Central Coalfields Limited Office of the General Manager Area Purchase Cell, B&K Area, P.O

Total Page:16

File Type:pdf, Size:1020Kb

Central Coalfields Limited Office of the General Manager Area Purchase Cell, B&K Area, P.O Central Coalfields Limited Office of the General Manager Area Purchase Cell, B&K Area, P.O. Bermo Dist.: Bokaro Ref: GM/B&K/APC/ Date:-18.12.17 To The General Manager (S&IC) Mail to: [email protected] CCL, Darbhanga House . Sub:-Monthly report of supply order for the Month of NOV’2017 Dear Sir, Enclosed please find herewith the supply order issued from Purchase Department of G.M. (B&K), Office during the month of NOV’2017 . Details are given below:- SL Order No. Date NO1 12180120 02.11.17 2 11180121 02.11.17 3 11180122 02.11.17 4 11180123 02.11.17 5 11180124 02.11.17 6 11180125 02.11.17 7 11180126 03.11.17 8 12180127 08.11.17 9 11180128 08.11.17 10 12180129 10.11.17 11 12180130 14-11.17 12 13180131 14.11.17 13 12180132 16.11.17 14 11180133 20.11.17 15 12180134 21.11.17 16 12180135 21.11.17 17 12180136 21.11.17 18 12180137 21.11.17 19 12180138 22.11.17 20 11180139 23.11.17 21 11180140 25.11.17 22 13180141 25.11.17 23 12180142 26.11.17 23 12180143 26.11.17 This is for your kind information. Chief Manager (MM)/S.O.(MM) B&K Area Area C.C. to 1. Chief Manager (System) / MM, CCL Ranchi. CENTRAL COALFIELDS LIMITED Office of the General Manager, B&K Area, Purchase Cell PO: Bermo,(Pin 829104),Bokaro, Jharkhand PURCHASE ORDER BY SPEED POST / E-MAIL GST No. 20AAACC7476RHZT PAN No.AAACC7476R NO: CCL/GM/B&K/APC/ Feeder Breaker Spares (BWF) /11180120 Dated : 02.11.2017 To, M/s Planet International, Jaridih Bazar(Bermo), A/C AKKOCP Dist. Bokaro (Jharkhand) PIN: 829114 SPARES FOR BHARAT WESTFALIA FEEDER BREAKER GST. No. 20AJWPK1940N1ZW ,PAN No. AJWPK1940N Sub: Supply of spares for Bharat Westfalia Feeder Breaker at Jarangdih Rly. Siding of B&K Area Ref: NIT No. : CCL/B&K/APC/Feeder Breaker Spr./AKKOCP /17-18/12 Dt.08.06.2017 Opened on 20.06.2017 Your Offer No. PI/17-18/B&K//B&K /CCL/01 Dt.18.06.2017 Dear Sirs, With reference to above, we for and behalf of B&K Area, CCL, hereby place our Supply Order at the following price terms and conditions noted below. Sl. Material Code Item Description Qty. Unit Rate Value (Rs.) No. B&K Code CCL Code (No.) 01 40201500703 40201000774 PICKS A1A345/15 200 510.00 102000.00 02 40201500193 40201000671 PICKS HOLDER A4B872 200 310.00 62000.00 03 LOCK FOR PICKS A1A345/16 200 26.00 5200.00 Basic Total 169200.00 Make : “PLANET INTERNATIONAL“ GST @18% 30456.00 Grand Total 199656.00 The Landed Value of Order: Rs: 199656.00 (Rupees: One Lakh Ninety Nine Thousand Six Hundred Fifty Six Only) Consignee: Depot Officer, Regional Store,(B&K), Jarangdih, PO: Jarangdih, Dist: Bokaro, Jhakhand, 829113. Delivery: within 45 Days from the date of receipt of supply order. Paying Authority: Area Finance Manager, B&K Area, .Area Accounts office GM(B&K),Kargali, P.O: Bermo 829104, Dist: Bokaro References: 1) BC NO : 33/02 Dt.19.05.17, F.C. No. B-175 Dt. 21.05.2017, Value Rs. 178506.00 2) B.C. No.33/14 Dt. 25.10.17,F.C.No. B-487 Dt. 02.11.17, Value Rs.21150.00 Total F.C = Rs. 178506.00 + Rs 21150.00 = Rs.199656.00 Under the Head “ Feeder Breaker Spares ” 3) Indent Ref: NIL Dt.15.05.2017 4) SO(E&M)/B&K/06 Dated 22.05.17 All other terms & conditions as per “Annexure-A” Chief Manager (MM)/SO(MM) B&K Area, Kargali CC : 1. Depot Officer, Regional Store, B&K, Jarangdih 2. CSK (A-1) , Receipt Section , Regional Store, B&K, Jarangdih 3. CSK- Spares Section , Regional Store, B&K, Jarangdih 4. Accounts Section, Regional Store, B&K,Jarangdih Copy to : 1. G.M.(B&K), Kargali – for kind information 2. G.M.(E&M)/HOD , CCL, Ranchi 3. AFM , B&K, Kargali 4. S.O.(E&M.),B&K, Kargali 5. Asst. Manager (Finance), AAO, B&K, Kargali - Annexure ”A” No: CCL/GM/B&K/APC/ Feeder Breaker Spares(BWF) /11180120 Dated : 02.11.2017 M/s Planet International, Jaridih Bazar (Bermo), Dist. Bokaro (Jharkhand) PIN:829114 GST. No. 20AJWPK1940N1ZW, PAN No. AJWPK1940N 1. PRICES: Firm till delivery 2. F.O.R. : Destination. 3. DELIVERY PERIOD : within 45 Days from the date of issue of order. However earliest delivery is requested in view of urgency. 4. CONSIGNEE: Depot Officer, Regional Stores (B&K) Jarangdih P.O: Jarangdih, Dist. Bokaro - 829 113 (Jharkhand) 5. GST : GST@18 % Extra 6. TRANSPORTATION: It is incumbent on the supplier to transport the contracted materials/supplies through registered common carriers only and documentation should be done as per provision of the Carriage by Road Act, 2007 . Any Transportation of goods through unregistered common carriers is illegal . 7. SUBMISSION OF TAX INVOICES :100 % GST invoice in triplicate duly stamped and pre-receipted along with Despatch Documents and Original Guarantee Certificate, Price Certificate , Price Fall Clause Certificate ,copy of E-Mandate (Annexure “B”) addressed to Depot Officer, Regional Store ,B&K, Kargali, Jarangdih and should be submitted to the Depot Officer, R/S B&K, Jarangdih for payment . 8. INSPECTION : Inspection shall be carried out by S.O.(E&M), B&K, Kargali or his authorized representative at destination site. 9. PAYING AUTHORITY : AFM , Area Accounts Office , office of G.M. (B&K), Kargali , PO: Bermo, Dist. Bokaro -829104 10. PRICE CERTIFICATION : You have to certify on the body of your bill that the price charged are not more than those applicable to any other organization/ Govt. deptt/ Semi Govt. Organisation/ PSU/CIL and its subsidiaries. If it is found excess, the excess amount shall be recovered from your any bill. In case in a later date if it is found that the price charged are higher, then you shall be liable to refund the excess amount so received by you, within 10 days of receipt of notice in this regard. 11. IDENTIFICATION MARKS: Identification mark i.e. manufacturers name etc. should be embossed/engraved on bulk materials at a visible place which is not subject to wear and fear for case of identification at any point of time. 12. GUARANTEE / WARRANTY: You shall give warranty of satisfactory performance of the item offered by them for a period of 12 months from the date of commissioning or 18 months from the date of receipt and acceptance by CCL.The supplier shall be responsible for any defects that they develop under the conditions provided for by the contract and under proper use, arising from faulty materials, design or workmanship and shall remedy such defects at his own cost when called upon to do so. If it becomes necessary to the supplier or renewal should be made by the supplier without any extra cost to CCL. 13. LIQUIDATED DAMAGES: The time for and date of delivery of the stores stipulated in the “Purchase Order” shall be deemed to be of the essence of the contract and delivery of the stores must be completed by the date specified. In the event of failure to deliver or dispatch the stores within the stipulated date / period in accordance with the samples and / or Specification mentioned in the supply order, Central Coalfields Limited. Shall have the right: a) To recover from the successful tenderer as agreed liquidated damages, a sum not less than 0.5%(Half Percent) of the price of any stores which the successful tenderer has not been able to supply as aforesaid for each week or part of a week during which the delivery of such store may be in arrears limited to 10%. Where felt necessary the limit of 10% can be increased to15% at the discretion of Head of the Material Management Division. b) To purchase elsewhere, after due notice to the successful tenderer on the account and at the risk of the defaulting supplier the store not supplied or others of a similar description without canceling the supply in respect of the consignment not yet due for supply c) To cancel the supply order or a portion there of and if so desired to purchase the stores at the risk and cost of the defaulting supplier and also. d) To Extend the period of delivery with or without penalty as may be considered fit and proper, the penalty, if imposed shall not be more than the agreed Liquidated Damages referred to in clause (a) above. e) To forfeit the security deposit full or in part. f) Whenever under this contract a sum of money is recoverable from and payable by the supplier, Central Coalfields Ltd. Shall be entitled to recover such sum by appropriating, in part or in whole, by deducting any sum or which at any time thereafter may become due to the successful tenderer in this or any other contract. Should this sum be not sufficient to cover the full amount recoverable, the successful tenderer shall pay Central Coalfield Limited on demand the remaining balance. The supplier shall not be entitled to any gain on any such purchases. 14. PRICE FALL CLAUSE: It will be a condition of the order that all through the currency of the prices, at which the you shall supply the stores, shall not exceed that lowest price them to any other agency including DGS&D.In the event of Price going down, the supplier shall promptly pass on such information to enable this Company to amend the ordered rate.
Recommended publications
  • Central Information Commission
    Hearing Notice Central Information Commission Baba Gang Nath Marg Munirka, New Delhi - 110067 011-26186535 http://dsscic.nic.in/online-link-paper-compliance/add File No. CIC/CCFLT/A/2018/121875 DATE : 22-07-2019 NOTICE OF HEARING FOR APPEAL/COMPLAINT Appellant(s)/Complainant(s): Respondent(s): RAGHUNATH SINGH CPIO : S/O LATE SHRI RADHA MOHAN SINGH, MU. 1. THE CPIO KARGALI BAZAR PO BERMO, DISTT CENTRAL COALFIELD LTD BOKARO BOKARO, JHARKHAND 829104 AND KARGALI AREA Kargali, Jharkhand,Bokaro CCL, Bermo, Bokaro, Jharkhand. Date of RTI Date of reply,if Date of 1st Appeal Date of order,if any,of CPIO made,if any any,of First AA 29-11-2017 - 26-02-2018 - 1. Take notice that the above appeal/complaint in respect of RTI application dated 29-11-2017 filed by the appellant/complainant has been listed for hearing before Hon'ble Information Commissioner Mr. Sudhir Bhargava at Venue VC Address on 20-08-2019 at 11:30 AM. 2. The appellant/complainant may present his/her case(s) in person or through his/her duly authorized representative. 3. (a) CPIO/PIO should personally attend the hearing; if for a compelling reason(s) he/she is unable to be present, he/she has to give reasons for the same and shall authorise an officer not below the rank of CPIO.PIO, fully acquainted with the facts of the case and bring complete file/file(s) with him. (b) If the CPIO attending the hearing before the Commission does not happen to be the concerned CPIO, it shall still be his/her responsibility to ensure that the CPIO(s) concerned must attend with complete file concerning the RTI request, the hearing along with him.
    [Show full text]
  • Selection List of Gramin Dak Sevak for Jharkhand Circle Cycle III Vide Notification No.R&E/GDSONLINEENGAGEMENT/2020 DATED 10.11.2020
    Selection list of Gramin Dak Sevak for Jharkhand circle Cycle III vide Notification No.R&E/GDSONLINEENGAGEMENT/2020 DATED 10.11.2020 S.No Division HO Name SO Name BO Name Post Name Cate No Registration Selected Candidate gory of Number with Percentage Post s 1 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ SC 1 DR64C3AFC49B84 RAMCHITRA Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak SEMIL- (96.4)-SC 2 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ ST 1 DR32F88D224581 LAL BABU GOND- Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak (95.8)-ST 3 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ UR 3 DR4DCCF61C7C9 YOGESH KUMAR- Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak A (97.2)-OBC 4 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ UR 3 DR7FD43E9B3C34 SONU KUMAR- Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak (97.2)-OBC 5 DH DN HRO RMS DH HRO RMS DH Dhanbad GDS ABPM/ UR 3 DR5B2C28D4C79B MANKU Dhanbad DN Dhanbad DN Dhanbad RMS Dak Sevak VISHWAKARMA- (97)-UR 6 Dhanbad Bokaro Steel B.S.City R.S. chainpur GDS BPM ST 1 DR2A936C48227A PURNIMA TUDU- City H.O S.O (93.1)-ST 7 Dhanbad Bokaro Steel B.S.City R.S. Kunduari B.O GDS BPM EWS 1 DR8A9C61CE4DC ROHIT RAJ- (95)- City H.O S.O D UR-EWS 8 Dhanbad Bokaro Steel B.S.City R.S. mango GDS ABPM/ SC 1 DR2931978E4BCC NARBEER SINGH- City H.O S.O Dak Sevak (95.4)-SC 9 Dhanbad Bokaro Steel B.S.City R.S.
    [Show full text]
  • Public Accounts Committee 1960-61
    PUBLIC ACCOUNTS COMMITTEE 1960-61 THIRTY -SIXTH REPORT (SECOND LOK SABHA) [Audit Report on the Accounts ot' the Damodar Valley Corporation for thc year 1958-591 LO'K SABHA SECRETARIAT NEN DELHI April, 1961/Chaitra,1883 (Saka) Price : Re. 0.75 nP. LIST OF AUTHORISED AGENTS OF LOK SABHA SECRETARIAT ANDHRA PRADESH 15. The New Order 28. D. B. Taraporavala Book Company, Ellis & Sons, Co., (P) Limb I. G. R. Lakshmi- Bridge, Ahmedabad- ted, 210, Dr. Naoroji Chetty and 6. Road, Bombay-I. 8 General Mer- Newa 16. Swadeshi Vastu Bhan- 29. Deccan Book Stall, Newpet, dar, Booksellers e~., Fergusson College Road, Jamnagar. Poona-4. 30.. The Good Compa- KERALA nlons, Raspura, Baroda. 2. Hindustan Diary Pub- 17. C. V. Venkitachala lishers, Market Street, Iyer, Near Railway 31. The Imperial Book Secundrrabad. Station, Chalakudi. Depot, 266, Mahatma Gandhi , ,ad, Poorfa. 3. Hydcrabad Book De- 18. International Rook P Abid Road (Gun House, Main Road, The International Ekdry), Hydera- Trivandrum. 32book House, Private bad. Ltd., 9, Ash Lane, 4. International Consul- MADHYA PRADESH Mahatma Gandhi Road, Bombay-I. C. Marredpally,Corpora'on, (East),489 19ig6,Modern Jawahar Book House, 33. The International Ganj* Book Service, Deccan Secunderabad-3. Jabalpur-I. j. K. J. Asservadam and Gymkhana, Poona-4. Sons, Cloughpet, P. 0. 20. The IndoreLaw 34. Minerva Book Shop, Ongole, Ciuntur Dis- H~Use3 Old Shop No. 1/80, Ne~aii trict (Andhra Pra- i\gr&urtOpp' Subhash Road, Marme desh). Indore. Drive, Bombay-2. 6. M. S. R. Murthy & 35. The New Book Company, Visakhapat- MADRAS Company (P) Limited, nam.
    [Show full text]
  • District Wise List of Village Having Population of 1600 to 2000 in Jharkhand
    District wise list of village having population of 1600 to 2000 in Jharkhand VILLAGE BLOCK DISTRICT Base branch 1 Turio Bermo Bokaro State Bank of India 2 Bandhdih Bermo Bokaro Bank of India 3 Bogla Chandankiyari Bokaro State Bank of India 4 Gorigram Chandankiyari Bokaro State Bank of India 5 Simalkunri Chandankiyari Bokaro State Bank of India 6 Damudi Chandankiyari Bokaro State Bank of India 7 Boryadi Chandankiyari Bokaro State Bank of India 8 Kherabera Chandankiyari Bokaro Bank of India 9 Aluara Chandankiyari Bokaro Bank of India 10 Kelyadag Chandankiyari Bokaro State Bank of India 11 Lanka Chandankiyari Bokaro State Bank of India 12 Jaytara Chas Bokaro Jharkhand Gramin Bank 13 Durgapur Chas Bokaro Bank of India 14 Dumarjor Chas Bokaro Central Bank of India 15 Gopalpur Chas Bokaro Jharkhand Gramin Bank 16 Radhanagar Chas Bokaro Central Bank of India 17 Buribinor Chas Bokaro Bank of India 18 Shilphor Chas Bokaro Bank of India 19 Dumarda Chas Bokaro Central Bank of India 20 Mamar Kudar Chas Bokaro Bank of India 21 Chiksia Chas Bokaro State Bank of India 22 Belanja Chas Bokaro Central Bank of India 23 Amdiha Chas Bokaro Indian Overseas Bank 24 Kalapather Chas Bokaro State Bank of India 25 Jhapro Chas Bokaro Central Bank of India 26 Kamaldi Chas Bokaro State Bank of India 27 Barpokharia Chas Bokaro Bank of India 28 Madhuria Chas Bokaro Canara Bank 29 Jagesar Gomia Bokaro Allahabad Bank Bank 30 Baridari Gomia Bokaro Bank of India 31 Aiyar Gomia Bokaro State Bank of India 32 Pachmo Gomia Bokaro Bank of India 33 Gangpur Gomia Bokaro State
    [Show full text]
  • River Action Plan Damodar
    ACTION PLAN FOR REJUVENATION OF DAMODAR RIVER IN JHARKHAND JHARKHAND STATE POLLUTION CONTROL BOARD, DHURWA, RANCHI, JHARKHAND-834004 CONTENT CHAPTER I ❖ BACKGROUND ❖ INTRODUCTION ❖ PHYSIOGRAPHY ❖ WATER RESOURCES & RAINFALL ❖ ANNUAL RAINFALL ❖ DEVIATION OF RAINFALL ❖ SEASONAL RAINFALL ❖ RAINFALL TREND IN RABI SEASON ❖ AVERAGE MOTHLY RAINFALL ❖ MOVING AVERAGE OF THE RAINFALL ❖ EXTREME EVENT ANALYSIS ❖ SURFACE WATER RESOURCES ❖ GROUND WATER RESOURCES ❖ DRAINAGE SYSTEM AND MAPS CHAPTER II DAMODAR RIVER BASIN RIVER COURSE AND MAJOR TRIBUTARIES CHAPTER III- SOCIO-ECONOMIC IMPORTANCE ❖ WATER RESOURCES AND ITS USES ❖ MINING AND INDUSTRIAL ACTIVITIES ❖ NATURAL AND ANTHROPOGENIC HAZARDS ❖ IDENTIFIED STRETCHES FOR REDUCING POLLUTION CHAPTER IV- ACTION PLAN ❖ ACTION PLAN- SHORT TERM AND LONG TERM ACTION AND THE IDENTIFIED AUTHORITIES FOR INITIATING ACTIONS AND THE TIME LIMITS FOR ENSURING COMPLIANCE ❖ SHORT TERM AND LONG TERM ACTION PLANS FOR REJUVENATION OF RIVERS AND THE IMPLEMENTING AGENCIES RESPONSIBLE FOR EXECUTION OF THE ACTION PLANS AND THE TIME LIMITS ARE GIVEN IN TABLE AS BELOW ❖ PROPOSED ACTION PLAN BY VARIOUS DEPARTMENT OF GOVT. OF JHARKHAND ❖ PROPOSED ACTION PLAN FOR RESTORATION OF JHARKHAND RIVERS ❖ ACTION PLAN AT VILLAGE LEVEL ❖ TIMELINES FOR IMPLEMENTATION OF MODEL RESTORATION PLAN in 2019- 2020 and 2020-2021 Chapter-1 JHARKHAND & ITS WATER RESOURCES 1.1 BACKGROUND:-Hon’ble National Green Tribunal passed the following orders in OA No. 673/2018 & M.A. No. 1777/2018 titled News item published in “The Hindu “authored by Shri Jacob Koshy titled “More river stretches are now critically polluted: CPCB on 20.09.2018 as per excerpts below. “The issue taken up for consideration in this matter is abatement of pollution in 351 river stretches in the country, identified as such by the Central Pollution Control Board (CPCB).
    [Show full text]
  • Hazaribagh, District Census Handbook, Bihar
    ~ i ~ € :I ':~ k f ~ it ~ f !' ... (;) ,; S2 ~'" VI i ~ ~ ~ ~ -I fI-~;'~ci'o ;lO 0 ~~i~~s. R m J:: Ov c V\ ~ -I Z VI I ~ =i <; » -< HUm N 3: ~: ;;; » ...< . ~ » ~ :0: OJ ;: . » " ~" ;;; C'l ;!; I if G' l C!l » I I .il" '" (- l' C. Z (5 < ..,0 :a -1 -I ~ o 3 D {If J<' > o - g- .,. ., ! ~ ~ J /y ~ ::.,. '"o " c z '"0 3 .,.::t .. .. • -1 .,. ... ~ '" '"c ~ 0 '!. s~ 0 c "v -; '"z ~ a 11 ¥ -'I ~~ 11 CENSUS 1961 BIHAR DISTRICT CENSUS HANDBOOK 14 HAZARIBAGH PART I-INTRODUCTORY NOTE, CENSUS TABLES AND OFFICIAL STATISTICS -::-_'" ---..... ..)t:' ,'t" -r;~ '\ ....,.-. --~--~ - .... .._,. , . /" • <":'?¥~" ' \ ........ ~ '-.. "III' ,_ _ _. ~ ~~!_~--- w , '::_- '~'~. s. D. PRASAD 0 .. THE IlQ)IAJr AD:uJlIfISTBA'X'lVB SEBVlOE Supwtnundent 01 Oen.ua Operatio1N, B'h4r 1961 CENSUS PUBLICATIONS, BIHAR (All the Census Publications of this State will bear Vol. no. IV) Central Government Publications PART I-A General Report PART I-B Report on Vital Statistics of Bihar, 1951-60 PART I-C Subsidiary Tables of 1961. PART II-A General Population Tables· PART II-B(i) Economic Tables (B-1 to B-IV and B-VU)· PAR't II-B(ii) Economic Tables (B-V, B-VI, B-VIII and B-IX)* PART II-C Social and Cultural Tables* PART II-D Migration Tables· PART III (i) Household Economic Tables (B-X to B-XIV)* PART III (ii) Household Economic Tables (B-XV to B-XVII)* PART IV-A Report on Housing and Establishments· PART IV-B Housing and Establishment Table:,* PART V-A Special Tables for Scheduled Castes and Scheduled Tribe&* PART V-B Ethnographic Notes on Scheduled Castes and Scheduled Tribes PART VI Village Surveys •• (Monoglaphs on 37 selected villages) PART VII-A Selected Crafts of Bihar PART VII-B Fairs and Festivals of Bihar PART VIII-A Administration Report on Enumeration * } (Not for sale) PART VIII-B Administration Report on Tabulation PART IX Census Atlas of Bihar.
    [Show full text]
  • Mine Closure Report for Govindpur Phase-Ii Open Cast Project (1.2 Mty)
    MINE CLOSURE REPORT FOR GOVINDPUR PHASE-II OPEN CAST PROJECT (1.2 MTY) (CENTRAL COALFIELDS LIMITED) AUGUST 2011 Regional Institute – III Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Gondwana Place, Kanke Road Ranchi-834008, Jharkhand 1 INTRODUCTION 1.1 About the Mine Govindpur OCP was worked earlier. Upper Kargali seam was planned and worked under the name of Govindpur OCP. The same report was expanded to include the underlying Bermo seam under the name of Govindpur Expansion OCP. The present Govindpur Ph-II OCP was planned as a new project to extract coal up to the lower most opencastable seam (i.e. Karo-VI seam) including area already worked in Govindpur OCP & Govindpur Expansion OCP. Total leasehold area of Govindpur Ph-II OCP includes both virgin and worked area. The name Govindpur Ph-II is incidental as in Ph-I, the upper seams of Kargali and Bermo have already been worked under the name of Govindpur OCP & Govindpur Expansion OCP (Not as Govindpur Ph-I OCP). History of Mine The PR of this project was prepared as a new project. The report proposed to exploit the upper Karo Group of seams (Seam VI to XI) based on the “Geological Report on Coal Exploration Govindpur North Block, East Bokaro Coalfield” prepared in Dec 2001 and the area south of Bermo Seam incrop upto 180 m depth line on Seam-VI floor in the south, bounded on the east by Mantico Nalla and on the west by Borrea Fault (F7-F7). This is a sector not covered in the geological report of Gobindpur North block (2001), and has now been defined for including additional reserves south of the original limits of Gobindpur North block.
    [Show full text]
  • SWAMI RAMKRISHNA PARAMHANSH TEACHER's TRAINING COLLEGE Dugda, P.O.- Karmatand, Dist - Bokaro, 828307
    SWAMI RAMKRISHNA PARAMHANSH TEACHER'S TRAINING COLLEGE Dugda, P.O.- Karmatand, Dist - Bokaro, 828307 Details of Students Year of Admission (Session- 2017-19) Category Admission Fee Sl Year of Contact No./ Name of Student Admitted Father’s Name Address (Gen/SC Result Percentage (Reciept No. Admission Mobile No. /ST/OBC No., Date & /Others Amount 1 2 3 4 5 6 7 8 9 10 At - Bishanpur, W.No.-39 _ _ R.No.- 651 P.O.-Mirzapur, Bandwar 8009083316 1 VARTIKA KUMARI HEMANT JHA Gen 2017 17.08.2017 Begusarai 8709642865 8000/- (Bihar) Matigarha, Baghmara R.No. -652 _ _ 9431320568 2 RAJAN RAJ ARJUN RAJAK Dist- Dhanbad (Jharkhand) SC 2017 17.08.2017 8873520393 825307 8000/- AT- Punsia, P.O..+ P.S.- _ _ R.No. -653 3 SHWETA KUMARI RANJIT CHAUDHARI Rajaun Gen 2017 8877357455 17.08.2017 Dist- Banka (Bihar) 8000/- At - Sunday Bazar _ _ R.No. -654 Q.No.-15/5, R.A.Type 7479442489 4 ANUPAM MUKHERJEE AMBIKA MUKHERJEE Gen 2017 17.08.2017 Bermo 8434082031 8000/- (Bokaro) Vill- Baradih, P.O.- Saranda R.No. -655 _ _ 7766006021 5 SANTOSH PD. YADAV RUPAN YADAV Dist- Giridih (Jharkhand) OBC 2017 17.08.2017 7654602123 825324 8000/- Manjhlitand, _ _ R.No. - 656 Birni 8294112274 6 SADHU SHARAN KUSHWAHA RAM SAGAR MAHTO OBC 2017 18.08.2017 Saranda 7368878310 8000/- Dist- Giridih R.No. -657 Jodharih More Chas _ _ 8084389969 7 DIVYA NIVEDITA PANDEY RABINDRA PANDEY Gen 2017 18.08.2017 Dist-Bokaro 7319907485 8000/- Vill- Raidih, P.O+P.O.- _ _ R.No.
    [Show full text]
  • Pre-Feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for Production of 3.0MTPA Hot Metal with Blast
    2019 PRE-FEASIBILITY REPORT FOR INTEGRATED STEEL PLANT OF ELECTROSTEEL STEELS LIMITED FOR PRODUCTION OF 3.0 MTPA HOT METAL WITH BLAST FURNACE (1×1050 m3, 1×350 m3, 1×1700 m3) ALONG WITH CPP OF CAPACITY 160 MW M/s ELECTROSTEEL STEELS LIMITED (an enterprise of Vedanta Limited) at Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar , Dist Bokaro, Jharkhand -827013 Pre-feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for production of 3.0MTPA Hot Metal with Blast Furnace (1×1050 m3, 1×350 m3, 1×1700 m3) along with CPP of Capacity 160 MW located at village Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar, Dist Bokaro, Jharkhand-827013 Table of Contents CHAPTER-1............................................................................................................ 7 EXECUTIVE SUMMARY........................................................................................... 7 CHAPTER-2.......................................................................................................... 11 INTRODUCTION OF THE PROJECT......................................................................... 11 2.0 INTRODUCTION ..........................................................................................................11 2.1 IDENTIFICATION OF THE PROJECT & PROJECT PROPONENT.......................................12 2.2 BRIEF DESCRIPTION AND NATURE OF THE PROJECT...................................................13 2.2.1 Chronology of the Project Implementation..........................................................13
    [Show full text]
  • Environmental Statement of Bokaro Colliery Opencast Project for 2015-16
    ENVIRONMENTAL STATEMENT OF BOKARO COLLIERY OPENCAST PROJECT FOR 2015-16 CENTRAL COALFIELDS LIMITED ENVIRONMENT DIVISION CCL,RANCHI Page-2 E X E C U T I V E S U M M A R Y E-1. This Annual Environmental Statement has been prepared as per the Gazette Notification No. G.S.R. 329(E) dated 13 th March’92, the Ministry of Environment & Forests, Government of India. E-2 Bokaro Opencast Project of Central Coalfields Limited is located in the East-Bokaro Coalfields of Bokaro Distt. of Jharkhand state. The mine block is situated on the north of Damodar river after railway line. The total area of the block is about 7 sq.Km.The project location and other surface features are given in the plan annexed as ANNEXURE . E-3 The annual target of production for the year 2015-16 is 70000 Tes. The project has achieved the production during 2015-16 is 84113 Tes. E-4 The Environmental Monitoring was carried out quarterly as per the guide lines of Ministry of Environment & Forest(MOEF).The Environmental Monitoring results for four quarters of 2015-16 are appended as ANNEXURE. E-5 Ambient air quality is monitored to study the level of air pollution. The main air pollutant is suspended particulate matter(SPM).It is difficult to quantity the amount of air pollutants generated due to opencast mining. E-6 Water is not directly used during mining for coal production. It percolates into working area during mining operation. However ,water is consumed for other purposes ,mainly for dust suppression.
    [Show full text]
  • S No Atm Id Atm Location Atm Address Pincode Bank
    S NO ATM ID ATM LOCATION ATM ADDRESS PINCODE BANK ZONE STATE Bank Of India, Church Lane, Phoenix Bay, Near Carmel School, ANDAMAN & ACE9022 PORT BLAIR 744 101 CHENNAI 1 Ward No.6, Port Blair - 744101 NICOBAR ISLANDS DOLYGUNJ,PORTBL ATR ROAD, PHARGOAN, DOLYGUNJ POST,OPP TO ANDAMAN & CCE8137 744103 CHENNAI 2 AIR AIRPORT, SOUTH ANDAMAN NICOBAR ISLANDS Shop No :2, Near Sai Xerox, Beside Medinova, Rajiv Road, AAX8001 ANANTHAPURA 515 001 ANDHRA PRADESH ANDHRA PRADESH 3 Anathapur, Andhra Pradesh - 5155 Shop No 2, Ammanna Setty Building, Kothavur Junction, ACV8001 CHODAVARAM 531 036 ANDHRA PRADESH ANDHRA PRADESH 4 Chodavaram, Andhra Pradesh - 53136 kiranashop 5 road junction ,opp. Sudarshana mandiram, ACV8002 NARSIPATNAM 531 116 ANDHRA PRADESH ANDHRA PRADESH 5 Narsipatnam 531116 visakhapatnam (dist)-531116 DO.NO 11-183,GOPALA PATNAM, MAIN ROAD NEAR ACV8003 GOPALA PATNAM 530 047 ANDHRA PRADESH ANDHRA PRADESH 6 NOOKALAMMA TEMPLE, VISAKHAPATNAM-530047 4-493, Near Bharat Petroliam Pump, Koti Reddy Street, Near Old ACY8001 CUDDAPPA 516 001 ANDHRA PRADESH ANDHRA PRADESH 7 Bus stand Cudappa, Andhra Pradesh- 5161 Bank of India, Guntur Branch, Door No.5-25-521, Main Rd, AGN9001 KOTHAPET GUNTUR 522 001 ANDHRA PRADESH ANDHRA PRADESH Kothapeta, P.B.No.66, Guntur (P), Dist.Guntur, AP - 522001. 8 Bank of India Branch,DOOR NO. 9-8-64,Sri Ram Nivas, AGW8001 GAJUWAKA BRANCH 530 026 ANDHRA PRADESH ANDHRA PRADESH 9 Gajuwaka, Anakapalle Main Road-530026 GAJUWAKA BRANCH Bank of India Branch,DOOR NO. 9-8-64,Sri Ram Nivas, AGW9002 530 026 ANDHRA PRADESH ANDHRA PRADESH
    [Show full text]
  • Steel Authority of India Limited Bokaro Steel Plant
    STEEL AUTHORITY OF INDIA LIMITED BOKARO STEEL PLANT Addition of 2.0 MTPA Pellet plant, a 7 m tall Coke Oven Battery and a 2 360m Sinter plant at Bokaro Steel City, Bokaro, (Jharkhand) PROJECT SUMMARY Bokaro Steel plant has already been accorded EC on 16.10.2008 by MoEF for expansion of its capacity from 4.0 MTPA to 7.0 MTPA of crude steel vide memo no. J- 11011/99/2007-IA II(I). Extension of the EC was accorded for a period of five years w.e.f. 15.10.2013 vide memo no. J-11011/99/2007-IA II(I) dtd. 24.01.2014. The proposed addition to the project will be carried out within the existing plant premises of Bokaro Steel Plant which is located in vicinity of BIADA industrial estate of Bokaro Steel City, Sub-division Bokaro of Bokaro District in Jharkhand, at longitude 86°02' to 86°09’ E and latitude 23°38' to 23°42' N. The plant is situated 215 to 243m above MSL gently rolling towards River Damodar, flowing west to east. The proposed facilities in the expansion programme of existing Bokaro Steel Plant of 7.0 MTPA production capacity are as follows: Sn. Proposed unit/facility Production Capacity/ configuration 1. Pellet Plant 2.0 MTPA 0.768 MTPA, 7 m tall top charged (68 2. Coke Oven Battery ovens) COB The raw material required for the additional facilities will be sourced from existing sources. Iron ore fines will be sourced from Bolani iron ore mines and Kiriburu & Meghataburu Iron ore deposits.
    [Show full text]