CHAPTER 7 INFRASTRUCTURE Getting Complete Automation of Data Collection and Transmission. the Anjunem Irrigation Project
Total Page:16
File Type:pdf, Size:1020Kb
CHAPTER 7 INFRASTRUCTURE getting complete automation of data Hydrology Project Phase –II collection and transmission. Goa’s performance under HP-II has The Anjunem Irrigation Project, is a been remarkable which came to a close medium irrigation project which in March, 2014. As a sequence to HP-II, caters to the needs of Sattari and the World Bank has introduced HP-III Bicholim Talukas. About 82 MLD of named as National Hydrology Project water from the return flow of the (NHP). The National Hydrology Project project is drawn by the PWD for would not only provide additional Sanquelim, Assonora and Podocem financial support but also offer excellent treatment plants to meet the potable opportunity to introduce new water needs of the surrounding technologies into water resource sector areas. The entire project is under planning & management. National & Participatory Irrigation Management international technical expertise would Programme (PIM). be available to further strengthen the Hydrology Information System (HIS) The on-going major inter-state Tillari network. Exposure of stakeholders by Irrigation Project (TIP) has become way of National and International study one of the 99 prioritized projects in tours, updating of skills through various the priority III class, which is nearing training courses conducted by experts completion. Besides irrigation, the from Central Government Agencies, project envisages providing 115.03 World Bank Experts will also reflect in mcm of water to meet the domestic, improved efficiency of staff leading to industrial and other non-agricultural better delivery of service and requirements of Pernem, Bardez, development of human resource. Under Bicholim and Tiswadi Talukas. The the Purpose Driven Studies (PDS), Dam Irrigation Potential Created and Break Analysis is proposed to be taken Utilized under Major/Medium and an amount of `. 50.00 lakh has Projects is given Table No.7.8 been received from Ministry of Water Resources. Expenditure incurred up to November 2017 is `. 53.56 lakh. Table No.7.8 Irrigation Potential Created and Utilized under Major/Medium Projects Expenditure Potential created (ult.) Potential utilized (ult.) Incurred Sr. Name of the Scheme 2017-18 2017-18 Cum. upto 2017-18 Upto No Cum. upto upto Sept upto Sept Sept 2017 November 2017 Sept 2017 2017 2017 (`. in Lakh) Major & Medium Irrigation a Tillari Irrigation Project - 16822.95 53.65 4707.99 1361.25 Salaulim Irrigation b - 14106.00 - 3915.00 873.20 Project Anjunem Irrigation c - 4620.00 - 3208.00 38.75 Project Total - 35548.95 53.65 11830.99 2273.20 Economic Survey 2017-18 55 CHAPTER 7 INFRASTRUCTURE National Cyclone Risk Mitigation water for irrigation at Chapoli in Project (NCRMP) Canacona taluka, Panchwadi in Ponda taluka and Amthane in Bicholim taluka. NCRMP is a flagship program, the first These tanks have a combined storage World Bank funded project in India of 20.89 mcm. The three tanks also exclusively focusing on ex-ante cumulative supply 35 MLD for drinking disaster risk mitigation. It is water. Another minor irrigation tank at implemented by the National Disaster Gavnem in Canacona taluka, planned Management Authority (NDMA), New to serve the ST community is under Delhi with the support from Ministry of construction. Almost 95% of the work Home Affairs (MHA), GOI focusing on of this tank is completed. Besides the cyclone prone coastal States and irrigating 100 Ha., the tank has a water UTs. In phase II, the States of Gujarat, supply component of 5 MLD for Maharashtra, Kerala, West Bengal, domestic use. Partial storage of 1.5 to Karnataka and Goa have been 2.0 MLD has been made available to included. PWD for water supply purpose. The command area of the tank falls in the The Telecommunication Consultants Gavnem, Tolem, Saturlim and Fulamol India Limited (TCIL), has been villages of Canacona taluka. Irrigation awarded the contract under the potentials created and utilized under Ministry of Communication and IT, GOI Minor Irrigation Schemes is given in for preparation of DPR for Table No.7.9 Development of last Mile Connectivity and Early Dissemination Solution for Water Resource Development the State under NCRMP-II. Programme Multipurpose Cyclone Shelter (MPCS) & MPCS with fire stations are The State has been successfully proposed to be taken in Canacona, implementing a scheme for post Mormugao, Bardez, Pernem and monsoon water harvesting for Tiswadi Talukas. The work order for groundwater recharge through construction of multipurpose shelter at construction of a series of bandharas Dabolim issued. across rivers and nallahs in the sweet water zones. These bandharas build Minor Irrigation up cascading storages along the river courses. Besides helping build up Under the Minor Irrigation schemes, groundwater level in the aquifers various scheme such as irrigation storages created by the bandharas wells, storage tanks, lift irrigation, also help meet the growing water bhandaras, subsidy to farmers for requirement of the State through construction of new open and bore augmentation of water supplies to wells etc. are implemented. Irrigation to water treatment plants, especially the potential to the tune of 30594.01 during the lean season. Till now 404 Ha. has been created, out of which bhandaras have been constructed with 10.06 Ha. have been created upto a storage capacity of 388.20 lakh cum September 2017. Potential utilized is for irrigation as well as water resource 25821.49 Ha, out of which utilization development. during 2017-18 is 8.88 Ha. Beneficiary Oriented Schemes Three minor irrigation tanks have been constructed in the State to impound Construction of Irrigation Wells subsidy scheme. Economic Survey 2017-18 56 CHAPTER 7 INFRASTRUCTURE Roof-Top rainwater harvesting A total area of 12716.09 Ha has been scheme. covered under field channels. Special Financial Grant/ Assistance Achievements under Command Area for water Resource activities. Development of Irrigation Projects (CCA) is given in Table No.7.10 Command Area Development (CAD) Flood Control, Anti Sea Erosion and The Command Area Development Drainage Programme has been implemented for the Salaulim, Anjunem and Tillari This scheme provides for works to Irrigation Projects. Activities such as prevent damage to property against construction of field channels, land floods and destructive sea erosion and leveling and shaping, warabandi, drainage congestion especially during farmers’ training and formation of water the monsoons. Physical progress of users associations are taken up under the schemes is given in Table No.7.11 the programme to minimize the gap Table No.7.11 between the potential created and Physical Progress under Flood Control, Sea utilized. Erosion and Drainage. Length protected (in Kms) In response to the National Policy to 2017-18 Cum. encourage Participatory Irrigation Sr. Name of the (upto Upto No Scheme Sept. Sept. Management (PIM), the State has 2017) 2017 formed 86 Water Users’ Associations 1 Flood Control 2.527 119.47 to operate and maintain the network of 2 Anti-Sea Erosion 0.600 41.63 distributaries and water courses in the 3 Drainage 3.451 117.99 commands of Salaulim Irrigation Project, Tillari Irrigation Project and Total 6.578 279.09 Anjunem Irrigation Project. Table No.7.9 Irrigation Potential Created and Utilized under Minor Irrigation Scheme (In Ha.) Potential Created (Ult.) Potential Utilized (Ult.) Sr.No Name of the scheme 2017-18(Till Cum (Till 2017-18 (Till Cum (Till Sept. 2017) Sept. 2017) Sept. 2017) Sept. 2017) Minor Irrigation 70.30 30594.01 8.88 25821.49 1 Surface Water 10.06 26642.01 8.88 22468.74 2 Ground Water 0.00 3952.00 0.00 3352.80 Table No.7.10 Achievement under Command Area Development of Irrigation Projects (CCA) (In Ha.) Sr.No CAD Activity TIP SIP AIP Total 1 Area Covered under FCs in Ha 5866.09 4750.00 2100.00 12716.09 2 Warabandi in Ha. 150.00 2701.00 1545.00 4396.00 3 Land Leveling/Shaping in Ha. - 326.00 593.00 919.00 4 Farmers Training In Numbers 2515 7696 4211 14422 5 Water Users Associations in Numbers 42 28 16 86 Economic Survey 2017-18 57 CHAPTER 7 INFRASTRUCTURE Western Ghats Development to supplement the National Water Programme (WGDP) Policy and to bring out the state specific issues and also remodeling The four talukas of Sattari, Canacona, the existing laws/rules it was Sanguem and Dharbandora have been proposed to adopt new State Water brought under Western Ghats Policy for which the draft Goa State Development Programme. Minor Water Policy 2015 was prepared irrigation schemes with shorter and is in the final stages of gestation periods such as open wells, approval. tube wells, bore wells, lift irrigation Construction of barrage and schemes, tanks and bandharas are upgradation of raw water pumping undertaken under WGDP to serve station at Ganjem on Madei River these hilly areas. The Iirrigation for augmentation of about 75 MLD Potential created and utilized under raw water for Opa water works on WGDP is given in Table No.7.12 Madei River is in process for administrative approval and New Initiatives expenditure sanction. In order to satisfy the present and A new scheme popularly called as future demand for drinking water ‘Nital Goem Nital Baim’ has been supply augmentation of Opa water introduced to help promote the works by enhancing pumping conjunctive use of water and also capacity or water about 100 MLD maintain the ground water structure from main canal of Salaulim in the State. Irrigation Project Pajimol to Kale In December 2017, new web portal river at Kale village in Sanguem in i.e. https://goawrd.gov.in/ has been being done. launched for online services like Supply of raw water to Mopa airport Registration of wells and tankers by pumping water from ch.17.300 under the Ground water Regulation km of RBMC of TIP at Nagzar Act, 2002, Registration of village in Pernem Taluka has been contractors in WRD, Booking of rest technically sanctioned for amount houses, e-payment facility for of `.6.66 crore.