1.0 Brief on 4000 MW Deoghar Ultra Mega Power Project to Be Set up in Pipra Village, Mohanpur Anchal, District Deoghar, Jharkhand 1.0 Brief on 4000 MW Deoghar Ultra Mega Power Project to be set up in Pipra village, Mohanpur Anchal, District Deoghar, Jharkhand 1.1 Ministry of Power, Govt. of India has taken the initiative to develop coal based Ultra Mega Power Projects (UMPPs) of 4000 MW capacity (using Supercritical Technology) in different parts of the country. Power Finance Corporation Limited (PFC) is the nodal agency and Central Electricity Authority (CEA) is providing technical support for development of these UMPPs. 1.2 A 4000 MW UMPP is proposed to be set up Mohanpur Anchal in Deoghar district of Jharkhand. In this regard, Deoghar Mega Power Limited (DMPL), a wholly owned subsidiary of PFC Ltd. has been incorporated as a Special Purpose Vehicle to carry out technical studies, obtain all linkages, clearances and approvals and to select a developer for the Project through International Competitive Bidding process as per the Guidelines and Standard Bidding Documents issued by Ministry of Power, Govt of India. 1.3 Jharkhand is one of the power- starved states in the country with high potential for development. The 4000 MW UMPP will play a key role in providing the much needed power to overcome the short fall as well as in spurring all round economic development in the State. It will also supply power to other states as per the allocation given below: Sl. No. Procurer Power Allocated (MW) 1 Jharkhand 1500 2 Gujarat 1000 3 Tamil Nadu 600 4 Karnataka 300 5 Haryana 200 6 Kerala 200 7 Goa 200 Total 4000 1.4 Location The site is located under the block office of Mohanpur of Deoghar District at about 16 kilometers North of the Deoghar district town. The Eastern Railway Main line running between Patna to Asansol is at a distance of about 15 Kms on the Western side of the proposed site and the nearest railway station is Chandan on Broad gauge at a distance of 10 kilometers between Banka to Deoghar. The river Chandan is running at a distance of 800 meters from the south boundary of the site. The site is approachable from the Banka Deoghar road which is about 10 km from the site. Motor able road is available upto Pipra village from the deoghar district town which is about 16 km from the site. 1.5 Land Availability Total land for the proposed power plant is 2200 acres. This does not include land required for, Ash & Water Pipeline corridors, Fuel Transportation corridors, access roads and Transmission tower corridor etc. 1.6 Water Availability Estimated consumptive water requirement for the project is about 106 MCM which is proposed to be met from Ganga River. The water would be transported through a pipeline to the project site. 1.7 Coal Availability Coal requirement for the project is estimated about million tonnes per annum (MTPA). @ 85% PLF considering domestic coal of 3425 kCal/kg GCV. Station heat rate has been taken as 2300 kCal/kWh as per latest CERC regulations. Coal will be sourced from the Rajmahal group of coalfields located in the State of Jharkhand. 1.8 Power Evacuation Power from the proposed plant will be evacuated through 765 KV & 400 KV transmission lines. 1.9 Construction Power In the construction phase power will be drawn from Deoghar substation which is around 15 kms from the proposed site. 1.10 Project cost & tariff The estimated Capital Cost, Capitalised Project Cost (including IDC) has been taken as Rs. 35,000 crore. Tariff comprising of Fixed Charge in Rs/kWh and variable Charge in Rs/kWh would be quoted by the Bidders and the Bidders would be selected based on the lowest evaluated levellised tariff as per the provisions of the Guidelines and Standard Bidding Documents (SBDs) issued by Central Government under section 63 of the Electricity Act 2003. 1.11 Project Schedule The project will be scheduled for the first unit to go into commercial operation in 52 months after the ”zero date” & subsequent units at four (6) months interval thereafter. 1.12 The Salient Features of the Project are as follows: Items Description S.No. 1. Project 4000 MW Ultra Mega Power Project 2. Proponent Deoghar Mega Power Limited A wholly owned subsidiary of Power Finance Corporation Limited (A Govt. of India Undertaking) 3. Plant Capacity & 4000 MW (5x800 MW or 6x600MW) Configuration 4. Location Mohanpur Anchal of Deoghar District in the State of Jharkhand Latitude : 240 33’ 07.72” to 240 37’ 03.97” N Longitude : 860 42’ 59.39” to 860 47’ 16.54” E Nearest Town : Chandan- 10 Km, and Deoghar about 16 km Nearest National : NH -114- A 15 Km and SH- 22 Highway about 10km Nearest Railway Station: Chandan- 10 km and Deoghar is about 16 Km Nearest Airport : Ranchi about 210 Km Durgapur, West Bengal about 145 km Proposed Deoghar, Simra about 20 km Nearest Sea Port : Kolkata- 300 km 6. Site Elevation 210 m – 220 M above mean sea level MSL 7. Seismic Zone Seismic Zone III as per IS 1893 (Part-1) : 2005 8. Availability of the Approx. 2200 acres land will be acquire for the Power Plant Land area including Township and Ash dyke as per CEA guideline. 9 Availability of the 106 Million Cubic Meter (MCM)/year (Approx. 12510m3/hr) Water from the Ganga River 10. Availability of The annual coal requirement is estimated at about 18-20 Primary/ Support million tons per annum based on the GCV of about 3400-3800 Fuel & Source kcal/kg. Coal for the proposed plant will be fed from coal block in the State of Jharkhand. The support fuel (HSD/LDO) from nearest refinery/oil depots by rail/road. 11. Steam Generator Semi outdoor type two pass single re-heat balanced draft, drumless unit designed for firing pulverized coal as main fuel. 12. Steam Turbine The steam turbine generator will be single shaft, two /three Generator cylinders, tandem compound, reheat, regenerative, condensing unit directly coupled to AC Generator giving a continuous output at generator terminal of 800, 000 KW at 21~27 KV. 13. Control System Distributed Digital Control and Management Information Items Description S.No. System (DDCMIS) with integrated, CRT/Key Board operation for Steam Generator, Turbine, Generator and auxiliaries from Central Control room. i)1 4. Chimney Two (2) twin flue and One (1) single flue chimney of 275 M high. ii)1 5. Power The power generated from the plant will be evacuated at 765 Evacuation kV/400kV Transmission System to the nearest grid station. iii)16 . Project First unit 48 months from ‘zero date’ Completion Subsequent units at an interval of 6 months. iv) Schedule 17. Total Project Rs. 35,00,000/- Lakhs Cost (Estimated) .
Recommended publications
  • 2020080110.Pdf
    District Rural Development Agency, Deoghar Details of all applications for the post of Technical Assistant (J.E) under MGNREGA in Deoghar district Sl Appl Name of Father's/ Permanent Address Address for CorrespondenceDate of Sex Cat Disability Qualification REMARKS No. No. Applicant Husband's Name Birth % E/D/P Essential Additional Qualification Village/Mohalla/ P.O/Thana Block District Diploma B.Tech (Civil) / [MCA] Locality B.E.(Civil)/[B.Sc (Comp M.Sc (Comp) / PGDCA Hons)] (B.Sc(Comp) / BCA) E.Qual % of Total E.Qual % of Total E.Qual % of Total Marks Marks Marks Obtained Obtained Obtained 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 1 ANISH KUMAR RAY ASHISH KUMAR RAY KAROWN KAROWN KAROWN DEOGHAR SAME AS PMT 11.05.2000 M GEN Diploma 85.63 NO NO Duplicate with Sl No. ADDRESS 225 2 2 PREM TUDU SAMUEL TUDU DWARPAHARI DHAMNI MARGOMUNDA DEOGHAR VILL-KARHALBIL 10.03.1993 M ST Diploma 67.38 NO NO BAHA TOLA PO -SHIV PAHAR BLOCK DUMKA DIST DUMKA 3 3 SANTOSH PANDIT RUPLAL PANDIT THAADI BARMSHOLI SARATH DEOGHAR SAME AS PMT 15.03.1997 M BC-1 Diploma 59.80 NO NO ADDRESS 4 4 BRAJESH KUMAR GANESH RAM BHOJPUR BHOJPUR DEVIPUR DEOGHAR VILL-SANTHALI PO- 18.12.1997 M BC Diploma 65.00 NO NO JASIDIH BLOCK - DEOGHAR DIST- DEOGHAR 5 5 RAHUL ANAND GOUTAM KUMAR BILLI KHAMAHAR PATHROL MADHUPUR DEOGHAR VILL- CHANDMARI PO 17.02.2001 M GEN Diploma 74.70 NO NO SINGH MADHUPUR BLOCK- MADHUPUR DIST EDEOGHAR 6 6 BASUDEV MANDAL FULO MANDAL MARIKDIH MOHANPUR MOHANPUR DEOGHAR SAME AS PMT 19.11.1995 M BC-1 Diploma 67.10 NO NO ADDRESS 7 7 ANSAR MIYAN NASRUDDIN
    [Show full text]
  • Magmatic Underplating Beneath the Rajmahal Traps: Gravity Signature and Derived 3-D Configuration
    Magmatic underplating beneath the Rajmahal Traps: Gravity signature and derived 3-D configuration A P Singh∗, Niraj Kumar and Bijendra Singh National Geophysical Research Institute, Uppal Road, Hyderabad 500 007, India ∗ e-mail: apsingh−[email protected] [email protected] The early Cretaceous thermal perturbation beneath the eastern continental margin of the Indian shield resulted in the eruption of the Rajmahal Traps. To understand the impact of the magmatic process that originated in the deep mantle on the lower crustal level of the eastern Indian shield and adjoining Bengal basin the conspicuous gravity anomalies observed over the region have been modelled integrating with available geophysical information. The 3-D gravity modelling has delin- 3 eated 10–15 km thick high-density (ρ =3.02 g/cm ) accreted igneous layer at the base of the crust beneath the Rajmahal Traps. Thickness of this layer varies from 16 km to the west of the Rajmahal towards north to about 12 km near Kharagpur towards south and about 18 km to the east of the Raniganj in the central part of the region. The greater thickness of the magmatic body beneath the central part of the region presents itself as the locus of the potential feeder channel for the Rajmahal Traps. It is suggested that the crustal accretion is the imprint of the mantle thermal perturbation, over which the eastern margin of the eastern Indian shield opened around 117 Ma ago. The nosing of the crustal accretion in the down south suggests the possible imprint of the subsequent magmatic intrusion along the plume path.
    [Show full text]
  • Development of 9 Tourism Facilities in Jharkhand on Renovate, Operate, Maintain and Transfer (Romt) Basis
    DEVELOPMENT OF 9 TOURISM FACILITIES IN JHARKHAND ON RENOVATE, OPERATE, MAINTAIN AND TRANSFER (ROMT) BASIS PROJECT INFORMATION MEMORANDUM VOLUME III DISCLAIMER A joint discussion will happen between the JTDC Authority and the preferred bidder/ Developer prior to the signing of the agreement and handover of Project Site to the Developer. Through a joint inspection of the Project Site, both parties shall agree to the exact area, exact quality of construction and inventory of the existing facilities therein and jointly prepare and sign a joint inspection report. Contents THE PROJECT .......................................................................................................................................................................... 4 Background......................................................................................................................................................................... 4 Objectives ........................................................................................................................................................................... 5 The Sites............................................................................................................................................................................... 6 1. Tourist complex, Hundru,Ranchi ...................................................................................................................29 2. Tourist Information Centre, Madhuban, Parasnath(Giridih).................................................................
    [Show full text]
  • Pakur District, Jharkhand State
    भूजल सूचना पुस्तिका पाकु र स्जला, झारखंड Ground Water Information Booklet Pakur District, Jharkhand State के न्द्रीय भमू िजल बोड ड Central Ground water Board Ministry of Water Resources जल संसाधन िंत्रालय (Govt. of India) (भारि सरकार) State Unit Office,Ranchi रा煍य एकक कायाडलय, रााँची Mid-Eastern Region िध्य-पूर्वी क्षेत्र Patna पटना मसिंबर 2013 September 2013 1 भूजल सूचना पुस्तिका पाकु र स्जला, झारखंड Ground Water Information Booklet Pakur District, Jharkhand State Prepared By सुनिल टोꥍपो (वैज्ञानिक ख ) Sunil Toppo (Scientist B) रा煍य एकक कायाडलय, रााँची िध्य-पूर्वी क्षेत्र,पटना State Unit Office, Ranchi Mid Eastern Region, Patna 2 GROUND WATER INFORMATION BOOKLET PAKUR DISTRICT, JHARKHAND STATE CONTENTS Chapter Page No. 1.0 Introduction 1 1.1 Administration 1 1.2 River System 1 1.3 Irrigation practices 2 1.4 Studies/ Activities carried out by CGWB 2 2.0 Rainfall & Climate 2 2.1 Rainfall 2 2.2 Climate 2 3.0 Geomorphology & Soil 3 3.1 Geomorphology 3 3.2 Soils 3 4.0 Ground Water Scenario 4 4.1 Hydrogeology 4 4.1.1 Exploratory wells 4 4.1.2 Depth to water level 5 4.1.3 Seasonal Fluctuation 6 4.1.4 Long term water level trend (2002 – 2011) 6 4.2 Ground Water Resources 6 4.3 Ground Water Quality 7 4.4 Status of Ground Water Development 7 5.0 Ground Water Management Strategy 8 5.1 Ground Water Development 8 5.2 Water Conservation & Artificial Recharge 8 6.0 Ground Water related issues and problems 9 7.0 Awareness & Training Activity 9 7.1 Mass Awareness Programme 9 8.0 Area Notified by CGWA/ SGWA 9 9.0 Recommendations 10 3 List of Tables: Table 1 : Administrative division and population of Pakur district.
    [Show full text]
  • JHARKHAND - NOTIFIED PROTECTION OFFICERS (W.E.F
    JHARKHAND - NOTIFIED PROTECTION OFFICERS (w.e.f. 11.06.2007) 1. Ms. Hema Choudhary, CDPO, Integrated Child Development Services, Lapung, P.O. Lapung, Ranchi - 835244, Jharkhand. Ph. 9934172154 2. Smt. Abha Choudhary, CDPO, Integrated Child Development Services, Ranchi Sadar, Kanke Road, Apar Shivpuri, Ranchi - 834008, Jhharkhand. Ph. 9431578415 3. Ms. Pushpa Tigga, CDPO, Integrated Child Development Services, Angara, P.O. Angara, Ranchi – 835103, Jharkhand. Ph. 9431118906 4. Ms. Renu Ravi, CDPO, Integrated Child Development Services, Chanho, P.O. Chanho, Ranchi - 835239, Jharkhand. Ph. 9431701597 5. Ms. Jyoti Kumari Prasad CDPO, Integrated Child Development Services Mandar, P.O. Mandar, Ranchi - 835214. Jharkhand Ph. 9130147188 6. Ms. Neeta Kumari Chouhan, ICDPO, Integrated Child Development Services, Khijari, P.O. Namkum, Ranchi – 834010, Jharkhand. Ph. 9431465643 7. Ms. Sudha Sinha, CDPO, Integrated Child Development Services, Bero, P.O. Berro, Ranchi – 835202, Jharkhand. Ph. 9431386449 8. Ms. Nirupama Shankar, CDPO, Integrated Child Development Services, Ratu, P.O. Ratu, Ranchi - 835222, Jharkhand. 9. CDPO, Integrated Child Development Services, Bundu, P.O. Bundu, Ranchi - 835204, Jhharkhand. 10. Ms. Uma Sinha, CDPO, Integrated Child Development Services, Tamar, P.O. Tamar, Ranchi – 835225, Jhharkhand. Ph. 9431312338 11. Ms. Surbhi Singh, CDPO, Integrated Child Development Services, Ormanjhi, P.O. Ormanjhi, Ranchi - 835219, Jharkhand. Ph. 9431165293 12. CDPO, Integrated Child Development Services, Budmu, P.O. Budmu, Ranchi – 835214, Jharkhand. 13. Ms. Pooja Kumari, CDPO, Integrated Child Development Services, Kanke, P.O. Kanke, Ranchi - 834006. Jharkhand Ph. 9431772461 14. Ms. Kanak Kumari Tirki, CDPO, Integrated Child Development Services, Silli, P.O. Silli, Ranchi - 835103, Jharkhand. Ph. 9431325767 15. Ms. Lilavati Singh, CDPO, Integrated Child Development Services, Sonahatu, Post – Sonahatu, Ranchi - 835243, Jharkhand.
    [Show full text]
  • Sahebganj Districts, Jharkhand
    कᴂद्रीय भूमि जल बो셍ड जल संसाधन, नदी विकास और गंगा संरक्षण विभाग, जल शक्ति मंत्रालय भारत सरकार Central Ground Water Board Department of Water Resources, River Development and Ganga Rejuvenation, Ministry of Jal Shakti Government of India AQUIFER MAPPING AND MANAGEMENT OF GROUND WATER RESOURCES SAHEBGANJ DISTRICTS, JHARKHAND राज्य एकक कायाालय, रांची State Unit Office, Ranchi भारत सरकार Government of India जऱ स車साधन, नदी विकास एि車 ग車गा स車रक्षण म車त्राऱय Ministry of Water Resources, River Development & Ganga Rejuvenation केन्द्रीय भमू म-जऱ र्बो셍ा Central Ground Water Board PART – I/ भाग -१ Aquifer Maps and Ground Water Management Plan of Sahebganj district, Jharkhand जऱभतृ न啍शे तथा भूजऱ प्रबंधन योजना साहिबगंज जजऱा, झारख赍ड State Unit Office, Ranchi Mid-Eastern Region, Patna March 2019 रा煍य एकक कायााऱय रा車ची मध्य-ऩर्बू ी क्षेत्र ऩटना माचा २०१९ Aquifer Maps and Ground Water Management Plan of Sahebganj district, Jharkhand जऱभतृ न啍शे तथा भूजऱ प्रबंधन योजना साहिबगंज जजऱा, झारख赍ड State Unit Office, Ranchi Mid-Eastern Region, Patna March 2019 रा煍य एकक कायााऱय रा車ची मध्य-ऩर्बू ी क्षेत्र ऩटना माचा २०१९ REPORT ON AQUIFER MAPPING AND MANAGEMENT PLAN (PART – I) OF SAHEBGANJ DISTRICT, JHARKHAND 2017 – 18 CONTRIBUTORS’ Principal Authors Sunil Toppo : Junior Hydrogeologist (Scientist-B) Supervision & Guidance A.K.Agrawal : Regional Director G. K. Roy : Officer-In- Charge T.B.N. Singh : Scientist-D Dr Sudhanshu Shekhar : Scientist-D Hydrogeology, GIS maps and Management Plan Sunil Toppo : Junior Hydrogeologist Dr Anukaran Kujur : Assistant Hydrogeologist Atul Beck : Assistant Hydrogeologist Hydrogeological Data Acquisition and Groundwater Exploration Sunil Toppo : Junior Hydrogeologist Dr Anukaran Kujur : Assistant Hydrogeologist Atul Beck : Assistant Hydrogeologist Geophysics : B.
    [Show full text]
  • Resettlement Planning Document India: Jharkhand State Roads Project
    Resettlement Planning Document Resettlement Plan for Jamtara–Dumka Section Document Stage: Draft Project Number: 40005 May 2009 India: Jharkhand State Roads Project Prepared by Road Construction Department, Government of Jharkhand. The resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. ADB State Road Project in Jharkhand Full Resettlement Plan for Package – II: Jamtara – Dumka Section RESETTLEMENT PLAN TABLE OF CONTENTS List of Abbreviations 4 Executive Summary 5 Chapter 1 : The Project Background 10 1.1. Project Description 10 1.2. Project Benefits and impacts 11 1.3. Measures to minimize impacts 12 1.4. Objectives of the Resettlement Plan 13 Chapter 2 : Project State and Subproject District 14 2.1. Project State 14 2.2. Subproject Districts 15 Chapter 3 : Findings of the Resettlement Census Survey 17 3.1. Objectives of the Resettlement Census Survey 17 3.2. Methodology 17 3.3. Findings of the Resettlement Census survey 17 3.4. Gender impacts of the subproject 23 3.5. Scope of the Land & Assets Acquisition 25 3.6. Impact on Agricultural land 27 3.7. Impact on Residential Assets 29 3.8. Impact on Commercial Assets 33 3.9. Impact on Residential cum Commercial Assets 36 3.10. Awareness & Perceptions of the affected households on the 41 subproject Chapter 4 : Impact on Indigenous Peoples in the Project Area 43 4.1. Schedules Tribes (ST) in Jharkhand 43 - 1 - ADB State Road Project in Jharkhand Full Resettlement Plan for Package – II: Jamtara – Dumka Section 4.2.
    [Show full text]
  • Ftyk Fuokzpu Dk;Kzy;] Lkgscxat
    ftyk fuokZpu dk;kZy;] lkgscxat ch0,y0vks0 dh lwph 01& jktegy fo/kku lHkk fuokZpu {ks= AC- Booth Booth Name Name of BLO Mobile No Address NO Number Middle School Hajipur Diyara 1-Vill- Hajipur Diyara, Dist- 1 1 Savita Devi 9939967486 (New Building) Sahibganj Middle School Hajipur Diyara, 2-Vill- Hajipur Diyara, Dist- 1 2 Sangita Devi 9955137519 (Old Building) Sahibganj Middle School Hajipur Diyara, 3-Vill- Hajipur Diyara, Dist- 1 3 Sulekha Devi 7739650069 (Old Building) Sahibganj 4-Vill- Hajipur Bhitta, Dist- 1 4 Up. Middle School, Rajgaown Ramakanta Devi 8936016787 Sahibganj 5-Vill- Hajipur Bhitta, Dist- 1 5 Up. Middle School, Rajgaown Babita Devi 9973195910 Sahibganj 1 6 Panchayat Building, Dihari Manju Kumari 9973195910 6-Vill- Dihari, Dist- Sahibganj 1 7 Up.High School,, Dihari Ajay Kumar Yadav 7766017485 7-Vill- Dihari, Dist- Sahibganj Up. Middle School, Patwar 8-Vill- Patwar Tola, Dist- 1 8 Rita Devi 9801340228 Tola Sahibganj Up. Middle School, Patwar 1 9 Usha Devi 9661205005 9-Vill- Dihari, Dist- Sahibganj Tola Up. Middle School Badi 10-Vill-Bholiya Tola, Dist- 1 10 Shavya Devi 8409462362 Kodarjanna Sahibganj Middle School Badi 11-Vill-Bari Kojarjanna South, 1 11 Renu Devi 9006958107 Kodarjanna (South Part) Dist- Sahibganj Middle School Badi 12-Vill-Mahaldar Tola, Dist- 1 12 Shrimani Devi 8271720579 Kodarjanna (North Part) Sahibganj Middle School Badi 13-Vill- Naya Tola, Dist- 1 13 Kiran Devi 9771823375 Kodarjanna (North Part) Sahibganj Urdu Middle School 14-Vill- Makhmalpur South, 1 14 Akhtari Begam 9801430040 Makhmalpur Dist- Sahibganj Panchayat Building 15-Vill-Rahamat Tola, Dist- 1 15 Anjuman Aara 7295915866 Makhmalpur ( South Part) Sahibganj Panchayat Building 16-Vill- Sarpanch Tola, Dist- 1 16 Alimuddin Jang 9798190712 Makhmalpur ( South Part) Sahibganj Up.
    [Show full text]
  • DISTRICT ENVIRONMENT PLAN District-Deoghar
    DISTRICT ENVIRONMENT PLAN for District-Deoghar [Hon’ble NGT vide order dated 26.09.2019 in the matter of O.A 360 of 2018] 1 | P a g e PREFACE The District Environment Committee for each district of Jharkhand was constituted vide Department of Forest, Environment & Climate Change, Govt. of Jharkhand notification no. 489 dated 26.12.2019. The concerned Deputy Commissioner and Divisional Forest Officers were Notified as Chairman and Member Secretary respectively of the Committee apart from other members. In the light of Judgement passed on 26.09.2019 by Hon’ble National Green Tribunal (NGT) in the matter of O.A. 360 of 2018 this District Environment Plan has been prepared. After a lot of delibrations during the various meetings of District Environment Committee, tasks were assigned to various concerned departments to provide information and basic data for the preparation of District Environment Plan (DEP) for Deoghar District. We express our sincere thanks to Jharkhand State Pollution Control Board for providing necessary guidance through meetings, Video Conferencing and communications to prepare this plan. We are also thankful to Deputy Development Commissioner, Nagar Aaukta, Civil Surgeon, Irrigation Department, Public Health Engineering Department and Regional Office of Pollution Control Board, Dumka, Mining Department, Deoghar for extending their sincere support for providing necessary inputs/data for this plan. We also thank Sri Prince and Sri Roushan Sharma of Divisional Forest Office, Deoghar for timely compilation of data received from various sources and to complete this plan within the time frame. This plan is uploaded on the official website of the Deoghar District for reference and future use.
    [Show full text]
  • Obtaining Environmental Clearance
    OBTAINING ENVIRONMENTAL CLEARANCE CATEGORY FOR TETRIYA STONE DEPOSIT (MINOR MINERAL), IN TETRIYA MOUZA OF SAHIBGANJ B2 DISTRICT, JHARKHAND STATE {AREA COVER 9.87 ACRES (3.995 HA)} PROJECT FORM-IM I. BASIC INFORMATION :- Sl. Item Details No. I. Name of the Mining Lease site Tetriya Stone Deposit II. Location/site Location: (GPS Co-ordinates) Mouza – Tetriya, P.S. – Taljhari, Dist – Sahibganj, Jharkhand. Boundary Location (Co – ordinates) Pillar No. Latitude Longitude A N25°02'38.00" E87°42'07.36" B N25°02'42.36" E87°42'04.40" C N25°02'49.92" E87°42'12.29" D N25°02'43.81" E87°42'14.78" III. Size of the Mining Lease (Hectare) 9.87 Acres / 3.995 Ha J.B. No 1 2 7 8 Plot No. 19(P) 34(P), 36(P) 17(P) 18 IV. Capacity of the mine Lease (TPA) 2,80,956 Tonnes / Annum 937 Tonnes / Day V. Period of Mining Lease Fresh Area. Applied on 17.01.2018 VI. Expected Cost of the project 44 Lakhs VII. Contact Information M/s Dadi Maa Stone Works Partners: Sri Sanjay Kumar Bhuwaniya and Md. Shamim At–Makhani, P.O. - Taljhari, P.S. – Rajmahal, Sub-Division – Rajmahal, Dist – Sahibganj, Jharkhand, Pin -816129 Phone No. – +91-9973848050/9955948836 Email ID: [email protected] PROJECT PROPONENT PAGE 1 M/S DADI MAA STONE WORKS OBTAINING ENVIRONMENTAL CLEARANCE CATEGORY FOR TETRIYA STONE DEPOSIT (MINOR MINERAL), IN TETRIYA MOUZA OF SAHIBGANJ B2 DISTRICT, JHARKHAND STATE {AREA COVER 9.87 ACRES (3.995 HA)} PROJECT II. ENVIRONMENTAL SENSITIVITY :- Sl. Areas Distance in Kilometer / Details No.
    [Show full text]
  • DIPS Deoghar.Pdf
    Contents: Sl. No Topic Page No 1 General characteristics of the District 1 1.1 Location & geographical area 2 1.2 Topography 2 1.3 Availability of Minerals 3 1.4 Forest 3 1.5 Administrative setup 3-4 2 District at a Glance 4-6 2.1 Existing status of Industrial Area in the District 7 3 Industrial Scenario of …. 7 3.1 Industry at a glance 7 3.2 Year wise trend of Units registered 8 3.3 Details of existing Micro & small enterprises & Artisan Units in the District 9 3.4 Large Scale Industries/ Public Sector Undertakings 10 3.5 Major Exportable Items 11 3.6 Growth Trend 11 3.7 Vendorisation/ Ancillarisation of the Industry 11 3.8 Medium Scale Enterprises 11 3.8.1 List of the units in ……….. & near by Area 11 3.8.2 Major Exportable Item 11 3.9 Service Enterprises 11 3.9.1 Coaching Industry 11 3.9.2 Potential Areas for Service Industry 11 3.10 Potentials for New MSMEs 12-13 4 Existing clusters of Micro & Small Enterprise 13 4.1 Details of Major Clusters 13 4.1.1 Manufacturing Sector 13 4.1.2 Service Sector 13 4.2 Details of identified cluster 14 4.2.1 Welding electrodes 14 4.2.2 Stone Cluster 14 4.2.3 Chemical Cluster 15 4.2.4 Fabrication and General Engineering. Cluster 15 5 General issues raised by the industry association during the course of meeting 6 Steps to set up MSMEs 16 1. Brief Industrial Profile of Deoghar District 1.
    [Show full text]
  • List of Consumers of Sahibganj
    SL. NO Consumer No. Consumer Name Consumer Address Tarrif Total Amount 298 GVCS000006 THE I/C MEDICAL OFFICER RANGA HOSPITAL, RANGA NDS-3 11,58,453 397 GVCS000046 DISTRICT HOMEGAURD COMMANDENT OFFICE, BANSKOLA,SAKRIGALI NDS-3 10,96,411 396 GVCS000029 B.D.O. , RAJMAHAL , NAYA BAZAR,RAJMAHAL NDS-3 10,90,657 395 GVCS000030 B D O , TALJHARI BLOCK NDS-3 10,88,846 297 MJPCS00557 BHARTI INFRATEL LTD PROP- A DWIVEDI, MIRZAPUR NDS-3 7,91,505 392 TPCS000005 DIVN.ELEC.EXEC.ENGINEER , E.RLY,MALDA,AT-TEENPAHAR NDS-3 6,98,808 198 LHDCS00001 SUNIL KR BHARTIYA S/o LT MURARILAL BHARTIYA, LOHANDA,AT-PETROL PUMP NDS-3 6,81,282 296 BHCS002471 ADIWASI KALYAN HOSTEL B S K COLLEGE, BARHARWA NDS-3 6,14,929 386 GVCS000002 SUPDT OF POLICE , RAJMAHAL THANA NDS-3 6,11,735 385 GVCS000033 CIVIL S.D.O. , S.D.O. COURT,RAJMAHAL NDS-3 6,11,126 295 GVCS000015 THE B.D.O. , PATHNA BLOCK,PATHNA NDS-3 5,93,452 294 GVCS000014 THE PRAKHAND BIKASH OFFI. , BARHARWA BLOCK NDS-3 5,90,543 380 GVCS000004 THANA INCHARGE , RADHANAGAR THANA,UDHWA NDS-3 5,14,026 191 MZCCS00783 BRANCH MANAGER STATE BANK OF INDIA, MIRZA CHAUKI NDS-3 4,79,984 190 MDSCS00045 BRANCH MANAGER STATE BANK OF INDIA, CHHOTA MADANSAHI NDS-3 4,63,921 188 BROCS00546 HEAD MASTER STR GIRLS HIGH SCHOOL, BANDARKOLA,BORIO,SAHIBGAN NDS-3 4,56,278 377 GVCS000007 MEDICAL OFFICER , REFERAL HOSPITAL,RAJMAHAL NDS-3 4,32,801 179 GVCS000009 DIST EMPLOYMENT OFFICE , LOHANDA NDS-3 3,98,842 373 GVCS000001 SUPDT OF JAIL , RAJMAHAL NDS-3 3,75,802 369 RJLCS01800 ATC TOWER OF INDIA (P) LT C/o MD ZIAUDDIN AHMED, GUDRAGHAT,RAJMAHAL NDS-3
    [Show full text]