SMART 3 Year Anniversary Presentation
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
General Manager's Report
Sonoma-Marin Area Rail Transit District General Manager’s Report – July 2018 5401 Old Redwood Highway, Suite 200 Petaluma, CA 94954 Tel: (707) 794-3330Fax: (707) 794-3037 www.SonomaMarinTrain.org Larkspur Extension Project ▪ Larkspur Station work continues with the construction of the station platform, ramp and rough grading for the parking lot. ▪ Reconstruction of the roadway portion of the Andersen Drive at-grade crossing was completed on July 3rd with the reopening of the roadway. ▪ Grading for track construction is underway from the tunnel to the station. ▪ Work began on the San Rafael Creek bridge. Andersen Drive At-Grade Crossing P a g e | 2 of 24 Andersen Drive At-Grade Crossing Larkspur Station Platform Construction P a g e | 3 of 24 Larkspur Station Platform Ramp – concrete formwork P a g e | 4 of 24 South Cal Park Tunnel to Station placing the gravel ballast for the track P a g e | 5 of 24 Excavation for utilities from near the Auburn Street Bridge P a g e | 6 of 24 San Rafael Creek Bridge – foundation construction P a g e | 7 of 24 COMMUNITY OUTREACH Community Outreach| Presentations and Community Events It’s summer in Marin and Sonoma counties, which means warm weather and activities for the whole family to enjoy. SMART’s booth at the Marin County Fair was a popular stop. Many took the opportunity to beat the traffic and avoid paying for parking by taking the train to the Marin Civic Center. As part of a new summer safety outreach initiative, SMART staff introduced a new engagement technique to connect with families and young children about the importance of safety near tracks and trains. -
Sonoma-Marin Area Rail Transit District
Sonoma-Marin Area Rail Transit District General Manager’s Report – December 2019 5401 Old Redwood Highway, Suite 200 Petaluma, CA 94954 Tel: (707) 794-3330 Fax: (707) 794-3037 www.SonomaMarinTrain.org P a g e | 2 of 29 Your SMART Team P a g e | 3 of 29 Gary Phillips, Chair, SMART Board of Directors Congressman Huffman Judy Arnold, Chair, Transportation Authority of Marin P a g e | 4 of 29 Barbara Pahre, President, Golden Gate Bridge Catherine Way, Mayor, City of Larkspur Jake Mackenzie, MTC Commissioner P a g e | 5 of 29 Larkspur Station Opening Day P a g e | 6 of 29 P a g e | 7 of 29 Congressman Huffman participated in the Band Holiday Express Train at Larkspur Station P a g e | 8 of 29 Larkspur Station Opening Day P a g e | 9 of 29 P a g e | 10 of 29 P a g e | 11 of 29 Novato Downtown Ribbon Cutting Ceremony December 14, 2019 P a g e | 12 of 29 Congressman Huffman, City of Novato Mayor Athas, and Supervisor Arnold First Train stopping in Downtown Novato P a g e | 13 of 29 COMMUNITY OUTREACH SMART hosted the Larkspur Station Ribbon Cutting Ceremony on Friday, December 13, 2019, to celebrate the commencement of passenger service to Larkspur that is coordinated with the ferry to provide an economical, climate-friendly and stress-free way to travel between the North Bay and San Francisco. The new Larkspur station will be a gateway to the Bay for commuters and visitors alike. -
2019 Annual Report
2019 Annual Report Fiscal Year 2018-2019 5401 Old Redwood Highway | Suite 200 | Petaluma, CA 94954 SonomaMarinTrain.org Table of Contents About the Sonoma-Marin Area Rail Transit District .................1 Message from the Chair of the Board of Directors ..................2 Passenger Rail Service ........................................................................3 Grand Opening of New Stations .....................................................4 Operations ..............................................................................................5 Capital Projects .................................................................................. 10 Communications and Marketing ................................................. 13 Safety and Security ........................................................................... 19 Human Resources ............................................................................. 20 Financial Information ....................................................................... 21 Sonoma-Marin Area Rail Transit District About the Sonoma-Marin Area Rail Transit District (SMART) Sonoma-Marin Area Rail Transit (SMART) is the Bay Area’s newest passenger rail service providing a safe, reliable and congestion-free transportation option for Marin and Sonoma counties. The current 45-mile system includes stations in the Sonoma County Airport area, Santa Rosa, Rohnert Park, Cotati, Petaluma, Novato, San Rafael, and Larkspur. SMART’s system also includes a bicycle and pedestrian pathway along portions -
VTA Daily News Coverage for Monday, December 9, 2019 1
From: VTA Board Secretary <[email protected]> Sent: Monday, December 9, 2019 5:44 PM To: VTA Board of Directors <[email protected]> Subject: From VTA: December 9, 2019 Media Clips VTA Daily News Coverage for Monday, December 9, 2019 1. Commuters may see changes on Bay Area public transit soon (ABC7 News) 2. Environmental activists urge VTA to shift funds from highway projects to mass transit (san Jose Spotlight) 3. Bart Opening Delayed (KTVU CH. 2) Commuters may see changes on Bay Area public transit soon (ABC7 News) As 2019 comes to a close, be prepared for changes to your commute. Some local transit agencies aren't waiting for the new year. Below is a list of upcoming changes to the busiest transit agencies serving the Bay Area. Golden Gate Transit: Dec. 8, 2019 Bus schedules and routes are adjusted quarterly by the Golden Gate Bridge Highway & Transportation District to make the system run more efficiently. Starting on Sunday, Dec. 8, many routes will be affected, some stops will be moved, some buses canceled, and others will be added. Route 31 will no longer serve the Larkspur Ferry Terminal when new SMART Train service debuts on Saturday, Dec. 14. VTA: Dec. 28, 2019 Changes to buses and light rail service start on Saturday, Dec. 28, 2019. VTA says buses will run more frequently on better routes. A new light rail line, the orange line, will debut. BART service to Santa Clara County is delayed longer than originally planned, so VTA bus service will continue to operate in the areas that will eventually be covered by BART trains. -
Central and Southern Marin Transit Study A1-I Task 2: Existing Conditions Analysis Report 12/19/08
Ta sk 2: Existing Conditions Analysis Report CC eennttrraall aanndd SSoouutthheerrnn MMaarriinn Tr ansit Study T ransit Study De cember 19, 2008 TABLE OF CONTENTS CHAPTER 1: INTRODUCTION ......................................................................................................... 1 CHAPTER 2: EXISTING TRANSIT SERVICES ............................................................................... 3 2.1 Public Transit Overview ........................................................................................................................ 3 2.2 Transit Service Coverage by Corridor ............................................................................................. 4 2.3 Golden Gate Transit Service Performance by Route ............................................................... 13 2.3.1 GGT Revenue Hours and Ridership by Route .................................................................... 13 2.3.2 GGT Bus Productivity and Farebox Recovery ................................................................... 14 2.4 Proposed Near Term GGT Service Changes ................................................................................ 16 2.5 Marin Transit Service Performance by Route ........................................................................... 16 2.5.1 Marin Transit Revenue Hours and Ridership by Route ................................................ 16 2.5.2 Marin Transit Bus Productivity and Farebox Recovery ............................................... 17 2.6 Proposed Near Term Marin -
General Manager's Report – November 2019
Sonoma-Marin Area Rail Transit District General Manager’s Report – November 2019 5401 Old Redwood Highway, Suite 200 Petaluma, CA 94954 Tel: (707) 794-3330 Fax: (707) 794-3037 www.SonomaMarinTrain.org COMMUNITY OUTREACH Community Outreach - Free Rides to Assist Those Impacted by the Kincade Fire SMART offered free train service to assist those in the area who needed transportation options during the period of the Kincade Fire and PG&E Power Safety Shut-off. Thousands of riders got on board each day during the free period, from October 30 through November 6. SMART trains operated on a modified schedule for several days due to the power shut-off in the northern portion of Santa Rosa, but resumed the full-service schedule promptly. SMART also offered free rides during the Thanksgiving holiday and weekend, as a continuation of the free service the SMART Board of Directors approved in October 2019 to assist residents displaced during the Kincade Fire. The testing of the railway and crossings for the new Novato Downtown station during the weekend of November 8 and 9 resulted in the Board approving to roll some of the earlier fare-free days into this Thanksgiving holiday weekend. Community Outreach - Construction The Communications and Marketing Department experienced a busy month, with several steps towards the opening of the Larkspur extension and Novato Downtown station taking place in November. During the weekend of November 8 and 9, SMART closed a portion of the railroad between the Petaluma Downtown and Novato Hamilton stations to accommodate testing for the new Novato Downtown station. -
Directions to Ferry Building San Francisco
Directions To Ferry Building San Francisco Maenadic Gustav churns pestilentially, he hoppling his Davie very soon. Plundered Roderich despites antichristianly and incredulously, she tweeze her tripod resentences participially. Ginger remains Congolese: she rehearsed her three-decker brutalising too problematically? Head up the rock cruise line to none in nature attractions are directions to ferry building is available to the ferry terminal to take muni to subscribe to get out the lot Turn left onto main deck and the east bay area is booked online store your hotel may remain closed for san francisco in? Proceed to san francisco ferries from google maps to chase bank. Peninsula attendees can be using your trip down arrow, so cool giant steel beams soar two closest to build a bustling energy of. Exploratorium, and a schedule of arrival times. Accessibility for passengers with special needs is consequently very dependent on the vessel. Turn right onto Main but continue improve the broken terminal, dog limb, and cranes. In order to match the texture and patina of the old brick, Guiffre used six different pigments applied by hand, and then applied green shading to mimic the new staining process. Validated is easy to san francisco ferries from any of. If they were installed, after your spam. Paid parking is available but limited around Oracle Park; riders are encouraged to take public transportation. All vessels are wheelchair accessible and have assessable restrooms. Weekends and holidays it can get crowded; go early. We understand directions, san francisco ferries arrive at baggage near you start your phone and then board before touching your left on ferry. -
Weekday Service Reductions 1
Comments received regarding weekday service reductions 1 Need earlier train for my commute The first train Northbound in the AM is too late and the last train Southbound in the PM is too early. REALLY??? Now I can't ride this train at ALL!!! I would be arriving 2 hour late to my office and leaving 2 hours early! Think people, think!!! Most folks work 8 hours a day, not 5 or 6! Keep the service the way it was. Otherwise, SMART will be ANOTHER USELESS EXPENSIVE public system, just like the GGBus and the rest of the bureaucratic inept transportation systems in the Bay Area. If you cut the weekday trips and I can't ride your train, my family, friends, and I will boycott and vote against every measure and every opportunity to give you money! Need earlier northbound trains, and later southbound trains The earliest southbound train does not get me to work on time by 2min. If this did not change I would not take the smart train. It is absolutely imperative to run the early morning (departing Larkspur at 6:38 am) train in order for me to be able to use the train for my daily commute. I do not understand why you would eliminate this most important time while leaving both a 9:30 and a 10 am train. Commuters who are commuting north for work that would take a 10 am train can easily take a 9:30 train instead, and just be a little early. For those of us needing the early morning train, there is no alternative that works. -
Santa Cruz County Regional Transportation Commission's
Santa Cruz County Regional Transportation Commission’s Elderly & Disabled Transportation Advisory Committee (Also serves as the Social Service Transportation Advisory Council) AGENDA 1:30pm - 3:30pm Tuesday, September 11, 2018 Regional Transportation Commission Santa Cruz Office 1523 Pacific Avenue, Santa Cruz, CA, 95062 (2nd Floor) 1. 1:30pm — Call to Order 2. 1:30pm — Introductions 3. 1:35pm — Oral communications 4. 1:40pm — Additions or deletions to the consent or regular agenda 1:42pm- CONSENT AGENDA All items appearing on the consent agenda are considered to be minor or non- controversial and will be acted upon in one motion if no member of the E&D TAC or public wishes an item be removed and discussed on the regular agenda. Members of the E&D TAC may raise questions, seek clarification or add directions to Consent Agenda items without removing the item from the Consent Agenda as long as no other E&D TAC member objects to the change. 5. Approve Minutes from June 12, 2018 — pg. 4 6. Receive Transportation Development Act Revenues Report — pg. 9 7. Receive RTC Meeting Highlights — pg. 11 8. Recommend that the Regional Transportation Commission approve appointments to E&D TAC Committee — pg. 13 9. Receive Information Items — pg. 19 a. Letter from E&D TAC to City of Watsonville regarding Vision Zero adoption, July 2, 2018 — pg. 19 b. Letter of support from E&D TAC to California DOT for Westside Safe Routes to School and Gap Closure Project, July 19, 2018 — pg. 20 c. Letter of support from E&D TAC to California DOT for Santa Cruz Rail Trail Segment 8 and 9 Construction, July 19, 2018 — pg. -
Elderly & Disabled Transportation Advisory Committee AGENDA 1
Santa Cruz County Regional Transportation Commission’s Elderly & Disabled Transportation Advisory Committee (Also serves as the Social Service Transportation Advisory Council) AGENDA 1:30pm - 3:30pm Tuesday, June 12, 2018 Note meeting location Watsonville Community Room, 275 Main Street, Suite 400, 4th Floor - Parking Garage Level 6, Watsonville CA 1. 1:30pm – Call to Order 2. 1:30pm - Introductions 3. 1:35pm - Oral communications 4. 1:40pm- Additions or deletions to the consent or regular agenda 1:42pm- CONSENT AGENDA All items appearing on the consent agenda are considered to be minor or non-controversial and will be acted upon in one motion if no member of the E&D TAC or public wishes an item be removed and discussed on the regular agenda. Members of the E&D TAC may raise questions, seek clarification or add directions to Consent Agenda items without removing the item from the Consent Agenda as long as no other E&D TAC member objects to the change. 5. Approve Minutes from April 10, 2018 - pg. 3 6. Receive Transportation Development Act Revenues Report - pg. 8 7. Receive RTC Meeting Highlights - pg. 9 8. Recommend that the Regional Transportation Commission approveappointments to E&D TAC Committee - pg. 11 9. Receive E&D TAC June 2018 Roster – pg. 13 10. Receive Final Draft Community Bridges Lift Line and RegionalProjects Measure D Five-Year Plans - pg. 14 11. Receive Information Items - pg. 27 Page 1 REGULAR AGENDA 12. Receive Program Updates (other than items listed separately on the regular agenda) - pg. 28 a. Volunteer Center - FY 17/18 TDA 3rd Quarter Report b. -
Sonoma-Marin Area Rail Transit District
Item 4c Sonoma-Marin Area Rail Transit District General Manager’s Report August/September 2018 5401 Old Redwood Highway, Suite 200 Petaluma, CA 94954 Tel: (707) 794-3330Fax: (707) 794-3037 www.SonomaMarinTrain.org Item 4c 1st Birthday Fest P a g e | 2 of 33 Item 4c P a g e | 3 of 33 Item 4c P a g e | 4 of 33 Item 4c OMMUNITY OUTREACH Community Outreach| Presentations and Community Events On August 18, SMART celebrated its one-year anniversary with SMART Fest—a free festival and community celebration at the Novato Hamilton station. As part of the festivities, and to thank our riders for a successful first year of service, train service was free on August 18 and 19. Additional morning runs expanded service so attendees could take the train to the festival. The event was a huge success. Three-car train sets ran at capacity throughout the weekend, with thousands of passengers taking the opportunity to experience the North Bay on the SMART train. SMART parking lots were also free that weekend at the Sonoma County Airport, Rohnert Park, Petaluma, and Novato San Marin stations. At the Novato Hamilton station, guests enjoyed live music performances by the doRiaN Mode and Smash City during the celebration. SMART Fest featured several popular North Bay food trucks, including The Frizzled Shallot, Jam’s Joy Bungalow, El Roy’s Mexican Grill, Kona Ice, and Trader Jim’s Floats. Local vendors and community partners set up booths and displays where they offered information on products and services. Numerous transit partners also attended the event, including Clipper, Golden Gate Transit, Transportation Authority of Marin, Marin Transit, and Sonoma County Transit. -
Staff Report Meeting Date
J-7 STAFF REPORT 922 Machin Avenue MEETING Novato, CA 94945 DATE: July 24, 2018 (415) 899-8900 FAX (415) 899-8213 www.novato.org TO: City Council FROM: Regan M. Candelario, City Manager Russ Thompson, Public Works Director Chris Blunk, Deputy Director/City Engineer SUBJECT: CONSIDERATION OF AND POSSIBLE ACTION TO ADOPT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NOVATO APPROVING A FUNDING AGREEMENT WITH THE SONOMA-MARIN AREA RAIL TRANSIT (SMART) FOR PHASE II OF THE DOWNTOWN STATION PROJECT; AUTHORIZING THE CITY MANAGER TO EXECUTE THE AGREEMENT AND MAKING A DETERMINATION THAT NO FURTHER ENVIRONMENTAL REVIEW IS REQUIRED FOR APPROVAL THEREOF REQUEST Consider and possibly take action to adopt a resolution to: 1. Approve a Funding Agreement with SMART in the amount of $5,214,000 to complete the Downtown Novato SMART Station (Downtown Station); 2. Authorize the City Manager to execute the Funding Agreement; and 3. Make the finding that no further environmental review is required under CEQA for approval thereof based on the findings and facts set forth in Novato City Council Resolution 12-16, Section 4, adopted on February 9, 2018. BACKGROUND On October 6, 2015, the City Council agreed to fund a feasibility study performed by SMART that considered the costs and operational impacts of a third SMART station in downtown Novato (Downtown Station.) SMART determined that it was possible to serve the Novato North Station and the Downtown Station on an alternating stop basis. After considerable debate and input from the public, the Council approved moving forward with a phased approach to the Downtown Station project with the caveat that overall costs would be higher if the project was not built as a single phase and that future phases could also exceed initial cost estimates.