Preparing the Road Network Development Project

Total Page:16

File Type:pdf, Size:1020Kb

Preparing the Road Network Development Project Democratic Republic of Timor Leste Ministry of Infrastructure National Directorate for Roads, Bridges and Flood Control Preparing the Road Network Development Project (ADB TA No. 7100- TIM) Initial Environmental Examination Rehabilitation of Road Link Ermera to Maliana (A11-01) May 2009 This report was prepared by the Government of Timor Leste and is not an ADB Document. Page i INITIAL ENVIRONMENTAL EXAMINATION Table of Contents A Introduction 1 A.1 Background 1 A.2 Purpose and Scope of the Initial Environmental Examination 1 A.2.1 ADB Guidelines 1 A.2.2 GoTL Requirements 2 A.3 Process and Implementation 5 B Description of the Sub-Project 8 B.1 Subproject Objective 8 B.1.2 Beneficiaries and Need 8 B.1.3 Brief description 9 B.2 Anticipated Works 9 B.3 Cost and Benefit Estimate 11 B.3.1 Financial Project Cost 11 B.3.2 Main Project Benefits 11 B.4 Sub-Project Alternatives 12 C Description of the Environment 14 C.1 Physical Resources 14 C.1.1 Topography and Geology 14 C.1.2 Seismic Activity 18 C.1.3. Climate 18 C.1.4 Water Resources 19 C.1.5 Air Quality 22 C.2 Ecological Resources 22 C.2.1 Land Cover and Vegetation 22 C.2.2 Biodiversity and Wildlife Management Areas 26 C.3 Human & Economic Development 32 C.3.1 Population 32 C.3.2 Agricultural Development 32 C.3.3 Quarries, Borrow Sites and Disposal Sites 32 C.3.4 Industrial Development 33 C.3.5 Infrastructure 33 C.4 Quality of Life Values and the Socio-Cultural Environment 34 C.4.1 Ethnic and Cultural Diversity 34 C.4.2 Poverty Levels 34 C.4.3 Education and Health 34 C.4.4 Land Tenure 34 C.4.5 Historical and Cultural Sites 34 D Screening of Potential Environmental Impacts and Mitigation Measures 37 D.1 Overview 37 D.1.1 Assessing Environmental Impacts 37 D.1.2 GIS – Environmental Sensitivity Mapping (ESM) 37 D.2 Design / Pre-Construction Phase 40 D.2.1 Protection of Biological Value and Protected Areas 40 D.2.2 Environmentally Sound Design 41 D.2.3 Road Safety 41 D.2.4 Social or Community Concerns (pre-construction) 41 D.3 Construction Phase 42 D.3.1 Social or Community Concerns (construction) 42 D.3.2 Geological, Soil Instability and Erosion 42 Preparing the Road Network Initial Environmental Examination (IEE) Development Project Timor Leste (ADB TA: 7100-TIM) May 2009 Page ii of 87 D.3.3 Controlling Sediment 48 D.3.4 Controlling Storm water 48 D.3.5 Management of Stockpiles, Spoil-heaps, Batters 49 D.3.6 Air Quality and Dust Control 50 D.3.7 Noise Control 50 D.3.8 Quarry Selection and Management 50 D.3.9 Offsite and Waste Management 51 D.3.10 Safety and Health 51 D.3.11 Cultural Heritage 52 D.3.12 Site de-commissioning 52 D.4 Operation Phase 53 D.4.1 Peoples Safety 53 D.4.2 Rehabilitation and Maintenance of Practices 53 D.4.3 Noise Control 53 E Environmental Management and Monitoring Plan 54 E.1 Environmental Management Plan 54 E.2 Environmental Monitoring Plan 55 E.2.1 Reporting Arrangements 56 E.3 Institutional Implementation and Reporting Arrangements 57 E.3.1 Sub-Project Implementation 57 F Public Consultations and Information Disclosure 61 F.1 Consultations and Awareness 61 F.2 Information Disclosure 61 G Findings and Recommendations 62 H Conclusions 62 References 63 List of Figures Figure 1: Simplified Procedure for Environmental Assessment and 4 Pollution Control in Timor Leste Figure 2: Schematic Flowchart of the Environmental Assessment Procedures 7 for TA 7100: Developing the Road Network in Timor Leste Figure 3: Subproject Location Map 8 Figure 4: Topography Map 15 Figure 5: Slope Map 16 Figure 6: Geological Stability Zone Map 17 Figure 7: Timor Leste Rainfall Distribution Map 18 Figure 8: Historic Annual Rainfall 19 Figure 9: Flood prone areas within the project area 20 Figure 10: Areas Prone to Flooding Map 21 Figure 11: Landcover Map 25 Figure 12: Biological Value Area Map 31 Figure 13: Population of Sub Districts Map 36 Figure 14: Sensitivity Classes Map 39 Figure 15: Bio-Engineering Solutions 1 45 Figure 16: Bio-Engineering Solutions 2 46 Figure 17: Locations for Bio-Engineering Mitigation Measures 47 Figure 18: Examples of Sedimentation Control Structures at Construction Stage 49 Figure 19: Flow Chart for Milestones in Environmental Assessment 60 and Management Activities for TA 7100 inTimor Leste List of Tables Table 1: Relevant Environmental law and Regulations in Timor Leste 2 Preparing the Road Network Initial Environmental Examination (IEE) Development Project Timor Leste (ADB TA: 7100-TIM) May 2009 Page iii of 87 and their current status Table 2: Environmental Classification of Proposed Road Projects 3 Table 3: Selected Environmental and Spatial Datasets in Timor Leste and Their Relevance for Environmental Impact Screening for Road Networks 6 Table 4: Average Annual Daily Travel (AADT) for the Subprojects 9 Table 5: Preliminary Implementation Schedule 11 Table 6: Cost per Subproject Road 11 Table 7: ALGIS Data on Land Cover derives from September 2000 Satellite 23 Remote Sensing Data Table 8: List of Existing and Proposed Protected Areas in Timor Leste 27 Table 9: Designated and Candidate Important Bird Areas (IBA) in Timor Leste 30 Table 10: Significance Threshold Matrix for Environmental Impacts 38 Table 11: Estimated Environmental Management and Monitoring Costs 54 Table 12: Environmental Management Plan (EMP) 64 Table 13: Environmental Monitoring Plan 71 Annex 1: Subproject Environmental Compliance Inspection and Monitoring Form 73 Annex 2: District Profiles 79 Annex 3: Proposed Locations for Bio-Engineering Locations 81 Preparing the Road Network Initial Environmental Examination (IEE) Development Project Timor Leste (ADB TA: 7100-TIM) May 2009 Page iv of 87 Abbreviations AADT Annual Average Daily Traffic ADB Asian Development Bank ALGIS Timor Leste GIS Agency DEA Executing Agency DoE Directorate of Environmental Services DRBFC Directorate of Roads, Bridges and Flood Control EA Environmental Assessment EARP Environmental Assessment & Review Procedures EEO Engineer cum Environmental Officer EIA Environmental Impact Assessment EMP Environmental Management Plan ESM Environmental Sensitivity Mapping/Map ETPA Responsible Department within the Timor Leste Public Administration GIS Geographic Information System IBA Important Bird Area IES International Environmental Specialist MAFF National Directorate for Forestry under the Ministry for Agriculture, Forestry and Fisheries MoI Ministry of Infrastructure NES National Environmental Specialist PM Project Manager PSA Poverty and Social Analysis GoTL Government of Timor Leste IEE Initial Environmental Examination IRR Internal Rate of Return (%) NPV Net Present Value PISC Project Support Implementation Consultant PMU Project Management Unit PPE Personal Protection Equipment QA Quality Assurance REA Rapid Environment Assessment (internal ADB document) RF Resettlement Framework RMUP Road Maintenance and Upgrading Project RP Resettlement Plan SIEE Summary IEE SLM Sustainable Land Management Project (UNDP) TL Timor Leste UN OCHA Office for the Coordination of Human Affairs (UN) Preparing the Road Network Initial Environmental Examination (IEE) Development Project Timor Leste (ADB TA: 7100-TIM) May 2009 Page 1 of 87 INITIAL ENVIRONMENTAL EXAMINATION A. INTRODUCTION A.1 Background This Initial Environmental Examination (IEE) has been prepared as part of the Asian Development Bank (ADB) Technical Assistance (TA) in preparing the road network development project (TA 7100-TIM) for rehabilitation of roads in Timor Leste. The proponent is the Ministry of Infrastructure, National Directorate for Roads, Bridges and Flood Control in Timor Leste, aided by international and national consultants provided by this TA. Since the country gained independence in 2002, the road infrastructure, which was greatly damaged during the unrest following the 1999 elections, has received basic emergency repair of many damaged and impassable sections. Nonetheless a decade or more of lack of maintenance has left the road network in a poor condition, which severely hampers access to social services, markets and the movement of goods. To a great extent, the economic development of the country as a whole depends on the connectivity of a reliable road system, as land transport represents the main means of travel within the country. The sample roads selected for rehabilitation are important links, which have been identified during the TA’s Phase 1 of engineering assessments and economic analysis for a “Ten Year Master Plan/Investment Plan for Timor Leste National Road Network”. They will improve connectivity on the local as well as regional level. The Project is therefore expected to support sustainable development, reduce poverty and improve access to markets and social services for the population. The sample roads selected are National Road (NR) Liquica to Batugade (A03-03), Batugade to Mota Ain (A03-04) and Ermera to Maliana (A11-01). The road links are shown in the Map, Fig. 3 below. This IEE covers the Subproject road from Ermera to Maliana (A11-01). A.2 Purpose and Scope of the Initial Environmental Examination The Initial Environmental Examination (IEE) report presents the findings and recommendations of the environmental assessment of the sample road links proposed by the Ministry of Infrastructure. It purpose is to ensure that environmentally sound practices have been incorporated into project design, and potential negative impacts will be avoided or mitigated to acceptable levels. The environmental assessment process follow and complies with Timor Leste regulatory framework and ADB requirements. The environmental impact was considered for quarries, borrow pits, material stockpile sites, contractors' yard, damage to local access roads, and terrestrial and aquatic environment within approximately 500m on both sides of the road corridor. The extent of the study during operation has been limited to the existing road corridor with the exception of noise, which is considered up to 100m on either side of the road.
Recommended publications
  • Title Page, Including the Date of Completion of the Analysis Report
    FAA 118 / 119 REPORT CONSERVATION OF TROPICAL FORESTS AND BIOLOGICAL DIVERSITY IN TIMOR-LESTE JUNE 2012 PURPOSE In 2012, USAID/Timor-Leste will prepare its five-year Country Development Cooperation Strategy. USAID/Timor-Leste recognizes that protection of the environment and sustainable management of natural resources are required for a successful development program. Climate change adaptation, environment and natural resources management will be crosscutting themes in the new strategy. This report is an update of an assessment conducted in 2009 and fulfills the planning requirements set out by two provisions of the Foreign Assistance Act: 1. Section 118(e) "Country Analysis Requirements – Each country development strategy statement or other country plan prepared by the Agency for International Development shall include an analysis of – (1) the actions necessary in that country to achieve conservation and sustainable management of tropical forests, and (2) the extent to which the actions proposed for support by the Agency meet the needs thus identified." 2. Section 119(d) "Country Analysis Requirements – Each country development strategy statement or other country plan prepared by the Agency for International Development shall include an analysis of – (1) the actions necessary in that country to conserve biological diversity, and (2) the extent to which the actions proposed for support by the Agency meet the needs thus identified." METHODOLOGY This report is intended as an update to the 2009 draft of the Timor-Leste Tropical Forests and Biodiversity Analyses. Additional information was gathered and incorporated into the previous report during a visit to Timor-Leste in April 2012 by Sarah Tully, USAID, ME/TS.
    [Show full text]
  • Sustainable Destination Management in Timor‐Leste
    Philipps‐University of Marburg Faculty of Geography Final Thesis for the award of the academic degree Diplom‐Geograph Sustainable Destination Management in Timor‐Leste Author Thesis Coaches Christian Wollnik Prof. Dr. Markus Hassler wollnik@daad‐alumni.de Prof. Dr. Christian Opp Marburg, December 2011 Acknowledgments Acknowledgments This thesis would not have been possible without the financial support of the German Academic Exchange Service (DAAD), as well as the helpful assistance by the members of the German East Timor Society (DOTG e.V.), who especially facilitated the preparation of the field research in Tim‐ or‐Leste. With regard to my stay in Timor‐Leste, I would like to thank all my interviewees, as well as all the welcoming Timorese I met – I am still impressed by the uniqueness of both the countryside and its charming people, who tend to look into a bright future, hopefully for good and all leav‐ ing the troubles of the past behind. I also would like to offer my gratitude to the Austrian Society for South‐East Asian Studies (SEAS) and Tourism Watch, the Desk for Corporate Social Responsibility andTourism at the Church Devel‐ opment Service (EED). Both institutions gave me the opportunity to present my ongoing re‐ search and preliminary results.* I am heartily thankful to my supervisor, Prof. Dr. Markus Hassler, for his encouragement, guid‐ ance and support from the initial to the final level of the study. Lastly, I offer my regards and blessings to all of those who supported me in any respect during the completion of the project, especially my close friends and my family.
    [Show full text]
  • Table of Contents
    Sustainable Development in Timor-Leste NATIONAL REPORT TO THE UNITED NATIONS CONFERENCE ON SUSTAINABLE DEVELOPMENT (UNCSD) On the run up to Rio+20 Ministry of Economy & Development February 2012 Table of Contents TABLE OF CONTENTS .............................................................................................................................................. 2 ABBREVIATIONS .................................................................................................................................................... 3 EXECUTIVE SUMMARY ........................................................................................................................................... 6 I. INTRODUCTION ............................................................................................................................................. 9 II. APPROACH AND METHOD OF NATIONAL PREPARATIONS FOR RIO+20 ....................................................... 12 A. OBJECTIVES OF THE RIO +20 NATIONAL PREPARATIONS ......................................................................................... 13 B. HOW ARE THE RIO+20 NATIONAL PREPARATIONS UNDERTAKEN? ............................................................................ 13 III. OVERALL PICTURE OF SUSTAINABLE DEVELOPMENT IN TIMOR-LESTE ......................................................... 15 A. GOVERNMENT OF TIMOR-LESTE (GOTL) RESPONSES TO MULTILATERAL ENVIRONMENTAL AGREEMENTS ................. 18 B. INSTITUTIONAL FRAMEWORK FOR SUSTAINABLE DEVELOPMENT ............................................................................
    [Show full text]
  • Empowering the Natives: Community Participation in Tourism Development in Tutuala, Timor Leste Titi S
    Empowering the Natives: Community Participation in Tourism Development in Tutuala, Timor leste Titi S. Prabawa & Vicente M.L. Guterres What is the research about? • The role of Haburas, a local NGO in Timor Leste, in supporting community based tourism development in Tutuala, East Timor. Tutuala: • Tutuala is a remote area located at the eastern end of Timor island, a sub district of Lautem in Timor Leste. • It is about 27 km from Lautem. • Tutuala sub-district was divided into two villages and each village was headed by a village head called chefe Suco. • The distant from Dili, the capital of East Timor, to Suco Tutuala is 234 Km. • The trip from Dili to Suco Tutuala took about 8 to 9 hours due to bad condition of the road. Tutuala Location (Taken from google map): Tourist attractions at Tutuala: Ili Kere-kere Site Jaco Island: How does Haburas start with the program in Tutuala? • Concern about the local community livelihood after UNTAET declared the area of Tutuala and its surroundings as a protected area in 2000. • Access of the community to their livelihood resources is very limited. • People used to combine traditional subsistent agriculture and fishing to make their living. • Potentials of the area as a tourism destination for its scenic natural beauty. • Since 2000, tourists have flowed to the area bringing their own tents, food and other camping facilities. • With the support from CIDAC, an International NGO based in Portugal, applying fund from EU, between 2003-2008, Haburas ran a community based tourism program in Tutuala as an alternative livelihood for the locals.
    [Show full text]
  • Timor-Leste Strategic Development Plan, 2011–2030
    SDP 2011-2013 PART 1: INTRODUCTION SDP 2011-2013 PART 1: INTRODUCTION TIMOR-LESTE STRATEGIC DEVELOPMENT PLAN 2011 - 2030 VERSION SUBMITTED TO THE NATIONAL PARLIAMENT 1 SDP 2011-2013 PART 1: INTRODUCTION 2 SDP 2011-2013 TIMOR-LESTESDP 2011-2013 STRATEGIC DEVELOPMENT PLAN 2011 - 2030 PART 1: INTRODUCTION PART 1: INTRODUCTION CONTENTS PART 1 INTRODUCTION 7 OVERVIEW 8 BACKGROUND 9 STRATEGIC DEVELOPMENT PLAN 11 PART 2 SOCIAL CAPITAL 13 EDUCATION AND TRAINING 14 HEALTH 33 SOCIAL INCLUSION 44 ENVIRONMENT 53 CULTURE AND HERITAGE 61 PART 3 INFRASTRUCTURE DEVELOPMENT 69 ROADS AND BRIDGES 70 WATER AND SANITATION 77 ELECTRICITY 85 SEA PORTS 93 AIRPORTS 97 TELECOMMUNICATIONS 99 PART 4 ECONOMIC DEVELOPMENT 105 RURAL DEVELOPMENT 107 AGRICULTURE 118 PETROLEUM 136 TOURISM 141 PRIVATE SECTOR INVESTMENT 151 PART 5 INSTITUTIONAL FRAMEWORK 157 SECURITY 158 DEFENCE 163 FOREIGN AFFAIRS 170 JUSTICE 176 PUBLIC SECTOR MANAGEMENT AND GOOD GOVERNANCE 181 NATIONAL DEVELOPMENT AGENCY AND ECONOMIC POLICY AND INVESTMENT AGENCY 188 PART 6 ECONOMIC CONTEXT AND MACROECONOMIC DIRECTION 192 PART 7 CONCLUSION AND STAGING OF THE STRATEGIC DEVELOPMENT PLAN 215 3 TIMOR-LESTESDP 2011-2013 STRATEGIC DEVELOPMENT PLAN 2011 - 2030 PART 1: INTRODUCTION DISTRICT MAP OF TIMOR-LESTE 2011 Source: UNDP 4 SDP 2011-2013 TIMOR-LESTESDP 2011-2013 STRATEGIC DEVELOPMENT PLAN 2011 - 2030 PART 1: INTRODUCTION PART 1: INTRODUCTION LIST OF TABLES TABLE 1 – ESTIMATED SCHOOL INFRASTRUCTURE NEEDS 15 TABLE 2 – PROGRESS ACHIEVED IN BASIC EDUCATION, 2000 TO 2010 17 TABLE 3 – SECONDARY EDUCATION IN TIMOR-LESTE, 2010 20 TABLE 4 – GRADUATED STUDENTS (CUMULATIVE DATA UP TO 2011) 22 TABLE 5 – SUMMARY OF EXISTING HEALTH FACILITIES IN TIMOR-LESTE 34 TABLE 6 – BENEFITS PAID UNDER DECREE-LAW NO.
    [Show full text]
  • Environmental Assessment Document Timor-Leste
    Environmental Assessment Document Project No.: 50211-001 Date: August 2016 Document status: Final Timor-Leste: National Road No. 1 Upgrading – Dili – Baucau Simplified Environmental Impact Statement/ Initial Enviornmental Examination This environmental assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or Staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. JICA National Road No. 1 Upgrading Project: Manatuto – Baucau Section Page | i Simplified Environmental Impact Statement Table of Contents 1. INTRODUCTION ..................................................................................................................................... 1 A. THE PROJECT .............................................................................................................................................. 1 B. PROJECT PROPONENT ................................................................................................................................. 1 C. OBJECTIVE, METHODOLOGY AND SCOPE OF SEIS .................................................................................... 2 2. DESCRIPTION OF THE PROJECT .....................................................................................................
    [Show full text]
  • Introduction to Timor Loro Sae 500 Years (1999: 11-29)
    Introduction to Timor Loro Sae 500 Years (1999: 11-29) ...we have never been aware as we now are of how oddly hybrid historical and cultural experiences are, of how they partake of many often contradictory experiences and domains, cross national boundaries, defy the police action of simple dogma and loud patriotism. Far from being unitary or monolithic or autonomous things, cultures actually assume more ‘foreign elements, alterities, differences, than they consciously exclude (Edward Said 1994). Since the island of Timor was first visited by Portuguese navigators, a mere twenty or so years after Columbus crossed the Atlantic ocean in 1492, and within years of the passage of the first caravels through the Straits of Malacca, Portugal has been the dominant external influence, at least on the eastern part of the island. Equally, many Timorese share at least part Portuguese ancestry while many more have adopted the religion of their former colonizer. The exception to this fact of life was the brief but destructive occupation of Timor by Japan (and Australia) during the Pacific War, and the near-genocidal impact of the Indonesian military invasion and annexation of the half-island commencing in 1975-76. Even so, as continuing acts of resistance to this occupation reveal, the Timorese have not easily acquiesced in their dominance by outsiders, now or in the past. No less important, with the reversion of Macau to Chinese sovereignty in 1999, East Timor along with, perhaps, Western Sahara and New Caledonia remains the major case of unrequited decolonization left in the world. As a work of historical sociology, this book seeks to explain the world-historical incorporation of Timor over long time, especially between the poles of colonial domination on the one hand, and accommodation and resistance, on the other.
    [Show full text]
  • Faa 118 / 119 Report June 2004
    FAA 118 / 119 REPORT CONSERVATION OF TROPICAL FORESTS AND BIOLOGICAL DIVERSITY IN EAST TIMOR JUNE 2004 TABLE OF CONTENTS A. INTRODUCTION 3 B. LEGISLATIVE AND INSTITUTIONAL STRUCTURES AFFECTING BIOLOGICAL RESOURCES 4 Legislation 4 Government Institutions 5 Donors and International Organizations 7 Non-governmental Organizations Active in East Timor 7 C. BIOPHYSICAL AND ECOSYSTEM CHARACTERISTICS 8 Climate and Topography 8 Natural Ecosystems 8 D. CURRENT STATUS OF TROPICAL FORESTS AND BIODIVERSITY 10 Tropical Forest Status and Management 10 Biodiversity Status and Management 13 E. ASSESSMENT OF THREATS TO TROPICAL FORESTS AND BIODIVERSITY 18 F. USAID’S CURRENT ACTIVITIES 19 G. ACTIONS NECESSARY TO CONSERVE BIOLOGICAL DIVERSITY AND TROPICAL FORESTS 21 Watershed Management through Sustainable Agriculture and Reforestation 21 Water Quality and Quantity 21 Firewood and Energy 21 Policies and Planning for Forest and Biodiversity Management 22 Biodiversity Conservation 22 Environmental Education and Awareness 23 Ecotourism 23 Environmental Impact Analysis 24 H. MEETING CONSERVATION NEEDS: CURRENT AND RECOMMENDED ACTIONS 24 Current Actions 24 Recommended Actions 25 G. BIBLIOGRAPHY 30 2 A. INTRODUCTION East Timor is located on Timor Island in the Lesser Sunda Islands chain. Its residents voted for independence from Indonesia in a referendum held in 1999. Immediately following the referendum, large-scale violence by the Indonesian Army and militia erupted that included massacres and wide-scale destruction of property. Sixty to eighty percent of public and private property was destroyed including schools and health clinics. There was a displacement of people into mountainous areas (UNHRC, 2000). Such violence destroyed the socio-economic base for the country’s development. The United Nations has helped to support the development of this new sovereign state and in May 2002, East Timor became independent.
    [Show full text]
  • Out of the Ashes out of the Ashes Destruction and Reconstruction of East Timor James J
    Out of the Ashes Out of the Ashes Destruction and Reconstruction of East Timor James J. Fox and Dionisio Babo Soares (Editors) Published by the ANU E Press The Australian National University Canberra ACT 0200, Australia Email: [email protected] Web: http://epress.anu.edu.au Previously published by Crawford House Publishing Pty Ltd Bathurst 2795 New South Wales, Australia National Library of Australia Cataloguing-in-Publication entry Out of the Ashes: The Destruction and Reconstruction of East Timor Bibliography. Includes index ISBN 0-9751229-1-6. 1. 2. I. Fox, James J., 1940– . II. Soares, Dionisio Babo, 19—, III. Research School of Pacific and Asian Studies, The Australian National University. 959.0000 All rights reserved. You may download, display, print and reproduce this material in unaltered form only (retaining this notice) for your personal, non-commercial use or use within your organization. All electronic versions prepared inhouse Cover design by Brendon McKinley First edition © 2000 James J. Fox, Dionisio Babo Soares, et al This edition © 2003 James J. Fox, Dionisio Babo Soares, et al Printed by DigitalPrintAustralia, Adelaide Contents Foreword by Xanana Gusmão vii Preface ix Preface to the ANU E Press publication xi Contributors xiii Abbreviations and acronyms xvii Map of Timor xxii Map of East Timor xxiii Background 1 Tracing the path, recounting the past: historical perspectives on Timor James J. Fox 1 2 From province to nation: the demographic revolution of a people Terence H. Hull 28 3 East Timor: education and human resource development Gavin W. Jones 41 4 Political developments leading to the referendum Dionisio Babo Soares 53 5 The diplomacy on East Timor: Indonesia, the United Nations and the international community Grayson J.
    [Show full text]
  • PIF) PROJECT TYPE: Full-Sized Project TYPE of TRUST FUND:GEF Trust Fund for More Information About GEF, Visit Thegef.Org
    GEF-6 PROJECT IDENTIFICATION FORM (PIF) PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND:GEF Trust Fund For more information about GEF, visit TheGEF.org PART I: PROJECT INFORMATION Project Title: Securing the long-term conservation of Timor-Leste’s biodiversity and ecosystem services through the establishment of a functioning National Protected Area Network and the improvement of natural resource management in priority catchment corridor Country(ies): Timor-Leste GEF Project ID:1 9434 GEF Agency(ies): CI (select) (select) GEF Agency Project ID: Other Executing Partner(s): Ministry of Agriculture and Fisheries (MAF), Submission Date: 04/08/2016 Ministry of Commerce, Industry & Environment (MCIE), and CI Timor-Leste GEF Focal Area(s): Multi-focal Areas Project Duration (Months) 48 Integrated Approach Pilot IAP-Cities IAP-Commodities IAP-Food Security Corporate Program: SGP Name of parent program: [if applicable] Agency Fee ($) 300,633 A. INDICATIVE FOCAL AREA STRATEGY FRAMEWORK AND OTHER PROGRAM STRATEGIES2 (in $) Objectives/Programs (Focal Areas, Integrated Approach Pilot, Corporate Trust Fund Programs) GEF Project Co- Financing financing (select) (select) SFM-1 GEFTF 556,728 2,350,000 (select) (select) SFM-2 GEFTF 556,728 2,350,000 BD-1 Program 1 (select) (select) GEFTF 890,765 3,760,000 LD-1 Program 1 (select) (select) GEFTF 668,073 2,820,000 LD-1 Program 2 (select) (select) GEFTF 668,073 2,820,000 (select) (select) (select) (select) (select) (select) (select) (select) (select) (select) (select) (select) (select) (select) (select)
    [Show full text]
  • PLAN YOUR TRIP UNDERSTAND TIMOR-LESTE Loo
    ©Lonely Planet Publications Pty Ltd “All you’ve got to do is decide to go and the hardest part is over. So go!” TONY WHEELER, COFOUNDER – LONELY PLANET Get the right guides for your trip PAGE PLAN YOUR PLANNING TOOL KIT 1 Photos, itineraries, lists and suggestions YOUR TRIP to help you put together your perfect trip 10 Top Experiences ........ 4 WEBSTER MARK 4 Welcome to 10 Timor-Leste .................... 11 TOP Need to Know ................. 12 EXPERIENCES If You Like... ..................... 14 Month by Month ............. 16 Itineraries ........................ 18 Diving & Snorkelling ....... 20 COUNTRY/REGIONALCOUNOUNTRY/REGIONALAL SHOESTRING PHRASEBOOKPHRRASEBOB OKO • TheTh originalii l • Big trip Welcome to Diving & Snorkelling Sitting at the southwest corner of the Coral Triangle, the north coast of Timor-Leste and Atauro Tour de Timor ................. 23 1 has some of the best diving going. The reefs are pristine and the sea life is as plentiful as it is Comprehensive • Multicountry diverse, Smiling, from nudibranchs friendly to turtles people to schooling will trevally. The other good news is that most of it can • Timor- be seenwelcome on shore you dives. toFor theirthose that country don’t dive an– thed snorkelling is also some of the best in the word. See p 20 . all it has to offer. Make sure you • Adventurous • Maximise budget Dili Marathon .................. 27 Leste take them up on it. Adventure Awaits Year-Round Timor-Leste richly rewards those who venture to its mountainous interior for trekkin Regions at a Glance ....... 30 hot springs, dense jungles and raging rivers. Getting there is a major part of the adventur whether by vehicle, mountain bike, foot or even Timor pony – however, it is well worth th eՖ ort.
    [Show full text]
  • Land Access and Livelihoods in Post-Conflict Timor-Leste: No Magic Bullets
    International Journal of the Commons Vol. 9, no 2 September 2015, pp. 619–647 Publisher: Uopen Journals URL:http://www.thecommonsjournal.org URN:NBN:NL:UI:10-1-117248 Copyright: content is licensed under a Creative Commons Attribution 3.0 License ISSN: 1875-0281 Land access and livelihoods in post-conflict Timor-Leste: no magic bullets Simon P.J. Batterbury School of Geography, University of Melbourne, Australia and Vrije Universiteit Brussel, Belgium [email protected] Lisa R. Palmer School of Geography, University of Melbourne, Australia [email protected] Thomas R. Reuter Asia Institute, University of Melbourne, Australia [email protected] Demetrio do Amaral de Carvalho Universidade da Paz and Haburas Foundation, Timor-Leste [email protected] Balthasar Kehi School of Geography, University of Melbourne, Australia [email protected] Alex Cullen School of Geography, University of Melbourne, Australia [email protected] Abstract: In Timor-Leste, customary institutions contribute to sustainable and equitable rural development and the establishment of improved access to and management of land, water and other natural resources. Drawing on multi-sited empirical research, we argue that the recognition and valorization of custom and common property management is a prerequisite for sustainable and equitable 620 Simon P.J. Batterbury et al. land tenure reform in Timor-Leste. In a four-community study of the relationship between land access and the practice of rural livelihoods in eastern and western districts of Timor-Leste, where customary management systems are dominant, we found different types of traditional dispute resolution, with deep roots in traditional forms of land management and with varying levels of conflict.
    [Show full text]