municipal Council 1) Local Nallas 5.00 12.50 -7.50 5.00 0.00 0.00 having STP and is in working --- Complied level of teratment aeration and length 74km condition clorination.

MPC Board will provide financial & technical assistance to villages in This office has issued letter to Timeline not next three years to comply with 49 Valse Gram Panchayat 1) Valse nalla 0.40 0.00 0.40 0.00 0.40 0.00 NA NA Gram Panchayat for provided waste management. SRO Jalgaon, installation of STP has issued letter to Gram Panchayat for installation of STP. Dhangarwadi Urmodi to Nagthane

MPC Board will provide financial & technical assistance to villages in This office has issued letter to Timeline not next three years to comply with 50 Nagthane Gram Panchayat 1) Nagthane nalla 0.00 0.00 0.00 0.00 0.00 0.00 NA NA Gram Panchayat for provided waste management. SRO Jalgaon, installation of STP has issued letter to Gram Panchayat for installation of STP.

Underground drainage Mahabaleshwar DPR prepared. Budget DPR approved. Proposal for location 51 Venna Satara Municipal Council 1) Ranmala Nala, Karanje 12.80 0.00 12.80 0.00 12.80 17.50 Mar-22 network line work is under to Mahuli sanctioned of 50cr. for approval is under progress. progress.

Timeline not 52 Pahur, Dist. Jalgaon Gram Panchayat 1) Local Nallas 0.45 0.00 0.45 0.00 0.45 0.00 NA NA provided Zilla Parishad, Jalgaon, given proposal for Financial & Technical Assistance from MPCB for provision Sunasgaon to Timeline not 53 Waghur Neri, Dist. Jalgaon Gram Panchayat 1) Local Nallas 0.00 0.00 0.00 0.00 0.00 0.00 NA NA of STP at the Pahur, Neri and provided Sakegaon, Nhavi & Padalse villages. MPCB has approved fund of Rs. 2 Timeline not Lakh for each Gram Panchayts. 54 Sakegaon, Dist. Jalgaon Gram Panchayat 1) Local Nallas 0.00 0.00 0.00 0.00 0.00 0.00 NA NA provided River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

No Treatment Facility. 02 STPs are 1) Hingnaghat town drain coming to Wena 100% Civil work completed. STP proposed Kawadghat to River near Railway Bridge of MBBR technology having with cap acity of 13.5 (10+3 MLD). 55 Wena Hinganghat Municipal Council 6.25 0.00 6.25 0.00 6.25 13.00 Jan-21 Hinganghat 2) Hingnaghat town drain coming to Wena capacity 13 MLD civil work Budgetary River from Ghat completed provision 10 MLD-7.17 Cr & 3.5 MLD-4.0 Cr. 2.

No Treatment Facility. 01 STP is proposed with capacity of 35 MLD. Swarajnagar to 1) Subhash Road nalla at Sathe Chowk, Work of drainage work is Budget 165 Cr Sanctioned. 50%- 56 Bindusar Beed Municipal Council Municipal Council 22.00 0.00 22.00 0.00 22.00 35.00 Tender floated for land acquisition Jul-21 Snehanagar Sneha Nagar, Beed. under progress GOI, 25%-GOM & 25%-MC. WO already relaeased, work under progress.

Sanction work order for 12.6 MLD FSTP of capacity 25 KLPD is Total Sewage network length Capacity STP. 57 Bori Along Amalner Amalner Municipal Council 1) Local nalla coming from Amalner city 10.00 0.00 10.00 0.00 10.00 12.60 provided. Proposal of STP not 8% work completed Jul-21 is 80km, till date work prepared. completed is 21km.

DPR proposal for 5 MLD future work under preparation. Pandharpur to Drainage network of 85% 1) Gopalpur Nalla coming from 58 Chandrabhaga Shegaon Pandharpur Municipal Council 18.50 18.50 0.00 12.50 6.00 5.00 Under DPR preparation Nil Complied completed, Total length in Pandharpur. Namame Chandrabhaga on the line Dhumala current phase 60km of Namame Ganga announced by Govt. of Maharashtra

Timeline not 59 Ghoti Village Gram Panchayat 1) Ghoti Village Nalla 0.87 0.00 0.87 0.00 0.87 0.00 No No provided

MPC Board will provide financial & Igatpuri to technical assistance to small towns Darna Timeline not 60 Sansari Bhagur Municipal Council 1) Bhagur Village Nalla, 0.74 0.00 0.74 0.00 0.74 0.00 No No in next three years to comply with provided waste management.

Timeline not 61 Sansari Village Gram Panchayat 1) Sansari Nalla. 0.42 0.00 0.42 0.00 0.42 0.00 No No provided

STP Work has been started at site Construction of 48 CMD STP is of work at Gat No.413,390 Jalgaon Two STPs of capacity 48 MLD started. Excavation work is 62 Jalgaon Municipal Corporation 1) Local nalla coming from the Jalgaon city 48.00 0.00 48.00 0.00 48.00 48.00 Aug-21 Shiwar having capacity of 48.00 and 50 MLD are proposed. completed. Civil work is not yet MLD. FSTP of capacity 20 KL/Day is started. Malegaon to provided. Girnna Jalgaon MPC Board will provide financial & 1) Kolha nalla coming from the Bhadgaon Timeline not technical assistance to villages in 63 Bhadgaon Municipal Council 2.00 0.00 2.00 0.00 2.00 0.00 No No City provided next three years to comply with waste management.

Civil work is completed and will Pachora to Construction of STP is 80 % Drainage network work is commission around March 2021. 64 Hiwara Pachora Municipal Council 1) Local nalla coming from Pachora city. 3.00 0.00 3.00 0.00 3.00 9.00 No Mar-21 Nimbora completed. under progress.

Malkapur STP completed and rest of Total Network 59 km and nalla will divert to STP by March 65 Malkapur Municipal Council 1) Local nalla 6.14 8.00 -1.86 6.14 0.00 0.00 - - Complied construstion work of Network 2020. 51km done Karad to No gap in Treatment capacity Koyana Paparde

Instructions given to MC for 66 Karad Municipal Council 1) Local nalla 8.50 8.50 0.00 8.50 0.00 0.00 - Complied upgradation of existing STP. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

06 STPs with capacity 145 MLD have been proposed.

60 MLD STP was granted and sanction.

Length of sewage network - 46km Revised DPR of proposed 06 170 Cr sanction from Govt. MJP for nos of STP having investment of 60 MLD STP and Gap will address Pelhar Dam to 1) Sopara Nalla, Rs. 1232 Cr was send to State Length of sewage network - 67 Pelhar Vasai Virar Municipal Corporation 105.00 30.00 75.00 30.00 75.00 145.00 -- Mar-22 15MLD. State Govt. accorded its Golani Naka 2) Tungar Nalla, Govt and State Govt. submutted 46km. approval to JNNURM-UIDSST for 3) Waliv Nalla. for further approval to Central Augmentation of Water Supply and Govt. Yet appproval not received. Under Ground Sewarage System of VVCMC and further recommended to Ministery of UDD of Govt. of India.UDD has directed to JNNURM- UIDSST to forward the above proposals to Govt. of India vide letter dtd. 17/02/2014.

Under Construction - Desai 2 STPs provided with treatment Solapur to Nagar STP - 20.00 MLD. capacity of 75 MLD and 15 MLD 68 Sina Solapur Municipal Corporation 1) Degaon Nalla. 90.00 92.00 -2.00 62.73 27.27 12.50 Complied Bankalagi Excavation work is started. Date respectively. 12.5 MLD Proposed for of comletion will be Dec-2021 future requirement under process

Along dist. of Jalgaon Proposal submitted to Government Kodgaon Dam, Two STPs of capacity 13 MLD 69 Titur Municipal Council 1) Local nallas 13.63 0.00 13.63 0.00 13.63 19.00 Sep-21 for 02 STPs Tal. and 6 MLD are proposed. Land Acquisition is under process. Chalisgaon, Dist Jalgaon

MPC Board will provide financial & Timeline not technical assistance to villages in 70 Amba Bense to Roha Pali Village Gram Panchayat 1) Local nallas 1.00 0.00 1.00 0.00 1.00 0.00 provided next three years to comply with waste management.

MPC Board will provide financial & Shahapur Nagar Panchayat has Timeline not technical assistance to villages in 71 Shahapur Nagar Panchayat 1) Local nallas 2.50 0.00 2.50 0.00 2.50 0.00 proposed to provide STP. Not Started provided next three years to comply with However, DPR not yet prepared Shahapur to waste management. Bhatsa Bhadane MPC Board will provide financial & Timeline not technical assistance to villages in 72 Vashind Village Gram Panchayat 1) Local nallas 0.00 0.00 0.00 0.00 0.00 0.00 Nil Nil provided next three years to comply with waste management.

1) Inlet water supply for Shahda City is less than 135 LPCD so STP is not proposed for Shahada Municipal Council. FSTP is approved for Lonkheda to 73 Gomai Shahada Municipal Council 1) Local nallas 2.00 0.00 2.00 0.00 2.00 0.00 NA FSTP of 10 KLD Installed Complied Shahda Municipal Council of Shahda capacity 10 KLD (0.01 MLD) and now in operation 2)Technology used for FSTP- Sludge Drying Bed

Process for purchase of land not yet DPR has been sanctioned. But completed. STP project will be Kavathe to 74 Kan Sakri Nagar Panchayat 1) Local nallas 1.20 0.00 1.20 0.00 1.20 0.00 due to unavailablity land no NA started after availability of this land Sakari progress. and after acquiring required funds from the government. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

02 Nos of STPs with Capacity (40+32 MLD) 72 MLD have been proposed. The Latur Corporation provided Budget 139 Cr Sanctioned. 50%- water once in a 15days at a tune of Latur to Latur Municipal GOI, 25%-GOM & 25%-MC. 75 Manjara Municipal Corporation 1) Siddheshwar Nalla 30.00 0.00 30.00 0.00 30.00 72.00 Mar-22 30Million litre approximately water Nanded Bridge Corporation Due to Land Issue Project on supply is 2MLD. hold River Manjra is 7 km away from Latur city, except monsoon water never meet to the river, it is being used by the farmers.

1) Lakshtirth Nall 2) Jayanti Nalla 3) Dudhali Nalla 4) Jamdar Club Nalla 5) Siddharth Nagar Nalla 6) CPR hospital Nalla 7) Rajhans Nalla 8) Ramanmala Nalla !) STP- Dudhali- 6 MLD- 10% 9) Dream World Nalla work completed (foundation) Temprory measures by means of Balance 5 Nalls will be 76 Kolhapur Municipal Corporation 10) Line Bazar Nalla 96.00 91.00 5.00 73.00 23.00 10.00 (2) STP- Kasaba Bavad- 4 MLD, Mar-21 bleeching powder dosing manually diverted to STPS 11) Kasaba Bavada Nalla 55% work completed Project is and traditional Phytoremidation. 12) Bapat Camp Nalla under Amrut Yojana, Centrl Govt. 13) Kala Odha Nalla 14) Gandhinagar Nalla 15) Valiwade Nalla 16) Tilawani/Rui Nalla Shirol to Panchganga 17) Hupri Nalla Kolhapur 18) Shirdhon Nalla 19) Shirol Nalla

1) Chandur Nalla 5 nallas are connected to river Ichalkaranji MCs have proposed 01 77 Ichalkaranji Municipal Council 38.00 20.00 18.00 14.00 24.00 18.00 Mar-21 2) Kabnur Nalla (Including Chandur nalla) without treatment. STP with capacity 20 MLD.

Timeline not 78 Other villages Gram Panchayat 1) Local nallas 23.00 0.00 23.00 0.00 23.00 0.00 provided

Proposed sewerage network of Total sewage network length 147.56 Km, will be completed by from 6 major nalla is 26km May-2021 AMRUT Budget 163Cr. 1. Moti Nalla - 6km 1. Moti Nalla 2. Hagara Nalla- 3km Approved fund allocated Funding 20% Undergroung drainage, 2. Hagara Nalla 3. Sushi Nalla- 4km details- 10% STP construction completed Varkhede to 3. Sushi Nalla 4. Londhi Nalla- 4km GOI-65.76 Cr, 79 Panzara Dhule Municipal corporation 36.00 0.00 36.00 0.00 36.00 57.00 Mar-21 Dhule 4. Londhi Nalla 5. G.T.B Nalla- 3km GoM 32.88 Cr. & Technology- SBR Funding 5. G.T.B Nalla 6. Hamal Nalla- 5km ULB/MC-32.88 Cr. details- Amrut Mission. 6. Hamal Nalla Sewage gen. 30MLD Total 131.62Cr.

Proposed sewerage Network Amrut Mission implimentation of drain 147.56km Agency maharshtra Jeevan pradhikaran Dhule.

Inlet water supply for Navapur City is Tintemba to 80 Rangavali Navapur Municipal Council 1) Local nallas 2.00 0.00 2.00 0.00 2.00 0.00 FSTP of 10 KLD Installed Complied less than 135 LPCD so FSTP of 10 Navapur KLD installed and now in opeartion River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

Planning to nalla tapping process on existing two major nalla including small minor nala to major nala and mini STP and ABR planted filter 1. Local Nallas from Chambhar khind to bed and chlorination process. MC is planning to tap the manjor 2 fish market Council resolution are sanction nallas & connecting samll nallas to Dadli to DPR preparation is under 81 Savitri Mahad Municipal Council 2. Local Nallas from Narenagar to prabhat 3.20 0.00 3.20 0.00 3.20 3.70 Mar-22 to proposed underground these major nallas, to pass this Muthavali progress. colony crematorium drainage system under state sewage through filter bed & 3. Local Nallas from Koteshwari lend vahal Nagarothan Plan and DPR chlorination sanctioning for preparation of CDP export consultant panel are inivited via tender publishing on state level news paper.

There are 9 small villages are situated on the bank of surya river. Those villages are located > 1 km away from surya river. The household of Villages are Dhamni Dam Timeline not 82 Surya 09 Villages Gram Panchayat 1) Local nallas 0.00 0.00 0.00 0.00 0.00 0.00 NA NA NA provided septic tank followed by to Palghar provided soak pit for domestic sewage.In some places comm on toilet facility provided. No any drain discharge in river Surya & No any industry situated on the bank of river Surya.

The generated sewage is being 1) Met Village No major drain as only small villages are Timeline not No Drainage as only small 83 Gram Panchayat 0.23 0.00 0.23 0.00 0.23 0.00 Nil Nil soaked in to soakpits provided by located along the river stretch. provided villages indivisual residents of village due to

84 2) Uchat Village, Gram Panchayat 0.00 0.00

85 3) Kondhale Village, Gram Panchayat 0.00 0.00

86 4) Mhaswal Village, Gram Panchayat 0.00 0.00 Tansa River Along Thane 87 5) Bersheti Gram Panchayat 0.00 0.00

88 6) Jaale Gram Panchayat 0.00 0.00

89 7) Kuyalu Gram Panchayat 0.00 0.00

90 8) Nehal Pada Gram Panchayat 0.00 0.00

Gap in treatment capacity is 1) Vadol STP Capacity-20.70 46.3MLD. Ulhasnagar MC has total 8MLD Khadegovili STP-Work MLD Commission. 2) 04 STPS with capacity of 74.96 MLD. order given to agency on dated Shantinagar STP capacity-31.26 91 Ulhasnagar Municipal Corporation 1) Local nallas 67.00 20.70 46.30 20.70 46.30 54.26 Aug-21 18.5.2020 and date of copletion MLD 95%work completed.3) 1 STP - 20.7 MLD August 2021 Khemani STP Dec-2020 4) SBR 2 STP - 15 MLD sequencing batch reactor. 3 STP- 31.26 MLD 4 STP-8 MLD proposed for future

70% area of the city has been 92 Ambernath Municipal Council 1) Local nallas 28.00 54.00 -26.00 28.00 0.00 0.00 Complied covered by underground sewerage network.

Kalyan to wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Sewage Gap in Capacity of Sr. Name of the Treatment Treatment Actual Stage of Under construction completion of ULB wise information of River Stretchs Cities/Towns Type of Local Body Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Capacity Capacity Utilization STP STPs for current drainage network (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement. Ulhas Badlapur

likely date of completion : As Per work Order March 2021 ( Extended Preliminary works in progress - upto Dec-2021 ) 1.Hendrepada nalla- 2.5km 1.Hendrepada nalla Cleaning,survey,design,trial bore technology : SBR. 2. Joveli nalla- 1km 2. Joveli nalla etc hydraulic design for Note: As Per 3. Eramjad nalla- 550mtr. 3. Eramjad nalla Sewerage Treatment Plant is Government Order this Sewerage 4. Badlapur gaon nalla- 1.5km 93 Kulgaon Badalapur Municipal Council 4. Badlapur gaon nalla 26.00 22.00 4.00 22.00 4.00 22.00 Submitted on March 20 & June Dec-21 Project Handover to Maharashtra 5. Sonivali Nalla- 700mtr. 5. Sonivali Nalla 20 to Superintendent Jeevan Prathikaran (MJP) as an 6. Near WTP barrage road 6. Near WTP barrage road nalla Engineer,MJP for Sanction, After Implementing Agency.As Per MJP nalla-2km Sanctioning Design,actual work Officer discussion due to Covid -19 started on site Lockdown no work should be started hence date of Completion likely extended upto be Dec-2021

Timeline not 94 Sarsi Village Gram Panchayat 1) Local nallas 0.19 0.00 0.19 0.00 0.19 0.00 No STP proposed yet provided

95 Gandhre Village Gram Panchayat 1) Local nallas 0.00 0.00 MPC Board will provide financial & Gandhre to technical assistance to villages in Vaitarana Sarashi next three years to comply with waste management. 96 Pimproli Village Gram Panchayat 1) Local nallas 0.00 0.00

97 Koyna Village Gram Panchayat 1) Local nallas 0.00 0.00

Timeline not 98 Kherdi Village Gram Panchayat 1) Local nallas 0.19 0.00 0.19 0.19 0.00 provided

Timeline not 99 Dalvatne Village Gram Panchayat 1) Local nallas 0.00 0.00 0.00 MPC Board will provide financial & provided technical assistance to villages in next three Kherdi to Vashishthi years to comply with waste Dalvatne Timeline not management. MPCB 100 Gane Village Gram Panchayat 1) Local nallas 0.00 0.00 0.00 provided had proposed wetland phytorid project at Dalvatne village

Timeline not 101 Khadpoli Gram Panchayat 1) Local nallas 0.00 0.00 0.00 provided

2728.65 1961.40 767.25 1637.57 1091.08 1297.96