Alternative Area 3: Fredericksburg (Dahlgren Spur to Crossroads)

Total Page:16

File Type:pdf, Size:1020Kb

Alternative Area 3: Fredericksburg (Dahlgren Spur to Crossroads) TIER II DRAFT ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY AREA ALTERNATIVE AREA 3: FREDERICKSBURG BUILD ALTERNATIVE 3B (DAHLGREN SPUR TO CROSSROADS) • Construct one main line track in most Add One Track East of Existing sections, with track shifts to improve 3 Length: 14 miles Approximate Cost: $506.9 million • There are three Build Alternatives in Area 3, all of which: speed, and a new elevated railway at • Support expanded intercity passenger (all passenger train types), VRE commuter, the station • Within town, the additional track B and CSXT freight rail service • Provide proposed new DC2RVA service at Fredericksburg Station: Northeast would be added east of the existing U two tracks Regional (SEHSR) and Interstate Corridor (SEHSR) CFP 60 I A third track already exists between • Include a new Fredericksburg Station, including building, platform, and parking Dahlgren Spur • L Fredericksburg and the Spotsylvania D improvements (varies by alternative) Fredericksburg Station (Amtrak & VRE) • No changes to stations served by Amtrak passenger service (Interstate Station (i.e., no improvements required) • Rail improvements generally within A Corridor (Carolinian), Northeast Regional (Virginia), and Long Distance) or VRE commuter service existing railroad right-of-way L • No public roadway crossing closures / T • Improvements to major rail bridge over the Rappahannock River Existing 3 Tracks • Track maximum authorized speed: ≤ 79 mph Grade separate one at-grade roadway E crossing (Landsdowne Road) R • All other public roadway crossings N Spotsylvania Station (VRE) would remain at-grade with A safety improvements T • Consistent with City of Fredericksburg I CFP 50 Comprehensive Plan (2015) V E S BUILD ALTERNATIVE 3A BUILD ALTERNATIVE 3C • Maintain existing two-track corridor Maintain Two Tracks Through Town Add Two-Track Bypass East through the city, with some track shifts Length: 14 miles Approximate Cost: $240.2 million Length: 18 miles Approximate Cost: $977.5 million to improve speed • Within Fredericksburg, no construction of • Construct new two-track bypass east new track / no additional rail capacity of the city • Maintain existing two main • Serves all freight rail as well as all line tracks Existing 2 Tracks Existing 2 Tracks Interstate Corridor (SEHSR and CFP 60 • Shift tracks in some sections to CFP 60 Dahlgren Spur Dahlgren Spur Carolinian), Long Distance, and improve speed Auto Train passenger trains Fredericksburg Station (Amtrak & VRE) • Freight, passenger, and commuter Fredericksburg Station (Amtrak & VRE) Existing public roadway crossings, train operations through town • including along existing Dahlgren similar to existing conditions • Construction of one additional track, Spur, would remain at-grade, with safety improvements Existing 3 Tracks with some shifts to improve speed, Existing 3 Tracks north and south of the city • Any new public roadway • All improvements within existing crossings on the bypass would be grade separated Spotsylvania Station (VRE) railroad right-of-way Spotsylvania Station (VRE) • All public roadway crossings remain • Requires additional at-grade with safety improvements railroad right-of-way • Construct one main line track north CFP 50 CFP 50 and south of the city, with track shifts to improve speed IMAGES ARE FOR ILLUSTRATIVE PURPOSES ONLY AND ARE NOT TO SCALE IMAGES ARE FOR ILLUSTRATIVE PURPOSES ONLY AND ARE NOT TO SCALE 21 22.
Recommended publications
  • Virginia Railway Express Strategic Plan 2004-2025
    VRE STRATEGIC PLAN Contents EXECUTIVE SUMMARY .......................................................................................................................V Current State of the Railroad ..............................................................................................................v The Strategic Planning Process..........................................................................................................vi The VRE Ridership Market................................................................................................................vii Strategic Plan Scenarios and Recommendations .............................................................................viii Core Network Needs...........................................................................................................................ix Potential Network Expansion ..............................................................................................................x Phased Service Improvement and Capital Investment Plan ..............................................................xii Financial, Institutional and Organizational Issues ..........................................................................xiii VRE Moving Forward ......................................................................................................................xiv 1. CURRENT STATE OF THE RAILROAD..........................................................................................1 VRE SYSTEM OVERVIEW .........................................................................................................................1
    [Show full text]
  • Amtrak Timetables-Virginia Service
    Effective July 13, 2019 VIRGINIA SERVICE - Southbound serving BOSTON - NEW YORK - WASHINGTON DC - CHARLOTTESVILLE - ROANOKE - RICHMOND - NEWPORT NEWS - NORFOLK and intermediate stations Amtrak.com 1-800-USA-RAIL Northeast Northeast Northeast Silver Northeast Northeast Service/Train Name4 Palmetto Palmetto Cardinal Carolinian Carolinian Regional Regional Regional Star Regional Regional Train Number4 65 67 89 89 51 79 79 95 91 195 125 Normal Days of Operation4 FrSa Su-Th SaSu Mo-Fr SuWeFr SaSu Mo-Fr Mo-Fr Daily SaSu Mo-Fr Will Also Operate4 9/1 9/2 9/2 9/2 Will Not Operate4 9/1 9/2 9/2 9/2 9/2 R B y R B y R B y R B y R B s R B y R B y R B R s y R B R B On Board Service4 Q l å O Q l å O l å O l å O r l å O l å O l å O y Q å l å O y Q å y Q å Symbol 6 R95 BOSTON, MA ∑w- Dp l9 30P l9 30P 6 10A 6 30A 86 10A –South Station Boston, MA–Back Bay Station ∑v- R9 36P R9 36P R6 15A R6 35A 8R6 15A Route 128, MA ∑w- lR9 50P lR9 50P R6 25A R6 46A 8R6 25A Providence, RI ∑w- l10 22P l10 22P 6 50A 7 11A 86 50A Kingston, RI (b(™, i(¶) ∑w- 10 48P 10 48P 7 11A 7 32A 87 11A Westerly, RI >w- 11 05P 11 05P 7 25A 7 47A 87 25A Mystic, CT > 11 17P 11 17P New London, CT (Casino b) ∑v- 11 31P 11 31P 7 45A 8 08A 87 45A Old Saybrook, CT ∑w- 11 53P 11 53P 8 04A 8 27A 88 04A Springfield, MA ∑v- 7 05A 7 25A 7 05A Windsor Locks, CT > 7 24A 7 44A 7 24A Windsor, CT > 7 29A 7 49A 7 29A Train 495 Train 495 Hartford, CT ∑v- 7 39A Train 405 7 59A 7 39A Berlin, CT >v D7 49A 8 10A D7 49A Meriden, CT >v D7 58A 8 19A D7 58A Wallingford, CT > D8 06A 8 27A D8 06A State Street, CT > q 8 19A 8 40A 8 19A New Haven, CT ∑v- Ar q q 8 27A 8 47A 8 27A NEW HAVEN, CT ∑v- Ar 12 30A 12 30A 4 8 41A 4 9 03A 4 88 41A Dp l12 50A l12 50A 8 43A 9 05A 88 43A Bridgeport, CT >w- 9 29A Stamford, CT ∑w- 1 36A 1 36A 9 30A 9 59A 89 30A New Rochelle, NY >w- q 10 21A NEW YORK, NY ∑w- Ar 2 30A 2 30A 10 22A 10 51A 810 22A –Penn Station Dp l3 00A l3 25A l6 02A l5 51A l6 45A l7 17A l7 25A 10 35A l11 02A 11 05A 11 35A Newark, NJ ∑w- 3 20A 3 45A lR6 19A lR6 08A lR7 05A lR7 39A lR7 44A 10 53A lR11 22A 11 23A 11 52A Newark Liberty Intl.
    [Show full text]
  • Piedmont and Carolinian Performance Snapshot
    PIEDMONT & CAROLINIAN PERFORMANCE SNAPSHOT NCDOT RAIL DIVISION for the Month of APRIL 2018 Ridership FFY18 APR FFY17 APR Δ FFY18 YTD FFY17 YTD Δ Carolinian 21,060 25,525 -17% 148,219 155,219 -5% Piedmont 12,654 12,233 3% 93,378 88,284 6% Total 33,714 37,758 -11% 241,597 243,503 -1% Number of Trains Average Number of Passengers per Train FFY18 APR FFY17 APRService FFY18 APR FFY17 APR Δ 60 60 Carolinian 351 425 -17% 118 96 Piedmont 107 127 -16% Revenue FFY18 APR FFY17 APR Δ FFY18 YTD FFY17 YTD Δ Carolinian $1,310,771 $1,586,931 -17% $9,442,344 $9,564,446 -1% Piedmont $287,075 $261,040 10% $2,144,476 $1,897,232 13% Total $1,597,846 $1,847,971 -14% $11,586,820 $11,461,678 1% Amenities Mo. Surcharge + $21,214 Mo. Expense $3,304 Mo. Surplus $17,910 & Vending Vending Income April 2018 service modifications impacted 4 Piedmont Trains and 2 Carolinian Trains. On April 4, Trains 74 and 75 were cancelled due to track damage from a tractor trailer striking a railroad bridge in Durham. On April 15, Train 76 operated between Charlotte and Greensboro only due to trees and powerlines downed across the tracks by storms; alternate transportation was provided for passengers. On April 18, Train 74 operated between Charlotte and High Point only due to traction motor failure in the locomotive; alternate transportation was provided for passengers. On April 22, Trains 79 and 80 operated between Charlotte and Rocky Mount only due to CSX signal work.
    [Show full text]
  • Quarterly Report on the Performance and Service Quality of Intercity Passenger Train Operations
    Pursuant to Section 207 of the Passenger Rail Investment and Improvement Act of 2008 (Public Law 110-432, Division B): Quarterly Report on the Performance and Service Quality of Intercity Passenger Train Operations Covering the Quarter Ended June, 2019 (Third Quarter of Fiscal Year 2019) Federal Railroad Administration United States Department of Transportation Published August 2019 Table of Contents (Notes follow on the next page.) Financial Table 1 (A/B): Short-Term Avoidable Operating Costs (Note 1) Table 2 (A/B): Fully Allocated Operating Cost covered by Passenger-Related Revenue Table 3 (A/B): Long-Term Avoidable Operating Loss (Note 1) Table 4 (A/B): Adjusted Loss per Passenger- Mile Table 5: Passenger-Miles per Train-Mile On-Time Performance (Table 6) Test No. 1 Change in Effective Speed Test No. 2 Endpoint OTP Test No. 3 All-Stations OTP Train Delays Train Delays - Off NEC Table 7: Off-NEC Host Responsible Delays per 10,000 Train-Miles Table 8: Off-NEC Amtrak Responsible Delays per 10,000 Train-Miles Train Delays - On NEC Table 9: On-NEC Total Host and Amtrak Responsible Delays per 10,000 Train-Miles Other Service Quality Table 10: Customer Satisfaction Indicator (eCSI) Scores Table 11: Service Interruptions per 10,000 Train-Miles due to Equipment-related Problems Table 12: Complaints Received Table 13: Food-related Complaints Table 14: Personnel-related Complaints Table 15: Equipment-related Complaints Table 16: Station-related Complaints Public Benefits (Table 17) Connectivity Measure Availability of Other Modes Reference Materials Table 18: Route Descriptions Terminology & Definitions Table 19: Delay Code Definitions Table 20: Host Railroad Code Definitions Appendixes A.
    [Show full text]
  • 20210419 Amtrak Metrics Reporting
    NATIONAL RAILROAD PASSENGER CORPORATION 30th Street Station Philadelphia, PA 19104 April 12, 2021 Mr. Michael Lestingi Director, Office of Policy and Planning Federal Railroad Administrator U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 Dear Mr. Lestingi: In accordance with the Metrics and Minimum Standards for Intercity Passenger Rail Service final rule published on November 16, 2020 (the “Final Rule”), this letter serves as Amtrak’s report to the Federal Railroad Administration that, as of April 10, 2021, Amtrak has provided the 29 host railroads over which Amtrak currently operates (listed in Appendix A) with ridership data for the prior month consistent with the Final Rule. The following data was provided to each host railroad: . the total number of passengers, by train and by day; . the station-specific number of detraining passengers, reported by host railroad whose railroad right-of-way serves the station, by train, and by day; and . the station-specific number of on-time passengers reported by host railroad whose railroad right- of-way serves the station, by train, and by day. Please let me know if you have any questions. Sincerely, Jim Blair Sr. Director, Host Railroads Amtrak cc: Dennis Newman Amtrak Jason Maga Amtrak Christopher Zappi Amtrak Yoel Weiss Amtrak Kristin Ferriter Federal Railroad Administration Mr. Michael Lestingi April 12, 2021 Page 2 Appendix A Host Railroads Provided with Amtrak Ridership Data Host Railroad1 Belt Railway Company of Chicago BNSF Railway Buckingham Branch Railroad
    [Show full text]
  • Ceo Report February 2021
    CEO REPORT FEBRUARY 2021 FEBRUARY 2021 The Virginia Railway Express, a joint project of the Northern Virginia Transportation Commission and the Potomac Rappahannock Transportation Commission, will provide safe, cost‐effective, accessible, reliable, convenient, and customer responsive commuter‐oriented rail passenger service. VRE contributes to the economic vitality of its member jurisdictions as an integral part of a balanced, intermodal regional transportation system. FEBRUARY 2021 TABLE OF CONTENTS CEO REPORT I FEBRUARY 2021 TABLE OF CONTENTS SUCCESS AT A GLANCE ....................................................................................................................................... 3 ON‐TIME PERFORMANCE ................................................................................................................................... 4 AVERAGE DAILY RIDERSHIP ................................................................................................................................ 6 SUMMONSES ISSUED ......................................................................................................................................... 7 TRAIN UTILIZATION ............................................................................................................................................ 8 PARKING UTILIZATION ....................................................................................................................................... 9 FINANCIAL REPORT FOR DECEMBER 2020 .........................................................................................................
    [Show full text]
  • Virginia Service-Boston-Norfolk-March162020
    Effective March 16, 2020 VIRGINIA SERVICE - Southbound serving BOSTON - NEW YORK - WASHINGTON DC - CHARLOTTESVILLE - ROANOKE - RICHMOND - NEWPORT NEWS - NORFOLK and intermediate stations Amtrak.com BOOK TRAVEL, CHECK TRAIN STATUS, ACCESS YOUR ETICKET AND MORE THROUGH THE Amtrak app. 1-800-USA-RAIL Northeast Northeast Northeast Silver Northeast Northeast Service/Train Name4 Palmetto Cardinal Carolinian Carolinian Regional Regional Regional Star Regional Regional Train Number4 65 67 89 51 79 79 95 91 195 125 Normal Days of Operation4 FrSa Su-Th Daily SuWeFr SaSu Mo-Fr Mo-Fr Daily SaSu Mo-Fr 5/24,7/2, 5/25,7/3, 5/25,7/3, Will Also Operate4 9/6 9/7 9/7 5/24,7/2, 5/25,7/3, 5/25,7/3, 5/25,7/3, Will Not Operate4 9/6 9/7 9/7 9/7 R B y R B y R B y R s d y R B y R B y R B R s y R B R B On Board Service4 Q l å OQ l å O l å O l å O l å O l å O y Q å l å O y Q å y Q å Symbol 6 R95 Boston, MA ∑w-u Dp l9 30P l9 30P 6 05A 6 30A 36 05A –South Station Boston, MA–Back Bay Station ∑v- 9 36P 9 36P 6 10A 6 35A 3R6 10A Route 128, MA ∑w- l9 50P l9 50P 6 20A 6 45A 3R6 20A Providence, RI i1 ∑w- l10 22P l10 22P 6 45A 7 10A 36 45A Kingston, RI b2 ∑w- 10 48P 10 48P 7 06A 7 31A 37 06A Westerly, RI >w- 11 05P 11 05P 7 20A 7 45A 37 20A Mystic, CT > 11 17P 11 17P 7 30A 37 30A New London, CT (Casino b) ∑v- 11 31P 11 31P 7 43A 8 07A 37 43A Old Saybrook, CT ∑w- 11 53P 11 53P 8 02A 8 27A 38 02A Greenfield, MA >w 5 45A 5 45A Northampton, MA >v 6 10A 6 10A Holyoke, MA >v t 6 25A 6 25A Springfield, MA ∑v- Ar 6 53A 7 25A 6 53A Dp 7 05A 7 05A Windsor Locks, CT > 7 24A 7 44A 7 24A Windsor, CT > 7 29A 7 49A 7 29A Valley Flyer Train 495 Hartford, CT ∑v- Valley Flyer Train 495 7 39A 7 59A 7 39A Berlin, CT >v 7 49A 8 10A 7 49A Meriden, CT >v 7 58A 8 19A 7 58A Wallingford, CT > 8 06A 8 27A 8 06A Amtrak Hartford Line Train 405 New Haven, CT–State St.
    [Show full text]
  • Doug Allen Virginia Railway Express Paul Ballard Trinity Metro/Texrail
    Doug Allen Virginia Railway Express Nicola Liquori SunRail Paul Ballard Trinity Metro/TEXRail Mass Transportation That’s Good for the Masses Location: Central Florida P DeLand Corridor: Central Florida Rail Corridor 61 miles, 4 counties DeLand SunRail Operating Route: 49 miles, 4 counties Future Northern Orange City Opening: May 2014 - Phase 1 (12 stations) Expansion SunRail Stations Federal Funding Grant Agreement $357m P SunRail Parking Provided Deltona Southern Expansion (4 stations) open July 2018 Future Northern Expansion Federal Funding Grant Agreement $187m I-4 Ultimate Construction Project Lake St Johns River P Monroe Ridership: 6,546 - Average Daily Ridership June 2019 DeBary VOLUSIA CO. SEMINOLE CO. Increased 80% between FY18 − FY19 with P Sanford opening of Southern Expansion LAKE CO. LAKE LAKE CO. CO. SEMINOLE ORANGE CO. Sanford SunRail is a Central Florida Pipeline P Lake Mary • Connects individuals with industries and opportunities Longwood Lake Jesup • Delivers solutions-oriented transportation by connecting to and P Longwood Winter Springs promoting other public and private transportation Altamonte ORANGE CO. ORANGE SEMINOLE CO. Springs P Altamonte Springs • Explores partnerships and technologies to meet evolving Maitland Oviedo P Maitland workforce and community needs Winter Park SEMINOLE CO. ORANGE CO. Winter Park/Amtrak Why it Works AdventHealth • The goal is not movement, but the connection of people LYNX Central Station Church Street and the betterment of a region Orlando Health/Amtrak • Every station is an opportunity to create micro-hubs of Orlando local commerce P Sand Lake Road Orlando • Benefits go far beyond delivering people: ntl irport • Increase in property value and taxes P Meadow Woods • New transit-oriented development • Increased local commerce ORANGE CO.
    [Show full text]
  • Atlantic Coast Service
    ATLANTIC COAST SERVICE JANUARY 14, 2013 NEW YORK, VIRGINIA, the CAROLINAS, GEORGIA and FLORIDA Effective SM Enjoy the journey. featuring the SILVER METEOR ® CAROLINIAN SM SILVER STAR ® PALMETTO ® AUTO TRAIN ® PIEDMONT® 1-800-USA-RAIL Call serving NEW YORK–PHILADELPHIA WASHINGTON–RICHMOND–RALEIGH–CHARLOTTE CHARLESTON–SAVANNAH–JACKSONVILLE ORLANDO–KISSIMMEE–WINTER HAVEN TAMPA–ST. PETERSBURG–FT. MYERS WEST PALM BEACH–FT. LAUDERDALE–MIAMI and intermediate stations AMTRAK.COM Visit NRPC Form T4–200M–1/14/13 Stock #02-3536 Schedules subject to change without notice. Amtrak is a registered service mark of the National Railroad Passenger Corp. National Railroad Passenger Corporation Washington Union Station, 60 Massachusetts Ave. N.E., Washington, DC 20002. ATLANTIC COAST SERVICE Silver Silver Piedmont Piedmont Palmetto Carolinian Silver Star Train Name Silver Star Carolinian Palmetto Piedmont Piedmont Meteor Meteor 73 75 89 79 91 97 Train Number 98 92 80 90 74 76 Daily Daily Daily Daily Daily Daily Normal Days of Operation Daily Daily Daily Daily Daily Daily R y R y R B R B R s R s R s R s R B R B R y R y l l y l å y l å r l r l On Board Service r l r l y l å y l å l l Read Down Mile Symbol Read Up R R R95 R93/83/ R82/154/ R R R 67 67 Mo-Fr 161 Connecting Train Number 174 66 66 66 9 30P 9 30P 6 10A 9 35A 0 Dp Boston, MA–South Sta. ∑w- Ar 6 25P 8 00A 8 00A 8 00A R9 36P R9 36P R6 15A R9 41A 1 Boston, MA–Back Bay Sta.
    [Show full text]
  • Rappahannock Regional Jail 34
    Part I: Setting the Stage Setting the Stage In 2007, the City Council adopted a Vision Statement to guide Fredericksburg toward its 300th anniversary in 2028. This Comprehensive Plan provides the framework for the community to attain that vision – addressing current conditions, defining goals for the future, and providing strategies that reconcile the existing conditions and the City’s desired outcomes. This Part I of the Comprehensive Plan sets the stage with a clear statement of vision, a brief overview of what a comprehensive is supposed to be, and a presentation of facts that provide a community profile. Preface Chapter 1: Vision and Comprehensive Plan Overview Chapter 2: Fredericksburg: A Community Profile 1 Preface Fredericksburg, Virginia, December 2014 This Comprehensive Plan has been prepared to guide decision making. It is to be used to help the City of Fredericksburg move forward in a manner that embraces local values and achieves the City’s vision for itself. The Fredericksburg City Council adopted its last comprehensive plan in 2007. A year later, the nation experienced a severe economic downturn that had a tremendous impact on the available revenues that are used to cover local government costs. The local real estate market dropped, although not as significantly as it did in some parts of the country, due to the City’s favorable location as a part of the Northern Virginia/Washington D.C. metropolitan area. Still, some area housing lost value and many local businesses are still trying to recover. At this time, the City is beginning to see renewed investment in the community and this revised Plan renews the City’s policies to guide the anticipated growth.
    [Show full text]
  • I-95 395 Transit-TDM Study
    I-95/I-395 Transit/TDM Study Final Report FEBRUARY 29, 2008 Developed by I-95/I-395 Transit/TDM Technical Advisory Committee Project Lead Virginia Department of Rail and Public Transportation 1313 East Main Street, Suite 300 P.O. Box 590 • Richmond, VA 23218-0590 www.drpt.virginia.gov I-95/I-395 Transit/TDM Study Final Report Developed by I-95/I-395 Transit/TDM Technical Advisory Committee February 29, 2008 I-95/I-395 Transit/TDM Study Acknowledgements In early 2007, at the request of the regional transportation agencies and authorities, the Secretary of Transportation of the Commonwealth of Virginia asked the Department of Rail and Public Transportation (DRPT) to initiate a study and form a multijurisdictional Technical Advisory Committee to provide technical input into determining the appropriate transit services to be implemented in conjunction with the I-95/I-395 HOV/Bus/HOT Lane project. The Technical Advisory Committee members extensively reviewed and discussed the recommendations of this study. In preparing the recommendations, the TAC reviewed the scope, inputs, demand modeling, and results of the study at every stage. The committee members who represent the interested jurisdictions and agencies agreed with the final recommendations of the study. The committee members include: • Jim Maslanka of City of Alexandria; • Tamara Ashby and Lynn Rivers of Arlington County; • Randall White and Jaak Pedak of Fairfax County; • Kathleen Beck of Fredericksburg Regional Transit (FRED); • Lloyd Robinson and Diana Utz of the George Washington Regional Commission (GWRC)/ Fredericksburg Area Metropolitan Planning Organization (FAMPO); • Don McAuslan of the Metropolitan Washington Council of Governments (MWCOG); • Rick Taube of the Northern Virginia Transportation Commission (NVTC); • Alfred Harf and Eric Marx of the Potomac and Rappahannock Transportation Commission (PRTC); • Sara Woolfenden and Fulton deLamorton of Stafford County; • Phyllis Kaplan of the U.S.
    [Show full text]
  • VRE OPERATIONS BOARD MEETING April 16, 2021 – 9:00 A.M
    VRE OPERATIONS BOARD MEETING April 16, 2021 – 9:00 A.M. Finance Committee Meeting – Follows Adjournment of Operations Board Meeting VIA WebEx 1. Roll Call 2. Consent Agenda A. Resolution Finding Need to Conduct April 16, 2021 Meeting Electronically B. Approval of Agenda C. Authorization to Issue an Invitation for Bids for Repair and Overhaul of Air Brake Equipment D. Authorization to Issue an Invitation for Bids for Rehabilitation of Wheelsets and Traction Motor Assemblies 3. Approval of Minutes from the March 19, 2021 VRE Operations Board Meeting 4. Chair’s Comments 5. Chief Executive Officer’s Report 6. Virginia Railway Express Riders’ and Public Comment 7. Action Items: A. Authorization to Exercise a Contract Option and Amend a Task Order for Maintenance Services for VRE Facilities B. Authorization to Exercise a Contract Option for Custodial and Seasonal Services for VRE Facilities C. Authorization to Execute a Right of Entry Agreement for MCBQ Construction Activities Adjacent to the VRE Quantico Station Parking Lot D. Recommend Authorization to Execute the Amended and Restated Operating Access and Amended Master Lease Agreements with CSX Transportation 8. Information Items: A. Spending Authority Report B. Construction Manager/General Contractor (CM/GC) Alternative Delivery Method C. Use of Federal Relief Funds in the FY 2022 Operating Budget 9. Closed Session 10. Operations Board Member’s Time The Next VRE Operations Board Meeting will be on May 21, 2021- 9:00 A.M. 2 Virginia Railway Express Operations Board Resolution 2A-04-2021 Resolution Finding Need to Conduct April 16, 2021 Meeting Electronically WHEREAS, on March 12, 2020, the Governor of Virginia declared a state of emergency in Virginia in response to the spread of novel coronavirus, or COVID-19, a communicable disease of public health threat as so declared by the State Health Commissioner on March 7, 2020 (“COVID-19”); and, WHEREAS, in subsequent Executive Orders, particularly Executive Order Nos.
    [Show full text]