Valle Dulce Danessa Sample Computation
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Estimation of Local Poverty in the Philippines
Estimation of Local Poverty in the Philippines November 2005 Republika ng Pilipinas PAMBANSANG LUPON SA UGNAYANG PANG-ESTADISTIKA (NATIONAL STATISTICAL COORDINATION BOARD) http://www.nscb.gov.ph in cooperation with The WORLD BANK Estimation of Local Poverty in the Philippines FOREWORD This report is part of the output of the Poverty Mapping Project implemented by the National Statistical Coordination Board (NSCB) with funding assistance from the World Bank ASEM Trust Fund. The methodology employed in the project combined the 2000 Family Income and Expenditure Survey (FIES), 2000 Labor Force Survey (LFS) and 2000 Census of Population and Housing (CPH) to estimate poverty incidence, poverty gap, and poverty severity for the provincial and municipal levels. We acknowledge with thanks the valuable assistance provided by the Project Consultants, Dr. Stephen Haslett and Dr. Geoffrey Jones of the Statistics Research and Consulting Centre, Massey University, New Zealand. Ms. Caridad Araujo, for the assistance in the preliminary preparations for the project; and Dr. Peter Lanjouw of the World Bank for the continued support. The Project Consultants prepared Chapters 1 to 8 of the report with Mr. Joseph M. Addawe, Rey Angelo Millendez, and Amando Patio, Jr. of the NSCB Poverty Team, assisting in the data preparation and modeling. Chapters 9 to 11 were prepared mainly by the NSCB Project Staff after conducting validation workshops in selected provinces of the country and the project’s national dissemination forum. It is hoped that the results of this project will help local communities and policy makers in the formulation of appropriate programs and improvements in the targeting schemes aimed at reducing poverty. -
Laguna Lake Development and Management
LAGUNA LAKE DEVELOPMENT AUTHORITY Presentation for The Bi-Lateral Meeting with the Ministry of Environment Japan On LAGUNA DE BAY Laguna Lake Development Authority Programs, Projects and Initiatives Presented By: CESAR R. QUINTOS Division Chief III, Planning and Project Development Division October 23, 2007 LLDA Conference Room Basic Fac ts o n Lagu na de Bay “The Lake of Bay” Laguna de Bay . The largest and most vital inland water body in t he Philipp ines. 18th Member of the World’s Living Lakes Network. QUICK FACTS Surface Area: * 900 km2 Average Depth: ~ 2.5 m Maximum Depth: ~ 20m (Diablo Pass) AerageVolmeAverage Volume: 2,250,000,000 m3 Watershed Area: * 2,920 km2 Shoreline: * 285 km Biological Resources: fish, mollusks, plankton macrophytes (* At 10.5m Lake Elevation) The lake is life support system Lakeshore cities/municipalities = 29 to about 13 million people Non-lakeshore cities/municipalities= 32 Total no. of barangays = 2,656 3.5 million of whom live in 29 lakeshore municipalities and cities NAPINDAN CHANNEL Only Outlet Pasig River connects the lake to Manila Bay Sources of surface recharge 21 Major Tributaries 14% Pagsanjan-Lumban River 7% Sta. Cruz River 79% 19 remaining tributary rivers The Pasig River is an important component of the lake ecosystem. It is the only outlet of the lake but serves also as an inlet whenever the lake level is lower than Manila Bay. Salinity Intrusion Multiple Use Resource Fishing Transport Flood Water Route Industrial Reservoir Cooling Irrigation Hydro power generation Recreation Economic Benefits -
One Big File
MISSING TARGETS An alternative MDG midterm report NOVEMBER 2007 Missing Targets: An Alternative MDG Midterm Report Social Watch Philippines 2007 Report Copyright 2007 ISSN: 1656-9490 2007 Report Team Isagani R. Serrano, Editor Rene R. Raya, Co-editor Janet R. Carandang, Coordinator Maria Luz R. Anigan, Research Associate Nadja B. Ginete, Research Assistant Rebecca S. Gaddi, Gender Specialist Paul Escober, Data Analyst Joann M. Divinagracia, Data Analyst Lourdes Fernandez, Copy Editor Nanie Gonzales, Lay-out Artist Benjo Laygo, Cover Design Contributors Isagani R. Serrano Ma. Victoria R. Raquiza Rene R. Raya Merci L. Fabros Jonathan D. Ronquillo Rachel O. Morala Jessica Dator-Bercilla Victoria Tauli Corpuz Eduardo Gonzalez Shubert L. Ciencia Magdalena C. Monge Dante O. Bismonte Emilio Paz Roy Layoza Gay D. Defiesta Joseph Gloria This book was made possible with full support of Oxfam Novib. Printed in the Philippines CO N T EN T S Key to Acronyms .............................................................................................................................................................................................................................................................................. iv Foreword.................................................................................................................................................................................................................................................................................................... vii The MDGs and Social Watch -
Data Collection Survey on Septage Management for Facilitating the Environmental Development Project
Data Collection Survey on Septage Management for Facilitating the Environmental Development Project Final Report March 2015 Japan International Cooperation Agency (JICA) Yokohama Water Co., Ltd. (YWC) Data Collection Survey on Septage Management for Facilitating the Environmental Development Project Final Report Contents Summary 1. Outline of Project 1.1 Background ········································································································ 1-1 1.2 Objectives ·········································································································· 1-2 1.3 Examination Contents ···························································································· 1-3 2. Outline of the Target Cities 2.1 Calamba City ······································································································ 2-1 2.1.1 Outline ········································································································· 2-1 2.1.2 Organization ·································································································· 2-2 2.1.3 City Ordinances relevant to Septage ······································································· 2-4 2.2 Angeles City ······································································································· 2-5 2.2.1 Outline ········································································································· 2-5 2.2.2 Organization ·································································································· -
Septage Management Program in 2015 for Calamba Water District
Septage Management Program in 2015 for Calamba Water District March 2015 Japan International Cooperation Agency (JICA) Yokohama Water Co., Ltd.(YWC) Septage Management Program in 2015 For Calamba Water District Contents Summary 1. Outline of Project 1.1 Background ········································································································ 1-1 1.2 Objectives ·········································································································· 1-2 1.3 Examination Contents ···························································································· 1-3 2. Outline of Calamba City 2.1 Outline ·············································································································· 2-1 2.2 Organization ······································································································· 2-2 2.3 City Ordinances relevant to Septage ············································································ 2-4 3. Outline of Calamba Water District 3.1 Outline of Operations ····························································································· 3-1 3.2 Organization ······································································································· 3-8 3.3 Financial Condition and Tariff Scheme········································································· 3-9 4. Septage Management - Current Conditions and Future Schedule 4.1 Current Conditions of Septage Management ·································································· -
Republic of the Philippines DEPARTMENT of LABOR and EMPLOYMENT Regional Office No
Republic of the Philippines DEPARTMENT OF LABOR AND EMPLOYMENT Regional Office No. IV-A 4th Flr. Andenson Bldg. II, Brgy. Parian, Calamba City Telefax No.: (049) 545-7362 August 01, 2016 NOTICE OF FILING OF APPLICATION FOR ALIEN EMPLOYMENT PERMIT (AEP) Notice is hereby given that the following employers have filed with this Regional Office application/s for Alien Employment Permit/s. Position and Brief Name and Citizenship of Name and Address of Company/Employer Description of Foreign National Functions LAGUNA AUTO-PARTS MANUFACTURING Mr. Yoshinori Osaka/ 1. CORPORATION President Japanese Laguna Technopark, Biñan City, Laguna ANALOG DEVICE GEN. TRIAS, INC. Ms. Xue Lin/ Finance/Accounting 2. GBP, Javalera, General Trias, Cavite Chinese Analyst 2 (E06) NISSEN PHILIPPINES, INC. Mr. Shinya Yokoyama/ Machine and Equipment 3. SEZ, Maguyam Rd., Silang, Cavite Japanese Supervisor NISSEN PHILIPPINES, INC. Mr. Mitsuhiro Watanabe/ 4. Production Manager SEZ, Maguyam Rd., Silang, Cavite Japanese Business and Technology Mr. Jose Luis Romero EMS COMPONENTS ASSEMBLY, INC. Consultant for LED 5. Salguero/ Laguna Technopark, Biñan City, Laguna Luminaire and Smart Spanish Lighting Set-Up FUJITSU DIE-TECH CORPORATION OF THE Mr. Yosuke Ueno/ Administration 6. PHILIPPINES Japanese Department Adviser SEPZ, Laguna Technopark, Biñan City, Laguna RENEWABLE PRODUCTS GROUP, INC. Mr. Christian Palazzolo/ Assistant General 7. CPIP-SEZ, Batino, Calamba City, Laguna Italian Manager BITUIN MANPOWER AGENCY, INC. Ms. Mui Sy Lieng/ 8. Interpreter Brgy. Paciano Rizal, Calamba City, Laguna Vietnamese BITUIN MANPOWER AGENCY, INC. Ms. Lan Ngoc Ly/ 9. Interpreter Brgy. Paciano Rizal, Calamba City, Laguna Vietnamese BITUIN MANPOWER AGENCY, INC. Ms. Denh A Ly/ 10. Interpreter Brgy. -
8A21362286f5dd64492576600
D. Cost of Assistance 5 Computed cost of assistance provided by the National Government, LGUs, NGOs and other GOs is PhP 146,664,690: NDCC (PhP 21,170,000); DSWD (PhP 49,722,459); DOH (PhP 6,938,780); LGUs (PhP 48,056,893); NGOs/Other GOs (PhP 20,776,558) – Tab E 5 NDCC Rice assistance – 23,200 sacks of rice were distributed to the LGUs in Regions I (9,500), II (2,400), III (2,300), IV-A (1,000), IV-B (1,000), V (3,000), CAR (3,100) and NCR (900) E. Status of Roads and Bridges due to Effects of TY “Pepeng” and TS “Ondoy” – Tab F 5 Based on the report of DPWH, 10 road sections (6 in CAR and 2 in Region I and 2 in Region III ) and 9 bridges (2 in CAR, 3 in Region I and 1 in Region III, 2 in IV-A and 1 in IV-B ) are still impassable as of October 28, 2009 due to series of slides, scoured and washed out bridge approach, road cuts and scoured slopes protection Damaged bridges are the Baay Bridge in Abra, Salacop Bridge in Benguet; San Vicente Bridge in La Union, Bued and Carayungan Bridges in Pangasinan; Pulong Buhangin in Bulacan, Marcos Highway 3rd Concrete and Cawong Bridges in Batangas and the Manoot Bailey Bridge in Mindoro Occidental. II. HUMANITARIAN RESPONSE Highlights A. Food and NFIs 5 DSWD provided PhP49.72 Million worth of relief augmentation support/ assistance consisting of food (rice, canned goods, biscuits) and non food items (mats, blankets and clothing) to DSWD Field Offices 5 Air logistics support for the transport of food and NFIs to Regions II and CAR was provided by the PAF–AFP and UNHAS helicopter sorties of UN-WFP. -
Nagcarlan Sinimulan Nang Paglingkuran Ng LARC at LWD
VOLUME 1|ISSUE NO. 04|DECEMBER 2016 LARC A quarterly Newsletter providing the latest news,Stream updates, and information in and around LARC Straight from GM, Page 2 LARC water, Page 2 Linggo ng nakatatandang, Page 2 From the COO’s, Page 3 Nagcarlan sinimulan nang paglingkuran ng CONTENTS LARC at LWD Pormal nang binuksan ng Laguna Water District Aquatech Resources Corporation (LARC) Nagcarlan ang kanilang main line na maghahatid ng tubig sa benefits from mga residente ng Brgy. Wakat at Brgy. Manaol sa LARC: Alalay sa Nagcarlan, Laguna noong Disyembre 22, 2016. Ang Barangay pagbubukas ng main line ng tubig ay Program pinangunahan ng mga opisyal ng LARC na sina G. Crisanto Hilario (Presidente ng LARC), Page 3 Engr. Rodrigo Yabut (LARC Chief Operating Officer), at Engr. Mat Wilson Ramos (LARC General LARC with LWD Manager) at ng mga opisyal mula sa Laguna Water holds 6th annual District (LWD) na sina GM Pantaleon Tabanao, Chairman Benito Romena, at Director Ramon de science and Pormal na binuksan ang main line para sa Brgy. Wakat at Villa. Brgy. Manaol sa pangunguna ni Vice Mayor math quiz Amie Malabag-Hernandez (kanan) at LWD GM Pantaleon contest Tabanao (ikalawa sa kanan). Page 4 Osuna, ipinaabot din niya ang kanyang suporta sa pamamagitan ng kanilang Municipal Planning and Development Coordinator na si Engr. Randy LGUs support Moredo bilang kanyang kinatawan. Dumalo din sa launching of okasyon sila Kap. Lorenzo Joyosa (Brgy. Wakat) at LARC’s Kap. Leodigario Arcigal (Brgy. Manaol) kasama ang Poster-slogan kanilang mga barangay kagawad. making contest Page 4 Nagsagawa rin ng mga “special customer orientations” na ginanap sa dalawang barangay ang LARC para sa mga interesadong aplikante. -
The Current State of Aquaculture in Laguna De Bay
A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Israel, Danilo C. Working Paper The Current State of Aquaculture in Laguna de Bay PIDS Discussion Paper Series, No. 2007-20 Provided in Cooperation with: Philippine Institute for Development Studies (PIDS), Philippines Suggested Citation: Israel, Danilo C. (2007) : The Current State of Aquaculture in Laguna de Bay, PIDS Discussion Paper Series, No. 2007-20, Philippine Institute for Development Studies (PIDS), Makati City This Version is available at: http://hdl.handle.net/10419/127958 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen die in der dort Content Licence (especially Creative Commons Licences), you genannten Lizenz gewährten Nutzungsrechte. may exercise further usage rights as specified in the indicated licence. www.econstor.eu Philippine Institute for Development Studies Surian sa mga Pag-aaral Pangkaunlaran ng Pilipinas The Current State of Aquaculture in Laguna de Bay Danilo C. -
Pila Watershed
Table of Contents Volume 15. Pila Sub-basin ....................................................................................................... 3 Geographic location ................................................................................................................ 3 Political and Administrative Boundary ..................................................................................... 4 Land Cover ............................................................................................................................. 5 Watershed Characteristics and Drainage System ................................................................... 6 Watershed Characterization and Properties ........................................................................ 6 Sub sub-basin properties .................................................................................................... 7 Water Quantity ......................................................................................................................10 Stream flows ......................................................................................................................10 Water Balance ...................................................................................................................10 LIST OF FIGURES Figure 15-1 Geographical map ..................................................................................................................... 3 Figure 15-2 Political boundary map ............................................................................................................. -
Curriculum Vitae Janine D
Curriculum Vitae Janine D. Averion B. Samonte St. Brgy. Silangan Calauan, Laguna Email add: [email protected] Contact #: +639157964811 WORKING OBJECTIVE To be a part of your growing company where I can learn and improve my craft, develop camaraderie among my co-workers. At the same time, fulfill my goal that is financially rewarding. EDUCATIONAL BACKGROUND TERTIARY DalubhasaanngLunsodng San Pablo Brgy. San Jose, San Pablo City Business Administration Major in Financial Management SY 2011-2012 SECONDARY Dayap National High School Brgy.DayapCalauan,Laguna SY 2007-2008 INTERMEDIATE Banka-banka Elementary School Brgy. Banka-bankaNagcarlan, Laguna SY 2003-2004 SKILLS Translated more than 50,000 words from Italian-English and 100,000 words from English- Tagalog Processing of Loan applications, collections, repayments, preparing reports. GL Bookkeeper like Handling Inward Checks, Processing Time Deposit, Generating Back-ups, preparing tickets (debit & credit advice). Marketing Good in communication and interpersonal skills. Advance computer literacy (Microsoft Word, MS Power Point, MS Excel and Windows XP). JOB EXPERIENCE Quezon Capital Rural Bank Calauan,Laguna Branch Present position: Loans Specialist June 2015-Present Alaminos, Laguna Branch Previous position: Accounting Assistant January 19, 2015-May 2015 Calauan, Laguna Branch Previous position: Business Relations Assistant January 2, 2013-January 16,2015 Department of Trade and Industry Brgy. Banca-Banca Victoria, Laguna Position: Intern June- August 2013 OJT in Municipality of Calauan OJT in Luzon Development Bank Calauan, Branch Hands-on 50 hours training on Adobe Photoshop AFFILIATED ORGANIZATION Position Year of Membership Financial Management Society Member 2008-2012 Class Organization Treasurer 2008-2012 Rotaract Club of Silangang San Pablo Member August 2011 PERSONAL BACKGROUND Date of Birth: March 19, 1992 Place of Birth: Nagcarlan, Laguna Age: 25 Sex: Female Citizenship: Filipino Civil Status: Married Religion: Iglesia Ni Cristo Height: 5’1’’ Weight: 55 kg. -
Thales DIS Mexico SA De CV
R Certificate No: TS-CA-UP-0821 Certificate This is to certify that Thales DIS Mexico S.A. de C.V., Cuernavaca, Mexico has participated in the GSM Association Security Accreditation Scheme for UICC Production (SAS-UP) and satisfied the scheme’s requirements. This certificate remains valid until the end of August 2021*. Alex Sinclair Chief Technology Officer GSMA * Dependent on continued supporting site certification (currently valid to end August 2020) Check certificate validity: A list of accredited sites is published on the GSM Association website at www.gsma.com/sas/ s Scope of Certification To be viewed as part of Security Accreditation Scheme Certificate No: TS-CA-UP-0821 Production Site: Thales DIS Mexico S.A. de C.V. Calle 9 Este #192 Ciudad Industrial del Valle de Cuernavaca (Civac), Jiutepec. Morelos, C.P. Site Address: 62578, Mexico Type: Centralised IT. Gemalto SA, 525 avenue du Pic de Bertagne CS 12023, Gemenos Cedex 13881, France, Supporting site(s) details: Gemalto Philippines Inc., Bldg 7A, Southern Luzon Internatl. Business Park Batino Calamba, Laguna 4027, Philippines. Expiry date: August 2020 The auditors were provided with appropriate evidence that the processes and controls on the audit dates were consistent with those required by the SAS-UP Standard v9.0 and the SAS Consolidated Security Requirements v4.0, with the following scope: Generation of data for personalisation: UICC, eUICC Personalisation: Card Management of PKI certificates: GSMA PKI Post-personalisation packaging: Card Outsourcing: The management of network security and some Notes & Exclusions: None production systems at Thales, Cuernavaca is carried out These activities were outsourced and not subject as part of the corporate MSC environment (supporting to review by the auditors sites specified above).