FINAL REPORT-2019.Cdr
Total Page:16
File Type:pdf, Size:1020Kb
Managing Director’s Report 2019 NATIONAL ENGINEERING SERVICES PAKISTAN (PVT.) LIMITED 02Services 03Fields Of Activity 04My Word 14Dam Engineering Sector 06Energy 16Highways & Sector Transportation Engineering Sector 10Water & 24Architecture & Agricultural Planning Development Sector Sector 30Environmental & Public Health Engineering Sector 34Oil, Gas & Industrial Major New, Sector 40Ongoing & Completed Projects 36Information Technology & GIS Sector 02 Appraisals, Pre-feasibility and Feasibility Studies ® Reconnaissance Studies ® Preliminary Investigations ® Development of Alternative Proposals ® Outline Designs and Cost Estimates ® Front End Engineering Design ® Technical and Economic Feasibility Studies ® Site Selection Studies ® Doability Studies ® Pre-qualification of Contractors Surveys and Investigations ® Evaluation of Tenders and ® Topographic Surveys and Mapping Recommendations ® Geographical Information System ® Contract Documents ® Geotechnical and Soil Investigations ® Geological, Geophysical, Hydrological Construction Supervision and and Environmental Surveys Contract Management ® Traffic Surveys ® Project Management ® Commercial Surveys ® Contract Administration ® Socio-economic Surveys ® Progress Monitoring and Control ® Instrumentation and Monitoring ® Works Supervision and Quality Control ® Equipment Inspection and Design Commissioning ® Design Vetting ® Measurements Specialised Services ® Preliminary Designs ® Certification of Periodic Payments to ® Institutional Strengthening and ® Model Tests Contractors Capacity Building ® Computer Simulations ® Tourism Planning ® Detailed Designs and Specifications Post-construction Services ® Inspection of Dams and Barrages ® Detailed Drawings ® Third Party Validation and Monitoring ® Development of Building Codes ® PC-1 & PC-2 ® Completion Reports ® Asset Valuation ® Operation and Maintenance Manuals ® Services for Public-Private Partnership Tender and Contract Documents ® Routine Maintenance and Safety and BOT Projects ® Bill of Quantities, Technical Inspections ® Trainings Specifications, Cost Estimates and ® Retrofitting and Rehabilitation ® Building Codes Schedules ® Conservation of Structures ® Landslide Study and Mitigation ® Tender Documents for Normal/EPC ® Performance Monitoring ® Deep Excavation Support Contracts 03 Mitigation and Deep Excavation Support Control, Contaminated Site Assessment Systems and Mitigation, Environmental Audit and Resettlement Action Plans Airport Terminal Buildings, Hangars, Runways, Taxiways and Air Traffic Steel Mills, Automobile Plants, Cement Control Towers Plants, Fertilizer Plants, Polyester Plants, Water Resources Planning, Drainage, Sugar Plants, Chemical Industrial Plants Salinity Control and Land Reclamation, Deep Seaports, Fish Harbours, Marine and Textile Units Dams and Barrages, Irrigation and Terminals, Container Terminals, Inland Drainage Systems, Water Resources River Navigation and Marine Jetties Business Process Re-engineering, Management Information System, IT Development and Management, Flood Architectural and Engineering Design, and Software Development, Database Management and Forecasting/Warning Healthcare Buildings, Educational Applications, Web Portals, Data Systems and Institutional and Social Buildings, High-rise Buildings, Corporate Warehousing, Data Conversion, Development Office Buildings, Commercial and Networking and Data Centres, Satellite Power Transmission and Distribution, Community Buildings, Sports and Imagery Processing, Digital Terrain Substations, Hydropower, Thermal Recreational Facilities, Industrial Modelling, Global Positioning System Power, Nuclear Power, Rural Buildings, Low-cost Housing, Residential (GPS) Survey, Remote Sensing, GIS Electrification, Renewable Energy, Communities, Urban/Rural Planning, Development and Map Digitisation Supervisory Control and Data Slum Upgradation, Landscaping, Interior Land Surveying, Cadastral Surveying, Acquisition (SCADA) and Design and Rehabilitation and Hydrographic Survey, Geodetic Survey, Telecommunications, Oil and Gas Refurbishment Works Drone Survey, Monitoring Motorways, Highways, Urban Roads, Seismic Hazard Microzonation, Disaster Design and Supervision of Heating Rural Roads, Grade-separated Risk Reduction and Management Ventilation and Air Conditioning (HVAC), Interchanges, Bridges and Flyovers, Studies and Trainings, Implementation Fire-fighting, Elevators, Escalators, Subways and Underpasses, Tunnels, Strategies, Policy Formulation, Platform Screen Doors, Building Computer Generated Transport Residential Communities, Advocacy Management Systems and Building Modelling and Planning, Rapid Mass Planning, Preparation of Zoning Energy Audits Transit System, Railways, 3D Animation Regulations and Bye-laws, Tourism of Highway Projects (Real-life Planning, Regeneration and Building Agriculture Development and Management, On-farm Water Simulation), Steel Structure Design, Codes Pedestrian Bridges, Bus Shelters and Management, High-efficiency Irrigation Intelligent Transport System (ITS) Water Supply, Sewerage, Stormwater Systems, Soil and Water Conservation, Arrangement for Operational Facility Drainage, Solid Waste Management, Social and Environmental Institutional Plumbing, Water and Wastewater Development, Natural Resources Geotechnical, Geo-environmental, Treatment Development (Aquatic Life Study, Geohazards, Site Investigations, Monitoring and Evaluation Tasks, Geological Characterisation, Site Characterisation/Baseline Data for Horticulture/Floriculture Forestry, Geophysical Surveys, Construction Environmental Impact Assessment, Rangeland Management, Livestock and Materials & Minerals, Dams, Landslide Environmental Risk Assessment, Dairy Development and Wildlife Mitigation, Seismotectonic Studies, Environmental Planning and Management) and Seismic Risk Evaluation, Ground Management, Environmental Health Socio-economic Project Impact Improvement, Problematic Ground and Safety, Air and Noise Pollution Evaluation 04 “My message to you all is of hope, courage, and confidence.” { Quaid-e-Azam Muhammad Ali Jinnah { he National Engineering The major projects acquired by NESPAK Japanese historian Shigeru Mizuno has Services Pakistan (Pvt.) Limited during the current fiscal included; rightly said that quality needs to be (NESPAK) was envisioned by its 800MW Mohmand Dam Hydropower constantly improved, but it is just as founders as an organisation Project, Balochistan Water Resources necessary to make sure that quality Tfree from foreign dependence and Development Sector Project, Solar Water never deteriorates. NESPAK closely capable of delivering the highest quality Pumping in Balochistan, Karachi Bulk watches its working mode by in the field of engineering consultancy. It Water Supply Scheme, Phase-I, K-IV undertaking yearly audits. During the was envisaged as an institution which Water Project, Karachi, Kartarpur year, NESPAK audit officials visited had to lead the consultancy market of Corridor Project, Narowal, Wastewater various divisions and offices in Pakistan and compete abroad with Treatment Plants for Mehmood Booti, Islamabad, Lahore, Karachi and excellence. Time has proved that NESPAK Shadbagh, Shahdara and Babu Sabu, Peshawar to ensure has succeeded in fulfilling its objectives Lahore, 300km Hyderabad-Sukkur compliance with the to a large extent owing to the Motorway on Public-Private Partnership Quality Management unprecedented struggle offered by its mode, Development of CPEC City, System (QMS). professional brigade who left no stone Nowshera, Establishment of unturned to achieve their stated aims. Infrastructure in LDA City (Phase-I), The professionals of NESPAK have been Lahore, Port Connectivity Project, putting up a good show to boost the Karachi, Khyber Pakhtunkhwa Flood Company's performance in these testing Management Plan, Booue and Tsengue- times when the country's economic Leledi Hydroelectric Projects,Gabon, indicators are not painting a bright Kano River and Hadejia Valley, Irrigation picture. Schemes, Dams Safety and Rivers Training in Hadejia-Jama'are River Like the past, NESPAK managed to secure Basin, Nigeria and Road between a handsome number of projects during Thumrait Interchange and the financial year 2018-19. The Company Mubaila Interchange, Muscat acquired 87 projects during the fiscal Expressway, Oman. year, depicting an excellent performance as a result of its robust marketing strategies. Out of these, 76 jobs were domestic and 11 in the foreign countries, i.e., Gabon, Kingdom of Saudi Arabia, State of Qatar, Sultanate of Oman and Federal Republic of Nigeria. NESPAK contracted a fee of Rs. 11.14 billion for these projects, which is 11% more than the last year’s (Rs. 10.07 billion). 05 A Surveillance Audit was conducted at house trainings and collaborative learning various NESPAK offices by the Lead programmes have been also implemented Auditor/Technical Expert of TUV Austria at NESPAK. BUSINESS Bureau of Inspection and Certification Workforce is the key to the success of an 14000 during June 2019. The audit was organisation. To quote American 12000 1 extensive with the objective to measure RUPEES IN MILLION 1,866 businessman and author Harvey Mackay: 11,144 the conformance of NESPAK QMS to 10000 10,071 “Your workforce is your most valuable 10,021 meet the requirements of ISO 9001:2015 asset. The knowledge and skills they have, 9,049 Standard. The QMS was found compliant 8000 represent the fuel that drives the engine of with the requirements of the Standard by business - and you can leverage that 6000 the TUV