M54 to M6/M6 (Toll) Link Road Scheme Assessment Report M54-M6/M6 Toll Link Road Highways England Scheme Assessment Report

Total Page:16

File Type:pdf, Size:1020Kb

M54 to M6/M6 (Toll) Link Road Scheme Assessment Report M54-M6/M6 Toll Link Road Highways England Scheme Assessment Report M54 to M6/M6 (Toll) Link Road Scheme Assessment Report M54-M6/M6 Toll Link Road Highways England Scheme Assessment Report Table of Content 1 Introduction....................................................................................................................... 4 Purpose of the Report ......................................................................................................... 4 Scheme History .................................................................................................................. 4 Scheme Objectives ............................................................................................................. 6 2 Existing Conditions .......................................................................................................... 8 Introduction ......................................................................................................................... 8 Existing Highway Network ................................................................................................... 8 Traffic Conditions ................................................................................................................ 9 Traffic Volumes ................................................................................................................. 10 Accidents .......................................................................................................................... 10 Geological and Geotechnical Conditions ........................................................................... 11 Road Drainage and the Water Environment ...................................................................... 11 Groundwater Quality / Hydrogeology ................................................................................. 11 Topography ...................................................................................................................... 12 Contaminated Land .......................................................................................................... 12 Air Quality ......................................................................................................................... 12 Noise & Vibration .............................................................................................................. 12 Cultural Heritage ............................................................................................................... 12 Landscape ........................................................................................................................ 13 Nature Conservation ......................................................................................................... 13 Facilities for Non-Motorised Users..................................................................................... 14 3 Summary of Do-minimum consequences ..................................................................... 15 Introduction ....................................................................................................................... 15 Summary of key points ..................................................................................................... 15 Traffic Model ..................................................................................................................... 15 Air Quality and Noise under Do-Minimum Scenario ........................................................... 15 4 Summary of Route Options ............................................................................................ 16 Introduction ....................................................................................................................... 16 Amendments to Option B(W) design since the previous options stage ............................... 16 The standard of the link..................................................................................................... 18 5 Summary of Tables of Traffic, Economics, Costs ......................................................... 19 Introduction ....................................................................................................................... 19 Economic Assessment Results ......................................................................................... 19 Traffic, Economics, Costs Scoring ..................................................................................... 21 6 Summary of Engineering Assessment .......................................................................... 22 Introduction ....................................................................................................................... 22 Buildability Assessment .................................................................................................... 22 Construction Programme .................................................................................................. 23 Engineering Assessment Summary and Scoring ............................................................... 23 7 Summary of Operational Safety, technology and maintenance Assessment .............. 24 Introduction ....................................................................................................................... 24 Summary of Modified Option B (W) Operation ................................................................... 24 Summary of Modified Option C (E) Operation.................................................................... 25 Summary of Modified Option C (W) Operation................................................................... 26 Summary of Modified Option B (W) (excluding M6 Toll Link) Operation ............................. 26 HE514465-ACM-HGN-M54_SW_PR_Z-RP-CH-0009 2 Revision P04 September 2018 Status A3 M54-M6/M6 Toll Link Road Highways England Scheme Assessment Report Departures from Standard, Operational and Safety Considerations ................................... 27 Operational Safety Assessment Summary and Scoring ..................................................... 32 8 Summary of Technology and Maintenance Assessment .............................................. 33 Introduction ....................................................................................................................... 33 Technology Requirement .................................................................................................. 33 Maintenance ..................................................................................................................... 33 Technology and Maintenance Assessment Summary and Scoring .................................... 34 9 Summary of Environmental Assessment and Environmental Design ......................... 35 Introduction ....................................................................................................................... 35 Air Quality ......................................................................................................................... 35 Noise and Vibration .......................................................................................................... 35 Cultural Heritage ............................................................................................................... 36 Landscape and visual ....................................................................................................... 36 Nature and Conservation .................................................................................................. 36 Geology and Soils ............................................................................................................. 37 Materials ........................................................................................................................... 37 People and Communities .................................................................................................. 37 Road Drainage and the Water Environment ...................................................................... 38 Assessment of Cumulative Effects .................................................................................... 38 Summary of NNNPS compliance Issues ........................................................................... 39 Environmental Assessment Summary and Scoring ........................................................... 40 10 Summary of Public Consultation ................................................................................... 41 Introduction ....................................................................................................................... 41 The Consultation Process ................................................................................................. 41 Initial Results .................................................................................................................... 41 Stakeholder Submissions .................................................................................................. 41 Public Consultation Summary and Scoring ........................................................................ 42 11 Socio-economic impact Assessment ............................................................................ 43 Introduction ....................................................................................................................... 43 Socio-Economic Impact Assessment ................................................................................ 43 Socio-economic impact Assessment Summary and
Recommended publications
  • Catalogue.Pdf
    Barnett Ross WEDNESDAY 25TH OCTOBER 2017 At The Radisson Blu Portman Hotel 22 Portman Square London W1H 7BG Commencing at 12.00 p.m. AUCTION 25 TH OCTOBER 2017 Auctioneers J. Barnett FRICS J. L. G. Ross MRICS Tel: 020 8492 9449 Fax: 020 8492 7373 Notice to all Bidders 1. Please note the General Conditions of Sale which are included with this catalogue and the Special Conditions of Sale which are available on request. An Addendum will be made available on the Auction Day and the bidder should check whether the lot which he/she is interested in bidding for is included. 2. Prospective purchasers are assumed to have inspected the properties in which they are interested and to have made all usual pre-contract searches and enquiries. 3. The successful Bidder is Bound under Contract as soon as the Auctioneer’s gavel falls on his/her final bid. Immediately thereafter the successful Bidder will be handed a Form to fill out supplying details of his/her name and address together with (if different) the name and address of the purchaser and those of his/her solicitors. He/she must also supply a cheque for the deposit, which we will hold at our office. The bidder will be given our bank account details and must arrange to transfer the deposit monies to our client bank account the following day by way of a ‘same day CHAPS payment.’ Once these funds are received we will return the bidder’s cheque by post. 4. The information from the Form will be used to complete a memorandum of contract similar to the one at the back of this catalogue which the purchaser must sign and hand to the Auctioneer’s staff prior to leaving the room.
    [Show full text]
  • 160 Great Britain for Updates, Visit Wigan 27 28
    160 Great Britain For Updates, visit www.routex.com Wigan 27 28 Birkenhead Liverpool M62 36 Manchester Stockport M56 Mold Chester 35 Congleton Wrexham 59 M6 Shrewsbury 64 65 07 Wolverhampton Walsall West Bromwich Llandrindod Birmingham Wells Solihull M6 03 Coventry Warwick02 Carmarthen Hereford 01 51 60 Neath M5 Swansea 06 Pontypridd Bridgend Caerphilly Newport Cardiff M4 13 Barry Swindon M5 Bristol 61 14 Weston-super-Mare Kingswood 31 Bath 32 M4 05 Trowbridge 62 Newbury Taunton M5 20 Yeovil Winchester Exeter Southampton 55 Exmouth M27 Poole Lymington Bournemouth Plymouth Torbay Newport GB_Landkarte.indd 160 05.11.12 12:44 Great Britain 161 Wakefield 16 Huddersfield Hull Barnsley Doncaster Scunthorpe Grimsby Rotherham Sheffield M1 Louth 47M1 Heanor Derby Nottingham 48 24 Grantham 15 Loughborough 42 King's Leicester Lynn 39 40 Aylsham Peterborough Coventry Norwich GB 46 01 Warwick Huntingdon Thetford Lowestoft 45 M1 Northampton 02 43 44 Cambridge Milton Bedford Keynes Biggleswade Sawston 18 M40 19 Ipswich Luton Aylesbury Oxford Felixstowe Hertford 21 50 M25 M11 Chelmsford 61 30 53 52 Slough London Bracknell Southend-on-Sea Newbury Grays 54 Wokingham 29 Rochester Basingstoke 22 M3 Guildford M2 M25 Maidstone Winchester 23 M20 17 M27 Portsmouth Chichester Brighton La Manche Calais Newport A16 A26 Boulogne-sur-Mer GB_Landkarte.indd 161 05.11.12 12:44 162 Great Britain Forfar Perth Dundee 58 Stirling Alloa 34 Greenock M90 Dumbarton Kirkintilloch Dunfermline 57 Falkirk Glasgow Paisley Livingston Edinburgh Newton M8 Haddington Mearns 04 56 Dalkeith 26 Irvine Kilmarnock Ayr Hawick A74(M) 41 Dumfries 25 Morpeth Newcastle Carlisle Upon Whitley Bay 12Tyne 08 South Shields Gateshead 09 11 Durham 49 Redcar 33 Stockton-on-Tees M6 Middlesbrough 10 38 M6 A1(M) 37 Harrogate York 63 M65 Bradford Leeds Beverley M6 28 M62 Wakefield Wigan 16 27 Huddersfield Birkenhead Liverpool Manchester Barnsley M62 Scunthorpe 35 36Stockport Doncaster Rotherham Sheffield GB_Landkarte.indd 162 05.11.12 12:44 Great Britain 163 GPS Nr.
    [Show full text]
  • Cargo Crime Update February 2021 the Work Undertaken by Navcis Freight Crime Would Not Be Possible Without the Assistance & Funding from Our Financial Partners
    d Cargo Crime Update February 2021 The work undertaken by NaVCIS Freight Crime would not be possible without the assistance & funding from our financial partners. NaVCIS receive cargo crime notifications from a number of sources namely Police, Industry, Hauliers, Insurers, Cargo Surveyors, Trade Organisations, the Road Haulage Association, and the British International Freight Association. Cargo crime data is received regularly from 40 UK police forces on a weekly, monthly, or quarterly basis. Overview – Cargo Crime – February 2021 320 notifications of cargo crime £4,834,962.00 combined loss value Theft from motor vehicle was the predominant crime type Fuel was the most frequently stolen commodity Essex had the highest number of cargo crime reports Clacket Lane Services, M25, J5-6, Surrey was the MSA with the highest number of cargo crime reports Figure 1: Heat map to show the geographical spread of reported cargo crime offences by post code in February 2021 1 All Cargo Crime Offences – February 2021 Figure 2: Pie chart to show reported cargo crime offences by offence type in February 2021 2 Geographical Overview - Theft from Trailer – February 2021 124 Theft from Trailer notifications Figure 3: Google ‘My Maps’ to show the national spread of reported theft from trailer offences by post code (where provided) in February 2021 3 All Cargo Crime – Stolen Commodity Type – February 2021 Figure 4: Pie chart to show stolen cargo commodity types in February 2021. The category ‘Unknown’ has been removed and the remaining commodity types have been grouped (‘Other’ 30%) to enable the commodities with 10+ reports to be highlighted.
    [Show full text]
  • Practical AUGUST1996£2.20 U) U) Es Zi 0 Et
    U) practical AUGUST1996£2.20 U) U) eS zI 0 et W ct 5 0 IL ores N et e Power - Ridden ley.carrying 0 The S 1 Way (A IA 4Ova o Compact Dual Band MobileFT -8000R p "So easy to operate, I didn't 'Advancedperformance, and Features simple to use. I knew Yaesu even need the manual!" Frequency Coverage would be first with RX: 110-550 MHz "High-tech features, too, 750-1300 MHz* like the enhanced TX: 144-146 MHz 430-450 MHz Smart -Search'," 3 Power Output Levels 2m 50/10/5 Watt 70c Frl35/10/5 Watt one-touchliome"channels)that store 110 Memory Channels Continuing Yaesu's leading edge engi- 155 per band,including neering philosophy, the FT -8000R Compact - repeater shift. CTCSS encode tone, and packet "Home" channels) Dual Band Mobile introduces industry -first baud rate. Other essential features include Enhanced Smart Searchrm features and no-nonsense operation for today's a Time Chit Timer and an all -new S -Meter CTCSS Encode demanding Amateur. No puzzling key combina- Squelch that opens based on the S -meter reading. Time -Out Timer (TOT) Other options include a DTMF backlit S -Meter Squelch tions on the FT -8000R; eight clearly marked microphone (another Yaesu first) and for Dual Receive (V+V,U+U,V+U) keys and Yaesu's exclusive Omni -Glow' display a progrannning alternative, the ADMS-2C Crossband Repeat make operation a snap. Want to change bands? (bidirectional or one-way) Personal Computer Programming Kit simplifies PC Programmable w/optional Just push the VHF or UHF Volume control! operation even more.
    [Show full text]
  • Your Ref: PL/2015/51409/PPOL Mr Lawrence Osborne Planning Officer Solihull MBC by Email Matthew Taylor Operations Directorate
    Your ref: PL/2015/51409/PPOL Matthew Taylor Operations Directorate The Cube 199 Wharfside Street Mr Lawrence Osborne Birmingham Planning Officer B1 1RN Solihull MBC www.highways.gov.uk 19 December 2017 By email Dear Lawrence PL/2015/51409/PPOL Outline application for a motorway service area, new motorway junction and associated works (means of access for consideration). Proposed Motorway Service Area, Solihull Road, Hampton In Arden, Solihull Thank you for your correspondence regarding the Highways England response to the above referenced planning application for a new Motorway Service Area (MSA) between Junctions 5 and 6 on the M42 in Solihull. Highways England (“we”) have been appointed by the Secretary of State for Transport as a strategic highway company under the provisions of the Infrastructure Act 2015 and we are the highway authority, traffic authority and street authority for the Strategic Road Network (SRN). As you are aware, following an approximate two year period when we recommended that the application not be determined whilst the applicant addressed a number of outstanding concerns, we subsequently resolved on 21 August 2017 to recommend to you a series of planning conditions which would make the development acceptable to us. You have specifically asked us to provide a comprehensive response to you setting out how we have arrived at our conclusion that the development scheme is now capable of being safely integrated with the SRN such that the safe operation of the motorway including its ‘Smart Motorway’ system would not be adversely affected. Context You will be aware that the application is not the first such MSA proposal to be brought forward for your consideration on this site.
    [Show full text]
  • Impact of Sustainable Transport Measures on Town Centres
    Local Sustainable Transport Fund Case Study Evaluation – Impact of Sustainable Transport Measures on Town Centres SUPPORTING TECHNICAL APPENDICES Department for Transport July 2017 LSTF Case Study Evaluation - Impact of Sustainable Transport Measures on Town Centres Supporting Technical Appendices Notice This document and its contents have been prepared and are intended solely for Department for Transport’s information and use in relation to the LSTF Case Study Evaluation Study. Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document history Job number: 5127520 Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.0 Initial draft for DfT review AL, EH, KQ, JR JR - 26/08/16 Accent Rev 2.0 Version 2 addressing AL, Accent JR JR JR 13/12/16 comments from DfT and Peer Reviewer Rev 3.0 Updated draft responding JR - - - 03/03/17 to final comments from DfT (FINAL VERSION) Atkins LSTF Case Study Evaluation - Impact of Sustainable Transport Measures on Town Centres Supporting Technical Appendices Table of contents Chapter Pages Part A - Introduction and Methodology 1. Introduction 7 1.1. Introduction 7 1.2. Study purpose and context 7 1.3. Evaluation aims and research questions 7 1.4. High level programme and study timescales 8 2. Methodology 9 2.1. Introduction 9 2.2. Overall approach 9 2.3. Overview of evidence base 11 2.4. Data issues and limitations 19 Part B – Telford Case Study 3. Introduction 22 3.1. Introduction 22 4. Rationale for LSTF bid 23 4.1.
    [Show full text]
  • Element Court
    Modern self-contained offices TO LET from 1,780 to 4,120 sq ft Hilton Cross Business Park Wolverhampton WV10 7QZ Element Court Element Court The Details The Location offers 8 modern Key features of the site are: Element Court is at the two storey self- confluence of the region’s Excellent car parking ratio motorway network. Located contained office (90 in total with 8 disabled) buildings ranging at the northern fringe of the in size from 1,780 Raised access floors and Wolverhampton and Black suspended ceilings Country conurbation, Element to 4,120 sq ft within Court has direct site access from a landscaped Fitted fire alarms and the A460 Cannock Road on to environment. security systems the M54 Motorway (Junction Passenger lifts 1) which connects to the M6 (offices 1, 4 & 5 only) (Junction 10A). The M6 Toll is approximately 4 miles north at VRF heating and cooling systems Junction 11A of the M6. External steel security shutters to The A460 is a primary bus route ground floor doors and windows between Wolverhampton and LG7 compliant internal lighting Cannock. Intercity and regional rail services are available from Double glazed windows Wolverhampton and Birmingham New Street. CCTV monitored main site entrance barrier Courtyard lighting and landscaping Sat Nav: WV10 7QZ Manchester Cannock & M56 4 4 Office 1 2 3 T7 st nd M6 (1 floor) (2 floor) T6 A38 A449 11 M6 Toll T8 A5 T5 sq ft 4,120 1,780 1,780 1,700 1,600 A460 M54 2 1 Tamworth 10A T4 A461 Office 5 6 7 8 Element A452 Court sq ft 3,300 1,780 1,780 1,780 M6 A454 M6 Toll 10 Walsall T3 Wolverhampton M1 North 9 Sutton T2 A463 M42 1 8 8 7 Coldfield A41 A38 8 A4123 18 T1 19 M6 7 2 1 15 18 6 Dudley 61 3 West Bromwich 12 17 5 M5 Birmingham 13 M42 4 Bristol & Birmingham South West Aiport & M40 For enquiries contact: www.langtreegroupplc.co.uk/property/element-court The Agents for themselves and for the Sellor/Lessor of this property who agents they are give notice that: 1.
    [Show full text]
  • |FREE| M54 Motorway
    M54 MOTORWAY EBOOK Author: Timoteus Elmo Number of Pages: 80 pages Published Date: 22 Oct 2011 Publisher: Loc Publishing Publication Country: United States Language: English ISBN: 9786137757413 Download Link: CLICK HERE M54 Motorway Online Read Business 3 hours ago. M54 to M6 link road. Contact me at jamie. Navigation menu Personal tools Log in. By continuing to browse our site, you agree to the use of these cookies. Between junction 4 and junction 5, the road passes across the Wolverhampton M54 Motorway Shrewsbury railway lineand through the centre of Telford. Wikimedia Commons. This prompted the Department of Transport to consider that site. Sincedevelopers have been solely M54 Motorway for coming up with their own proposals for new motorway services. All rights reserved. This aesthetic improvement M54 Motorway took two and a half years to complete and employed over people. Viral news 21 hours ago. Shropshire County Council. Shrewsbury 23 hours ago. Reviews M54 Motorway Shrewsbury 1 hour ago. Construction timeline. Latest updates 24 August The Department for Transport DfT is currently investigating the possibility of extending the M54 westward to Shrewsburythereby placing the county town on the M54 Motorway motorway map for the first time. Close Privacy Overview This website uses cookies to M54 Motorway your experience while you navigate through the website. We would like your views on these proposed changes. Start date UK News Less than an hour ago. Other nearby roads. Connects to. It then passes to the north of Shifnal. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic M54 Motorway of the website.
    [Show full text]
  • For Sale Junction 1 M54 Hilton Cross
    3 NEW LOGISTICS/ JUNCTION 1 M54 MANUFACTURING / UNITS HILTON CROSS BUSINESS PARK TO LET/ FOR SALE WOLVERHAMPTON UNIT 1 – 47,750 SQ FT WV10 7QZ UNIT 2 – 62,000 SQ FT UNIT 3 – 113,000 SQ FT WOLFPACK-J1M54.COM SUSTAINABILITY Our buildings at Wolf Pack, Hilton Cross Business Park, Wolverhampton will be constructed to a market leading specification that will benefit the occupiers using them, by reducing occupational A PRIME costs and fulfilling many of the environmental, social and corporate governance ratings in measuring the sustainability and social impact of buildings. Our buildings acknowledges the key requirements of the Mid – Box industrial and logistics market and indeed exceeds them in many areas. MANUFACTURING Barberry have worked hard to use the latest environmentally friendly technology to minimise the dependency on fossil fuels, help reduce CO2 emissions and the costs of occupation for occupiers who have the opportunity to procure a renewable electrical energy tariff and AND LOGISTICS drive towards a zero carbon operation. Optimum performance EPC A rating insulated cladding DEVELOPMENT and roof materials Target BREEAM High efficiency air ‘Excellent’ source heat pump Unit 2 Wolf Pack, Hilton Cross Business Park, Wolverhampton, is a high profile speculative development of 3 self-contained detached Reduce cooling, 10% PV Cells lighting and buildings built to a market leading specification with planning heating demand. permission for manufacturing, warehousing and distribution uses. Buildings will be available to lease or purchase
    [Show full text]
  • Park Design & Build
    FOR SALE/ TO LET DESIGN & BUILD OPPORTUNITIES UP TO 120,000 SQ FT 4.9 ACRE SITE WITH 2 ACRES STORAGE/EXPANSION PLANNING CONSENT FOR B2/B8 USES FULLY SERVICED SITE READY FOR DEVELOPMENT A460 • JUNCTION 1 • M54 • WV10 7HP VERNON DESIGN PARK & BUILD JOIN THE SUCCESS... WWW.VERNONPARK.CO.UK UP TO 120,000 SQ FT DESIGN & BUILD WWW.VERNONPARK.CO.UK 01 JOIN THE SUCCESS... WWW.VERNONPARK.CO.UK 02 DESCRIPTION WOLVERHAMPTON & STAFFORDSHIRE Vernon Park comprises a 4.9 acre development site benefitting from detailed Vernon Park is a highly prominent development planning consent for a high specification, at Junction 1 of the M54 motorway. The 120,000 sq ft B2/B8 building. Adjacent to the Jaguar Land Rover Engine Facility lies only 5 development site lies a further 2 acre plot for minutes drive time away demonstrating the additional storage or expansion. attractiveness of this location. Vernon Park has succeeded in attracting Situated within the Wolverhampton & a number of major businesses and Staffordshire region where manufacturing household names including Joseph Joseph, is twice as prominent as it is nationally. The Mann + Hummel and J Banks. development enjoys excellent access to the local and national road network. The site is fully serviced and ready for immediate development. Other occupiers nearby include, TRW, Moog, EWS and BSL. JOIN THE SUCCESS... WWW.VERNONPARK.CO.UK 03 ACCOMODATION Industrial Warehouse design & build up to 120,000 sq ft. Designed to occupier specification NOTE: Computer generated images used TYPICAL BUILDING SpEC 10 m eaves height 10 dock level and 2 level access loading doors High quality offices Gated and fenced secured yard Car parking to suit occupier and additional areas if required 50 KN/m2 floor loading capacity JOIN THE SUCCESS..
    [Show full text]
  • Pick up Points
    Pick Up Points Please note pick up times will be confirmed with your final joining details. Please note not all pickup points will run on every tour. Abercynon Ampthill Bakewell Aberdare Andover Baldock Aberdeen Annan Baldock Services (A1(M)) Aberdeen (ABZ) Annandale Water Services Banbury (A74(M)) Abergavenny Bangor Arbroath Abergele Banstead Armthorpe Abingdon Bargoed Arnold Abington Services (M74) Barking Arundel Accrington Barnet Ashbourne Acle Barnetby Top Services Ashburton (M180) Adlington Ashby-de-la-Zouch Barnoldswick Alcester Ashford Barnsley Alcester Oversley Mill Services (A46) Ashington Barnstaple Aldershot Ashton-in-Makerfield Barrow-in-Furness Aldridge Ashton-under-Lyne Barry Alfreton Aspatria Barton-le-Clay Alnwick Astley Barton-upon-Humber Alsager Atherstone Basildon Alton Atherton Basingstoke Altrincham Attleborough Bath Amble Audenshaw Batley Ambleside Axminster Battle Amersham Aylesbury Bawtry Amesbury Countess Ayr Beaconsfield Services (A303) Bembridge Beaconsfield Services Amesbury Solstice Park (M40) Britannia Grand Burstin Services (A303) Bebington Britannia Grand Ammanford Pont Abraham Scarborough Beccles Services (M4) Pick Up Points Please note pick up times will be confirmed with your final joining details. Please note not all pickup points will run on every tour. Beckenham Birmingham Bourne Bedford Birmingham (BHX) Bournemouth Bedlington Birtley Bournemouth (BOH) Bedworth Bishop Auckland Brackley Beeston Bishop's Cleeve Bracknell Belfast (BFS) Bishop's Stortford Bradford Belper Bradford-on-Avon Birchanger Green
    [Show full text]
  • Si 2010/2424
    STATUTORY INSTRUMENTS 2010 No. 2424 ROAD TRAFFIC The M5, M6 and M54 Motorways (Temporary Restriction of Traffic) Order 2010 Made - - - - 24 September 2010 Coming into force - - 01 October 2010 WHEREAS the Secretary of State for Transport, being the traffic authority for the M5 Motorway (“the M5”), the M6 Motorway (“the M6”), the M54 Motorway (“the M54”) and connecting roads, is satisfied that traffic on lengths of those motorways and some of those connecting roads in the Metropolitan Boroughs of Sandwell and Walsall and the County of Staffordshire should be restricted because of the likelihood of danger to the public: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14(1)(b) of the Road Traffic Regulation Act 1984(a), and of all other powers enabling him in that behalf, hereby makes the following Order:- 1. This Order may be cited as the M5, M6 and M54 Motorways (Temporary Restriction of Traffic) Order 2010 and shall come into force on 1 October 2010. 2. In this Order – “the motorway” means – (a) the northbound and southbound carriageways of the M6 between a point 250 metres south of the centreline of the Rushall canal underbridge at Junction 8 and a point 750 metres north of the centreline of the B4156 Hobnock Road overbridge at Junction 10a; (b) the eastbound carriageway of the M54 from the centreline of the western overbridge at Junction 1 to its junction with the southbound carriageway of the M6 (Junction 10a); and (c) the westbound carriageway of the M54 from its junction with the northbound
    [Show full text]