Hsuk North-West Rail Strategy
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Northern Delights
Railways | Great North Rail Project Northern delights We’ve been delivering designs for rail upgrades in the north of England for nearly two decades. Now part of the £1bn Great North Rail Project, the work is stimulating regional and national growth. 2 I Mott MacDonald I Northern delights Northern delights I Mott MacDonald I 3 To Scotland Preston and beyond to Manchester N Blackpool Six fast trains per hour instead of five. Preston Blackburn Rochdale Liverpool to Manchester Four fast trains per hour instead of two. est Coast Main Line Bolton Journey time reduced by up to 10-15 minutes. W Wigan Salford Central Manchester Victoria Earlestown Manchester Roby Huyton Traord Park Piccadilly Ordsall Liverpool Freight Terminal Lime Street Chord Liverpool To Manchester To Stockport Airport South Parkway To Chester To Crewe Electrification scheme Existing electrified track Existing track Roby-Huyton four tracking North of England rail upgrades Ordsall Chord (see separate case study) Due to be delivered by 2022, the The Great North Rail Project (GNRP) started life as At Manchester Victoria Station, where terminating opportunities systematically to identify the best a modest rail enhancement scheme for routes in trains were hogging valuable space, we concluded interventions. The tool considers factors such as Great North Rail Project will bring and around the city of Manchester and adjacent that extra capacity would be best achieved by allowing track geometry, signal sighting, gradient, acceleration, new opportunities to the north areas of Cheshire. It has evolved into more than trains arriving from Blackpool, Wigan and Liverpool air resistance, ecology and track construction, and £1bn of improvements covering a much larger part to continue onwards beyond Manchester. -
Castlefield Ordsallchord Panel01
CASTLEFIELD Preserving, Improving, Living – CASTLEFIELD in the heart of our city MANCHESTER Liverpool and Manchester Railway The Coming of the Railways From the Roman Road at Castlefield Fort to the rail link across the Irwell known as the ‘Ordsall Chord’, this part of Manchester and Salford has always played an important role in the city’s links with the rest of Britain and the world. Lithograph, 1833, showing the water tower, ramp and bridge. © From Coloured Views on the Liverpool and Manchester Railway, 1833 Liverpool and Manchester Approach Viaduct Railway Line Between the river and Water Street, the railway was The Liverpool and Manchester Railway was opened in carried on the Grade II listed Approach Viaduct. 1830 to link the factories of Manchester with the port at Negotiations over land purchase meant that a cart Liverpool. The railway also provided a passenger service way had to be constructed over the river alongside the and was the first public railway to rely exclusively on steam track on the bridge and Approach Viaduct. Access to power. It was built as a double-track line over the entire the Salford bank and Water Street was provided by length — a world first. The railway was advertised as means of ramps. The Water Street ramp was capped being cheaper and quicker than by road or water and with an ornate water tower. proved popular with passengers. The original 1830 colonnaded railway bridge over Water Street. Courtesy of Manchester Libraries, Information and Archives, Manchester City Council Liverpool Road Station The Georgian House on the corner of Water Street and Liverpool Road forms the earliest part of Liverpool Road Station. -
Castlefield Ordsallchord Panel04
CASTLEFIELD Preserving, Improving, Living – CASTLEFIELD in the heart of our city MANCHESTER The story of the Ordsall Chord The Old and the New The area around the Ordsall Chord has witnessed many changes, especially throughout the nineteenth century with the arrival of the canals and then the railways. With several listed structures and the below ground remains of a dye-works and workers’ housing, this area is significant in the story of Manchester and Salford. The arch of the Ordsall Chord Bridge crossing the River Irwell. © Greater Manchester Archaeological Advisory Service Linking Victoria & Piccadilly The official opening of the Ordsall Chord railway bridge at the beginning of November 2017 was a huge milestone in the Great North Rail Project A link between Victoria and Piccadilly stations was first and in early December a train crossed the new lines travelling directly suggested in 1971. This proposal for an underground tunnel between Victoria and Piccadilly Stations for the first time. However the was abandoned in 1977, as was a further proposal in 1979. construction works associated with the Ordsall Chord project continued The Ordsall Chord scheme was agreed in 2015 and the and included the completion of equally significant aspects of the project, new railway line opened in November 2017. The scheme including repairs to the historic structures and the creation of a sequence includes an innovative crossing over the River Irwell known of new public realm spaces. as the Network Arch, an asymmetric bridge which is the first of its type to be built in the UK. Stephenson’s Bridge, the network arch and a new public footbridge form the setting of a pair of piazzas on either side of the river. -
UK Jubilee Line Extension (JLE)
UK Jubilee Line Extension (JLE) - 1 - This report was compiled by the OMEGA Centre, University College London. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. - 2 - CONTENTS A INTRODUCTION Type of Project Location Major Associated Developments Current Status B BACKGROUND TO PROJECT Principal Project Objectives Key Enabling Mechanisms and Timeline of Key Decisions Principal Organisations Involved • Central Government Bodies/Departments • Local Government • London Underground Limited • Olympia & York • The coordinating group • Contractors Planning and Environmental Regime • The JLE Planning Regime • The Environmental Statement • Project Environmental Policy & the Environmental Management System (EMS) • Archaeological Impact Assessment • Public Consultation • Ecological Mitigation • Regeneration Land Acquisition C PRINCIPAL PROJECT CHARACTERISTICS Route Description Main Termini and Intermediate Stations • Westminster -
Infra Mancrichard Brook + Martin Dodge PICC-VIC TUNNEL
Futurebound Services HELIPORT MANCUNIAN WAY Infra_MANCRichard Brook + Martin Dodge PICC-VIC TUNNEL GUARDIAN EXCHANGE Catalogue to accompany the exhibition CUBE Gallery | RIBA Hub Spring 2012 Infra_MANC Infra_MANC Post-war infrastructures of Manchester The catalogue of Infra_MANC. An exhibition at the RIBA Hub / CUBE Gallery, Portland Street Manchester from 27th February – 17th March 2012. Curated by Richard Brook and Martin Dodge Richard Brook Manchester School of Architecture, John Dalton West, Chester Street, Manchester. M1 5GD, UK. Martin Dodge Department of Geography, University of Manchester, Oxford Road, Manchester, M13 9PL, UK. Infra_MANC Prelims Second edition 2012 © Richard Brook and Martin Dodge 2012 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior permission of the publisher. Richard Brook and Martin Dodge have asserted their right under the Copyright, Designs and Patents Act, 1988, to be identified as the authors and editors of this work. Published by bauprint 34 Milton Road Prestwich Manchester M25 1PT ISBN 978-0-9562913-2-5 Prelims Infra_MANC Table of contents Acknowledgements Curator biographies Introduction and overview map Timeline Ch.001 Helicopter Dreaming Ch.002 Mancunian Way [A57(M)] Our Highway in the Sky Ch.003 The Picc-Vic Tunnel Ch.004 Guardian Underground Telephone Exchange Bibliography List of exhibits Exhibition photos Infra_MANC Prelims ACKNOWLEDGEMENTS Copyright The exhibition and catalogue are an academic project and were undertaken on a non-commercial basis. We have assembled visual materials from a large number of sources and have endeavoured to secure suitable permissions. -
The Freight Solution to the Castlefield Problem
The Freight Solution to the Castlefield Problem Including The Business Case for a new route and western access to Trafford Park April 2020 (Revised August 2020) Contents Part 1. The Castlefield Problem – Freight’s Great Opportunity .................................................................................... 2 The Problem ............................................................................................................................................................... 2 A more fundamental question ................................................................................................................................... 5 Carrington Park .......................................................................................................................................................... 6 The search for a route to the south ........................................................................................................................... 7 Connecting to the West Coast Main Line .................................................................................................................. 9 Benefits of the proposed interventions ................................................................................................................... 14 Part 2. The Business Case for a Western Route to Trafford Park ................................................................................ 15 Assumptions ............................................................................................................................................................ -
Semmms Implementation Plan 2004
1 SEMMMS IMPLEMENTATION PLAN 2004 (SOUTH EAST MANCHESTER MULTI MODAL STRATEGY) Produced by the SEMMMS Partner Transport Authorities (Cheshire C.C, Derbyshire C.C, Manchester C.C, Stockport M.B.C, Tameside M.B.C and the Greater Manchester Passenger Transport Authority and Executive) 2 SEMMMS Steering Implementation Group Chair - Mike Hayward Government Office for the North West Participants include representations from Cheshire County Council Derbyshire County Council Freight Transport Association Greater Manchester Passenger Transport Authority/Executive Highways Agency Macclesfield Borough Council Manchester Airport Manchester City Council Network Rail North West Regional Assembly Strategic Rail Authority Stagecoach Manchester Stockport Metropolitan Borough Council Tameside Metropolitan Borough Council This group was created on the completion of the SEMMMS strategy and has met regularly since to develop joint initiatives and monitor and review progress of the SEMMMS strategy 3 SEMMMS Contact Officers Cheshire County Council: John Gray 01244 603 572 Derbyshire County Council: Jim Seymour 01629 580 000 Greater Manchester PTE: Moira Percy 0161 242 6291 Greater Manchester PTA: Richard Elliott 0161 234 3312 Manchester City Council: Nigel Gilmore 0161 234 4063 Stockport Metropolitan Borough Council: Sue Stevenson 0161 474 4351 Tameside Metropolitan Borough Council: Carol Willgoose 0161 342 3920 Document Initial Contact Officer: Sue Stevenson, Stockport Metropolitan Borough Council Transportation Policy and Programmes 2nd Floor, Hygarth House -
How to Accommodate Forcast Growth on the Cheshire Line Corridor
How to accommodate forecast growth on the Cheshire Line Committee (CLC) corridor? Railway investment choices October 2019 02 Contents Part A: Executive Summary 03 Part B: The Long Term Planning Process and Continuous 05 Modular Strategic Planning Part C: Today’s Railway 07 Part D: Factors influencing change 13 Part E: Impact of future year growth 16 Part F: Approach to option development 19 Part G: Emerging Strategic Advice 22 Part H: Options and Advice to Funders 24 How to accommodate forecast growth on the Cheshire Line Committee (CLC) corridor? October 2019 03 Part A Executive Summary We are pleased to present an assessment of some current network assets, whilst accommodating the possible investment choices for the Cheshire Lines franchise commitments using both the CLC route and Committee (CLC) corridor between Liverpool and elsewhere. Network Rail has worked collaboratively Manchester via Warrington Central. These choices are with rail industry colleagues to consider the presented to understand which interventions may be investment choices that may be required to support required to meet future growth forecasts on the CLC this forecast growth between 2024 and 2043. corridor by 2026, 2033 and 2043. This work has been Since the development of the original report, the completed as part of the Continuous Modular economic appraisal results have been updated to Strategic Planning (CMSP) approach adopted under reflect some alternative assumptions on capital and the Long-Term Planning Process (LTPP). Industry operating costs. Whilst these revisions have improved partners have participated in the study. This the results, the updated value for money assessment collaborative approach has helped to identify some is still not sufficient to demonstrate a ‘good’ case (with possible investment choices to accommodate forecast a benefit cost ratio above 2.0). -
Salford CC Rail Strategy
SALFORD RAIL STRATEGY (For SCC Council Consideration on 19 July 2017) LYNWOOD TRANSTEC LTD, CONSULTANTS TO THE RAILWAY & TRANSPORT INDUSTRIES, Lynwood House, 7 Lynwood Grove, STOCKPORT SK4 5DP SALFORD RAIL STRATEGY - STRUCTURE 1. THE PURPOSE OF THE RAIL STRATEGY 2. THE OBJECTIVES OF THE RAIL STRATEGY 3. THE CONTEXT OF THE RAIL STRATEGY The Local Context The Greater Manchester Spatial Framework The Regional Context The Rail North Long Term Rail Strategy (LTRS) Transport for the North ‘Northern Transport Strategy’ and the first Independent Economic Review for the North The Transport for the North’s ‘Strategic Transport Plan’ The Northern Hub Northern Railway and TransPennine Express committed changes Future franchises Transport for Greater Manchester Ten Year Rail Plan The Greater Manchester Transport Vision for 2040 4. RAIL IMPROVEMENTS IN THE SHORT TO MEDIUM TERM ELECTRIFICATION Proposals for Future Electrification Currently Committed Schemes TRAIN SERVICE DEVELOPMENT IMPROVEMENTS TO SALFORD RAILWAY STATIONS Existing commitments Accessibility initiatives Interchange and Integration Regenerating communities through station development zones Station Retail Shops The Stations – • Salford Central • Salford Crescent • Walkden • Irlam • Eccles • Patricroft • Swinton (Moorside and Clifton) 5. RAIL IN THE COMMUNITY The National Context The Regional Context The Local Context - Station Adoption Community Rail Partnerships in practice The Journey Forward 6. RAIL FREIGHT IN GREATER MANCHESTER 7. RAIL IMPROVEMENTS IN THE LONGER TERM 8. LONGER TERM -
Future Tube Projects
Appendix 4 Transport Committee 17 January 2012 Transcript of Item 7: Future Tube Projects Richard Tracey (AM): You will understand, obviously because my constituency is Wandsworth and Merton, that I am extremely interested in terms of future trends in the Northern line extension to Battersea and so could I ask you first of all about that? How that is going along from your perspective and the various ramifications of the changes that have happened in Nine Elms in recent time? Michèle Dix (Managing Director of Planning for TfL): Up until recently, certainly before Treasury Holdings and Real Estate Opportunities went into administration, we were working closely with Treasury Holdings on the development of the Northern line proposal. The work that we were doing was being paid for by Treasury Holdings and there is a Section 106 agreement with them for the Battersea Power Station site for a lot of money that was associated with taking that Northern line extension through to a Transport and Works Act (TWA) by getting the powers in order to build it. We have worked closely with them and we have wanted to ensure that the approach to the work, the way that the line is laid out, the access etc, was consistent with the sorts of services that London Underground (LU) would want to see, hence the close working. This past year, we have worked more closely with them on the public consultation that took place on the options revisiting some of the consultation that was done in the previous years so that we were satisfied that the solution that came out of that was the preferred solution and, based on an assessment, was the right one to take forward. -
Capital Programme 2015/16 – 2020/21: Technical Appendix
2 Greater Manchester Local Transport Plan 3 | Capital Programme 2015/16 – 2020/21: Technical Appendix Capital Programme 2015/16 – 2020/21: Technical Appendix This document provides a summary of the business case for each of the major schemes in the 2015/16 to 2020/21 Capital Programme.. Greater Manchester Local Transport Plan 3 | Capital Programme 2015/16 – 2020/21: Technical Appendix 3 SCHEME NAME: South Heywood Growth Area Wide Improvement Headline Description: The scheme involves the construction of a 1km link road between the M62 Junction 19 and the Hareshill Road/Manchester Road junction, a tie-in to the M62 at Junction 19, works to the Manchester Road junction, and widening and upgrading of Hareshill Road. The scheme would provide access to existing and planned employment sites, including the Heywood Distribution Park/Simplified Planning Zone, and future housing and employment development in the South Heywood area as well as relieving congestion in and around Heywood Town Centre. It is proposed that the new link road and the improvement to the Manchester Road junction would be funded by the LTB, the tie-in to the M62 would be funded by Rochdale Council and the improvement to Hareshill Road would be funded by private sector development. There is a requirement for the link road to be constructed in advance of the development and improvements to Hareshill Road. The new link road is fully endorsed and supported by the Highway Agency who, as part of their Pinch Point Programme, will be delivering improvements to the M62 Junction 19. The scheme will involve improvements to the roundabout and its connecting slip roads, which will provide better access to Heywood Distribution Park, as well as reducing congestion and improving journey time reliability on the M62 and M66 as a result. -
JP Allocation 28 North of Irlam Station Topic Paper Pfe 2021
JP Allocation 28 North of Irlam Station Topic Paper PfE 2021 Contents Section A – Background ..................................................................................................... 4 Introduction ........................................................................................................... 4 Allocation JP 28 [North of Irlam Station] Overview ................................................ 6 Site Details ............................................................................................................ 7 Proposed Development ......................................................................................... 8 Site Selection ...................................................................................................... 11 Planning History .................................................................................................. 11 GMSF 2019 Consultation Responses ................................................................. 12 GMSF 2019 Integrated Assessment ................................................................... 13 GMSF 2020 Integrated Assessment ................................................................... 13 Section B – Physical ......................................................................................................... 22 Transport ............................................................................................................. 22 Flood Risk and Drainage ....................................................................................