Construction Specification 64—Gabions and Gabion Mattresses

Total Page:16

File Type:pdf, Size:1020Kb

Construction Specification 64—Gabions and Gabion Mattresses Construction Specification 64—Gabions and Gabion Mattresses 1. Scope The work consists of furnishing, assembling, and installing rock-filled wire-mesh gabion baskets and gabion mat- tresses. Gabions are at least 12 inches high. Gabion mattresses are no more than 12 inches high. 2. Material Types Gabions and gabion mattresses shall consist of rectangular wire mesh formed containers filled with rock. Gabions will conform to one of the following types. The wire coating shall be as specified in Section 7. Twisted-mesh—Nonraveling, double twisted, hexagonal wire mesh consisting of two wires twisted together in two 180-degree turns. Twisted-mesh, fasteners, and stiffeners shall conform to the requirements of ASTM A975. Lacing wire is the standard fastener for twisted-mesh gabions and gabion mattresses. Ring fasteners may be used and shall be made of stainless steel. Ring fasteners must provide the minimum strength per lineal foot that is speci- fied in ASTM A975 for gabions and gabion mattresses. Welded mesh—Welded mesh with a uniform square or rectangular pattern and a resistance weld at each intersec- tion. Welded mesh and stiffeners shall conform to the requirements of ASTM A974 with the exception that welded- mesh may be delivered in component form, either rolled or stacked, for assembly at the job site. Spiral binders are the standard fastener for welded-mesh gabions and gabion mattresses. Spiral binders shall con- form to the requirements of ASTM A974. Alternate fasteners for use with welded-mesh gabions and gabion mat- tresses, such as ring fasteners or lacing wire, shall be formed from wire meeting the same quality and coating thick- ness requirements as specified for the gabions and gabion mattresses. Ring fasteners shall be made of stainless steel. Standard fasteners and alternate fasteners must provide the minimum strength per lineal foot that is specified in ASTM A974 for gabions and gabion mattresses. Rock—Rock shall conform to the quality requirements in Material Specification 523, Rock for Riprap, unless oth- erwise specified in section 7. At least 85 percent of the rock particles, by weight, shall be within the predominant rock size range. Gabion basket Predominant Minimum rock Maximum rock or mattress rock size dimension dimension height (in) (in) (in) 12-, 18-, or 36-inch basket 4 to 8 4 8 6-, 9-, or 12-inch mattress 3 to 6 3 6 At least 30 days before delivery to the site, the contractor shall inform the engineer in writing of submit in writing the source from which the rock will be obtained. The test data, and other information by which the material was determined by the contractor to meetneeded to document that the rock meets the requirements of this specifica- tion are included. The contractor shall provide the engineer free access to the source for the purpose of obtaining samples for testing and source approval. Bedding or filter material—Bedding or filter material, when specified, shall meet the gradation shown on the plans, or as specified in section section 7, and the requirements of Material Specification 521, Aggregates for Drain- fill and Filters. Geotextile, when specified, shall conform to the requirements specified in section section 7 and those of Material Specification 592, Geotextile. 3. Foundation preparation The foundation on which the gabions and gabion mattresses are to be placed shall be cut or filled and graded to the lines and grades shown on the drawings. Surface irregularities, loose material, vegetation, and all foreign matter shall be removed from the foundation. When fill is required, it shall consist of material conforming to the specified (210–VI–NEH, January 2014) 64–1 requirements specified in section 7. Fill shall be compacted as specified in section 7. Gabions, gabion mattresses, and bedding or specified geotextiles shall not be placed until the foundation preparation is completed and founda- tion the subgrade surfaces have been inspected and approved by the COTR meets the requirements of this specifi- cation. Compaction of bedding or filter material is required as specified in section section 7. The surface of the finished material shall be to grade and free of mounds, dips, or windrows. Geotextile shall be installed in accordance with the requirements of Construction Specification 95. 4. Assembly and placement Where a gabion or gabion mattress unit must be modified, welded-mesh panels may be cut to fit. Twisted-mesh panels may be folded and neatly wired but shall not be cut. Assembly—Use ring-type fasteners or lacing wire for the assembly and placement of twisted-mesh panels. Wrap the lacing wire with alternating single and double half-hitches at 4- to 6-inch intervals and secure by tying a double half-hitch at each end. Use spiral or ring type fasteners for the assembly and placement of welded-mesh panels. Where spiral fasteners are used, crimp the ends to secure the spirals in place. Where ring type fasteners are used, install the fasteners at a maximum spacing of 6 inches. Interior diaphragms are required where any inside dimension exceeds 3 feet. Use the same type fasteners and fas- tening procedures to install interior diaphragms and lids as used in the panel assembly. Diaphragms are installed to assure that no open intervals are present that exceed 3 feet. Placement—Place the empty gabions or gabion mattresses on the foundation and use lacing wire to intercon- nect the all adjacent horizontal and vertical edges adjacent gabions along the top, bottom, and vertical edges using lacing wire. Wrap the wire with alternating single and double half-hitches at 4- to 6-inch intervals. Welded-mesh gabions and gabion mattresses may be interconnected with spiral fasteners, ring-type fasteners, or lacing wire. Un- less otherwise specified in section 8, lacing wire will be the only fastener allowed for interconnecting woven mesh gabions. Spiral fasteners, ring type fasteners, or lacing wire. Where spiral fasteners are used, crimp the ends to se- cure the spirals in place. Where ring type fasteners are used, install the fasteners at a maximum spacing of 6 inches. are commonly used for the assembly and interconnection of welded mesh gabions. Spirals are screwed down at the connecting edges then each end of the spiral is crimped to secure it in place. Lacing may be used as needed to supplement the interconnection of welded mesh gabions and the closing of lids. Interconnect each layer of gabions and gabion mattresses to the underlying layer of gabions along the front, back, and sides. Stagger the vertical and horizontal joints between the gabions of adjacent rows and layers by at least half one-fourth of a cell length. 5. Filling operation Twisted-mesh—After adjacent empty twisted-mesh units are set to line and grade and common sides properly connected, they shall be placed in straight line tension and stretched to remove any kinks from the mesh and to gain a uniform alignment. Units may be staked to maintain the established proper alignment before the rock is placed. No stakes shall be placed through geotextile material. Fasteners shall be attached during the filling opera- tion as needed to preserve the strength and shape of the structure. Internal connecting crosstie wires shall be placed in each unrestrained gabion and gabion mattress unit of more than 18 inches in height, including units left temporarily unrestrained. Two internal connecting wires shall be placed concurrently with rock placement at each 12-inch interval of depth. These crossties shall be evenly spaced along the front face and connected to the back face. All crosstie wires shall be looped around two mesh openings and each wire end shall be secured by a minimum of five 180-degree twists around itself after looping. Welded-mesh—Welded-mesh units do not require stretching. Units may be staked to maintain the established proper alignment before the rock is placed. No stakes shall be placed through geotextile material. Fasteners shall be attached during the filling operation as needed to preserve the strength and shape of the structure. 64–2 (210–VI–NEH, January 2014) Internal crossties or stiffeners shall be placed in each unrestrained gabion and gabion mattress unit of more than 18 inches in height, including units left temporarily unrestrained. Crossties or stiffeners shall be placed concur- rently with rock placement at each 12-inch interval of depth. They shall be placed across the corners of the gabions (at 12 inches from the corners) providing diagonal bracing. Lacing wire or preformed hooked wire stiffeners may be used. Twisted and welded-mesh—The gabions and gabion mattresses shall be carefully filled with rock in a manner that will ensure alignment, avoid bulges, and provide a compact mass that minimizes voids. Machine placement requires supplementing with hand work to ensure the desired results. The units or cells in any row shall be filled in stages so that the depth of rock placed in any one cell does not exceed the depth of rock in any adjoining cell by more than 12 inches. Along the exposed faces, the outer layer of stone shall be carefully placed and arranged by hand to ensure a neat, compact placement with a uniform appearance. The last layer of rock shall be uniformly leveled to the top edges of the cells. Lids shall be stretched tight over the rock filling. The use of crowbars or other single point leverage bars for lid closing is prohibited as they may damage the baskets. The lid shall be stretched until it meets the perimeter edges of the front and end panels. The gabion lid shall then be secured to the sides, ends, and diaphragms with lacing wire, spiral binders, or approved alternate fas- teners. Lacing wire shall be wrapped with alternating single and double half-hitches at 4- to 6-inch intervals.
Recommended publications
  • Item Unit of Specification Description Number
    ITEM UNIT OF SPECIFICATION DESCRIPTION NUMBER MEASURE YEAR REFERENCE ------- ----------------- --------- ------------------------ --------------------------------------------------------------------------- 0001.00 CAL DAY 08 SURVEILLANCE OF TEMPORARY TRAFFIC CONTROL DEVICES ------- ----------------- --------- ------------------------ --------------------------------------------------------------------------- 0001.04 DAY 08 ENDANGERED SPECIES DAILY SURVEYOR ------- ----------------- --------- ------------------------ --------------------------------------------------------------------------- 0001.06 BARR DAY 08 VERTICAL PANELS ------- ----------------- --------- ------------------------ --------------------------------------------------------------------------- 0001.08 BARR DAY 08 422.00 BARRICADE, TYPE II ------- ----------------- --------- ------------------------ --------------------------------------------------------------------------- 0001.10 BARR DAY 08 422.00 BARRICADE, TYPE III ------- ----------------- --------- ------------------------ --------------------------------------------------------------------------- 0001.20 EACH 08 BARRICADE, TYPE III ------- ----------------- --------- ------------------------ --------------------------------------------------------------------------- 0001.30 LIGHT DAY 08 422.00 TYPE B HIGH INTENSITY WARNING LIGHT ------- ----------------- --------- ------------------------ --------------------------------------------------------------------------- 0001.45 BARR DAY 08 REFLECTORIZED PLASTIC DRUM -------
    [Show full text]
  • Linktm Gabions and Mattresses Design Booklet
    LinkTM Gabions and Mattresses Design Booklet www.globalsynthetics.com.au Australian Company - Global Expertise Contents 1. Introduction to Link Gabions and Mattresses ................................................... 1 1.1 Brief history ...............................................................................................................................1 1.2 Applications ..............................................................................................................................1 1.3 Features of woven mesh Link Gabion and Mattress structures ...............................................2 1.4 Product characteristics of Link Gabions and Mattresses .........................................................2 2. Link Gabions and Mattresses .............................................................................. 4 2.1 Types of Link Gabions and Mattresses .....................................................................................4 2.2 General specification for Link Gabions, Link Mattresses and Link netting...............................4 2.3 Standard sizes of Link Gabions, Mattresses and Netting ........................................................6 2.4 Durability of Link Gabions, Link Mattresses and Link Netting ..................................................7 2.5 Geotextile filter specification ....................................................................................................7 2.6 Rock infill specification .............................................................................................................8
    [Show full text]
  • Storms and Coastal Defences at Chiswell This Booklet Provides Information About
    storms and coastal defences at chiswell this booklet provides information about: • How Chesil Beach and the Fleet Lagoon formed and how it has What is this changed over the last 100 years • Why coastal defences were built at Chiswell and how they work • The causes and impacts of the worst storms in a generation booklet that occurred over the winter 2013 / 14 • What will happen in the future Chesil Beach has considerable scientific about? significance and has been widely studied. The sheer size of the beach and the varying size and shape of the beach material are just some of the reasons why this beach is of worldwide interest and importance. Chesil Beach is an 18 mile long shingle bank that stretches north-west from Portland to West Bay. It is mostly made up of chert and flint pebbles that vary in size along the beach with the larger, smoother pebbles towards the Portland end. The range of shapes and sizes is thought to be a result of the natural sorting process of the sea. The southern part of the beach towards Portland shelves steeply into the sea and continues below sea level, only levelling off at 18m depth. It is slightly shallower at the western end where it levels off at a depth of 11m. This is mirrored above sea level where typically the shingle ridge is 13m high at Portland and 4m high at West Bay. For 8 miles Chesil Beach is separated from the land by the Fleet lagoon - a shallow stretch of water up to 5m deep.
    [Show full text]
  • O B D S Orien Broch Distri Stake Ntatio Hure Ct Ehold on for Ders
    Government of Nepal Orientation Brochure for District Stakeholders Rural Access Programme (RAP) Phase 3 April 2016 ` 1. INTRODUCTION The purpose of this brochure is to provide an overview of the Rural Access Programme Phase 3 (RAP3). It describes the objective, core principles, programme areas, progrramme components and implementation arrangements. The target audience of the brochure are the stakeholders who are related with RAP3 implementation in general and the DDC and DTO officials in particular. 2. BACKGROUND AND OBJECTIVE OF RAP3 RAP has been implemented continuously since 2001 and is a bi-lateral progrramme between the Government of Nepal (GoN) and the Department for International Development (DFID) of the UK Government. The programme is being implemented with the grant assistance provided by UK Aid. The implementation of the current phase of RAP3 started in 2013 and will laast until March 2017. An extension of the programme to 2019 is planned. The current phase of the Rural Access Programme (RAP3) builds on the processes of previous phases but with significant changes, including: • Support focussed on the poorest districts in western Nepal • Emphasis on sustainable asset management and community resilience • Working closely to support central and district government organnisations and build capacity • A range of implementation modalities depending on intervention characteristics and management performances of the ddistrict. The objective of RAP3 is to increase the economic opportunities available to the poorest and most vulnerable people in the remotest districts of Nepal. It does so by providing employment for the poor to maintain and upgrade existiing roads, construct new rural roads and economic infrastructure where these are lacking.
    [Show full text]
  • Construction Guide V2 LR.Pdf
    1 Introduction – protect and survive 2 Basic construction guidelines 3 Design of Concertainer structures 4 Fill selection and characteristics 5 Preconfigured structures 6 Improvised structures 7 Maintenance and repair 8 Product technical information 9 Trial information 10 Packing and shipping 11 Conversion tables 12 Contacts 1 Introduction – protect and survive Introduction – protect and survive 1.01 HESCO® Concertainer® has Delivered flat-packed on standard been a key component in timber skids or pallets, units providing Force Protection since can be joined and extended the 1991 Gulf War. using the provided joining pins and filled using minimal Concertainer units are used manpower and commonly extensively in the protection of available equipment. personnel, vehicles, equipment and facilities in military, Concertainer units can be peacekeeping, humanitarian installed in various configurations and civilian operations. to provide effective and economical structures, tailored They are used by all major to the specific threat and level military organisations around of protection required. Protective the world, including the UK structures will normally be MOD and the US Military. designed to protect against ballistic penetration of direct fire It is a prefabricated, multi- projectiles, shaped charge cellular system, made of warheads and fragmentation. Alu-Zinc coated steel welded HESCO Guide Construction for Engineers mesh and lined with non-woven polypropylene geotextile. Introduction – protect and survive 1.02 Protection is afforded by the fill In constructing protective material of the structure as a structures, consideration must consequence of its mass and be given to normal structural physical properties, allied with design parameters. the proven dynamic properties of Concertainer units. The information included in this guide is given in good faith, Users must be aware that the however local conditions may protection afforded may vary affect the performance of HESCO Guide Construction for Engineers with different fill materials, and structures.
    [Show full text]
  • Coordinated Resource Management Plan
    APPLETON-WHITTELL RESEARCH RANCH COORDINATED RESOURCE MANAGEMENT PLAN The Research Ranch was established in 1968 by the Appleton family as an ecological field station to provide a large scale exclosure by which various land uses and actions in the Southwest could be evaluated. This role, as a control or reference area, creates challenges to land management actions. Each proposed action must be judged not only on the conservation outcome but also on the potential to have adverse impact on the research values for which the field station was established. Effective management for both conservation and research is only possible if all partners are informed and involved. The Research Ranch, approximately 8,000 acres, is a complicated partnership among land owners and federal land administrative agencies: Coronado National Forest (CNF), Bureau of Land Management (BLM), Resolution Copper Mining Co. (RCM), The Research Ranch Foundation (TRRF), The Nature Conservancy (TNC), and National Audubon Society (NAS or Audubon). NAS manages the facility via contractual agreements with each entity. The Research Ranch is a Center/Sanctuary of NAS, administered through the Audubon Arizona state office in Phoenix. Audubon’s strategic plan is to achieve conservation results on a broad scale by leveraging the NAS network and engaging diverse people; the Research Ranch is evaluated by NAS for its support of the following conservation concerns: Climate Change, Water, Working Lands and Bird Friendly Communities. This Coordinated Resource Management Plan (CRMP) constitutes all ownership along with the Natural Resources Conservation Service (NRCS), Arizona Game & Fish Department (AZGF) and US Fish & Wildlife Service (USFWS). Planned practices to meet goals listed in this CRMP may not necessarily be implemented on all parcels.
    [Show full text]
  • Experimental Study of Structural Behavior of Mesh-Box Gabion
    University of Palestine College of Applied Engineering and Urban Planning Department of Civil Engineering Experimental study of structural behavior of mesh-box Gabion By: Mohamad Z. Al Helo 120110139 Mohammed S. Al-Massri 120111288 Hesham H. Abu-Assi 120111251 Mohammed J. Hammouda 120110163 Islam T. Joma 120090301 Supervisor: Dr. Osama Dawood Graduation project is submitted to the Civil Engineering Department in partial Fulfillment of the requirements for the degree of B.Sc. in Civil Engineering. Gaza, Palestine Oct. 2016 I DEDICATION We would like to dedicate this work to our families specially our Parents who loved and raised us, which we hope that they are Proud of us, for their sacrifice and endless support. We would like to dedicate it to our Martyrs, detainees and Wounded people who sacrificed for our freedom. II ACKNOWLEDGMENT We would like to express our appreciation to our supervisor Dr. Osama Dawood for his valuable advices, continuous Encouragement, professional support and guidance. Hoping our research get the satisfaction of Allah and you as well. III ABSTRACT The research described by the current dissertation was focused on studying the mechanical behavior of the wired-mesh gabions under axial compression load. And it is important to mention that there is no specific standard for using gabions as structural elements It is a unique study because using this type of construction usually does not take into consideration the study of the structural behavior of these boxes, and here many of the problems facing the construction of this kind appears. This research studied the behavior of these boxes through laboratory experiments.
    [Show full text]
  • Gabions Being Used As a Headwall
    Gabions being used as a headwall. Gabions - Their Applications on the Golf Course by JOHN DREW Superintendent, Winters Run Golf Club, Maryland ROSION IS a basic part of We who are within the influence of 100 years. Unfortunately, Winters Run nature, and indications are that streams and rivers tend to become con- does not understand such definitions Ethe forces that tear down and cerned when the rain starts coming and will pro bably flood a few more build up are not tired yet. One of these down hard. times in our lives. forces that we in the golf course business Our golf course, like so many others, Many ideas have been proposed to have to deal with is that of water and contains some land that is not suitable prevent creek bank erosion. Vegetation, resultant erosion. Creek, pond, stream, for housing or farming. Forty-eight of logs, rip-rap, railroad ties, concrete, or wave erosion affect almost all of us 180 acres are in a flood plain. Winters and steel sheet piling have been used at some time. Run, a major stream, meanders through with varying degrees of success and / or Erosion caused by running water can the course, giving it character, beauty, failure. In our case, we decided that be extremely devastating. These pro b- floods, erosion, and silt. The last named rip-rap would protect our eroding creek lems become magnified in areas of items caused us to look for protection banks most effectively and at minimal increasing population. Water runoff from water damage early in the clu b's cost.
    [Show full text]
  • APPENDIX E EROSION PREVENTION BMPS Attachment
    Attachment 7.2 Oregon DEQ APPENDIX E EROSION PREVENTION BMPS EP-1 Scheduling EP-2 Preservation of Existing Vegetation EP-3 Surface Roughening EP-4 Topsoiling EP-5 Temporary Seeding and Planting EP-6 Permanent Seeding and Planting EP-7 Mycorrhizae / Biofertilizers EP-8 Mulches EP-9 Compost Blankets EP-10 Erosion Control Blankets and Mats EP-11 Soil Binders EP-12 Stabilization Mats EP-13 Wind Erosion Control EP-14 Live Staking EP-15 Pole Planting EP-16 Live Fascines and Brush Wattles EP-17 Brush Box EP-18 Fascines with Subdrains EP-19 Live Pole Drains EP-20 Brush Packing or Live Gully Fill Repair EP-21 Sodding OREGON MANUAL-APPENDICES.DOC Erosion and Sediment Control Manual April 28, 2005 293 SCHEDULING – EP-1 Scheduling involves sequencing construction activities and the installation of erosion and sediment control measures to reduce the amount and duration of soil exposed to erosion by wind, rain, runoff and vehicle tracking. The timing of soil-disturbing activities and the timing of implementation of BMPs are both critical to the prevention of accelerated erosion and transport of sediment off-site. The scheduling of grading should take into account the rainy season and should minimize the length of the time that soils are left exposed, and reduce the total area of exposed soil during the rainy season. Consideration should be given to phasing the grading and construction so that critical areas (such as highly erodible soils, areas adjacent to receiving waters, etc.) are not disturbed until the non-rainy season, and so the entire area that is disturbed at any one time is kept to a size that can be controlled effectively.
    [Show full text]
  • Infrastructure Defense Technologies
    In the United States Court of Federal Claims (Filed April 7, 2008) (Originally Filed Under Seal March 14, 2008) INFRASTRUCTURE DEFENSE ) TECHNOLOGIES, LLC, ) No. 07-582 C Plaintiff, ) (Consolidated Lead Case) ) v. ) Pre-award bid protest; subject matter ) jurisdiction; standing; prejudice; waiver; bridge THE UNITED STATES, ) contract; sole source supply contract; cross- Defendant, ) motions for judgment on the administrative ) record; motion to dismiss; one responsible and ) source exception to the Competition in ) Contracting Act; standard of review; national HESCO BASTION, LTD, ) defense and security. Defendant-Intervenor. ) ) INFRASTRUCTURE DEFENSE ) TECHNOLOGIES, LLC, ) Plaintiff, ) ) No. 07-695 C v. ) (Consolidated Member Case) ) THE UNITED STATES, ) Defendant. ) C. Joël Van Over, McLean, VA, for plaintiff. Jack Y. Chu, of counsel. David A. Harrington and A. Bondurant Eley, Commercial Litigation Branch, Civil Division, United States Department of Justice, Washington, D.C., for defendant, with whom were Jeffrey S. Bucholtz, Acting Assistant Attorney General, Jeanne E. Davidson, Director, and Brian M. Simkin, Assistant Director. Douglas C. Proxmire, Washington, D.C., for defendant-intervenor. Elizabeth Gill, of counsel. OPINION AND ORDER1/ Merow, Senior Judge In this pre-award procurement protest, brought pursuant to 28 U.S.C. § 1491(b)(1), the protestor, Infrastructure Defense Technologies, LLC (hereinafter “IDT”), seeks injunctive and declaratory relief to preclude the Defense Logistics Agency (“DLA”) from awarding a follow-on sole source Indefinite Delivery Indefinite Quantity (“IDIQ”) contract for collapsible force protection (“Concertainer”) units to Hesco Bastion, Ltd. (“Hesco”). Hesco has intervened in this action. Pursuant to RCFC 52.1, motions have been filed, by all parties, for judgment on the administrative record of this procurement which record was supplemented by the deposition of DLA official Thomas Lauersen and material submitted by plaintiff.
    [Show full text]
  • NAVFAC Design Manual 7.02
    +)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))), * CCB Application Notes: * * * * 1. Character(s) preceded & followed by these symbols (. -) or (+ ,) * * are super- or subscripted, respectively. * * EXAMPLES: 42m.3- = 42 cubic meters * * CO+2, = carbon dioxide * * * * 2. All degree symbols have been replaced with the word deg. * * * * 3. All plus or minus symbols have been replaced with the symbol +/-. * * * * 4. All table note letters and numbers have been enclosed in square * * brackets in both the table and below the table. * * * * 5. Whenever possible, mathematical symbols have been replaced with * * their proper name and enclosed in square brackets. * .))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))- Naval Facilities Engineering Command 200 Stovall Street Alexandria, Virginia 22332-2300 APPROVED FOR PUBLIC RELEASE Foundations & Earth Structures DESIGN MANUAL 7.02 REVALIDATED BY CHANGE 1 SEPTEMBER 1986 NAVAL FACILITIES ENGINEERING COMMAND PUBLICATIONS TRANSMITTAL SN 0525-LP-300-7071 )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) 1. TITLE NUMBER DATE DM-7.02 FOUNDATIONS ANTD EARTH STRUCTURES Change 1 September 1986 )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) 2. ATTACHMENTS New Cover. New Record of Document Changes page. New pages iii through xiv. New pages 7.2-35 through 7.2-38. New pages 7.2-47 through 7.2-50. New pages 7.2-53 and 7.2-54. New pages 7.2-57 through 7.2-64. New pages 7.2-127 through 7.2-130. New pages 7.2-151 and 7.2-152. New pages 7.2-175 through 7.2-178. New pages 7.2-243 and 7.2-244. New DD Form 1426. )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) 3. EXPLANATION Remove old cover dated May 1982 and replace with attached new cover dated September 1986. Insert new Record of Document Changes page immediately after new cover page.
    [Show full text]
  • Gabion Box Catalog
    WALCOOM Walcoom Corporation GABION B OX www.walcoom.com E-mail: [email protected] GABION BOX Gabion Boxwith Good Structure for Slope Protection and Retaining Wall Gabion box is a strong-structure product with hexagonal or rectangular holes, which can be divided into woven gabion box and welded gabion box according to different fabrics. Gabion box is also called gabion baskets, which can be divided into galvanized gabion box, Galfan coated gabion box, stainless steel gabion box and PVC coated gabion box because of different materials. Gabion box has many characteristics, such as robust and flexible structure, excellent permeability, good corrosion and rust-resistance, high tensile strength and good durability. It can be used for protective applications and decorative applications, such as rockfall barrier, slope protection, retaining wall, flood controlling, military defence, gabion planter and landscape constructions. Feature: ● Quality geotextile lining. ● Dense filling material. ● Robust and flexible structure. ● Excellent permeability. ● Good corrosion and rust resistance. ● High tensile strength and shear resistance. ● Sound insulation is good. ● Low cost and environmental friendly. ● High versatility and aesthetic design. ● Easy assembly. ● Convenient usage. ● Good durability and long lifespan. Specification: ● Material: high quality low carbon steel. ● Wire diameter: 1 mm – 5 mm. According to custom sizes. ● Fabric type: welded gabion box and woven gabion box. ● Mesh structure (woven): double twisted structure and triple twisted structure. ● Holes shape: hexagonal shape and rectangular shape. ● Surface treatment: hot-galvanized, electro galvanized, Galfan coated and PVC coated. ● Fittings: ● spiral joints, hog rings, U clips and gabion stiffeners. ● Box types: standard bastion barrier and recoverable bastion barrier. ● Geotextile color: white, gray, green, sand and other colors.
    [Show full text]