Proposed Commercial - Residential Complex, Vacanza Homes
Total Page:16
File Type:pdf, Size:1020Kb
PROPOSED COMMERCIAL - RESIDENTIAL COMPLEX, VACANZA HOMES at Block No.-112, F.P No.18, O.P No.-57, Final T.P.S No.-43 (Bhimrad) Surat. Gujarat TABLE OF CONTENTS 1. COMPANY INTRODUCTION ........................................................................................................................................ 3 2. PROJECT LOCATION ................................................................................................................................................... 3 3. PROJECT COST ............................................................................................................................................................ 4 4. PROJECT DESCRIPTION .............................................................................................................................................. 5 4.1 Infrastructural features ........................................................................................................................................ 5 4.2 Built up area summary ......................................................................................................................................... 5 5. ELECTRICITY ............................................................................................................................................................... 5 5.1 Power Requirement ............................................................................................................................................. 5 5.2 Source of Power ................................................................................................................................................... 6 5.3 Electrical Load Demand ....................................................................................................................................... 6 5.4 Substation and Power supply .............................................................................................................................. 6 5.5 Power Factor Control ........................................................................................................................................... 6 5.6 Captive Generation .............................................................................................................................................. 6 5.7 Earthing ................................................................................................................................................................ 6 6. ENERGY CONSERVATION DETAILS ............................................................................................................................. 7 7. WATER & WASTE WATER SYSTEM ............................................................................................................................. 8 7.1 Sources of Water ................................................................................................................................................. 9 7.2 Waste water System .......................................................................................................................................... 10 7.3 Details of Water Conservation Measures: ......................................................................................................... 10 8. ENVIRONMENTAL MANAGEMENT DURING CONSTRUCTION & OPERATION PHASE .............................................. 10 9. PROPOSED PARKING PROJECTION ........................................................................................................................... 16 10. RAIN WATER HARVETSING AND STORM DRAINAGE ............................................................................................. 17 11. GREEN BELT DEVELOPMENT .................................................................................................................................. 19 12. OBJECTIVES OF RISK ASSESSMENT ........................................................................................................................ 20 12.1 Risk Identification and Risk Mitigation ............................................................................................................ 20 12.2 Disaster Management Plan .............................................................................................................................. 20 12.3 Safety Measures .............................................................................................................................................. 21 13. BUILDING MANAGEMENT SYSTEM ........................................................................................................................ 22 14. RISK OF EARTHQUAKE ........................................................................................................................................... 24 15. EMERGENCY MANAGEMENT GROUP .................................................................................................................... 24 ANNEXURES Sr No DESCRIPTION 1 Lay out plan 2 Floor wise layout plan 3 Elevation plan 4 Parking plan & Basement plan 5 Airport NOC 6 HFL certificate 7 Details of STP 8 Undertakings 9 Pervious Environmental Clearance and it’s compliance 10 Construction Format 2 1. COMPANY INTRODUCTION Our Group is a success story spanned across decades and continues to achieve higher targets relentlessly for quality performance and service in diverse fields of Civil Construction. The group has made an impact on the supply side of the modern-day living. A style that has been the dream of new class of consumers, a style encompassing the whole range of consumption pattern of the young and the upcoming consumers that has become synonym. The higher standards are set by the group in its pursuit to position Gujarat at par with the developed economies of the India and with a vision to be and remain at the commanding height of Real Estate Business. The development of proposed facility falls under Item No. 8 (a) in Notification vide S.O. 1523(E) dated 14th September 2006 issued by Ministry of Environment and Forest and amended there after and accordingly need to obtain prior environmental clearance from respective committee before starting the project activities. Formal EIA / EMP, Public consultation is not required for this project as per EIA notification and can be considered directly for appraisal for grant of the Environmental clearance on basis of conceptual plan. 2. PROJECT LOCATION Proposed Facility will be developed at Final T.P. S No.-43 (Bhimrad), Block No.-112, O.P No.-57, F.P No.18, Surat, Gujarat. The latitude and longitude of proposed site are 21° 8'14.50"N and 72°48'17.17"E. Site plan is enclosed here with as Figure. Site Selection Criteria Before selecting the sites following points have been considered. Proposed project is adjacent to SMC. No National park or Wildlife Sanctuary falls within 10 KM radius of project site. No ecological sensitive areas such as tropical forests, biosphere reserves fall within 10 KM radius of proposed site. 3 Project Location: Salient Feature of the Site Feature Description Plot. No. Final T.P. S No.-43 (Bhimrad), Block No.- 112, O.P No.-57, F.P No.18, Village Surat, City Gujarat State Latitude and Longitudes of the project site 21° 8'14.50"N and 72°48'17.17"E. Mean Sea Level 16 m Total area acquired 6404.00 sq. mt Total Built up area 24838.82 sq. mt Type of Land Private Residential land Nearest railway station Surat – 8.01 Km (NE direction) National Highway National Highway NH. No. 8 (~16.7 km) Ratan J Batli Nearest Air port Nearest Airport Surat–6.99 Km (SW Direction) National park/Reserved forest None Within 10 km Radius 3. PROJECT COST The estimated additional project cost for expansion of facility with basic amenities is anticipated to be around Rs. 1.50 crore (Approx.), entire project now shall contain 1 nos of Commercial cum residential Buildings having 14th floors 4 . 1 nos of Residential Buildings having 14th floors . 234 Residential Units and 24 Commercial units 4. PROJECT DESCRIPTION 4.1 Infrastructural features Following facilities will take shape up as Project: Garden with jogging park Clubhouse for society 4.2 Built up area summary SSSSummary of built up area is given in table all are in sq.mt. 5. ELECTRICITY 5.1 Power Requirement The proposed development is for residential purpose. The Electrical Energy is required for meeting the Lighting, Computer Power, Air conditioning, Water Pumps, etc. The design of entire electrical installation will be based on the following standards and codes: Indian Standard Specifications, Indian Electricity Act, Indian Electricity Rules, IEEE Regulations, IEEE wiring code, National Building Code, National Fire Protection 5 Authority, National Electrical Code, Chief Fire Officer, and Tariff Advisory Committee of Fire Insurance. 5.2 Source of Power The Power to the Complex will be available from DGVCL. The Power will be available at 66 KV 500 MA Fault level from supply authority. As per our experience the quality of the power is not very good. The Variation is to very large extending hence Transformers with OLTC and having tap setting of -15% to + 15% are proposed. 5.3 Electrical Load Demand The Estimated Electrical load requirement of the proposed Development is 1300 KW. 5.4 Substation and Power supply To meet the above said Electrical load requirement of complex, the Power from M/s. DGVCL, the Supply Power Company in Gujarat, is to be received at 66 KV from their Receiving Station. The power is then stepped down to 11KV in the Substation