28 July 2021) 1

Total Page:16

File Type:pdf, Size:1020Kb

28 July 2021) 1 Page 1 of 5 Government of Pakistan Prime Minister’s Office National Disaster Management Authority Islamabad MONSOON 2021 DAILY SITUATION REPORT NO – 028 (Period Covered: 1300 Hrs 27 July 2021 – 1300 Hrs 28 July 2021) 1. Area Affected (Last 24 Hours). Ser Province / Rgn Daily Incident 1 x child and 1 x female died due to urban flooding in Sector E-11/1. a. ICT Details to follow. b. Balochistan Nothing to Report (NTR) 1 x house fully damaged in District Abbottabad due to land sliding. Furthermore, 50-60 houses in the area are at high risk. Khyber c. 2 x children died & 2 x persons got injured in District Mardan Pakhtunkhwa due to building collapse. Yarkhon-Mastuj Road blocked due to land sliding. 2 x persons died in District Gujrat due to roof collapse. 1 x person died in District Sialkot due to building collapse. 1 x person got injured in District Gujranwala due to roof collapse. Due to rain in Islamabad (Saidpur 123, Golra 103, Bokra 20, d. Punjab Shamsabad 30 & Chaklala 15), Nullah Lai attained maximum level as following: - Kattarian - 21 ft (0810 hours) Gawal Mandi - 17 ft (0920 hours) No loss of life or property reported and situation normalized at 1130 hrs. e. Sindh NTR f. AJ&K 1 x bridge damaged due to flash flood at Bagrote on 27 July 2021. g. Gilgit Baltistan However, no other damages reported. Detail assessment will be shared by GBDMA. 2. Cumulative Damages (1 July todate) a. Summary of Damages of Infrastructure & Private Properties Province/ Houses Power Road Bridge Shop Hotels Masjid Rgn Wise PD FD Houses AJ&K - - - - - - 24 - Balochistan 6 1 - - - 13 5 - GB 2 1 - - - - - - ICT - - - - - - - - KP 1 2 - - - 36 6 - Punjab - - - - - 19 8 - Sindh - - - - - - 150 - Total 9 4 - - - 68 193 - Note: PD: Partially Damaged, FD: Fully Damaged Page 2 of 5 c. Summary of Casualty – Injured/ Death Province / Deaths Injured Region M F C T M F C T AJ&K 3 2 - 5 1 2 1 4 Balochistan 13 3 - 16 10 - - 10 GB 2 2 - 4 - - - - ICT - 1 1 2 - - - - KP 11 1 10 22 19 3 11 33 Punjab 23 3 2 28 62 - - 62 Sindh - - 3 3 - - - - Total 52 12 15 79 92 5 12 109 3. Flood Relief Activities a. Relief Camps Established. NTR. b. Rescue Activities. NTR. c. Aviation Activities. NTR. d. Relief Activities. NTR. 4. Threat to Next Likely Areas. NTR. 5. River Discharges. As per FFD, All the Major Rivers are flowing below low flood level. Low to Medium level flooding is expected in the Nullahs of Rivers Chenab & Ravi. Details of river discharges is attached as Annex A. 6. Dams Levels Max Conservation Current Remaining Ser Reservoirs Level & Storage Level & Storage Level & Storage (Feet) (MAF*) (Feet) (MAF*) (Feet) (MAF*) a. Tarbela 1,550.00 5.882 1502.36 3.363 47.64 2.519 b. Mangla 1,242.00 7.356 1183.60 3.373 58.4 3.983 c. Chashma 649.00 0.278 643.80 0.096 5.2 0.182 Total Storage – 13.516 (MAF) Total Storage till 28 July 2021 – 6.832 (MAF) Remaining Storage – 6.684 (MAF) Reference: Federal Flood Commission 7. Weather Forecast for Next 24 Hours by PMD. Fairly widespread thunderstorm/rain of Moderate to HEAVY Intensity with isolated VERY HEAVY falls is expected over the upper catchments of all the Major Rivers along with Rawalpindi, Gujranwala, Sargodha & Lahore Divisions. Scattered thunderstorm/rain with one or two HEAVY falls is expected over Peshawar, Kohat, Banu, DI khan, Faisalabad, Sahiwal, Multan, Bahawalpur & DG Khan Divisions. 8. Rainfall Last 24 Hours. Attached as Annex B. 9. Weather Advisory / Press Release. In response to PMD weather alert NDMA has issued weather advisory to all concerned on 26th July 2021 that strong monsoon currents Page 3 of 5 are continuously penetrating in upper pats of the country and likely to continue during the week. Under the influence of this weather system, following is predicted: - a. Rain-wind-thundershower (with isolated heavy falls) is expected in Kashmir, Islamabad, Rawalpindi, Attock, Chakwal, Jhelum, Gujrat, Mandi Bahauddin, Sialkot, Narowal Gujranwala, Hafizabad, Lahore, Faisalabad, Sargodha, Mianwali, Kohistan, Shangla, Mansehra, Abbottabad, Haripur, Mardan, Charsadda, Nowshera, Dir, Chitral, Peshawar, Kohat, Tank and Karak with occasional gaps from Monday to Friday (26th- 30th July 2021). b. Rain-wind-thundershower is expected in Gilgit-Baltistan (Ghizer, Astore, Diamir, Skardu Gilgit, Hunza, Nagar, Ghanche and Kharmang), Bannu, D.I. Khan, Bhakkar, Layyah, Dera Ghazi Khan, Multan, Sahiwal, Barkhan, Kohlu, Sibbi and Zhob from Tuesday to Thursday (26th 29th July 2021). 10. Flood Warning / Alert. As per FFD, flows are likely to increase in River Jhelum at upstream Mangla (High to Very High flood level) and High flood in River Chenab at Marala, Khanki, Qadirabad from 28th to 30th July 2021.. 11. Daily Flood / Base Flow Data Obtained from India Ser Name of Full Live Current Current Inflow Outflow Dam Reservoir Storage Live Level Level Capacity Storage at FRL (MAF) (MAF) 22-07-21 a. Bhakra Dam 1680 5.050 1.054 1579.34 47,744 18,167 River Sutlej b. Pong Dam 1400 4.991 0.620 1315.36 28,994 10,507 River Beas c. Thein Dam Not Not 1732 1.900 0.340 1638.40 River Ravi available available Reference: Ministry of Water Resources, Office of PCIW report dated 28 Jul 2021. Page 4 of 5 Annex A To NDMA SITREP No-028 Dated 28 July 2021 RIVERS FLOW SITUATION REPORTED BY FLOOD FORECASTING DIVISION Actual Danger Observed Flow Forecast for Forecasted Design Level Rivers Station Next 24 hrs Flood Level Capacity (V. High Inflow Outflow (Inflow) (Inflow) Flood) Low to Tarbela 1,500 273.0 142.3 300-380 650 Medium No Kalabagh 950 170.9 163.4 significant Below Low 650 change Chashma 1,000 214.2 200.8 -do- -do- 650 River Indus Taunsa 1,000 172.3 151.3 -do- -do- 650 Guddu 1,200 160.9 118.4 -do- -do- 700 Sukkur 900 112.0 56.2 -do- -do- 700 Kotri 875 43.6 3.2 -do- -do- 650 River Kabul Nowshera 540 47.6 47.6 -do- -do- 200 High to Mangla 1,060 45.0 10.6 50 R 260 225 River V.High Jhelum No Rasul 850 7.4 0.0 significant Below Low 225 change Low to Marala 1,100 107.3 74.1 110-160 400 Medium Khanki 1,100 78.8 72.6 80-120 Low 400 River Chenab Qadirabad 900 81.3 61.3 80-100 Low 400 Below Low Trimmu 875 27.0 10.6 30-50 450 Panjnad 865 43.5 27.9 No -do- 450 Jassar 275 14.6 14.6 significant15-30 -do- 150 Shahdara 250 35.8 35.8 change25-38 -do- 135 River Ravi Balloki 380 39.0 10.3 40-50 Low 135 No Sidhnai 150 28.2 12.4 significant Below Low 90 change G.S. Wala - 0.03 0.03 -do- -do- 50 River Sutlej Sulemanki 325 14.5 2.3 -do- -do- 175 Islam 300 2.0 0.8 -do- -do- 175 Note. All data in Thousands of Cusecs. Page 5 of 5 Annex B To NDMA SITREP No-028 Dated 28 July 2021 SIGNIFIANT RAINFALL REPORTED LAST 24 HOURS BY PMD Stations Rainfall (mm) Punjab Islamabad (Saidpur 123, Golra 103, City 72, Bokra 20 & A/P Sialkot (City103 & A/P 83) Gujrat 63 Narowal 54 Murree 34 Rawalpindi (Chaklala 32 & Shamsabad 30) Jhelum 22 Gujranwala 12 M. B. Din 06 Attock 03 Hafizabad 01 Balochistan Nil. Khyber Pakhtunkhwa Balakot 30 Kakul 18 Takht Bai 12 Mirkhani, Buner & Mohmand Dam 02 Gilgit Baltistan Nil. AJ&K Kotli 56 Panjera 38 Balakot 30 Bandi Abbaspur 28 Chakothi 27 Rawalakot 20 Brarkot 15 Muzaffarabad (A/P 10 & City 06) Garhi Dupatta & Chattar Kalas 05 Sindh Nil. .
Recommended publications
  • Development Expenditure (Volume-IV) Budget Estimates 2021-22
    For Departmental use only FEDERAL BUDGET 2021–2022 DETAILS OF DEMANDS FOR GRANTS AND APPROPRIATIONS Development Expenditure (Volume-IV) Budget Estimates 2021-22 Government of Pakistan Finance Division Islamabad PART III - DEVELOPMENT EXPENDITURE A - DEVELOPMENT EXPENDITURE ON REVENUE ACCOUNT : I - CABINET SECRETARIAT - PAGES 86 Development Expenditure of Cabinet Division 2403 87 Development Expenditure of Aviation Division 2407 88 Development Expenditure of Establishment Division 2417 89 Development Expenditure of Poverty Alleviation and Social Safety Division 2420 90 Development Expenditure of SUPARCO 2423 II - CLIMATE CHANGE, MINISTRY OF - 91 Development Expenditure of Climate Change Division 2431 III - COMMERCE, MINISTRY OF - 92 Development Expenditure of Commerce Division 2437 IV - COMMUNICATIONS, MINISTRY OF - 93 Development Expenditure of Communications Division 2443 V - DEFENCE, MINISTRY OF - 94 Development Expenditure of Defence Division 2449 95 Development Expenditure of Survey of Pakistan 2456 VI - DEFENCE PRODUCTION, MINISTRY OF - 96 Development Expenditure of Defense Production Division 2461 VII - ENERGY, MINISTRY OF - 97 Development Expenditure of Power Division 2465 (i) VIII - FEDERAL EDUCATION, PROFESSIONAL TRAINING, PAGES NATIONAL HERITAGE AND CULTURE, MINISTRY OF - 98 Development Expenditure of Federal Education and Professional Training Division 2475 99 Development Expenditure of Higher Education Commission (HEC) 2490 100 Development Expenditure of National Vocational & Technical Training Commission (NAVTTC) 2527 101
    [Show full text]
  • Annual Plan 2019-20 of 12Th Five Year Plan (2018-23) Is Very Challenging
    ANNUAL PLAN 2019-20 Table of Contents No. Contents Page No. Foreword iii Review Committee v Executive Summary vii Abbreviations and Acronyms xix Part I: Economic Recovery to Inclusive and Sustainable Growth 1 1. Economic Framework-Growth, Investment and Savings 3 2. Balance of Payments 13 3. Fiscal, Monetary and Capital Market Development 25 4. Public Sector Development Programme (PSDP) 35 5. Food Security and Agriculture Development 45 6. Manufacturing, Mineral and Commerce Sectors 57 7. Information & Communication Technology 63 8. Population 69 9. School and College Education 75 10. Higher Education 79 11. Science and Technology 87 12. Health 93 13. Nutrition 105 14. Labour, Employment and Skill Development 111 15. Mass Media, Culture & National Heritage 119 16. Energy 127 17. Water Resources Development 147 18. Transport and Logistics 153 19. Physical Planning & Housing 161 20. Poverty Alleviation and Achieving SDGs 163 21. Social Welfare- Inclusion of Vulnerable Groups 171 22. Gender and Women Empowerment 175 23. Religious Pluralism and Interfaith Harmony 179 24. Governance and Institutional Reforms 181 Part II: Special Areas of Focus 189 25. Balanced Development – Focus on the Less Developed Regions 191 26. Climate Change and Environment 199 FOREWORD The Annual Plan 2019-20 of 12th Five Year Plan (2018-23) is very challenging. It is first year of the present government which is committed to put Pakistan on sustainable and inclusive economic growth trajectory. In pursuance of its agenda, the government has already taken various urgent Fiscal and External sectors measures to stabilize the economy. In addition, Extended Financing Facility (EFF) with the IMF has already been concluded for providing support to the reform program and seek assistance from WB and ADB to build fundamentals of the economy.
    [Show full text]
  • FINAL REPORT-2019.Cdr
    Managing Director’s Report 2019 NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LIMITED 02Services 03Fields Of Activity 04My Word 14Dam Engineering Sector 06Energy 16Highways & Sector Transportation Engineering Sector 10Water & 24Architecture & Agricultural Planning Development Sector Sector 30Environmental & Public Health Engineering Sector 34Oil, Gas & Industrial Major New, Sector 40Ongoing & Completed Projects 36Information Technology & GIS Sector 02 Appraisals, Pre-feasibility and Feasibility Studies ® Reconnaissance Studies ® Preliminary Investigations ® Development of Alternative Proposals ® Outline Designs and Cost Estimates ® Front End Engineering Design ® Technical and Economic Feasibility Studies ® Site Selection Studies ® Doability Studies ® Pre-qualification of Contractors Surveys and Investigations ® Evaluation of Tenders and ® Topographic Surveys and Mapping Recommendations ® Geographical Information System ® Contract Documents ® Geotechnical and Soil Investigations ® Geological, Geophysical, Hydrological Construction Supervision and and Environmental Surveys Contract Management ® Traffic Surveys ® Project Management ® Commercial Surveys ® Contract Administration ® Socio-economic Surveys ® Progress Monitoring and Control ® Instrumentation and Monitoring ® Works Supervision and Quality Control ® Equipment Inspection and Design Commissioning ® Design Vetting ® Measurements Specialised Services ® Preliminary Designs ® Certification of Periodic Payments to ® Institutional Strengthening and ® Model Tests Contractors Capacity Building
    [Show full text]
  • Audit Report on the Accounts of Wapda Ministry of Water Resources Audit Year 2017-18
    AUDIT REPORT ON THE ACCOUNTS OF WAPDA MINISTRY OF WATER RESOURCES AUDIT YEAR 2017-18 AUDITOR GENERAL OF PAKISTAN TABLE OF CONTENTS Page ABBREVIATIONS & ACRONYMS i PREFACE v EXECUTIVE SUMMARY vii SUMMARY TABLES & CHARTS I Audit Work Statistics xiii II Audit observations regarding financial xiii management III Outcome Statistics xiii IV Irregularities pointed out xiv V Cost-Benefit xiv WATER AND POWER DEVELOPMENT AUTHORITY (WAPDA) CHAPTER 1 COORDINATION WING 1.1 Introduction 1 1.2 Comments on Financial Statements 1 1.3 Audit Paras 3 CHAPTER 2 WATER WING 2.1 Introduction 25 2.2 Comments on Financial Statements 25 2.3 Brief comments on the status of compliance with PAC 26 directives 2.4 Audit Paras 27 CHAPTER 3 POWER WING 3.1 Introduction 69 3.2 Comments on Financial Statements 69 3.3 Brief comments on the status of compliance with PAC 69 directives 3.4 Audit Paras 70 ANNEXURE MFDAC Paras 161 ABBREVIATIONS AND ACRONYMS AGP Auditor General of Pakistan AGPR Accountant General Pakistan Revenues AJ&K Azad Jammu and Kashmir B&C Budget & Consolidation BoD Board of Directors BOQ Bill of Quantity BPS Basic Pay Scale CCA Cultural Command Area CCC Central Contract Cell CDA Capital Development Authority CDL Cash Development Loan CDWP Central Development Working Party CEO Chief Executive Officer CMTL Central Material Testing Laboratory CRBC Chashma Right Bank Canal CRRK Chief Resident Representative Karachi CSA Consultancy Services Agreement CPPA Central Power Purchasing Agency DAC Departmental Accounts Committee DG Director General DISCOs Distribution
    [Show full text]
  • Federal PSDP 2019-20 Authorization As on 20-Dec-19
    Federal PSDP 2019-20 Authorization as on 20-Dec-19 (Million Rupees) Name of Project Cost Expenditure Throw- Allocation 2019-20 Authorization Upto June forward (Rupee Total Foreign Rupees Foreign Total 2019 Component) Aid Aid AVIATION DIVISION 1Construction of Airport Security 2,586.9 0.0 2,286.6 300.2 100.000 0.000 100.000 100.000 Force Camp (ASF) at IIAP 2Construction of Rain Water 2,629.4 0.0 1,638.9 990.5 100.000 0.000 100.000 100.000 Harvesting Kasana Dam 3Establishment of Specialized 2,502.5 0.0 2,446.1 56.4 3.532 20.000 23.532 3.532 Medium Range Weather Forecasting Center (SMRFC) and Strengthening of Weather Forecasting system in the Islamic Republic of Pakistan 4Installation of Weather Surveillance 1,580.0 0.0 1,017.8 562.2 30.000 130.000 160.000 30.000 Radar at Karachi in the Islamic Republic of Pakistan 5Installation of Weather Surveillance 1,848.7 0.0 9.0 1,839.7 30.000 20.000 50.000 30.000 Radar at Multan in the Islamic Republic of Pakistan 6 New Gwadar International Airport 22,247.5 0.0 1,146.8 21,100.6 355.000 200.000 555.000 NGIA Project 7Reverse Linkage Project Between 101.0 0.0 20.0 81.0 20.500 19.500 40.000 10.250 Pakistan Meteorological Department and Marmara Research Centre (MRC), Turkey (IDB) 8Construction of Double Storey 86.9 0.0 0.0 86.9 25.000 0.000 25.000 2.500 Ladies Hostel/ Barrack with Provision of Third Storey alongwith Mess, Recreation Hall and Allied Facilities at AIIAP Lahore (53xladies staff) 9Construction of 2x Double Storey 167.6 0.0 0.0 167.6 30.000 0.000 30.000 3.000 Barrack with Provision of Third
    [Show full text]
  • Modeling of Future Electricity Generation and Emissions Assessment for Pakistan
    Article Modeling of Future Electricity Generation and Emissions Assessment for Pakistan Abdullah Mengal 1,*, Nayyar Hussain Mirjat 2, Gordhan Das Walasai 3, Shoaib Ahmed Khatri 2, Khanji Harijan 4 and Mohammad Aslam Uqaili 2 1 Department of Mechanical Engineering, Balochistan University of Engineering & Technology, Khuzdar 89100, Pakistan 2 Department of Electrical Engineering, Mehran University of Engineering & Technology, Jamshoro 76062, Pakistan; [email protected] (N.H.M.); [email protected] (S.A.K.); [email protected] (M.A.U.) 3 Department of Mechanical Engineering, Quaid-e-Awam University of Engineering, Sciences & Technology, Nawabshah 67480, Pakistan; [email protected] 4 Department of Mechanical Engineering, Mehran University of Engineering & Technology, Jamshoro 76062, Pakistan; [email protected] * Correspondence: [email protected]; Tel.: +92-300-890-2886 Received: 31 December 2018; Accepted: 8 April 2019; Published: 12 April 2019 Abstract: Electricity demand in Pakistan has consistently increased in the past two decades. However, this demand is so far partially met due to insufficient supply, inefficient power plants, high transmission and distribution system losses, lack of effective planning efforts and due coordination. The existing electricity generation also largely depends on the imported fossil fuels, which is a huge burden on the national economy alongside causing colossal loss to the environment. It is also evident from existing government plans that electricity generation from low-cost coal fuels in the near future will further increase the emissions. As such, in this study, following the government’s electricity demand forecast, four supply side scenarios for the study period (2013– 2035) have been developed using Long-range Energy Alternatives Planning System (LEAP) software tool.
    [Show full text]
  • Indicative Generation Capacity Expansion Plan (IGCEP) 2018-40
    Identify Require -ments Provide Satisfy IGCEP Plan Objectives LOLP Cater Growth Power System Planning National Transmission and Dispatch Company (NTDC) February 2019 Table of Contents List of Figures ..................................................................................................................... v List of Charts ...................................................................................................................... vi List of Tables ..................................................................................................................... vii Acronyms ......................................................................................................................... viii Useful Links of Stakeholder Entities ............................................................................... xii Foreword ............................................................................................................................. 1 Acknowledgements ............................................................................................................ 2 1. Power System Planning – Gateway to NTDC ........................................................ 3 2. Setting the Perspective ........................................................................................... 6 2.1. Generation Planning – A Subset of Power System Planning ..................................... 6 2.2. Preamble ..................................................................................................................
    [Show full text]
  • Symposium 2017 Vol 38
    74th Annual Symposium of Pakistan Engineering Congress i - PAKISTAN ENGINEERING CONGRESS 74TH ANNUAL SESSION JAN. 2016 – DEC. 2017 ANNUAL SYMPOSIUM ON THE TOPIC OF “IMPACT OF INFRASTRUCTURE DEVELOPMENT AND PAKISTAN ECONOMY” Volume 38 LAHORE ii 74th Annual Symposium of Pakistan Engineering Congress ON BEHALF OF PAKISTAN ENGINEERING CONGRESS Pakistan Engineering Congress as a body does not hold itself responsible for the opinions expressed by different authors in this Volume Compiled and Edited By: Engr. Syed Mansoob Ali Zaidi Member Executive Council / Convener Symposium Committee Published By: Engr. Nayyar Saeed Secretary PEC Price Rs. 500/- Members Free Can be had at: PAKISTAN ENGINEERING CONGRESS (4th Floor) Pakistan Engineering Congress Building, 97-A/D-1, Liberty Market Gulberg-III, Lahore 54660 (Near Liberty Roundabout) Phone: (042) 35784238, (042) 35784235 Fax: (042) 35784236 Web-site: www.pecongress.org.pk E-mail: [email protected] ISBN: 978-969-603-035-5 74th Annual Symposium of Pakistan Engineering Congress iii PAKISTAN ENGINEERING CONGRESS THE EXECUTIVE COUNCIL FOR THE 74th SESSION PRESIDENT Engr. Ch. Ghulam Hussain Immediate Past President Engr. Iftikhar Ahmad (President 73rd Session) VICE-PRESIDENTS 1. Engr. Husnain Ahmad 6. Engr. Ch. Muhammad Arif 2. Engr. R. K. Anver 7. Engr. Akhtar Abbas Khawaja 3. Engr. Ijaz Ahmad Cheema 8. Engr. Syed Shehzad Raza 4. Engr. Dr. Izhar-ul-Haq 9. Engr. Muhammad Amin 5. Engr. Tariq Rasheed Wattoo OFFICE BEARERS 1. Engr. Nayyar Saeed Secretary 2. Engr. Ch. Muhammad Aamir Ali Joint Secretary 3. Engr. Najam Waheed Treasurer 4. Engr. Capt (R) M. Qadir Khan Publicity Secretary 5. Engr. Amjad Saeed Business Manager EXECUTIVE COUNCIL MEMBERS 1.
    [Show full text]
  • POK Vol 13, No. 04 April 2020
    POK Volume 13 | Number 04 | April 2020 News Digest A MONTHLY NEWS DIGEST ON PAKISTAN OCCUPIED KASHMIR Political Developments Gilgit Baltistan Activist said Pakistan's double standards on people of Ladakhi Buddhism Sultan M Hali, India objects to COVID-19 quarantine camps in AJK Opposition leader wants GB Assembly dissolved Pakistan using quarantine excuse to lockup lawyers in Gilgit Gilgit-Baltistan minister quits over failure to get lockdown eased SC irked by delay in giving rights to GB citizens Economic Developments Shahbaz Rana, World Bank increases Dasu project financing by $700m Terence J Sigamony, Diamer-Bhasha Dam: 'Lobbies' trying to wreak 'vengeance' Tanveer Ahmad, AL&R of Diamer-Bhasha Dam project's cost goes up China starts building high-altitude airport on the Pamir Plateau Urdu Media Baltistan should get its share from the Assistance China has given Gilgit Baltistan faces laboratory crisis Don't cute the salaries of employees No. 1, Development Enclave, Rao Tula Ram Marg New Delhi-110 010 Jammu & Kashmir (Source: GIS Section MP-IDSA) In this Edition In the month of April, the local administration was preoccupied with the pandemic situation in GB and issues like hoarding of essential commodities, shortages of personal protective equipment (PPEs) for the paramedics, lack of coronavirus testing laboratories, medical staff and ventilators, and shortages of funds due to Pakistan not giving the region its share of aid received from the U.S., World Bank and Asian Development Bank (ADB) to fight COVID-19 grabbed the attention of the local media. This month also the government of Pakistan approached the Supreme Court seeking its clearance to amend the "Government of Gilgit-Baltistan Order 2018" to conduct the upcoming general elections by adopting the Elections Act 2017 as well as setting up a caretaker government during the interregnum period.
    [Show full text]
  • Muhammad Umar Farooq
    NESPAK CURRICULUM VITAE Name of Firm : National Engineering Services Pakistan (Pvt.) Limited Name of Person : MUHAMMAD UMAR FAROOQ Nationality : Pakistani Profession : Water Resources Engineering Position in Firm : Senior Engineer (Water Resources) Specialization in Firm : Hydrological & flood modelling, Reservoir operations and optimizations, Hydropower energy estimation, Sediment modelling, Indo- Pak trans-boundary waters matters, Data analysis and processing, Year of joining firm : 2011 Affiliation with : i. Member Pakistan Engineering Council Professional Institutions ii. Member Pakistan Engineering Congress iii. International Association for Hydro- Environment Engineering and Research (IAHR), Germany Contact Email : [email protected] KEY QUALIFICATIONS As a team member worked on developing the snow and glacier melt runoff model for Kabul River Basin. Provided assistance to couple the runoff models for Kabul, Indus, Jhelum and Chenab rivers to develop an integrated flow forecasting system. Carried out various reservoir operation studies with a focus to optimize the hydropower energy, irrigation losses and revenue gains. Assisted in flood estimation, flood modelling and suggestion of mitigation measures uder various projects. Carried out design evaluation of various India’s hydropower projects in accordance with the provisions of Indus Waters Treaty along with other trans-boundary waters issues. Performed sedimentation study and optimization of operational storage at India’s Kishenganga and Ratle HEPs. Participating/providing technical assistance for the meetings of Permanent Indus Commission since 2013. Performed sediment/hydraulic modelling for various projects in the Indus Basin. Assisted in optimization of flushing scenario for 840 MW Suki Kinari Hydropower Project on techno-economic basis. Developed various scripts using R- Programming and VBA Excel for modelling and day to day assignments.
    [Show full text]
  • Kalabagh Dam Wapda Chairman Comes up with Creative Idea
    Kalabagh dam Wapda chairman comes up with creative idea Page NO.03 Co lNO.02 ISLAMABAD: Terming Sindh’s concerns on Kalabagh dam genuine, Chairman Water and Power Development Authority (Wapda), Lt-General Muzammal Hussain (retired) proposed on Tuesday that if a consensus evolves on the dam within political forces, then it should be built but its operation should be handed over to Sindh aimed at addressing its concerns. He made these comments before the Senate Standing Committee on Water Resources, days before the Supreme Court (SC) would deliberate on the Kalabagh dam issue. The meeting was presided over by Senator Shamim Afridi. Talking about long-term hydropower projects, Chairman Wapda said that Kalabagh dam should be constructed if provinces show their consent, adding that consensus is necessary prior to taking any initiative on it. He cited a report by Qamar Zaman Shah in which a couple of recommendations were made: (i) there should not be any link canal on right or left side of the reservoir; (ii) there should be authentic statistics of sufficient water availability to fill the reservoir as river Kabul, river Swat and Sindh residual will fall in the dam; and (iii) Management and O&M of the dam should be handed over to Sindh. Chairman Wapda acknowledged that the concerns of Sindh are genuine, that in case the project is established Punjab will not get its share. He said the height of the project has already been slashed by 10 per cent to address KPK’s concerns adding that with the establishment of Mohmand Dam (old Munda dam), the apprehensions of flooding in Mansehra and Naushera will be addressed.
    [Show full text]
  • Brief Overview Diamir Bhasha Dam and Mohmand Dam 05-Jul-2018
    REP-300 Brief Overview Diamir Bhasha Dam and Mohmand Dam 05-Jul-2018 Analyst: Tahir Abbas [email protected] +92 21 3246 2589 www.arifhabibltd.com www.jamapunji.pk Best Domestic Equity House Corporate Finance House of the Year Top 25 Listed Companies Best Equity House Supreme Court Deems Construction of Dams Vital for Pakistan • The Honorable Supreme Court of Pakistan (CJP) has issued directives for immediate construction of Diamir Bhasha and Mohmand dams. • While Chief Justice Mr. Saqib Nisar has announced a donation of PKR 1mn for the cause, he also formed a committee under the chairmanship of Water and Power Development Authority (WAPDA) Chief to monitor the progress of work as well as an account to collect funds for the project. • The committee is set to present a report on the subject within 3 weeks. 2 Diamir Bhasha Dam Location: The project is located on Indus River, about 315 km upstream of Tarbela Dam, 165 km downstream of the Northern Areas Capital Gilgit and 40 km downstream of Chilas. 3 Diamir Bhasha Dam Location Cont.. 4 Diamir Bhasha Dam Salient Features • This will be a Roller Compacted Concrete (RCC) Dam • Height of the Dam will be 272m • Gross storage capacity is expected to be 8.1 MAF (Million Acre Feet) • Live storage capacity will be around 6.1 MAF • Gross power generation capacity is estimated at 4,500MW • Expected completion time is 14 years • Estimated cost of the project is USD 15bn Diamir Bhasha Dam – Snapshot Dam Type Roller Compacted Concrete (RCC) Height of Dam 272 m Gross Storage Capacity 8.1 MAF Live Storage Capacity 6.4 MAF Power Generation 4,500 MW Execution by WAPDA Expected Completion 14 years Estimated Cost (USD) 15bn Source: WAPDA and AHL Research 5 Diamir Bhasha Dam Status • Land acquisition in progress (initial stages) Funding • Government has previously negotiated the funding of Diamir Basha Dam with World Bank • World Bank has two funds to finance development projects including: 1.
    [Show full text]