Roanoke City Public Schools Patrick Henry High School Stadium – New Field House

Total Page:16

File Type:pdf, Size:1020Kb

Roanoke City Public Schools Patrick Henry High School Stadium – New Field House Roanoke City Public Schools Patrick Henry High School Stadium – New Field House Invitation For Bid #3033 Addendum No. 3 Date: October 28, 2020 Architect: Interactive Design Group To: All Bidders of Record This addendum forms a part of and modifies the bidding requirements and proposed contract documents for the subject project, dated September 30, 2020. Receipt of this Addendum shall be acknowledged in the space provided on the Bid Form. Failure to do so may subject a bidder to disqualification. Invitation for Bid #3033: 1. Section VIII, Paragraph 17: Change the word “contractor” to “architect”. 2. Section VIII, Paragraph 18: In the first sentence, change the word “contractor” to “architect”. Drawings: 1. Sheet G-001 – Cover Sheet: Note added Zoning Information. 2. Sheet A-101 - First Floor Plan: Note revised door swing for Door 115. 3. Sheet A-103 – Roof Plan: Note that fan EF-2 has been moved inside of the roof screen and that the roof screen heights have changed per revised Roof Note R9. The extent of the roof screen and the walkway pads have been clarified. 4. Sheet P-102 – Partial First Floor Plan, Area - Sanitary: Note floor drain added in Men’s Toilet 102. 5. Sheet E-401 – Panel Schedule, One-Line Diagram: Note the added One-Line Plan Note 4. Specifications: 1. Section 01 10 10 – Summary of Work: In Paragraph 1.7, A: a. Delete the words “as defined in the Prime Contract Bid Package Descriptions.” b. Add “The estimated cost of the Building Permit is $10,135.80, based on an estimated cost of $2,900,000.00. The Contractor is responsible for paying the final cost of the permit.” Attachments: Add the following revised drawings with revision date October 23, 2020 in lieu of the originally issued drawings sheets. 1. Sheet G-001 – Cover Sheet 2. Sheet A-101 - First Floor Plan 3. Sheet A-103 – Roof Plan 4. Sheet P-102 – Partial First Floor Plan, Area - Sanitary 5. Sheet E-401 – Panel Schedule, One-Line Diagram End of Addendum #3 GENERAL CONSTRUCTION NOTES 1. SEE G-002 FOR GENERAL CONSTRUCTION NOTES. NOTES LEGEND A - MISCELLANEOUS G - DOORS / GLAZINGS P - PLUMBING A-202 C - CIVIL K - FURNITURE / FINISHES R- ROOF 1 130' - 0" 1' - 2" 8' - 0" 46' - 8 3/8" 36' - 7 5/8" 46' - 8" 12' - 0" 1' - 2" E - ELECTRICAL L - LIFE SAFETY S - STRUCTURAL 8' - 8" 3' - 8" 2' - 8" 3' - 8" 28' - 0 3/8" 7' - 0 5/8" 3' - 0 3/4"6' - 4 1/4" 3' - 8" 6' - 4" 3' - 0 3/4" 7' - 1 1/4" 28' - 0" 3' - 8" 2' - 8" 3' - 8" 8' - 8" F - FLOORS / CEILINGS M - MECHANICAL W - WALLS M.O. M.O. MEN'S LVR M.O. LVR SOCCER WOMEN'S M.O. M.O. FLOOR PLAN NOTES TOILETS/ 1 2 STORAGE 3 TOILETS / A-401 W1 G3 S3 TYP SHOWERS A-401 M1 G3 M1 A-401 SHOWERS A1. TYPE S-A SIGN. SEE A-602 SHEET. 107 INTERACTIVE DESIGN GROUP 4' - 0" 4' - 0" 102 8" 109 A2. 7' - 0" HIGH VINYL COATED CHAIN FENCE WITH TWO 4' - 0" WIDE GATES UNDER STAIR LANDING. VERIFY HEIGHT. 301 6TH STREET SW ROANOKE, VA 24016 M12 103A W.H. F1. OUTLINE OF BALCONY ABOVE. P. 540.342.7534 F. 540.342.7536 K1 K1 8' - 0" 8' - 0" 103A 5 M6 DN RAMP F2. 6' - 0" X 1' 6" X 12" DEEP SUMP WITH EXPANDED MESH COVER. 5' - 6 3/8" 2' - 4" 9' - 6 5/8" A-501 M6 1' - 10" 1' - DATA 8' - 0" FD W2 LTH OF FD FOOTBALL M6 A V G1. FOLDING SECURITY GATE. SEE SPECIFICATIONS. E I 101.1 103B 108.2 W R 5 5/8" N STORAGE 103 B 107 G A1 103.1 O I G1 - 7/8" 26' 9 A1 G2. ACCORDION PARTITION. SEE SPECIFICATIONS. FD G1 FD M N 4' - 8" 4' - 8" SG1 SG4 ELEC M I A2 - 1/4" 27' 2 103 F2 106 O A 3' - 8 1/4" G3. 8" X 8" X 4" GLASS MASONRY BLOCK AT OPENINGS. PROVIDE HOLLOW METAL 104.1 C 106 FRAME. RICHARD A. RIFE EWC M6 D. D. W. W. 2' - 4" No. 005477 3 10" 2' - EWC ICE G4. HOLLOW METAL FRAME INTERIOR WINDOW F2. S1 1' - 8" SEPTEMBER . 30 . 2020 A-501 11 5/8" 28' - 8" 10" 14' - 1" 1' - 8" 14' - 9" 19' - 8 3/8" 4' - 6" 8' - 4" 9' - 8" 25' - 2" - 3/8" 11' 5 20' - 3/8" 20' 0 105 A2 K1. ATHLETIC LOCKERS ( 2' DEEP X 6' HIGH) WITH 4" HIGH CONCRETE LOCKER BASE. FD FD S1 FD A CORRIDOR LACROSSE SEE ELEVATION 3 & SECTION 4 ON SHEET A-301. RCHITECT JAN LAUNDRY CORRIDOR M8 M4 STORAGE M4 M8 M8 100 1 115 104 116 L1. 1 1/2" DIAMETER GALVANIZED PIPE HANDRAIL ATTACHED TO WALL MOUNT 34" M8 16' - 1/4" 16' 7 105 20' - 20' 8" 20' - 20' 8" ABOVE RAMP. M8 48' - 48' 0" S1 G2 4' - 8 1/8" - 0". 48' EWC 115 116 EWC 104.3 104.2 103.2 JV L2. 1 1/2" DIAMETER GALVANIZED PIPE HANDRAIL WITH VERTICAL AT 5' - 0" O.C. MAX. S1 4 AND HORIZONTAL RAILS AT 17" AND 34" ABOVE RAMP OR STEPS. W2 VARSITY 101.3 100A CORRIDOR 108.4 FOOTBALL M6 G2 A-501 FOOTBALL SG2 G1 SG3 8' - 7" S1 UP A-202 32 3' - 3" G1 100A 4' - 0" 108 W2 M1. MECHANICAL LOUVERS. SEE MECHANICAL DRAWINGS. UP 4' - 0 1/2" 101 4' - 8 1/8" S1 2' - 10" 2' - 2' - 10" 2' - M2. 16" W X 12" HIGH LOUVER - SEE MECHANICAL PLANS. G4 FD 75' - 0 13/16" FD 24' - 8 5/8" 110.1 114.1 112.1 8 5/8" 28' - 9 3/8" 112.2 8 5/8" 432- A-201- S1. 6" X 6" x 1/4" TS COLUMN. SEE STRUCTURAL DRAWINGS. COL 2' - 9" COL M6 COL COL FD M6 FD 4' - 8" A1 111.2 111.1 G4 A1 101.2 COACHES 113 TRAINER M6 COACHES 108.1 M6 S2. 4 x 4 x 1/4 T.S. COLUMN @ LANDING ABOVE. SEE STRUCTURAL DRAWINGS. 114 112 110 11" 1' - W2 - 3/8" 15' 6 M6 K1 TOILET 5 A-301 TOILET M6 S3. CONTROL JOINT. SEE DETAIL 3, SHEET A-201 & BUILDING ELEVATIONS . 1' - 10" 1' - 1' - 10" 1' - 15' - 3/8" 15' 6 K1 - 3/4" 20' 9 11 5/8" 28' - 8" 20' - 4 3/8" 113 9' - 0" 17' - 0" A1 8' - 6" 111 20' - 4" 25' - 2" S4. CONCRETE RETAINING WALL. SEE STRUCTURAL DRAWINGS. 10' - 10' 0" 10' - 10' 0" S5. 4" REINFORCED CONCRETE SLAB ON 4" COMPACTED PORUS STONE FILL. 112.3 W1. 12'' PAINTED SPLIT FACE CMU W/ FOAMED-IN-PLACE INSULATION. W2. 8" SPLIT FACE CMU. 4' - 0" 4' - 0" 11 5/8" 4 5 W1 G3 M2 11 5/8" F1 A-401 A-401 3' - 0" 3' - 0" 10' - 0" 3' - 8" 2' - 8" 3' - 8" 10' - 0" 3' - 8" 2' - 8" 3' - 8" 23' - 4" 3' - 4" 23' - 4" 3' - 8" 2' - 8" 3' - 8" 10' - 0" 3' - 8" 2' - 8" 3' - 8" 10' - 0" M.O. M.O. M.O. M.O. M.O. M.O. M.O. M.O. M.O. 12 NO. REVISIONS DATE 1 1 CITY REVIEW 10.23.20 A-201 A-301 FIRST LEVEL FLOOR PLAN 1/8" = 1'-0" +39.9 +41.0 +41.0 4' - 0" L1 +41.0 DN L2 3' - 0" +40.5 L1 8' - 0" +40.0 RAMP DOWNRAMP DOWNRAMP 4' - 0" 1' - 0" NEW FACILITY FOR ROANOKE CITY +40.0 L1 PUBLIC SCHOOLS FD 4' - 8" +39.95 EL. +40.00 EL.+40.0 +39.59 S5 +40.0 S5 PATRICK HENRY S4 HIGH SCHOOL FD FD +39.6 FIELDHOUSE 20' - 20' 8" 2102 GRANDIN RD SW UP ROANOKE, VA 24015 8' - 0" 4' - 0" +39.95 EL. +40.00 EL.+40.0 +39.59 +40.0 FD 4' - 8" S4 DATE SEPTEMBER . 30 . 2020 DRAWN AS S4 CHECKED DS/ RAR 10' - 10' 0" 12' - 12' 6" +39.4 JOB 19-059 +39.4 FLOOR PLAN LEGEND 4' - 0" 4' - 0" +39.3 INDICATES EXISTING WALL CONSTRUCTION +39.3 S5 INDICATES NEW WALL CONSTRUCTION FIRST LEVEL 14' - 14' 0" FLOOR PLAN S5 +37.0 90 DEG. SWING 45 DEG. SWING INDICATES INDICATES NEW DOOR EXISTING DOOR +37.0 SHEET NORTH AREAWAY DETAIL PLAN SOUTH AREAWAY DETAIL PLAN GRAPHIC SCALE: 1/8" = 1' - 0" 1/8" = 1'-0" 1/8" = 1'-0" 0 8' 16' 24' 32' A-101 10/23/2020 9:27:03AM GENERAL INT. ELEV. & CASEWORK NOTES 1. CASEWORK TO MEET A.W.I. STANDARD FOR CUSTOM AND COMMERCIAL CASEWORK. NOTES LEGEND A - MISCELLANEOUS G - DOORS / GLAZINGS P - PLUMBING C - CIVIL K - FURNITURE / FINISHES R- ROOF E - ELECTRICAL L - LIFE SAFETY S - STRUCTURAL F - FLOORS / CEILINGS M - MECHANICAL W - WALLS INTERIOR ELEV. & CASEWORK NOTES INTERACTIVE DESIGN GROUP M1. RT-1, SEE MECHANICAL DRAWINGS. UNIT WITH CURB IS 6' - 3" HIGH. 1 301 6TH STREET SW ROANOKE, VA 24016 M2. RT-2, SEE MECHANICAL DRAWINGS. UNIT WITH CURB IS 6' - 2" HIGH. P. 540.342.7534 F. 540.342.7536 M3. HP-1, SEE MECHANICAL DRAWINGS. UNIT IS 4' - 3" HIGH. TH OF M4. HP-2, SEE MECHANICAL DRAWINGS. UNIT IS 4' - 3" HIGH. AL V E I W R A-202 N G M5. EF-2, SEE MECHANICAL DRAWINGS. O I M N M I O 1 M6. DASHED LINES INDICATES MAINTENANCE CLEARANCE FOR ROOFTOP A MECHANICAL EQUIPMENT.
Recommended publications
  • March 18, 2019 and Reviewed the Policies on the Agenda and Recommends Them for Approval
    806 The Board Meeting ofthe Voorhees Township Board of Education was held on Monday, March 18,2019 at 7:34 PM at the Administration Building, Bruce Karpf, Vice-President, presiding. The Voorhees Township Board ofEducation uses a Rolling Agenda concept. Items that are listedfor a vote on the public board agenda are sent to the Board ofEducation members weekly as information items. Each member has the ability to request topic to be discussed in Committee meetings as needed. 1. PUBLIC NOTICE Public notice ofthis meeting pursuant to the Open Public Meetings Act has been given by the Board Secretary in the following manner: 1. Posting written notice on the official bulletin board at the Voorhees Township Public Schools Administrative Building on March 4, 2019. 2. Sending written notice to the Courier Post on March 4, 2019. 3. Filing written notice with the Clerk of Voorhees Township on March 4, 2019. II. SALlJTE TO TIlE FLAG III. ROLLCALL Present Absent Barbara Dunleavy Rachel van Aken Dana Galiano Dr. Marissa Levy Richard Nelson John Schmus Monica Watson Bruce Karpf, Vice-President Dawn Wallace, President (Arrived at 7:37 PM) Dr. Barry J. Galasso, Interim Superintendent Helen G. Haley, Business Administrator/Board Secretary Howard Mendelson, Attorney IV. 1. Motion by Dr. Levy, seconded by Mrs. Schmus, to approve the minutes ofthe meeting of February 27, 2019. Motion carried, 7 ayes. VOORHEES TOWNSHIP MARCI-I 18, 2019 807 2. Motion by Mrs. Watson, seconded by Dr. Levy, to approve the minutes of the March 11,2019 meeting and the executive session meetings of: a.
    [Show full text]
  • Los Angeles - Glendale - Burbank Corridor Feasibility Study Final Report 21 October 2019
    Los Angeles - Glendale - Burbank Corridor Feasibility Study Final Report 21 October 2019 Prepared by: In association with: IBI Group Terry A Hayes Associates HDR Translink RSE Epic Land Solutions RSG Costin Public Outreach Group LOS ANGELES GLENDALE BURBANK CORRIDOR FEASIBILITY STUDY FINAL REPORT PREPARED FOR Metro Regional Rail One Gateway Plaza Los Angeles, CA October 21, 2019 IN ASSOCIATION WITH: IBI Group HDR RSE RSG Terry A. Hayes Associates Translink Epic Land Solutions Costin Public Outreach Group Los Angeles-Glendale-Burbank Corridor Feasibility Study Final Report October 2019 This page intentionally left blank. Page ii Los Angeles-Glendale-Burbank Corridor Feasibility Study Final Report October 2019 TABLE OF CONTENTS EXECUTIVE SUMMARY.................................................................................................................. 1 Project Purpose...................................................................................................................... 1 Background ............................................................................................................................ 1 Feasibility Study Objectives ................................................................................................... 2 Study Findings ....................................................................................................................... 5 Study Resolution ...................................................................................................................10 1. INTRODUCTION
    [Show full text]
  • TRANSPORTATION SYSTEM PLAN Adopted April 8Th, 2014 by Ordinance No
    CITY OF TROUTDALE TRANSPORTATION SYSTEM PLAN Adopted April 8th, 2014 by Ordinance no. 820 Prepared for: Prepared by: City of Troutdale Kittelson & Associates, Inc. 219 E Historic Columbia River Highway 610 SW Alder, Suite 700 Troutdale, Oregon 97060 Portland, Oregon 97205 503.665.5175 503.228.5230 www.kittelson.com Transportation System Plan Troutdale Transportation System Plan Troutdale, Oregon Prepared For: City of Troutdale 219 E Historic Columbia River Highway Troutdale, Oregon 97060 (503) 665-5175 Prepared By: Kittelson & Associates, Inc. 610 SW Alder, Suite 700 Portland, OR 97205 (503) 228-5230 Project Manager: Matt Hughart, AICP Project Principal: Mark Vandehey, P.E. Project No. 12560.0 March 2014 Table of Contents Transportation System Plan TABLE OF CONTENTS Chapter 1. Executive Summary ........................................................................................................... 1-1 Introduction.............................................................................................................................................................................. 1-1 Goals and Policies ..................................................................................................................................................................... 1-2 Transportation Plans ................................................................................................................................................................ 1-3 Financing ...............................................................................................................................................................................
    [Show full text]
  • Demand-Responsive Transportation Systems
    I ~ I CleGFi nolOiQ· U.S. DEPARTMENT OF TRANSPORTA·TION OF THE SECRETARY I , ...~Sharing OFFICE AND URBAN MASS TRANSPORTATION ADMINISTRATION ~ :::0 :....­ c:, •r• C, STATE-OF-THE-ART I OVERVIEW ...c: AUGUST 1974 HE 5620 dcmand-,c,pon,iUc +P3 D45 Urnill~~[POO[I]UffiU~OO~ ~ - w•on J --- ~·~ - This document has been prepared by the Transportation Systems Center and is disseminated under the sponsorship of the Department of Trans­ portation in the interest of information exchange. FOREWORD On March 16, 1972, the President sent a special message to Congress wherein he called "for a strong new effort to marshal! science and technology in the work of strengthening our economy and improving the quality of our life." In this message he stated that in the final analysis," the progress we seek requires a new partnership in science and technology-­ one which brings together the Federal Government, private enterprise, State and local governments, and our universities and research centers in a coordinated, cooperative effort to serve the national interest." As part of its ongoing commitment to this principle of technology-sharing, the U.S. Department of Transportation has initiated a series of publications based on research and development efforts sponsored by the Department. The series comprises technical reports, state-of-the-art documents, newsletters and bulletins, manuals and handbooks, bibliographies, and other special publications. All share a primary objective: to contri­ bute to a better base of knowledge and understanding throughout the transportation community, and, thereby, to an improvement in the basis for decision-making within the community. This title in the series presents an overview of demand responsive transportation, an innovative approach that may help fill the need for flexibility in public transportation.
    [Show full text]
  • 723-14 M34 M34a Sbs M&S Layout 1
    Bus Timetable Effective as of August 31, 2014 M34/ M34A Via 34 St M34 – between Javits Convention Center and Eastside Ferry Terminal M34A – between Waterside Plaza and Port Authority Bus Terminal If you think your bus operator deserves an Apple Award – our special recognition for service, courtesy and professionalism – call 511 and give us the badge or bus number. ¯˘¿ Fares – MetroCard® is accepted for all MTA New York City trains (including Staten Island Railway - SIR), and, local, Limited-Stop and +SelectBusService buses (at MetroCard fare collection machines). Express buses only accept 7-Day Express Bus Plus MetroCard or Pay-Per-Ride MetroCard. All of our buses and +SelectBusService Coin Fare Collector machines accept exact fare in coins. Dollar bills, pennies, and half-dollar coins are not accepted. Free Transfers – Unlimited Ride MetroCard permits free transfers to all but our express buses (between subway and local bus, local bus and local bus etc.) Pay-Per-Ride MetroCard allows one free transfer of equal or lesser value if you complete your transfer within two hours of the time you pay your full fare with the same MetroCard. If you pay your local bus fare with coins, ask for a free electronic paper transfer to use on another local bus. Reduced-Fare Benefits – You are eligible for reduced-fare benefits if you are at least 65 years of age or have a qualifying disability. Benefits are available (except on peak-hour express buses) with proper identification, including Reduced-Fare MetroCard or Medicare card (Medicaid cards do not qualify). Children – The subway, SIR, local, Limited-Stop, and +SelectBusService buses permit up to three children, 44 inches tall and under to ride free when accompanied by an adult paying full fare.
    [Show full text]
  • Greater Productivity for Intralogistics Robust Industrial Pick-To-Light Solutions Let’S Connect
    Greater productivity for intralogistics Robust industrial Pick-to-Light solutions Let’s connect. Intralogistics Increase efficiency and avoid errors Pick-to-Light and Put-to-Light Precise picking and feeding for intralogistics Solutions at a glance The acceleration of production working processes, flexible adjustments to meet Pick-to-Light (P2L) solutions are installed in the picking or withdrawal area. fluctuations in demand and the growing need for customised products are presen- The compartment displays are equipped with a digital display, a capacitive touch ting industrial companies with considerable challenges. Intralogistics in particular button with a bright multi-coloured LED, and optionally an external sensor input. is looking for solutions that increase productivity and optimize the interaction and The production information system indicates the storage location that the picker communication between all work areas. From the delivery of raw materials to final should go to through coloured illuminated LEDs. The display also shows how many assembly, all components have to reach their place of deployment more quickly, parts are to be removed. The touch button or external sensor are used to confirm more efficiently and more reliably. Our Pick-to-Light and Put-to-Light solutions that a picking step has been completed. provide valuable support for picking and assembly applications. Using light signals, they guide employees through a sequence of work steps within a picking process Put-to-Light solutions are deployed in the filling area for empty containers. that have to be confirmed successively. This approach minimizes potential sources The functionalities are analogous to those of the Pick-to-Light solution.
    [Show full text]
  • Transit & Bus Committee Meeting
    Transit & Bus Committee Meeting July 2014 Committee Members F. Ferrer, Committee Chairman J. Banks III, Committee Vice Chairman J. Ballan S. Metzger J. Kay A. Albert C. Moerdler A. Cappelli J. Molloy E. Watt Transit & Bus Committee Meeting 347 Madison Ave. - 5th Floor Board Room New York, NY 10017 Monday, 7/28/2014 9:30 - 10:30 AM ET 1. PUBLIC COMMENT PERIOD 2. APPROVAL OF MINUTES – JUNE 23, 2014 June Committee Meeting Minutes - Page 4 3. COMMITTEE WORK PLAN Committee Work Plan - Page 10 4. OPERATIONS PERFORMANCE SUMMARY a. May Operations Report May Operations Report - Page 18 5. FINANCIAL REPORTS a. May NYCT Financial & Ridership Report NYCT Financial Report - Page 55 b. May SIR Financial & Ridership Report SIR Financial Report - Page 77 c. May MTA Bus Financial & Ridership Report MTA Bus Financial Report - Page 88 d. Capital Program Status Report Capital Program Status Report - Page 101 6. PROCUREMENTS July Procurement Staff Summary & Resolution - Page 110 a. Non-Competitive NYCT Non-Competitive Actions - Page 114 b. Competitive NYCT Competitive Actions - Page 116 c. Ratifications NYCT Ratifications - Page 127 7. ACTION ITEMS Approve a. ADA Accessibility ADA Accessibility: 3 Stations -- Sea Beach & West End Lines - Page 131 8. SERVICE CHANGES a. NYCT Bx24 Extension Approve NYCT Bx24 Extension - Page 133 b. NYCT Q17/27 Route Revision NYCT Q17/27 Route Revision - Page 139 c. MTA Bus Q113 Local and Q114 Limited Restructuring MTA Bus Q113 Local and Q114 Limited Restructuring - Page 143 9. SPECIAL REPORTS & PRESENTATIONS a. MetroCard Report MetroCard Report - Page 148 10. STANDARD FOLLOW-UP REPORTS a. NYCT & MTA Bus EEO & Diversity Report NYCT & MTA Bus EEO & Diversity Report - Page 152 b.
    [Show full text]
  • School Bus Services in Rochdale September 2019 to July 2020
    School Bus Services in Rochdale September 2019 to July 2020 Services in this leaflet operate on schooldays only, unless otherwise stated. Services are listed alphabetically under school names. Rochdale Schools 2019-2020 website - 1 - 18/10/19 An introduction to School buses and concessionary fares for students in Greater Manchester Passengers can pay a fare to the driver for each journey shown on this timetable. However, students will need to show an IGO pass to travel at the concessionary (reduced) fare. If students do not have an IGO pass, they will have to pay a higher fare. Most of the journeys shown in this timetable are funded by Transport for Greater Manchester (TfGM). The majority of TfGM funded services charge a standard fare and also offer daily return tickets. In some cases, the return ticket can also be used for travel on other journeys which serve similar areas – even if it is provided by a different operator. On most services, students can also buy a weekly scholar’s ticket, which costs £7.40. These are ONLY valid on schooldays on school buses and are available from the bus driver on all services where they are applicable. To help the driver, please try to have the correct fare when buying your ticket. A summary of fares and ticketing information on all school services included in this timetable can be found at https://www.tfgm.com/tickets-and-passes/bus-school-bus-services There are also a small number of TfGM funded services where the operator sets the fares. You will need to check with the operator what fares are available.
    [Show full text]
  • Transit Concepts Report for Miami-Dade County and Transit Alliance
    Transit Concepts Report For Miami-Dade County and Transit Alliance September 2019 Table of Contents 1 Introduction ...................................................................................................... 1 Appendix A: Phase 1 Public Input ....................................................................... 42 What are the big questions? ......................................................................................................................................... 3 Appendix B: Detailed Concept Maps .................................................................. 47 Ridership and Coverage Goals are in Conflict .............................................................................................................. 4 Appendix C: Isochrones ....................................................................................... 53 Public Input in Phase 1 .................................................................................................................................................. 5 What are the Concepts? ............................................................................................................................................... 6 Municipal Trolleys: Redesign for More Useful Service? ................................................................................................ 7 What are the outcomes of each concept? .................................................................................................................... 8 What can you do? ........................................................................................................................................................
    [Show full text]
  • Ultrasonic Sensors Ultrasonic Sensors for Object Detection
    Ultrasonic Sensors Ultrasonic sensors for object detection Regardless of color and surface properties BUS ultrasonic sensors can be used universally and are perfect for distance measurement or position detection of granular materi- als, liquids and powders. They measure fill levels, heights and sag without making contact as well as count and monitor the presence of objects. They do this regardless of color and surface properties. Therefore transparent objects that generate strong reflections pose no problem for them. As precision all-rounders, ultrasonic sensors are particularly suited for critical situations. Dust, dirt and steam do not impair them. Broad detection range – high precision Their detection range extends from 20 mm to 8 m, meaning that even longer object distances can be handled without problem. Their high resolution and small blind zones ensure extreme precision. Integrated synchronization means that the sensors do not interfere with one another. Switching and analog variants BUS ultrasonic sensors differ form one another in their output signal. Each series is available as a switching or analog version, whereby all analog versions are available with voltage or current output (0…10 V or 4…20 mA). The BUS M30 includes variants with two switching outputs, one switching and one analog output or two switching outputs and one analog output so that one sensor can adopt the function of a second sensor. IO-Link BUS 18M sensors with push/pull output are equipped with an IO-Link interface that enables a change from SIO mode to IO-Link mode. 402 Ultrasonic Sensors Contents Media 404 Industries, application areas 405 Application areas, sensor selection 406 Modes 407 Sound cones 408 Cylinder Designs BUS M30 410 BUS M18, BUS W18 418 BUS M12 434 Block Designs BUS R06 428 BUS Q80 436 Accessories for Ultrasonic Sensors 438 Basic information and definitions can be found on page 952.
    [Show full text]
  • Mta Small Business Development Program
    MTA SMALL BUSINESS DEVELOPMENT PROGRAM Contract Award Summary - SBMP Tier 1 As of August 06, 2020 ID Agency Project Number Project Name Awarded Contractor Contract Award Date Contractor Current/Final Certificate Contract Amount 11-1 LIRR 6348 HSF Emergency Generator Replacement PE and Consultants, New York LLC 2/25/2020 WBE,MBE $900,000.00 11-2 NYCT C-52152 Install PID Box and Cables - CCTV at 28th St Station A.R.S. Electric, LLC 6/24/2020 $896,349.00 11-3 NYCT C-52153 Install PID Box and Cables - CCTV at 23rd St Station K.A.B. Electric Corp. 6/26/2020 MBE $840,000.00 11-4 NYCT A-37327 85 St. and Woodhaven Blvd./JAM RK Contracting Inc. 6/5/2020 $674,303.35 11-5 NYCT A-37328 75 St. and Cypress Hills/JAM Square Inch Design Corp. (Re) 6/9/2020 WBE,DBE,MBE $603,736.00 11-6 NYCT A-37330 Street Stair Repairs (S4/M5/M6AB) at Canal Street Station Empire Construction and Property 6/24/2020 WBEDBE, $410,434.00 Management Group, Inc. 11-7 NYCT A-37332 Prince St / Bwy S4/S6 Madhu Construction Corporation 7/29/2020 WBE,MBE $540,000.00 Year 11 Awarded Amount To Date: $4,864,822.35 10-1 B&T TNM-393 GARAGE FLOOR PROTECTIVE COATING Logan Stone Inc. 2/14/2019 $352,682.23 10-2 B&T VNM-395 Washing / Resealing various Concrete Walls - Staten Island side The Outfit M&J Limited Liability Company 12/16/2019 MBE $544,600.00 10-3 B&T CBM-333 Pedestrian Sidewalk Improvements near Bay Street Exit National Veteran Contractors, LLC 12/17/2019 MBE $992,779.48 10-4 B&T MMC-1901 Abutment Door Repalcement IBX Services LLC (Re.) 12/20/2019 $732,380.00 10-5 B&T VNC-1701X New Engineers Office at the Verrazano Narrows Bridge Service Empire Construction and Property 1/14/2019 WBEDBE, $828,811.62 Building.
    [Show full text]
  • 13Th-Market to 61St-Baltimore
    August 29, 2021 34 13th-Market to 61st-Baltimore Serving Center City and Angora This Route Runs Weekdays Every 15 Minutes 15 or less 15 Hours / Day 15 6:00 A.M. – 9:00 P.M. 5 Days / Week 5 Monday – Friday Connections at 30th Street Station: Franklin 9, 10, 11, 13, 30, 31, 34, 36, Institute 2 Kirkbride 44, 49, 62, 78, 124, 125, LUCY and 30th Street Suburban WEST PHILADELPHIA Center all Regional Rail Lines and Amtrak Station Station 16 7 33 124, CHOP Penn Presbyterian ® ® 4 d St 125 r Market St W. Philadelphia Pediatric Medical Center MFL 30th St Market St 69th Street 33 Chestnut St H. S. Center BSL Transportation University City 21 ® U of P 2 4 Center Walnut St West Catholic 36TH ST 7 69th St 3 Drexel d St d St 21 27 30TH ST 15TH ST 19TH ST 22ND ST H. S. U 13TH ST 33RD ST 40th St 49th St 49th 43r 43r 48th St 48th 42nd St Spruce St 52nd St Sayre H. S. 37TH ST Spruce St 32 40TH ST 42 17 University d Hospital of R PORTAL of the Arts ll U U of P ha n s Mercy 64 iv South St ar e M 60th St 57th St 11 Hospital r v s Children’s Peirce A i t Penn Medicine Catharine St 36 VA Medical y Hospital College 69th St 52 Baltimore at Rittenhouse 49th St 13 Center Av PHILADELPHIA University 76 DELA Washington Av G of the Sciences Carstops shown on the map with a COUNTY Sherwood 64 Grays Ferry white circle are located in the trolley tunnel.
    [Show full text]