M A G A Z I N E The latest news & reviews from the industry What’s in Store at RAIL LIVE 2018

Revolutionising Rail: UKRRIN Centres of Excellence

What does the EU-Japan Economic Partnership & Agreement Mean for the Rail Industry?

Rail Live – Issue Two 2018 Letter from the Editor

Dear Readers, timed perfectly for the start of summer in the Northern Hemisphere where it’s held Rail Live 2018 will take place at the Quinton Rail Technology Centre in ANDREW LUSH Director Warwickshire on 20–21 June. [email protected]

As always there will be plenty to see and feature What Does the EU-Japan JOSEPHINE CORDERO SAPIÉN do. Vivarail, who are based at the Economic Partnership Agreement Editor-in-chief technology centre and whose aim is to Mean for the Rail Industry? The (revised) [email protected] produce low-cost, low-maintenance WTO Government Procurement rolling stock, will exhibit their D-train, at Agreement that came into force in 2014 NICOLA BROWN Rail Live. Founded in just 2012, Vivarail addresses government procurement for Head of Sales purchased D78 goods and services based on openness, [email protected] stock in 2014 with the purpose of transparency and non-discrimination. converting it into Class 230s. Last year’s Up until now Japan has managed to AMBER GUy-KEMP Rail Live was the first time such a keep its rail market closed despite the Head of Client Content converted Class 230 carried passengers. GPA. However the new agreement with [email protected] At this year’s Rail Live Vivarail will exhibit the EU will change this, giving rail a battery version of its D-train, which will industry suppliers on both sides greater GUy RAyMENT once again give passenger rides. market access. Graphic Design Rail Live will also feature a bi-mode Our next issue, due to be published in traction display on which will run a September 2018, will focus on ZOE CUNNINGHAM Direct Rail Services Class 88 locomotive InnoTrans, held in Berlin at the trade fair Editorial Assistant (see cover) and a Porterbrook Class 769 grounds Messe Berlin from 18–21 [email protected] (formerly Class 319 Flex). The ROSCO September. It is by far the biggest rail has taken its 319 electric multiple units show in the world and is a must-attend KERI ALLAN and is converting them into tri- and bi- event. If you are going and would like Features Writer mode electro-diesel multiple units. to be represented in our magazine, Testing of the Class 769 is set to take please contact Andrew Lush at A2B Global Media Ltd place at the GCR heritage railway. The [email protected]. Third Floor Class 319 was made redundant due to 11–15 Dix’s Field the arrival of the class 700 Please enjoy our 2nd issue of 2018! Exeter EX1 1QA trains on the network. United Kingdom Revolutionary antenna-solutions-solutions One of Rail Live’s supporting partners, Office: +44 (0)1392 580002 UKRRIN, is working with Rail Live to Mobile: +44 (0)7432 725001 CONNECTIVITY. for a nnew era in enterpriserise present cutting-edge research and mobility networking. innovation in rail engineering and Email: [email protected] TRANSFORMMED. technology. UKRRIN has four Centres of Website: www.railway-news.com Excellence (Digital Systems, Rolling Stock, Infrastructure and Testing) in the If you would like to submit editorial UK and they will all be represented at the content, or you are interested in giving Central Display Area of the Rail Live’s an interview for the magazine, please contact Josephine Cordero Sapién. Innovation Zone. The Innovation Theatre If you would like your company to will feature a programme of join Railway-News’s online platform, presentations on UKRRIN’s plans and please contact Andrew Lush. activities. To learn more about UKRRIN’s Centres of Excellence, please see Nailah To subscribe to our newsletter, visit www.railway-news.com. Fraser Haynes’s editorial on page XX in Very Low Profile. EElectronically Steered. Highgh Gain. Phased Array. this publication. Josephine Cordero Sapién, COVER: Class 88 locomotive ‘Genesis’ © Hugh learn more at phasorsolutioons.com editor-in-chief Llewelyn under licence CC BY-SA 2.0 I also want to draw your attention to the

2 3 Quality. Choice. Service. Contents

RAIL LIVE 2018

p.6 What’s in Store at RAIL LIVE 2018 AzLMLM Axlel Counter CableC bl

FEATURES

p.15 What does the EU-Japan Economic Partnership Agreement Mean for the Rail Industry?

p.22 Revolutionising Rail: UKRRIN Centres of Excellence

Network Rail TelecTelecommunicatiions Cable - Exxtternal trracksideackside signallingignalling cable Duct graade p.35 Big Change Is Coming Down the Line – The General Data Protection Regulation

SUPPLIER NEWS

p.26 Charcroft Meeting the Power Supply Challenge for Rail Electronics

Network Rail TelecTelecommunicatiions Cable - Exxtternal trracksideackside signallingignalling cable armoureed p.18 Zonegreen Zonegreen Reduces Risk

p.10 Goldschmidt Thermit Group Products and Services for More Safety, Reliability and Availability of Your Railway Tracks from Thermit Welding (GB) Ltd

p.30 Loram Maintenance of Way, Inc. Loram Around the World

Interconnecting Cable for SSI Systems p.47 Parker Choosing the Right Hose to Keep Your Train Design on Track

p.38 Windhoff BT Cables has a range of cables approved forr,, amongst others, Network Rail’s stringent product Windhoff to Supply Key Technology to ICE Plant in Cologne acceptance standard NR/PS/TEL/00015 in both PE and ZHLS. Full details are now available on the p.42 GKD PADS database reference PA05/06233.PA05/06233. With market-leading supply chain capabilities and world-class GKD Technologies Show SensorSafe Rail Range at Rail Live Exhibition, Including Brand New Safety Features manufacturing experience, we are the cable partner you can rely on for qualityy,, choice and service. Our stock lists are available now online at www.btcables.com p.46 UPCOMING EVENTS June 2018 – August 2018 BT Cables Limited, Delaunays Road, Blackley, Manchesterr,, M9 8FP T: 0161 741 2345 www.btcables.com

4 5 What’s in Store at RAIL LIVE 2018 RAIL LIVE 2018 will once again take place at the Quinton Rail Technology Centre, Long Marston, near Stratford-upon-Avon, on Wednesday/Thursday June 20/21.

Once again the show will retain all the ingredients that has made it so successful over the past five years. This year however the event will be similar to a major international air show in nature, just applied to the rail market. Exhibitors can do everything at RAIL LIVE 2018 that they could do at Birmingham's NEC or London’s Excel – with the unique added advantage of plenty of open-air space and adjacent tracks to both demonstrate rail plant/equipment (the traditional heart of RAIL LIVE) and exhibit passenger trains and other rail vehicles.

A major feature at RAIL LIVE 2018 is the exhibition hall/convention centre – a 2,500 square metre high-quality climate-controlled temporary building in which exhibitors include: , Eversholt, , Porterbrook, Office of Rail Regulation, National Skills Academy for Rail, Rail Delivery Group, High Speed 1, and the Rail Safety & Standards Board (RSSB). This building will also house a 300- seat conference hall where the National Rail Convention will be Vivarail D-train Class 230: licence CC0 staged. The opening keynote speech is due to be given at 10:30am

6 7 into the show. • Working hydrogen locomotive • Bombardier Class To register, go from the Institution of 345 ‘Aventra’ Elizabeth Line to www.raillive.org.uk. Please Mechanical Engineers’ (Crossrail) train, courtesy note that this form registers you RAILWAY CHALLENGE held Transport for London. for admission into both the RAIL each year on the 10.25in gauge LIVE 2018 main gate and the Stapleford Miniature Railway, • GBRF Class 66 Freight NATIONAL RAIL CONVENTION in Melton Mowbray locomotive the exhibition building. • DRS Class 88 and Class 769 • BRITISH TRANSPORT POLICE: EMU bi-mode ‘Flex’ (formerly counter-terror, trespasser on MAJOR FEATURES Class 319) conversion from train roof removal and dog unit Porterbrook/Wabtec. displays, including explosives OF RAIL LIVE detection by ‘sniffer’ dog Mojo INCLUDE: • NETWORK RAIL survey and Constable Phil Healy, from Interior of Class 345 (Crossrail): © Sunil060902 helicopter on display plus Manchester. Also, mobile under licence CC BY-SA 4.0 drone survey unit command unit/level crossing • NATIONAL RAIL CONVENTION: demonstrations. video camera vehicles open/on display. • 0ver 300 exhibitors booked in by Secretary of State for Transport more than 1,000 vehicles, (Porterbrook Flex Class 319 • NETWORK RAIL Plain Line the exhibition building and Chris Grayling. Other scheduled encircled by a 3km continuous conversion and a DRS Class 88 Pattern Recognition (PLPR) • Rail accident investigation outside speakers include BEIS Minister test track with its own small locomotive) plus Vivarail’s D train high-definition video track branch: incident response unit Richard Harrington, RDG Chief station and even a short section of battery prototype, which will be survey train on display Executive Paul Plummer, NR CEO OLE. Several rail engineering and giving passenger rides. You can • Major rail industry Mark Carne, TfL Commissioner maintenance companies are even take a short ride behind companies exhibiting Mike Brown, Urban Transport based here, including Vivarail, Britain’s only operational including: Network Rail, Group Chairman Tobyn Hughes whose workshops produce its hydrogen-powered fuel cell Siemens, Porterbrook, Balfour and many more. Full details can be Class 230 diesel-electric and locomotive and try your hand at Beatty, Talgo, Eversholt, found at raillive.org prototype battery D trains, using flying a drone. Hitachi, SPl & CPL Powerlines refurbished former London Underground sub-surface trains. But the heart and soul of RAIL • Plant demonstrations by Including outside QRTC is the perfect location LIVE continue to be its world-class Railcare Sweden, Balfour stands, there will be for RAIL LIVE 2018. plant exhibition/demonstrations, Beatty, AP Webb, GOS pioneered successfully at Long Engineering, Sandhurst Rail, over 300 exhibitors. There’s plenty of business interest Marston over the last five years. Ground Control, Engcon to and opportunity – but running Network Rail and its senior name but a few Railway magazines have partnered alongside this will be many managers have always played a with The Rail Alliance to develop demonstrations/special features, key role in RAIL LIVE and continue • Battery, bi-mode & and enhance the established and including tactical displays by 35 to do so. RAIL LIVE 2018 and the hydrogen motive power on successful RAIL LIVE plant show, British Transport Police officers; a associated NATIONAL RAIL display. which occupies 120 acres of the unique opportunity to examine CONVENTION are open to all UK ex-Ministry of Defence installation Network Rail’s survey helicopter; a rail industry professionals; there • Prototype Vivarail battery D at Long Marston. QRTC has five bi-mode traction display for both are no admission fees. It’s best to train on display/being Class 319: © Peter Skuce under licence CC BY-SA 4.0 miles of sidings capable of storing passenger and freight pre-register to ensure rapid entry demonstrated

8 9 EFFICIENT TOOLS AND MACHINES FOR TRACK WORKS Following along with our focus on both safety and efficiency Thermit Welding offers new enhancements to our range of rail tools. One example of these tools is the RD 300 P, the latest rail drill from the Goldschmidt Thermit Group. The SMARTWELD RECORD RD 300 P enables quick and precise drilling of the rail web, allowing drilling times of 20 to 60 seconds dependent on the hole diameter and rail hardness, and comes equipped with an enhanced quick clamp device. The device also brings ergonomic benefits due to its light weight and perfect centre of gravity. Through safer and higher performance our tools enrich the day-to-day working of a rail engineer.

One of the latest devices, pioneered by Thermit Welding (GB), is the SMARTWELD ACE (Accelerated Cooling Equipment) that has been designed to decrease the overall cooling time of a weld. The SMARTWELD ACE is Products and services for more safety, a purpose-built battery-powered water misting system, engineered reliability and availability of your railway to be placed on top of an aluminothermic weld following the shearing of the weld. By tracks from Thermit Welding (GB) Ltd removing a greater proportion of the weld waste material (via the Rail Drill RD 330 P Gull wing shear blade) and then Thermit Welding (GB) Ltd, part of GOLDSCHMIDT pressures. This is facilitated by the applying a fine water mist to the the Goldschmidt Thermit Group, SMARTWELD Application, part of offers a wide range of new and GOES DIGITAL the GOLDSCHMIDT DIGITAL APP, innovative solutions to provide A big priority in 2018 for Thermit with the data being stored to an significant improvements all Welding is to increase the use of android device with further across the railways. From digital solutions. The SMARTWELD options to export the data to the enhanced rail cooling devices to RECORD is one such device that improvements in digital highlights our answer to this cloud. With devices such as the monitoring of the weld process, SMARTWELD RECORD digital weld Thermit Welding and the whole requirement for digitisation. The Goldschmidt Thermit Group are SMARTWELD RECORD allows for inspection and automated weld pioneering advancements to the digital recording of the entire weld data gathering are no longer ideas railways worldwide. process, including preheating of the future.

10 11 Track geometry measurement system with laser-based rail profile measurement

Road-rail vehicle LRD 18 TCC cooling weld approximately 15 overhead lines, bridges & tunnels minutes can be saved per weld. and welding as well as cranes & Thanks to careful development rescue applications. We can also and testing Thermit Welding can offer special road-rail vehicles in guarantee that this time-saving modular construction, with heavy method will have no effect on the cranes and trolleys and road high quality that a THERMIT® weld vehicles for different applications. is known for. Further to this, cost savings are also possible with this RAIL MEASURING device as it allows for more welds to take place in given SYSTEMS FROM possession times. GRAW GRAW, the latest member of the ROAD-RAIL Goldschmidt Thermit Group VEHICLES: specialises in the development and production of computer- UNBEATABLE controlled geometry MOBILITY ON measurement devices and systems for tracks and switches THE TRACKS and for the rolling stock wheels. The road-rail vehicles from the They manufacture portable Please visit us at our booth E21 at Rail Live to Swedish group company SRS devices and also develop real- get more information on our product range Sjölanders AB can be used both time systems for track geometry and see our products demonstrated live. on rail and on the road and are vehicles as well as stationary custom-made to meet your needs wheel geometry systems. Thermit Welding (GB) Ltd and requirements thanks to Furthermore, GRAW has extensive different attachments and experience in developing software 87 Ferry Lane, Rainham, Essex RM13 9YH superstructures. Road-rail vehicles for the collection, processing, Phone +44 (0) 1708 522626 are available for the installation, analysis and storage of Fax +44 (0) 1708 553806 inspection and maintenance of measurement data. [email protected]

12 13 Visit Parker at InnoTrans 2018

What Does the EU-Japan Economic Partnership Agreement Mean for the Rail Industry? After four years of negotiations, the EU-Japan Reduce procurement & logistics On track for reliability costs by sourcing multiple Free Trade Agreement is now in the final stages and performance requirements for both freight and passenger vehicles from of ratification, with both sides aiming to bring a single supplier the trade deal into force by early 2019. By Keri Allan

The overall object of this Agreement (GPA) has allowed for public contracts, and also agreement is to increase trade certain entities in Japan not to complex customer-supplier flows between the EU and Japan, abide by GPA procurement rules. relationship requirements, which and once concluded, it will open The EU-Japan deal is set to favour domestic bidders. up huge market opportunities for change this. both sides. In addition, new bidders are often Parker offers the broadest range of technologies, enabling our partners to Currently, only 3.5% of public put off by the requirement that One of the big winners will be the procurement in Japan comes suppliers must be able to source a multitude of requirements from a single supplier. European rail industry, thanks to from foreign firms, in part down to demonstrate past experience Could you benefi t from working with Parker’s dedicated transportation team? changes pushed through around difficulties foreign suppliers face in working in the Japanese market. We’re ready to take your challenges from concept to reality; addressing public procurement – in particular the Japanese procurement performance, application weight and space. the Operational Safety Clause market. This includes extensive “Japan is one of the major world [email protected] Visit us at Innotrans 2018 parker.com/rail (OSC). This OSC in the WTO use of the OSC to exclude foreign rail markets and can therefore Government Procurement suppliers from being able to bid offer major business opportunities

14 15

and non-discriminatory treatment European Commission of those “We have been cutting all of European rail suppliers.” commitments.” administrative blockages and using all resources,” Mauro Concerns have been raised Trade relationships look set to Petriccione, the EU’s chief regarding the recent privatisation greatly improve between Europe negotiator with Japan, said at a of some Japan’s most important and Japan with the arrival of this recent press conference. rail operators – Japan Rail (JR) new free trade agreement and East, JR Central and JR West, with businesses in the EU and Japan However, with the UK keen to further privatisations expected to are keen to take advantage of this strike its own trade deals it is set to follow. This is because they bring agreement. the operators concerned formally leave the EU’s Single Market and outside of the scope of both the One current EU Member State, Customs Union. The UK has said it GPA and upcoming free trade however, faces uncertainty. With would like to copy and paste the agreement because their Brexit still looming, where does deal with Japan after that, but the

JR East train: © Yuichi Kosio under licence CC BY 2.0 purchases no longer fall under the this leave the UK? Financial Times reports that Japan definition of ‘public procurement’. wants a better deal. The But, as one EU official explains, The UK won’t automatically get newspaper writes that “while the these new companies have access to the EU’s existing deals UK is hoping to duplicate the for the European rail supply Nguyen. “This will apply within together and remove regulatory committed to honour open and after it exits in March 2019, but in wide-ranging access embodied in industry. Nevertheless, foreign one year of when the agreement trade barriers,” they explain. fair procurement policies. this particular case Japan has said the Japan-EU trade pact, penetration on the Japanese rail comes into force. In exchange the it wishes the EU deal to apply to Japanese officials are hardening market remains low, especially EU has granted Japanese So what does this all really mean “To alleviate this [issue], the JR the UK during the transition against offering an identical deal with respect to rolling stock,” says suppliers partial access to the for the European rail industry? companies have – on their own period, which is set to run until to a much smaller economy”. Jonathan Nguyen, Public Affairs European railways procurement Well, essentially it comes down to initiative –made public December 2020. It does mean Railway industry suppliers in the Manager at the Association of market.” EU companies being able to statements emphasising their that the EU-Japan deal must be in the European Rail Industry participate in procurement bids in commitment to open and place before the UK formally exits EU27 can look forward to greater UNIFE. Japan has also agreed to accept Japan on an equal footing with competitive procurement the EU in March 2019. As a result access to the Japanese market in an exchange of letters on railways domestic businesses. procedures as part of their the lead negotiators from both the near future. Those in the UK “Although some European – covering the Railway Industrial business philosophy,” they sides have said that it is a high might be able to enjoy the manufacturers have managed to Dialogue and the Technical “Progress was already achieved in explain. “The Government of priority to get it in force before benefits of the EPA for a while, but enter the Japanese rail market on Expert Group on Railways – 2014 with the ‘one-year package’ Japan has formally informed the then. for them the future is uncertain. niches, mostly at the component cementing the current co- of measures on railways, which level, the wide majority of operation between the two sides were helpful to begin increasing European suppliers encounter to the free trade agreement. transparency in procurement and major hurdles hampering their facilitating market penetration by access to the market. There are “Both initiatives, which were European suppliers. Nevertheless, several reasons for that, the most already launched while the more needed to be done to level important being the OSC, which negotiations were still ongoing, the playing field. This is why we has effectively enabled Japanese will continue in the future,” says welcomed the long-awaited public entities not to procure in a an EU official. “The success of the announcement of the removal of transparent, non-discriminatory Railway Industry Dialogue will the OSC,” says Nguyen. manner.” depend on the willingness of European companies to engage “[But] to ensure a level-playing The EU-Japan talks have led to an with the process. field on respective markets, it is agreement in principle that now key to ensure that provides EU rail suppliers with “Japanese railways operators have commitments made by Japan are better access to contracts put out a genuine interest in EU products, actually enforced and result in for tender in by Japan’s central, but that interest is very much changes in business practices,” he regional and local governments by focused on innovative cutting- adds. “A strong and dedicated removing the OSC. edge products. The Technical method to monitor rail Expert Group will continue procurement should be set up. It “The effect of this agreement is to working on technical standards, is also crucial that private or non- exempt European firms from the which will help bring the EU and covered entities abide by codes of French : © Matthew Black under licence CC BY-SA 2.0 application of the OSC,” says Japanese industries closer conduct to guarantee transparent

16 17 The quantity of third rails in the Zonegreen, the Sheffield-based the 1930s using the third rail southeast of the UK is greater than rail safety specialists, are using system and much of this ZONEGREEN in any other area of the country their considerable industry infrastructure remains today. and according to the Network Rail experience and expertise to tackle Indeed, some older depots still do Electrical Power Asset Policy the issue. not have safe external walkways or adequate lighting, making for (December 2012) “it contributes Christian Fletcher, Zonegreen’s challenging working conditions in reduces third almost eight times more (than the technical director, said: “The safest yards alongside the third rail. AC network) to overall risks on the way to protect personnel is to Consequently, accidents are far railway”. keep them away from areas of more likely to occur. risk. It is estimated by the BBC that rail risk In this day and age, the idea that the costs involved in converting What can and is bare, live conductors of 750 volts the third rail system to overhead run through our places of work at lines would be in excess of £17 being done to billion, so clearly, more viable ground level is hard to improve safety? All railways are dangerous, but some measures are necessary.” comprehend, yet these are exactly The Office of Rail and Road’s the dangers facing depot The railway in the southeast was (ORR) policy states: “Where railways are more dangerous than others. operatives. one of the first to be electrified in existing third rail needs to

18 19 continue being operated, automating manual points, has Christian Fletcher added: “To help maintained and renewed, the rail also been designed to increase reduce the risks inherent in third industry must ensure continuous safety in rail depots and can be rail areas, it is vital to have properly improvements in the design, used to reduce the dangers engineered systems that can play operation and maintenance of associated with the third rail. a major role in protecting depot such electrical systems.” Points Converters are fitted staff. By applying our ability and Traditional safety measures, for retrospectively to existing manual technology to the issue, we can example the use of protection hand points and can be controlled help to prevent personal injury boards and written procedures, either by key switches located in a and the associated costly are still commonplace in depots position of safety, remote damages.” today. However, both of these handsets or a central computer manual systems are open to system. This allows the point to be For the foreseeable future, the human error and do still lead to operated remotely, without third rail is here to stay. Its removal fatalities among depot workers, putting people in harm’s way. would mean converting 2,500 resulting in untold grief for family miles of track, a new fleet of trains The innovative system removes members and colleagues and and the reconstruction of depots, the need for shunters to traverse huge fines for their employers. bridges, tunnels and stations. potentially long distances to reach Evidently, there is a need for better manual points, at all times of the employee safeguards. The ORR Strategy for Regulation day and night. In areas where of Health and Safety Risks in May Zonegreen is leading a two- there is potentially poor lighting, 2017 called for “safety pronged attack on the risks ballast and uneven surfaces, the improvements in yards, depots associated with third rails to dangers of contact with the third and sidings, in particular in relation improve protection for workers at rail are heightened and ever rail depots via its Interlocking and present. to electrical risks”. Overall, the Points Converter systems. best way to protect people from Points Converter is a low-cost, the harm the third rail can cause is easy to use system that maintains The basic role of interlocking is to to keep them away from it. Thanks the integrity of the underlying protect personnel and equipment to Zonegreen, life-saving solutions hand point and requires only from the dangers posed by live that embody these requirements minimal civil works and changes traction power supplies. to operating procedures. Routes are readily available. Zonegreen’s system works by can be pre-set through multiple inhibiting the use of third-party For more information about points, which can be reconfigured equipment until the third rail has or upgraded at any time and an Zonegreen’s interlocking and been isolated, through a event logging facility is Points Converter systems, combination of mechanical keys incorporated, to enable the depot telephone (0114) 230 0822, email and electronic contacts. Areas of manager to keep a record of all [email protected] or visit risk are fenced off and access is points operation. www.zonegreen.co.uk controlled using interlocked gates, a method that is routinely seen in depots where staff are protected from live overhead lines.

This type of system is particularly beneficial on stabling roads, where operations such as cleaning and sanding are completed. Workers are often required to walk in and around the six-foot space alongside the third rail, putting them at considerable risk.

The Zonegreen Points Converter, an innovative method of

20 21 These institutions develop their own research programmes, but REVOLUTIONISING collaboration between centres and with industry is also vital for the successful testing and, if appropropriate, implementation of RAIL: UKRRIN CENTRES their ideas and recommendations. The UK Rail Research and Innovation Network (UKRRIN) is one of several organisations around the world which facilitates OF EXCELLENCE these exchanges thanks to four Centres of Excellence around the country involving eight universities. The network officially opened in April 2018 and Railway research is a major welcomes approaches from interested parties. In this article Nailah Fraser Haynes tells Railway- area of research in engineering, News what her organisation does and why it will ‘revolutionise’ management and policy innovation in the rail industry. around the world. There are Railway-News (RN): What is the UKRRIN, dedicated centres in and why do we universities in the USA, need it? Nailah Fraser Haynes (NFH): In 2017 the Rail Supply Group (RSG) UK and Europe. launched a strategy setting out its desire to strengthen and develop the UK rail supply sector. ‘Fast Track to the Future’ detailed a plan to create a network of world-class Centres of Excellence at different universities around the UK to overcome the dreaded valley of death, and accelerate the uptake of innovation research and development, allowing projects to be brought to market more quickly and effectively.

These Centres of Excellence were selected following a request for proposals to support a bid for Higher Education Funding Council for England (HEFCE) Research Partnership Investment Fund (RPIF) funding. A process which was facilitated by the Rail Research UK Association (RRUKA)

22 23 bringing new technologies and The vision is for the centre as a The vision for the CERS is to including 25Kv OLE and 3rd/4th products developed through resource to provide the rail provide the facilities and expertise DC, crossings, embankments, collaborative academic research industry with access to some of required to allow the railway tunnels, bridges, jointed and into market applications globally. the most up-to-date test facilities industry to develop innovative continuously-welded track, a products and processes to ensure anywhere in the world, cutting- loop, telecom innovation lab, that the rolling stock of the future CENTRES OF edge methods for field tests and meet the needs of passengers and systems performance simulation ExCELLENCE measurements, and a broad base freight customers. testing, instrumentation services, Centre of Excellence of internationally recognised and mechanical fabrication for scientists and engineers with prototyping. in Digital Systems significant experience in the rail Centre of (CEDS) industry. Excellence in The vision for the CET is to This centre is led by Professor Testing (CET) accelerate adoption and Clive Roberts at the University of transformational change in rail on behalf of RSG. The fund is This is where UKRRIN comes in. Centre of Led by Network Rail’s Rail Birmingham. It aims to deliver a Innovation Development Centre systems technology, and new designed to support investment in Launched with a parliamentary step-change in Excellence in (RIDC) Programme Manager railway products and services. higher education research reception in February, UKRRIN is a through digital technology and ground-breaking partnership Rolling Stock (CERS) Amanda Mackie, the Centre of This centre will link with others in facilities and aims to: has four key themes: Future Excellence in Testing (CET) aims between the rail industry and eight the UK Rail Research and Railway Operations and Control; Led by Professor Simon Iwnicki at to help accelerate the adoption universities to bring the rail Innovation Network to provide a • Enhance the research facilities Data Integration and the University of Huddersfield, the and transformational change in industry four new world-class ‘one stop shop’ for testing and Cybersecurity; Smart Monitoring Centre of Excellence in Rolling rail systems technology, and new of higher education institutions Centres of Excellence covering: trialling, and we will support the and Autonomous Systems; and Stock (CERS) is a group of three railway products and services. (HEIs) undertaking world- rolling stock, infrastructure, digital ‘Four C’s’ of the Rail Technical Introducing Innovation. The CEDS universities bringing together leading research systems and testing. Seventeen is becoming the ‘go to’ facility for Strategy, and in particular Key expertise and facilities from the It incorporates access to existing industrial partners have come the integration and verification of Capability 12 in the Rail Technical University of Huddersfield, at-scale test facilities, including • Encourage strategic together and are part of the digital technologies across all of Strategy Capability Delivery Plan. Loughborough University and those provided by Network Rail partnerships between HEIs and UKRRIN network including these themes and with the RIDCs (in Melton and Tuxford), Siemens, Unipart Rail, Railway Introducing Innovation theme, will Newcastle University. other organisations active in Transport for London (Acton & The development of UKRRIN Industry Association, British Steel be able to work from Technology research Stratford), and Quinton Rail provides a clear map of UK rail and many more. The network Readiness Level 1 right through to The CERS will meet the current Technology Centre (Long expertise and facilities, with a builds on the achievements of its market introduction. and future demands of the GB rail Marston). • Stimulate additional model which focuses on the predecessors RRUK and RRUKA industry for research and investment in HE research selected centres of excellence and brings the UK rail sector the Centre of innovation to support the next Capabilities across the CET testing • Strengthen the contribution of means to provide a step-change generation of railway vehicles. It and trialling facilities include high and includes partners and the research base to economic Excellence in in research, development and will link with other centres in the and low-speed facilities for vehicle affiliates able to support delivery growth. innovation with a focus on Infrastructure (CEI) UKRRIN network to provide a ‘one and infrastructure testing in key areas. CEI is led by Professor William stop shop’ for all rolling stock Powrie at the University of development providing the Southampton. It aims to create high-performance, low- following high-quality research maintenance railway infrastructure and world-class testing facilities: through research and innovation and will integrate the specialist • The Traction Drivetrain and centres for railway infrastructure Braking Facility research in the UK with the industrial base and network • The Interaction operators. It will provide Dynamics Facility straightforward access to leading researchers and facilities, to • The Virtual Train Design Lab generate practical improvements in the performance and whole-life cost of railway infrastructure and • The Maintenance Reliability accelerate innovation from and Passenger Interaction research into practice. Facility

24 25 MTM Power’s patented thermoselective vacuum encapsulation process Meeting the Power Supply Challenge for Rail Electronics

Supplying power to electronic systems in the rail industry means overcoming extreme environmental and operational challenges. It is no surprise, therefore, that power supplies can often be the cause of system failures, as Charcroft’s Chris Leek, explains.

Specifying a power supply for use in the rail industry goes beyond meeting the standard form, fit and function of conventional electronic systems. The chosen unit must withstand environmental factors such as shock and vibration as well as dirt and other contaminants. It must also operate reliably in the presence of high transient voltages. If the supply is not rugged enough, any one of these factors could result in a system Inside a power supply with thermoselective vacuum encapsulation failure.

26 27 Withstanding to provide the external connections to the PCB. Three Transients variants of the supply were being For one OEM, the cause of an used to cover the required input intermittent failure of the door voltages of 24V, 72V and 100V. control system on passenger To address the issues with rolling stock had been identified reliability, Charcroft as high transient voltages. The recommended replacing the power supply unit’s (PSU) reaction enclosed, open-frame unit with an to the transient voltages was so MTM Power PCMDS150WK-IP65 extreme that some of the units supply, which combines had ignited on the PCB. Finding a thermoselective vacuum replacement unit, however, encapsulation with IP65 sealing. proved to be a challenge. The thermoselective vacuum encapsulation process provides an After discussions with the OEM’s alternative to filling PSUs with engineers, Charcroft suggested resin. In this patented process, the replacing the original units with a components within the PSU are PMDS30 110S24U-VT, DC-DC thoroughly cleaned to remove converter, from MTM Power. The debris such as grease or soldering new unit’s ultra-wide, 33–154V fluxes. The components are then DC input range would protect the dried and pre-heated before being electronics from transients and encapsulated under vacuum ensure a fully isolated and conditions. The result is a solid regulated supply to the encapsulation which provides equipment. To match the extreme resistance to both shock mounting arrangements of the and vibration. The inseparable original unit, Charcroft arranged cemented joint between the for MTM to supply a modified pin- potting material and the mounted converter, fitted to the The standard PCMDS150-IP67 unit components also means that the includes IP67 sealing PCB with input and output unit can withstand humidity, connectors in the existing condensation and high isolation arrangement. This modification to voltages. It also eliminates the the mounting configuration need to allow for air and creepage allowed the failing PSUs to be distances during the design swapped out for the new units process. during the normal maintenance programme. Reliability is enhanced because factors such as ageing, rapid Solving Reliability temperature changes, heat, cold and other environmental Issues influences do not result in A failing power supply was the delamination, cracking or air cause of another OEM’s reliability pockets, which can potentially reset, operating independently of enclose the original open-frame Finding a power supply to issues with an on-board train Improved Reliability lead to failure. The elimination of the 12V board net. The built-in unit, and a reduction in the withstand the dirt, contamination, protection and warning system electrolyte loss from electrolytic heat-sink also eliminated the need at Reduced Cost number of inventory lines. (TPWS). The original units met the vibration, shock and high transient capacitors also helps to support a for external cooling fans, which Whereas three different units were system’s electrical and mechanical In addition to solving the reliability voltages in the rail environment longer system lifetime. can often be a risk factor in the issues, the PCMDS150WK-IP65 needed to meet the 24V, 72V and specifications, but reliability can be challenge. But it is a failure of power supplies. MTM supply was also able to provide a 100V input voltages, the problems began to appear soon To enhance reliability even further, challenge which can often be after the unit went into operation. the standard off-the-shelf unit Power carried out full testing of 20% reduction in the overall cost PCMDS150WK-IP65’s nominal addressed by the combination of a The specified open-frame power was fitted with a secondary circuit on the customised supply for of each unit. This cost reduction voltage options of 24V (16.8V– supply had been enclosed in a with fully independent isolation compliance to EN50155 and was achieved through the 33.6V) and 110V (50.4V–154V) rugged power supply, supported metal case, for protection against and regulation. This modification EN50121-3-2 before delivery to combination of eliminating the covered all three input voltages by the skills of a specialist dirt and contamination, with wires provided a 40V rail for use as a the OEM. hand-assembly required to with just two variants. distributor. www.charcroft.com

28 29 The people. Thhe products. TheT process. A maintenance parttnership that goesg the distanncence. Loram Around The World

Located in Hamel, Minnesota, USA, Loram Maintenance of the Way, Inc. (Loram) is a leading supplier of track maintenance machinery.

Founded in 1954, we built our business on helping railway companies preserve their lines by manufacturing machines that bring maintenance to the rail. With over 60 years in the rail industry, Loram is recognised as the industry leader in rail grinding, offering a wide range of products to serve all facets of the railroad market. Beyond our expansive offerings, Loram’s unmatched industry expertise can fulfil any specialisation to satisfy the most difficult requirements. Our product depth and ability to respond to customer needs continue to drive strong product demand both domestically and globally.

With 125 machines in 16 countries, a catalogue machine that does such as Great Britain and Loram has developed the not fully meet the customer’s ® Germany. These features afford With 60 years of industry leadership, railroads worldwide rely on LORAM people, products, expertise to grind on heavy haul, needs. equipment and tracck maintenance services. We are commmitted to the safety of your operation, freight, transit, commuter, and customers detailed records of the extending the life of rail assets and increasing operationaal efficiency. short line railroads. Incorporating Loram’s rail grinders feature state- grinding and rail performance in high-power, flexible grinding of-the-art quality assurance tools THE GLOBAL LEADDER IN MAINTENANCE OF WAAYY SERVICESSERVICES AND EQUIPMENT LORAM.COMM order to follow the life-cycle of modules with patented control and software programs that allow SPEED PERFORMANCE RELIABILITYTY their rail, and assist in managing systems, Loram rail grinders offer proof of performance compliance RAIL GRINDING • BALLLAST MAINTENANCE • OEM • FRICTION MMANAGEMENT • PROGRAM MANAGEMENT the overall rail maintenance © 2015 Loram, Inc. the industry’s leading technologies with the most stringent rail and the most choices rather than grinding standards in countries planning.

30 31 metal, all while removing as little This process is refined by metal as is required at the fastest continuing to study the speeds possible. Less metal avoidance, surface finish or noise deterioration of rail and causes for removed artificially through impact the selection of the variation, incorporating those grinding leaves more of the rail optimal grind stone from Loram’s findings into the decision-making head and extends the life of the option on the market coupled grind stone offerings. This process. Numerous test sites are rail, provided adequate metal is with a robustness that makes this program is then downloaded into evaluated along with vast amounts removed to accomplish the product an attractive option for all the rail grinder. The grinding itself of data collected from every Class objective. Precision is required to compare and has led to strong customers. is computer-controlled and I railway in North America. ensure this is the case. Less metal demand on many Heavy Haul regularly calibrated to ensure Refinements in the grind plan removal required allows even Railways in North and South Ensuring accuracy of the grinding accuracy. The horsepower of the development process continue to faster speeds, fewer passes, less Loram offers a complete line of America and Australia. For process starts with a good pre- grind motors adjusts to any improve the ability to achieve the time spent in a block and a lower grinders to tackle both the large Specialty Grinding needs, the RGS inspection. This practice also variations in the machine speed to profiling and metal removal cost per track kilometer. Speeds and the small jobs, from heavy Series is the most productive optimises the deployment and maintain a consistent metal objectives at the maximum will continue to be limited by the haul and short line railroads to machine on the market that allows remediation activities on track. Rail removal rate. The grinders all efficiency. need to provide precise profiling transit lines and subway systems, customers to optimise profiles are measured in a rail feature an on-board profile of the rail as well as line of sight from mountains to tunnels. productivity, reduce cost, and inspection vehicle, comparing measurement system to check Continuous braking requirements for machine Loram’s product offerings include: increase asset life of switches and results to a pre-determined compliance to the optimal profile operation. RG 400 Series – Heavy Haul, C crossing rail. In markets with optimal template. The profiling along with a dual encoder Evolution 21/44 Series – International, RGI – restrictive clearance and axle needs are combined with a depth location system. Features exist for As traffic density continues to As customer focus is one of International, RGS – Specialty, and weight, the Loram RGI Series and of cut as a result of an assessment a GPS system, in addition to the increase, it is critical to get the Loram’s five core values, Loram the L Series – C44 Series are designed with the of surface condition to develop a dual encoders, that automatically work done as efficiently as provides the resources necessary Mobile/Specialty/Transit. One of latest technology to satisfy the grind plan, including speeds, grind selects the proper template based possible. Loram foresees for listening to our customers’ Loram’s most successful products most restrictive precision grinding motor locations and number of on the machine’s track location. continued movement toward needs and then delivers the ideal has been the 400 Series Grinder, needs. The L Series Grinder is the passes required. Specific customer The grind and profile data is stored precision in achieving the desired solution. Loram has partnered which offers value beyond most productive “truckable” requirements such as obstacle and available for future reference. profile and removing the fatigued with our customers to develop

32 33 Big Change Is Coming Down the Line – The General Data new rail grinding product offerings performance equipment, the right exceed your expectations. Loram’s and strategies. maintenance practices, asset management team, which is knowledgeable personnel, and made up of recognised technical Protection Regulation Railroads have historically worked progressive training and safety experts in the rail grinding production and specialty rail practices to produce reliable industry, produce customised grinders separately, but Loram services. Loram strives for 98% collaborated with its customer to reliability (shift uptime) in all our grind plans using Rail Inspection challenge the status quo, which services, and we closely monitor Vehicles and then measure the resulted in a joint rail grinding reliability statistics to assess and result to ensure a quality grind. strategy. This new strategy allows aggressively address any Loram’s operations team consists The General Data Protection the production and specialty rail downtime issues. of trained and experienced grinders to work simultaneously in technicians, operators, the same track window, blend maintainers and managers to keep Regulation (GDPR) represents a grind zones for a continuous rail The Future of Rail profile and retain preventive Grinding your grinding program on schedule. seismic shift in the way businesses gradual grind cycles for mainline Loram allocates a significant rail and specialty track assets. amount of resources to research Loram’s RG400 Series production and develop new processes and Loram fully understands that while are allowed to process data. rail grinders and 24-stone RGS technologies to advance the carloads, tonnage and passenger specialty rail grinders are the key effectiveness and efficiency of our density continue to increase, track to joint rail grinding success. As equipment. Loram’s continuous time is shrinking, and Loram’s line these machines provide industry- improvement efforts help us offer of rail grinders includes multiple leading productivity and the most innovative and options that take into efficiency, the RG400 is typically productive equipment, ensuring consideration these able to grind a single high-speed safe, effective, and efficient pass while the RGS is able to operation for our customers. circumstances by offering the follow and complete any In addition to our rail grinding most innovative and most additional mainline grinding and products, Loram maintains productive machines in the world grind the specialty track assets. concentrated efforts in rail accompanied by Loram’s world- Multiple railroads have grinding services. All equipment class rail grinding technologies, incorporated joint rail grinding, and services needed to plan, processes and people. These and they are seeing decreased perform, maintain, and measure options allow railway customers pass kilometer to track kilometer your entire rail grinding business ratio and double the amount of are handled directly by Loram. to continue to extend rail life, specialty track assets ground Loram’s extensive engineering improve the wheel and rail annually. This model can be team of over 90 engineers ensures interaction, reduce defect rates, directly applied to Loram C44 and that our equipment is designed to and reduce rail failure incidents. RGI rail grinders for international customers with reduced clearance and axle weight requirements.

It takes a blend of high © Dennis van der Heijden under licence CC BY 2.0

34 35 group companies for example. 4. Ensured your customer-facing who understands data This contract review tends to be agreements, employment protection and can deal with one of the biggest pieces of a contracts, policies etc. have queries as they arrive. GDPR compliance programme. been updated and are Any idea that GDPR is simply an IT compliant. 9. Ensured that all new projects problem or an HR problem alone (including software, builds, use is missing the bigger picture. 5. Considered deleting data that of third party suppliers, etc.) IT does have an important part to cannot be cleansed to make it are built with “privacy in play and it is essential that all compliant. design”. This needs to be systems are compliant. It is also documented in the same way essential that the legal agreements 6. Ensured staff have been that you would conduct a with IT providers have been trained. health and safety assessment. reviewed and re-negotiated if

necessary to ensure they are now 7. Ensured that you have a breach The legal changes for GDPR are GDPR-compliant. policy (breaches need to be relatively straightforward; the © Dennis van der Heijden under licence CC BY 2.0 The HR element is also significant. reported to the ICO within 72 ramifications for how businesses hours). It is essential that HR deal with data are not. Over 90% of data breaches are please call Ben Travers on engenders a culture where Any railway business that deals within the scope of that consent due to human error. You can have the best IT systems in the world people feel comfortable Ben Travers is a partner and head 01392 210700 or email with data relating to EU citizens is only. but still be breaching GDPR disclosing the breaches. of intellectual property and IT at affected. From marketing to how [email protected]. regulations if employees do not Stephens Scown LLP. If you have you hold data on your employees, In order to be successful in For more information visit have secure passwords. For this 8. Implemented a central point of any questions about your the regulations have far-reaching complying with GDPR, you will reason, training is very important. contact within the organisation business’s GDPR obligations, www.stephens-scown.co.uk implications. In this article Ben have had to undertake a data GDPR requires that staff are Travers, Head of Intellectual mapping exercise by auditing your trained on how data is used in a Property and IT Legal Services data. You need to know where compliant fashion. The GDPR also at Stephens Scown explains data originates from, where the requires that policies are updated consent for its processing is, some of the key changes. and that staff are trained on them. where data is shared with third Although most businesses will parties, how it is used, etc. have heard about GDPR, there is a Knowing this will have allowed Roadmap to GDPR significant amount of confusion you to identify where work needs compliance about what businesses need to to be done to clear up any For most organisations GDPR change to comply. And there is a consents, change IT practices and compliance will have taken some lot at stake. Fines for breaches will liaise with third party suppliers. time to achieve, there is no quick be up to 20 million euros or 4 per While many businesses mistakenly fix. As a general roadmap cent of the business’s annual believe that GDPR only relates to businesses will hopefully have worldwide revenue. The marketing information, the actual taken the following steps: legislation came into force on 25 remit is much broader. For May 2018, so many businesses example, it dictates how you use 1. Conducted a data mapping have been working hard to get employee data. If your business exercise – identified what you their house in order in time. uses a third-party payroll own, where it sits, how it is company, you must first make used, etc. sure employees are aware and The right mind-set secondly that the contracts with 2. Obtained consents where The starting point must always be the payroll company are GDPR- they were needed and lacking. to ensure you have the right compliant. mind-set when dealing with data. 3. Reviewed agreements with Although personal data (i.e. data This compliance of contracts third parties who have access which identifies a living individual) needs to be replicated across all to data (such as marketing might sit on your organisation’s third parties who receive data. For companies, email hosting server that does not mean it is railway businesses this may companies, etc.), re-negotiated your data. Instead, you use it with include marketing companies, these or find another supplier the consent of the data subjects, website hosting companies and if appropriate.

36 37 ICE Plant Cologne-Nippes – WINDHOFF to Supply Key Technology

The recently completed ICE maintenance depot in Cologne-Nippes was opened with an official ceremony.

This plant is the first climate-neutral maintenance plant in Europe. According to Deutsche Bahn it will reduce carbon emissions by 1,000 tons and is operated without using any fossil fuels.

WINDHOFF Bahn- und Anlagentechnik GmbH was able to demonstrate its various product solutions for DB’s requirements at this new plant. Thus, the new ICE depot has been fitted with four 430-metre elevated rail tracks for the maintenance of the ICE fleet with 68 rail bridges, wheelset drops, a turntable drop pit for the exchange of the , a turntable and a traction cable installation

38 39 WINDHOFF MPV® FOR CONSTRUCTION AND MAINTENANCE OF OVERHEAD for the external cleaning system LINE SYSTEMS & TRACK (train wash facility), all supplied by WINDHOFF Modular Concept: Maximum versatility with the MPV ® WINDHOFF. due to the modular vehicle design. What has become recognised as “WINDHOFF technology” is In addition WINDHOFF supplied a system that allows demountable work modules for various the emission-free, battery-electric infrastructure work streams: a range of hydraulic cranes to give shunter TeleTrac RW60AEM-QF optimised capacity, flexible elevated work platforms & work mod- ules configured for electrification and OLE - or track maintenance. complete with transverse gear. It is The WINDHOFF MPV®’s operational use is widespread and fit for used as a shunting vehicle for a the future. subfloor turntable to ensure that the wheelsets are positioned with high precision. At the front of the 34t shunter are hydraulically powered, lowerable running gears Meet us in Berlin! for road mode with heavy-duty Open Air Site wheels so that the vehicle can be International Trade Fair lifted and positioned next to the for Transport Technology Stand No. O/421 tracks on a concrete slab when necessary.

WINDHOFF is proud of having made a major contribution WINDHOFF towards implementing this groundbreaking project. WORKSHOP WINDHOFF Bahn- und EQUIPMENT Anlagentechnik GmbH, Rheine, Germany, is a worldwide supplier FOR RAILWAY DEPOTS of a wide range of high-tech / Lifting Jacks products with a focus on rail / Underfloor Lifting Plants vehicles and railway equipment as / Roof Access Platforms well as shunting technology. / Raised Rail with integrated (Wheel/Bogie) Drop System / Turntables and Traversers / Rail-Road-Shunting Vehicles / Bogie Measuring Devices

www.windho.com 40 41 GKD Technologies show SensorSafe Rail Range at Rail Live exhibition, including brand new safety features Continuously Improving Reliability GKD Technologies design, develop and produce height, slew and load safety control systems for Road Rail vehicles (RRV’s) and general construcon equipment such as excavators. The company will be exhibing at the forthcoming Rail Live exhibion 20–21 June 2018, Quinton Rail Technology Centre, Warwickshire, showing the very latest in related technology.

3RCi+ Road Rail, Rated Capacity Indicator Visitors to the GKD stand will see the newly upgraded 3RCi+ system, which is the latest version of the world’s most popular retrofit rated capacity indicator for road rail applicaons.

GKD Technologies continuously research how to make their products The 3RCi+ has been developed with the newest technology to meet the growing safety requirements of the more reliable to help reduce downtime on the rail. They have worked rail industry - enabling RRV’s to work to their maximum capacity whilst operang safely and securely. closely with their supplier to manufacture a new external slip ring for use on their systems. The new slip ring provides increased durability Slew limits, virtual walls and height limits are included, featuring selecve intelligent hydraulic moon cut of through improved water resistance and improved electrical pathways. any boom or slew funcon at limit to prevent movement further into danger, but allows recovery into the “safe” zone. Selecve intelligent hydraulic moon cut also provides graduated, smooth control of hydraulic funcons as they approach the set limits. Full data logging of all funcons and operaonal state is included. reliability issues The 3RCi+ also features a touchscreen graphical display inside the cab where the operator can see all of the details about the machine and its capabilies in its current posion. The display is water resistant with IP64 rang. An ambient light sensor has been included to control the screens brightness automacally.

For more information contact our team on 01202 971972, email [email protected] GKD Technologies 17 Cobham Road, Ferndown Industrial Estate, Wimborne, Dorset, BH21 7PE, UK or visit our website www.gkdtec.com/rail-machine-safety-systems.

42 43

GKD Technologies’ new Slip Ring with integrated encoder. Upcoming GKD has developed in conjuncon with Kraus in Germany a high reliability and durability slip ring with an integrated GKD encoder. This unique design provides the opportunity for converters and maintainers to further improve the integrity and performance of the wheeled or tracked RRV’s. Gold pathways within the Railway Events slip ring provide for improved data transmission integrity, the integrated encoder provides for a compact and reliable design. June, July, August 2018

SafeRail Congress innovative security and safety suppliers working today. With a wide variety of ways to get involved such as When: 11 June 2018 – 12 June 2018 hosting an on-floor exhibition seminar, on-floor show Where: Washington Hilton, 1919 Connecticut branding, hosting workshops and much more, Transport Ave NW, Washington, DC 20009, USA Security and Safety Expo is the place to be to position Bringing together North America’s leading freight rail and your company as the most trusted and secure solution passenger transit networks, SafeRail is the region’s only provider in the business. Click the link below to get your dedicated safety and security show. Taking place at the free expo pass! Washington Hilton in Washington DC on 11–12 June Event website: https://hubs.ly/H09l09B0 2018, SafeRail is the perfect place to meet the networks looking to upgrade their systems. Africa Rail 2018 The congress will bring together over 300 senior-level transportation experts from across North America to When: 12 June 2018 – 13 June 2018 uncover safety best practice for freight, passenger and Where: Sandton Convention Centre, metro operators to ensure reliability, competitiveness, Johannesburg, South Africa GKD Technologies’ unique ‘Capacity Planner’ software federal compliance and a positive public perception. Africa’s longest-running and most successful railway Alongside a C-level keynote session on broader issues event now enters its 21st successful year. From humble The purpose of the Capacity Planner so ware is to enable fast and accurate li planning to be carried out around safety and investment, the conference will feature beginnings as a small conference with a handful of for machines equipped with GKD 3RCi Rated Capacity Indicators. The planners are machine specific and specific sessions dedicated to: preparing for the final exhibition stands, it now takes up two massive halls at the stages of PTC installation, bringing infrastructure up to a Sandton Convention Centre in Johannesburg. It has are available to be downloaded on the GKD website. state of good repair, mitigating against human error and grown to become Africa’s most important and best- trespassing and suicide prevention. supported railway conference and exhibition. Over the The GKD Planner consists of a folder, which contains the Capacity Planner program, and a number of files Event website: https://hubs.ly/H09k_910 past two decades, Africa Rail has become the undisputed containing data relevant to the dimensions and li capacity of the RRV. This RRV data is idencal to the leader. It is an unrivalled platform for the continent’s data files exisng within the GKD 3RCI system fied to the machine being planned for, the data is derived railway industry to come together, to learn, to network Transport Security and Safety Expo and to do business. from extensive p tesng within a range of track condions under controlled condions when the First of When: 11 June 2018 – 12 June 2018 Event website: Class machine is calibrated. The capacity planner so ware will therefore reflect the true li capacity of the Where: Washington Hilton, 1919 Connecticut http://www.terrapinn.com/exhibition/africa- rail/index.stm machine under all track condions. Ave NW, Washington, DC 20009, USA Security and safety for mass transport in the digital age – the only event of its kind to provide a platform for e UK and overseas. Please visit the transport operators across all verticals, government RSCS 2018: Railway Signalling and officials and suppliers to address current concerns, share Control Systems best practice and build long-lasting business connections. The show will host presentations & discussion streams When: 18 June 2018 – 21 June 2018 with C-level and director-level operator speakers from Where: etc.venues Victoria, London, UK aviation, road, rail, transit, maritime and border control. RSCS 2018: IET Railway Signalling and Control Systems is Alongside these content streams, Transport Security and a four-day training course, presented in collaboration with Tel: +44 (0) 1202 971 972 Email: [email protected] www.gkdtec.com Safety Expo is also host to a large-scale exhibition which the IRSE and delivered by a host of expert lecturers who will display the latest solutions alongside the most have worked on railway systems around the world.

44 45 Event website: demonstrate how you can help them overcome these https://events.theiet.org/rscs/index.cfm?origin=Railw challenges. ayNews-banner The conference provides vendors with an opportunity to Choosing the learn about upcoming projects and tenders before anyone else does. Transport-Led Development in Event website: Wales 2018 http://www.terrapinn.com/conference/metrorail- americas/index.stm Right Rail Hose to When: 19 June 2018 Where: Jurys Inn, Central Cardiff Delivering enhanced transport infrastructure and SITCE 2018 maximising transport investment to drive economic When: 09 July 2018 – 11 July 2018 Keep your Train development and growth. Where: Sands Expo and Convention Centre, With transport infrastructure development continuing to Marina Bay Sands 10 Bayfront Avenue, Singapore be a key focus area in Wales, Transport-Led Development in Wales will again provide the latest and most essential 018956 The third edition of LTA-UITP Singapore International Design on Track information for senior professionals working in the transport and infrastructure sector. With the critical role Transport and Exhibition (SITCE) is jointly organised by the transport can play in supporting economic growth, Land Transport Authority of Singapore (LTA), the infrastructure optimisation, enhanced supply chain International Association of Public Transport (UITP) and efficiency and job creation, this one-day conference is a LTA’s subsidiary, MSI Global Pte Ltd. For this edition, UITP’s must-attend event for any transport or property established International Rail Conference will be fully professional operating in Wales. integrated within SITCE 2018. This is your opportunity to The new European standard Event website: be a key part of this dedicated international congress and https://www.waterfrontconferencecompany.com/con exhibition on urban rail transport technologies, planning, ferences/transport-led-development-in- systems and solutions. EN45545, introduced in wales?utm_source=Railway- Event website: News&utm_medium=listing&utm_campaign=356RNE http://www.sitce.org/?utm_source=Railway%20News September 2013, was designed WS &utm_medium=Website- Banner&utm_campaign=Media%20Partners&utm_con to create a much safer travel tent=Website RAIL LIVE 2018 environment for passengers When: 20 June 2018 – 21 June 2018 Where: Long Marston Airfield, Campden Road, UK Rail Station Development and and rail staff. Stratford-upon-Avon, United Kingdom Regeneration Rail Live is the annual event that brings the entire industry together to showcase UK rail expertise. Rail Live 2018 will When: 11 July 2018 be the largest, most comprehensive outdoor event for rail Where: Addleshaw Goddard, Central London in the UK. It is undergoing a transformation for 2018 with Practical insight on delivering successful station many exciting new developments. developments that maximise housing opportunities and economic growth. Rail Live 2018 builds on the highly successful plant show New trains built from March 2016 As we enter the age of higher- UK Rail Station Development and Regeneration brings onwards have to be built in line speed trains, longer tunnels and the that has been staged every year at Long Marston since together the rail and property sectors to learn how to 2012, and this plant display remains at the core of this with this standard. need for greater survivability, the deliver successful developments at all scales. Providing enhanced event. European Union sought to find an the latest insight on planned projects and exploring the Event website: http://www.raillive.events/ For engineers, this standard has alternative, either to the formerly best models for planning and delivery, the event will focus made designing rail vehicles more Component valid national – and therefore on who should lead development, how to align timelines challenging, particularly when different – safety standards or to to enable better delivery with less risk, and how to deliver Specification is World Metrorail Congress Americas they have to contend with some the classic hose assembly flame projects that maximise the residential and commercial Crucial When: 26 June 2018 – 27 June 2018 opportunities that development creates. of the world’s most demanding tests in accordance with EN 15540 Hoses are used extensively Where: Hilton Philadelphia City Avenue, 4200 Event website: environments. Powerful vibrations, (a minimum of 800C for at least 15 City Ave, Philadelphia, PA 19131 https://www.waterfrontconferencecompany.com/con varying temperature extremes and throughout rail vehicles, including minutes). Combine that with the locomotives, high-speed trains World Metrorail Congress Americas focuses on strategic ferences/uk-rail-station-development-and- harsh climates in general have demand to ensure compliance with discussions between both rail operators and vendors regeneration?utm_source=Railway- become typical working and trams, so achieving early and ever lower pollutant emission limits, about upcoming metro projects and improvement plans. News&utm_medium=listing&utm_campaign=355RNE environments for components complete compliance has been you have a recipe that could give a Discover what challenges lie ahead for rail operators and WS and systems in rail systems. crucial. train design engineer a headache.

46 47 How material and components act when exposed to fire is not only dependent on their inherent properties, but also on their application, what shape they are For example, lateral ‘spread of used in and the final arrangement flame’ tests need to be performed of the materials’ exposed surfaces. on samples hanging vertically in Not to forget their relative mass accordance with EN 5658-2. The and thickness. “smoke test” is done differently, taking place in a single test ensure hoses are safe, reliable, Based on this, products listed in chamber complying with EN durable and flexible. Bonus: our EN 45545-2 are further 5659-2. This test is done to expertise in trouble-free handling. categorised into sub-groups: use determine the heat release and in accessible or not openly mass loss rate characteristics of Parker, as a worldwide system accessible areas (think the driver's the products involved using a solution provider, is an cabin); general area of application calorimeter method according to experienced partner for rail key success of many projects is (inside or outside of train EN 5660-1. Testing for evidence of applications and is certified to all the fact that Parker was the first waggons) and a more specific smoke toxicity is performed required standards. Offering a hose manufacturer in Europe to area of application and material according 10 NF X70-JOO parts 1 wide range of hoses from low to develop a new rubber compound (train furniture, electrical or and 2. Finally there is also the EN high pressure for all relevant rail suspension, auxiliary systems), to the required standards of mechanical equipment). 11925-2 ignition testing for small applications within locomotives, cooling systems (water cooling, air parts and burning, dripping high-speed trains, city trains, EN45545 in terms of fire conditioning), fluid conveying redundancy. With smoke three-wire braid compact hose, Looking at EN 45545-1, its material. Sounds complex and a regional trains, trams, suburban (diesel fuel, water for sanitary behaviour and toxicity under specially designed for high operation and design categories lot? It is. Having someone do this trains/metros and track facilities) and of course heating control, Parker has enabled design are used to determine the hazard for you is cost-saving – and could maintenance vehicles, Parker is (water). pressures (4SP-level). Our modern engineers to construct new levels on which the requirements be life-saving. one of the first hose classic, the 797RH Compact Spiral designs easily and with peace of Ideally suitable are the 681 DB 2TE are based: this part defines the manufacturers to fulfil these new hose is suitable for applications In the case of Parker’s products, mind. Special rail hoses deliver hose and 441 RH compact hose. necessary test procedures. These requirements of EN 45545-2. where both high pressures and these tests are performed by the more design advantages such as Both are available with carbon requirements are currently light bend raduses are required. All certification company LAPI. With better bending radiuses making steel and stainless steel fittings. If specified in 25 varieties (R1-R25). feature Parker’s well-known rubber hose products the aim is What’s in It for Me? designs easier, manipulation faster very tight bend raduses are Parkrimp No-Skive crimping always to achieve high flame The demand for EN 45545-2- and reducing assembly costs. needed, the 477Rh hose is the How Are the Tests resistance through the use of compliant hoses has never been ideal product to use. Larger technology for those that prefer to superior rubber compounds and stronger. Mass transportation is We offer a range of hoses for dimensions up to 2” are available make their own safe and reliable Done? latest processing technologies. We growing in importance; demand in whatever application: hydraulics with the 421RH hose solution. hose assemblies. The testing methods are laid out make sure to be a development many countries throughout the (brake system, hydrostatics), Plus, when operating in higher in a rather detailed manner. partner with its customers to world is high and still rising. The pneumatics (brake system, pressures, we offer the 372RH www.parker.com

48 49 BRINGING YOU THE LATEST RAILWAY NEWS AND LEADING RAIL SUPPLIERS FROM AROUND THE WORLD

50 51 We hope you have enjoyed our latest Railway-News magazine. Be sure to look out for our next issue. We are now producing a magazine on a quarterly basis so please do not hesitate to contact us at [email protected] if you would like to feature your latest technology in an upcoming issue. Please also take a look at www.railway-news.com for all the latest rail news, events and technology.

Office Tel: +44 (0) 1392 580002 | Mob: +44 (0) 7432 725001 | email: [email protected]

A2B Global Media | Third Floor | 11-15 Dix's Field | Exeter | EX1 1QA | United Kingdom www.railway-news.com

52