Mtr Corporation Railway Protection Area Plan Match
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Initial Transport Assessment of Development Options
This subject paper is intended to be a research paper delving into different views and analyses from various sources. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not necessarily represent the views of the HKSARG. WORKING PAPER NO. 35 INITIAL TRANSPORT ASSESSMENT OF DEVELOPMENT OPTIONS Purpose 1. The purpose of this paper is to provide information on the reference transport demand forecasts, assessment of Reference Scenario and framework for option evaluations. Background 2. Under Stage 3 of the HK2030 Study, Development Scenario and Development Options are formulated. The Development Options are then subject to transport, economic, financial as well as environmental assessments. Under the integrated approach adopted for the Study, the transport requirements identified for the Development Options are also assessed in terms of the environmental, economic and financial implications in order that a meaningful comparison of the Development Options could be made. 3. Under the Reference Scenario, various development choices have been considered to satisfy the land requirements. They can broadly be categorised into two different options of development patterns, namely Decentralisation and Consolidation. The details are presented in the paper on Development Options under the Reference Scenario. Assessments have been carried out to identify the transport requirements of the two Development Options in 2010, 2020 and 2030. The findings are summarised in the following sections. Development Options 4. Under the Reference Scenario, the population in 2030 could be in the region of 9.2 million which is only marginally more than the population of 8.9 million for 2016 adopted in the previous strategic planning. -
File Ref.: MA 60/1(2002) Pt.4 LEGISLATIVE COUNCIL BRIEF
File Ref.: MA 60/1(2002) Pt.4 LEGISLATIVE COUNCIL BRIEF SHIPPING AND PORT CONTROL (AMENDMENT) REGULATION 2002 INTRODUCTION At the meeting of the Executive Council on 25 June 2002, the Council ADVISED and the Chief Executive ORDERED that the A Shipping and Port Control (Amendment) Regulation 2002, at Annex A, should be made under section 80(1) of the Shipping and Port Control Ordinance to impose a designated area in the Kap Shui Mun water area and require all vessels to tender pre-arrival notification (PAN). BACKGROUND AND ARGUMENT Imposing a Special Area in the Kap Shui Mun area 2. At present, through traffic to and from the northwestern approaches of Hong Kong waters are free to be conducted in either the Kap Shui Mun Fairway or Ma Wan Fairway. Such traffic can be both southeast-bound and northwest-bound. The average navigational width of the Kap Shui Mun Fairway and Ma Wan Fairway are 210 metres and 680 metres respectively. 3. In view of the collision incidents that happened in the Kap Shui Mun area, Marine Department conducted an in-house study in the year 2000 on the traffic using the area with a view to developing measures to improve navigational safety there. The study recommends, inter alia, that a single direction traffic scheme should be introduced to the Kap Shui Mun area. Under the scheme, through traffic in the northern part of the much narrower Kap Shui Mun Fairway should be limited to southeast-bound only. The two-way bound traffic arrangement in both the southern part of the Kap Shui Mun Fairway and the entire Ma Wan Fairway can remain unchanged. -
Road P1 (Tai Ho – Sunny Bay Section), Lantau Project Profile
The Government of the Hong Kong Special Administrative Region Civil Engineering and Development Department Road P1 (Tai Ho – Sunny Bay Section), Lantau (prepared in accordance with the Environmental Impact Assessment Ordinance (Cap. 499)) Project Profile December 2020 Road P1 (Tai Ho – Sunny Bay Section) Project Profile CONTENTS 1. BASIC INFORMATION ......................................................................................... 1 1.1 Project Title ................................................................................................................ 1 1.2 Purpose and Nature of the Project .............................................................................. 1 1.3 Name of Project Proponent ........................................................................................ 2 1.4 Location and Scale of Project and History of Site ..................................................... 2 1.5 Number and Types of Designated Projects to be Covered by the Project Profile ...... 3 1.6 Name and Telephone Number of Contact Person ...................................................... 3 2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAMME ........ 5 2.1 Project Planning and Implementation ........................................................................ 5 2.2 Project Timetable ....................................................................................................... 5 2.3 Interactions with Other Projects ................................................................................. 5 3. POSSIBLE -
Transport Infrastructure and Traffic Review
Transport Infrastructure and Traffic Review Planning Department October 2016 Hong Kong 2030+ 1 TABLE OF CONTENTS 1 PREFACE ........................................................... 1 5 POSSIBLE TRAFFIC AND TRANSPORT 2 CHALLENGES ................................................... 2 ARRANGEMENTS FOR THE STRATEGIC Changing Demographic Profile .............................................2 GROWTH AREAS ............................................. 27 Unbalanced Spatial Distribution of Population and Synopsis of Strategic Growth Areas ................................. 27 Employment ........................................................................3 Strategic Traffic and Transport Directions ........................ 30 Increasing Growth in Private Vehicles .................................6 Possible Traffic and Transport Arrangements ................. 32 Increasing Cross-boundary Travel with Pearl River Delta Region .......................................................................7 3 FUTURE TRANSPORT NETWORK ................... 9 Railways as Backbone ...........................................................9 Future Highway Network at a Glance ................................11 Connecting with Neighbouring Areas in the Region ........12 Transport System Performance ..........................................15 4 STRATEGIC DEVELOPMENT DIRECTIONS FROM TRAFFIC AND TRANSPORT PERSPECTIVE ................................................. 19 Transport and Land Use Optimisation ...............................19 Railways Continue to be -
PWSC(2002-03)20 on 8 May 2002
For discussion PWSC(2002-03)20 on 8 May 2002 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 705 – CIVIL ENGINEERING Civil Engineering – Land Development 660CL – Site formation, construction of associated infrastructure and provision of government, institution and community facilities for an international theme park on Lantau Island Members are invited to recommend to Finance Committee – (a) the upgrading of part of 660CL, entitled “Infrastructure for Penny’s Bay Development, Package 3 and Penny’s Bay Reclamation Stage 2”, to Category A at an estimated cost of $2,375.9 million in money-of-the-day prices; and (b) the retention of the remainder of 660CL in Category B. PROBLEM We need to provide the necessary infrastructure and government, institution and community (GIC) facilities to support the development of Hong Kong Disneyland (HKD) Phase 1 at Penny’s Bay on Lantau Island. We also need to provide land for the future development of HKD Phase 2. /PROPOSAL ..... PWSC(2002-03)20 Page 2 PROPOSAL 2. The Director of Civil Engineering (DCE), with the support of the Secretary for Economic Services, proposes to upgrade part of 660CL to Category A at an estimated cost of $2,375.9 million in money-of-the-day (MOD) prices for the construction of infrastructure and GIC facilities to serve HKD Phase 1 and the reclamation works for the future development of HKD Phase 2. PROJECT SCOPE AND NATURE 3. The scope of the part of 660CL which we now propose to upgrade to Category A comprises - (a) construction of a section of Road P2 about 1.8 kilometres -
Cb(1)1790/06-07(02)
CB(1)1790/06-07(02) PI/LEGCO 2007/05/28 PM 04:06 To %Panel - PLW cc &LGA[1]7 Subject Fw: LANTAU CONCEPT PLAN Dear Honourable Members, I refer an email with attachment from Mr Gordon Andreassend for your reference. Best regards, Brenda YEUNG PIO2 ----- Forwarded by PI/LEGCO on 2007/05/28 PM 04:03 ----- "gordon" To <[email protected]> 2007/05/28 AM 06:50 cc Subject LANTAU CONCEPT PLAN Greetings - Please copy this email and attachment to all members of the Legco Planning Lands and Works Panel, prior to their meeting on May 29. I would particularly address this message to Professor Patrick Lau Sau Shing who represents my Functional Constituency in Legco. Patrick has often requested comment and feedback from his constituents - and the comments contained in the attached document fully convey my views. I am happy to share these views with all panel members. I appeal to all in the panel to consider the future of Lantau extremely carefully. The enjoyment of this priceless natural treasure by generations yet unborn, will depend very much on decisions made in the next few years. Sincerely, Gordon Andreassend MBE FHKIS, MNZIS, MRICS Lantau Map 2026 The comments shown below were prepared in January 2006 in a project where writers gave their views of development in Lantau in 20 years time. Here is what I wrote at that time. I have known Lantau’s tracks and trails for about 40 years, and as a surveyor and a mapper had almost 30 years to look at Lantau in greater detail on Lands Department aerial photos and maps. -
When Is the Best Time to Go to Hong Kong?
Page 1 of 98 Chris’ Copyrights @ 2011 When Is The Best Time To Go To Hong Kong? Winter Season (December - March) is the most relaxing and comfortable time to go to Hong Kong but besides the weather, there's little else to do since the "Sale Season" occurs during Summer. There are some sales during Christmas & Chinese New Year but 90% of the clothes are for winter. Hong Kong can get very foggy during winter, as such, visit to the Peak is a hit-or-miss affair. A foggy bird's eye view of HK isn't really nice. Summer Season (May - October) is similar to Manila's weather, very hot but moving around in Hong Kong can get extra uncomfortable because of the high humidity which gives the "sticky" feeling. Hong Kong's rainy season also falls on their summer, July & August has the highest rainfall count and the typhoons also arrive in these months. The Sale / Shopping Festival is from the start of July to the start of September. If the sky is clear, the view from the Peak is great. Avoid going to Hong Kong when there are large-scale exhibitions or ongoing tournaments like the Hong Kong Sevens Rugby Tournament because hotel prices will be significantly higher. CUSTOMS & DUTY FREE ALLOWANCES & RESTRICTIONS • Currency - No restrictions • Tobacco - 19 cigarettes or 1 cigar or 25 grams of other manufactured tobacco • Liquor - 1 bottle of wine or spirits • Perfume - 60ml of perfume & 250 ml of eau de toilette • Cameras - No restrictions • Film - Reasonable for personal use • Gifts - Reasonable amount • Agricultural Items - Refer to consulate Note: • If arriving from Macau, duty-free imports for Macau residents are limited to half the above cigarette, cigar & tobacco allowance • Aircraft crew & passengers in direct transit via Hong Kong are limited to 20 cigarettes or 57 grams of pipe tobacco. -
Head 43 — CIVIL ENGINEERING DEPARTMENT
Head 43 — CIVIL ENGINEERING DEPARTMENT Controlling officer: the Director of Civil Engineering will account for expenditure under this Head. Estimate 2002–03................................................................................................................................... $915.2m Establishment ceiling 2002–03 (notional annual mid-point salary value) representing an estimated 1 497 non-directorate posts at 31 March 2002 reducing by eight posts to 1 489 posts at 31 March 2003......................................................................................................................................... $499.0m In addition there will be an estimated 35 directorate posts at 31 March 2002 and at 31 March 2003. Capital Account commitment balance................................................................................................. $24.0m Controlling Officer’s Report Programmes Programme (1) Tourism and Recreational This programme contributes to Policy Area 5: Travel and Development Tourism (Secretary for Economic Services). Programme (2) Port and Marine Facilities This programme contributes to Policy Area 3: Air and Sea Communications (Secretary for Economic Services). Programme (3) Site Formation and This programme contributes to Policy Area 22: Buildings, Reclamation† Lands and Planning (Secretary for Planning and Lands) and Policy Area 23: Environmental Protection and Conservation (Secretary for the Environment and Food). Programme (4) Slope Safety and These programmes contribute to Policy Area 27: Intra- -