Alternative Area 3: Fredericksburg (Dahlgren Spur to Crossroads)
Total Page:16
File Type:pdf, Size:1020Kb
TIER II DRAFT ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY AREA ALTERNATIVE AREA 3: FREDERICKSBURG BUILD ALTERNATIVE 3B (DAHLGREN SPUR TO CROSSROADS) • Construct one main line track in most Add One Track East of Existing sections, with track shifts to improve 3 Length: 14 miles Approximate Cost: $506.9 million • There are three Build Alternatives in Area 3, all of which: speed, and a new elevated railway at • Support expanded intercity passenger (all passenger train types), VRE commuter, the station • Within town, the additional track B and CSXT freight rail service • Provide proposed new DC2RVA service at Fredericksburg Station: Northeast would be added east of the existing U two tracks Regional (SEHSR) and Interstate Corridor (SEHSR) CFP 60 I A third track already exists between • Include a new Fredericksburg Station, including building, platform, and parking Dahlgren Spur • L Fredericksburg and the Spotsylvania D improvements (varies by alternative) Fredericksburg Station (Amtrak & VRE) • No changes to stations served by Amtrak passenger service (Interstate Station (i.e., no improvements required) • Rail improvements generally within A Corridor (Carolinian), Northeast Regional (Virginia), and Long Distance) or VRE commuter service existing railroad right-of-way L • No public roadway crossing closures / T • Improvements to major rail bridge over the Rappahannock River Existing 3 Tracks • Track maximum authorized speed: ≤ 79 mph Grade separate one at-grade roadway E crossing (Landsdowne Road) R • All other public roadway crossings N Spotsylvania Station (VRE) would remain at-grade with A safety improvements T • Consistent with City of Fredericksburg I CFP 50 Comprehensive Plan (2015) V E S BUILD ALTERNATIVE 3A BUILD ALTERNATIVE 3C • Maintain existing two-track corridor Maintain Two Tracks Through Town Add Two-Track Bypass East through the city, with some track shifts Length: 14 miles Approximate Cost: $240.2 million Length: 18 miles Approximate Cost: $977.5 million to improve speed • Within Fredericksburg, no construction of • Construct new two-track bypass east new track / no additional rail capacity of the city • Maintain existing two main • Serves all freight rail as well as all line tracks Existing 2 Tracks Existing 2 Tracks Interstate Corridor (SEHSR and CFP 60 • Shift tracks in some sections to CFP 60 Dahlgren Spur Dahlgren Spur Carolinian), Long Distance, and improve speed Auto Train passenger trains Fredericksburg Station (Amtrak & VRE) • Freight, passenger, and commuter Fredericksburg Station (Amtrak & VRE) Existing public roadway crossings, train operations through town • including along existing Dahlgren similar to existing conditions • Construction of one additional track, Spur, would remain at-grade, with safety improvements Existing 3 Tracks with some shifts to improve speed, Existing 3 Tracks north and south of the city • Any new public roadway • All improvements within existing crossings on the bypass would be grade separated Spotsylvania Station (VRE) railroad right-of-way Spotsylvania Station (VRE) • All public roadway crossings remain • Requires additional at-grade with safety improvements railroad right-of-way • Construct one main line track north CFP 50 CFP 50 and south of the city, with track shifts to improve speed IMAGES ARE FOR ILLUSTRATIVE PURPOSES ONLY AND ARE NOT TO SCALE IMAGES ARE FOR ILLUSTRATIVE PURPOSES ONLY AND ARE NOT TO SCALE 21 22.