Report to: Council, 30 September 2014

Report of: Deputy Leader and Cabinet Member for Economic Prosperity ______

Subject: SOUTH DEVELOPMENT PLAN: PROPOSED MODIFICATIONS FOR CONSULTATION PURPOSES

1. Purpose of Report

1.1 The purpose of this report is to:

• Update members regarding progress with the South Worcestershire Development Plan (SWDP) and the Inspector’s conclusions arising from Stage 1 of the SWDP Examination process.

• Advise members about the work undertaken to address the conclusions and recommendations of the Local Plan Inspector regarding the submitted SWDP.

• Seek approval of recommended proposed modifications to the submitted SWDP for the purposes of undertaking formal public consultation into Post-Submission Proposed Modifications to the SWDP.

• Advise Council of the next steps in the SWDP process, including arrangements for consultation about the proposed modifications.

• To identify key evidence and supporting documents which are related to the recommended Proposed Modifications.

• To advise Council of the recommendations of the South Worcestershire Joint Advisory Panel, including its recommendation that, subject to the approval of the Proposed Modifications, the SWCs write to the Planning Minister seeking support for substantial weight to be afforded the emerging SWDP in Development Management decisions and any associated appeals as the Plan progresses.

1.2 Council should note that supporting evidence, Background Papers, Maps associated with the Proposed Modifications are available electronically either from the Council’s own website or the SWDP website www.swdevelopmentplan.org

It is recommended that:

(I) The recommended proposed main modifications to the submitted SWDP as set out in Appendix 1 to this report (including proposed modifications to the Policies Map and Key Diagram) and the associated Sustainability Appraisal are approved for the purposes of formal public consultation;

(II) Delegated approval is given to the Service Manager for Economic Development & Planning Policy in consultation with the Portfolio Holder for Economic Prosperity to make minor changes to the proposed

modifications in terms of formatting, presentation and accuracy, including any minor changes arising from the consideration of the proposed modifications by the other South Worcestershire Councils, prior to publication for consultation purposes; and

(III) The South Worcestershire Councils write to the Planning Minister seeking support for substantial weight to be afforded the emerging SWDP in current and future Development Management decisions and any associated appeals as the Plan progresses.

2. Background

2.1 On 10 th December 2012 the three South Worcestershire Councils approved the pre- submission version of the SWDP for formal submission to the Secretary of State. This was following consideration of responses to consultation undertaken in August and September 2012 into proposed Significant Changes to the plan. Following public consultation on the Pre-Submission Document and consideration of representations received the SWDP was formally submitted to the Secretary of State for the purposes of examination in accordance with Regulation 22 on 28 th May 2012.

2.2 The submission of the SWDP triggered the start of the Examination of the SWDP and the appointment of Mr Roger Clews BA MSc DipEd Dip TP MRTPI by the Secretary of State to conduct the Examination.

2.3 The Inspector indicated to the South Worcestershire Councils his intention to hold the Examination in two distinct Stages. Stage 1 was confined to the consideration of the soundness of the proposed levels of employment, housing and retail provision set out in policy SWDP3, and whether or not the requirements of section 33A of the Planning and Compulsory Purchase Act 2004 in respect of the duty to co-operate were met in the preparation of the Plan. The first Stage 1 hearing was held between 1st and 3 rd October 2013.

2.4 The Inspector subsequently wrote to the South Worcestershire Councils on 28 th October setting out his Interim Conclusions in respect to Stage 1.

2.5 In his first set of Conclusions the Inspector concluded, amongst other things:

• The South Worcestershire Councils had complied with the legal requirement under the Duty to Co-operate.

• The Employment Land requirements were broadly acceptable but should not be treated as maximum requirements.

• Further work around retail needs should be undertaken.

• The Worcestershire Strategic Housing Market Assessment (SHMA) 2012 could not be treated as a reliable basis for identifying housing need in the Plan area up to 2030. Therefore further work would be required in relation to the housing requirement of 23,200 dwellings (2006 – 2030) set out in the Submitted SWDP.

The Inspector noted that this issue went to the soundness of the plan and it could not be rectified without further work.

2.6 The South Worcestershire Councils agreed a timetable with the Inspector for the recommended additional work around housing need and commissioned consultants to look further at elements of the household projections and economic forecasts for South Worcestershire given the objective of the plan to be economic development led.

2.7 Technical evidence including an updated Objectively Assessed Housing Need (OAHN) was submitted to the Inspector on 31 st January 2014.

2.8 In the light of this additional technical work the South Worcestershire Councils suggested in evidence to the Examination that the overall housing need for South Worcestershire should be between 26,700 dwellings and 27,343 dwellings (using the average and mid-point of a jobs-led sensitivity scenario based on three employment forecasts in the updated SHMA evidence).

2.9 A re-convened session of Stage 1 of the Examination was held between13th and 14 th March 2014. In terms of housing need, the Inspector subsequently recommended (Inspector’s letter of 31 st March 2014 refers) taking a mid point between two Sensitivity Tests based on jobs led scenario ‘average’ case forecasts within the submitted evidence. He concluded that this represents the full, objectively assessed level of need (OAHN) over the plan period. This increased the requirement for South Worcestershire to 28,370 dwellings, which is distributed as follows:

Table 1

South Worcestershire OAHN 2006 – 2030 as recomm ended by the Local Plan Inspector Malvern Hills District 8,590 dwellings Worcester City 9,830 dwellings District 9,950 dwellings South Worcestershire Total 28,370 dwellings

2.10 The South Worcestershire Councils wrote to the Inspector on 7 th April 2014 stating their intention to proceed as quickly as possible with the preparatory work required for the next stage of the examination whilst endeavouring to ensure that the resultant plan is sound and the process legally compliant. This work would include addressing the recommended increase in housing need. The SWCs advised, at that time that recommended proposed modifications would be prepared for consideration by the three Councils in June 2014 with consultation to follow in July and August 2014. In reality the high volume of responses to the ‘call for sites’ and the scale of the work required to bring forward robust recommended proposed modifications to the three Councils has resulted in this timetable slipping to September for consideration of the recommended proposed modifications and consultation in

October and November 2014. The plan timetable is discussed in more detail in Section 7 of this report.

2.11 This is the first formal occasion that the Inspector’s Conclusions in relation to Stage1 of the SWDP Examination process have been considered by the SWCs. However, the Inspector’s Conclusions have been previously presented to the South Worcester Leaders and South Worcestershire Joint Advisory Panel, and district councillor briefings have been held.

3. Recommended Proposed Modifications

3.1 Scope of the Recommended Proposed Modifications

3.2 It should be noted that modifications to the Local Plan fall into two broad categories these are Main and Minor Modifications. The Local Plan Inspector will wish to be advised of both types of modifications and schedules of intended modifications and a track change version of the SWDP have already been submitted to the SWDP Examination library (and can be viewed on the SWDP Website). However, it is only Main modifications which significantly modify the content of policies or proposals or their interpretation which are required to be subject to formal public consultation before they can incorporated into the plan as submitted. This report is only concerned with Main Modifications to the SWDP and therefore all references to Proposed Modifications throughout this report should be treated as reference to Post Submission Proposed Main Modifications.

3.3 The recommended Proposed Modifications set out in Appendix 1 to this report are Post-Submission Proposed Modifications to the submitted SWDP. If approved for consultation purposes and submission to the SWDP Examination they will have the effect of replacing the content of the submitted SWDP. The consultation arrangements associated with the recommended Proposed Modifications are discussed below. However, members may wish to note that the subsequent consultation responses to the changes to the SWDP will be reported directly to the Inspector and not back to the SWCs. There is a direct parallel with the pre- submission stage in December 2012 when the three SWCs approved the pre- submission version of the SWDP for consultation and submission to the Secretary of State. At that stage consultation responses were passed directly to the appointed Inspector and not formally considered by the SWCs.

3.4 The Stage 1 Examination process and on-going work on the SWDP has already identified a number of potential main and minor modifications to the submitted SWDP. The Inspector has already been advised of the SWCs likely acceptance of these changes which range across various sections of the SWDP. It is inevitable that the Stage 2 element of the Examination will also generate the need for consideration to be given to further main and minor modifications to the submitted SWDP.

3.5 It will therefore be necessary for a package of proposed modifications to be consulted upon after the completion of Stage 2 of the Examination prior to the receipt of the Inspectors full report into the SWDP.

3.6 However, the current package of recommended Proposed Modifications are confined, in the main, to changes to the plan which are required to address the Inspector’s recommended uplift in the OAHN requirement up to 2030. This approach has been agreed with the Inspector and enables the SWDP to move forwards to Stage 2 of the Examination as quickly as possible.

3.7 This means the bulk of the changes set out in Appendix 1 of this report are related to:

• Incorporating the recommended OAHN requirement (28,370 dwellings) into the SWDP and the associated district distribution;

• Establishing sub-area targets for the plan which address the full OAHN requirement;

• Identifying the supply of new or amended housing allocations required to address the recommended uplift in the OAHN (note this also includes the deletion of sites which are no longer considered deliverable); and

• Amending or introducing the SWDP policies required to guide the implementation of recommended housing allocations.

3.8 This approach has been accepted by the Inspector as an appropriate way forward and it enables the Stage 2 Examination to proceed and consider a proposed housing supply which addresses the full OAHN. Furthermore, the changes to the proposed housing requirements and associated supply will have been subject to consultation and testing on the same basis as the submitted SWDP.

3.9 If the recommended uplift in the OAHN requirement is not addressed as set out above and subject to formal consultation, given the Inspector’s comments about the unsoundness of the submitted housing requirement, in the opinion of the Heads of Planning for all three SWCs, it would be extremely unlikely that the inspector would allow the Examination to continue and the SWCs would be invited by the Inspector to withdraw the submitted plan.

3.10 The recommended Proposed Modifications set out in Appendix 1 do however include other changes to the SWDP. These are:

• A revised Annex I which provides an updated schedule of Infrastructure requirements. This is considered essential as it has been necessary to fully review infrastructure requirements in the light of the recommended housing uplift, both in terms of the quantum of housing and its recommended location;

• A revised Policy SWDP 17: Travellers and Travelling Show people. This has been introduced given the publication of the new Worcestershire Gypsy and Traveller Accommodation Assessment (GTAA) (2014) which represents a major new piece of evidence underpinning the SWDP and which has implications for Gypsy and Traveller provision as an element of housing need and specific site allocations. The Inspector has indicated that he is content for the SWCs to decide whether to deal with revisions to Policy SWDP17 now or following Stage 2.

• The recommended Proposed Modification to SWDP Policy 3 also includes updated figures for retail development as a result of the Local Plan Inspector’s conclusions arising from Stage 1 of the Examination.

3.11 Further main modifications to the SWDP will inevitably be discussed during Stage 2 of the Examination. If they are to be incorporated into the SWDP they will have to be formally reported to the SWCs for approval and subject to further public consultation, before the SWDP could be formally adopted.

3.12 Addressing the uplift in the OAHN: Strategy Issues

3.13 The SWDP is based upon a vision and approach for the area which is:

• Economic prosperity-led with a focus on jobs and investment;

• Predicated on the future growth of the city of Worcester needing to take place around the city in the adjacent areas of Wychavon and Malvern Hills through the development of urban extensions and promoting the sub-regional role of the City;

• Focussed on housing need requirements based on the OAHN (as now updated) and locating growth in accordance with a hierarchy of sustainable settlements;

• Supported by an overarching Infrastructure Delivery Plan, which sets out where new infrastructure needs to be provided, when its needs to be provided, how much it will cost and who is responsible for delivering it.

• Supported by investment in strategic transportation within and around Worcester and the A46.

• Based upon thorough review of the Integrated Assessment (which includes the Sustainability Assessment).

3.14 At a basic level the task of addressing the uplift in the OAHN requires the SWCs to incorporate the new OAHN into the SWDP and identify sufficient additional housing land supply to bridge the gap between the housing supply identified in the submitted SWDP (23,425 dwellings – as subsequently amended downwards by the Inspector’s recommendations ) and the increased requirement of 28,370 dwellings (2006-2030).

3.15 However, in order that the SWDP can continue through the Examination process it is critical that the response to the uplift in the OAHN can be brought forward in a way which is consistent with and supports the vision, objectives and spatial strategy

underpinning the submitted SWDP. If this were not possible or the preferred way forward for the SWCs was significantly different, there is a major risk that the plan could be re-directed back to an earlier stage of preparation so that an alternative or modified strategy can be consulted upon and tested. This would mean a major delay in the process of adopting the SWDP with the inherent risks associated with none of the SWCS having an up-to-date Local Plan and means of establishing policy on housing requirements and an associated housing land supply.

3.16 The SWDP was prepared within the context of National Planning Policy Framework (NPPF) and was guided by the vision and objectives of the Plan, all of which had been the subject of extensive public consultation. The strategic policies of the SWDP are set out in policies SWDP 1 - SWDP 7 and those policies and in particular SWDP2 (Development Strategy and Settlement Hierarchy) were the main drivers of the allocation of sites in the submitted SWDP.

3.17 The SWDP development strategy has yet to be tested but the Inspector. However, in his Interim Conclusions of 28/10/13 he made some important statements about the meeting of housing need. In particular:

• Para 82: An important factor in the decision of the three SWCs to prepare the SWDP jointly is that Worcester City’s built-up area is tightly constrained inside its boundaries. There is insufficient space in the City’s administrative area to meet all its needs for development, especially housing.

• Para 83: Hence the Plan proposes that a share of Worcester’s housing need should be met on sites just outside and abutting its boundary, in both Malvern Hills and Wychavon (policy SWDP3 H). The Worcester City administrative area together with the urban extension sites directly abutting it are referred to in the reasoned justification to policy SWDP3 as the Wider Worcester Area (WWA).

• Para 84: Because of natural and environmental constraints, Malvern Hills district is also seen by the Councils as having limited ability to accept new development. The Plan therefore proposes that part of its housing need be met in the WWA and part in Wychavon.

• Para 85: These arrangements are entirely in line with the approach suggested in NPPF paragraph 179 to deal with situations where development requirements cannot wholly be met within an LPA’s own area. Accordingly, policy SWDP3D and Table 4b of the plan contain separate housing apportionments for the WWA, Malvern Hills excluding the WWA, and Wychavon excluding the WWA. The policy specifies that the apportionments are non-transferable between these three areas.” (Extract from the Inspector’s letter dated 28.10.13)

3.18 The recommended Proposed Modifications set out in Appendix 1 are considered to address the housing uplift in accordance with the vision, objectives and strategy of the SWDP. It is considered that the strategy is sufficiently robust and can accommodate the necessary housing uplift and the recommended Proposed Modifications. This is achieved in accordance with the SWDP strategy and particularly

the policies SWDP1-7, and especially policy SWDP 2. The approach is consistent across the plan area and delivers sustainable growth in the following respects:

• Continuing to seek to reduce the need to travel;

• Making sure that the distribution of housing and employment is in balance; and

• Making the most effective use of available or readily provided infrastructure.

3.19 The following represent key principles / factors that have also guided the recommended response to the housing uplift:

a) Provide for sufficient housing across South Worcestershire to meet the OAHN and, subject to constraints, address housing need where it arises;

b) Focus most housing need in the urban areas (this follows the settlement hierarchy set out in policy SWDP 2) , where housing needs, employment opportunities and access to infrastructure are greatest and where the cost of public service delivery is relatively lower;

c) Maintain the openness of the Green Belt. This supported by guidance in the NPPF and it is set out in Policy SWDP 2 A v). Furthermore, the submitted SWDP was supported by a comprehensive Green Belt review (2010) which concluded that the existing South Worcestershire Green Belt continues to serve nationally identified Green Belt purposes. Officers are also concerned that the allocation of Green Belt for development could be only done after a further Green Belt Review which would trigger a fundamental review of the SWDP which could lead to the withdrawal of the SWDP. There is sufficient suitable and non Green Belt land to deal with the uplift without a further Green Belt Review;

d) Safeguard the open countryside. The open countryside is defined in SWDP 2 B (as proposed in the track change document) as “land beyond any development boundary or land beyond the Worcester City administrative boundary. In these areas development will be strictly controlled, especially in designated areas such as the Areas of Outstanding Natural Beauty”;

e) Maintain the openness of Significant Gaps. As stated in SWDP 2 C, “any development proposals should retain the open character of the Significant Gaps”. However, it is acknowledged that Significant Gap status is not an absolute constraint to strategic plan led growth where the purpose of a particular Significant Gap can be maintained; and

f) Development should be of an appropriate scale and type. As stated in Policy SWDP 2E (as proposed in the track change document), “ with regard to development proposals, the scale must be proportionate to the needs and size of settlement, local landscape character and /or location as well as the availability of community service infrastructure to accommodate it in a

sustainable manner”. SWDP 2F also provides guidance: “Within development boundaries and within the Worcester City administrative area, preference is given to the redevelopment of brownfield sites before bringing forward greenfield land. In the open countryside the preference will also be to redevelop brownfield sites in the first instance although the availability of infrastructure and accessibility to local services will be material considerations…”

3.20 In addition it is clearly essential that sites recommended for housing allocation are deliverable and free from overriding technical or environmental constraints and that any other constraints which it may be evident cannot be overcome.

3.21 The package of allocations and changes to existing allocations for housing development set out in Appendix 1 have also been submitted for assessment in the context of the Sustainability Appraisal prepared to test the strategy and associated policies in the SWDP.

3.22 Addressing the uplift in the OAHN: Distribution of housing requirements

3.23 As stated in paragraph 3.19 the SWDP seeks to address the OAHN across South Worcestershire. It also establishes the strategy of achieving urban concentration at Worcester. This objective is delivered through SWDP policy in the form of the Wider Worcester Area 1 (WWA) described in SWDP 3 para 29.

3.24 The proposed distribution of housing need set out in the recommended modification to Policy SWDP 3 reflects the available and deliverable capacity in each of the thee South Worcestershire Districts which accords with the strategy of the SWDP. Unmet housing need is directed to policy sub-areas which reflect the objectives and locational strategy of the plan. Its is the lack of capacity within Malvern Hills and Worcester City that has driven the need for cross boundary co-operation over plan- making so that unmet housing need can be met in a strategic and logical way across South Worcestershire.

3.25 It has been necessary to revisit the overall extent of the WWA as a means of addressing the uplift in the OAHN but it considered that the objective is robust and continues to be deliverable in line with the original principles set out in the version of the plan submitted to the Secretary of State in May 2013. The current text needs to be amended to take account of the new land supply which has been identified in this area and its enhanced capacity to deliver urban concentration and meet additional housing needs of Malvern Hills and Worcester City. Additional text is also required to set out how this approach supports a number of strategic objectives within the SWDP and that a significant change in circumstances would require a review of how the objective of meeting Worcester’s needs and unmet needs from Malvern Hills in the WWA would be implemented in detail.

1 Wider Worcester Area (WWA) is defined as the City of Worcester and the Urban Extensions immediately adjoining the city boundary in Malvern Hills and Wychavon Districts.

3.26 In the light of the additional capacity identified in the review it is recommended that all of Worcester City’s revised OAHN could be met within the Wider Worcester Area. Malvern Hills’ need that cannot be met in its towns and villages should be directed in the first instance to the WWA and only need that cannot be met in the WWA should then be directed to the Wychavon sub-area. Currently available information suggests around 2441 dwellings from Malvern Hills revised OAHN can also be accommodated within the Urban Extensions in the Wider Worcester Area situated within Malvern Hills District.

3.27 Table 2 below provides a summary of the distribution of OAHN and the recommended housing requirements for the policy sub-areas established under Policy SWDP3. Table 3 provides the comparable figures for the submitted version of the SWDP. Figure 1 below shows the recommended flows of housing growth within the SWDP sub-areas under SWDP Policy 3.

Table 2: Recommended proposed modifications

SWDP Inspector’s Supply SUBAREA/Area SWDP 3 Target recommended Recommended in OAHN (districts) Appendix 1 Malvern 8,590 5,913 Malvern Hills 5,900 (Ex WWA) Sub Area

Worcester 9,830 6,784 WWA 6,750 (Supply includes (Worcester City) 80 at Worcester South SUE)

Worcester urban N/A 5,471 WWA 5,450 extns (Malvern Hills and (supply excludes Wychavon ) 80 dws in

Worcester) Wychavon 9,950 10,768 Wychavon 10,300 (Ex WWA) Sub Area TOTAL 28,370 28,936 South Worcs 28,400

Table 3 Submitted SWDP as set out in Policy SWDP 3

2012 Strategic Supply SUBAREA/Area SWDP 3 Target in Housing Market submitted SWDP Assessment (SHMA) (districts) Malvern 7,520 4,768 Malvern Hills 4,900 (Ex WWA) Sub Area Worcester 8,150 5,690 WWA 9,400 City (Worcester City) (of which the City target was Worcester 3,925 Within WWA 5,500) Urban Extensions Wychavon 7,500 9,042 Wychavon 8,900 (Ex WWA) Sub Area TOTAL 23,170 23,425 South Worcs 23,200

Figure 1: Diagram showing housing flows across the SWDP as recommended under Proposed Modification to SWDP Policy 3.

3.28 The recommended housing targets set out in Table 1 of this report (and SWDP 3 in Appendix 1 ) meet the full OAHN for South Worcestershire up to 2030. The recommended distribution is within, and supportive of, the vision, objectives and spatial strategy of the Plan. The overall distribution of proposed housing growth within the SWDP (as recommended for modification) continues to ensure that growth is focussed on existing urban areas with greater levels of growth directed to the higher order settlements within the proposed settlement hierarchy. There is a significant increase in the level of growth proposed in the WWA and specifically the urban extensions This reflects the sub-regional role of Worcester City. A response to the recommended housing uplift that did not first consider options for further growth at Worcester would be unlikely to be found sound.

3.29 Addressing the uplift in the OAHN: Housing Supply identification

3.30 The primary focus for the site identification process has been to identify sufficient land for housing to address the Inspector’s recommended OAHN. It has also been necessary to find additional sites to address the Inspector’s Initial Conclusions at Stage 1 of the Examination with respect to the proposed housing supply. In his Conclusions the Inspector made recommendations which reduced the housing supply in the submitted plan by around 1,200 dwellings. Therefore, the South Worcestershire Councils have undertaken work to identify sites for around 6,700 additional dwellings. This includes intensification on submission allocations as well new allocations, plus additional supply from completions 2012 to 2014 and commitments at 2014, including recent appeals.

3.31 In order to propose an increased housing supply the SWCs have had regard to the following potential sources:

• Extension and / or intensification of existing SWDP allocation sites;

• Omission sites put forward by developers but not currently allocated in the SWDP;

• Current planning housing applications and paid pre-application advice sites (including sites approved but subject to completion of s.106 agreements);

• Planning permissions on sites post submission of the SWDP, including those allowed on appeal;

• Sites submitted to the Strategic Housing Land Availability Assessment (SHLAA) for evaluation since its last publication (December 2012);

• Other sites identified recently by the three South Worcestershire Councils, including surplus public sector sites, vacant and derelict land and buildings and local authority property; and

• Sites submitted under the Call for Sites carried out after the Stage 1 Examination (March / April 2014).

3.32 The South Worcestershire Councils considered that data already held in relation to the above points one to six provided a comprehensive database from which to formulate proposed modifications. However, given the publication of National Planning Practice Guidance in March this year, which promotes the importance of up to date consultation on housing availability it was agreed to undertake a comprehensive ‘call for sites’ exercise across South Worcestershire.

3.33 Around 550 suggested sites were submitted to the South Worcestershire Councils in response to the ‘Call for Sites’ consultation. The bulk of suggested sites came forward in Wychavon and Malvern Hills Districts.

3.34 An initial screening of possible additional sites was undertaken to identify those sites most suitable to address the housing uplift. This screening process included criteria associated with compatibility with the SWDP strategy and significant site or locational constraints. Those sites carried forward as potential allocations have been subject to more detailed assessment and consultation, including transportation modelling and Sustainability Appraisal.

3.35 Those sites now recommended for inclusion in the SWDP housing supply are identified in Appendix 1 . Those sites which have not been carried forward from the ‘Call for Sites’ exercise are listed in Appendix 2 to this report (a hyper link is provided from Appendix 2 to the relevant location maps). The principal reasons for a site not being selected are set out in Appendix 2 . The reasons stated represent a high level statement and do not necessarily reflect all site-specific constraints that may exist.

3.36 Council should be aware that the housing uplift set out in Appendix 1 includes all sites granted consent, either directly by the local planning authority or on appeal, including sites where s.106 agreements are still to be signed and issued. It is accepted that some of these sites do not sit comfortably with SWDP strategy either in terms of their location or the level of growth established in a particular location. However, it is considered inappropriate to ignore the existence of these sites as this would simply require the SWDP to allocate more sites than currently set out in Appendix 1 and for the SWDP to exceed the OAHN.

3.37 The submission of such a high number of sites under the ‘Call for Sites’ exercise that has led to the slippage in the Proposed Modifications timetable as it has been essential to ensure that potential allocations are assessed on a detailed basis and a level comparable with those sites allocated under the submitted SWDP. In addition it has been necessary to assess the impact of all potential allocations which passed the initial screening and the detailed assessment with respect to the Infrastructure Delivery Plan (IDP) and the Sustainability Appraisal.

3.38 The housing land supply information (commitments) set out in the recommended Proposed Modifications has been updated to 1 st April 2014, and includes associated updating of small sites windfall dwellings allowances and completions/commitments. It also includes recent appeal decisions.

3.39 Council will note that the housing supply for South Worcestershire is 28,936 against the recommended SWDP target of 28,400 (which rounds upwards the 28,370 dwellings recommended by the Inspector) . The recommended housing supply provides some overall flexibility associated with deliverability of sites over the plan period. It is not a deliberate approach to establish ‘headroom’ around the OAHN as the South Worcestershire Councils firmly believe the Inspector’s recommended approach has addressed any perceived uncertainty around the level of the OAHN and the OAHN has been fully addressed by the recommended Proposed Modifications.

3.40 Addressing the uplift: Key Elements of Worcester City

3.41 The potential to increase the level of housing growth within Worcester City has been considered as part of the proposed modifications process. It is part of the strategy of urban concentration at Worcester. As well as supply taking account of the evidence from monitoring of housing development (commitments and completions), the recommended modifications set out in Appendix 1 to this report propose additional housing supply in the city through the intensification of sites allocated in the SWDP as submitted in May 2013, and additional sites to be proposed to be allocated. Total supply in the City is about 6,784 dwellings including these proposed changes, a rise of about 1,100 compared to the submitted plan. The City supply of 6,784 excludes the Worcester urban extensions, except for an indicative 80 dwellings now recommended to be developed on land in the City in the SWDP 45/1 Worcester South urban extension, adjacent to the Ketch roundabout .

3.42 Total supply capacity from the submitted plan allocations and the recommended additional site allocations would amount to 2,689 dwellings, a rise of about 1,235 compared to the submitted SWDP. The 2,689 are part of the overall 6,784 supply. 24 of the 2,689 have been built, 699 have been granted planning permission and 558 have been approved subject to completion of a Section 106 Agreement. 1,408 have not yet been permitted, including 80 situated in the city within the Worcester South urban extension.

3.43 The proposed modifications recommended in Appendix 1 would result in the overall capacity on sites allocated in the submitted SWDP rising by 372 to 1,827 dwellings. This is due to intensification, notably at the SWDP44/4 Shrub Hill Opportunity Zone, reflecting the development east of the railway approved subject to s.106 and the need for housing development to the west of the railway to assist the mix of uses and viability of regeneration of this area. The rise also takes account of close care and extra care apartments permitted at SWDP43/18 (Grove Farm – now ‘branded’ as University Park (100 units, now under construction) and the SWDP43/25 College of Art and Design, Barbourne where demolition works are underway. Previously those sites were solely for C2 care homes. Recommended site allocation boundary changes are proposed at: SWDP 43/4 Old Northwick Farm to take account of new evidence about flood risk; at the College of Art and Design, reflecting the permitted area; and at SWDP43/7 Sansome Walk, taking account of site access and property boundaries .

3.44 Twenty-nine additional sites totalling 858 dwellings are recommended for allocation across the city as set out in Appendix 1 , with over 80% of these being brownfield. Seven have been granted planning permission but not yet started, two are approved subject to S106, and 20 are not yet the subject of planning applications. In particular, the site capacity of these sites takes appropriate account of local green network mitigation, the historic environment, avoidance and management of flood risk, and the impact of neighbouring uses. A series of footnotes to the relevant site policies provides the necessary guidance for those sites’ development. The largest proposals are the former Crown Packaging site at Perry Wood Walk (totalling 240 dwellings) and mixed redevelopment at Lowesmoor Wharf (including 100 dwellings).

3.45 Addressing the Uplift: Key Elements of the Wider Worcester Area (Urban Extensions)

3.46 The potential to increase the level of housing growth located at Worcester in accordance with the SWDP’s strategy has been considered as part of the proposed modifications process. The recommended modifications set out in Appendix 1 to this report propose that the two largest urban extension allocations (SWDP 45/1 and 45/2) are modified and a wholly new urban extension Land at Swinesherd Way is allocated for 300 dwellings.

3.47 With respect to Site SWDP45/1 (Broomhall Community and Norton Barracks Community) to the south of Worcester City it is recommended that the allocation is increased by 150 dwellings to 2,600 dwellings. No modification of the existing allocation site boundary or the amount of employment land to be provided is proposed.

3.48 The recommended increase of 150 dwellings is considered achievable on the basis of on-going master planning work with prospective developers and the evidence provided through the submission of planning applications across this allocation. Other text changes are proposed the SWDP 45/1 to reflect progress with master planning work and infrastructure discussions.

3.49 Council will note that under SWDP 3 reference is now made to 80 dwellings on this urban extension falling within the administrative boundary of Worcester City. This change reflects the alignment of the City boundary within the proposed allocation. However, it remains the position that the allocation will be brought forward comprehensively having regard to the fact that the allocation sits, in part, in the administrative areas for all three South Worcestershire Councils.

3.50 With respect to SWDP Site 45/2 (Temple Laugherne) to the west of the city it is recommended that the allocation is increased by 1,175 dwellings from 975 dwellings to 2,150 dwellings. No changes with respect to the amount of employment land are proposed.

3.51 The increase is achieved by extending the proposed allocation under the submitted SWDP slightly further westwards and further north towards the Martley Road

(B4204). The policy associated with the allocation now proposes that the development is served by a spine road connecting the A44 in the south to the Martley Road in the north. This requirement reflects the output of the transportation modelling undertaken by WCC associated with the Worcester Transport Strategy. The diagram accompanying the allocation proposes that the recommended spine road forms the outer edge of the proposed development (subject to detailed design and assessment). This could have urban design benefits with respect to promoting cycling and walking in to the city from the development. It would also offer the possibility that the capacity of the spine road could potentially be increased should long terms aspirations for a NWLR (in whole or part) come forward. Paragraphs 3.78 and 3.80 below however, make clear that there is no current requirement under the SWDP as recommended for modification for the building of a NWLR (in whole or part) or the protection of an alignment for its longer term construction.

3.52 Further changes are recommended to the allocation policy SWDP 45/2 to reflect increased size of the allocation, including increasing the size of the proposed local centre.

3.53 Clearly there is a disparity between the two largest urban extensions with respect to how advanced they are with Master Planning work. In the case of Site SWDP45/1 (Broomhall Community and Norton Barracks Community) most of the proposed allocation area is subject to planning applications and discussions have been on- going regarding master planning issues. The indicative diagram accompanying this site reflects the developing work under taken so far.

3.54 Whilst part of the area under the enlarged allocation at SWDP Site 45/2 (Temple Laugherne) to the west of the city is the subject of current planning applications these are broadly related to the earlier allocation made under the submitted version of the SWDP for 975 dwellings. Given the quick turnaround required for Proposed Modifications to the SWDP to address the housing uplift it is inevitable that Master Planning associated with the enlarged allocation is not yet advanced. The policy wording associated with SWDP 45/2 as proposed for modification makes clear that the disposition of proposed uses within the allocation boundary will require, and be subject to, further intensive Master Planning to ensure the comprehensive development of the amended allocation as a whole and provide an integrated and cohesive urban design and movements within the site and to / from the city.

3.55 A wholly new urban extension is recommended for allocation at Land at Swinesherd Way for 300 dwellings. This urban extension is within Wychavon District adjacent to the eastern edge of the City. It is located between the A4440 and the M5. The recommended proposed modifications introduce a specific allocation policy for this site which, amongst other matters, addresses the need for a comprehensive landscaping scheme to address noise issues from the A4440 and the M5, as well as avoidance of areas within the allocation boundary subject to surface water flooding.

3.56 No changes are proposed with respect to SWDP45/3 Kilbury Drive and SWDP 45/4 Gwillam’s Farm as both of these sites already have the benefit of planning approval. No changes are proposed to SWDP 45/5 Worcester Technology Park as the urban

extension is for employment uses only and is therefore unaffected by the uplift in the OAHN.

3.57 Addressing the uplift: Key Elements of Malvern Hills District (Ex WWA)

3.58 The SWDP housing allocations, as amended by the recommended Proposed Modifications, continue to maintain the strategy objective of focussing development in the towns and higher order settlements across the District.

3.59 Excluding the WWA, the allocations within Malvern Hills District, total 3093 dwellings of these 1295 dwellings (42%) already have planning approval, with a further 35 dwellings subject to current planning applications.

3.60 In total 1982 dwellings are allocated in or adjacent to the main towns across the district.

3.61 The total allocation to the district’s villages is 1,110 dwellings of which 756 dwellings are in Category 1 villages (of which 633 (84%) have planning permission), 340 dwellings in Category 2 villages (of which 188 (55%) have planning permission) and 14 in Category 3 villages (all of which have planning permission). Overall this means around three quarters of the rural allocations set out in the SWDP (which includes both allocations in the submitted plan and proposed for modification) already have the benefit of planning approval.

3.62 Only two additional allocations are recommended (see Appendix 1 ) in the rural areas on sites which currently do not have the benefit of planning permission. These are:

• Land south of Greenhill Farm, Hallow (30 dwellings); and

• Land off Bransford Road, Rushwick (50 dwellings).

3.63 In overall terms addressing the uplift across Malvern Hills District (ex. WWA) has been assisted by the additional housing supply generated by planning approvals granted recently (including appeal decisions) on five-year housing land supply grounds.

3.64 The main changes for Malvern set out in Appendix 1 are as follows:

• Land at North East Malvern (Policy SWDP 56) is recommended to increase by 100 dwellings to 800 dwellings (with no recommended change to the allocation site boundary);

• The proposed redevelopment of former QinetiQ land (Policy SWDP 53) is recommended to increase by 50 dwellings to 300 dwellings (with no recommended change to the allocation site boundary). The employment land requirement remains unchanged; and

• Six new are recommended for allocation:

o Victoria Road Car Park (21 dwellings);

o Broadlands Drive (33 dwellings);

o Brook Farm Drive (77 dwellings);

o Lower Howsell Road former Allotments (81 dwellings); and

o Two other sites which have recently received planning permission are allocated – these are Pickersleigh Grove (44 dwellings) and Mill Lane, Poolbrook (62 dwellings).

3.65 At Tenbury 3 additional allocations are recommended. These include two sites recently granted planning approval on appeal which are Land at Mistletoe Row (44 dwellings) and Land opposite Morningside (43 dwellings). The only wholly new site allocated at Tenbury is Land south of the Oaklands (35 dwellings).

3.66 Since the submission of the SWDP in May 2013, Upton-upon- Severn has had two additional housing sites outside of the SWDP granted approval that are now incorporated into the SWDP. These are Upton Marina (70 dwellings – granted on appeal) and Welland Road, Tunnel Hill (43 dwellings). The SWDP submission allocation at Sunny Bank Meadow (Site SWDP 58/1) has also been granted planning approval (25 dwellings). In combination these sites will achieve more than the level of housing growth recommended under Policy SWDP 58, which under SWDP 58 (C) made a non site-specific allocation to Upton-upon-Severn of 75 dwellings to be brought forward in the area via Neighbourhood Planning.

3.67 The proposed modifications in Appendix 1 now recommend that the non site- specific allocation of 75 dwellings at Upton-upon-Severn is deleted. However, this change would not preclude a neighbourhood plan (s) bringing forward additional housing allocations if unconstrained sites could be identified and were in line with local housing need requirements.

3.68 Addressing the uplift: Key Elements of Wychavon District

3.69 Wychavon, along with Malvern Hills and Worcester City, engaged positively in respect of identifying additional housing supply in order to meet the SWDP examination inspector’s recommended increase in the Objectively Assessed Need for Housing. Over 260 representations were received following the “call for sites”. Many of these had previously been submitted to the Strategic Housing Land Availability studies or were amendments to allocations already proposed in the SWDP. In the meantime the Council continued to approve a number of major housing proposals and together with a number of significant housing appeals which went in favour of the developer, the need for additional new allocations rapidly receded. Indeed the only new proposed housing allocations are those which already have planning permission or at least a resolution to grant planning permission subject to a s.106 legal agreement and which are supportive of the proposed SWDP development strategy. In summary the proposed main modifications would result in a total of 79

SWDP housing allocations of which only 36 do not have a planning permission or resolution to grant permission. The total housing supply for Wychavon District now stands at 10,768 dwellings which is 468 dwelling more than the proposed “policy on “housing requirement of 10,300 dwellings. Compared with the SWDP as submitted in May 2013 the balance of rural development versus urban development has moved slightly in favour of the former albeit that has been driven by the planning applications approved including appeal sites. Overall the majority of the development will continue to be met at the relatively more sustainable locations i.e. , and as advocated in the SWDP development strategy (SWDP2).

3.70 Addressing the uplift in the OAHN: Infrastructure Delivery Plan (IDP) and consideration of the North West Link Road at Worcester

3.71 The purpose of the Infrastructure Delivery Plan (IDP) is to identify the key infrastructure to support future housing and employment growth proposed by the SWDP up to 2030. National planning policy provides the framework for this. The IDP seeks to assess the current physical, social and green infrastructure provision across South Worcestershire along with what investment and improvement schemes are planned and programed in the plan period.

3.72 A new SWDP policy (SWDP Policy 7) was introduced into the SWDP at the earlier suggested changes stage and provides the link to the IDP. No changes are proposed to SWDP Policy 7 but the schedule of infrastructure requirements reproduced as Annex I to the SWDP has been updated (see Appendix 1 to this report). The updating process reflects consultation with all essential infrastructure providers and includes the results of transport modelling undertaken by WCC and the Highways Agency.

3.73 The May 2013 version of the SWIDP estimated a total infrastructure capital cost for the SWDP proposals of over £500m. The September 2014 SWIDP shows that these capital costs for the September 2014 proposals will increase by at least an additional £50m. There has been full consultation with all infrastructure stakeholders dealing with all forms of physical, social and green infrastructure and this feedback is all saying that there are no “show stoppers” to prevent proposed development coming forward in the plan period.

3.74 The key infrastructure elements are Transport and Education:

3.75 Transport: Estimates show the total capital cost rising from the original figure of about £204m to now around £226m. This is a significant increase but not in percentage terms which suggests a positive correlation between the development strategy and the transport strategy.

3.76 Education: Latest estimates show the total capital cost rising from about £66m to now about £94m. This is because in some cases a threshold has been crossed in terms of school capacity although in other instances new housing development will help boost the intake of schools with spare capacity.

3.77 Full information on this and other forms of infrastructure can be found in the SWIDP (see Annex I as recommended for modification in Appendix 1 to this report).

3.78 North West Link Road at Worcester: In order to update the IDP and bring forward proposals for additional growth at Worcester, consideration has been given to the need for a North West Link Road (NWLR) which could potentially connect the A4440 / A44 at Grove Farm to the A449 north of Worcester.

3.79 The views of Worcestershire Council have been sought on this matter and the impact of proposed housing growth on the A 4440 southern link road and motor way junctions has been fully taken into account.

3.80 The current position can be summarised as follows:

• The level of growth proposed at Worcester and specifically the recommended major urban extension to the west of the City (2,150 dwellings) does not require the building of a NWLR in either whole or part during the plan period (i.e. up to the year 2030);

• The advice of the Highway Authority is that it is unlikely that a significantly larger major urban extension to the west of the City ( i.e. larger than the recommended modification set out in Appendix 1 to this report ) could be served using the existing road network, including the A4440 southern link road, even with major improvement, and a NWLR in whole or part would be required. Further, technical work and transport modelling would be required however, to determine a general tipping point where a NWLR would be required;

• The building of a NWLR remains a long term aspiration in the Worcestershire Local Transport Plan No.3. However, there is no approved scheme, no approved detailed alignment or current design proposal and no funding identified for the building of a NWLR. Furthermore, there is no long term commitment to further growth to the west of the City beyond 2030 which may result in the need for a NWLR. This aspiration therefore does not currently provide a basis for protecting a particular alignment or space for a potential NWLR in the SWDP or the associated IDP;

• SWDP Policy 45 (2) deals with the major urban extension to the west of the City. The policy and the associated IDP require a spine road connection between the A4440 / A44 to the south of the allocation to the Martley Road (B4204) in the north. This requirement reflects the detailed outputs of the Worcester Transport Model as recently updated; and

• Good planning would suggest that notwithstanding the advice above regarding the current absence of a case for a NWLR the implementation of SWDP Policy 45 (2) should not preclude the possible completion of a NWLR at some later stage. SWDP Policy 45 (2) envisages that the spine road connection between the A4440 / A44 in the south and the Martley Road (B4204) in the north will form the outer western boundary of the proposed development. It is suggested that the

proposed road’s overall alignment and its connections with existing roads to the south and north could be designed so as to enable the proposed spine road to be uprated to form part of a potential NWLR in the longer term. However, this will currently have to be achieved through discussion and negotiation with the prospective developers of the major urban extension to the west of the City.

3.81 Addressing the uplift in the OAHN: SWDP Viability

3.82 The National Planning Policy Framework (NPPF) formalises the requirement for Councils to ensure that the Local Plan is deliverable and viable. Accordingly consultants were commissioned to undertake an independent assessment of the overall viability of the Plan. Their findings on the submitted SWDP formed part of the evidence base for the Plan.

3.83 At the pre-submission stage the key conclusion of the consultants work was that the policies set out in the SWDP would not put the implementation of the Plan at serious risk.

3.84 Given that additional housing supply has had to be identified to address the increase in the OAHN requirement and additional infrastructure requirements have been identified through the updating of the IDP it has been necessary to commission a further assessment of the SWDP’s overall viability.

3.85 The consultants have identified that in overall terms the Policies of the SWDP are placing increased pressures on overall viability. This is particularly important with respect to brownfield sites across the Plan area, but which are concentrated in Worcester City, where sites may be potentially unviable or marginal in the face of all full policy compliance and infrastructure requirements. The consultants advise that affordable housing provision is potentially one of the most significant factors that impacts on the viability of brownfield sites and particularly those in Worcester city. This has led to a recommendation that consideration is given to a reduction in the affordable housing requirement in Worcester City on Brownfield Sites and that further detailed assessment is undertaken regarding the viability of the proposed Major Urban Extensions.

3.86 This recommendation is discussed in the following section of this report. However, it should be noted that whilst viability issues with Worcester City have previously impacted on the delivery of affordable housing, where some developments do not achieve 40% affordable housing, the picture is not the same across South Worcestershire as a whole. Recent decisions in both Wychavon and Malvern Hills indicate that housing schemes in these locations can include and deliver 40% affordable housing without adversely impacting on viability of the delivery of other essential infrastructure or mitigation measures.

3.87 The consultants remain of the view that, subject to consideration being given to amending the affordable housing requirements set out under SWDP Policy 15: (Meeting Affordable Housing Needs) the SWDP policies in overall terms would not

put the implementation of the Plan at serious risk. The updated viability assessment report can be viewed at www.swdevelopmentplan.org

3.88 Addressing the uplift in the OAHN: Affordable Housing Supply

3.89 The Submitted SWDP had regard to the need for 8,250 affordable dwellings between 2006 and 2030. Evidence submitted by the South Worcestershire Councils to the Stage 1 of Examination into the SWDP stated that the forecast affordable housing supply for the plan period, at that time, would be around 6,100 dwellings. The Local Plan inspector in his findings noted the mismatch between the overall requirement for affordable housing and the forecast supply but he did not recommend to the Councils any particular actions to address the shortfall.

3.90 As part of the work undertaken to address the recommended uplift in the OAHN for South Worcestershire, consideration has been given to the likely supply of affordable housing that will be delivered in the context of the increased housing supply now proposed through the recommended Proposed Modifications. This work has had regard to the recommended proposed modification to SWDP Policy 15: (Meeting Affordable Housing Needs) which proposes a reduced contribution towards affordable housing grounds on brownfield sites within Worcester City on viability grounds (see 3.85 above).

3.91 The updated need total is 8,140 affordable dwellings. The current forecast is that even with the Proposed Modification to SWDP Policy 15 a total of 8,903 dwellings will be provided across South Worcestershire between 2006 and 2030. This demonstrates that with the recommended uplift in the OAHN requirement there is an opportunity to provide a closer match between affordable housing need and supply over the plan period. However, this will be subject to on-going assessment of viability and specifically viability and deliverability for major sites.

3.92 Whilst the projected supply of 8,903 affordable dwellings suggests a modest surplus of affordable housing against need, this belies internal variation in supply against affordable housing need across South Worcestershire. With respect to Worcester City’s affordable housing need there remains a potential shortfall of around 800 dwellings up to 2030. This would point towards a joint strategy to be adopted by the South Worcestershire Councils to ensure that housing development within the WWA maximises its potential contribution towards meeting the City’s affordable housing needs. This could be achieved through a memorandum of understanding or a joint allocations policy. However, this is not a planning policy matter and does not feature in the recommended Proposed Modifications.

3.93 Addressing the uplift in the OAHN: Integrated Assessment

3.94 The Planning and Compulsory Purchase Act 2004 requires a Sustainability Appraisal (SA) of the Strategy and Policies in the Local Development Framework. The SA is intended to assess the impact of the plan from an environmental, economic and social perspective. It is intended to test the performance of a plan against the

objectives of sustainable development and thereby provide the basis for its improvement. The SA is an on-going assessment of the South Worcestershire Development.

3.95 A Sustainability Framework has been developed and all emerging options and policies have been tested against this at each step in the Plans preparation. The Integrated Assessment also includes the Habitats Regulations Assessment which is required under the Strategic Environmental Assessment Directive.

3.96 It has therefore been essential to test the impact of changes arising from meeting the uplift of the OAHN through the Integrated Assessment process. This includes considering the impact of the Proposed Modifications both individually and cumulatively with the submitted SWDP.

3.97 The SA broadly indicates that the recommended Proposed Modifications are positive in improving the required mitigation of the effects of proposed development and importantly the recommended Proposed Modifications are consistent with, and supportive of, the SWDP vision, objectives and strategy for sustainable development. The updated Integrated Assessment can be viewed at www.swdevelopmentplan.org

4. SWDP Policy 17: Travellers and Travelling Show people / Gypsy and Traveller Accommodation Assessment.

4.1 The six district councils across Worcestershire, along with Worcestershire County Council have co-operated over the updating of the Worcestershire Gypsy and Traveller Accommodation Assessment (GTAA) (February 2008) which was originally used to develop and justify the submitted SWDP Policy 17. The SWCs considered that the 2008 GTAA was in need of both review and updating. Furthermore, it was considered that a thorough review of the GTAA methodology was required.

4.2 The 2014 update of the Worcestershire GTAA is based upon a comprehensive survey of existing sites and assessment of future needs. The assessment work was completed in early 2014. Whilst the full report is still to be released (expected October 2014) the Executive Summary has been published on the basis that its findings have been accepted by the Worcestershire Councils and finalisation of the background report is unlikely to result in any changes to the conclusions reached by the Assessment or the estimates of forecast need.

4.3 The GTAA is considered to represent a major element of the SWDP evidence base and it is related to understanding and responding to overall housing needs within South Worcestershire. As the results of the 2014 Assessment are so markedly different from the 2008 Assessment it is considered important that proposed modifications are brought forward at this stage rather than post Stage 2 Examination. Furthermore, the reduced level of need for Gypsy pitches identified by the updated Assessment has a direct bearing for policies associated with the major urban extensions. It will be noted that the recommended Proposed Modifications propose that the two potential Gypsy and Traveller sites at Site SWDP45/1 (Broomhall Community and Norton Barracks Community) are reduced to one.

Furthermore, in the absence of immediate 5 year requirements for Gypsy and Traveller accommodation in Malvern Hills District and Worcester City any future allocation of sites will be dependent upon the outcome of a future review of the GTAA. This position is reflected in the recommended update of the Local Development Scheme with respect to the timing of the proposed Gypsy and Traveller Site Allocations DPD.

5. Duty to Co-operate

5.1 Section 100 (3) of the Localism Act amends Section 20(5) of the Planning and Compulsory Purchase Act 2004 (PCPA 2004) by requiring the Local Plan Inspector to consider (alongside legal compliance and soundness) whether the local authority has complied with any duty imposed on the SWCs by Section 33 A in relation to the preparation of the plan.

5.2 As stated above the Local Plan Inspector has found, on the basis of Stage 1 of the Examination that the South Worcestershire Councils have complied with the legal duty.

5.3 The South Worcestershire Councils recognise that duty is on-going and therefore they have not simply rested on the Inspector’s Conclusions at Stage 1.

5.4 The production of additional evidence regarding OAHN involved the participation of the north Worcestershire districts in recognition that the Worcestershire Strategic Housing Market Assessment had been a joint project with the additional work giving rise to potential implications for their plan making work. In addition those authorities previously contacted under the duty to co-operate prior to the submission of the SWDP have been contacted again to determine whether the recommended SWDP response to the uplift in the OAHN requirement gives rise to any new strategic cross boundary issues. None have been raised with the South Worcestershire Councils. Similarly the on-going plan making work of neighbouring and near neighbour authorities has not raised any new issues for the SWDP to address at this time. An update to the Duty to Co-operate background Paper will be submitted to Stage 2 of the SWDP examination.

6. Proposed Consultation Arrangements

6.1 If approved by the three South Worcestershire Councils it will be necessary to publish the Post Submission Proposed Modifications for formal consultation purposes in accordance with Regulation 24. This will ensure that the Stage 2 Examination has the opportunity to consider the submitted plan and the proposed modifications on a like-for-like basis with respect to providing the public with the opportunity to comment on the changes and whether they are considered sound or not.

6.2 If approved the Post Submission Proposed Modifications will be published for consultation for six weeks between the 6 th October and 14 th November 2014.

6.3 The consultation material will make clear that responses are only being sought in relation to the Post Submission Proposed Modifications and not other elements of the Submitted SWDP which are not proposed for change.

6.4 Appendix 3 to this report sets out the proposed consultation programme which replicates that undertaken at the Pre-submission consultation stage. As with the Pre- submission consultation responses will be invited as to whether the Proposed Modifications are sound and if not, how could they be made sound?

7. Next Steps / SWDP timetable: Local Development Scheme (LDS)

7.1 The recommended updating of the Local Development Scheme for each of the South Worcestershire Councils is addressed in detail by a separate report on this agenda.

7.2 The Local Plan Inspector at Stage 2 of the Examination will be required to determine whether the SWDP (as recommended for modification) has been prepared in accordance with the LDS. The updated LDS recommended for approval reflects the changes to the SWDP timetable that have occurred since the current version was approved. It also updates the plan making intentions of the three South Worcestershire Councils.

7.3 The production of a Local Development Scheme is a statutory requirement for every Local Planning Authority as prescribed under the Planning and Compulsory Purchase Act 2004. Best practice also indicates that regular updates to the Project Plan should be provided on the Council’s website, as has been the case to-date with amendments to the timetable for the SWDP. Changes in legislation since the LDS production have reduced the regulations guiding the production of an LDS.

7.4 The Local Development Scheme itself does not establish policy, but simply outlines plans to be produced, the timetables for their production and the resources that will be necessary to deliver them. It does however set out forthcoming policy documents and their likely content.

7.5 Appendix A to the LDS report on this agenda sets out the detailed timeline for the SWDP which anticipates resumption of the Examination process early in 2015, further proposed modifications and consultation over the summer 2015 and formal adoption by December 2015.

8. Five Year Housing Land Supply Considerations

8.1 The Inspector’s recommended OAHN requirement and its distribution (see Table 1 above) is significant in that it provides the most up-to-date and robust assessment of housing need against which to establish 5 year housing land requirements and measure the housing land supply against for development management purposes. This is particularly important as there has been considerable debate and uncertainty recently during planning appeals across South Worcestershire as to what figures should be used to establish housing need requirements (i.e. the 5-year land supply target) in the absence of up to date Local Plans.

8.2 However, without the ‘policy on’ approach proposed by the recommended Proposed Modifications to SWDP Policy 3 which establishes a distribution for the OAHN to planning policy sub areas, the requirements associated with the OAHN will applied bluntly on a ‘policy off’ basis at a district by district level.

8.3 It should be noted that the SWDP seeks to establish the ‘policy on’ sub areas under Policy SWDP3 as areas where housing need will be met on a non transferable basis. This, in policy terms, seeks to ensure that any shortfall in deliverable supply in one sub-area does not result in compensatory releases, justified on 5-year housing land supply grounds, being made in another sub-area.

8.4 As a working example, in the absence of the approval of the Proposed Modifications, this would mean that appeals on housing land supply across Malvern Hills District as a whole would be measured against the OAHN requirement of 8,590 dwellings up to the year 2030 and not reflect the establishment of the separate Malvern Hills (Ex WWA) sub area set out in Table 5A for 5,900 dwellings. It can be seen from Table 4 below that the ‘policy off’ position is considerably worse for Malvern Hills District as a whole. This potentially runs the risk that housing growth that, under the plan strategy, would be directed towards Worcester would be released on appeal in less sustainable locations across the wider Malvern Hills District. Clearly such releases would not be supportive of the overall SWDP strategy or its related objectives, but in the absence of an emerging Local Plan, that can be afforded some weight, such considerations are unlikely to have a significant bearing in the minds of planning inspectors.

8.5 It will be noted that for Wychavon (ex WWA) the sub area requirement is larger than the OAHN requirement. Therefore, the imposition of a ‘policy on’ requirement has a negative impact on the 5 year housing land supply. However, as can be seen from Table 5 below, the sub area can still maintain a 5.57 year supply.

8.6 The shortfall in housing land supply within that part of the WWA which falls within Malvern Hills District inevitably reflects the lead in time for the construction of the greater part of the two very large urban extensions to the south and west of the City. It is also unsurprising given that the 5-year housing requirement is driven in part by housing requirements which are yet to be approved as Proposed Modifications to the SWDP.

Table 4: Indicative 5 year housing land supply against district level OAHN requirements. District OAHN Indicative 5 year housing land requirement supply Malvern Hills 8590 3.51 Worcester City 9830 2.37 Wychavon 9950 5.95 South 28370 N/A Worcestershire Table 5: Indicative 5 housing land supply against SWDP Policy 3 sub area requirements (as proposed for modification). SWDP Sub Area Sub Area target Indicative 5 year housing land supply Malvern Hills 5900 4.93 (excluding WWA) Worcester City 6750 6.09 Wider Worcester 5450 See below Area – urban extensions only Wider Worcester 4550 3.0 Area within Malvern Hills District Wider Worcester 900 6.1 Area within Wychavon District Wychavon 10,300 5.57 (excluding WWA) South 28,400 N/A Worcestershire

8.7 The housing land supply estimates provided in Tables 4 and 5 are indicative for the purposes of illustrating the significance of the progressing the SWDP with respect to future development management decisions. They do not however, represent detailed statements of current 5-year housing land supply for development management purposes which will be produced by each of the South Worcestershire Councils in due course. Neither do the estimates above represent rolling 5-year housing land supply estimates for plan-making purposes.

9. Consideration of the recommended Proposed Modifications by the South Worcestershire Joint Advisory Panel (SWJAP)

9.1 The South Worcestershire Development Plan (SWDP) Joint Advisory Panel (JAP) was set up to oversee the development of the SWDP and its predecessor the South Worcestershire Joint Core Strategy.

9.2 The JAP consists of 5 elected members from each of the South Worcestershire Councils and a representative from Worcestershire County Council. JAP is responsible for advising on the SWDP, making recommendations to the three Councils and to “report on and aim to promote and recommend the Panel’s recommendations to their respective District Council decision making bodies”.

9.3 The JAP has no executive powers and therefore can only make recommendations back to each of the three councils.

9.4 Following the submission of the the SWDP to the Secretary of State on 28 May 2013 JAP has continued with its focus shifting to steering the plan through the examination process.

9.5 Following the receipt of the Inspector’s Conclusions into Stage 1 of the Examination, JAP has been briefed regarding on-going work to address the uplift in the OAHN and associated work on infrastructure requirements and viability.

9.6 The Panel considered the recommended Proposed Modifications and related supporting work / evidence on 2 nd and 12 th September 2014.

9.7 The SWJAP specifically considered:

• The Post Submission Proposed Modifications to the submitted SWDP (as set out in Appendix 1 to this report) as being sound and deliverable;

• The recommended changes to the Infrastructure Delivery Plan (as Proposed for Modification - Annex I to the SWDP);

• The Panel noted the findings of the updated Viability Study and endorses it for the purposes of informing the recommended Proposed Modifications and specifically the recommended main modifications to SWDP Policy 17 regarding affordable housing;

• The proposed consultation programme (set in Appendix 3 to this report);

• The preparation of updated and revised Statements of Community Involvement for the three SWCs; and

• Proposed updating and review of Local Development Schemes for South Worcestershire.

9.8 The recommendations of the Joint Advisory Panel to the South Worcestershire Councils are as follows:

(I) The recommended proposed main modifications to the submitted SWDP as set out in Appendix 1 to this report (including proposed modifications to the Policies Map and Key Diagram) and the associated Sustainability Appraisal are approved for the purposes of formal public consultation.

(II) Delegated approval is given to the relevant Head of Service in consultation with the Planning Portfolio Holder to make minor changes to the proposed modifications in terms of formatting, presentation and accuracy, including any minor changes arising from the consideration of the proposed modifications by the other South Worcestershire Councils, prior to publication for consultation purposes.

(III) The South Worcestershire Councils write to the Planning Minister seeking support for substantial weight to be afforded the emerging SWDP in current and future Development Management decisions and any associated appeals as the Plan progresses.

(IV) The Councils accept the proposed updated and revised Statement of Community Involvement and agree to its immediate adoption (effective 1 October 2014).

(V) The Councils: • approve their Local Development Scheme (LDS) 2014-17;

• note the revised Schedule detailing the timetable revisions consequent to the Inspector’s Interim and Further Interim Conclusions;

• agree to its immediate implementation (effective 1 October 2014);

• agree to its immediate publication via the SWDP website; and

• delegate authority to the relevant Heads of Service in consultation with the Portfolio Holders to make minor amendments to the text of the LDS in order to correct any minor errors that may be identified, subject to the agreement of all three South Worcestershire Councils where minor amendments relate to joint documents.

9.9 With respect to the paragraph 9.8 (iii) above the Panel was concerned that recent planning appeal decisions, including appeal decisions issued by the Secretary of State, have placed very limited, if any, weight on the emerging SWDP. The reason for taking such a course of action has been cited as the on-going uncertainty about the OAHN requirement addressed by the SWDP, the absence of proposals from the SWCs about how the uplift in the OAHN would be addressed and the level of objection to proposed housing objections.

9.10 The Panel considers that by recommending Post Submission Proposed Modifications which address the Inspector’s recommended full OAHN and proposing additional housing supply to address that housing requirement, the SWCs have gone a long way towards removing the perceived level of uncertainty. Furthermore, by publishing the recommended Post Submission Proposed Modifications for consultation purposes the SWCs will have returned the SWDP to a stage comparable with the submission stage, with the major added benefit that the OAHN requirement for the plan has already been considered and accepted by the Local Plan Inspector, together with the broad approach towards sub-areas and redistribution as the means of meeting that need.

9.11 The Panel also believes that failure by the Planning Inspectorate and the Secretary of State to place increasing weight on the emerging plan, as proposed for modification, would not reflect the Government’s own national planning policy advice and not accord with informal advice offered to the SWCs by the previous planning minister.

9.12 The recommendation set out in Paragraph 9.8 (iii) above is based upon the view of the Panel that the planning minister should be advised that the South Worcestershire Councils have taken major steps to remove any perceived uncertainty around the content of the SWDP and the OAHN and how it will be addressed. Furthermore, placing increasing weight on the emerging plan accords with the Government’s own policy advice and failure to place weight on the emerging strategy and policies would undermine delivery of the strategy and local public confidence in the merits and advantages of a plan led system.

9.13 Council will note that the recommendations set out in Paragraphs 9.8 (iv) and (v) are addressed under separate reports on this agenda.

10. Equalities, Financial, Health and Safety, HR, Legal and Policy Implications

Each of the Worcestershire Councils has made provision within its What will this own budgets to meet their equal contributions towards the cost? production of the SWDP. Collaboration on a single Local Plan has (Identify Financial, enabled savings at key steps in the plan production process, Legal, Property and where duplication can be removed. Personnel issues) Progressing a single Local Plan for South Worcestershire represents a major logistical task. It has benefited from combining and sharing the skills within each of the authorities involved, although it has been necessary to reduce capacity and commitments in other areas of work. The SWDP programme has had to accommodate several additional stages in its preparation which were not envisaged in the original project timetable. This has included an additional Preferred Options stage, suggested changes consultation and more recently the preparation of recommended proposed modifications during the Examination process. This has required significant elements of the SWDP evidence base to be updated. The costs associated with this work are currently being absorbed within the overall project budget across the three SWCs. Further, examination of project costs arising from the extended timetable set out in the updated LDS will be needed and requires close monitoring. In the event of a decision of one or more of the SWCs were to bring about the production of separate Local Plans for the districts across South Worcestershire this would result in very significant resource implications for each authority in terms of direct costs, delay and access to adequate officer support and expertise. It would also significant increase the resource and risk demands associated with not having an up to date Local Plan in place for each of the authorities. Failure to progress on a joint plan basis would be likely to require the individual authorities to take several steps backwards in the plan making process and come forward with individual documents, undertake separate consultation programmes, separate examinations (at which all three councils would need to be represented) and receive three separate inspector’s reports. The emerging SWDP provides a comprehensive basis for How does this reviewing existing land use, transportation, social, economic and meet our environmental policy covering the district. priorities? In accordance with national planning policy the SWDP seeks to (Show how this deliver sustainable development having regard to social, proposal meets one economic and environmental objectives. of the Council’s The strategy provides a strong economic development vision for priorities and the area which has shaped the policies of the plan. explain how it also The strategic nature of the document establishes the Councils meets its land use priorities. underpinning principles of “Enterprise” and “Partnership” )

Relevant stakeholders and consultees have b een consulted over Have you the formulation of the recommended proposed modifications. consulted? Formal public consultation as set out in Appendix 3 to this (What public or report will be carried out into the recommended Proposed other consultation Modifications in accordance with Development Plan Regulations. has been undertaken in relation to this matter?)

The South Worcestershire Development Plan addresses a wide Is there an range of social, environmental and economic issues which include Equalities identifying groups within the community whose needs can be impact? addressed through the plan making process. The provision of Has an Equality Impact Assessment strategic infrastructure, affordable housing, improved Screening Report accessibility and access to employment are covered by the joint been completed plan, as are the needs of the aging population across South Yes/No? If not, Worcestershire. The submitted version of the SWDP and the this report cannot recommended proposed modifications are subject to a be taken to comprehensive Integrated Assessment which includes equalities Committee unless impact. The adequacy of the Integrated Assessment will be justified? examined as part of the plan making process. See above. Has a Full Equalities Impact Assessment been completed? Yes/No? If not, why not?

11. Risk Management

11.1 Any slippage in the current plan timetable (as set out in the revised Local Development Scheme) would make it extremely difficult to meet key milestones. In the short term this could result in the Local Plan Inspector advising the SWCs that he is unable to programme Stage 2 of the Examination and can not keep the Examination ‘open’ indefinitely. This could lead to a request that the plan is withdrawn.

11.2 Slippage in the plan timetable will further extend the period to when the plan can be adopted and full weight placed on it for development management purposes. Any considerable delay or reversion to an earlier stage would result in an extended period of risk associated with planning by appeal, which may fail to deliver the full range of supporting infrastructure. Council may wish to note that putting in place a full 5-year supply of deliverable sites without progressing the SWDP would still result in existing adopted Local Plan policies which manage the release of housing continuing to be deemed out of date in accordance with NPPF requirements.

11.3 Given the plan making and associated development management risks, further delay with progressing the SWDP should avoided, particularly given the progress made with formulation of the OAHN through the Stage 1 Examination process.

11.4 The SWDP Project Manager is responsible for updating the Soundness and Legal Compliance tool kits at each stage in the Development Plan process as recommended by the Planning Inspectorate. An updated tool kit response will be provided for the Stage 2 Examination.

Risk Identified Inherent Proposed measures Residual Risk Risk Evaluation Evaluation Failure to strategically Risk Score 8 Progress the Risk Score 5 and development of the comprehensively South Worcestershire address Local Plan as a basis for the needs of South developing and Worcestershire and implementing common specifically the cross policies and addressing boundary implications specific sub-regional of issues by the publication growth associated of the Preferred Options with the Paper, as recommended City of Worcester by the Joint Advisory could lead Panel to inappropriate and incremental development which does not maximise community benefits and incurs adverse environmental consequences. Failure of the three Risk Score 8 Update and approve a Risk Score 5 Councils Revised LDS to agree the content of a South Worcestershire Joint Development Joint Advisory Panel and Plan and District adhere to the LDS Councils to receive timetable regular progress reports could lead to delays with respect to LDS and commitments / even possible failure milestones and of the undertake corrective tests for soundness. action whenever This could further lead necessary. to increased costs and Briefings provided to leave SWJAP and all Council South Worcestershire members in all 3 Councils without an appropriate at relevant stages of the and Plan regarding key policy up to date spatial development issues/ strategy decisions. with the associated risk of Regular monitoring and inappropriate management of the development. SWDP costs and identification of potential Note: Assessed as overspend at an early High Impact stage in order for due to Financial Risk appropriate action to be to taken by the 3 partner combined LPA councils resources dedicated to Local Ensure that all Plan documentation and production and the evidence for the Plan is potential accessible and a effects of having to handover period is built revert to into any key member of individual Local Plan staff leaving. production or a Joint Local Plan being found Regular meetings with to be unsound. Team Leaders to monitor workloads and address Loss of key staff or capacity issues. insufficient resource to ensure that development of the SWLP is not delayed.

Failure to prepare Risk Score 8 Advise SWDP programme Risk Scor e 5 sound proposed officer / Local Plan modifications to the Inspector of SWCs submitted SWDP in timetable for addressing timely fashion to the Inspector’s enable SWDP (stage recommended uplift in the 2) to be re-opened. OAHN for South Worcestershire and any essential adjustments. Update evidence base / key reports required to the development of proposed modifications – using external resources where necessary. Reporting of recommended Proposed Modifications to the SWCs at the earliest possible opportunity. Undertake informal consultation regarding formulation of proposed modifications. Undertake formal modifications consultation into proposed modifications. Submit consultation responses to the Local Plan Inspector in accordance with agreed timetable.

12. Comments of the Service Manager for Economic Development and Planning Policy

12.1 In order to progress the South Worcestershire Development further it is essential that the South Worcestershire Councils respond positively and quickly to the Local Plan Inspector’s recommended changes to the emerging plan. Otherwise the Local Plan Inspector has already indicated that he would find that the Plan is unsound. This is because he does not consider that the submitted SWDP addressed the full OAHN for South Worcestershire up to the year 2030 and therefore the proposed housing supply is insufficient to address housing need.

12.2 The recommended response set out in Appendix 1 to this report has been tested against, and is consistent with, the Vision, objectives and spatial strategy underpinning the submitted plan and can be reasonably presented to the Examination as main modifications to the submitted Plan and not a departure from these key elements of the SWDP.

12.3 The sites recommended for allocation for housing are drawn from a comprehensive search for potential sites, which has included a ‘call for sites’ exercise in line with NPPG guidelines. Sites recommended for allocation or amendment, have been appropriately assessed for their suitability and associated infrastructure requirements and viability. Their recommendation for allocation is supported by the updated SWDP evidence base. The package of recommended proposed modifications has been satisfactorily assessed against the Sustainability Appraisal supporting the SWDP.

12.4 Failure to respond to the Inspector’s recommended changes to the emerging SWDP in a positive manner or to respond with proposed modifications that are not consistent with the submitted Plan’s vision, objectives and spatial strategy is likely to result in the Local Plan Inspector inviting the SWCs to withdraw the SWDP or the Inspector finding it unsound. This would result in significant delay in the plan making process with major risks for all three authorities from a development management perspective due to the absence of up to date development plan coverage.

13. THE DEPUTY LEADER AND PORTFOLIO HOLDER FOR ECONOMIC PROSPERITY, COUNCILLOR MARC BAYLISS, RECOMMENDS THAT:

(I) The recommended proposed main modifications to the submitted SWDP as set out in Appendix 1 to this report (including proposed modifications to the Policies Map and Key Diagram) and the associated Sustainability Appraisal are approved for the purposes of formal public consultation;

(II) Delegated approval is given the Service Manager for Economic Development & Planning Policy in consultation with the Portfolio Holder for Economic Prosperity to make minor changes to the proposed modifications in terms of formatting, presentation and accuracy, including any minor changes arising from the consideration of the proposed modifications by the other South Worcestershire Councils, prior to publication for consultation purposes; and (III) The South Worcestershire Councils write to the Planning Minister seeking support for substantial weight to be afforded the emerging SWDP in current and future Development Management decisions and any associated appeals as the Plan progresses.

Ward(s): All Officer: David Blake Service Manager Economic Development & Planning Policy Tel: 01905 722536 Email: [email protected]

Appendices: Appendix 1: First Schedule of Proposed Modifications (October 2014) Appendix 2 – Sites details re sites not carried forward as Proposed Modifications. Appendix 3: Proposed Consultation Programme. Related The following SWDP evidence documents can be viewed on the Information: SWDP website www.swdevelopmentplan.org Amion Report (January 2014) Integrated Assessment (SA / HRA / SEA) 2014 update Viability Assessment (2014) Water Cycle Study (2014) Worcestershire GTAA (Executive Summary) (2014) South Worcestershire Infrastructure Delivery Plan update (2014) Portfolio of Maps of new sites or those with amended boundaries – as set out in the Post Submission Proposed Main Modifications (September 2014) References: This matter is also being reported to Wychavon District and (To or from other Malvern Hills District Council on 30 th September 2014. The report Committees) and recommendations presented to the South Worcestershire Councils shares the same content and recommendations. Council reports dated 10 th December 2012 (Special Councils) addressed approval of the submission version of the SWDP. The decisions of the three South Worcestershire Councils at that time put in place various delegations and approvals which continue in operation whilst the SWDP remains at Examination (minute 60 refers).

Appendix 1 South Worcestershire Development Plan Examination:

Schedule of Proposed Modifications following Stage 1 of the Examination, arising from the Objective Assessment of Housing Need and Inspector’s Further Interim Conclusions, March 2014

South Worcestershire Councils

Version considered by South Worcestershire Councils on 30 th September 2014 Consultation runs from 6 th October – 14 th November 2014 (ends at 5.00pm)

NB/ all text shown as amended and policy numbers / table references etc. are taken from the original submission document (May 2013). Modifications not directly related to the uplift are not shown in this schedule for reasons of clarity. A further set of main modifications, including any identified through previous consultations, will be consulted upon at a later stage of the examination process. Any former modification relating to a policy or reasoned justification specifically referred to in this schedule is now effectively superseded.

1

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map A New Plan for South Worcestershire – Table 1

PM1 Reasoned AMEND the last two sentences of paragraph 97 after Table 1 as follows To respond to the recommendation in Justification The implications of this new evidence have been considered and analysed in the Housing Background paragraph 61 of the Further Interim after Table 1 Paper. In summary, it has not been necessary to amend policy on housing provision. Conclusions and the total projected paragraph dwelling requirement figures for 2006- 97 30 as set out in paragraph 57 of the The implications of this new evidence and the conclusions and recommendations of the SWDP Further Interim Conclusions. Inspector in the Further Interim Conclusions (notably paragraphs57 and 61) were considered and analysed in the Housing Background Paper 2012 and the Addendum 2014. As a result the scale of To respond to evidence relating to the objectively assessed housing need for the plan period in South Worcestershire rose to 28,370. The Objective Assessment of housing need. housing provision target in SWDP 3 rose to 28,400 to match this need. There is no evidence of To be consistent with proposed additional unmet housing need from outside South Worcestershire that must be accommodated in changes to SWDP 3. the plan area to add to the South Worcestershire need.

SWDP 2 – Development Strategy and Settlement Hierarchy

PM2 SWDP 2 A REPLACE SWDP 2A ii. with the following To be consistent with the Proposed ii. Phase development to maintain a rolling 5-year housing land supply to 2030; Change to SWDP 2Aii which responds ii Provide for and facilitate the delivery of sufficient housing to meet objectively to the recommendation at paragraph 91 assessed needs to 2030; of the Inspector’s Interim Conclusions on the Stage 1 Matters to delete the reference to phasing in SWDP 3 E (i.e. by deleting the SWDP2 A ii. reference to “phase development.) To remove the unnecessary duplication of policy set out inSWDP3 I by deleting 2 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map the reference to ‘maintaining the 5 year housing land supply’. The replacement clause provides certainty about the strategic focus for delivering sufficient housing plus the emphasis on meeting objectively assessed needs, and is subsequently expanded on in SWDP 3. PM3 SWDP 2Avii vii. With respect to scale and type, development will need to be commensurate with and appropriate The proposed revised policy was used to the size and characteristics of the host settlement. A location’s capacity to assimilate change will be in the assessment of new sites needed taken into account . Development should be of an appropriate scale and type (see part E below) and to meet the uplift in the OAHN. be informed by the Settlement Hierarchy set out below.. PM4 SWDP 2C The open countryside is defined as land beyond any development boundary 1 and the built form of the The proposed revised policy was used urban area, or land beyond the Worcester City administrative boundary 2. … in the assessment of new sites needed to meet the uplift in the OAHN. PM5 SWDP 2F With regard to development proposals, the scale must be proportionate to the needs and size of the The proposed revised policy was used settlement, local landscape character and / or location as well as the availability of community service in the assessment of new sites needed infrastructure to accommodate it in a sustainable manner. The scale of development proposals must also to meet the uplift in the OAHN. enhance the local landscape character, PM6 SWDP 2 AMEND SWDP 2 by inserting the following after Part I To provide certainty about the status of the three Sub-Areas within the J. The following three Sub Areas are identified to support the implementation of SWDP2, development strategy policy by naming including policy set out in SWDP 3: them in SWDP 2. This confirms the

1 Most allocations extend beyond the development boundaries, which have been carried forward from the former Malvern Hills and Wychavon Local Plans. Once detailed schemes for these allocations have been approved and work commenced, these will be treated as being within the development boundary for the purpose of this definition. The associated green infrastructure will then be treated as Local Green Network under SWDP 38. 2 The allocated Worcester urban extensions are part of the open countryside until planning permission has been granted and development has commenced in accordance with SWDP45/1, SWDP45/2, SWDP45/3, SWDP45/4 and SWDP45/5, when they will be considered to form part of the urban area and therefore will no longer be considered to form part of the open countryside. 3 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map • Wider Worcester Area context for the Sub Areas concept • Malvern Hills (excluding Wider Worcester Area) Sub Area applied in strategic SWDP 3, consistent with the reference to Sub Areas set out • Wychavon (excluding Wider Worcester Area) Sub Area. in the Reasoned Justification to SWDP

3, and the Housing Background Paper (and Addendum) evidence, as noted in paragraph 83 of the Inspector’s Interim Conclusions on the Stage 1 Matters. PM7 SWDP 2 - AMEND by inserting the following after paragraph 5 of SWDP 2 To provide the reasoned justification Reasoned relating from the proposed change Justification 6. As a spatial plan, the SWDP sets out strategic policy that relates to places, unconstrained inserting SWDP 2J. This expresses the following by administrative boundaries, SWDP 2 therefore identifies three separate Sub Areas that definition of the Sub Areas, and reflects Paragraph 5 are mutually exclusive and together they cover the whole plan area. The Sub Areas are: the conclusions set out in both the evidence in the Housing Background • the Wider Worcester Area (WWA)– comprising Worcester City plus the urban Paper (and Addendum) and as extensions directly abutting the administrative area of the City summarised in paragraphs 82 to 85 of • the Malvern Hills (Excluding WWA) Sub Area – comprising that part of Malvern the Inspector’s Interim Conclusions on Hills district outside of the Wider Worcester Area the Stage 1 Matters. • the Wychavon (Excluding WWA) Sub Area – comprising that part of Wychavon district outside of the Wider Worcester Area.

7. The Sub Areas are the SWDP response to two strategic issues:

a. Worcester City’s built-up area is tightly constrained inside its boundaries. There is insufficient space in the City’s administrative area to meet all its needs for development, especially housing. This is the driver for the concept of the Wider Worcester Area (WWA) enabling Worcester as a sub regional centre to grow beyond the City boundary, A share of Worcester’s housing and employment need

4 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map is redirected to the Worcester urban extensions so that need is met on sites just outside and abutting its boundary, in both Malvern Hills and Wychavon.

b. Because of natural and environmental constraints, Malvern Hills district has limited ability to accept new development. The Plan therefore proposes that that part of its housing need which cannot be met in the Malvern Hills (Excluding WWA) Sub Area be redirected in the first instance to the Wider Worcester Area (Malvern Hills) area.

8. As concluded by the Inspector for the SWDP examination, these arrangements are entirely in line with the approach suggested in Framework paragraph 179 to deal with situations where development requirements cannot wholly be met within an LPA’s own area. SWDP 3 sets out further policy to implement this approach.

SWDP 3 – Employment, Housing and Retail Provision Requirement and Delivery

PM8 SWDP 3D REPLACE the existing overall housing target for South Worcestershire with the following: As recommended at paragraph 86 of the Further Interim Conclusions, Table Housing provision will be made for about 23,200 28,400 dwellings (net).... 4b has been revised such that the South Worcestershire housing provision target is based on the recommendation in paragraph 61 of the Further Interim Conclusions and the total projected dwelling requirement figures for 2006-30 as set out in paragraph 57 of the Further Interim Conclusions.

5 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM9 SWDP 3 REPLACE existing Table 4b with the following: As recommended at paragraph 61 of Table 4b Table 4b: HOUSING SUB-AREA Market Affordable the Further Interim Conclusions, Table 12 4b has been revised such that the PROVISION 2006-2030 SUBTOTALS Housing Housing housing provision targets are based on Wider Worcester Area (WWA) 9,400 6,900 2,500 the projected dwelling requirement Malvern Hills (excluding WWA) 4,900 3,600 1,300 figures for 2006-30 set at paragraph 57 Wychavon (excluding WWA) 8,900 6,600 2,300 of the Further Interim Conclusions. South Worcestershire Total 23,200 17,100 6,100 The amended housing trajectories in (of which Worcester City) 5,500 4,600 900 Appendix 4 (PM240) illustrate these revised targets. Table 4b: HOUSING PROVISION 2006-2030 SUB AREA AREA AREA Market Affordable The structure of Table 4b has been 12 SUBTOTAL Housing Housing revised in response to paragraph 86 of Wider Worcester Wider Worcester Area the Interim Conclusions on the Stage 1 6,750 5,250 1,500 Area (WWA) (Worcester City*) Matters. Wider Worcester Area 5,450 3,200 2,250 (Malvern Hills and Wychavon*#) Malvern Hills Malvern Hills 5,900 4,100 1,800 (excluding WWA) (excluding WWA) Wychavon Wychavon 10,300 6,950 3,350 (excluding WWA) (excluding WWA) South Worcestershire 28,400 19,500 8,900 Total Note* Located within the district of # For monitoring purposes the target (market housing and affordable housing) for that part of WWA 6 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map within Malvern Hills District is 4,550 and the target for that part of WWA within Wychavon District is 900

PM10 SWDP 3E DELETE SWDP 3E and Table 4c: As recommended in paragraph 91 of and the Inspector’s Interim Conclusions on Table 4c E. The overall provision for both market and affordable housing to be sought from the Stage 1 Matters, SWDP 3E and Table 4c have been deleted, which development will be located and phased in accordance with the subtotals set out in Table 4c. thereby also removes the potential

inconsistency with revised Table 4b. Table 4c HOUSING PROVISION SUB-AREA Phasing Phasing Phasing 2006-2030 TOTALS 2006 - 2013 2013 - 2019 after 2019 Wider Worcester Area (WWA)* 9,400 3,100 2,700 3,700 Malvern Hills (excluding WWA) 4,900 2,000 1,100 1,800 Wychavon (excluding WWA) 8,900 3,500 2,000 3,400 South Worcestershire TOTAL* 23,200 8,600 5,800 8,900 *of which Worcester City 5,500 3,100 1,000 1,500

7 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM11 SWDP 3 F REPLACE existing Table 4d with the following: As advocated at paragraph 66 of the

Table 4d Further Interim Conclusions, Table 4d Table 4d RETAIL PROVISION 2006- AREA SUBTOTALS has been revised to show the total 2030 (net floorspace sq.m.) retail floorspace to be provided for the Wider Worcester Area (WWA)* 30,000 plan period to 2030. Table 4d Malvern Hills (excluding WWA) 7,500 consequently is now consistent with Tables 4a and 4b. Wychavon (excluding WWA) 12,500 TOTAL* 50,000 *of which Worcester City 28,000

Table 4d Retail requirements 20013 – 2031 (net floorspace sq. m. rounded to nearest 100sq.m.) Convenience Comparison Total Wider Worcester Area 0 30,726 30,726 Malvern Hills 669 6,786 7,455 Wychavon 0 1,326 1,326 Total 669 38,838 39,507

8 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM12 SWDP 3G REPLACE Table 4e with the following: To accommodate additional housing Table 4e TABLE 4e TOTAL OVERALL Employment Homes M Retail (sq. m) and retail provision in accordance with PROVISION 2006-2030 ha proposed uplift in numbers arising from the Proposed Modifications to Tables SUPPLY COMPONENTS 4b and 4d. Wider Worcester Area Food Non- Food The supply categories of empty homes A Completions (to 31/03/13) 9 2,184 2,644 2,600 10,085 in use and extra-care housing release 5,111 are deleted in response to paragraphs Commitments B (at 01/04/13) 35.4 940 1,958 10,000 6,000 71 and 77 of the Inspector’s Interim 1,273 8,197 Conclusions on the Stage 1 Matters. Empty Homes in Use N/A 150 N/A N/A Extra care housing release N/A 100 N/A N/A Windfall Allowance C N/A 847 717 N/A N/A Urban Capacity Allocations D 32 1,455 1,886 0 10,000 (SWDP 43, 44) 22,000 Urban Extensions E, F 41 3,925 2000 500 1,500 Urban Extensions (Worcester 80 City) E, F Urban Extensions 4,585 (Malvern Hills District) E, F Urban Extensions (Wychavon 385 District) E, F SUPPLY Subtotal 117.4 9,615 12,255 30,600 40,782 7,884 9 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map

Malvern Hills (excluding WWA) Completions A 10.84 1,326 1,686 1,248 0 536 0 Commitments B 10.76 709 1,232 400 880 0 88 Empty Homes in Use N/A 150 N/A N/A Extra care housing release N/A 200 N/A N/A Windfall Allowance C N/A 562 419 N/A N/A Urban Capacity Allocations 9 397 806 1,011 3,724 Urban Extensions 10 700 800 0 0 Village Allocations H 0 554 827 0 0 Tenbury Wells Allocations 0 70 75 18 (0) 302 0 Upton-upon-Severn Allocations 0 100 68 17 0 214 0 SUPPLY Subtotal 40.6 4,768 5,913 7,470 3,812 1,891

Wychavon (excluding WWA) Completions A 32.38 1,399 2,749 0 2,616 7,142 4,212 Commitments B, G, H, I, J 52.88 2,136 0 2,468 4,200 4,867 3,338 Empty Homes in Use N/A 250 N/A N/A Extra care housing release N/A 200 N/A N/A Windfall Allowance C N/A 963 N/A N/A

10 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map 958 Urban Capacity Allocations 0 781 500 750 711 Urban Extensions 33.5 2,140 0 0 835 Village Allocations F 0 1,173 0 0 648 Major Rural Employment 14.45 N/A N/A N/A Allocations (Throckmorton Airfield 3 and Interbrook, 4) Major Development Area 6 N/A N/A N/A intensification (land equivalent) SUPPLY Subtotal 139.21 9,042 12.592 8,300 10,768 5,584

South Worcestershire 297.21 23,425 50,662 52,894 TOTAL SUPPLY 28,936 15,359

PM13 SWDP 3G DELETE footnotes 13 and 14 and AMEND Notes A to J as follows To accommodate additional housing Table 4e - and retail provision in accordance with footnotes 13 map reference SWDP3/1. outcome of Phase 1 hearing, informed by the latest monitoring evidence, and 14 Proposals map reference SWDP3/2. specifically.

3 Proposals map reference SWDP3/1. 4 Proposals map reference SWDP3/2. 11 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map To respond to the conclusion in Notes: paragraph 80 of the Inspector’s Interim A. Total number of dwellings (net) completed 1 April 2006 - 31 March 2012 2014 ..... Conclusions on the Stage 1 Matters (amendment of the discount of planning Total amount of employment space completed 1 April 2006 - 31 March 2011. permissions not implemented to 5%). Total amount of retail floorspace (net) completed 1 April 2006 - 31 March 2011. 2010 To respond to the recommendation in B. Total number / amount of homes / employment space with planning permission. Includes 166 park paragraph 63 of the Further Interim homes at Leedons caravan park, Broadway. A discount of 4 5% for planning permissions not being Conclusions (amendments to the implemented has been applied to all outstanding commitments (excluding dwellings under construction). windfall allowance (small site [non- Retail commitments are as of 31/03/10 plus those between 01/04/10 – 31/03/13. garden land]). C. Windfall is unallocated housing development. The annual windfall rate allowances for 2016 2017 - 2026 and for 2026 -2030 respectively are: • Worcester 69 and 46 63 and 42 . • Malvern Hills 45 and 30 35 and 23 . • Wychavon 82 and 55. To avoid double counting with the completion of small windfall commitments existing at 2012 2014 , the allowance for small, non-garden windfall completions is for the period 2016 -17 2017 /18 to 2029 /2030. In addition, this allowance is reduced further by discounting the supply of small site allocations (5 to 9 dwellings) that could otherwise be windfalls forecast for completion 2016 /17 2017/2018 to 2030. D. These allocations are all within the Worcester City administrative area and are set out in policies SWDP 43 - 44. E. These allocations are beyond the Worcester City administrative area, except for approximately 80 dwellings on Site SWDP45/1 . The Urban Extensions are set out in SWDP 45. F. The retail floorspace for Worcester urban extensions excludes small shops proposed in SWDP45/2 and SWDP45/4 G. Village allocations are set out in policies SWDP 59 - 61. H Includes 39 dwellings on Land at Stonebow Road, , allowed on appeal after

12 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map April 2014 I H. The supply in Wychavon includes the large site at Long Marston for 380 dwellings allowed on appeal after April 2014 In order to meet the 5 -year housing land supply, Wychavon District Council has granted planning permission or had appeals allowed for 6 major housing proposals which are departures from the adopted Wychavon District Local Plan. These housing schemes are: • Allesborough Hill, Pershore (45). • north of Broadway Road, Evesham (34). • between Dudley Road and Station Road (71). • off Station Road, Honeybourne (44). • rear of Sunnyfield House, (39). Crown Lane, Wychbold (60). The sixth, at Crown Lane, Wychbold (60) is an allocation. Thornleigh Nurseries, Drakes Broughton (11) was also included (this was an exception site). J Includes 765 dwellings allowed on appeal after March 2014 at Yew Tree Hill, Droitwich K Policies Map reference SWDP3/1. L Policies Map reference SWDP3/2. M The completions and commitments supply totals include dwellings on SWDP site allocations that were completed by end March 2014 or committed. To avoid double counting, the totals in the allocation supply categories exclude those completions and commitments on SWDP allocations PM14 SWDP 3 I AMEND SWDP 3 I as follows : To ensure consistency with national planning policy and to respond to I. The availability of housing land will be kept under review, maintaining a continuous supply paragraph 86 of the Inspector’s Interim Conclusions on the Stage 1 Matters, of suitable sites to deliver the overall south Worcestershire housing target and to maintain a rolling five and paragraph 64 of the Further Interim year supply of deliverable housing land consistent with the area sub-totals set out in SWDP 3D Conclusions guidance advice. Table 4b . New housing sites identified in the SWDP will be released for development consistent with 13 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map Table 4e, having regard to i. The need to maintain a 5 year supply of housing land. ii. SWDP 13 on making effective use of land. iii. The contribution that will be made towards improved infrastructure provision, including affordable housing. PM15 SWDP 3 Delete paragraph 2 To provide consistency with the Reasoned Proposed Changes to SWDP 3 made justification The SWDP’s locally derived total housing provision target in SWDP 3 is based on the Worcestershire in response to the uplift in the housing paragraph 2 Strategic Housing Market Assessment (SHMA) 2012. The SHMA is the latest assessment of the full need and the Further Interim housing needs of the SWDP area. It provides robust, credible evidence on which to base the planned Conclusions paragraphs 61 and 57. scale of growth in south Worcestershire. The SHMA developed scenarios of housing growth identifying the And to reflect the evidence, set out in scale and mix of housing and the range of tenures that the local population is likely to need over the plan the OAHN and the Housing period that meet household and population projections. These were informed by national demographic Background Paper Addendum 2014. and household projections, evidence on job growth and information about the local housing market. There is a difference between households and housing, which SHMA and the plan fully recognise. The housing provision calculations have taken vacancies, second homes and non-delivery into account.

PM16 SWDP 3 Delete paragraph 5 To provide consistency with the Reasoned The Housing Background Paper (2012) sets out the detailed justification of the planned scale and Proposed Changes to SWDP 3 made justification distribution of housing development, including an improvement to the alignment of housing, jobs and the in response to the uplift in the housing paragraph 5 labour force. need and the Further Interim Conclusions paragraphs 61 and 57. And to reflect the evidence, set out in the OAHN and the Housing Background Paper Addendum 2014.

14 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM17 SWDP 3 REPLACE paragraphs 2 and 5 with the following: To provide consistency with the Reasoned Proposed Changes to SWDP 3 made justification The SWDP’s locally derived total housing provision targets in SWDP 3 Table 4b are based on the in response to the uplift in the housing paragraph 2, evidence in the ‘SWDP Objective Assessment of Housing Need’ January 2014 and subsequent need and the Further Interim 5 recommendations of the Inspector for the SWDP Examination on the objective assessment of Conclusions paragraphs 61 and 57. housing need (OAHN). The latter identified the scale of the need for housing over the plan period. And to reflect the evidence, set out in That replaced the 2012 SHMA as the latest assessment of the full housing needs of the SWDP area. the OAHN and the Housing It provided robust, credible evidence on which to base the planned scale of growth in south Background Paper Addendum 2014. Worcestershire. The Addendum to the Housing Background Paper (2014) sets out the evidence providing the detailed justification of the planned scale and distribution of housing development, alignment of housing, jobs and the labour force. PM18 SWDP 3 - Delete paragraph 3 and replace with the following To provide consistency with the Reasoned SWDP 3 plans for growth of about 23,200 dwellings for 2006 - 2030, which reflects the overall scale of Proposed Changes to SWDP 3 and Justification housing growth associated with SHMA Sensitivity Scenario 2 (23,157 dwellings). This policy target is in respond to the uplift in the housing paragraph 3 line with the SHMA evidence, which states that this scenario represents an upper limit for the partner need and the Further Interim authorities to consider when setting a housing target. Conclusions paragraphs 61 and 57

SWDP 3 plans for growth of about 28,400 dwellings in South Worcestershire for the plan period 2006 to 2030. This policy target is in line with the conclusions and recommendations of the Inspector for the SWDP Examination. The rounded South Worcestershire housing provision target of about 28,400 reflects the OAHN’s overall scale of housing need of 28,370 dwellings. PM19 SWDP 3 - AMEND by inserting the following after paragraph 3: To provide consistency with the Reasoned Proposed Changes to SWDP 3, to Justification The OAHN is based on the evidence, being the mid point between the average of housing growth respond to the conclusions and paragraph 3 forecasts from two suites of jobs-led sensitivity scenarios (SENS2 and SENS3). These use a trend- recommendation in paragraphs 57 and (additional based demographic growth scenario modified to take account of additional in-migration resulting 61 of the Further Interim Conclusions paragraph) from forecast employment growth. The scenarios of housing growth identified the scale of and to reflect the evidence, set out in 15 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map housing that the population is likely to need over the plan period. The housing growth forecasts the Housing Background Paper underpinning those scenarios were informed by up to date national household and population Addendum 2014. projections. Taking full account of a range of up to date and representative job forecasts, the jobs led scenarios forecast population, household and housing growth consistent with delivering sufficient labour force to meet jobs growth, allowing for unemployment and commuting The housing growth forecasts also took vacancies and second homes into account. The OAHN had regard to information about the local housing market. and other market signals, PM20 SWDP 3 - Delete paragraphs 4, 8 and 9 and replace with the following To provide consistency with the Reasoned Identifying sources of housing supply to meet this scenario has enabled the partner authorities to plan to Proposed Changes to SWDP 3, to Justification meet the full, objectively assessed needs for market and affordable housing in the housing market area, respond to the conclusions and paragraphs as far as is consistent with the policies set out in the NPPF. The sources of supply identified in Table 4e recommendation in paragraphs 57 and 4, 8 and 9 exceed the total provision requirement target. On this basis there is no unmet need to address 61 of the Further Interim Conclusions and to reflect the evidence, set out in the Housing Background Paper Unmet need from other areas outside South Worcestershire Addendum 2014. Neighbouring local planning authorities have provided no evidence of unmet housing need in their areas that needs to be met in south Worcestershire. No evidence has yet been provided that indicates forthcoming plan-making in those areas cannot accommodate their own needs or would result in unmet need that has to be provided for in the SWDP area. From an objective assessment of development requirements, the partner authorities conclude that the SWDP meets an appropriate level of unmet housing requirement to 2030 arising from more distant areas outside south Worcestershire (such as the ), which it is reasonable to accommodate within this plan area. South Worcestershire will continue to provide housing to accommodate substantial in- migration, but at levels consistent with sustainable development and an economic prosperity-led plan.

Unmet need from other areas outside South Worcestershire The housing provision targets in Table 4b relate to South Worcestershire needs. Those needs include substantial net in-migration forecast to 2030, including in-migration to achieve the

16 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map necessary uplift in labour force in the plan area. The targets do not make further provision for external need over and above the forecast migration taken into account in the population forecasts underpinning the OAHN. The partner authorities had no evidence of additional unmet housing need from outside this plan area that must be met in the SWDP area. Moreover, it has not been clearly established through any other LPA’s Local Plan process that external unmet needs from outside South Worcestershire must be met through provision in the SWDP area. PM21 SWDP 3 - AMEND Reasoned Justification - After paragraph 5 and the heading ‘Sub-area housing provision To provide consistency with the Reasoned targets’ and before paragraph 6, insert the following additional paragraphs Proposed Changes to SWDP 3, to Justification respond to the conclusions and paragraph 5 SWDP 3 sets out spatial Sub Area and Area policies for housing targets and supply. Table 4b recommendation in paragraphs 57 and (additional provides housing provision targets based on Sub Areas and Areas. The ‘geography’ of those areas 61 of the Further Interim Conclusions paragraph) is defined in SWDP 2. The matching policy towards Sub Area housing supply is set out in SWDP3 and to reflect the evidence, set out in Table 4e. the Housing Background Paper Addendum 2014. Whilst the South Worcestershire OAHN housing need matches the SWDP3 Table 4b total housing requirement target, the Sub Area and Area targets in Table 4b differ from the individual district To provide consistency with the need figures provided by the OAHN 5. The SWDP is a joint plan that has been positively prepared. Proposed Changes to SWDP 2, reflect Through joint working and co-operation the Plan has redirected unmet need within the parts of the the updated evidence on housing plan area and so addressed ‘larger than local’ cross-boundary issues relating to the following: supply, including the Housing Background Paper Addendum 2014, a) Worcester City’s built up area is tightly constrained inside its boundaries. There is insufficient and respond to the Interim Conclusions space in the City’s administrative area to meet all the district need for development, paragraph 82. especially housing. The target of 6,750 dwellings is based on the forecast supply of housing including future deliverable and developable sites to 2030. At 6.750 the Wider Worcester Area (Worcester City) Area target is below the 9,830 dwellings Worcester City need identified in the OAHN. b) Because of natural and environmental constraints, Malvern Hills (Excluding WWA) Sub Area)

5 The Housing Background Paper Addendum 2014 provides justification and analysis of the Sub Areas’ provision and supply. 17 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map has limited ability to accept new development. The target of 5,900 is based on the forecast supply of housing including future deliverable and developable sites to 2030 that have been identified within the Sub Area. At 5,900 dwellings, the policy provision target for the Sub Area is below the 8,590 dwellings Malvern Hills District stated in the OAHN. The SWDP relies on the SWDP 2 policy designation of the Wider Worcester Area (WWA) as the means to resolve both cross-boundary issues. The policy accords with the approach set out Framework paragraph 179 to deal with situations where development requirements cannot wholly be met within an LPA’s own area. The Wider Worcester Area enables Worcester as a sub regional centre to grow beyond the City boundary, The scale of supply identified within the City (about 6,780 dwellings) comes from completions, commitments, future small windfalls and allocations, Identification of the latter took account of site availability, the viability of delivering affordable housing and infrastructure, and material considerations such as the Green Belt, flood risk, heritage assets, the Local Green Network, and the need for employment land. The share of Worcester’s need for housing that is unmet in the City (about 3,100 dwellings) and part of the need for employment land (about 25ha) is redirected to the Worcester urban extensions so that need is met in the WWA on sites just outside the administrative boundary, in both Malvern Hills and Wychavon (policy SWDP 3H). PM22 SWDP 3 - Replace paragraphs 6 and 7 with the following To provide consistency with the Reasoned The sub-area targets in Table 4e differ from the district figures in SHMA Sensitivity Scenario 2 6. At 4,900 Proposed Changes to SWDP 3, to Justification dwellings, the policy provision for Malvern Hills (outside the Wider Worcester Area) is below the housing respond to the conclusions and paragraph 6 level based 7,500 dwellings in that scenario The scale of growth of the Plan’s sub-areas has been recommendation in paragraphs 57 and and 7 moderated by the need to respect key natural and environmental assets. Redirection of approximately 61 of the Further Interim Conclusions 2,600 of the Malvern Hills housing requirement has been necessary because of limited opportunities for and to reflect the evidence, set out in urban growth in Malvern Hills District. This is due to constraints on the development of Greater Malvern the Housing Background Paper and in Malvern Vale resulting from their proximity to the Malvern Hills AONB and the need to protect the Addendum 2014. AONB from adverse environmental impacts of extensive, concentrated urban development nearby. Other To provide consistency with the

6 The Housing Background Paper provides justification and analysis of the Sub Areas’ provision and supply. 18 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map material considerations were taken into account, such as the viability of delivering affordable housing and Proposed Changes to SWDP 2 and in infrastructure. The SWDP has been positively prepared though joint working and this co-operation has response to the updated evidence on addressed ‘larger than local’ cross-boundary issues relating to housing. This enabled the unmet housing housing supply, including the Housing requirement of Malvern Hills to 2030 to be met within the plan area by redirecting and absorbing its Background Paper Addendum 2014, displaced housing requirement within the Wider Worcester Area and in Wychavon. The displaced 2,600 and in response to paragraph 84 of the dwellings are divided approximately evenly between these two sub-areas. One benefit of this approach is Inspector’s Interim Conclusions on the that it provides an opportunity to damp down the historic trend of large-scale net in-migration into the Stage 1 Matters. Malvern Hills area (which has put pressure on that local housing market) by making alternative provision at more sustainable locations elsewhere in the SWDP area that can accommodate the displaced requirement. The SWDP addresses the consequences of accommodating the displaced Malvern Hills requirement, including: a. The need to provide employment opportunities at major urban extensions accommodating part of the displaced demand, in order to reduce the need to travel. b. It acknowledges the need for transport infrastructure and services to enable the labour supply to access employment in Malvern Hills. c. A meaningful proportion of the affordable housing in the Worcester South and West Urban Extensions will meet affordable housing need from Malvern Hills. d. The need to co-ordinate services provided by the county and district councils and other providers to support communities in the wider Worcester area.

The Malvern Hills (Excluding WWA) Sub Area target has been based on supply consistent with a scale of growth in the Sub Area which reflects the need to respect key natural and environmental assets. This also avoided generating a level of rural dispersal that would be at odds with the SWDP strategy. Other material considerations were taken into account, such as site availability and the viability of delivering affordable housing and infrastructure. Redirection of approximately 2,700 dwellings Malvern Hills need was necessary because of limited opportunities for urban growth in Malvern Hills District. This is due to constraints on the development of Malvern resulting from 19 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map proximity to the Malvern Hills AONB and the need to protect the AONB from adverse environmental impacts of extensive, concentrated urban development nearby. In setting and justifying the housing provision targets, the displaced housing need from the Sub Area has been redirected in the first instance to that part of Wider Worcester Area situated within Malvern Hills District. Approximately 300 dwellings unmet need has been redirected to Wychavon (Excluding WWA) Sub Area, to locations with the strongest existing economic linkages. This approach enables the Malvern Hills housing need to be met within the plan area. One consequence of this approach is that by accommodating 30% of the OAHN need outside the Sub Area it provides the potential to damp down the historic trend of large-scale net in-migration into the Malvern Hills settlements in the Sub Area which has put pressure on that local housing market.

The SWDP addresses the consequences of accommodating the redirected unmet Worcester need and the displaced Malvern Hills need at the Worcester urban extensions, including: a) The need to provide employment opportunities at major urban extensions which accommodate most of the redirected and displaced unmet housing need, in order to reduce the need to travel. b) Priority for investment in a package of transport infrastructure and services to enable the labour supply to access employment in the City and in Malvern Hills. c) A meaningful proportion of the affordable housing in the Worcester South and West urban extensions will meet affordable housing need from Malvern Hills. d) The need to co-ordinate services provided by the county and district councils and other providers to support communities in the wider Worcester area. PM23 SWDP 3 - AMEND by replacing paragraph 10 with the following: To provide consistency with the Reasoned The partner authorities undertook diligent joint working, to identify their requirements through evidence Proposed Changes to SWDP 3 made Justification gathering and during plan preparation. The SHMA involved joint working within Worcestershire to prepare in response to the uplift in the housing paragraph 10 evidence on housing need. The partner authorities worked with neighbouring authorities because housing need and the Further Interim market areas cross administrative boundaries. They co-operated both with adjoining authorities and with Conclusions paragraphs 61 and 57. To more distant local authorities, such as councils in the West Midlands, to consider strategic priorities for the respond to the updated evidence. 20 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map delivery of homes, including cross-boundary housing requirements. As a result, the housing provision rose to 23,200. The evidence base sets out the joint working and other activities demonstrating effective co- operation consistent with the Duty to Co-operate. The partner authorities undertook diligent joint working, to identify their requirements through evidence gathering and during plan preparation. The SHMA 2012 and the subsequent OAHN 2014 involved joint working with neighbouring authorities within Worcestershire to prepare evidence on housing need. Drawing on the latest evidence, the forecast housing need increased and the related housing provision target rose to 28,400. The SWDP Sub Area and Area targets sum to that total. The partner authorities also co-operated both with adjoining authorities and with more distant local authorities, such as councils in the West Midlands, to consider strategic priorities for the delivery of homes, including cross-boundary housing requirements. The evidence base documented the joint working and other activities demonstrating effective co-operation consistent with the Duty to Co-operate legal requirement and the Framework. PM24 SWDP 3 - AMEND paragraph 11: To provide consistency with the Reasoned Proposed Changes to SWDP 3. Justification at least 8,250 8,140 dwellings. This takes into account SHMA evidence on need already met in the plan To response to the evidence in the paragraph 11 period and the future need to be met being based on: updated forecast of need for a a) 976 871 completions to 2011 (updated monitoring). affordable housing reflecting the latest housing monitoring information PM25 SWDP 3 - AMEND by replacing the start of paragraph 12 with the following In response to the latest evidence. Reasoned The Housing Background Paper provides an objective assessment Justification paragraph 12 The Addendum to the Housing Background Paper, 2014 provides the audit trail of the objective assessment PM26 SWDP 3 - AMEND paragraph 12 bullet points a. and b: To provide consistency with the Reasoned Proposed Changes to SWDP 3, Justification a) 976 871 completions 2006 - 2011 plus296 919 completions 2011 – 2012 2014 , plus total To update the forecast supply for 21 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map paragraph 12 commitments (permitted but either under construction or not yet started) for 704 1,838 dwellings as at affordable housing reflecting Proposed a and b April 2012 2014 plus sites allowed on appeal April to August 2014 Changes to SWDP 3 and site b) The potential to deliver up to approximately 4,110 5,270 affordable dwellings from future housing allocations made in response to the supply, from which affordable housing can be sought. uplift in the housing need and the Further Interim Conclusions paragraphs 61 and 57. To reflect the latest housing monitoring information. PM27 SWDP 3 - AMEND by replacing the start of paragraph 13 and bullet point a. with the following: To provide consistency with the Reasoned This takes into account: Proposed Changes to SWDP 3. To Justification a. The residue of overall housing provision not committed as at April 2012 (approximately 13,680 respond to the updated forecast supply paragraph 13 dwellings, including delivery on sites allocated in the SWDP but excluding empty homes brought back for affordable housing reflecting a into use and housing release as households move to extra-care housing with high-care packages). Proposed Changes to SWDP 3 and site allocations made in response to the

uplift in the housing need and the This takes into account: Further Interim Conclusions paragraphs a) The residue of overall housing provision not committed (approximately 13,800 dwellings, including 61 and 57. To reflect the latest housing delivery on sites allocated the SWDP not yet permitted). monitoring information To omit supply sources from empty homes brought back into use and housing release as households move to extra-care housing with high-care packages in response to paragraphs 71 and 77 of the Inspector’s Interim Conclusions on the Stage 1 Matters. PM28 SWDP 3 - Delete paragraph 13 bullet point c and replace by inserting a new paragraph after paragraph 13 and To reflect the latest housing monitoring Reasoned before paragraph 14 information, and changes in legislation. Justification c) A further reduction of 5%, made for forecasting purposes only, to discount lower delivery rates prior to paragraph 13 plan adoption and allow for circumstances where there may be no local need, consistent with the criteria 22 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map c for SWDP 15 or where there are viability issues. The supply from commitments including sites allowed on appeal April-August 2014 already takes account of contemporaneous viability issues and evidence of local need. The consequence of the Government’s changes to regulations allowing developers to renegotiate agreed affordable housing contributions, existing or future, has not been included in the supply forecast as it would prejudge the negotiations in advance of developers’ site and time specific evidence. The joint allocations policy approach within Worcestershire under Home Choice Plus means that the likelihood of there being no affordable housing need for affordable housing delivered within South Worcestershire is greatly reduced. PM29 SWDP 3 - AMEND by replacing the start of Paragraph14 and bullet point a. and i. with the following: To provide consistency with the Reasoned Proposed Changes to SWDP 3, To Justification The target of 6,100 affordable dwellings is a minimum . The target is about 2,150 below the total level of respond to the updated forecast supply paragraph 14 potential need, but it is a realistic target for delivering affordable housing via the uplift in development for affordable housing reflecting bullet point a. value. It is expected to be added to through other, non-development sources of supply: Proposed Changes to SWDP 3 and site allocations made in response to the and i. a. Changes in tenure within the existing stock, or from sources external to south Worcestershire, uplift in the housing need and the which will not require the construction of additional dwellings, including; Further Interim Conclusions paragraphs i. Change in stock in Worcester from market housing to private sector rent that is 61 and 57. To reflect the latest housing affordable (the potential for delivering 570 units through the Local Lettings Agency monitoring information during the plan period is additional to the 6,100 target in SWDP 3).

The plan area target of 8,900 affordable dwellings could accommodate the forecast total level of potential need, and is a realistic target for delivering affordable housing via the uplift in development value. The potential shortfall forecast in the Wider Worcester Area is expected to be reduced through other, non-development sources of supply as well as the joint allocations policy approach. a. Changes in tenure within the existing stock, or from sources external to south Worcestershire, which will not require the construction of additional dwellings,

23 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map including; i. Change in stock in Worcester from market housing to private sector rent that is affordable (the potential for delivering 285 units through the Local Lettings Agency during the plan period is additional to the 3,700 WWA target in SWDP 3). PM30 SWDP 3 - AMEND Paragraph14 bullet point b as follows: To provide consistency with the Reasoned ...... in addition to the 23,200 28,400 ) Proposed Changes to SWDP 3, and to Justification respond to the conclusions and paragraph 14 recommendation in paragraphs 57 and bullet point b 61 of the Further Interim Conclusions PM31 SWDP 3 - AMEND paragraph 15 as follows To provide consistency with the Reasoned Proposed Changes to SWDP 3. To Justification The market housing provision total and subtotals in SWDP 3 are calculated by subtracting only the respond to the updated forecast supply paragraph 15 potential for delivering 6,100 8,900 affordable dwellings through development value uplift from the 23,200 for affordable housing reflecting 28,400 total, Proposed Changes to SWDP 3 and site allocations made in response to the uplift in the housing need and the Further Interim Conclusions paragraphs 61 and 57. To reflect the latest housing monitoring information

PM32 SWDP 3 - AMEND by Deleting paragraph 20 and replacing with the following To provide consistency with the Reasoned … 21% of the provision requirement has been completed and there are commitments for a further 16%. Proposed Changes to SWDP 3. To Justification 10% is met from small non-garden windfalls, with 4% individually derived both from bringing empty homes respond to the latest evidence reflect paragraph 20 back into use and from the release of Class C3 housing. The largest component is from site allocations, the updated forecast supply of housing which contribute 48% to supply. This mix of sources provides a healthy balance between certainty and reflecting Proposed Changes to SWDP flexibility. Delivery of housing is not over-reliant on any one category 3 and site allocations made in response to the uplift in the housing need and the 24 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map … 25 % of the provision requirement has been completed and there are commitments for a further 28% Further Interim Conclusions paragraphs (permitted ). 7% is met from forecast small non-garden windfalls . The largest component is from site 61 and 57. To reflect the latest housing allocations (not built or committed), which contribute 41% to housing provision (24% is in WWA, monitoring information 9% and 8% respectively in the Malvern Hills (Ex-WWA) and Wychavon (Ex-WWA) Sub Areas). This mix of sources provides a healthy balance between certainty and flexibility. Delivery of housing is To respond to paragraphs 71 and 77 of not over-reliant on any one category. the Inspector’s Interim Conclusions on the Stage 1 Matters, by omitting supply sources from empty homes brought back into use and housing release as households move to extra-care housing with high-care packages

PM33 SWDP 3 - Amend the start of paragraph 22 To respond to paragraph 80 of the Reasoned As well as dwellings completed since 1 April 2006, those dwellings under construction or with planning Interim Conclusions Justification permission but not yet started (the latter discounted by 5%) are part of the supply counted towards paragraph 22 housing provision PM34 SWDP 3 - Amend the start of paragraph 23 To respond to paragraph 62 of the Reasoned Evidence supports the forecast supply of small, non-garden windfalls post-March 2014, Further Interim Conclusions and to Justification reflect the latest housing monitoring paragraph 23 information PM35 SWDP 3 - Delete the paragraphs 24, 25 and 26, and replace with the following To respond to recommendations in Reasoned Housing supply is also added to by: paragraphs 71 and 77 of the Justification a. Bringing long-term empty homes back into use. Inspector’s Interim Conclusions on the Stage 1 Matters, and National Planning paragraph b. The release of housing achieved through delivery of extra-care housing that involves a Practice Guidance paragraph 039. 24, 25 and significant level of care through a care package. 26 The NPPF makes clear that local planning authorities should identify and bring back into residential use

25 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map empty housing and buildings, in line with local housing and empty homes strategies. A realistic allowance for bringing long-term empty homes back into use in the sub-areas has been included in SWDP 3 as part of the supply identified to meet the provision requirement. The plan includes an allowance for the potential release of housing that is achieved as extra-care / high care package housing is developed and occupied. Unlike dwellings that are inherited, which do not result in a net increase in the release of Use Class C3 dwellings, the development of this extra-care housing has the effect of creating additional local capacity, but this is only counted the first time that occupants move from their houses into extra-care accommodation. Only high-care package extra-care housing is taken into account in calculating this type of housing release. The Framework makes clear that local planning authorities should identify and bring back into residential use empty housing and buildings, in line with local housing and empty homes strategies. No specific allowance for net additional housing supply from bringing empty homes back into use is made for this in SWDP 3. Any future empty homes strategy and evidence relating to the means to support delivery may enable a future SWDP review to take this potential supply source into account in line with national guidance. PM36 SWDP 3 - Delete paragraph 29 (from the third sentence to the end) and replace with the following: To provide consistency with the Reasoned Additional work on urban capacity for the city, including an allowance for small windfalls, has Proposed Changes to SWDP 3. To Justification demonstrated that the number of dwellings delivered through development that can be accommodated respond to the latest evidence and paragraph 29 within the city boundary can be increased to about 5,400 homes, plus an allowance for about 150 empty reflect the updated forecast supply of homes brought back into use and about 100 dwellings released as households move into extra care housing reflecting Proposed Changes homes with higher care packages. At 3,925 the scale of urban extension allocations for the Wider to SWDP 3 and site allocations made in Worcester Area is sufficient to address the revised requirement for 9,400 dwellings from 2006 to 2030. response to the uplift in the housing .... Additional work on urban capacity for the city, including an identification of housing allocations, need and the Further Interim commitments and completions plus an allowance for small windfalls, has demonstrated that the Conclusions paragraphs 61 and 57. number of dwellings delivered through development that can be accommodated within the city To reflect the latest housing monitoring boundary can achieve about 6.700 homes in the plan period. At about 5,550 the scale of urban information. extension allocations for the Wider Worcester Area combined with supply is the City, is sufficient To clarify the role of monitoring and the to address the WWA target of 12,250 dwellings from 2006 to 2030. The urban extensions provide use of review in the event of significant 26 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map enhanced capacity to deliver urban concentration and meet the additional housing needs of changes in circumstances regarding Malvern Hills and Worcester City. The scale of housing in the Wider Worcester Area policy Sub delivery or needs relating to the Wider Area supports delivery of strategic objectives in the SWDP. Notably, by delivering sufficient new Worcester Area. homes to support economic growth, regeneration, allocating development in locations with good access to local services, maximising transport choice and maximising opportunities to deliver affordable housing.

If future monitoring indicates a significant change in circumstances then this would require a review of how the objective of meeting Worcester’s needs and unmet needs from Malvern Hills in the Wider Worcester Area would be implemented in detail. This would relate to circumstances impacting on Worcester or Malvern Hills needs or in delivering housing supply to meet needs PM37 SWDP 3 - Delete paragraphs 33 and 34, To provide consistency with the Reasoned 5-year housing land supply calculations will be produced annually for each sub-area plus Worcester city. Proposed Changes to SWDP 2. Justification “Separate and non-transferable housing provision” in the policy means that any shortfall identified against To accommodate additional housing paragraph 33 the 5-year housing land supply in one sub-area will not be met elsewhere in the SWDP area. provision in accordance with proposed Detailed evidence is set out in the Housing Background Paper. That evidence demonstrates how the plan uplift in numbers and to respond to the can maintain a ‘rolling’ 5-year supply with either a 5% or 20% buffer brought forward from the end of the conclusion in paragraph 86 of the plan period, taking into account the site allocations in the plan. The residual method used to calculate the Inspector’s Interim Conclusions on the 5-year housing land supplies is robust. The Housing Background Paper demonstrates why this method is Stage 1 Matters. used in preference to other models. The NPPF does not require the SWDP to provide a land bank at the To provide consistency with the end of 2030. The housing trajectories will be monitored and updated on an annual basis through the Proposed Changes to SWDP 3, which Annual Monitoring Report and also through roll-forward and further reviews of the Strategic Housing Land respond to the conclusions and Availability Assessment (SHLAA). recommendation in paragraphs 57 and 61 of the Further Interim Conclusions. Replace with the following: To respond to the updated evidence on Five-year housing land supply calculations will be produced annually for each of the three Sub housing supply, including the Housing Areas set out in SWDP 3 D Table 4b. SWDP 3 Table 4b also has a specific policy target for WWA Background Paper Addendum 2014. (Worcester City). Worcester City Council will make a separate calculation for its administrative area. SWDP3 Table 4b also has a footnote relating to the WWA (Wychavon and Malvern Hills) Area 27 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map which breaks down the Area target, providing separate ‘targets’ for Malvern Hills and Wychavon, for the purposes of monitoring the five year housing land supply. Malvern Hills and Wychavon District Councils will make separate calculations for those parts of their administrative areas within and outside the Wider Worcester Area (WWA) in accordance with SWDP 3D Table 4b. This enables the LPAs to comply with Framework paragraph 49. “Separate and non-transferable housing provision” in the policy means that any shortfall identified in the five-year housing land supply against any Area sub total will not be met elsewhere in the SWDP area. Detailed evidence is set out in the Housing Background Paper Addendum 2014. That evidence demonstrates how the plan can maintain a ‘rolling’ five-year supply with either a 5% or 20% buffer brought forward from the end of the plan period, taking into account the site allocations and other supply components in SWDP 3 Table 4e. The Housing Background Paper Addendum demonstrates that for the purposes of plan preparation there was no evidence of persistent under- delivery in Worcester city and so using the residual (‘Liverpool’) method to calculate the five-year housing land supply was appropriate for Worcester City. The residual method was also appropriate for the Wider Worcester Area due to the site specific phasing of Worcester urban extensions. Even after applying the ‘Sedgefield’ approach to the Malvern Hills (Ex WWA) and to the Wychavon (Ex WWA) Sub Area, the evidence demonstrated how a ‘rolling’ five-year supply with a 20% buffer can be maintained. The forward looking 5 year supply position declines at the end of the plan period but this is because the Framework does not require the SWDP to provide a land bank at the end of 2030. The plan review is the correct mechanism for identifying supply after 2030. The housing trajectories will be monitored and updated on an annual basis through the Annual Monitoring Report and also through roll-forward and further reviews of the Strategic Housing Land Availability Assessment (SHLAA). This will also provide the evidence to justify whether each LPA should use the residual or ‘Sedgefield’ approach in the future. Annual monitoring will include monitoring applicants’ evidence which they use to demonstrate the extent to which their proposed housing development will contribute to the five year deliverable housing land supply. Over time this can be compared to delivery achieved on those developments.

28 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM38 SWDP 3 - Amend the start of paragraph 37 To respond to the latest evidence and Reasoned The scale of potential housing supply currently forecast in Table 4e is over 500 dwellings... reflect the updated forecast supply of Justification housing reflecting Proposed Changes paragraph 37 to SWDP 3 and site allocations made in response to the uplift in the housing need and the Further Interim Conclusions paragraphs 61 and 57. To reflect the latest housing monitoring information. PM39 SWDP 3 - Delete the 3 rd sentence of paragraph 38 and replace with the following: To respond to the latest evidence and Reasoned Completions improved in 2011 – 2012 reflect the updated forecast supply of Justification Completions improved in 2011 – 2014, including 866 dwellings completed in 2013-14 in Wychavon housing and the latest housing paragraph 38 which was more than three times the average annual completions in the preceding seven years. monitoring information.

PM40 SWDP 3 - AMEND paragraph 42 : To respond to the conclusion in Reasoned Policy on the phasing of housing is set out in Table 4c. This takes a longer-term view of housing delivery, paragraph 91 of the Inspector’s Interim Justification with a positive approach to completions. The 2012 - based Housing Trajectories, set out in Annex E, are Conclusions on the Stage 1 Matters paragraph 42 more cautious, reflecting contemporary information from developers and the building industry about delivery . Whilst the housing trajectories indicate that completions will start to recover substantially after the local plan is adopted, it is considered appropriate to identify a number of specific management actions to help bring sites forward for development in line with, or sooner than, the arc currently indicated in the trajectory, this will enable a move towards the phasing policy ambitions SWDP 15 – Meeting Affordable Housing Needs

PM41 SWDP 15 Bi i. On sites of 15 or more dwellings within Malvern Hills District , Wychavon District and on greenfield The update to the Local Plan Viability sites in Worcester City , 40% of the units … Assessment in September 2014 has suggested that 40% affordable housing 29 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map is not viable on brownfield sites within Worcester City. PM42 SWDP 15 B Insert new bullet point ii: The update to the Local Plan Viability i, ii On sites of 15 or more dwellings on brownfield sites in Worcester City, 30% of the units should be Assessment in September 2014 has affordable i.e. social rented, affordable rented and intermediate tenure and provided on site. suggested that 40% affordable housing is not viable on brownfield sites within Worcester City. PM43 SWDP 15Biv On sites of less than 5 five dwellings a financial … The update to the Local Plan Viability Assessment in September 2014 has suggested that 40% affordable housing is not viable on brownfield sites within Worcester City. PM44 SWDP 15 Evidence in the Affordable Housing Development Viability Study 2008, and its Property Market Update The update to the Local Plan Viability Reasoned Report (July 2010) undertaken for the South Worcestershire districts Councils suggests indicated that Assessment in September 2014 has Justification affordable housing provision could still be provided at a rate of 40% on larger sites of 15 or more dwellings suggested that 40% affordable housing paragraph 5 without undermining development viability. The 2014 viability report however suggests that this is still viable except for brownfield sites should be reduced to 30% albeit only on brownfield sites within the administrative boundary of within the administrative area of Worcester. For smaller sites … Worcester. SWDP 43 – Worcester City Allocations

PM45 SWDP 43/2 Amend Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. To reflect permitted (approx.) development on the whole site (Phase 1 granted permission) on 21/3/13 SWDP43/2 Gregory's Bank industrial estate 140 164 6.6 (P13M0017); and Phase 2 granted

planning permission 24/04/14 30 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map (P14M0080). (19 dwellings under construction as at April 2014) PM46 SWDP 43/4 Amend Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for extended (approx.) site area (including garden land to rear of 20, Old Northwick Lane), topography, SWDP43/4 Old Northwick Farm xx 40 45 4.58 drainage and restricting built

development (including residential curtilage) to land that is in Flood Zone 1; taking full account of the historic environment (Conservation Area) and the riverside location for green network mitigation through biodiversity enhancement. PM47 SWDP 43/4 Replace existing footnote to SWDP43/4 Old Northwick Farm: To respond to the concerns raised in the Table 11 xx SFRA does not preclude development on-site but site-specific SWDP consultation responses of the xx Footnote to SWDP43/4 Environment Agency. No built development including residential curtilage will be allowed outside Flood Zone 1. The To respond to evidence in: the South SFRA does not preclude development on site but site-specific Flood Risk Assessment will be Worcestershire Level 2 SFRA Addendum required. The site boundary excludes areas with a risk of 1 in a 1000 years or higher risk, as Report May 2014 and the 26 August evidenced by the Flood Risk Assessment accompanying application P14E0368. Site development 2014 EA letter accepting the evidence will reduce flood risk by reducing the volume and rate of runoff through: exemplar source control of flood risk demonstrated through the SUDS techniques; and mitigation measures for surface water runoff from potential development, FRA accompanying application including use of green infrastructure. Suitable surface water mitigation will manage groundwater P14E0368. risk. Safe access and egress to the site will be achieved via vehicular access only from Northwick To respond to the need to manage Road. No vehicular access from Old Northwick Lane other than the existing access only into the surface water, runoff and ground water, curtilage of 20 Old Northwick Lane. and peak flows from the Severn and the 31 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map unnamed watercourse to the north of the site. To respond to the need to ensure safe site access and egress PM48 SWDP 43/7 Amend Table 11: To amend the indicative site capacity as Table 11 Site ref location No. of Site area the result of site design preparation, dwellings (ha) allowing for character of adjoining area (approx.) and surrounding uses, site shape, car parking, site access, traffic flow, SWDP43/7 Sansome Walk Swimming Pool x 40 33 0.9 pedestrian route and retention of access x Footnote to SWDP43/4 to adjoining uses. Site access may be achieved from the existing vehicular access from Chestnut Street and a new To clarify the options for site access vehicular access from Sansome Walk PM49 SWDP 43/9 Amend Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. To reflect approved (approx.) development. 12 dwellings approved subject to S106 SWDP43/9 Old Brewery Service Station, Barbourne Road 6 12 0.27

agreement as at 15/08/14 (P14D0123) as part of mixed use development with retail on the ground floor and flats above. PM50 SWDP 43/14 Amend Table 11: To reflect permitted development on Table 11 Site ref location No. of Site area whole site. 181 dwellings granted dwellings (ha) planning permission on 23/05/13 (approx.) (P13Q0171 reserved matters pursuant to outline planning approval P12Q0232) SWDP43/14 Former Ronkswood Hospital 200 181 5.7

32 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM51 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, through frontage (approx.) development in Flood Zone 1, allowing for retention of green network mitigation SWDP43a 73 - 77 Bromwich Road X 11 0.14 to rear as private amenity space on land sloping steeply down towards flood plain. x Footnote to SWDP43a To reflect approved development. Frontage development only with safe access and egress to the site from Bromwich Road. No 11 dwellings approved subject to S106 built development including residential curtilage will be allowed outside Flood Zone 1. The SFRA (P14C0012) as at 15/08/2014. does not preclude development on site but site-specific Flood Risk Assessment will be required. Site development will reduce flood risk by reducing the volume and rate of runoff through: exemplar source control SUDS techniques; and mitigation measures for surface water runoff from potential development, including use of green infrastructure. Suitable surface water mitigation will manage groundwater risk. PM52 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. Allowance made for (approx.) junction, drainage and onsite landscaping on this brownfield site. To SWDP43b Martley Road 18 0.39 reflect approved development 18

dwellings approved subject to S106 (P14J0046) as at 15/08/2014. PM53 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. Allowance made for (approx.) junction improvement, drainage and onsite landscaping on this brownfield 33 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map

SWDP43c Malvern Gate, Bromwich Road 45 1.28 site. To reflect permitted development.

Granted outline planning permission for residential development (P14C0034) – indicative 45 dwellings PM54 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for 50% green (approx.) network to deliver provision of enhanced open space / habitat to sustain links from SWDP43d Land at Ambrose Close x 24 1.17 the north. x Footnote to SWDP43d To include about 50% green network for open space, habitat improvement and links to the green network to the north PM55 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing means for (approx.) vehicular access, topography and drainage, and for 50% green network SWDP43e Land at Hopton Street x 30 1.59 mitigation to sustain broad green link between cemetery and allotments; retain x Footnote to SWDP43e best scrub habitat; and sustain east-west To include about 50% green network for habitat retention and links to the adjoining green movement for walking and local use / network access. PM56 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for 50% green (approx.) network mitigation on greenfield area 34 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map

SWDP43f County Council Offices, Sherwood Road x 15 0.50 through careful design that retains worthy trees and provides landscaping to

complement local green network. x Footnote to SWDP43f To include about 50% green network, retention of trees, and landscaping to complement adjoining green network PM57 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for 50% green (approx.) network mitigation on greenfield area through careful design that retains SWDP43g County Council Offices, Bilford Road x 15 0.67 worthy trees and provides landscaping. Application will need investigating x Footnote to SWDP43g information on land north of Bilford To include about 50% green network, retention of trees, and landscaping to complement Road, in vicinity of Perdiswell Golf adjoining green network. Investigation required to assess ground conditions. Course e.g. gas risk assessment PM58 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for restricting (approx.) housing (including curtilage) and site access/egress to Flood Zone 1, and for SWDP43h Laugherne Garage, Bransford Road x 10 0.44 green network mitigation (where open space can include landscaping / SUDs / x Footnote to SWDP43h habitat improvements). No built development including residential curtilage will be allowed outside Flood Zone 1. The SFRA does not preclude development on site but site-specific Flood Risk Assessment will be required. Housing development, including the curtilage, only on the higher ground located away from Laugherne Brook, and safe site access and egress required. On-site green network 35 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map mitigation for landscaping, improved habitat, SUDs. PM59 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for access (approx.) road, retention of on-site woodland on eastern part of site (south of Tyne SWDP43i Crown Packaging Site, Main site, Perry Wood Walk x 200 8.06 Close), for drainage and for buffers to mitigate against impacts of existing x Footnote to SWDP43i adjacent industrial uses, railway line and Comprehensive approach to developing Sites SWDP43i and SWDP43j, and potentially with SWDP associated noise, as well as need for 43/3; retaining on-site woodland in east of site; buffers to mitigate impact of adjoining uses design to take full account of historic including railway; taking full account of historic environment environment. Benefits of co-ordinated development of SWDP43k with SWDP43l Crown Packaging Site, Woodside Offices and Car Park, Perry Wood Walk and SWDP43/3 Ribble Close and gas holder site PM60 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for access (approx.) road, for drainage and for buffers to mitigate against impacts of existing SWDP43j Crown Packaging Site, Woodside Offices and car 40 0.95 adjacent industrial uses, railway line and park, Perry Wood Walk x associated noise, as well as need for design to take full account of historic x Footnote to SWDP43j environment. Benefits of co-ordinated Comprehensive approach to developing Sites SWDP43i and SWDP43j, and potentially with SWDP development of SWDP43k with 43/3; retaining on-site woodland in east of site; with buffers to mitigate impact of adjoining uses SWDP43l Crown Packaging Site, Main 36 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map including railway; taking full account of historic environment Site, Perry Wood Walk and SWDP43/3 Ribble Close and gas holder site. PM61 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for location (approx.) e.g. proximity to city centre and St Johns District Centre, access road, for drainage SWDP43k Land off Bromyard Terrace x 30 0.15 and for buffers to mitigate against impacts of existing adjacent industrial x Footnote to SWDP43k uses, railway line and associated noise, Having full regard for the historic environment, including listed buildings and their setting and as well as need for design to take full the key assets and characteristics such as surviving burgage plot boundaries in this part of the account of historic environment. St Johns Conservation Area. PM62 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for green (approx.) network mitigation through on-site biodiversity offsetting, and the Certificate SWDP43l Battenhall Road (Former NALGO Sports Ground) x 20 2.9 of Lawfulness for keeping and grazing of horses and the use of the old clubhouse x Footnote to SWDP43l as stables approved 01/03/12 The housing to be on the eastern part of the site abutting existing housing west of Battenhall (P12B0045). Rise, with access from Battenhall Road. To include 66%at least 75% green network mitigation as on-site biodiversity offsetting including retaining the link between existing habitat on land east of the site adjoining Battenhall Road / Battenhall Rise and the wider Local Green Network. PM63 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 provision in accordance with proposed 37 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map

Site ref location No. of Site area uplift in numbers, allowing for green dwellings (ha) network mitigation through biodiversity (approx.) enhancements and having regard to the SWDP43m Tolladine Golf Course (Club House & Putting 9 0.98 setting of adjacent green space of Green) x Leopard Hill and key views. Nine dwellings granted planning permission on 20/04/11 on part of site (former x Footnote to SWDP43m clubhouse / car park) P10Q0537. Built development on brownfield land, retaining green network in south west area of the site with mitigation through biodiversity enhancements, having regard to the setting of the adjacent green space of Leopard Hill and key views. PM64 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for (approx.) surrounding residential development and time limitation on existing legal SWDP43n Earls Court Farm (Community Land) 13 0.32 agreement restricting site use to

community use ceasing by April 2015 PM65 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for site (approx.) topography and drainage, the historic environment and prominent canalside SWDP43o Royal Mail Sorting Office, Westbury Street x 20 0.28 location, and proximity to the Canal Basin railway embankment with x Footnote to SWDP43o opportunities to enhance these Green Taking full account of historic environment, enhancing the conservation area, improving the Network corridors canal-side location and enhancing green network corridors (canal and embankment). Mitigation 38 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map of surface water including runoff from development, and drainage allowing for site topography. Opportunity to improve pedestrian-cycle link at Lion Walk PM66 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing green network (approx.) mitigation by retention and enhancement of ‘village green’ style open area and SWDP43p Langdale Drive x 10 0.67 greater biodiversity plus better enclosure from main road. x Footnote to SWDP43p To provide for green network mitigation by retaining and enhancing the open area and biodiversity improvement PM67 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for character (approx.) of the Conservation Area and surrounding uses, retaining a commercial SWDP43q Zig Zag site, St John's x 10 0.05 frontage, with potential for apartments above and to rear, sustaining the x backyard character Footnote to SWDP43p Retaining commercial frontage on the ground floor PM68 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for location, (approx.) i.e. proximity to city centre, taking historic environment fully into account, SWDP43r The Bridge Inn, Lowesmoor Terrace x 15 0.1 enhancing the conservation area. The 39 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map housing development being to the rear x Footnote to SWDP43r and on first floor frontage, i.e. retaining Comprehensive approach required for developing Sites SWDP43r and SWDP43aa, and potentially commercial use on ground floor frontage. with SWDP 43o; retaining commercial use on ground floor frontage having full regard to the Benefits of coordinated development of historic environment and local character SWDP43r and SWDP43aa Lowesmoor Wharf. PM69 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for changes (approx.) in permitted development rights since April 2014 (from A1 to C3) and SWDP43s Rose Avenue x 8 gross (net 0.18 opportunity to deliver 100% affordable 4) housing.

Potential opportunity to retain post office in this area e.g. relocating it to land on x Footnote to SWDP43s the east side of Rose Avenue (currently Design to include sympathetic frontage and retention of forecourt parking. Dwellings to be a play area) which is available. located only on west side of Rose Avenue. Requirement to re-provide the existing play Application by Worcester Community equipment either within the development on another nearby site. Housing Ltd to improve the play area (aimed at toddler/primary school age group) following previous incidents of vandalism. Application was approved on 5 December 2012 and subsequently implemented)

40 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM70 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for frontage (approx.) development of a small group on this brownfield site, and the character of SWDP43t Coach Park adjacent to Barley Crescent (4-4a, 7 0.07 adjoining area. Tolladine Road)

PM71 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers, allowing for (approx.) development for example as clustered student accommodation, the historic SWDP43u Royal Worcester Porcelain site x 8 0.15 environment, the scale and character of the area, and continuing the wider x Footnote to SWDP43u regeneration of the former Royal Having full regard to historic environment and local character as part of regeneration of the wider Worcester Porcelain location. area PM72 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. To reflect permitted (approx.) development. 10 dwellings granted planning permission 17/12/13 SWDP43v Brickfields Road 10 0.14 (P13N0461)

PM73 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. To reflect permitted development. 10 dwellings granted 41 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map (approx.) planning permission 09/05/12 (P12A0053) approved to extend time SWDP43w 23-24 Foregate Street 10 0.97 period for implementation on extant

planning permission (P08A0590). PM74 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. To reflect permitted (approx.) development. 17 dwellings granted planning permission 4/11/09 (P09D0341 SWDP43x Christian Meeting Room, Diglis Lane 17 0.29 Reserved Matters) (P06D0292 outline

application approved 30/08/06). PM75 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. To reflect permitted (approx.) development. 37 extra care units granted planning permission 23/05/13 SWDP43y White Ladies Close, land at 37 0.21 (P13A0087) or (with variation of

condition 14 and 15) granted 11/02/14 (P13A0576). PM76 SWDP 43 Add the following to Table 11: To accommodate additional housing Table 11 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. To reflect permitted (approx.) development. 38 extra care apartments granted planning permission on 28/10/10 SWDP43z East Bank Drive (Phase 3) 38 0.35 (P10E0322); 3 rd phase to extra-care

retirement facility (approved under P09E0392).

42 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM77 SWDP 43/18 Amend Table 12: To accommodate additional housing Table 12 Site ref location uses No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. 32 close care (approx.) apartments, eight close care bungalows and 60 extra-care apartments (part of SWDP43/18 Grove Farm University campus, health and 100 18.62 gross health and wellbeing campus) granted well being campus (medical planning permission on 25/07/13 centre / care home / close care (P13K0248 reserved matters - pursuant and extra care housing), to outline approval P11K0588 for mixed business uses including use development [which included business innovation centre, education D1 / nursery D1; fitness D2 / research and development, B1 business uses; hotel D1; care / extra- hotel; nursery, retail (ancillary)

care apartments and care home C2 / retail A1]). Note: the 100 residential units do not include the 60-bed care home also permitted by P11K0588. The site area has increased, to match the extent of the gross area permitted. PM78 SWDP 43/25 Amend Table 14: To accommodate additional housing Table 14 Site ref location No. of Site area provision in accordance with proposed uplift in numbers. Change of use to 60 uses dwellings (ha) (approx.) ‘later living’ residential units granted planning permission on 24/07/14 SWDP43/25 School of Art and Design, Barbourne 60 0.99 (P13A0155). Units are designed as Care Home or Extra Care / Close Care housing apartments.

43 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM79 SWDP 43 Add the following to Table 12: Mixed use (housing and commercial) Table 12 Site ref location No. of Site area redevelopment of brownfield site, to dwellings (ha) accommodate additional housing (approx.) provision in accordance with proposed uplift in numbers, allowing for location, SWDP43aa Lowesmoor Wharf x 100 1.14 i.e. proximity to city centre, taking historic environment fully into account enhancing x Footnote to SWDP43aa the conservation area and improving the Mixed use housing and commercial development. Retaining existing commercial uses canal basin & its setting (the surrounding compatible with residential development facilitating relocation of less compatible on-site public space) and habitat enhancement. commercial uses to appropriate premises within the City. Comprehensive approach required to Benefits of co-ordinated development of developing sites SWDP43r and SWDP43aa; taking full account of historic environment, SWDP43aa and SWDP 43r The Bridge enhancing conservation area, improving canal basin and enhancing habitat. Inn, Lowesmoor Terrace. PM80 SWDP 43 Add the following to Table 12: Mixed use redevelopment of brownfield Table 12 Site ref location No. of Site area site. To accommodate additional housing dwellings (ha) provision in accordance with proposed (approx.) uplift in numbers, allowing for replacement faith / meeting place facility; SWDP43ab Holy Trinity Church, Lichfield Avenue x 8 0.28 biodiversity enhancement, and focal point location. x Footnote to SWDP43ab Application for the prior notification of Mixed use housing and replacement faith/meeting place facility; designed as a focal point, and proposed demolition of Holy Trinity & St including biodiversity enhancement Martins Church (PRA13G04). Decision: The prior approval of the City Council is not required for the method of the proposed demolition and any proposed restoration described in the application. 44 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map Decision dated 13/11/13 PM81 SWDP 43 Add the following to Table 12: Mixed use (housing and on-site Table 12 Site ref location No. of Site area replacement public house) dwellings (ha) redevelopment of brownfield site. To (approx.) accommodate additional housing provision in accordance with proposed SWDP43ac Cavalier Public House, St George's Lane x 8 0.11 uplift in numbers, allowing for historic environment and canalside location. x Footnote to SWDP43ac Mixed use housing and replacement public house, taking account of the historic environment and canal-side location

PM82 SWDP43 AMEND by inserting an additional paragraph after paragraph 6 as follows To respond to the evidence on sites Reasoned An assessment of all non-strategic sites including those put forward through the Strategic Housing Land assessment. Justification Availability Assessment can be found in the background paper Non-Strategic Housing Allocations. The 2014 Sites assessment will be paragraph 6 Assessment of non-strategic sites including those put forward through the Strategic Housing absorbed within an Addendum to the – additional Land Availability Assessment and the Call for sites in 2014 can be found in the evidence in the Non-Strategic Housing Allocations paragraph SWDP Non-Strategic Housing Allocations background paper and the 2014 Sites assessments. background paper. PM83 SWDP43 Amend by deleting the start of paragraph 7 and replacing with the following: To be consistent with SWDP 3 Table 4e Reasoned Evidence demonstrates that the city can accommodate 5,600 dwellings,… – Supply. Justification To accommodate additional housing 7 Evidence demonstrates that the city can accommodate about 6,750 dwellings within the provision through increased capacity administrative boundary…

PM84 SWDP43 Amend start of paragraph 8: To be consistent with SWDP 3 Table 4e Reasoned – Supply. And Table 4b Housing Justification Therefore, capacity for a further 4,470 dwellings needs… provision 8 To accommodate additional housing 45 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map provision through increased capacity

PM85 SWDP43 Amend by deleting the start of paragraph 9 and replacing with the following To be consistent with SWDP 3 Table 4e Reasoned The site allocations, through the urban extensions, have capacity for about 3,925dwellings – Supply. Justification The site allocations in the Worcester urban extensions, have capacity for about 5,550 dwellings To accommodate additional housing 9 (including 80 within the city administrative boundary). provision through increased capacity

nd PM86 SWDP43 Amend 2 sentence of paragraph 11: To be consistent with SWDP 3 Table 4e Reasoned – Supply. Justification Housing development will not be permitted given the proximity of the land to the M5 , except where To accommodate additional housing paragraph 11 allocated by SWDP45/A- Land at Swinesherd Way provision through increased capacity in the Proposed Change Worcester Urban Extension on land at Swinesherd Way SWDP 44 – Worcester City Centre

PM87 SWDP 44 Amend Table 17 To accommodate additional housing Table 17 Site ref location No. of Site area provision through increase in site dwellings (ha) capacity in accordance with proposed (approx.) uplift numbers. SWDP44/4 Shrub Hill Opportunity Zone 596 19.89 To reflect approved development on part of site. Land east of the railway • Approximately 350 596 dwellings and residential (Sherriff Street) – hybrid application for care units regeneration and renewal – for mixed • Plus other mixed use / commercial development use development (including 396

dwellings) - approved subject to S106 agreement as of 15/8/14), Site capacity of opportunity zone increased to include capacity for 200

46 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map dwellings on land to west of railway, to support delivery of regeneration and mixed use.(P12G0199)

PM88 SWDP44 AMEND first sentence of paragraph 19: To be consistent with the proposed Reasoned It is estimated that, although not residentially led, an element of housing development will be included that change to SWDP 44/4 Justification could deliver approximately 350 600 dwellings plus student flats including flatted development paragraph 19 SWDP 45 – Directions for Growth Outside the City Boundary

PM89 SWDP 45 … five six sustainable, well-designed developments are proposed To accommodate additional housing provision through increased capacity as Worcester urban extensions in accordance with proposed uplift in housing numbers and in line with the spatial strategy. PM90 SWDP45/1 Amend part Ai : To accommodate additional housing Ai provision through increase in site … and around 2,450 2,600 dwellings. Delivery of the development is dependent upon the phased capacity in accordance with proposed implementation of the Worcester transport Strategy and in particular the dualling of the A4440 uplift numbers. Southern link Road the initial phase of which is currently being delivered. The next phase will be the completion of the dualling between Broomhall Way and Whittington junction which needs to be in place by 2019 to support both this development and the wider SWDP. Initial phases of the development shall be linked to the already funded improvements to the A4440 (southern Link Road) which will include measures to improve existing junctions. Later phases of development will be linked to the timing of further delivery of A4440 improvements including measures such as dualling. PM91 SWDP45/1 ii. Consistent with SWDP 14 the dwellings will be … To cross reference the policy to SWDP 47 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map Aii 14 - Housing Mix. PM92 SWDP45/1 iii. The masterplan diagram for SWDP 45/1 below … which include a centrally located To ensure that this serves the Aiii Neighbourhood local centre … proposed development without … • … community building, emergency services infrastructure , children’s centre … attracting large scale offsite shopping … • local convenience and comparison retailing and ; trips; to acknowledge requirement for developer contribution to emergency

services infrastructure. See also Appendix 3 PM93 SWDP45/1A … of the 2,450 2,600 dwellings … A minimum of 40 35 of these … sports and recreation facilities. The To accommodate additional housing v pedestrian and cycle routes linking existing and new development to those uses will be subject to more provision through increase in site detailed masterplanning. capacity in accordance with proposed uplift numbers PM94 SWDP45/1 Provision for two separate sites, each one site for Travellers of up to 10 pitches , for Travellers within or To reflect updates to the GTAA Avii on the edge of the urban extension x. evidence base

x See also SWDP 17 – Travellers and Travelling Showpeople PM95 SWDP45/1 viii. Improvements to the A4440, the A38 and associated highways, public transport, cycle and To acknowledge that transport Aviii walking infrastructure and services- shall include measures to improve accessibility by non- car infrastructure required serves a wide modes to Worcester city centre, and other key employment, health, education, leisure and range of land uses. transport (interchange) facilities, services and destinations across the city including the provision of at least two grade-separated pedestrian / cycle crossings. PM96 SWDP45/1 ix. Safeguarding land on the southern side of the A4440 for the dualling of the road and the provision of To emphasise the importance of cycle Aix the pedestrian and cycle bridges needed to provide sustainable transport links between the and pedestrian links between the site development and the Worcester city walk and cycle networks. and the wider area. PM97 SWDP45/1 x. The potential provision of a parking hub to be agreed in consultation with Worcestershire County To allow for flexibility in the provision of Ax Council a parking hub. 48 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM98 SWDP45/1 Xii …links to Worcester city, the neighbourhood local centre and … To acknowledge that the centre will Axii serve mainly local needs. PM99 SWDP45/1 … mitigate noise and flood risk and maintain the individual identities of Broomhall To acknowledge that the green network Axiii has a multi-functional role. PM100 SWDP45/2 ii. Phased delivery of around 975 2,150 dwellings within the site area shown on the diagram for To accommodate additional housing Bii SWDP45/2. The disposition of proposed uses within the allocation boundary will require, and be provision through increase in site subject to, further intensive Master Planning to ensure the comprehensive development of the capacity in accordance with proposed amended allocation as a whole and provide an integrated and cohesive urban design and uplift numbers and explain how the movements within the site and to / from the City. … details of the extended site in terms of location of the different uses will be informed through detailed master planning. This takes additional land out of the Significant Gap to the west of the current allocation. PM101 SWDP45/2 B iii. Consistent with SWDP 14 the dwellings will be … To cross reference the policy to SWDP 14 Housing Mix PM102 SWDP45/2 v. Small local shops, with a contribution towards enhancing Dines Green Neighbourhood Centre. Local To ensure that retail floorspace is Bv convenience and comparison retailing within a neighbourhood centre ; the Neighbourhood appropriate for the size of the site, but Centre should include not more 1,500 square metres net of retail floorspace and no single still for local needs. convenience store should exceed 1,000 square metres net.

PM103 SWDP45/2 B Insert new section : To acknowledge that the uplift in the housing numbers will require the vi a range of community facilities and services including a two-form entry primary school, delivery of a primary school on the site, community hall which may also provide for dual use community facilities

49 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM104 SWDP45/2 vii. The development of a local Green Infrastructure network, which will include measures for the To emphasize the need to protect the Bvii protection and enhancement of the Earl’s Court Scheduled Ancient Monument and its setting. adjacent SAM PM105 SWDP45/2 ix. Contributions towards transportation, education, sporting and recreational facilities, and emergency To acknowledge requirement for Bix services infrastructure developer contribution to emergency services infrastructure. PM106 SWDP45/2 x. Measures to support and safeguard the implementation of the schemes set out in the To reiterate the need for the scheme to Bx Worcestershire LPT3, including the adopted Worcester Transport Strategy, which includes the have regard to the LPT3 and the WTS phased dualling of the A4440 Southern Link Road the initial phase of which is currently being delivered; the requirement for the delivery of a spine road within the site between the A44 and the Martley Road which will protect the alignment / delivery of a Northwest Link Road in the longer term; and improve the accessibility by non-car modes to Worcester city centre, including a parking hub facility close to the A4440. PM107 SWDP45/3 ii. Consistent with SWDP 14 the dwellings will be … To cross reference the policy to SWDP Cii 14 Housing Mix PM108 SWDP45/3 vi. The development of the Local Green Infrastructure Network. To use the accepted terminology Cvi PM109 SWDP45/3 viii. Contributions to transportation, education, sporting and recreational facilities, emergency services To acknowledge wider infrastructure Cviii infrastructure and village hall. requirements arising from the development. PM110 SWDP45/3 x. Only No vulnerable built development for uses compatible with the flood risk vulnerability To acknowledge the need to mitigate Cx classification in the 2012 Technical Guidance to the National Planning Policy Framework will flood risk on part of the site. be permitted in to occur in Flood Risk Zones 2, 3a or 3b. PM111 SWDP45/3 Insert new section : To reiterate the need for the scheme to Cxi Measures to support and safeguard the implementation of the schemes set out in the have regard to the LPT3 and the WTS Worcestershire LTP3, including the adopted Worcester Transport Strategy, improve accessibility

50 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map by non-car modes to Worcester city centre and key employment health, education, leisure and transport (interchange) destinations, facilities and services across Worcester City as a whole . PM112 SWDP45/4 ii. Consistent with SWDP 14 the dwellings will be … To cross reference the policy to SWDP Dii 14 - Housing Mix PM113 SWDP45/4 vi. The development of the Local Green Infrastructure Network. To use the accepted terminology Dvi PM114 SWDP45/4 vii. Contributions to transportation, education, sporting and recreational facilities and emergency To acknowledge wider infrastructure Dvii services infrastructure. requirements arising from the development. PM115 SWDP45/4 viii. Measures to improve accessibility by non-car modes to Worcester city centre, Bevere, River Severn, Requirement for parking hub now not Dviii local employment areas, schools and leisure centre .and the allocated Claines parking hub site. required PM116 SWDP 45 Include new urban extension between SWDP45/4 and SWDP45/5: Introduction of new policy section – SWDP45/* - Land at Swinesherd Way relating to new urban extension – to i. Delivery of a maximum of 300 dwellings of which 40% will be affordable. accommodate additional housing provision in accordance with proposed ii. Consistent with SWDP 14, the dwellings will be of mixed size, type and tenure in uplift in numbers. accordance with the needs set out within the SHMA (2012) and informed by local housing needs assessments in consultation with representatives of local communities. iii. No residential development beyond Flood Zone 1 or on areas previously the subject of surface water flooding. iv. Measures to secure safe access by non-car modes to Worcester city centre, local employment areas, Nunnery Wood Primary and Secondary Schools, Worcester Sixth Form College as well as local services at Whittington. v. A network of open spaces, to include equipped play space, which will deliver both Green Infrastructure and water management objectives. vi. A comprehensive landscaping scheme which ensures that traffic noise levels arising from

51 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map the A4440 and M5 do not breach prescribed standards for residential development. vii. Developer contributions towards community infrastructure considered necessary to improve accessibility, in particular by non-car modes. PM117 SWDP45/5 i. Phased delivery of a sustainable, well-designed technology park of approximately 16ha (Worcester For clarity Ei Technology Park) PM118 SWDP45/5 ii. Off-site highway works to support access to the site and contributions to improvements to the strategic Duplicated – policy requirement set out Eii highway network. at SWDP 45 / 5 E v PM119 SWDP45/5 iii. Landscaping that contributes to the Local Green Infrastructure Network … To use the accepted terminology Eiii PM120 SWDP45/5 iv. Measures to support and safeguard the implementation of the schemes set out in the To reiterate the need for the scheme to Eiv Worcestershire LTP3, including the adopted Worcester Transport Strategy , improve accessibility have regard to the LPT3 and the WTS by non-car modes to / from Worcester city centre and key residential and transport (interchange) destinations, facilities and services across Worcester City as a whole. PM121 SWDP45 Broomhall Community … To accommodate additional housing Table 18 SWDP – Phase 3 provision through increase in site Market Housing … 945 1,041 capacity in accordance with proposed uplift numbers Affordable Housing … 635 698 PM122 SWDP45 Temple Laughern … To accommodate additional housing Table 18 SWDP – Phase 3 provision through increase in site Market Housing … 380 1,085 capacity in accordance with proposed uplift numbers Affordable Housing … 250 720 PM123 SWDP 45 Swinesherd Way To accommodate additional housing Table 18 Market Housing … 180 provision through increase in site Affordable Housing … 120 capacity in accordance with proposed

52 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map uplift numbers PM124 SWDP 45 … about 3,900 5,560 dwellings will be required To accommodate additional housing Reasoned provision through increased capacity as justification Worcester urban extensions in paragraph 1 accordance with proposed uplift in housing numbers and in line with the spatial strategy. PM125 SWDP 45 … the creation of four five new urban extensions To accommodate additional housing Reasoned provision through increased capacity as justification Worcester urban extensions in paragraph 2 accordance with proposed uplift in housing numbers and in line with the spatial strategy. PM126 SWDP 45 The four five locations are: To accommodate additional housing Reasoned … provision through increased capacity as justification e) Swinesherd Way Worcester urban extensions in paragraph 3 accordance with proposed uplift in housing numbers and in line with the spatial strategy. PM127 SWDP 45 … provision of improved pedestrian / cycle and … To acknowledge the existing and Reasoned proposed cycle provision in the vicinity justification and in line with SWDP 4. paragraph 4d PM128 SWDP 45 … development and 2,450 2,600 dwellings) …(5ha of employment and 975 2,150 dwellings) … To accommodate additional housing reasoned provision through increased capacity as justification Worcester urban extensions in accordance with proposed uplift in 53 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map paragraph 5 housing numbers and in line with the spatial strategy. PM129 SWDP 45 … allocation of a sub-regional employment site as a fifth sixth urban extension … To acknowledge the further site for an reasoned urban extension at Worcester justification paragraph 6 PM130 SWDP 45 7. Providing access to jobs and essential services is a crucial part of delivering sustainable, To emphasize the need for the sites to Reasoned economically-led and inclusive communities. Development at locations that can be accessed by means be accessible to a range of services Justification other than the private car and which that provide efficient, accessible and attractive to users, links to and infrastructure paragraph the city centre and the key employment, residential, health, education, leisure and transport A7 (interchange) facilities, services and destinations across the city as a whole is essential. In conjunction with improvements to highway infrastructure at key pinch points across the South Worcestershire area, this integrated and multi-modal approach will increase the efficiency of the transport network, help to reduce transport-related and which provide good links to the city is essential. This also reduces carbon emissions and can improve the local environment and promote social inclusion. A safe, efficient and integrated transport system is important in supporting a strong and prosperous economy in Worcester. PM131 SWDP 45 … the potential to enhance public transport services via key transport corridors to/from/across Worcester To emphasize the need for the sites to Reasoned is maximised. New or improved local public transport (bus) services will be provided to link the new be accessible to a range of services Justification developments with the city centre and the key employment, residential, health, education, leisure and infrastructure paragraph and transport (interchange) facilities, services and destinations across the city as a whole and also A8 link to the existing settlements beyond the city. As part of the strategy to reduce congestion on the key arterial corridors into and across the city Three additional parking hubs are to may be delivered at or close to the urban extensions providing the opportunity to capture inbound car-borne traffic movement. PM132 SWDP 45 Include additional sentence at start of paragraph and amend : For clarification and in line with Local Reasoned Transport Plan ( LPT3). Justification A multi-modal approach is required to support the development strategy . … This has assessed and 54 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map paragraph identified: A9 PM133 SWDP 45 a. The impact of the planned development on the highway capacity and the operation of the For clarification Reasoned Worcester city network and the South Worcestershire’s strategic transport network as a whole Justification paragraph A9a PM134 SWDP 45 b. The potential development locations The package of transport infrastructure and service For clarification Reasoned enhancement schemes needed to accommodate the travel demand generated by the planned Justification development.. paragraph A9b PM135 SWDP 45 c. The likely impact on the existing road system and the environment The costs of mitigating transport For clarification Reasoned schemes. Justification paragraph A9c PM136 SWDP 45 … Strategic Flood Risk Assessment (Levels 1 and 2) as updated in 2012 and 2014 … need to be To acknowledge the further evidence reasoned accompanied by site specific flood risk assessments base update on flood risk. justification paragraph D3 PM137 SWDP 45 … there were are some important objectives that would need to be fulfilled which will need to and these For clarification reasoned would be an integral part … Justification paragraph 14

55 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM138 SWDP 45 … and the existing Norton Barracks settlement, which allows for direct access to local services for For clarification reasoned pedestrian and where the separation does not form barriers to direct pedestrian and cycle movements Justification between the two communities, cyclists and does not allow car-borne vehicular journeys except where paragraph crossed by the Norton Road/ local centre/ A38 link and functions as a biodiversity corridor and 14c recreational space PM139 SWDP 45 h. To provide a new police station emergency services infrastructure serving the local community. To acknowledge wider infrastructure reasoned requirements arising from the Justification development. paragraph 14h PM140 SWDP 45 … Allowance for possible dualling of the carriageway … To clarify the latest position reasoned justification paragraph 15b PM141 SWDP 45 The Plan has extended the Significant Gap (previously the M5 Protection Corridor, Worcester, and For clarification reasoned Strategic Gap, Wychavon) to the west of the M5 motorway so that land to the east and south-east justification of Norton Barracks is now subject to SWDP 2 part Aiv and C. In addition, land between Kempsey paragraph 17 and the southern limit of the urban extension remains as Significant Gap . Care will be needed in the treatment of the edges of the development area and the need to identify appropriate Significant Gaps beyond the new urban edge. In order to help minimise … from Norton Road roundabout and the A38. PM142 SWDP 45 20. The protection of the Earls’ Court Scheduled Ancient Monument is consistent with SWDP 1, 6 and For cross referencing reasoned 243 and section 12 of the NPPF. SWDP 6 and SWDP 24 (Historic Environment policies) also strengthen justification this protection. paragraph 20 PM143 SWDP 45 … the city boundary with the Laughern Brook valley except in the far north east corner , being a To describe the change in the site reasoned 56 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map justification particular feature … boundary paragraph 20a PM144 SWDP 45 … a rapid transit bus route into the city from the park and ride site. The primary road network through the To be in line with SWDP 4. reasoned development will extend the A4440 up to Oldbury Road and the B4264 Martley Road but should also justification allow for the construction of a northwest link road in the longer term. paragraph 20b PM145 SWDP 45 c. The northern development boundary would lie along the B4264 Martley Road north of Oldbury To describe the change in the site reasoned Road but provision will need to be made for sufficient land to enable appropriate landscape management boundary, where the road can now justification to take place. This will ensure that a hard urban edge is not created at this point and will mitigate the views form a buffer. paragraph across the area from Hallow in particular. The western boundary will follow the approximate line of 20c the spine road serving the development from the A44 to the Martley Road. PM146 SWDP 45 21. The two smaller urban extensions below are referred to as Kilbury Drive (to the east) … To clarify where the text relating to Reasoned these appears Justification paragraph 21 PM147 SWDP 45 Delete final sentence of paragraph 24 : Site already has Planning Permission Reasoned The nearby parking hub allocation east of the A449 is part of wider integrated transport proposals to foster and we had no adopted plan policy to Justification greater use of sustainable transport modes into the city. secure the parking hub paragraph 24e

57 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM148 SWDP 45 Include the following after paragraph 25: Introduction of new policy section Reasoned relating to new urban extension – to Justification Swinesherd Way (SWDP45/A): accommodate additional housing provision in accordance with proposed This site lies to the east of Kilbury Drive between Swinesherd Way and the M5, immediately to the uplift in numbers north of Whittington. In order for development to be suitably sustainable here the following objectives need to be achieved: - a) Minimise car dependency by securing bus penetration and safe cycle and walking access across Swinesherd Way, enabling residents to reach local services and employment opportunities; b) A comprehensive SuDS scheme that deals with the surface water flooding; c) No built development beyond Flood Zone 1; d) An agreed landscaping scheme that will reduce noise pollution from the A4440 and M5 to acceptable levels; e) Emerging vehicle and cycle / walking access only to Whittington village PM149 SWDP 45 … resulting in a successful bid for £17.5m of Regional Growth Fund. The amount bid for / received is Reasoned continually updated, and the figure is Justification not required as it will not illustrate the paragraph latest figures 30 SWDP 46 – Pershore Allocations

PM150 SWDP 46 Add the following to Table 19: To accommodate additional housing Table 19 Site ref location No. of dwellings provision in accordance with proposed (approx.) uplift in numbers. Approved subject to S106 SWDP46x Land off Rd, Pershore 21

58 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM151 SWDP 46 Amend table total: Total changed following additional Table 19 … allocations Pershore Allocations Total (excluding urban extensions) – 66 87 SWDP 47 – Pershore Urban Extension

PM152 SWDP47/1 A. SWDP 47/1 Land to the North Of Pershore The site area has been extended at … a phased delivery of approximately 600 695 new homes … Station Road to reflect recent planning permissions and also includes land at The Ford House which was previously surrounded by the allocated site. 260 dwellings already have planning permission, 290 dwellings have a resolution to grant planning permission subject to Section 106 and there is a current application for 124 dwellings. In total 674 units already have permission / a resolution to grant permission or an application. PM153 SWDP47/1 DELETE the following paragraph from the policy: Policy amended to reflect the fact that the GI will be located within the A SWDP 47/1 Land to the North Of Pershore boundaries of the allocation rather than as currently indicated. To ensure that a sufficient level of Green Infrastructure is provided for the development, the land immediately adjoining the northern boundary of the land to the west of Station Road will be used to provide some of the Green Infrastructure required for this site. However, the built form of the development will not extend beyond the boundaries shown on the Policies Map.

59 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM154 SWDP47/1 As table 19 shows, currently there is very limited … is proposed, comprising approximately 600 695 Total changed following additional Reasoned dwellings at … allocations. Permission / applications Justification, for 674 units already granted. paragraph 1 SWDP 49 – Droitwich Spa Urban Extensions

PM155 SWDP49 Include the following as new urban extension (renumbered as appropriate): Introduction of new policy relating to (WY045) new urban extension – to B SWDP49/ X Yew Tree Hill accommodate additional housing provision in accordance with proposed The Policies Map identifies a location for a sustainable, well-designed urban extension to the 7 uplift in numbers. Note footnote to south of the town in accordance with a more detailed masterplan brief policy. It is expected that the development will deliver: i) Phased provision of approximately 765 new homes reflecting a range of housing sizes and tenures to reflect and accommodate the needs of both the existing and new population of Droitwich Spa. ii) Phased provision of 200 unit care facility (C2 uses). iii) A local neighbourhood centre incorporating local shops, food outlets, leisure / entertainment and community facilities. A police post should be provided within this element of the development. iv) Upgraded access to A38 at the junction with Pulley Lane and necessary engineering works along the length of Pulley Lane as required accommodating the level of proposed development. v) Enhanced public transport, cycle and pedestrians connections to the town centre via Newland Road and Primsland Way.

7 Planning permission has been granted for the allocated development – W/11/01073/OU and W/12/02366/OU

60 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map vi) New public open space as appropriate, to incorporate and enhance existing Green Infrastructure, provide leisure facilities and to develop the Droitwich Diamond Jubilee Walk. vii) A landscaping strategy for the southern edge of the site, adjacent to Pulley Lane; this should seek to minimise the impact of the development on the countryside and designated Green Belt beyond. PM156 SWDP49 Amend the following: Introduction of new policy relating to new urban extension – amended policy B C SWDP49/2 3 – Stonebridge Cross Business Park … numbers as appropriate.

61 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM157 SWDP49 Add Reasoned Justification between paragraphs 3 and 4 (renumber as appropriate): Introduction of new policy relating to Reasoned new urban extension – to Justification SWDP49/X accommodate additional housing provision in accordance with proposed paragraph 3, 4. Land is allocated at Yew Tree Hill to deliver a sustainable urban extension to the south of the uplift in numbers. 4 town. This will comprise 765 homes of an appropriate mix, size and tenure, along with a local service centre. The latter will provide for a range of retail, leisure and entertainment outlets as well as community facilities to include a police post. In order to help address an identified residential care need over the plan period the site will also deliver a 200 unit care facility (C2 uses). 5. Features of the scheme should include open space and the enhancement of the Droitwich Diamond Jubilee Walk around the town. Links to the open countryside beyond via the existing public footpath network will also be secured. The setting of the higher ground around the water tower should be respected. The location of the urban extension on the rural/urban fringe of the town is acknowledged and any landscape strategy should incorporate enhance measures to minimise the impact of the development on the open countryside beyond . 6. Vehicular access will be only via Pulley Lane, on to the A38 and the necessary junction and highway upgrades will need to form part of any application beyond the allocated site boundary. Public transport and emergency vehicle access, along with cycling and pedestrian links, will be acceptable from Newland Land to Primsland Way and the town beyond. The provision of a timetabled bus service to the town centre should form part of any development to enhance the locations sustainable development credentials.

62 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map SWDP 50 – Evesham Allocations

PM158 SWDP 50 Add the following to Table 21 : To accommodate additional housing Table 21 provision in accordance with proposed uplift in numbers. Approved subject to Site ref location No. of dwellings S106 (approx.) SWDP50x Land at Aldington Lodge, Road, Evesham 60

PM159 SWDP50/1 Delete the following allocation: Site is covered by SWDP51/2, which Land at bottom of Peewit Road, Evesham - 63 has permission for 401 dwellings. PM160 SWDP 50 Amend table sub-total: Total changed following additional Table 21 Evesham Urban Capacity Total – 490 487 allocations SWDP 52 – Malvern Allocations

PM161 SWDP 52/4 Amend the following site allocation: Allocation changed following grant of Table 22 Site ref location No. of Site area planning permission (ref 13/01585/FUL dwellings (ha) for 5 dwellings). (approx.) SWDP52/4 Homestead, Halfkey 6 5 0.26

63 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM162 SWDP52/6 Delete the following from Table 22 : Delete site as landowner has advised Table 22 Site ref location No. of that it is no longer available for housing dwellings development. (approx.) SWDP52/6 Land to rear of 12, Priory Road 6

PM163 SWDP 52 Add the following to Table 22: To accommodate additional housing Table 22 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers, allowing for 50% GI (approx.) (ha) to deliver good level of open space. 62 dwellings granted subject to S106 SWDP52d Land at Mill Lane, Poolbrook 62 3.94 (13/01095/OUT) as at 22/07/2014

PM164 SWDP 52 Add the following to Table 22: To accommodate additional housing Table 22 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers, allowing for 50% GI (approx.) (ha) to deliver good level of open space. SWDP52i Land at Lower Howsell Road (former allotments) 81 5.21

PM165 SWDP 52 Add the following to Table 22: To accommodate additional housing Table 22 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers, to deliver a good (approx.) (ha) level of open space. 44 dwellings (net) approved 16/06/14 (13/00900/OUT). SWDP52f Pickersleigh Grove (part of Hayslan Fields) 44 3.30

64 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM166 SWDP 52 Add the following to Table 22: To accommodate additional housing Table 22 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in number. The site was a (approx.) (ha) commitment as a planning permission, which has lapsed, so is now allocated. SWDP52m Former Railway Sidings, Peachfield Road 20 0.67

PM167 SWDP 52 Add the following to Table 22: To accommodate additional housing Table 22 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. (approx.) (ha) SWDP52s Victoria Road Car Park 21 0.28

PM168 SWDP 52 Add the following to Table 22: To accommodate additional housing Table 22 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers, allowing for 40% GI (approx.) (ha) to deliver good level of open space. SWDP52w Land off Brook Farm Drive, Poolbrook 77 4.25

PM169 SWDP 52 Add the following to Table 22: To accommodate additional housing Table 22 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers, allowing for 40% GI (approx.) (ha) to deliver good level of open space. SWDP52y Broadlands Drive, Malvern 33 1.82

65 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM170 SWDP 52 Add the following to Table 22 : Site was a commitment with planning Table 22 Site ref location No. of Site permission for 28 dwellings, which has dwellings area recently lapsed, so has instead been (approx.) (ha) allocated. SWDP52* Barracks Store, Court Road, Malvern 28 0.8

PM171 SWDP 52 Amend table sub-total: Total changed following additional Table 22 Malvern Allocations Total – 147 506 allocations PM172 SWDP 52 Malvern’s urban capacity …has been established at approximately 4.5ha of employment land and 147 506 Total changed following additional Reasoned dwellings … together with 250 300 dwellings … of employment land and a site for 700 800 dwellings, allocations Justification together with … para. 1

SWDP 53 – Malvern Technology Centre (Qinetiq)

PM173 SWDP 53 … Approximately 250 300 dwellings. Total changed following additional Bii allocations, PM174 SWDP 53Ci 250 300 dwellings, of which 100 120 affordable Total changed following additional allocations PM175 SWDP 53 – b. Approximately 250 300 dwellings, based on a mix of housing types. Total changed following additional Reasoned allocations Justification para. 5b

66 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map SWDP 56 – Development at North East Malvern

PM176 SWDP 56Bii ii. 700 800 dwellings to be phased … Total changed following additional allocations PM177 SWDP A requirement to show how the site can be connected to and integrated with existing and proposed The Lower Howell Road former 56Cvi development, for example at the Royal Estates, and the former allotments site allocation to the south allotments site has now been allocated, (site SWDP52i) , through appropriate road , footpath and cycle links and through opportunities for and to explain the relationship to the regeneration. North east Malvern site. PM178 SWDP 56D Phase 2 of SWDP 2013-2019 Total changed following additional i. Phase 2 of SWDP 2013-2019 allocations • 220 dwellings, of which 100 88 will be affordable … … ii. Phase 3 of SWDP 2019-2030 • 480 580 dwellings, of which 180 232 will be affordable … PM179 SWDP 56 b. Approximately 700 800 dwellings. Total changed following additional Reasoned allocations Justification paragraph 1b PM180 SWDP 56 … on the road frontage. It provides a strong and visual site boundary. Consideration will be given to the The Lower Howell Road former Reasoned inclusion of the former allotment site in the context of the larger development site. The site at the former allotments site has now been allocated, justification allotments is now allocated (SWDP52i), but it is considered that, subject to detailed assessment and to explain the relationship to the paragraph 4 and comments from the Highway Authority, consideration will be given in the first instance to the North east Malvern site. main vehicular access to the former allotments site will be through the North East Malvern urban extension, to the Worcester Road.

67 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map SWDP 57 – Tenbury Wells Allocations

PM181 SWDP 57 Amend the following site allocation: To accommodate additional housing Table 23 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Appeal allowed (approx.) (ha) 30/09/13 (12/00659/OUT). Reserved matters for 43 dwellings SWDP57/1 Land opposite Morningside 30 43 1.05

(14/00006/REM) approved 23/05/2014. PM182 SWDP 57 Add the following to Table 24 : To accommodate additional housing Table 23 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. 44 dwellings allowed (approx.) (ha) on appeal 13/08/2013. SWDP57a Land at Mistletoe Row, Oldwood Road 44 3.74

PM183 SWDP 57 Add the following to Table 24 : To accommodate additional housing Table 23 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers (approx.) (ha) SWDP57c Land south of the Oaklands, Tenbury 35 1.92

PM184 SWDP 57 Amend table sub-total: Total changed following additional Table 23 allocations Tenbury Wells Allocations – Total 70 162

68 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map SWDP 58 – Upton upon Severn Allocations

PM185 SWDP 58 Add the following to Table 24 : To accommodate additional housing Table 24 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Upton Marina allowed (approx.) (ha) on appeal for up to 70 dwellings 06/06/14. SWDP58c Upton Marina (Previously Upton-upon-Severn, Holly 70 n/a Green / Ryall and Tunnel Hill Area)

PM186 SWDP 58 Add the following to Table 24 : To accommodate additional housing Table 24 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. 43 dwellings (approx.) (ha) approved subject to S106 as at 22/07/2014 (13/00009/FUL). SWDP58d Land at Welland Road (Tunnel Hill) 43 2.12

PM187 SWDP 58 Delete SWDP 58C: Delete this reference as an additional In addition a further 75 dwellings are allocated to the broad location of the Upton-upon-Severn, Holly 70 dwellings have recently been Green / Ryall and tunnel Hill area, the exact sites to be determined through neighbourhood planning. approved at Upton Marina, and are now allocated (PM185). PM188 SWDP 58 Amend table sub-total: Total changed following additional Table 24 Upton-upon-Severn Allocations - Total 25 138 allocations

PM189 SWDP 58 Delete last two sentences: Consequential upon PM185 above - an Reasoned Although a site at Holly Green is considered deliverable and is therefore allocated above, there are additional 70 dwellings have recently justification currently no other sites considered to be deliverable at this stage. Analysis of sites put forward through the been approved at Upton Marina, and paragraph 1 Strategic Housing Land Availability Assessment has shown limited availability of appropriate sites in both are now allocated. Tunnel Hill to the west and in Holly Green on the north-east side of the river. 69 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM190 SWDP 58 Amend paragraph 2: Consequential upon PM185 above - an Reasoned It is considered that a figure of approximately 100 dwellings is appropriate to meet the needs of the town additional 70 dwellings have recently justification over the plan period. With land at the north east of Upton Marina now a planning commitment for up been approved at Upton marina, and paragraph 2 to 70 dwellings and land at Welland Road approved subject to a S106 agreement for 43 dwellings, are now allocated. it is considered that the broad dwelling figure is achieved. Additional sites can be brought forward through a Neighbourhood Plan, if deemed necessary. Thus, an additional 75 dwellings are proposed at Upton as a broad location; the exact sites are to be determined through a Neighbourhood Plan, the District Council will produce an Area Action Plan for the Upton area later in the plan period to ensure this level of housing development is delivered.

SWDP 59 – Category 1 Village Allocations Malvern Hills Category 1

PM191 SWDP59/2 Amend the following site allocation: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. (approx.) (ha) SWDP59/2 Land west of Apostle Oak Cottage, Abberley Common 10 14 0.38

PM192 SWDP 59/4 Amend the following site allocation: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Planning permission (approx.) (ha) has been granted for 27 dwellings ref 12/01412/Ful, April 2014 SWDP59/4 Land adjacent to the Primary School, Great Witley 23 27 1.34

70 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM193 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Planning permission (approx.) (ha) granted for 15 dwellings under ref 13/01161/Ful, June 2014. SWDP59a Land at Walshes Farm, Clows Top Road, Abberley 15 1.44 Common

PM194 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Planning permission (approx.) (ha) granted under ref 13/01327/Ful, subject to S106 agreement. SWDP59b Land at Church House Farm, Clifton upon Teme 17 4.8

PM195 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Planning permission (approx.) (ha) granted under ref 14/00170/Out for 9 dwellings. SWDP59d Land at Braithwaites Yard, Hallow 9 0.68

PM196 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Planning permission (approx.) (ha) granted under ref 14/00170/Out for8 dwellings. SWDP59zk Land at the Royal Oak Public House, Hallow 8 0.19

71 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM197 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. (approx.) (ha) SWDP59zzi Land South of Greenhill Lane, Hallow 30 1.67

PM198 SWDP 59/7 DELETE the following allocation: Site now not available - land owner has Table 25 SWDP59/7 - Land at Yew Tree Farm, Hanley Swan (20) withdrawn PM199 SWDP 59/8 Amend the following site allocation: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. (approx.) (ha) SWDP59/8 Land adjacent to the Lawns including Bight Farm 138 190 4.70 (combined / extended sites), Kempsey 6.40

PM200 SWDP 59/9 Amend the following site allocation: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Planning permission (approx.) (ha) granted for 48 dwellings under ref 13/00878/Ful, subject to S106 SWDP59/9 Land to the west of Bell Lane / south of Martley Road, 40 48 2.08 agreement. Lower Broadheath

72 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM201 SWDP Amend the following site allocation: Change in site area. 59/11 Table 25 Site ref location No. of Site area dwellings (ha) (approx.) SWDP59/11 Strand Cottages, Peachley Lane, Lower Broadheath 6 0.23 0.60

PM202 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 provision in accordance with proposed uplift in numbers. Planning permission Site ref location No. of Site granted for 10 dwellings under ref dwellings area 13/0104/Ful. (approx.) (ha) SWDP59e 123a Main Road, Kempsey 10 0.39

PM203 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Planning permission (approx.) (ha) granted for 120 dwellings under ref 13/00417/Out on appeal. SWDP59f Land north of Brookend Lane (adjacent to the 120 6.87 Limes), Kempsey

73 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM204 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Planning permission (approx.) (ha) granted for 42 dwellings under ref 13/00725/out. SWDP59* Land adjacent to Henwick Mill House, Martley Road, 42 1.55 Lower Broadheath

PM205 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 Site ref location No. of Site provision in accordance with proposed dwellings area uplift in numbers. Planning permission (approx.) (ha) granted for 14 dwellings under ref 13/00981/Out. SWDP59k Land adjacent to Primary School, Martley 14 0.77

PM206 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 provision in accordance with proposed uplift in numbers. Planning permission Site ref location No. of Site granted on appeal for 50 dwellings. dwellings area APP/J1860/A/13/219703, Jan 2014. (approx.) (ha) SWDP59l Land at Lawn Farm, Drake Street, Welland 50 9.15

74 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM207 SWDP 59 Add the following to Table 25: To accommodate additional housing Table 25 provision in accordance with proposed uplift in numbers. Planning permission Site ref location No. of Site granted for 30 dwellings under ref dwellings area 13/01526/Out in July 2014, subject to (approx) (ha) S106 agreement. SWDP59zl Land between Old Post Office and Church Farm, 30 1.66 Drake Street, Welland

PM208 SWDP 59 Amend table sub-total: Total changed following additional Table 25 allocations Malvern Hills Category 1 Villages Total: 406 799 Wychavon Category 1

PM209 SWDP59/14 Amend the following site allocation: To accommodate additional housing Table 25 provision in accordance with proposed uplift in numbers Site ref location No. of Site dwellings area (approx.) (ha) SWDP59/14 Land off Banks Road, 30 39 1.01

75 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM210 SWDP Amend the following site allocation: Allocation changed following grant of 59/17 planning permission Table 25 Site ref location No. of Site area dwellings (ha) (approx.) SWDP59/17 Land to the east of Kingsdale Court, Broadway 12 13 0.50

PM211 SWDP59/20 Amend the following site allocation: To reflect planning permission granted Table 25 on site ( 12/02358/OU) for 92 dwellings Site ref location No. of Site area dwellings (ha) (approx.) SWDP59/20 Land west of Worcester Road, 100 92 3.98

PM212 SWDP59/25 Amend the following site allocation : Site area increasing to include site Table 25 previously allocated in Local Plan. Therefore allocation has increased Site ref location No. of Site area dwellings (ha) (approx.) SWDP59/25 The Racks (east), 14 34 1.08

76 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM213 SWDP59/27 Amend the following site allocation: To accommodate additional housing Table 25 provision in accordance with proposed uplift in numbers. Planning permission Site ref location No. of Site area (13/01818) under construction dwellings (ha) (approx.) SWDP59/27 Crown Lane, Wychbold 60 68 2.96

PM214 SWDP 59 Add the following to Table 25 : To accommodate additional housing Table 25 provision in accordance with proposed uplift in numbers. Planning permission. (WY003) Site ref location No. of Site area dwellings (ha) (approx.) SWDP59x Land opposite Horsebridge Avenue, Badsey 36 1.78

PM215 SWDP 59 Add the following to Table 25 : To accommodate additional housing Table 25 provision in accordance with proposed uplift in numbers (planning app (WY008) Site ref location No. of Site area reference 13/00696). dwellings (ha) (approx.) SWDP59 x Land between Leasowes Road and Laurels Road, 50 1.78 Offenham

77 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM216 SWDP 59 Add the following to Table 25 : To accommodate additional housing Table 25 provision in accordance with proposed uplift in numbers. Permission granted (WY009) Site ref location No. of Site area on appeal dwellings (ha) (approx.) SWDP59 x Spencer Commercial Services Ltd, Evesham Road, 9 0.33 Offenham

PM217 SWDP 59 Amend table sub-total: Total changed following additional Table 25 allocations Wychavon Category 1 Villages Total: 613 738

SWDP 60 – Category 2 Village Allocations Malvern Hills Category 2

PM218 SWDP 60/5 Amend the following site allocation: To accommodate additional housing Table 26 provision in accordance with proposed uplift in numbers. Site ref Location No. of Area dwellings (ha) (approx.) SWDP60/5 Former Allotments, Winsmore 30 35 1.57

78 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM219 SWDP60/6 Amend the following site allocation: To accommodate additional housing provision in accordance with proposed uplift in numbers. Planning permission Site ref Location No. of Area granted for 28 dwellings under dwellings (ha) reference 12/01661/FUL (approx.) SWDP60/6 Land at Claphill Lane, Rushwick 23 28 0.97

PM220 SWDP 60 Add the following to Table 26: To accommodate additional housing Table 26 provision in accordance with proposed uplift in numbers. Planning permission Site ref location No. of Area granted for 8 dwellings under ref dwellings (ha) 13/01224/Ful, subj to S106 agreement. (approx.) SWDP60a Land at Stoney Lea, Broadwas 8 0.50

PM221 SWDP 60 Add the following to Table 26: To accommodate additional housing Table 26 provision in accordance with proposed uplift in numbers. Upheld on appeal for Site ref location No. of Area 45 dwellings, Jan 2014- ref dwellings (ha) APP/J1860/A/13/2200044 (approx.) SWDP60b Land adjacent to the Crown Public House, Powick & 45 2.72 Collett’s Green

79 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM222 SWDP 60 Add the following to Table 26: To accommodate additional housing Table 26 provision in accordance with proposed uplift in numbers. Planning permission Site ref location No. of Area granted for 39 dwellings, ref dwellings (ha) 13/00216/Out, Subj to S106 (approx.) agreement. SWDP60c Land south of Sparrowhall Lane, Powick & Collett’s 39 2.23 Green

PM223 SWDP 60 Add the following to Table 26: To accommodate additional housing Table 26 provision in accordance with proposed uplift in numbers. Planning permission Site ref location No. of Area granted for 53 dwellings, ref dwellings (ha) 13/00952/Ful. (approx.) SWDP60d Land at Kiln Lane, Leigh Sinton 53 2.01

PM224 SWDP 60 Add the following to Table 26: To accommodate additional housing Table 26 provision in accordance with proposed uplift in numbers. Site ref location No. of Area dwellings (ha) (approx.) SWDP60t Land off Bransford Road, Rushwick 50 2.16

PM225 SWDP 60 Amend table sub-total: Total changed following additional Table 26 allocations Malvern Hills Category 2 Villages Total: 135 340

80 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map Wychavon Category 2

PM226 SWDP Amend the following site allocation: To accommodate additional housing 60/12 provision in accordance with proposed uplift in numbers. Site is now complete. Table 26 Site ref location No. of Site area dwellings (ha) (approx.) SWDP60/12 Ivy Lane, 20 22 0.72

PM227 SWDP Amend the following site allocation: To accommodate additional housing 60/18 provision in accordance with proposed uplift in numbers. Permission granted Table 26 Site ref location No. of Site area May 2014. Advertising site and dwellings (ha) clearing conditions April 2014 (approx.) SWDP60/18 Land east of Boot Inn on Radford Rd (& 39-07) Flyford 12 16 1.41 Flavell

PM228 SWDP Amend the following site allocation: Permission granted May 2014 for 60/19 increased number Table 26 Site ref location No. of Site area dwellings (ha) (approx.) SWDP60/19 Land adjacent to Crest Hill, 5 9 0.45

81 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM229 SWDP60/24 Amend the following site allocation: To accommodate additional housing Table 26 provision in accordance with proposed uplift in numbers. Approved subject to Site ref location No. of Site area S106 dwellings (ha) (approx.) SWDP60/24 Land off Main Street, behind Nos 43 to 57, 12 20 0.83

PM230 SWDP60/27 Amend the following site allocation: To accommodate additional housing Table 26 provision in accordance with proposed uplift in numbers. Permission granted, Site ref location No. of Site area under construction. dwellings (ha) (approx.) SWDP60/27 Land at Shine Hill, adjacent to The Lanterns, South 6 30 2.13 Littleton

PM231 SWDP 60 Add the following to Table 26 : To accommodate additional housing Table 26 provision in accordance with proposed uplift in numbers. Planning permission (WY058) Site ref location No. of Site area granted subject to S106 dwellings (ha) (approx.) SWDP60 x Land between Pentalow and Berrycroft, Blacksmiths 8 0.44 Lane, Cropthorne

82 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map PM232 SWDP 60 Add the following to Table 26: Planning permission granted on appeal Table 26 (ref. APP/H1840/A/14/2218149) (WY059) Site ref location No. of Area (ha) dwellings (approx.) SWDP60 x Stonebow Road, Drake’s Broughton 39 2.86

PM233 SWDP 60 Amend table sub-total: Total changed following additional Table 26 allocations Wychavon Category 2 Villages Total: 415 504

SWDP 61 – Category 3 Village Allocations Malvern Hills Category 3

PM234 SWDP 61 Add / Amend the following to Table 27: To accommodate additional housing Table 27 Site ref location No. of Area provision in accordance with proposed dwellings (ha) uplift in numbers. Planning permission (approx.) granted for 62 dwellings on land at Pearl Lane (adjacent to Stourport) SWDP61/1 East of Chapel Meadow, Alfrick 13 14 0.39 under ref 13/01505/Out. SWDP61/* Land off Pearl Lane (relates to Stourport), Astley 62 2.16 Cross

PM235 SWDP 61 Amend table sub-total: Total changed following additional Table 27 Malvern Hills Category 3 Villages Total: 13 76 allocations

83 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map Wychavon Category 3

PM236 SWDP 61/2 Amend the following site allocation: To accommodate additional housing Table 27 Site ref location No. of Site area provision in accordance with proposed dwellings (ha) uplift in numbers. Planning permission (approx.) granted subject to S106 SWDP61/2 Land west of Main Street, 6 12 1.40

PM237 SWDP Amend the following site allocation: To accommodate additional housing 61/13 provision in accordance with proposed uplift in numbers. Site is under Table 27 Site ref location No. of Site area construction. dwellings (ha) (approx.) SWDP61/13 Honeybourne Road, 10 13 1.36

PM238 SWDP Amend the following site allocation: To accommodate additional housing 61/14 provision in accordance with proposed Table 27 SWDP61/14 - Land adjacent to Bridge Inn, Foredraught Lane, Tibberton - 5 6 0.45 uplift in numbers. Site is now complete. PM239 SWDP 61 Amend table sub-total: Total changed following additional Table 27 allocations Wychavon Category 3 Villages Total: 144 154 Annex E – South Worcestershire Housing Trajectories

PM240 Annex E Revised housing trajectory graphs to be included – see Appendix 4 To reflect the evidence on housing supply, which is detailed in the Housing

84 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map Background Paper – Addendum 2014, and the updated detailed housing trajectories. To be consistent with the proposed changes to the housing provision targets in SWDP 3 Table 4b and the housing supply identified in SWDP 3 Table 4e. Annex I - Infrastructure Delivery Plan Schedule

PM241 Annex I Revised IDP to be included – see Appendix 5 tbc

85 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Appendix 1 Proposed changes to SWDP 17

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map

PM242 SWDP 17A … outlined in Table 5 and 6. Provision will be made for the net requirement for additional pitches after To reflect 2014 GTAA. Previously, taking into account existing commitments and other planned provision. requirement was to meet need identified in GTAA minus pitches that had been granted consent to March 2012.

PM243 SWDP 17B Broad locations to meet the need for Traveller pitches and Travelling Showpeople plots net To clarify that the policy relates to requirement will be considered within, or on the edge of, existing settlements Travelling Showpeople, not just Gypsies and Travellers.

PM244 SWDP 17C The local planning authority will assess the suitability of proposals and planning applications (including the To clarify that opportunities for intensification or reasonable expansion of existing authorised traveller or travelling showpeople sites) intensifying existing sites (not just against the following criteria: physical expansion) will be assessed. Also, that the policy relates equally to Travelling Showpeople.

PM245 SWDP 17D … applications that perform well against meet the above criteria and contribute to meeting any remaining To remove ambiguity and add clarity, identified unmet need will be considered favourably applications should meet the criteria.

PM246 SWDP 17E Any planning permission will be subject to conditions relating to the number of pitches / plots and To add clarity. Planning consent restricting occupancy to Traveller or Travelling Showpeople use. should specify the number of pitches / plots that are being granted planning permission. In the past, some consents have merely related to a household or number of caravans and it has not been clear how many pitches or plots have been granted consent. 86 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map

PM247 SWDP 17 National Planning Policy requires for Traveller Sites (2012) states that local planning authorities to To reflect Planning Policy for Reasoned should set pitch targets for Travellers and plot targets for Travelling Showpeople that address the likely Traveller Sites (March 2012) justification permanent and transit site accommodation needs of Travellers in their area, working collaboratively with paragraph 1 neighbouring local planning authorities. National planning policy also requires says that local planning authorities to should set out criteria to provide a basis for the allocation of sites and to identify sufficient deliverable sites to provide a 5-year supply when measured against locally set targets.

PM248 SWDP 17 2. A The Worcestershire Gypsy and Traveller Accommodation Assessment for the South Housing Market To reflect the 2014 GTAA. Reasoned Area (which includes South Worcestershire) was published in 2008. The Assessment addressed the justification accommodation needs of gypsies, travellers and travelling showpeople published in 2014 It identifies the paragraph 2 need following requirements for additional permanent residential traveller pitches, Travelling Showpeople plots and transit pitches in the County in the period between 2014/15 and 2033/34 . 3. Within south Worcestershire, the need identified in the GTAA in the five years to 2018/19 Temporary Stopping Places for the period from 2008 up to 2013 is set out in Table 5 below :

PM249 SWDP 17 Insert new Table 5 ( delete original): To reflect the findings of the 2014 Table 5 Table 5: GTAA Need for Permanent Traveller Pitches, Travelling Showpeople Plots and Transit Pitches 2014/15 – 2018/19 (source: Worcestershire Gypsy & Traveller Accommodation Assessment, 2014) Permanent Permanent Travelling Transit Pitches Traveller Pitches Showpeople Plots

Malvern Hills -3 -3 3

Worcester -1 0 0 Wychavon 9 0 2

87 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map

PM250 SWDP 17 Insert new paragraphs To reflect the findings of the 2014 Reasoned 4. The GTAA identifies an overall shortfall of 5 permanent Traveller pitches across south GTAA justification Worcestershire in the period to 2018/19. The identified need is primarily in Wychavon where there is a requirement for nine pitches. Malvern Hills and Worcester have sufficient capacity to cover identified needs up to 2018/19. 5. For Travelling Showpeople, the GTAA identifies no overall additional need for plots across south Worcestershire in the period to 2018/19. 6. The GTAA identified a number of vacant pitches (particularly in Wychavon) and opportunities for the intensification or limited expansion of a number of existing sites in Malvern Hills and Wychavon. 7. Whilst the GTAA does not identify a need to plan for large strategic Traveller or Travelling Showpeople sites in the period to 2018/19, it recommends that the south Worcestershire authorities assess the suitability of proposals and planning applications for smaller sites as they arise against criteria-based planning policies. 8. The GTAA also recommends that provision be made for a minimum of five transit pitches and suggests that the south Worcestershire authorities liaise with a view to providing a shared facility for dealing with future unauthorised encampments. 9. The GTAA indicates a desire amongst Travellers for a mixture of Council / Registered Social Landlord (RSL) - managed sites and private sites. 10. The GTAA also identifies the likely longer-term requirement for pitches and plots, covering the period 2019/20 - 2033/34. The longer-term requirements, based on expected household formation rates, are set out in Table 6. The longer-term requirements make no allowance for turnover on existing sites and are therefore indicative and liable to change in light of future updated turnover rates .

88 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map

PM251 SWDP 17 Insert new Table 6 ( delete original): To reflect the findings of the 2014 GTAA Table 6 Table 6: Longer-Term Requirement for Permanent Traveller Pitches and Travelling Showpeople Plots 2019/20 – 2033/34 (source: Worcestershire Gypsy & Traveller Accommodation Assessment, 2014) 2019/20 – 2023/24 2024/25 – 2028/29 2019/20 – 2033/34 Traveller Showman Traveller Showman Traveller Showman Pitches Plots Pitches Plots Pitches Plots Malvern Hills 6 2 6 2 8 4 Worcester 5 0 3 0 5 0 Wychavon 19 0 23 0 26(?) 0 Total 30 2 32 2 39? 4

PM252 SWDP 17 Delete original paragraph 3: To reflect the findings of the 2014 Reasoned The evidence base for the West Midlands regional Interim Policy Statement: Provision of New GTAA justification Accommodation for Gypsies, Travellers and Travelling Showpeople, published in March 2010, has been paragraph 3 used to inform the level of provision over the plan period from 2007, as shown in Table 6 below

PM253 SWDP 17 Insert new paragraphs: 2014 GTAA supersedes the regional Reasoned 11. The GTAA suggests a need for up to 30 Traveller pitches between 2019/20 to 2023/24, 32 interim policy statement. justification pitches 2024/25 to 2028/29 and 39 pitches 2029/30 to 2033/34 – with most of the need arising in Wychavon. 12. For Travelling Showpeople, the GTAA indicates a need for an additional 8 plots in Malvern Hills between 2019/20 and 2033/34.

PM254 SWDP 17 Across south Worcestershire, the Interim Policy Statement indicated a need for an additional 97 To reflect the findings of the 2014

89 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map Reasoned permanent residential pitches for gypsies and travellers from 2007 – 2017; 35 additional pitches between GTAA justification 2017 – 2022; and 40 additional pitches between 2022 – 2027. paragraph 3, 4. Since the Gypsy and Traveller Accommodation Assessment was undertaken additional Traveller 4 sites have come forward and reduced the number of pitches required accordingly. Table 7 indicates that 60 permanent residential pitches were granted consent to the end of March 2012, leaving a net total of 37 pitches to be allocated to 2017.

PM255 SWDP 17 Wychavon has met its 5-year pitch requirement both for the period to 2017 and for 2017 – 2022. 2014 GTAA supersedes the regional Reasoned interim policy statement. justification paragraph 4

PM256 SWDP 17 Amend paragraphs: To reflect 2014 GTAA. Previously, Reasoned requirement was to meet need justification 13. Whilst the GTAA did not identify a need to plan for large strategic Traveller or Travelling identified in GTAA minus pitches that paragraph 4 Showpeople sites in the period to 2018/19, it is considered that sites for traveller communities had been granted consent to March could be provided as part of the significant development proposed in the urban extensions. 2012. SWDP 45 allocates up to 20 pitches through the identification of small sites (up to ten pitches) at Worcester West Urban Extension and in or adjacent to the Worcester South Urban Extension – as outlined in SWDP 45. The precise location of these sites will be identified through detailed masterplanning of the urban extensions. At the masterplanning stage, it will also be determined whether the sites on the urban extensions will be to meet Malvern Hills’, and / or Worcester’s or Wychavon’s pitch requirements. although there is a working assumption that one site a minimum of 10 will be allocated to meet Malvern Hills each of the three authorities ’ requirements. and a minimum of 10 will be to meet Worcester’s need. The sites in the urban extensions will help address the need for pitches in the period to 2018/19 and provide a supply of developable sites for the periods 2019/20 - 2023/24 and 2024/25 - 2028/29.

PM257 SWDP 17 Insert new paragraphs: To reflect 2014 GTAA. Previously, requirement was to meet need 90 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map Reasoned 14. Any proposals and planning applications for non-strategic residential sites and transit pitches identified in GTAA minus pitches that justification will be considered by each of the south Worcestershire authorities in the context of locally set had been granted consent to March targets and against the criteria outlined in SWDP17 B, C and D. 2012. 15. Planning Policy for Traveller Sites and CLG’s Good Practice Guide on Designing Gypsy and Traveller Sites (2008) suggest that, where possible, sites should be developed near to housing for the settled community as part of mainstream residential developments. Planning Policy for Traveller Sites also says that new traveller site development in open countryside that is away from existing settlements should be strictly limited and that that any sites in rural areas should respect the scale of, and not dominate the nearest settled community. 16. Planning Policy for Traveller Sites highlights the importance of good access to health services and schools to ensure that children can attend school on a regular basis. CLG’s Good Practice Guide on Designing Gypsy and Traveller Sites (2008) also says that it is essential that sites have access to water, electricity, drainage and sanitation.

PM258 SWDP 17 5. Provision to meet the net requirement for additional pitches in Malvern Hills and Worcester will be To reflect 2014 GTAA. Also, to clarify Reasoned determined through Traveller and Travelling Showpeople Site Allocations Development Plan Documents the link between SWDP45 and Justification in those local authority areas that will be subject to further consultations. SWDP17. paragraph 5

PM259 SWDP 17 6. For the period 2017 – 2027, the evidence is only a guide until a further local need assessment is Previously, small sites in urban Reasoned undertaken, when an alternative level of provision may need to be provided for. The updated needs extensions were to meet net Justification assessment will inform the number of pitches required for the period 2017 - 2030. In the light of a requirement for pitches in Malvern paragraph 6 further local needs assessment, further analysis will be undertaken on a south Worcestershire basis to Hills and Worcester only. 2014 GTAA determine where future sites may be located. indicates need for developable pitches in Malvern Hills, Worcester and Wychavon.

PM260 SWDP 17 8. The provision of transit sites and temporary stopping places is considered to be inappropriate on two To reflect 2014 GTAA Reasoned grounds. Firstly, transit sites are likely to generate pressure for the pitches to be occupied on a more Justification permanent basis (for which they will be unsuitable as a more basic level of service provision is 91 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref Page / Proposed change (post-Stage 1 hearings, 2014) Reason for change policy / paragraph / table / map paragraph 8 acceptable for transit pitches). Secondly, there is a temporary toleration policy that is operated within the county that enables the need to be accommodated in the shorter term without the formal provision of temporary stopping places. Therefore, the SWDP does not allocate any transit sites or temporary stopping place pitches.

PM261 SWDP 17 9. In addition to permanent residential pitches for Travellers, the Interim Policy Statement identified an To reflect 2014 GTAA and Planning Reasoned additional requirement for 22 plots for Travelling Showpeople within Worcestershire for the period Policy for Traveller Sites. Justification 2007-2012. For the period beyond 2012 the Interim Policy Statement recognised the difficulties of paragraph 9 predicting requirements over a longer period and did not indicate a specific plot requirement for south Worcestershire as a whole. Any planning applications for Travelling Showpeople plots will be assessed against the criteria outlined in the policy.

92 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Appendix 2 Index of new / amended housing site maps.

This list ONLY includes those sites that are either newly identified or are existing allocations that have been subject to a physical boundary change – allocated sites where housing numbers have increased without incurring boundary changes have not been included.

Ref. Location Category Approx. Size of New site / No. of site (ha) amended dwellings allocation Malvern Hills SWDP52d Land at Mill Lane, Poolbrook Malvern 62 3.94 N SWDP52f Pickersleigh Grove (part of Hayslan Fields) Malvern 44 3.30 N SWDP52i Land at Lower Howsell Road (former allotments) Malvern 81 5.21 N SWDP52m Former Railway Sidings, Peachfield Road Malvern 20 0.67 N SWDP52s Victoria Road Car Park Malvern 21 0.28 N SWDP52w Land off Brook Farm Drive, Poolbrook Malvern 77 4.25 N SWDP52y Broadlands Drive, Malvern Malvern 33 1.82 N SWDP52* Barracks Store, Court Road, Malvern Malvern 28 0.8 N SWDP52/6 Land to the Rear of 12 Priory Road Malvern (deleted) SWDP57a Land at Mistletoe Row, Oldwood Road Tenbury 44 3.74 N Wells SWDP57c Land south of the Oaklands, Tenbury Tenbury 35 1.92 N Wells SWDP58c Upton Marina (previously Upton-upon-Severn, Holly Green / Ryall and Upton 70 n/a N Tunnel Hill Area) SWDP58d Land at Welland Road Upton 43 2.12 N SWDP59/7 Land at Yew Tree Farm, Hanley Swan 1 (deleted) SWDP59/11 Strand Cottages, Peachley Lane, Lower Broadheath (combined / 1 6 0.26 0.60 A extended sites)

93 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref. Location Category Approx. Size of New site / No. of site (ha) amended dwellings allocation SWDP59/8 Land adjacent to the Lawns including Bight Farm (combined / extended 1 138 170 4.70 6.40 A sites), Kempsey SWDP59a Walshes Farm, Clows Top Road, Abberley Common 1 15 1.44 N SWDP59b Church House Farm, Clifton upon Teme 1 17 4.8 N SWDP59d Braithwaite’s Yard, Hallow 1 9 0.68 N SWDP59e 123a Main Road, Kempsey 1 10 0.39 N SWDP59f Land north of Brookend Lane (adj to The Limes), Kempsey 1 120 6.87 N SWDP59* Land adjacent to Henwick Mill House, Martley Road, Lower Broadheath 1 42 1.55 N SWDP59k Land adj. Primary School, Martley 1 14 0.77 N SWDP59l Lawn Farm, Drake Street, Welland 1 50 9.15 N SWDP59zk The Royal Oak Public House, Hallow 1 8 0.19 N SWDP59zl Land between Old Post Office and Church Farm, Drake Street, Welland 1 30 1.66 N SWDP59zzi Land south of Greenhill Lane, Hallow 1 30 1.67 N SWDP60/5 Former Allotments, Winsmore, Powick and Collet’s Green (combined / 2 30 35 1.57 A extended sites) SWDP60a Land at Stoney Lea, Broadwas 2 8 0.50 N SWDP60b Land adjacent to the Crown Public House, Powick and Collett’s Green 2 45 2.72 N SWDP60c Land south of Sparrowhall Lane, Powick and Collett’s Green 2 39 2.23 N SWDP60d Land at Kiln Lane, Leigh Sinton 2 53 2.01 N SWDP60t Land off Bransford Road, Rushwick 2 50 2.16 N SWDP61/* Land off Pearl Lane, Astley Cross (relates to Stourport) 3 62 2.16 N

Worcester SWDP43/4 Old Northwick Farm Worcester 40 45 4.58 A SWDP43/7 Sansome Walk Swimming Pool Worcester 40 33 0.9 A SWDP43a 73 - 77 Bromwich Road Worcester 11 0.14 N

94 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref. Location Category Approx. Size of New site / No. of site (ha) amended dwellings allocation SWDP43b Martley Road Worcester 18 0.39 N SWDP43c Malvern Gate, Bromwich Road Worcester 45 1.28 N SWDP43d Land at Ambrose Close Worcester 24 1.17 N SWDP43e Land at Hopton Street Worcester 30 1.59 N SWDP43f County Council Offices, Sherwood Road Worcester 15 0.50 N SWDP43g County Council Offices, Bilford Road Worcester 15 0.67 N SWDP43h Laugherne Garage, Bransford Road Worcester 10 0.44 N SWDP43i Crown Packaging Site, main site, Perry Wood Walk Worcester 200 8.06 N SWDP43j Crown Packaging Site, Woodside Offices and car park, Perry Wood Walk Worcester 40 0.95 N SWDP43k Land off Bromyard Terrace Worcester 30 0.15 N SWDP43l Battenhall Road (Former NALGO Sports Ground) Worcester 20 2.9 N SWDP43m Tolladine Golf Course (Club House and Putting Green) Worcester 30 0.98 N SWDP43n Earls Court Farm (Community Land) Worcester 13 0.32 N SWDP43o Royal Mail Sorting Office, Westbury Street Worcester 20 0.28 N SWDP43p Langdale Drive Worcester 10 0.67 N SWDP43q Zig Zag site, St John's Worcester 10 0.05 N SWDP43r The Bridge Inn, Lowesmoor Terrace Worcester 15 0.1 N SWDP43s Rose Avenue Worcester 8 gross 0.18 N (net 4) SWDP43t Coach Park adjacent to Barley Crescent (4 - 4a, Tolladine Road) Worcester 7 0.07 N SWDP43u Royal Worcester Porcelain site Worcester 8 0.15 N SWDP43v Brickfields Road Worcester 10 0.14 N SWDP43w 23 – 24, Foregate Street Worcester 10 0.97 N SWDP43x Christian Meeting Room, Diglis Lane Worcester 17 0.29 N SWDP43y Land at White Ladies Close Worcester 37 0.21 N

95 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Ref. Location Category Approx. Size of New site / No. of site (ha) amended dwellings allocation SWDP43z East Bank Drive (Phase 3) Worcester 38 0.35 N SWDP43/25 School of Art and Design, Barbourne Worcester 60 0.701 0.99 A SWDP43aa Lowesmoor Wharf Worcester 100 1.14 N SWDP43ab Holy Trinity Church, Lichfield Avenue Worcester 8 0.28 N SWDP43ac Cavalier Public House, St George's Lane Worcester 8 0.11 N

Wider SWDP45/1 Worcester South Urban Extension WWA 2450 2600 246 247 A Worcester SWDP45/2 Worcester West Urban Extension WWA 975 2150 77.56 139 A Area urban WC004 Land east of A440, Swinesherd Way WWA 300 18.42 N Extensions

Wychavon SWDP47/1 Land North of Pershore (site A) Town 600 695 30.12 A SWDP59/17 Land to the east of Kingsdale Road, Broadway 1 12 13 0.50 A SWDP59/25 The Racks (east), Ombersley 1 14 34 1.08 A SWDP60/27 Land at Shine Hill, adjacent to The Lanterns 2 6 30 2.13 A SWDP61/2 Land west of Main Street 3 6 12 1.40 A WY003 Land opposite Horsebridge Avenue, Badsey 1 36 1.78 N WY008 Land between Leasowes Road and Laurels Road, Offenham 1 50 1.78 N WY009 Spencer Commercial Services Ltd, Evesham Road, Offenham 1 9 0.33 N WY045 Yew Tree Hill, Droitwich Spa Droitwich Spa 765 44 N WY051 Land at Aldington Lodge, Offenham Road Town 60 3.8 N WY057 Land off Defford Road Town 21 1.22 N WY058 Land between Pentalow and Berrycroft, Blacksmith’s Lane, Cropthorne 2 8 0.44 N WY059 Stonebow Road, Drake’s Broughton 2 39 2.86 N

96 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Appendix 3 - Urban Extension Maps PM92

97 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

PM100

98

Appendix 4 PM240 Annex E – South Worcestershire Housing Trajectories Amended version

HOUSING TRAJECTORIES: SUB AREAS AND WORCESTER CITY The detailed housing trajectories set out the actual and forecast housing delivery in each year in the plan period.

Four sets of graphs illustrate the housing trajectories for: • Wider Worcester Area (WWA) This Sub Area includes Worcester City and the Worcester Urban Extensions • Worcester City • Malvern Hills (Excluding WWA) Sub Area • Wychavon (Excluding WWA) Sub Area The graphs display the forecast delivery of dwellings delivered through development. As well as past and forecast completions, the graphs illustrate analysis of the trajectories based on: • plan (SWDP 3 – annualised provision). • monitor • manage. The SWDP Housing Background Paper - Addendum 2014 sets out evidence about the housing trajectories.

99 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

WIDER WORCESTER AREA (WWA SUB AREA)

DWELLINGS

100 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

WORCESTER CITY

101 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

MALVERN HILLS (EXCLUDING WWA) SUB AREA

102 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

WYCHAVON (EXCLUDING WWA) SUB AREA

103 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers Appendix 5 PM241 Crucial Infrastructure Table ((SWDP 7) – amended version

Table to be read in conjunction with Policy SWDP 7, Infrastructure

Notes: 1. Policy numbers (in this version) are as up to date as possible at the time of finalising this Table (based on SWDP: Proposed Submission Document) and Proposed Modifications in September 2014. 2. The Schedule now includes a prioritisation of infrastructure between ‘’essential’’ and ‘’necessary’’, as included for the first time in May 2013 version of the SWIDP. For a full explanation, please refer to section 11f of the September 2014 SWIDP. 3. The educational measures needed to support the SWDP are very detailed and are listed in full in section 5A of the SWIDP. In Annex I, only the education measures needed on the key sites are shown. For the smaller sites, reference should be made to Section 5A of the SWIDP. 4. The transportation measures needed to support the SWDP have been identified on the basis of an assessment of the performance of the network with SWDP planned growth in place. The transport schemes proposed have been identified to mitigate against predicted future year transport issues and cover highways, passenger transport cycle and walk infrastructure and services. 5. In identifying the future year transport infrastructure and service schemes, the work has, where appropriate, drawn on existing LTP3 Transport Packages. Where additional (SWDP growth related) transport issues have been identified which were not previously covered in the LTP3, the necessary infrastructure and service enhancements have been developed and costed. 6. The transportation schemes have been identified on the basis of the cumulative impact of SWDP developments on the local and strategic transport network. Individual site policies (e.g. SWDP45/1 Worcester South Urban Extension) refer to specific schemes; however development will be expected to contribute to projects/schemes on the evidence of their cumulative impact across the transport network; therefore, it is likely that developer contributions will not be limited to just one scheme. 7. The cumulative impact of development is a key issue for Worcestershire County Council (and its key stakeholders) as it has to manage the transport network such that it supports the key policy aim of supporting economic growth. This aim would be undermined in the event of increased costs being imposed on businesses, other network users and transport operators arising from traffic congestion, inadequate levels of service on and performance of, the rail and bus networks and increased and variable journey times and costs. It is critical, therefore, that the cumulative effects of increased travel demand are properly understood and mitigating measures identified. 8. “Developer” contributions typically arise at present from S 106 payments which may be targeted at a specific project or a pooled contribution. Once the CIL charging schedules come into effect (which should be the case for most of the plan period), that will be a source of pooled developer contributions. 9. Some rounding differences may occur where costs are summarised to £million to 2 decimal places. 10. Whilst all costs are estimates at this stage it should be noted that in the “Transport” section the costs do not include land acquisition and CPO costs (if needed), passenger transport operating costs and local highways agreements under Highways Act Section 278. 11. Abbreviations: • C&RT=Canal & River Trust 104

• County = Worcestershire County Council (as transport authority and as the local authority for other services such as adult social care, children’s services, countryside services etc. etc.) • DfT = Department for Transport • EA = Environment Agency • FC = Forestry Commission • HA = Highways Agency • NR = National Rail • LSTF = Local Sustainable Transport Fund • STF = Sustainable Transport Fund • PT = Public transport generally • SE = Sport • SEP = Strategic Economic Plan • STWL = Severn Trent Water Limited • SWC = South Worcestershire Councils, i.e. Malvern Hills District Council, Worcester City Council and Wychavon District Council acting collectively. • TOC = Train Operating Companies • WLTB = Worcestershire Local Transport Board • WLEP = Worcestershire Local Enterprise Partnership • WMP = • WTSMSB = Worcester Transport Strategy Major Scheme Bid • WWT = Worcestershire Wildlife Trust

Other details

Transport Notes (see Section 4A: Transport):

Notes: (1) This accounts for Supervision, Evaluation, Drainage, Preliminary Design, Site Supervision, Design Services and Utilities, Landscape, Traffic Management TM, Groundworks/Earthworks, Maintenance, Consultation, Ecology (2) OB represents a contingency allowance reflecting the early stage in the development of schemes. It is a standard approach developed by the DfT to avoid over optimistic estimates of transport infrastructure costs (3) Costs EXCLUDE any land acquisition, CPO and Planning Application submission costs in the event that these are required

105 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

(4) County maintenance costs are for 30 years from completion of works and are the expressed as % of total construction costs at this stage in scheme development. These costs are not included in the above table, construction costs only are shown. (5) EXCLUDES allowance for: Junctions 6 and 7 works (BUT these to be assessed by HA). INCLUDES: Key corridors, SCOOT/MOVA, SLR dualling, TRO’s, improvements to Foregate Street, Shrub Hill and new Worcestershire Parkway, bus stop infrastructure, RTIS and PT elements of key corridors, new/improved walk and cycle routes and additional bridge (6) EXCLUDES City Centre Public Realm Improvements (7) Includes improvements to A44, A38 and A449 (8) EXCLUDES allowances for works to A46 Junctions (BUT these to be assessed by HA). (9) EXCLUDES provision of a highway link between Crown East Island and Martley Road (10) EXCLUDES allowances for on-going maintenance costs of infrastructure AND public transport operating (supply) costs (11) EXCLUDES allowance for inter-urban walk & cycle links (12) Costs are current year prices and values assuming construction 2014/15. These costs WILL increase in response to inflation and real terms price increases. This is particularly the case for those schemes which will be delivered later in the plan period.

106 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes PHYSICAL INFRASTRUCTURE A. Movement (Costs exclude any land acquisition and CPO costs (in the event that these are required), passenger transport operating costs and local s278 highways works) Worcester (Worcester Transport Strategy) Total £170.8 M Highway A4440/Southern Link SWDP 4 & Worcestershire £121.21M Worcs CC (IT 2012-2019: Essential Schemes Road capacity SWDP 7 CC (ITBlock), Block), Local (1) Dualling A4440 enhancements (phases Development Transport Board (Whittington-Ketch) 3 & 4, Whittington - Industry, (Devolved Major (2) Key Corridors Ketch - Powick), Key WLEP/SEP, Scheme linking urban Corridors Infrastructure WLTB, New Funding), extensions with City and operational Homes Bonus, Developers Centre enhancements, traffic Central Govt. (s106 & s278), (3) Shrub Hill signals enhancements New Homes Opportunity Zone (SCOOT/MOVA etc.), Bonus, +other transport VMS signing. NOTES: funding sources infrastructure works EXCLUDES costs for as available 2020-2030: M5 junctions 5, 6 and 7 (1) Further which are within the Enhancements to jurisdiction of the A4440 and Highways Agency. remaining key EXCLUDES costs for corridors highway schemes needed to mitigate proposed new development in and around Worcester Shrub Hill/Sherriff Gate area

107 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Rail Schemes Worecstershire Parkway SWDP 4 & Rail Industry £18.97 M Worcs CC (IT 2012-2019: Necessary & Shrub Hill Station SWDP 7 (NR/TOC's/DfT), Block), Local (1) Worcestershire improvements (limited to Worcestershire Transport Board Parkway improved access CC (ITBlock), (Devolved Major (2) Shrub Hill Station arrangements for users, Development Scheme (if Opportunity Zone EXCLUDES Industry, Funding), development

development-specific WLEP/SEP, Developers proposals advanced

infrastructure WLTB, New (s106 & s278), for delivery in this improvments associated Homes Bonus, Network Rail, period) with major new Central Govt. Train operating 2020 - 2030: developments such as Companies, DfT (1) Shrub Hill (if Sherriff Gate +other funding delivery of sources as

available Opportunity Zone development delayed)

Local Passenger Including: SWDP 4 & Bus Industry, £19.57 M Worcs CC (IT Across both phases Necessary Transport Upgraded bus stop SWDP 7 Worcestershire Block), Local (2012 - 2019 and Schemes infrastructure, extension CC (ITBlock), Transport Board 2020 - 2030) aligned of Real Time Information Development (Devolved Major with key Corridor systems (incl. SVD & Industry, Scheme improvements and links to signals WLEP/SEP, Funding), delivery of SWDP

108 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes operations) to corridors WLTB, New Developers planned growth (in linking SWDP2 Homes Bonus, (s106 & s278), particular the urban developments with LSTF, Central New Homes extensions of SWUE, Worcester City Centre Govt. Bonus, +other WoWUE, Gwillams and key trip attractors funding sources Farm, Kilbury Drive such as Shires Business as available and Swinesherd Park and which were not Way) covered by Phase 1 of the WTS. Walk and Cycle New and improved walk SWDP 4 & Sustrans, £11.04 M Worcs CC (IT Across both phases Necessary Schemes and cycle routes, SWDP 7 Worcestershire Block), Local (2012 - 2019 and additional walk and CC (IT Block), Transport Board 2020 - 2030) aligned cycle bridge to north of Development (Devolved Major with key Corridor city (and associated Industry, Scheme improvements and

access links) and walk & WLEP/SEP, Funding), delivery of SWDP

cycle elements of key WLTB, New Developers planned growth (in Corridor schemes Homes Bonus, (s106 & s278), particular the urban LSTF, Central New Homes extensions) Govt. Bonus, +other funding sources as available

109 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Droitwich Spa Total £8.9 M Highway Local highway network SWDP 4 & Worcestershire £3.62 M Worcs CC (IT Across both phases Essential Schemes improvements and SWDP 7 CC (ITBlock), Block), Local (2012-2019 & 2020 – elements of A38 Development Transport Board 2030) highway enhancements Industry, (Devolved Major in vicinity of Droitwich, WLEP/SEP, Scheme including: A38 Roman WLTB, New Funding), Way / B4065 Homes Bonus, Developers Bromsgrove Road, A38 Central Govt. (s106 & s278), Roman Way / A442 New Homes Kidderminster Road, Bonus, +other A38 Roman Way / funding sources B4090 Worcester Road as available and Hanbury Street / Queen Street / Saltway / Bromsgrove Road

Rail, Local Including: SWDP 4 & Sustrans, Bus £5.32 M Worcs CC (IT Across both phases Necessary Passenger SWDP 7 Industry, Rail Block), Local (2012-2019 & 2020 – (1) Improvements to Transport and Industry Transport Board 2030) Droitwich rail station and Walk and Cycle (NR/TOC's/DfT), (Devolved Major associated interchange Link Schemes Worcestershire Scheme facilities (including CC (ITBlock), Funding), parking, information, Development Developers access routes etc.). Industry, (s106 & s278), (2) Provision of WLEP/SEP, New Homes Infrastructure to enable WLTB, New Bonus, +other local PT services to Homes Bonus, funding sources access & serve SWDP LSTF, Central 110 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes development sites Govt. as available (particularly Copcut & Yew Tree Village). (3) Provision of walk & cycle footbridge over A38 linking proposed development sites to town centre & railway station. (4) Improvements to walk & cycle routes, crossing facilities, signage and other associated facilities Evesham Total £8.8 M Highway Including town centre SWDP 4 & Worcestershire £1.20M Worcs CC (IT Across both phases Essential Schemes junction enhancements, SWDP 7 CC (ITBlock), Block), Local (2012-2019 & 2020 – including: (A4184 / Development Transport Board 2030) B4624) Greenhill / High Industry, (Devolved Major Street / Worcester Road, WLEP/SEP, Scheme Vine Street / High Street WLTB, New Funding), / Bridge Street, Bridge Homes Bonus, Developers Street / Port Street / Central Govt. (s106 & s278), Waterside and A4184 New Homes (Cheltenham Road) / Bonus, +other Davies Road. NOTE: funding sources EXCLUDES A46 as available

111 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes schemes which are within the jurisdiction of the Highway Agency. Rail, Local Including: SWDP 4 & Sustrans, Bus £7.600 M Worcs CC (IT Across both phases Essential Passenger (1) Provision of walk & SWDP 7 Industry, Rail Block), Local (2012-2019 & 2020 – Transport and cycle footbridges over Industry Transport Board 2030) Walk and Cycle A46 and River Avon (NR/TOC's/DfT), (Devolved Major Link Schemes linking proposed Worcestershire Scheme development sites to CC (ITBlock), Funding), town centre, railway Development Developers station, retail parks and Industry, (s106 & s278), employment centres. WLEP/SEP, New Homes (2) Improvements to WLTB, New Bonus, +other Evesham rail station and Homes Bonus, funding sources associated interchange LSTF, Central as available facilities (including cycle Govt. parking, information, access routes etc.). (3) Provision of Infrastructure to enable local PT services to access & serve SWDP development sites. (4) Improvements to walking and cycling connectivity Malvern Total £6.4 M

112 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Highway Local highway network SWDP 4 & Worcestershire £5.6 M Worcs CC (IT Across both phases Essential Schemes improvments, including: SWDP 7 CC (ITBlock), Block), Local (2012-2019 & 2020 – A4103 / B4503 Leigh Development Transport Board 2030) Sinton Road, A449 Industry, (Devolved Major Worcester Road / WLEP/SEP, Scheme Richmond Road / WLTB, New Funding), Pickersleigh Avenue, Homes Bonus, Developers A449 Worcester Road / Central Govt. (s106 & s278), Howsell Road / New Homes Pickersleigh Road, A449 Bonus, +other Worcester Road / B4505 funding sources (Newtown Road) / as available Hornyold Road, B4208 Pickersleigh Road / North End Lane / Hayslan Road, B4208 Pickersleigh Road / North End Lane / Hayslan Road, B4211 Barnards Green Rd / B4208 Pickersleigh Rd / Upper Chase Rd / Court Rd / Avenue Rd, A449 Belle Vue Terrace / Wells Road / B4211 Church Street, B4208 Barnards Green Rd / B4211/ Poolbrook Road and B4208 Blackmore

113 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Park Rd / B4209 Hanley Rd. NOTE: EXCLUDES improvements to Townsend Way/A449 Junction associated with proposed Newlands development. Rail, Local Including: SWDP 4 & Sustrans, Bus £0.7 M Worcs CC (IT Across both phases Necessary Passenger (1) Provision of SWDP 7 Industry, Rail Block), Local (2012-2019 & 2020 – Transport and Infrastructure to enable Industry Transport Board 2030) Walk and Cycle local PT services to (NR/TOC's/DfT), (Devolved Major Link Schemes access & serve SWDP Worcestershire Scheme development sites. CC (ITBlock), Funding), (2) Improvements to Development Developers walking and cycling Industry, (s106 & s278), connectivity, including WLEP/SEP, New Homes to/from proposed WLTB, New Bonus, +other development sites Homes Bonus, funding sources (3) Improvements to LSTF, Central as available town centre walking and Govt. cycling facilities Pershore Total £4.4 M Highway Local highway network SWDP 4 & £1.050 M Worcs CC (IT Across both phases The Essential Schemes improvements, SWDP 7 Block), Local (2012-2019 & 2020 – authorities including:(A4104 / Transport Board 2030) support all B4084) Worcester Road (Devolved Major the / Three Springs Road, Scheme transport

114 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes (A4104 / B4084) Station Funding), schemes Road / Worcester Road / Developers set out in High Street and A4104 (s106 & s278), the Station Road / B4083 New Homes Pershore Wyre Road Bonus, +other Package NOTE: See Inter-Urban funding sources elements Highway section (below) as available of the for A44 highway SWIDP enhancements. and a new bridge and link road

between the A44 and the B4083. Rail, Local Including: SWDP 4 & £3.360 M Worcs CC (IT Across both phases Necessary Passenger (1) Improvements to SWDP 7 Block), Local (2012-2019 & 2020 – Transport and Pershore rail station and Transport Board 2030) Walk and Cycle associated interchange (Devolved Major Link Schemes facilities (including Scheme parking, information, Funding), access routes etc.). Developers (2) Provision of (s106 & s278), Infrastructure to enable New Homes local PT services to Bonus, +other access & serve SWDP funding sources development sites. as available (3) Improvements to 115 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes walking and cycling connectivity (4) Improvements to town centre walking and cycling facilities Rural Malvern Total: Hills £0.2 M Local Passenger Including: SWDP 4 & £0.2 M Worcs CC (IT Across both phases Necessary Transport and (1) Provision of SWDP 7 Block), Local (2012-2019 & 2020 – Walk and Cycle Infrastructure to enable Transport Board 2030) Link Schemes local PT services to (Devolved Major access & serve SWDP Scheme development sites. Funding), (2) Improvements to Developers walking and cycling (s106 & s278), connectivity to the New Homes existing network Bonus, +other (3) Improvements to funding sources walking and cycling as available facilities and infrastructure

116 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Rural Wychavon Total: £2.3 M Rail, Local Including: SWDP 4 & £2.3 M Worcs CC (IT Across both phases Necessary Passenger (1) Provision of SWDP 7 Block), Local (2012-2019 & 2020 – Transport and Infrastructure to enable Transport Board 2030) Walk and Cycle local PT services to (Devolved Major Link Schemes access & serve SWDP scheme development sites. Funding), (2) Improvements to rail Developers stations (Hartlebury) and (s106 & s278), associated interchange New Homes facilities (including Bonus, +other parking, information, funding sources access routes etc.). as available

Inter-Urban Total: £4.1 M Highways

117 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Highway Including improvements SWDP 4 & £4.1 M Worcs CC (IT Across both phases Essential Schemes to the A44 mainline SWDP 7 Block), Local (2012-2019 & 2020 – (Evesham-Worcester - Transport Board 2030) Bromyard) at Pinvin (Devolved Major Crossroads, Crown Scheme East, A38 Fernhill Funding), Heath (Hurst Lane) & Developers Martin Hussingtree, (s106 & s278), A449 roundabout at New Homes Claines Bonus, +other NOTE: EXCLUDES funding sources A449/Townsend Way as available Junction, subject to s278 discussions with the developer of Newlands site Overall County Total: £205.9 M

Highways Agency: Strategic Road Network

118 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Strategic A46 Evesham Bypass SWDP 4 & Highways £9.50 M Developers Across both Phases Essential Highway Junctions SWDP 7 Agency, (S106 & S278) + (2014-2019 and Network Developers, other funding 2020-2030) Scheme Worcestershire sources County Council available

Strategic M5 J5 SWDP 4 & Highways £0.50 M Developers Across both Phases Essential Highway SWDP 7 Agency, (S106 & S278) + (2014-2019 and Network Developers, other funding 2020-2030) Scheme Worcestershire sources County Council available

Strategic M5 J6 SWDP 4 & Highways £10.00 M Developers Across both Phases Essential Highway SWDP 7 Agency, (S106 & S278) + (2014-2019 and Network Developers, other funding 2020-2030) Scheme Worcestershire sources County Council available

Strategic M5 J7 SWDP 4 & Highways £0.40 M Developers Across both Phases Essential Highway SWDP 7 Agency, (S106 & S278) + (2014-2019 and Network Developers, other funding 2020-2030) Scheme Worcestershire sources County Council available TOTAL £20.40 M

OVERALL SWIDP TRANSPORT TOTAL £226.3M

119 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes

B. Utilities Renewable Hartlebury Energy from County Council & tbc County Council To be updated As set out Essential Energy schemes Waste Plant Partners Partners in section 4 E of SWIDP Electricity Western Power strategic Western Power tbc Developers As required Schemes Essential Distribution schemes sites Utility as set out generally companies in SWIDP Gas National Grid Gas and strategic National Grid Gas tbc Developers As required Schemes Essential Wales and West Utilities sites & Wales and Utility as set out generally West Utilities companies in SWIDP Water (supply Supply – detail of new STWL tbc Developers As required Info as set Essential and waste water) capital schemes being STWL out in discussed with STWL. SWIDP Waste – detail of any new capital schemes STWL tbc Developers tbc Info as set Essential being discussed with STWL out in STWL. SWIDP C. Flood Risk and Drainage Major schemes Strategic EA tbc County Council, As required Position Essential completed or under sites Developers SWC on construction. SUDS generally County Developers schemes technology to be used Developers set out in site-by-site in future SWIDP 120 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Section 4C

D. Communications Infrastructure Broadband scheme well SWDP 26 County, tbc County, BDUK 2012-2020 Position Essential advanced - Developers Developers set out in Worcestershire Local SWIDP Broadband Plan Section 4D

E. Waste Infrastructure Hartlebury EfW plant – SWDP 33 County, £120-160 M Developers etc. Build commenced As set out Essential otherwise smaller Waste Core Waste contractor, 2014 in section schemes will be Strategy Developers 4E of the developer funded. SWIDP

SOCIAL INFRASTRUCTURE A Education

121 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Worcester City Category Project SWDP Delivery Estimated cost Potential Estimated Cost/Fun Status Policy /Ref Partners sources if timescale ding/ No. funding Delivery Primar Secon Notes y dary

Worcester West SWDP 45/2 County, £6,000 £4,923 County Council, Up to 2019 & 2020- Informatio Essential Developers ,000 ,468 Developers 2030 n as set out in Section 5A of SWIDP Worcester South SWDP 45/1 £6,000 £5,974 Up to 2019 & 2020- ‘‘ Essential (includes new Primary “ ,000 ,571 “ 2030 School) East of Swinesherd Way WC004 “ £423,8 £457,9 “ Up to 2019 & 2020- “ Essential 24 98 2030 Kilbury Drive SWDP 45/3 “ £542,4 £586,2 “ Up to 2019 & 2020- ‘‘ Essential 94 36 2030 Gwillam’s Farm SWDP 45/4 “ £519,1 £561,0 “ Up to 2019 ‘‘ Essential 84 46 Ex Ronkswood Hospital SWDP “ £372,9 £403,0 “ Up to 2019 ‘‘ Essential site 43/14 65 37 Shrub Hill Opportunity SWDP 44/4 “ £1,262 £1,364 “ Up to 2019 & 2020- ‘‘ Essential Zone ,994 ,831 2030 Gregory’s Bank SWDP 43/2 “ £307,2 £332,0 “ Up to 2019 ‘‘ Essential 72 48 122 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Govt. Offices, SWDP “ £254,2 £274,7 “ Up to 2019 ‘‘ Essential Whittington Road 43/16 94 98 Blockhouse Opportunity SWDP 44/5 “ £254,2 £274,7 “ 2020-2030 ‘‘ Essential Zone 94 98 South of Leopard Hill SWDP 43/1 “ £211,9 £228,9 “ Up to 2019 & 2020- ‘‘ Essential 12 98 2030 Grove Farm, Bromyard SWDP ‘‘ £211,9 £228,9 ‘‘ Up to 2019 “ Essential Road C2 apartments 43/18 12 99 Crown Packaging Site WC014 ‘‘ £423,8 £457,9 ‘‘ Up to 2019 & 2020- “ Essential 24 98 2030

250 Bransford Road WC035 ‘‘ £334,8 £361,8 ‘‘ Up to 2019 & 2020- “ Essential 20 18 2030

Diglis Basin, Diglis Dock WC036 ‘‘ £317,8 £343,4 ‘‘ Up to 2019 & 2020- “ Essential Road 67 98 2030

Former Royal Worcester WC037 ‘’ £239,4 £258,7 ‘’ Up to 2019 ‘’ Essential Porcelain Site 60 68 Various across Cumulative ‘’ £2,788 £3,013 ‘’ Up to 2019 & 2020- See Essential Worcester total of all ,756 ,628 2030 section sites below 5A of 100 SWIDP dwellings SWDP 43 “ £1,527 £1,651 “ Up to 2019 & See Essential Windfall in City ,883 ,079 2020-2030 section

123 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes 5A of SWIDP

Malvern Hills District Category Project SWDP Delivery Estimated cost Potential Estimated Cost/Fun Status Policy Partners sources if timescale ding/Deli funding very Primar Secon Notes y dary

QinetiQ Site, Malvern SWDP53 “ £635,7 £686,9 “ Up to 2019 & 2020- ‘‘ Essential 35 95 2030 Development at North SWDP56 “ £1,589 £1,717 “ Up to 2019 & 2020- ‘‘ Essential East Malvern ,337 ,489 2030 Land adj the Lawns inc SWDP59/8 “ £292,4 £316,0 “ Up to 2019 & 2020- “ Essential Bight Farm, Kempsey 38 18 2030 Land north of Brookend SWDP 59 f “ £254,2 £274,7 “ Up to 2019 & 2020- “ Essential Lane (adj to The Limes), 94 98 2030 Kempsey Various across Malvern Cumulative ‘’ £3,502 £3,785 ‘’ Up to 2019 & 2020- See Essential total of all ,905 ,350 2030 section sites below 5A of

124 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes 100 SWIDP dwellings Estimated Windfall Malvern ‘’ £936,6 £1,012 ‘’ Up to 2019 & 2020- See Essential 2017/18 to 2029/30 50 ,173 2030 section 5A of SWIDP Wychavon District Category Project SWDP Delivery Estimated cost Potential Estimated Cost/Fun Status Policy Partners sources if timescale ding/Deli funding very Primar Secon Notes y dary

Copcut Lane, Droitwich SWDP 49/1 “ £1,568 £1,694 “ Up to 2019 & 2020- ‘’ Essential ,147 ,589 2030 Land off Vines Lane, SWDP 48/1 “ £211,9 £228,9 “ Up to 2019 ‘’ Essential Droitwich 12 99 Yew Tree Farm, WY045 “ £1,695 £1,831 “ Up to 2019 & 2020- ‘’ Essential Droitwich ,293 ,988 2030 Tagwell Road, Droitwich WY047 “ £211,9 £228,9 “ Up to 2019 ‘’ Essential 12 99 Employment site, top of SWDP 50/2 “ £211,9 £228,9 “ Up to 2019 ‘’ Essential Kings Rd, Evesham 12 99 West Abbey Road - SWDP 50/7 “ £423,8 £457,9 “ Up to 2019 ‘’ Essential South of Boat Lane, 24 98 Evesham Cheltenham Road, SWDP 51/1 “ £847,6 £915,9 “ Up to 2019 & 2020- ‘’ Essential Evesham 46 94 2030 125 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Pershore Road, SWDP 51/2 “ £849,7 £918,2 “ Up to 2019 & 2020- ‘’ Essential Hampton, Evesham 66 84 2030 Station Road / Wyre SWDP 47/1 “ £1,377 £1,488 “ Up to 2019 & 2020- ‘’ Essential Road, Pershore ,426 ,490 2030 Dilmore Lane /Station SWDP60/1 “ £667,5 £721,3 “ Up to 2019 & 2020- ‘’ Essential Road, 6 22 45 2030 Land west of Worcester SWDP59/2 “ £326,3 £352,6 “ Up to 2019 & 2020- ‘’ Essential Road, Hartlebury 0 44 57 2030

Land east of Withybed SWDP59/2 “ £211,9 £228,9 “ Up to 2019 ‘’ Essential Lane, 2 12 99 Land Adjacent to, Sims WY044 “ £805,2 £870,1 “ Up to 2019 & 2020- ‘’ Essential Metals UK (South West) 65 95 2030 Limited, Long Marston

Various across Cumulative “ £5,196 £5,615 “ Up to 2019 & 2020- See Essential Wychavon total of all ,086 ,057 2030 section sites below 5A of 100 SWIDP dwellings Estimated Windfall “ £2,040 £2,205 “ Up to 2019 & 2020- See Essential 2017/18 to 2029/30 ,710 ,256 2030 section 5A of SWIDP Total cost for SWDP plan area for Primary £47,927,214 126 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Total cost for SWDP plan area for Secondary £46,534,816 SWDP Education Total £94,462,030 Further Education Post 16 Education and SWDP 7 Education n/a Education County Necessary Training Funding Agency Funding Agency involved in facilitating but not funding of further education – see SWIDP Section 5A Higher Education/ University of Worcester SWDP 7 University. Position set out University, tbc Liaison Necessary University of County. SWC. in SWIDP County, SWC with Worcester University of Worcester

– position

set out in SWIDP Section 5A B. Health and Public Health Public consultation on SWDP 7 Clinical tbc tbc tbc Further Necessary the ‘Future of Commissioning info in 127 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Worcestershire Acute Groups, SWIDP Hospitals’ scheduled to Worcestershire be undertaken this Acute Hospitals autumn 2014, with final NHS Trust, decision on agreed way NHS forward to be Commissioning undertaken in spring Board. 2015. County C. Social Care County Council has no SWDP 7 County tbc tbc tbc Further n/a plans for new facilities. info in SWIDP D. Community Facilities Libraries Unlikely to be major new SWDP 7 County tbc tbc tbc Further Necessary capital investment in info in near future following the SWIDP opening of “The Hive” in Worcester in summer 2012 Faith Buildings Information in SWIDP SWDP 7 Faith Partners, tbc tbc tbc Updated Necessary Local Authorities info in & Developers SWIDP Community Community Facilities SWDP 7 Developers, tbc Developers, tbc Further Necessary Centres Various service Various service info in providers. providers. SWIDP. Local communit- Local

128 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes ies communities. County

Sports & University of Worcester Relevant University £10 M University, 2013 Opened Necessary Recreational Sports Arena. SWDP SE SE, 2013 Facilities policies Trustees of the Foundation for Sports and the Arts England Basketball England Badminton Private donations New Swimming Pool SWDP 43 SWC £10.5M SWC, Potential start date is April 2013 Necessary Worcester 44 and 45 SE Developers SE, Developers late 2014, with figure sites completion early 2016. This was considered a commitment at the April 2014 meeting of Worcester City Council 4 court sports hall SWDP 45/2 SWC £2.7 M Developers 2016-2026 Plus full Necessary (Worcester West) Developers (tbc) size synthetic

129 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes turf pitch and tennis courts.

4 court sports hall SWDP 45/1 SWC £2.7 M Developers 2021-2026 Plus Necessary (Worcester South) Developers outdoor tennis court. 6 Court badminton SWDP 43, SWC £4.5 M Developers 2011-2016 Autumn Necessary performance centre 44 and 45 Developers 2012 sites figure Football: full size 3G SWDP 43, SWC £0.8 M Developers 2011-2016 Autumn Necessary STP 44 and 45 Developers 2012 sites figure 4 court indoor tennis SWDP 43, SWC £5.5 M Developers 2016-2021 Autumn Necessary centre 44 and 45 Developers 2012 sites figure 2 MUGA SWDP 43, SWC £1.6 M Developers 2021-2026 Autumn Necessary 44 and 45 Developers 2012 sites figure 8 Lane synthetic SWDP 52 SWC n/a Developers 2011-2016 Based on Necessary athletics track, Malvern Developers 2010 Hills: Malvern College Sports Facilities Framewor k 5 court sports hall – SWDP 48, SWC £3.4 M Developers 2012-2016 Based on Necessary

130 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes indoor cricket 50, 51, 46, Developers 2010 (Wychavon) 47, 59, 60, Sports 61 Facilities Framewor k 8 court sports hall - SWDP 48, SWC £5.5 M Developers 2012-2016 Autumn Necessary (Droitwich or Evesham 49 Developers 2012 in Wychavon) SWDP 50, figure 51 4 court sports hall - SWDP 48, SWC £5.5 M Developers 2012-2016 Autumn Necessary (expansion of existing 50, 51, 46, Developers 2012 facility) and 2 court 47, 59, 60, figure sports hall, Wychavon 61 4 court sports hall, SWDP 48, SWC Developers £2.7 M SWC 2016-2021 Autumn Necessary Wychavon 50, 51, 46, Developers 2012 47, 59, 60, figure 61 2 x 3G Football STP SWDP 48, SWC £1.6 M Developers 2016-2018 April 2014 Necessary 50, 51, 46, Developers figure 47, 59, 60, 61 Sand filled STP SWDP 48, SWC £0.8 M Developers 2016-2018 April 2014 Necessary 50, 51, 46, Developers figure 47, 59, 60, 61 Outdoor athletics SWDP 50, SWC/ County/ £0.4 M SWC/ 2016-2021 Autumn Necessary training facility, school 51 Developers County/ 2012

131 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes site, Evesham Developers figure Outdoor athletics SWDP 46, SWC/ County/ £0.4 M SWC/ County/ 2021-2026 Autumn Necessary training facility, School 47 Developers Developers 2012 Site, Pershore figure 25m Swimming SWDP 43, SWC £3.9 M SE tbc Autumn Necessary (teaching pool) 44 and 45 SE (tbc) SWC 2012 Worcester West sites Developers Developers figure Worcester South football SWDP 45/1 SWC, SE, (See note below SWC 2016-2021 Autumn Necessary pitch (6.4 ha) Developers for total sports Developers 2012 provision figure) figure Worcester West football SWDP 45/2 SWC, SE, SWC 2016-2021 Autumn Necessary pitch (6.5 ha) Developers £1.1 M Developers 2012 figure Worcester East football SWDP 45/3 SWC, SE, SWC 2016-2021 Autumn Necessary pitch (6.9 ha) Developers £1.2 M Developers 2012 figure Worcester East cricket SWDP45/3 SWC, SE, £0.85M SWC 2016-2021 Autumn Necessary pitch (4 ha) (location tbc) Developers Developers 2012 figure Worcester South - 2 ha SWDP 45/1 SWC, SE, £0.65 M SWC 2021-2026 Autumn Necessary for cricket Developers Developers 2012 figure Worcester West - 4 ha SWDP 45/2 SWC, SE, £0.85 M SWC 2016-2021 Autumn Necessary for cricket Developers Developers 2012 figure Worcester south – 7 ha SWDP 45/1 SWC, SE, £1.25 M SWC 2016-2021 Autumn Necessary

132 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes for rugby Developers Developers 2012 figure Malvern Town - 6 ha for SWDP 56 SWC, SE, £1 M SWC 2016-2026 Autumn Necessary football Developers Developers 2012 figure Malvern Town / Malvern SWDP 56 SWC, SE, £0.65 M SWC 2021-2026 Autumn Necessary North East- 2 ha for Developers Developers 2012 cricket figure Evesham - 6 ha for SWDP 52 SWC, SE, £1 M SWC 2016-2026 Autumn Necessary football Developers Developers 2012 figure Evesham north - 6 ha for SWDP 52 SWC, SE, £1 M SWC 2011-2016 Autumn Necessary football Developers Developers 2012 figure Evesham south or SWDP 51 SWC, SE, £0.85 M SWC 2011-2016 or 2026 Autumn Necessary south-west 4 ha for and 52 Developers Developers 2012 cricket figure Evesham north - 2 ha for SWDP 52 SWC, SE, £0.65 M SWC 2011-2016 Autumn Necessary cricket Developers Developers 2012 figure Droitwich – Copcut Lane SWDP 49 SWC, SE, £0.65 M SWC 2012-2016 Autumn Necessary or Pulley Lane – 2 ha for Developers Developers 2012 cricket. figure Total for sports facilities listed above = £76.35 M E. Emergency Infrastructure

133 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes Police Post for South SWDP 45/1 WMP £0.159-£0.450 WMP 2012-2019 Updated Necessary Worcester Developers M Developers figure ANPR cameras- SWDP 45/1 WMP Developers £0.166 M WMP 2012-2019 Necessary Worcester South Developers Police Post for West SWDP 45/2 WMP £0.159-£0.450 WMP 2012-2019 Updated Necessary Worcester Developers M Developers figure ANPR cameras – West SWDP 45/2 WMP Developers £0.052M WMP 2012-2019 Necessary Worcester Developers Extension to Evesham SWDP 50, WMP £1.42 M WMP 2012-2019 Updated Necessary Police Station 51 Developers Developers figure New Police Posts at: SWDP 43, WMP £1.007M-£2.462 Developers 2012-2019 Updated Necessary • Worcester (2) 44, 45, 48, Developers M figure. 49, 56 and Includes • Droitwich 59, WC004 custody • Hartlebury sites facility • North East expansion Malvern at Worcester Additional Officers (set- SWDP 43- WMP £0.305 M WMP 2013-2019 Updated Necessary up costs for 80no. 54, 56-61 Developers Developers figure officers) sites Additional vehicles and SWDP 43- WMP £0.708 M WMP 2013-2019 Updated Necessary other operational 54, 56-61 Developers Developers figure equipment sites Additional central SWDP 43- WMP £0.108 M WMP 2013-2019 Updated Necessary support staff (set up 54, 56-61 Developers Developers figure

134 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes costs for 40no. support sites staff) Total for Police Infrastructure listed above £4.08 M - £6.121M Fire Service SWDP 50, H&W Fire and n/a H&W Fire and 2012-2019 Other Fire Necessary 51 Rescue Service Rescue Service, Service Developers requireme nts include new appliance s – not costed as “Infrastruc ture” Ambulance “Hub” SWDP West Midlands £0.40 M WM Ambulance 2012-2019 To be Necessary Worcester 43,44 and Ambulance Service, confirmed 45 sites Service Developers Total for Emergency Infrastructure listed above £4.4M - £6.5M (approx.)

GREEN INFRASTRUCTURE Sub-Regional facility: SWDP 43, County, tbc County, tbc Concept Necessary “Worcester/ Droitwich 44, 45, 48 Developers, Developers, only at Park” (based on the and 49 SWC, SWC, this stage. canal ring) sites and NE, EA, FC, NE, EA, FC, To be various WWT, WWT, C&RT updated rural sites in due BW 135 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers

Category Project SWDP Delivery Estimated cost Potential Estimated Costs/Fu Status Policy Partners sources of Timescale nding/ funding Delivery Notes course Sub-regional facility: SWDP 45/2 County, tbc County, tbc Concept Necessary “Hallow Riverside Park” Developers, Developers, only at (includes sites on both SWC, SWC, this stage. sidea of the River NE, EA, FC, NE, EA, FC, To be Severn between Grimley WWT WWT updated and Northwick) in due course Sub-regional facility: SWDP 45/1 County, tbc County, tbc Concept Necessary “Sandford (Clifton) SWDP 59 Developers, Developers, only at Water Park” (south of SWC, SWC, this stage. Draycott and extending NE, EA, FC, NE, EA, FC, To be south to base of Knight WWT, WWT, updated in due Hill) Minerals Minerals course operators operators (Landfill Community Fund) South Worcestershire Councils. Originally published 22 nd November 2012, with update and amendments up to 15 th September 2014.

136 Consultation – 6 October – 14 November (ends 5.00pm) 2014 Schedule of Proposed Modifications related to uplift in housing requirement numbers Appendix 2

South Worcestershire Development Plan Examination:

Schedule of potential housing sites considered and rejected following the Objective Assessment of Housing Need (summer 2014)

South Worcestershire Councils

This schedule relates to the list of proposed modifications that were drafted in response to the work undertaken by the SWC and the Inspector’s subsequent Interim Conclusions (31 March 2014).

Appendix 2

Malvern Hills District Council

District SWDP Ref Address Town or Reason Village MHDC NO REF Land SW of Abberley village Abberley CATEGORY 4 VILLAGE MHDC SWDP 61 c Clay Green Farm, Folly Road Alfrick HISTORIC ENVIRONMENT CONSTRAINTS/ACCESS MHDC NO REF Land South East of Stocks Lane, Alfrick Pound Alfrick LOCATION/IMPORTANT NATURE DESIGNATION (AONB/SSSI) (adj Old Police House) MHDC SWDP 61x Land to the north of Wheatley Cottage Alfrick LOCATION MHDC SWDP 61 a Carthouse Field Bransford LOCATION MHDC SWDP 3 za Bear & Ragged Staff, Station Road Bransford LOCATION/NATURE MHDC SWDP 61 v Land adjoining Fieldwoodhouse and 36 Bransford LOCATION/SCALE Suckley Road MHDC SWDP 61 w Land South of Fir Tree House and Bransford HISTORIC ENVIRONMENT CONSTRAINTS/CAPACITY West of Chapel Lane HIGHER ORDER SETTLEMENTS PREFERABLE MHDC SWDP 61y Land at Bank House Bowling Club Bransford SITE HAS PLANNING PERMISSION SUBJECT TO S106 BUT NOT SELECTED AS HIGHER ORDER CATEGORY VILLAGES PREFERABLE FOR SITE ALLOCATIONS PURPOSES MHDC SWDP 60 r Land off Church Lane, Broadwas Broadwas LOCATION MHDC SWDP 60 za Land at Brook House, Worcester Road Broadwas ADJACENT TO FLOOD ZONE 2/SURFACE WATER ISSUES/ HISTORIC ENVIRONMENT CONSTRAINTS MHDC NO REF Land south of Broomhall lane, adj Hatfield Broomhall nr LOCATION/SCALE Brook Worcester MHDC NO REF Land South of Brookend Lane, west of Broomhall nr LOCATION Roman Road Worcester

2

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC SWDP 3 s Land at Brookend Farm, East of Hollins Lane Broomhall nr LOCATION Worcester MHDC NO REF Land south of Holdings Lane, Lower Broomhall nr LOCATION Broomhall Farm Worcester MHDC SWDP 45/1 a Land South of Broomhall Lane, Lower Broomhall nr LOCATION Broadheath Worcester MHDC SWDP 60 s Land at Horse Hill Callow End LOCATION/SCALE/LANDSCAPE MHDC NO REF 1). Churchill Farm, Church Lane 2). Church Castlemorton LOCATION/OPEN COUNTRYSIDE/ Farm, Church Road HISTORIC ENVIRONMENT CONSTRAINTS/ OTHER HIGHER ORDER SETTLEMENTS PREFERABLE MHDC SWDP 53a Hope Lane (Extension) Clifton upon SIZE/SCALE/PART OF SITE ALREADY HAS PLANNING Teme PERMISSION MHDC NO REF Hope Barn Cottage, Holly Bush Lane Clifton upon LOCATION/NATIONAL POLICY Teme MHDC SWDP 59g Blue Shot Meadow, Pound Lane Clifton upon OTHER SITES WITH PLANNING PERMISSION IN VILLAGE Teme MHDC SWDP 59 c Land Opposite Steps Farm Clifton upon OTHER SITES WITH PLANNING PERMISSION IN VILLAGE Teme MHDC SWDP 61 z Land at Poolhay Close, Linkend Road Corse Lawn LOCATION/NATURE/ OTHER HIGHER ORDER SETTLEMENTS PREFERABLE MHDC NO REF Land to west of Crown East Lane Crown East LOCATION/OPEN COUNTRYSIDE/ OTHER HIGHER ORDER SETTLEMENTS PREFERABLE MHDC NO REF Land off A44 to the east of Hill Crest Crown East LOCATION

3

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC SWDP 61za Land to the rear of Yarringtons Eardiston LOCATION MHDC SWDP 61zb Field north of Moor Farm Eardiston LOCATION MHDC SWDP 3 t Earls Croome Garden Centre Earls Croome LOCATION/CATEGORY 4 VILLAGE MHDC NO REF Land Adjoining Upper Crundle End Farm, Elms Green LOCATION/OPEN COUNTRYSIDE Stockton MHDC SWDP 59 j The Hundred House Great Witley HISTORIC ENVIRONMENT CONSTRAINTS/SCALE MHDC SWDP 59 zo Land south of Stourport Road Great Witley SCALE/CAPACITY OF SETTLEMENT MHDC NO REF Land at Hillhampton Farm Great Witley LOCATION MHDC NO REF Land adjoining The Homestead, Clevelode Guarlford CATEGORY 4 VILLAGE/LOCATION/NATURE Lane MHDC SWDP 3 u AJ Gammond Ltd Clevelode Lane Guarlford CATEGORY 4 VILLAGE/LOCATION/EMPLOYMENT MHDC NO REF Land at Half Key, near Malvern Half Key SCALE/LOCATION MHDC SWDP 59zh Land at Hallow Park Farm, adj Pound Piece Hallow SCALE/SIGNIFICANT GAP Cottages MHDC NO REF Land adjacent to Pool Cottage Hallow LOCATION/APPEAL DISMISSED MHDC SWDP 59/5 a Land to north of Orchard Close, Hallow Hallow SIZE/SCALE (Extension) MHDC SWDP 3v Land off Beaconhill Drive, off Hallow Road Hallow FLOOD RISK MHDC SWDP 59 zr Site A - Land Adjacent to Heath Farm Hallow LOCATION/OTHER SITES IN VILLAGE CONSIDERED MORE SUSTAINABLE MHDC SWDP 59 zs Site B - Land Adjacent to Heath Farm Hallow LOCATION/OTHER SITES IN VILLAGE CONSIDERED MORE SUSTAINABLE

4

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC SWDP 59 zt Site C - Land Adjacent to Heath Farm Hallow LOCATION/OTHER SITES IN VILLAGE CONSIDERED MORE SUSTAINABLE MHDC SWDP 59 zzc Site D - Land Adjacent to Heath Farm Hallow LOCATION/OTHER SITES IN VILLAGE CONSIDERED MORE SUSTAINABLE MHDC SWDP 59 zi Land at Greenhill Farm Hallow SIZE/SCALE MHDC NO REF Midland Farm Bank, Hook Bank Hanley Castle LOCATION MHDC SWDP 61 zc Church End House, Church End Lane Hanley Castle HISTORIC AND ENVIRONMENTAL CONSERVATION CONSTRAINTS MHDC SWDP 59 h Albion Lodge (extended boundary to Hanley Swan ACCESS MHHS15) MHDC SWDP 59/7 Land at Yew Tree Farm Hanley Swan UNAVAILABLE - SITE WITHDRAWN MHDC SWDP 61 b Land at School Lane Holt Heath OTHER SITES IN HIGHER ORDER SETTLEMENTS AVAILABLE MHDC SWDP 61 u Land between the B4196 and sports field Holt Heath OTHER SITES IN HIGHER ORDER SETTLEMENTS AVAILABLE MHDC SWDP 61 ze Bentley Farm (Also know as Land Holt Heath HISTORIC ENVIRONMENTAL CONSTRAINTS/SCALE south of Warren House - portion of site at 1.49ha and SWDP 61zd Land West of the Red Lion Public House at 0.51ha) MHDC NO REF Land south of Bestmans Lane Kempsey LOCATION MHDC SWDP 59 zza Land at Old Road South (field 36) Kempsey LOCATION/ OTHER SITES WITH PLANNING PERMISSION IN VILLAGE MHDC SWDP 59 zza Land at Old Road South (field 45) Kempsey LOCATION/ OTHER SITES WITH PLANNING PERMISSION IN VILLAGE

5

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC SWDP 59 zy Land to the rear of The Firs Kempsey ACCESS/TREES MHDC SWDP 59 zw Land off Napleton Lane Kempsey LOCATION/ OTHER SITES WITH PLANNING PERMISSION IN VILLAGE/ ACCESS MHDC SWDP 59 zx Land to the north of Post Office Lane Kempsey ACCESS/SCALE/ OTHER SITES WITH PLANNING PERMISSION IN VILLAGE MHDC SWDP 59zz Hartlands Plant Centre, Draycott Villa Kempsey LOCATION Nurseries, 23 Main Road MHDC SWDP 59 zj Land to the rear of The Croft, Green Street Kempsey LOCATION/ACCESS (part of MHKY31) MHDC NO REF Land at Tadney's Farm, Fox Lane, Green Kempsey LOCATION Street MHDC SWDP 60q Land adj to Elmhurst Farm (North), Hereford Leigh Sinton SIGNIFICANT GAP Road MHDC SWDP 60p Land at Hop Pole Green Leigh Sinton APPEAL DISMISSED MHDC NO REF Cul de sac, Well Lane Little Witley CATEGORY 4 VILLAGE MHDC NO REF Land at Lower Swell Farm Longdon CATEGORY 4 VILLAGE MHDC NO REF The Corner House Longdon CATEGORY 4 VILLAGE/HISTORIC ENVIRONMENT CONSTRAINTS MHDC NO REF Land adjacent to The Hunter's Inn, Buckbury Longdon CATEGORY 4 VILLAGE MHDC SWDP 59zp Rickstones, Bell Lane - possible extension to Lower SIZE - SITE TOO SMALL SWDP59/9 Broadheath 6

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC NO REF Laugherne Bank Lower FLOOD RISK Broadheath MHDC SWDP 59zv Land off the B4204 (Land at Heath Nurseries) Lower LOCATION/SIGNIFICANT GAP and Broadheath SWDP 59m MHDC NO REF Brickets House Madresfield Madresfield LOCATION/CATEGORY 4 VILLAGE/GARDEN LAND MHDC SWDP 52 zi Land off Upper Welland Road -7100- Malvern LOCATION/AONB MHDC SWDP 3 z Former American Hospital, Blackmore Park Malvern LOCATION MHDC NO REF Watery Lane, Upper Welland Malvern AONB MHDC NO REF Land at Park Farm Upper Welland Malvern CATEGORY 4 VILLAGE MHDC NO REF Rosanagh, Upper Welland Road, Malvern Malvern CAT 4 VILLAGE/AONB/GARDEN LAND Wells MHDC SWDP 52 l Land at Bluebell Close Malvern VALUED OPEN SPACE/SPORTS RECREATION SITE MHDC SWDP 52 zh Junction of Grit Lane and Leigh Sinton Road Malvern LOCATION/SIGNIFICANT GAP MHDC NO REF Land to the rear of Stables Grit Lane Malvern LOCATION MHDC NO REF Land with pond to the front of Stables, Grit Malvern LOCATION/HISTORIC ENVIRONMENTAL CONSTRAINTS Lane MHDC NO REF Field to rear of Hop Kiln Cottage, Grit Lane Malvern LOCATION MHDC SWDP 52 u Romaran, Peachfield Road Malvern AONB MHDC SWDP 52 v Brooklands, Mayfield Road / land at Malvern FLOOD RISK Madresfield Road MHDC SWDP 52 x Land west and south of Pickersleigh Grove Malvern LANDSCAPE/URBAN CHARACTER

7

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC SWDP 52 z Woodend Farm Upper Welland - 3 sites. Malvern AONB MHDC SWDP 52 q Land at Worcester Road Malvern NATURE/HISTORIC ENVIRONMENT CONSTRAINTS MHDC SWDP 52 j Land at Hayslan Road Malvern VALUED OPEN SPACE/SPORTS RECREATION SITE MHDC SWDP 52 zf Clayfield Drive Malvern ACCESS/CONTAMINATED/TIPPED LAND MHDC SWDP 52 ze Land off Bronsil Drive Malvern SIGNIFICANT GAP/ACCESS MHDC NO REF Former Gas Works Lower Howsell Road Malvern LOCATION/EMPLOYMENT MHDC SWDP 52 za 186 Madresfield Road Malvern FLOOD RISK/ACCESS MHDC NO REF 24-28 Newtown Road (Back of Property) Malvern SIZE - TOO SMALL MHDC SWDP 52 zd Land Behind 106 Barnards Green, WR14 3ND Malvern SIZE/ACCESS MHDC SWDP 52 zc Land Behind 38, 42, 44, 46, 48 & 56 Malvern SIZE - TOO SMALL Newtown Road MHDC SWDP 52 zb Land Between Old Hollow and B4219 Malvern AONB (Cowleigh Road) MHDC NO REF Land off Wells Road Malvern AONB/ENVIRONMENTAL CONSTRAINTS (ECOLOGY, CONSERVATION) MHDC SWDP 52 o Land to the east of Meadowsweet Court Malvern FLOOD RISK (play area) MHDC NO REF Avon Close Play Area Teme Avenue Malvern AVAILABILITY UNKNOWN MHDC NO REF Land off Beauchamp Road Malvern AVAILABILITY UNKNOWN MHDC SWDP 54 Blackmore Park Malvern ALLOCATED FOR EMPLOYMENT USES MHDC SWDP 52 g Land at Montpelier Road, West Malvern Malvern TREES (TPOS)/AONB

8

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC SWDP 52 k Land adj to Chestnut Hill, off Oaklands Malvern IN AONB MHDC SWDP 52 e Land at Eastward Road Malvern SIGNIFICANT GAP MHDC SWDP 52 p Rugby Club, Spring Lane Malvern ACCESS/COMMUNITY USES MHDC SWDP 52 r Cales Farm, Sayers Aveue Malvern ACCESS/LANDSCAPE MHDC SWDP 52/6 Land to the rear of 12 Priory Road Malvern SITE NO LONGER AVAILABLE MHDC NO REF Site A - Worcestershire Golf Club Malvern Wells AONB/LOCATION/NATURE MHDC NO REF Site B - Worcestershire Golf Club Malvern Wells AONB/LOCATION MHDC NO REF Site C - Worcestershire Golf Club Malvern Wells AONB/LOCATION MHDC SWDP 52 zj Land North of Hanley Road Malvern Wells AONB/FLOOD MHDC NO REF Land to the north and west of Wood Farm Malvern Wells AONB Road MHDC SWDP 52 zg Land north of Hanley Road Malvern Wells AONB/FLOOD MHDC NO REF Arosfa, Upper Welland Road Malvern Wells AONB MHDC NO REF 129 and 131 Wells Road Malvern Wells AONB/LOCATION MHDC SWDP 61 zi Land opposite the Sun and Slipper/Rear of Mamble SIZE/SCALE Clee Heath MHDC SWDP 59 zm Land at Hollins Lane Martley LOCATION/FLOOD RISK MHDC SWDP 59 zn Land to north west of Memorial Hall Martley LOCATION MHDC SWDP 59 zq Land north of Sandyfields Martley LOCATION MHDC NO REF Land to the west of Chantry School Martley LOCATION/SCALE MHDC NO REF Land off Willow Road Martley LOCATION/CATEGORY 4 VILLAGE

9

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC SWDP 3 y The Tavern, Tavern Lane Newnham Bridge CATEGORY 4 VILLAGE MHDC SWDP 60 x Land south of Hospital Lane Powick & Collets LOCATION/ACCESS Green MHDC SWDP 60 w Land east of Hospital Lane Powick & Collets SCALE/OTHER SITES WITH PLANNING PERMISSION IN Green VILLAGE MHDC SWDP 60 z 6 Sparrowhall Lane (land north of) Powick & Collets CHARACTER OF AREA/ Green OTHER SITES WITH PLANNING PERMISSION IN VILLAGE MHDC SWDP 60u Land at Acreage View Farm Powick & Collets ACCESS Green MHDC NO REF Land Opposite The Old School House Queenhill LOCATION MHDC NO REF Land adjacent Ripple Farm, School Lane Ripple LOCATION/SCALE/OTHER CAPACITY IN HIGHER ORDER SETTLEMENTS MHDC SWDP 61 s Land to the north of Southview, Station Road Ripple BACK LAND LOCATION/ACCESS/ OTHER CAPACITY IN HIGHER ORDER SETTLEMENTS MHDC SWDP 61 t Land at Rectory Lane Ripple (land east of Green Gables, School Lane) OTHER CAPACITY IN HIGHER ORDER SETTLEMENTS MHDC NO REF Land at Oakford, Naunton Village Ripple LOCATION MHDC NO REF Land off Hams Way Rushwick LOCATION MHDC SWDP 60 zb Land at Brookfields Farm (adjacent to Rushwick ACCESS MHRW11) MHDC NO REF Land off Brandsford Road (west) Rushwick LOCATION (part of and additional to MHRW09)

10

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC SWDP 60 zc Land at Manor Farm, Bransford Road Rushwick LOCATION MHDC SWDP 58 b Land adjacent to Ryall House Farm Ryall and Holly OTHER PLANNING PERMISSIONS TO SERVE UPTON AREA Green MHDC SWDP 58 j Land south of The Grove Ryall and Holly LOCATION/SCALE/ Green OTHER PLANNING PERMISSIONS TO SERVE UPTON AREA MHDC NO REF Land forming part of Ryall Quarry Ryall and Holly LOCATION/SCALE Green MHDC SWDP 58g Land NW junction of Ryall Road & A38 Ryall and Holly ACCESS/LOCATION/ Green OTHER PLANNING PERMISSIONS TO SERVE UPTON AREA MHDC SWDP 58h Land north of Court Lea and east of Ryall's Ryall and Holly BACK LAND/NOT WELL RELATED TO SETTLEMENT/ Close Green OTHER PLANNING PERMISSIONS TO SERVE UPTON AREA MHDC SWDP 58/1a Land at Sunny Bank Meadow, Holly Green Ryall and Holly LANDSCAPE/CHARACTER/ (Extension) Green OTHER PLANNING PERMISSIONS TO SERVE UPTON AREA MHDC NO REF Land west of B4196 and south of The Knapp Shrawley LOCATION MHDC NO REF Land at Birchall Green Farm Sinton Green CATEGORY 4 VILLAGE MHDC NO REF Site Withdrawn Site Withdrawn SITE WITHDRAWN MHDC NO REF Lime Bank, Longley Green Suckley LOCATION/AONB MHDC SWDP 57 d Tenbury Business Park (west) Tenbury Wells RETAIN AS EMPLOYMENT USE MHDC NO REF Land south of Morningside with access from Tenbury Wells TOPOGRAPHY/LANDSCAPE Oldwood Road MHDC SWDP 57 e Land to the South of town contained within Tenbury Wells AVAILABILITY UNKNOWN/LOCATION the boundaries of

11

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village Terrills Lane, Saltbox Lane and Oldwood Road MHDC SWDP 57 b Mistletoe Row, Oldwood Road, Tenbury Tenbury Wells LOCATION Phase 3 MHDC NO REF The Old Post Office Tunnel Hill SIZE - TOO SMALL MHDC SWDP 58e Land off Hyde Lane Tunnel Hill OTHER SITE IN TUNNEL HILL WITH PLANNING PERMISSION MHDC SWDP 58f Land adjoining the Mount Tunnel Hill ACCESS/SCALE MHDC SWDP 58i Land adjoining Welland Road Tunnel Hill LOCATION MHDC SWDP 58a Land at rear of Karuna House, The Lodge Tunnel Hill SITE DISMISSED ON APPEAL/LOCATION MHDC NO REF Land at former nursery Uckinghall LOCATION MHDC NO REF Land to South of Uckinghall Nurseries Uckinghall LOCATION MHDC NO REF Land at Collinghurst Road Upton upon FLOOD RISK Severn MHDC SWDP 45/2 West of Worcester Urban Extension OUT FOR THE PURPOSES FOR THIS SITES LIST BUT IN AS PART OF THE WIDER WORCESTER AREA URBAN EXTENSION ALLOCATIONS MHDC SWDP 59/13 Land at The Pheasant Inn, Welland Welland PHEASANT INN PUBLIC HOUSE ALREADY a ALLOCATED (DIFFERENT PORTION OF LAND) OTHER PLANNING PERMISSIONS ALREADY IN VILLAGE/COMMUNITY FACILITY MHDC SWDP 59zzb Land at Juniper Farm Welland AONB/ACCESS

12

SWC – September 2014 Appendix 2

District SWDP Ref Address Town or Reason Village MHDC NO REF Land adj Spitalfields Football Club and land Welland OTHER SITES IN WELLAND WITH PLANNING PERMISSION at Welland Nursing Home MHDC NO REF DUPLICATE OF CALL FOR SITES ROW 86 Welland AONB/LOCATION MHDC NO REF Hazer's Field Worcester Road Welland AONB/LOCATION MHDC SWDP 59 zzg Land to the rear of The Laurels, Worcester Welland AONB Road MHDC SWDP 59 zzd Boundary Cottage, Gloucester Road Welland AONB/NATURE MHDC SWDP 59 zze Land adjacent to the Lovells, north of Drake Welland LOCATION Street MHDC NO REF Land adj Apple Tree Cottage Drake Street Welland SIZE - TOO SMALL/LOCATION MHDC SWDP 59 zzf Field immediately to the North-East of May Welland AVAILABILITY/LOCATION Cottage, Drake Street MHDC NO REF Land East of B4208 Welland FLOOD RISK MHDC SWDP 59 i Land north of Marlbank Road (north and Welland AT APPEAL/IN AONB/ south) OTHER SITES IN WELLAND WITH PLANNING PERMISSION MHDC NO REF Land near to the M5 N/A INSUFFICIENT INFORMATION

13

SWC – September 2014 Appendix 2

Worcester City Council

Site Name / Description Site Reference Location Authority Principle Reason for Rejection Land at Astwood Cemetery WO109 Worcester Worcester 9 - Site constraint - too small, allowing for green network mitigation Land at Cotswold Way WO111 Worcester Worcester 6 - Site constraint (natural environment asset) 8 - Site constraint (surrounding uses not compatible with residential uses) and will constrain existing employment uses Land at Liverpool Road WO113 Worcester Worcester 6 - Site constraint (natural environment asset) 9 - Site constraint - too small, allowing for green network mitigation Land at Tunnel Hill WO116 Worcester Worcester 6 - Site constraint (natural environment asset) 9 - Site constraint - too small, allowing for green network mitigation Rogers Hill/Lansdown Walk WO117 Worcester Worcester 6 - Site constraint (natural environment asset) 9 - Site constraint - too small, allowing for green network mitigation Land at Trefoil Close WO121 Worcester Worcester 6 - Site constraint (natural environment asset) 9 - Site constraint - too small, allowing for green network mitigation Land at Waverly Street WO122 Worcester Worcester 4 - Site constraint (flood risk) Pike Hill Land off Dove Close WO123 Worcester Worcester 6 - Site constraint (natural environment asset) - in LNR and SWS. And LGN Land at Howcroft Green WO124 Worcester Worcester 6 - Site constraint (natural environment asset) - LGN Land at Morris Avenue WO125 Worcester Worcester 6 - Site constraint (natural environment asset) - LGN Land at Amberley Close WO126 Worcester Worcester 7 - Site constraint ( transport access ) 6 - Site constraint (natural environment asset) - -LGN - green network mitigation & oil pipeline easement Land at Stanway Close WO127 Worcester Worcester 7 - Site constraint ( transport access ) 6 - Site constraint (natural environment asset) -LGN

14

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Principle Reason for Rejection Land at Droitwich Road WO128 Worcester Worcester 3. insufficient information about availability and certainty about future use of site in context of wider Perdiswell area 6 - Site constraint (natural environment asset) -LGN Land adjacent to A44 Nunnery WO134 Worcester Worcester 6 - Site constraint (historic environment asset) - AM/Setting Way Roundabout (Battenhall 6 - Site constraint (natural environment asset) - LGN Farms) Land at Trotshill Lane East WO137 Worcester Worcester 6 - Site constraint (historic environment asset) 6 - Site constraint (natural environment asset) - LGN Middle Battenhall Farm WO08 & Worcester Worcester 6 - Site constraint (historic environment asset) AM/Setting WO79 6 - Site constraint (natural environment asset) - LGN Tolladine Golf Course WO84 Worcester Worcester 6 - Site constraint (natural environment asset) - LGN Upper Battenhall Farm WO77 & Worcester Worcester 6 - Site constraint (historic environment asset) AM/Setting WO78 6 - Site constraint (natural environment asset) - LGN Ice Works, 174 Bromyard Road WO16 Worcester Worcester 4 - Site constraint (flood risk) Land at Everdine Close and WO130 Worcester Worcester 6 - Site constraint (natural environment asset) - LGN Battenhall Road Land at Sabrina Avenue WO115 Worcester Worcester 3 - Site not available Medway Road WO114 Worcester Worcester 3 - Site not available Comer Avenue Allotments WO110 Worcester Worcester 3 - Site not available Cornmeadow Lane WO120 Worcester Worcester 3 - Site not available Church Farm, Claines WO13 Worcester Worcester 5 - Site constraint (designated greenbelt) Droitwich Road Nursery and WO76 Worcester Worcester 5 - Site constraint (designated greenbelt) Garden Centre

15

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Principle Reason for Rejection Perdiswell and Moathouse Farm WO65 Worcester Worcester 5 - Site constraint (designated greenbelt) 4 - Site constraint (flood risk) - part of site Land N. of Worcester and B'ham WO66 Worcester Worcester 5 - Site constraint (designated greenbelt) canal and S. of A449 4 - Site constraint (flood risk)- part of site Land south of Warndon Wood WO02 Worcester Worcester 1. Not consistent with strategy. Loss of SWDP allocation for employment land within M5 corridor Midland Road Goods Yard, WO26 Worcester Worcester 1. Not consistent with strategy. Loss of SWDP allocation for Midland Road employment land 8 - Site constraint (surrounding uses not compatible with residential use) and will constrain existing employment uses Spicers Yard, Checketts Lane WO89 Worcester Worcester 8 - Site constraint (surrounding uses not compatible with residential use) and will constrain existing employment uses

16

SWC – September 2014 Appendix 2

Wychavon District Council

Site Name / Description Site Reference Location Authority Standard Reason Land off Bromsgrove Road 32-21 DROITWICH Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated green belt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land between Kidderminster 32-32 DROITWICH Wychavon 1. Not consistent with strategy. 10. The current commitments, Road and railway, Hampton including submitted SWDP allocations, already exceed Wychavon Lovett District's Objectively Assessed Need for Housing. Land north of Roman Way 32-34 DROITWICH Wychavon 1. Not consistent with strategy. 5. Excluded by site appraisal criteria: Site constraint (designated green belt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Ombersley Way 32-50 DROITWICH Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Church Farm, 32-51 DROITWICH Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Bays Meadow 32-53 DROITWICH Wychavon 1. Not consistent with strategy. 5. Excluded by site appraisal criteria: Site constraint (designated green belt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Chawson Lane 32-54 DROITWICH Wychavon 6. Site constraint (natural or historic environment asset). 10. The current commitments, including submitted SWDP allocations,

17

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason already exceed Wychavon District's Objectively Assessed Need for Housing.

Land off Pridzor Road 32-55 DROITWICH Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated green belt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Pulley Farm, Pulley Lane 32-56 DROITWICH Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated green belt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land south of Copcut Lane 32-58 DROITWICH Wychavon 1. Not consistent with strategy. 5. Excluded by site appraisal criteria: Site constraint (designated green belt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at 26 Cowl Street 37-A10a EVESHAM Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Cowl Street 37-A10b EVESHAM Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land between Blind Lane and 37-A13 EVESHAM Wychavon 6 - Site constraint (natural or historic environment asset - POS) 10. Briar Close Industrial The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

18

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Briar Close Industrial estate 37-A14a EVESHAM Wychavon 7. Site constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Briar Close Industrial estate 37-A14b EVESHAM Wychavon 7. Site constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off School Road, Hampton 37-A23 EVESHAM Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Former garage and depot, Brick 37-A24 EVESHAM Wychavon 10. The current commitments, including submitted SWDP Kiln Street allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at south west of Evesham 37-N01a EVESHAM Wychavon 4 - Site constraint (flood risk or sewerage/water supply). 10. The Road current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to south of Pershore Road, 37-N07 EVESHAM Wychavon 10. The current commitments, including submitted SWDP West of Fairfield allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the north of Boat lane 37-N17 EVESHAM Wychavon 4 - Site constraint (flood risk or sewerage/water supply). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

19

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason land to the east of Abbey Road 37-N18 EVESHAM Wychavon 4 - Site constraint (flood risk or sewerage/water supply). 6 - Site constraint (natural or historic environment asset). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the south of Offenham 37-N22 EVESHAM Wychavon 10. The current commitments, including submitted SWDP Road allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Cheltenham Road 37-O17 EVESHAM Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.4 - Site constraint (flood risk or sewerage/water supply) Land off Inches lane 37-O19a EVESHAM Wychavon 7. Site constraint (services/transport access or other infrastructure). Land off Pershore Road and 37-O27 EVESHAM Wychavon 10. The current commitments, including submitted SWDP Peewit Road allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Common Road 37-O28 EVESHAM Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Broadview Farm, Twyford 37-U37 EVESHAM Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land north of Wyre Road 71-26a PERSHORE Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

20

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land south of Wyre Road 71-27 PERSHORE Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. New Road 71-40 PERSHORE Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land north of Defford Road 71-41 PERSHORE Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land south of Defford Road 71-42 PERSHORE Wychavon 4 - Site constraint (flood risk or sewerage/water supply) . 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land north of Worcester Road 71-43 PERSHORE Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.6 - Site constraint (natural or historic environment asset) Land to the rear of 34 Bretforton 06-03 c BADSEY Wychavon 7 - Site constraint ( services/transport access or other infrastructure) Road 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land north of the B4035 06-08 BADSEY Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

21

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land off Brewers Lane, Badsey 06-27 BADSEY Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Horsebridge Avenue 06-32 BADSEY Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. land off Bretforton Road 06-33 BADSEY Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. land to the rear of 66 Bretforton 06-34 BADSEY Wychavon 10. The current commitments, including submitted SWDP Road allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Station Drive 12-14 Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Moreton Lane 12-16 BREDON Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Tewkesbury Road 12-17 BREDON Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Eckington Road 12-18 BREDON Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

22

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Station Road 17-06 BROADWAY Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Garages South East of Sheldon 17-17 BROADWAY Wychavon 10. The current commitments, including submitted SWDP Avenue allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land West of Leamington Road 17-20 BROADWAY Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Bibsworth Lane 17-22 BROADWAY Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Smallbrook Road 17-27 BROADWAY Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land west of Waresley Road and 45-08 HARTLEBURY Wychavon 10. The current commitments, including submitted SWDP Waresley Court allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Recreation ground at Waresley 45-29 HARTLEBURY Wychavon 1. Not consistent with strategy. 10. The current commitments, Court Road including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Former British Legion Club, 45-30 HARTLEBURY Wychavon 7. Excluded by site appraisal criteria: Site Constraint Millridge Way (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. 23

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land east of Worcester Road, 45-31 HARTLEBURY Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated adj St Martins greenbelt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj to Weston Road 51-01a HONEYBOURNE Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj to Harvard Avenue 51-11 HONEYBOURNE Wychavon 2. Relatively high level of development already proposed. Excluded by site appraisal criteria (Location). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Brook Farm, Weston 51-20 HONEYBOURNE Wychavon 1. Not consistent with strategy. 10. The current commitments, Road including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Village Hall site to the south of 51-21 HONEYBOURNE Wychavon 9. Excluded by site appraisal criteria: Site constraint - too small. 10. Bretforton Road The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Bretforton Road 51-23 HONEYBOURNE Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land south of Stonepit Lane 53-06 INKBERROW Wychavon 2. Relatively high level of development already proposed.. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

24

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land south of Elmdean 53-08 INKBERROW Wychavon 2. Relatively high level of development already proposed. Excluded by site appraisal criteria (Location). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land east of Sands Road 53-14 INKBERROW Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Knowle Fields Barn Farm 53-15 INKBERROW Wychavon 2. Relatively high level of development already proposed. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Laurels Road 66-08 OFFENHAM Wychavon 2. Relatively high level of development already proposed. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj to Knowledge Cottages 66-11 OFFENHAM Wychavon 2. Relatively high level of development already proposed Site to the east of Grantham, 66-26 OFFENHAM Wychavon 10. The current commitments including submitted SWDP allocations Laurels Road already exceed Wychavon District Objectively Assessed Need for Housing Land South of Laurels Road 66-27 OFFENHAM Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Boat Lane 66-30 OFFENHAM Wychavon 2. Relatively high level of development already proposed. Excluded by site appraisal criteria (Location). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon 25

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason District's Objectively Assesse d Need for Housing.

Land to the west of Newton 66-31 OFFENHAM Wychavon 2. Relatively high level of development already proposed. Excluded Road by site appraisal criteria (Location). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Rear of Cross Keys 67-06 OMBERSLEY Wychavon 10. The current commitments including submitted SWDP allocations already exceed Wychavon District Objectively Assessed Need for Housing Land off Sandy's Road 67-07 OMBERSLEY Wychavon 10. The proposed allocations alone are sufficient to meet the objectively assessed housing needs (only applicable to Wychavon) Land adj to Hill Top House 67-08 OMBERSLEY Wychavon 6. Excluded by site appraisal criteria: Site constraint (natural or historic environment asset). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land south of Appletree Walk 67-09 OMBERSLEY Wychavon 6. Excluded by site appraisal criteria: Site constraint (natural or historic environment asset). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land west of the A449 67-11 OMBERSLEY Wychavon 7. Site constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

26

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land to the rear of 67-15 OMBERSLEY Wychavon 7. Site constraint (services/transport access or other infrastructure). Longheadland, off Appletree 10. The current commitments, including submitted SWDP Walk allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to north of Crown Lane, 29wy-12 WYCHBOLD Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated rear of the Crown greenbelt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj to the Crown Public 29wy-21 WYCHBOLD Wychavon 10. The current commitments, including submitted SWDP House allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land opp Bredon Hill Middle 4-08 ASHTON UNDER Wychavon 1. Not consistent with strategy. 10. The current commitments, School, Elmley Road HILL including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land around Sunnymead off 07-01 BECKFORD Wychavon 1. Not consistent with strategy. 10. The current commitments, Back Lane and around Back Lane including submitted SWDP allocations, already exceed Wychavon House District's Objectively Assessed Need for Housing. Site off Blacksmith Lane beyond 07-02 BECKFORD Wychavon 1. Not consistent with strategy. 10. The current commitments, development including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to rear of Mulberry House 07-08 BECKFORD Wychavon 4. Excluded by site appraisal criteria: Site constraint (flood risk or and Meadowside sewerage/water supply). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

27

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land at Blacksmiths Lane 07-09 BECKFORD Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off New Street 15-22 BRETFORTON Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the Rear of Ivy Lane 15-23 BRETFORTON Wychavon 4. Excluded by site appraisal criteria: Site constraint (flood risk or sewerage/water supply). 7. Site Constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Stoneford Lane 15-25 BRETFORTON Wychavon 1. Not consistent with strategy (Location) 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Greenacres, Brook Lane 25-02 CROPTHORNE Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. land off Field Barn Lane 25-06 CROPTHORNE Wychavon 7. Site Constraint (services/transport access or other infrastructure - visibilty splays). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. land R/O The Croft 25-07 CROPTHORNE Wychavon 1. Not consistent with strategy (out of keeping with village / obscure plot). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

28

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land west of Middle Lane 25-08 CROPTHORNE Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. land at Field Barn lane, 25-15 CROPTHORNE Wychavon 1. Not consistent with strategy (out of keeping with village / obscure Cropthorne plot). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Blacksmiths Lane 25-16 CROPTHORNE Wychavon 1. Not consistent with strategy (out of keeping with village / location). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. land rear of oak rise, off Main 25-17 CROPTHORNE Wychavon 1. Not consistent with strategy (out of keeping with village / Road location). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land rear of the Sling, Field Barn 25-18 CROPTHORNE Wychavon 1. Not consistent with strategy (limited developable area). 10. The lane current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Site south of Drakes Broughton 31-07 DRAKES Wychavon 10. The current commitments, including submitted SWDP along A44 BROUGHTON allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the west of Stonebow 31-08 DRAKES Wychavon 10. The current commitments, including submitted SWDP Road adj railway BROUGHTON allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

29

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Site behind Hawthorne close off 31-09 DRAKES Wychavon 10. The current commitments, including submitted SWDP Stonebow Road BROUGHTON allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. land east of Stonebow Road adj 31-11 DRAKES Wychavon 10. The current commitments, including submitted SWDP railway BROUGHTON allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.7 - Site constraint ( services/transport access or other infrastructure) land north of B4084 west of 31-19 DRAKES Wychavon 10. The current commitments, including submitted SWDP Stonebow Road BROUGHTON allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.1 - Not consistent with strategy (scale). Land at Thornleigh Farm 31-27 DRAKES Wychavon 10. The current commitments, including submitted SWDP BROUGHTON allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.1 - Not consistent with strategy (scale). land to west of Stonebow Road 31-28 DRAKES Wychavon 10. The current commitments, including submitted SWDP adj railway BROUGHTON allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at New Road/Pershore 33-08a ECKINGTON Wychavon 10. The current commitments, including submitted SWDP Road allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Dilmore Lane between 61-06 FERNHILL HEATH Wychavon 10. The current commitments, including submitted SWDP edge of allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Site off A38 between the Old 61-13 FERNHILL HEATH Wychavon 10. The current commitments, including submitted SWDP Drive and Sling lane allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. 30

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land north of settlement, 61-14 FERNHILL HEATH Wychavon 10. The current commitments, including submitted SWDP between Lower Town and allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Station Road to north of 61-15 FERNHILL HEATH Wychavon 10. The current commitments, including submitted SWDP main settlement allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land south of Lower Town 61-23 FERNHILL HEATH Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at the Kennels 61-26 FERNHILL HEATH Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Station Road 61-27 FERNHILL HEATH Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj to Droitwich Road 61-28 FERNHILL HEATH Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated greenbelt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj Pole Position, Station 38-08 Wychavon 1. Not consistent with strategy. 10. The current commitments, Road including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the Rear of The Holding, 38-11 FLADBURY Wychavon 10. The current commitments including submitted SWDP allocations Broadway Lane already exceed Wychavon District Objectively Assessed Need for Housing 31

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Pugh Storage Land to the south 38-12 FLADBURY Wychavon 10. The current commitments including submitted SWDP allocations of Broadway Lane already exceed Wychavon District Objectively Assessed Need for Housing Land to the south of the 38-13 FLADBURY Wychavon 1. Not consistent with strategy. 10. The current commitments, Orchard, Station Road including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. land to the north of the Orchard, 38-14 FLADBURY Wychavon 1. Not consistent with strategy. 10. The current commitments, Station Road including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the north of Pole 38-15 FLADBURY Wychavon 1. Not consistent with strategy. 10. The current commitments, Position, Station Road including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Radford Road 39-12 New site Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj to the Old Post House, 39-13 New site FLYFORD FLAVELL Wychavon 1. Not consistent with strategy. 10. The current commitments, Radford Road including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Crest Hill 46-02 HARVINGTON Wychavon 6. Site constraint (natural or historic environment asset). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land south of village street 46-09 HARVINGTON Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. 32

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Evesham Road 46-09A HARVINGTON Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Crest Hill 46-22 HARVINGTON Wychavon 1. Not consistent with strategy (out of keeping with village / location). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land rear of Green End 72-10 PINVIN Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Barn House, Main St 72-06A PINVIN Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land rear of Green End 72-10 PINVIN Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land north of Green End and 72-17 PINVIN Wychavon 10. The current commitments, including submitted SWDP Owls Reach allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land south of Salt Boxes 72-22 PINVIN Wychavon 1. Not consistent with strategy (location) Cottages, adj to Road Land adj to St Nicholas Church, 72-23 PINVIN Wychavon 1. Not consistent with strategy (location) 6. Site constraint (natural Owletts Road or historic environment asset)

33

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land northof Salt Boxes 72-24 PINVIN Wychavon 1. Not consistent with strategy (location) Ccottages, off Upton Snodsbury Road Cleveland House, Terrace Road 72-25 PINVIN Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Nursery site, Winchcombe Road, 76-01 SEDGEBERROW Wychavon 1. Not consistent with strategy. 10. The current commitments, Sedgeberrow. WR11 7UB including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Nursery site, Winchcombe Road, 76-01 / 76-09 SEDGEBERROW Wychavon 1. Not consistent with strategy. 10. The current commitments, Sedgeberrow. WR11 7UB / Land (new SHLAA including submitted SWDP allocations, already exceed Wychavon to south of Nursery site on ref to follow) District's Objectively Assessed Need for Housing. Winchcombe Road, Sedgeberrow. WR11 7UB Land to south of Pear Tree Drive SHLAA ref to SEDGEBERROW Wychavon 1. Not consistent with strategy. 10. The current commitments, follow including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the south of land 76-07 SEDGEBERROW Wychavon 6. Excluded by site appraisal criteria: Site Constraint (natural or adjacent to St Mary's Church historic environment asset). 7. Excluded by site appraisal criteria: Site Constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the south of Main Street 76-13 SEDGEBERROW Wychavon 7. Excluded by site appraisal criteria: Site Constraint (services/transport access or other infrastructure). 10. The current

34

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

Land to the south of 76-15 / 76-18 SEDGEBERROW Wychavon 1. Not consistent with strategy. 4. Excluded by site appraisal criteria: Cheltenham Road behind 76-18 (new SHLAA Site constraint (flood risk or sewerage/water supply). 8. Excluded by / Land south of Cheltenham ref to follow) site appraisal criteria: Site constraint (surrounding uses not Road north of 76-18 compatible with residential use). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the south of 76-16 SEDGEBERROW Wychavon 1. Not consistent with strategy. 10. The current commitments, Cheltenham Road including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Churchill Road SHLAA ref to SEDGEBERROW Wychavon 10. The current commitments, including submitted SWDP follow allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.7 - Site constraint ( services/transport access or other infrastructure) Land adjacent Portway Farm SHLAA ref to SEDGEBERROW Wychavon 1. Not consistent with strategy. 10. The current commitments, (includes part of site submitted follow including submitted SWDP allocations, already exceed Wychavon known as: Land to south of Pear District's Objectively Assessed Need for Housing. Tree Drive) Land rear of 88 Winchcombe SHLAA ref to SEDGEBERROW Wychavon 1. Not consistent with strategy. 10. The current commitments, Road follow including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land fronting B4078, SHLAA ref to SEDGEBERROW Wychavon 1. Not consistent with strategy. 10. The current commitments, Cheltenham Road follow including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. 35

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land between 78 and 88 76-20 SEDGEBERROW Wychavon 10. The current commitments, including submitted SWDP Winchcombe Road allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at rear of Station Road 78-12 Wychavon 4. Site constraint (flood risk or sewerage/water supply) & 7. Site Constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj to Long Hyde Road 78-13 SOUTH LITTLETON Wychavon 6. Site constraint (natural or historic environment asset) and 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the rear of Inphone, adj 78-14 SOUTH LITTLETON Wychavon 7. Excluded by site appraisal criteria: Site Constraint small holding (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land between College Road and WY029 UPTON Wychavon 10. The current commitments, including submitted SWDP School Lane SNODSBURY allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land rear of Village Hall, Broad 11-13 BISHAMPTON Wychavon 4. Excluded by site appraisal criteria: Site constraint (flood risk or Lane sewerage/water supply). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Adj to Springhill Farm and 21-01 Wychavon 1. Not consistent with strategy. 10. The current commitments, Springfield House including submitted SWDP allocations, already exceed Wychavon

36

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason District's Objectively Assessed Need for Housing.

Land off Low Road 21-08 CHURCH LENCH Wychavon 7. Excluded by site appraisal criteria: Site Constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Evesham Road 21-09 CHURCH LENCH Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj Mayfield, 21-10 CHURCH LENCH Wychavon 1. Not consistent with strategy. 7. Excluded by site appraisal criteria: Road Site Constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Froglands Lane 23-09 Wychavon 1. Not consistent with strategy. 7. Excluded by site appraisal criteria: Site Constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Hoden Lane 23-12 CLEEVE PRIOR Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land East of Church Street 45CG-02 CROSSWAY Wychavon 10. The current commitments, including submitted SWDP GREEN allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. 37

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land north of Old Turnpike Road SHLAA ref to CROWLE Wychavon 1. Not consistent with strategy. 10. The current commitments, follow including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land on Old Turnpike Road SHLAA ref to CROWLE Wychavon 1. Not consistent with strategy. 10. The current commitments, (south) follow including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at north end of Crowle SHLAA ref to CROWLE Wychavon 1. Not consistent with strategy. 10. The current commitments, village between Crowle and follow including submitted SWDP allocations, already exceed Wychavon Crowle Green District's Objectively Assessed Need for Housing. Land adj to School Lane SHLAA ref to CROWLE Wychavon 10. The current commitments, including submitted SWDP follow allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to east of Church Rd / 26-01 / 26-06 / CROWLE Wychavon 7. Excluded by site appraisal criteria: Site Constraint North of Summerfield House on 26-09 ( new (services/transport access or other infrastructure). 10. The current Church Rd / Summerfield House SHLAA ref to commitments, including submitted SWDP allocations, already exceed & surrounding land off Church follow) Wychavon District's Objectively Assessed Need for Housing. Rd Site adj to Church Lane / Land 26-03 / 26-10 CROWLE Wychavon 1. Not consistent with strategy. 10. The current commitments, opposite Village Hall off Church (new SHLAA including submitted SWDP allocations, already exceed Wychavon Rd ref to follow) District's Objectively Assessed Need for Housing. Land east of GD1 off Froxmere 26-07 CROWLE Wychavon 10. The current commitments, including submitted SWDP Rd allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Site north of Froxmere Rd 26-12 CROWLE Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed 38

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Need for Housing.

Land rear of Elmley Close 36c-4 CUTNALL GREEN Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.5 - Site constraint (designated greenbelt) 1 & 2 Avon Bank 27-1 a DEFFORD Wychavon 1 - Not consistent with strategy (removed from settlement) 4. Excluded by site appraisal criteria: Site constraint (flood risk or sewerage/water supply). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Rear of the Mount 27-9 DEFFORD Wychavon 7. Excluded by site appraisal criteria: Site Constraint (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Harpley Road 27-16 DEFFORD Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land East of Upper Street 27-17 DEFFORD Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Lane behind properties on Hill 35-01 Wychavon 10. The current commitments, including submitted SWDP Lane from Hillmead to allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Hanbury Brickworks Site, 44-08 HANBURY Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated Saltway greenbelt). 10. The current commitments, including submitted SWDP

39

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

Land at Hanbury Road 44-09 HANBURY Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated greenbelt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. East of Hanbury Road, adj 44-10 HANBURY Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated Blackberry Hill greenbelt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land east of Blackberry Hill 44-11 HANBURY Wychavon 5. Excluded by site appraisal criteria: Site constraint (designated House, Forest Lane greenbelt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj Galton Arms, Harrow WY039 Wychavon 10. The current commitments, including submitted SWDP Lane allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Rear of Blacksmiths Lane 47-10 LOWER MOOR Wychavon 1. Not consistent with strategy. 10. The current commitments, (HILL & MOOR including submitted SWDP allocations, already exceed Wychavon PARISH) District's Objectively Assessed Need for Housing. Land rear of Haig Villas, 47-15 LOWER MOOR Wychavon 1. Not consistent with strategy. 10. The current commitments, Throckmorton Road (HILL & MOOR including submitted SWDP allocations, already exceed Wychavon PARISH) District's Objectively Assessed Need for Housing.

40

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land westof Duffledown View, 47-16 LOWER MOOR Wychavon 1. Not consistent with strategy. 10. The current commitments, (HILL & MOOR including submitted SWDP allocations, already exceed Wychavon PARISH) District's Objectively Assessed Need for Housing. Depot, north of The Firs, 47-17 LOWER MOOR Wychavon 1. Not consistent with strategy. 10. The current commitments, Throckmorton Road (HILL & MOOR including submitted SWDP allocations, already exceed Wychavon PARISH) District's Objectively Assessed Need for Housing. West of west side 60-8 NORTH & MIDDLE Wychavon 1. Not consistent with strategy. 10. The current commitments, LITTLETON including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj Hatfield Lane, Hatfield 64-04 NORTON JUXTA Wychavon 1. Not consistent with strategy (scale and location) 10. The current KEMPSEY commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj to Road 64-04 b NORTON JUXTA Wychavon 1. Not consistent with strategy. 10. The current commitments, KEMPSEY including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adj to Squirrels Leap, 64-05 NORTON JUXTA Wychavon 1. Not consistent with strategy. 10. The current commitments, Woodbury Lane KEMPSEY including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Woodhall Farm 64-24 NORTON JUXTA Wychavon 1. Not consistent with strategy. 10. The current commitments, KEMPSEY including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land around Norton Juxta 64-24 a NORTON JUXTA Wychavon 1. Not consistent with strategy (scale) Kempsey and North of KEMPSEY Littleworth, Brookhill Farm

41

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land around Norton Juxta 64-24 b NORTON JUXTA Wychavon 1. Not consistent with strategy (scale). 10. The current Kempsey and North of KEMPSEY commitments, including submitted SWDP allocations, already exceed Littleworth, Land off Brockhill Wychavon District's Objectively Assessed Need for Housing. Lane Land around Norton Juxta 64-24 c NORTON JUXTA Wychavon 1. Not consistent with strategy (location)10. The current Kempsey and North of KEMPSEY commitments, including submitted SWDP allocations, already exceed Littleworth, Brookhill Farm Wychavon District's Objectively Assessed Need for Housing. Land around Norton Juxta 64-24 d NORTON JUXTA Wychavon 1. Not consistent with strategy (location) 10. The current Kempsey and North of KEMPSEY commitments, including submitted SWDP allocations, already exceed Littleworth, Land adjacent to Wychavon District's Objectively Assessed Need for Housing. Church Lane/M5 Land around Norton Juxta 64-24 e NORTON JUXTA Wychavon 10. The current commitments, including submitted SWDP Kempsey and North of KEMPSEY allocations, already exceed Wychavon District's Objectively Assessed Littleworth, Land adjacent to Need for Housing. Church Lane/M5 Land around Norton Juxta 64-24 f NORTON JUXTA Wychavon 6 - Site constraint (natural or historic environment asset -POS) 10. Kempsey and North of KEMPSEY The current commitments, including submitted SWDP allocations, Littleworth, Land adjacent to already exceed Wychavon District's Objectively Assessed Need for Church Lane/M5 Housing. Land around Norton Juxta 64-24 g NORTON JUXTA Wychavon 1. Not consistent with strategy (scale and location) 10. The current Kempsey and North of KEMPSEY commitments, including submitted SWDP allocations, already exceed Littleworth, adjacent to Church Wychavon District's Objectively Assessed Need for Housing. Lane/Hatfield Lane Land around Norton Juxta 64-24 h NORTON JUXTA Wychavon 1. Not consistent with strategy (scale). 10. The current Kempsey and North of KEMPSEY commitments, including submitted SWDP allocations, already exceed

42

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Littleworth, adjacent to Church Wychavon District's Objectively Assessed Need for Housing. Lane/Hatfield Lane

Land around Norton Juxta 64-24 i NORTON JUXTA Wychavon 1. Not consistent with strategy (location) 10. The current Kempsey and North of KEMPSEY commitments, including submitted SWDP allocations, already exceed Littleworth, Land to the East of Wychavon District's Objectively Assessed Need for Housing. Norton House Farm Land around Norton Juxta 64-24 j NORTON JUXTA Wychavon 1. Not consistent with strategy. 10. The current commitments, Kempsey and North of KEMPSEY including submitted SWDP allocations, already exceed Wychavon Littleworth, Land adj to Squirrels District's Objectively Assessed Need for Housing. Leap, Woodbury Lane Land around Norton Juxta 64-24 k NORTON JUXTA Wychavon 1. Not consistent with strategy. 10. The current commitments, Kempsey and North of KEMPSEY including submitted SWDP allocations, already exceed Wychavon Littleworth, South of The Follies: District's Objectively Assessed Need for Housing. Norton Parkway Land at Pound House Farm, 64-25 NORTON JUXTA Wychavon 10. The current commitments, including submitted SWDP Church Lane KEMPSEY allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Woodbury Lane, Norton WY63 NORTON JUXTA Wychavon 1. Not consistent with strategy. 10. The current commitments, KEMPSEY including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land south west of Chapel Road 69-07 PEBWORTH Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

43

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land to the west of Chapel Road 69-11 PEBWORTH Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Dorsington Road 69-15 PEBWORTH Wychavon 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Fibrex Nurseries, Homeybourne 69-16 PEBWORTH Wychavon 10. The current commitments, including submitted SWDP Road allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Priory Farm 69BM-01 BROAD MARSTON Wychavon 1. Not consistent with strategy. 4. Excluded by site appraisal criteria: Site constraint (flood risk or sewerage/water supply). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land and farmyard at Court End 83-13 TIBBERTON Wychavon 1. Not consistent with strategy. 7. Site Constraint (services/transport Farm access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land and farmyard at Court End 83-14 TIBBERTON Wychavon 1. Not consistent with strategy. 7. Site Constraint (services/transport Farm access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land between Plough Road and 83-15 TIBBERTON Wychavon 1. Not consistent with strategy. 7. Site Constraint (services/transport Foredraught access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon

44

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason District's Objectively Assessed Need for Housing.

Land between Plough road and 83-16 TIBBERTON Wychavon 1. Not consistent with strategy. 7. Site Constraint (services/transport Hawthorn Rise access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the east of the Speed 83-17 TIBBERTON Wychavon 1. Not consistent with strategy. 7. Site Constraint (services/transport and the Plough public access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Greenfields Farm, north 85-01 Wychavon 1. Not consistent with strategy (scale). 10. The current of Worcester Road commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.5 - Site constraint (designated greenbelt) Land at Greenfields Farm, south 85-02 UPTON WARREN Wychavon 1. Not consistent with strategy (scale). 10. The current of Worcester Road commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.5 - Site constraint (designated greenbelt) Land at Greenfields Farm, east 85-03 UPTON WARREN Wychavon 1. Not consistent with strategy (scale). 10. The current of lakeside Court commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.5 - Site constraint (designated greenbelt) Land north-east of junction 88-12 WHITTINGTON Wychavon 7. Excluded by site appraisal criteria: Site Constraint between A44 and (services/transport access or other infrastructure). 10. The current commitments, including submitted SWDP allocations, already exceed 45

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Wychavon District's Objectively Assessed Need for Housing.

Land surrounding The Hill House 88-14 WHITTINGTON Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Walkers Lane and 88-20 WHITTINGTON Wychavon 10. The current commitments, including submitted SWDP Church Lane allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. The Chapelry, Walkers Lane 88-21 WHITTINGTON Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. 7 Old Hall Close 05-02 ASTON Wychavon 1. Not consistent with strategy. 10. The current commitments, SUMMERVILLE including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Adjacent Springhill Farm & 21-01AL ATCH LENCH Wychavon 1. Not consistent with strategy. 10. The current commitments, Springfield House including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Mitton, North 12-06 BREDONS Wychavon 1. Not consistent with strategy. 10. The current commitments, Tewkesbury HARDWICK including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adjacent Hill View 12-19 BREDONS Wychavon 1. Not consistent with strategy. 10. The current commitments, HARDWICK including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

46

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land at Home Farm 14-03 BREDONS Wychavon 1. Not consistent with strategy. 10. The current commitments, NORTON including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the rear of The Croft 18-01 BROUGHTON Wychavon 1. Not consistent with strategy. 10. The current commitments, HACKETT including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land west of Boston Lane 19-10 CHARLTON Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Crow Farm, Yessel Lane 19-9 CHARLTON Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land east of Farmers Lane 20-5 CHILDSWICKHAM Wychavon 1. Not consistent with strategy. 4. Excluded by site appraisal criteria: Site constraint (flood risk or sewerage/water supply). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off A441, Evesham Road 92-12 COOKHILL Wychavon 1. Not consistent with strategy. 5. Excluded by site appraisal criteria: Site constraint (designated greenbelt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adjacent to the Honeybee 30-01 DOVERDALE Wychavon 1. Not consistent with strategy. 10. The current commitments, Inn including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

47

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land adjacent St Richards and St 42-04 Wychavon 1. Not consistent with strategy. 10. The current commitments, Huberts Church including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Hadzor Lane/Green 42-04a HADZOR Wychavon 1. Not consistent with strategy. 10. The current commitments, Lane including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Green Lane/Middle 42-04b HADZOR Wychavon 1. Not consistent with strategy. 10. The current commitments, Lane including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land rear of Hadzor Lane 42-05 HADZOR Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adjacent Pershore Lane 49-02 Wychavon 1. Not consistent with strategy. 4. Excluded by site appraisal criteria: Bridge Site constraint (flood risk or sewerage/water supply). 5. Excluded by site appraisal criteria: Site constraint (designated greenbelt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Lamd at Court Farm, Hindlip 49-04 HINDLIP Wychavon 1. Not consistent with strategy. 5. Excluded by site appraisal criteria: lane Site constraint (designated greenbelt). 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Court Farm 61-29 HINDLIP Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

48

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Manor Farm Buildings, Manor 50-01 HINTON ON THE Wychavon 1. Not consistent with strategy. 10. The current commitments, Farm GREEN including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the rear of Hinton 50-02 HINTON ON THE Wychavon 1. Not consistent with strategy. 10. The current commitments, Cottages GREEN including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Bevans Lane 50-03 HINTON ON THE Wychavon 1. Not consistent with strategy. 10. The current commitments, GREEN including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land between Cheltenham Road 12-20 KINSHAM Wychavon 1. Not consistent with strategy. 10. The current commitments, and Watery Lane including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land rear of Micris, Chapel Lane 12-21 KINSHAM Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Grange Farmyard, Wick Road 56-01 LITTLE Wychavon 1. Not consistent with strategy. 10. The current commitments, COMBERTON including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adjacent to Porters 56-02 LITTLE Wychavon 1. Not consistent with strategy. 10. The current commitments, Cottages COMBERTON including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land north of Norton Village 63-02 NORTON AND Wychavon 1. Not consistent with strategy. 10. The current commitments, LENCHWICK including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

49

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land off Byrd Row 63-12 NORTON AND Wychavon 1. Not consistent with strategy. 10. The current commitments, LENCHWICK including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land between Green Lane and 65-01 Wychavon 1. Not consistent with strategy. 10. The current commitments, Plough Lane including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Green Lane 65-02 ODDINGLEY Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. The Croft, Goodleigh Hill, 71-44 PERSHORE Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land off Radford Road 74-02 ROUS LENCH Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Naseby House, Sale 26-18 SALE GREEN Wychavon 1. Not consistent with strategy. 10. The current commitments, Green including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land adjoining Walnut Cottage 48-10 SALEWAY Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Brook House Farm 48-08 SHERNALL GREEN Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

50

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land at Brookhouse Farm 48-09 SHERNALL GREEN Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Hill View Road, Upper 81-01 Wychavon 1. Not consistent with strategy. 10. The current commitments, Strensham including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Strensham Court, 81-02 STRENSHAM Wychavon 1. Not consistent with strategy. 10. The current commitments, Bredon Field including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Extensive site to north and east 80-04 STOULTON AND Wychavon 1. Not consistent with strategy. 10. The current commitments, of Stoulton running up railway including submitted SWDP allocations, already exceed Wychavon line District's Objectively Assessed Need for Housing. Land at Terony, Egdon Lane, 80-07 STOULTON AND Wychavon 1. Not consistent with strategy. 10. The current commitments, Egdon HAWBRIDGE including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land north of Evesham Road 47-15 UPPER MOOR Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. The Nurseries, Wadborough 31-29 WADBOROUGH Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Pershore College 89-02 WICK Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

51

SWC – September 2014 Appendix 2

Site Name / Description Site Reference Location Authority Standard Reason Land north of Sally Close 90-09 Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land north of Pitchers Hill 90-10 WICKHAMFORD Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Sandy's Avenue 90-11 WICKHAMFORD Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land to the rear of Sally Close 90-12 WICKHAMFORD Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Nuseries off Longdon Hill, 90-13 WICKHAMFORD Wychavon 1. Not consistent with strategy. 10. The current commitments, Broadway Road including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Nightingale Orchards, Longdon 90-14 WICKHAMFORD Wychavon 1. Not consistent with strategy. 10. The current commitments, Hill including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing. Land at Wyre Hill 91-11 Wychavon 1. Not consistent with strategy. 10. The current commitments, including submitted SWDP allocations, already exceed Wychavon District's Objectively Assessed Need for Housing.

52

SWC – September 2014

APPENDIX 3

South Worcestershire Development Plan Examination

Advice Note – Proposed Modifications Public Consultation

South Worcestershire Councils

Context and guidance for interested parties on the current public consultation into Proposed Modifications to the South Worcestershire Development Plan following Stage 1 of the Examination, (October 2013 and March 2014)

SWCs: 30 September 2014

Introduction A. The purpose of this document is to set out Proposed Modifications to the South Worcestershire Development Plan (SWDP) that have arisen during the ongoing Examination process. Proposed Modifications are those identified changes to the Plan that are considered necessary to ensure it is sound. The Proposed Modifications are proposed by the Inspector, under section 7C of the Planning and Compulsory Purchase Act 2004: “(7C)If asked to do so by the local planning authority, the person appointed to carry out the examination must recommend modifications of the document that would make it one that: — a. satisfies the requirements mentioned in subsection (5)(a), and b. is sound. ” B. Comments on the way in which the Proposed Modifications have been prepared are likely to relate to “legal compliance”. If it is the actual content of the Proposed Modifications that is commented on, it is likely this will relate to the “soundness” of the document. C. The SWDP is being examined by an independent inspector (Mr Roger Clews) whose role is to assess whether the plan has been prepared in accordance with the Duty to Co-operate, legal and procedural requirements and whether it is sound. D. A local planning authority should submit a plan for examination which it considers is “sound” – namely that it is: ● Positively prepared – the plan should be prepared based on a strategy which seeks to meet objectively assessed development and infrastructure requirements, including unmet requirements from neighbouring authorities where it is reasonable to do so and consistent with achieving sustainable development; ● Justified – the plan should be the most appropriate strategy, when considered against the reasonable alternatives, based on proportionate evidence; ● Effective – the plan should be deliverable over its period and based on effective joint working on cross-boundary strategic priorities; and ● Consistent with national policy – the plan should enable the delivery of sustainable development in accordance with the policies in the National Planning Policy Framework. E. The Inspector is therefore seeking comments on the Proposed Modifications through the medium of a focussed consultation process, to run for six weeks from 6 October to 14 November 2014. F. This consultation is not an opportunity to raise matters that either were, or could have been, part of the earlier representations or hearings on the submitted plan . Comments should be confined to the Proposed Modifications and Sustainability Appraisal as published. Any comments that attempt to address previous issues will not be considered by the Inspector. G. Following the close of the consultation, representations received in response to the Proposed Modifications will be collated by the South Worcestershire Councils (SWC) and forwarded to the Inspector. The Inspector will consider all the valid responses made to this consultation, together with those made at the formal stage of consultation and present his recommendations in a report. He may also feel it necessary to hold a further examination hearing to discuss any points raised. H. The SWC will not comment on or respond to the representations received. Responses to the Proposed Modifications are for the Inspector to consider. I. If you wish to make a representation seeking a change to the Proposed Modifications, you should: i. Make clear in what way the published Proposed Modifications is not sound or not legally compliant, having regard to the tests set out above. ii. Support your representation by evidence showing why the Proposed Modifications should be changed. iii. Say precisely how you think the Proposed Modifications should be changed.

J. All submission documents, including background papers and the Integrated Assessment appraisal, are available to view on the SWDP website at: www.swdevelopmentplan.org All Submission Documents will be available for inspection at the offices of Malvern Hills District, Worcester City and Wychavon District Councils. K. Please note the following: Representations may be by post or email. Representations should be made using the form provided (Appendix 1) Representations may be accompanied by a request to be notified at a specified address of any of the following: • that the SWDP has been submitted for independent examination; • the publication of the recommendations of any person appointed to carry out an independent examination of the SWDP; • the adoption of the SWDP. L. If you do require this notification, please remember to specify this on the standard response form and your contact address.

M. Proposed changes to strategic housing provision

Context 1. The South Worcestershire Councils (SWC) embarked on the drafting and production of a joint local plan in 2006. 2. The South Worcestershire Development Plan (SWDP) is the local plan for the future development of the three authority areas, drawn up by the SWC in consultation with local communities. It sets out strategic priorities for the area and determines the scale of growth required for South Worcestershire to meet social, economic and housing-related needs to 2030. 3. The SWDP sets out what the SWC consider to be the most appropriate and sustainable strategy for meeting those aims, in conjunction with delivering development that takes account of other significant issues such as: • the open countryside; • affordable housing; • good design; • flooding and water management; • the historic and natural environment; • areas of designated landscape value e.g. AONB • infrastructure. 4. Through SWDP site allocation policies, the plan identifies new housing allocations, including strategic urban extensions, intended to meet the full objectively assessed need for housing. 5. Early public engagement and visioning exercises, with reference to technical evidence, helped to define the key characteristics and challenges facing South Worcestershire. These were expanded on in the Issues and Options (2007) and Preferred Options (2008) reports and the accompanying Sustainability Appraisals and are summarised below: • Recognition of both the current and potential need for growth at Worcester through population projections / household projections, the adopted version (2004) of which identified Worcester as a Sub- Regional Focus. Worcester was subsequently identified regionally as a Settlement of Significant Development; • Roles and growth requirements of the towns of Droitwich Spa, Evesham, Malvern, Pershore, Tenbury Wells, and Upton-upon-Severn; • Sustainability of villages that provided local services, those villages within the hinterland of Worcester City and the towns in south Worcestershire; • Issues around the economic and social viability of the more remote rural areas within Malvern Hills and Wychavon. • Requirements for the delivery of infrastructure and services.

Background 6. As part of his interim conclusions, published in October 2013, the SWDP Inspector had reservations about certain aspects of the Worcestershire Strategic Housing Market Assessment (2012) (SHMA), specifically various technical aspects and the age of the base data. He requested, in line with NPPF para 159, that the SWC undertake a revision of the Objectively Assessed Housing Need work to provide a reliable and up-to- date basis for the determination of the housing requirement for the SWDP area. In doing so the Inspector outlined certain guidelines relating to his technical expectations for this work and also stated that he anticipated that the final provision figure was likely to be “ significantly higher ” than the 23,200 figure originally proposed in the Submission SWDP.

7. In preparing the report and to support the soundness of its conclusions, the SWC considered that it was essential to derive an independently prepared, representative and realistic objective assessment of housing need. The SWC contracted with Amion (who are also leading the preparation of the Strategic Economic Plan for Worcestershire LEP) and Edge Analytics (a leading company in the field of socio-economic analysis) to lead the work. Further, in line with the Inspector’s request to use more than one set of economic forecasts, they utilised three baseline sets: (a) Cambridge Econometrics – as used by Worcestershire LEP; (b) Experian – as promoted by developers at the September hearing; (c) Oxford Economics – commissioned by SWC.

What did the new evidence say? 8. The assessment used the latest official population estimates and three new employment forecasts. It comprised: • The preparation of population forecasts for the period up to 2030. • Translation of these forecasts, taking account of headship rates, into forecasts of the numbers of households. • Interpretation of the household forecasts into projections for future dwelling requirements – taking into account vacancies, second homes and developments already undertaken during the forecasting period. 9. The outcome of the Amion / Edge assessment was submitted to the Examination by the SWC and formed the basis of its response to the Inspector’s questions about the Strategic Housing Market Assessment. The assessment presented a range of scenarios with associated levels of housing growth, of which the one considered to be most appropriate and realistic was Scenario Three. This version used trend-based, migration-led scenarios and assumed a continuation of recent migration patterns to identify a range of between 26,700 and 27,300 new dwellings to meet housing need to 2030. 10. The reassessment was submitted to the Examination by the SWC alongside representations from other interested parties to the Inspector’s questions and concerns on the housing land supply. Their suggestions for additional housing numbers to meet what they saw as the extant need ranged from 28,400 to c38,000. 11. The SWC were of the view that the range identified in the Amion / Edge reports was appropriate for consideration by the Inspector as a Proposed Modifications to the SWDP. The revised housing figure took account of: - • realistic levels of economic growth and present / future employment growth • household formation rates • economic participation rates • in- and out-migration in the south Worcestershire area and the needs (if any) of adjacent or nearby authorities • affordable housing provision • meeting historic undersupply • justified levels of windfall development 12. More details of the report and supporting technical evidence can be found by looking at the Examination Website for the SWDP via this link - http://www.swdevelopmentplan.org/wp- content/uploads/2013/02/Councils-Updated-Assessment-list-of-documents.pdf

Proposed Modifications – new strategic housing figure identified by Inspector 13. Following the reconvened Examination hearings, the Inspector issued his recommended revised housing number to the SWC. He felt that:

… it would be reasonable to take the mid-point between the SENS2 and SENS3 jobs-led scenario “average” case forecasts as representing the full, objectively-assessed level of housing need over the Plan period. This gives the following projected dwelling requirement figures for 2006-30: Malvern Hills 8,590 Worcester City 9,830 Wychavon 9,950 South Worcestershire 28,370 (Paragraph 57, Inspector’s Further Interim Conclusions on the Outstanding Stage 1 Matters, 31 st March 2014) … I therefore recommend that the Councils adopt the figures in paragraph 57 above as representing the full, objectively-assessed need for housing over the Plan period, and as the basis for making provision for housing in the Plan in accordance with national planning policy and guidance . (Paragraph 61, Inspector’s Further Interim Conclusions on the Outstanding Stage 1 Matters, 31 st March 2014) 14. The Inspector has thus identified a figure to meet extant and future housing needs to 2030 of 28,370 .

Increasing the SWDP housing allocations

Options for meeting additional housing requirements 15. The strategy of the SWDP is to utilise a hierarchy of locations (Worcester, main towns, other settlements, villages) to accommodate identified housing need. This has meant the allocation of a portfolio of sites across the plan area, ranging from a number of sustainable urban extensions to relatively small sites in Category 3 rural settlements. Finding sites to meet the additional needs on top of those already identified is a sensitive task and care must be taken not to overlook the strategy in doing so. 16. With the objectively assessed need for housing rising to 28,370 to 2030, there will be a need to identify an increased supply, including new sites and extensions to / increased development density on submitted housing allocations. Doing so will enable the higher figure to be achieved with minimal impact on the shape and delivery of the wider strategy. 17. As part of their approach to meeting the higher number identified by the Inspector, the SWC undertook the following exercises: - Call for Sites a. In March 2014, the SWC carried out a ‘call for sites’ for housing purposes. This was as a consequence of the ongoing examination, and was intended to assist progress in moving towards the Stage 2 hearings while addressing the identified uplift in the objectively assessed need for housing. The SWC used this information to update the South Worcestershire Strategic Housing Land Availability Assessment (SHLAA), which identifies a pool of potential housing sites. The work was in line with the National Planning Policy Framework (NPPF). It also enabled the SWC to take account of the new National Planning Practice Guidance published by the Department for Communities and Local Government in March 2014, which advocates such updating as good practice. b. The SWC stressed that they were looking only for new sites that had not been under consideration previously (e.g. those sites that have not been subject to an application for planning permission nor identified during a previous SHLAA exercise). An objective assessment of the new sites was carried out using the SHLAA 4 th Edition (2012) methodology, including site survey work. c. As well as providing evidence to inform preparation of the SWDP the assessment may also be referred to by neighbourhood forums and parish / town councils as a starting point when identifying sites to allocate in a neighbourhood plan.

Re-examination of extant capacity on existing allocations The SWC revisited the identified capacities of the sites already allocated in the Submission SWDP and considered whether there was any scope for accommodating additional numbers of new dwellings on them. This would have the effect of reducing the number of new sites that would need to be allocated, although there would potentially be an increase in adverse impacts associated with increased development on such sites.

Outcome As a result of this site assessment process (sites were also the subject of rigorous technical testing by bodies such as the Worcestershire County Council Highways Department, Severn Trent and the SWC’s sustainability appraisal consultants), a list of additional and amended sites was compiled. In the view of the SWC, this list represented the most appropriate and sustainable means of meeting the uplift in housing numbers while at the same time maintaining the SWDP’s development strategy (SWDP 2).

South Worcestershire Development Plan Examination

Proposed Modifications to SWDP – Objective Assessment of Housing Need and associated uplift in housing numbers

South Worcestershire Councils

Representation form for responding to Proposed Modifications on the uplift in housing numbers following the first stage hearings into the SWDP (March 2014).

Please use a separate sheet for each modification response – there is an additional document available on the SWDP website that can be completed and appended to this form as many times as required. This will enable the Inspector to consider your comments on each modification as promptly as possible.

SWC: October 2014

Please use a separate Part A / B form for each modification you wish to respond to and attach to the one containing your contact details.

South Worcestershire Development Plan Proposed Modifications: October - November 2014

The South Worcestershire Councils (SWC) are seeking representations on the Proposed Modifications to the SWDP, following stage 1 of the examination in public (March 2014). The changes are proposed by the SWC to address issues around the need for an uplift of housing numbers to meet the objectively assessed housing need for the area and we are only able to accept representations on these matters.

REPRESENTATIONS MUST ONLY RELATE TO THE CURRENT PROPOSED MODIFICATIONS.

Further representations to the submitted SWDP will not be accepted. There is no need to repeat representations that you submitted at a previous stage.

. You can access the SWDP documents online and additional copies of this form from our website http://www.swdevelopmentplan.org/?page_id=5393

Completed forms should be returned either by

Email to:

Post to:

ALL REPRESENTATIONS SHOULD BE SUBMITTED IN WRITING NO LATER THAN 5.00PM ON 14 NOVEMBER 2014.

9 Please use a separate Part A / B form for each modification you wish to respond to and attach to the one containing your contact details.

Before completing the response form we would be grateful if you could tell us more about yourself: 1. Personal Details 2. Agent Details (if applicable)

Title

First Name

Last Name

Job Title (if relevant)

Organisation (if relevant).

Address

Postcode

Tel. No.

Email

HOW WE WILL USE YOUR DETAILS The personal information you provide on this form will be processed in accordance with the requirements of the Data Protection Act 1998. It will be used only for the preparation of local development documents or any subsequent statutory replacement. However, your name and representations will be made publicly available when displaying and reporting the outcome of the consultation stage, and cannot be treated as confidential. OTHER DETAILS , INCLUDING YOUR ADDRESS AND SIGNATURE, WILL BE TREATED AS CONFIDENTIAL .

In agreeing to the holding of your information you are giving permission for your details, held on the database, to be shared between the three local authorities. If you have any concerns or queries relating to this process, please contact 01905 722233.

I agree that contact details and any related responses can be held by the planning service departments of the three South Worcestershire local authorities. I understand that they will only be used in relation to the plan making process as required by the Planning and Compulsory Purchase Act 2004 and other planning-related legislation.

Signed : Date :

10 Please use a separate Part A / B form for each modification you wish to respond to and attach to the one containing your contact details.

3. Are you attaching any additional sheets that relate to this representation?

Number of Yes No sheets

4. Which Proposed Modification does your representation relate to?

Modification Number PM

5. Do you consider the Proposed Modification to be legally compliant?

Yes No No Comment

6. If you consider the Proposed Modification to be unsound, please identify which test of soundness your comments relate to? (tick all that apply)

Positively Effective prepared

Consistent Justified with National Policy

° Positively prepared – the plan should be prepared based on a strategy which seeks to meet objectively assessed development and infrastructure requirements, including unmet requirements from neighbouring authorities where it is reasonable to do so and consistent with achieving sustainable development; ° Justified – the plan should be the most appropriate strategy, when considered against the reasonable alternatives, based on proportionate evidence; ° Effective – the plan should be deliverable over its period and based on effective joint working on cross-boundary strategic priorities; and ° Consistent with national policy – the plan should enable the delivery of sustainable development in accordance with the policies in the National Planning Policy Framework .

11

Please use a separate Part A / B form for each modification you wish to respond to and attach to the one containing your contact details.

Part A Please use a separate sheet for each modification response – there is an additional document available on the SWDP website that can be completed and appended to this form as many times as required. This will enable the Inspector to consider your comments on each modification as promptly as possible.

Please give details of why you consider the Proposed Modification is not legally compliant or is unsound. Please be as precise as possible. If you wish to support the Proposed Modification please also use the box below to set out your comments.

Please note - your representation should provide evidence and information to support / justify your representation and any suggested change.

Your representation should relate only to the current Proposed Modifications.

Expand box / use additional page as necessary

12 Please use a separate Part A / B form for each modification you wish to respond to and attach to the one containing your contact details.

Part B Please set out what change(s) you consider necessary to make the Proposed Modification legally compliant or sound, having regard to the test(s) you have identified above. You will need to say why this change will make the Proposed Modification legally compliant or sound. It will be helpful if you are able to put forward your suggested revised wording of any policy or text. Please be as precise as possible.

Your representation should relate only to the current Proposed Modifications.

13 Please use a separate Part A / B form for each modification you wish to respond to and attach to the one containing your contact details.

14 Please use a separate Part A / B form for each modification you wish to respond to and attach to the one containing your contact details.

7. If your representation is seeking a change to the Proposed Modification, are you content for it to be considered by written representations, or do you consider it necessary to participate in person at an examination hearing?

Written representations Participate at an examination hearing

8a. If you wish to participate at an examination hearing, please outline why you consider this to be necessary:

8b. Where there are a large number of identical or very similar responses to a particular modification, it would assist the inspector if individuals could work together on presenting a joint case at the hearing. If you are able to do this, please indicate below who will be representing you. Your individual comments will still be considered by the Inspector.

Thank you for taking the time to complete this representation.

15

South Worcestershire Development Plan Examination

Proposed Modifications to SWDP – Objective Assessment of Housing Need and associated uplift in housing numbers

South Worcestershire Councils

Additional sheet(s) for responses to individual modifications – to be appended to main form as required

Please use a separate sheet for each modification response to enable the Inspector to consider your comments on each modification as promptly as possible.

SWCs: October 2014

16

Additional sheet for responses to individual modifications – to be appended to main form as required

South Worcestershire Development Plan Proposed Modifications – October - November 2014

Please use a separate sheet for each modification number.

Your Name / Organisation Name (if relevant)

(for tracking purposes only )

4. Which Proposed Modification does your representation relate to?

Modification No. PM

5. Do you consider the Proposed Modification to be legally compliant?

Yes No No Comment

6. If you consider the Proposed Modification to be unsound, please identify which test of soundness your comments relate to? (tick all that apply)

Positively prepared Effective

Consistent with Justified National Policy

• Positively prepared – the plan should be prepared based on a strategy which seeks to meet objectively assessed development and infrastructure requirements, including unmet requirements from neighbouring authorities where it is reasonable to do so and consistent with achieving sustainable development; • Justified – the plan should be the most appropriate strategy, when considered against the reasonable alternatives, based on proportionate evidence; • Effective – the plan should be deliverable over its period and based on effective joint working on cross-boundary strategic priorities; and • Consistent with national policy – the plan should enable the delivery of sustainable development in accordance with the policies in the National Planning Policy Framework.

17

Additional sheet for responses to individual modifications – to be appended to main form as required

Part A

Please use a separate sheet for each reference number.

Please give details of why you consider the Proposed Modification is not legally compliant or is unsound. Please be as precise as possible. If you wish to support the Proposed Modification please also use the box below to set out your comments.

Please note - your representation should provide evidence and information to support / justify your representation and any suggested change.

Your representation should relate only to the current Proposed Modifications.

18

Additional sheet for responses to individual modifications – to be appended to main form as required

Part B

Please set out what change(s) you consider necessary to make the Proposed Modification legally compliant or sound, having regard to the test(s) you have identified above. You will need to say why this change will make the Proposed Modification legally compliant or sound. It will be helpful if you are able to put forward your suggested revised wording of any policy or text. Please be as precise as possible.

Your representation should relate only to the current Proposed Modifications.

19