Worcestershire Rail Investment Strategy Supporting Development of Worcestershire’S Local Transport Plan 4

Total Page:16

File Type:pdf, Size:1020Kb

Worcestershire Rail Investment Strategy Supporting Development of Worcestershire’S Local Transport Plan 4 Worcestershire County Council Worcestershire Rail Investment Strategy Supporting Development of Worcestershire’s Local Transport Plan 4 Autumn 2017 Contents An Evidenced Rail Vision For Worcestershire 4 1. Executive Summary 7 2. Introduction 12 3. Stage 1 – Current Travel Markets, Train Services & Accessibility 15 4. Stage 2 – Review of Worcestershire’s Development Proposals 39 5. Stage 3 – Rail Industry Plans & Gap Analysis 52 6. Stage 4 – Economic Testing Of Connectivity Options 78 7. Stage 5 – The Prioritised Conditional Outputs 84 8. Stage 6 – Making It Happen 96 An Evidenced Rail Vision For Worcestershire Worcestershire is an attractive, thriving County of The Rail Industry’s Plans 566,000 people, set to grow by 47,200 new homes 2030 and 25,000 new jobs by 2025 which will result The industry forecasts up to 97% growth in in a £2.9bn growth in Gross Value Added (GVA) passenger volumes on Worcestershire routes by from £9bn to £11.9bn per annum 1. The County’s rail 2043 2. services will not match these ambitions without significant earlier development and investment The industry has an emerging vision, shared in beyond that committed by the rail industry. Worcestershire, for a faster 2 trains per hour (tph) Worcestershire to London service, supported by The Challenge enhancements to the North Cotswold Line, the Great Western electrification scheme and new Connectivity to London is slow and of limited Intercity Express Programme (IEP) trains. frequency, with many Worcestershire passengers using the M5-M42-M40 to access better Birmingham However its planning processes do not include International and Warwick Parkway services. The additional Cross Country or southbound opening of Worcestershire Parkway in early 2019 will, connectivity beyond current commitments to however, begin to address this issue by providing serve the new Worcestershire Parkway in 2019, and enhanced accessibility to the North Cotswold Line its long-distance and local services are planned and Cardiff – Nottingham Cross Country services. by different Network Rail routes and multiple However, other strategic UK-wide Cross Country operators. Worcestershire County Council seeks the services will continue to pass through but not call support of the industry in planning Worcestershire’s in Worcestershire, limiting connectivity to the rail services in a fully integrated manner, reflecting economies of South-West, North-West and North- our vision of “One-Economy-One Railway” for East England. Worcestershire. The growing University City of Worcester suffers Addressing capacity restrictions caused by the poor connectivity due to restricted rail County’s several single line sections and outdated infrastructure, outdated signalling and limited signalling systems is being considered by Network historic investment in its 2 stations. Rail but with no committed timescales. The County is a key partner in the newly-established North Kidderminster and Redditch (and Bromsgrove after Cotswold Line Task Force which seeks to bring introduction of the new electrification timetable forward capacity upgrades on this route and in the in May 2018) are well served by local services into Worcester area; the evidence underpinning our Birmingham, but have limited connectivity to Vision set out in this Strategy strongly supports the London or southwards. These services also face work of the Task Force. challenges of overcrowding, particularly during peak periods - both issues can have a profound effect in Electrification of the Bristol-Birmingham and suppressing demand. Snow Hill Lines, capable of increasing capacity for new services for Worcestershire under previous Department for Transport (DfT) consideration, is not now included in active industry plans following 1 Worcestershire Local Enterprise Partnership, Strategic Economic Plan; March 2014 2 Network Rail Long Term Planning Process, Long Distance Market Study; October 2013 4 the Government’s July 2017 announcement of the Worcestershire is keen to gain from new UK-wide cancellation of major UK rail electrification schemes, journeys offered by HS2 from 2026 and 2033, and proposing future reliance on ‘bi-mode’ electric/ all of which will, however, be by connection at diesel powered trains. Alternative ways of increasing Birmingham Curzon St. or interchange (See section connectivity and capacity will therefore need to be 5.9.2 for further information regarding HS2). found on this corridor. This Strategy thus focuses on new, direct Worcestershire’s Evidenced Proposals connectivity on the ‘Classic Network’, connectivity being achieved via local and long-distance rail Worcestershire County Council (WCC) has prepared services, to both regional and UK-wide economies this Rail Investment Strategy to evidence its in order to promote the County’s sustainable economic case – in terms of GVA and jobs – for economic growth and success (the concept of “One enhanced County rail connectivity. Economy / One Railway”). The Strategy proposes 4 overarching Conditional Infrastructure To Support Outputs for rail service development which would Worcestershire’s Vision deliver £50.42m GVA per annum, and 1,151 new jobs in the County 3: The Conditional Outputs also cover key aspirational infrastructure schemes essential to facilitate this • 2 Trains Per Hour Worcester-Oxford- new connectivity, including: Paddington – £21.22m GVA p.a. and 475 new jobs; • North Cotswold Line Capacity Upgrade; • 1 Train Per Hour Kidderminster-Droitwich • Worcester Area And Droitwich Spa To Stoke Spa-Worcester-Paddington – £13.8m GVA p.a. Works Capacity Upgrade; and 273 new jobs; • New Car Park Capacity And/Or New • Calls At Worcestershire Parkway In Bristol- Stations; Manchester And Plymouth-Newcastle Services – £9.6m GVA p.a. and 250 new jobs; • Worcester Shrub Hill Station Regeneration; • Regional Service Between Kidderminster/ • Electrification Of Both The Bristol To Bromsgrove, Worcester And Cheltenham Birmingham And Snow Hill Lines. 4 Spa, Gloucester And Bristol – £5.73m GVA p.a. and 153 new jobs. 3 JMP, Worcestershire RIS GVA Analysis: Wider Impacts Note; June 2016 4 Although in light of the recent Secretary of State for Transport’s announcement putting on hold all future electrification schemes, these Conditional Outputs will need to be carefully considered with regards to delivery. 5 Taking The Vision Forward • DfT and Network Rail on the Long Term Planning Process to 2023 and 2043; Worcestershire recognises that its aspirations require planning within the medium and long-term • Midlands Connect on its ‘Powering the rail industry investment framework to 2023 and Midlands Engine’ Transport Strategy (ensuring 2043. Worcestershire’s Rail Vision is fully integrated with the Midlands Connect proposals); and This Vision will thus form the basis for the County’s active and ambitious engagement with stakeholders • Neighbouring Local Enterprise Partnerships and partners including: and local authorities with common interests. • The North Cotswold Line Task Force on ways to quickly develop and deliver the shared Joint Vision for the North Cotswold Line; • DfT on investment within industry Control Period 6 (2019-2024) and upon re-franchising specifications; 6 1. Executive Summary 1.1 In 2016 Worcestershire County Council between Redditch and Birmingham (during commissioned SLC Rail to develop a peak periods) and between Worcester – Worcestershire Rail Investment Strategy Bromsgrove – Birmingham (all day). (WRIS), to form part of the County’s fourth Local Transport Plan (2017 – 2030). The WRIS 1.4 Stage 2: Change In Worcestershire is split into 5 key stages, designed to; baseline The Strategic Economic Plan (SEP) produced the current rail situation in the County; by the Worcestershire Local Enterprise assess the scale of growth expected; identify Partnership (WLEP) sets out ambitious growth gaps and solutions; model the economic targets for the County. By 2025 the SEP benefits of these solutions, and; prioritise the proposes the creation of 25,000 new jobs, investment to achieve maximum value for construction of 47,200 new dwellings by 2030 money. and an increase in GVA from £9bn to £11.8bn 1.2 Investing in the rail network of the County per annum. This growth is focused around is important in order to achieve sustained the rail corridors in the three areas of Wyre economic growth, increased connectivity Forest, Bromsgrove & Redditch and South and reduced reliance on motor vehicles. The Worcestershire. Further housing development outputs of this WRIS can be used to lobby is expected to ‘overspill’ from the Greater the rail industry for prioritised improvements Birmingham housing allocations and, although up to 2043. A summary of the Strategy’s numbers are still to be quantified, it is thought findings is found below. around 37,900 new houses will need to be shared between the nine adjacent local 1.3 Stage 1: Baseline authorities (including Worcestershire) by 2031. Key policy documents for the region (e.g. the Worcestershire is crossed by two nationally SEP, WCC’s LTP3 and the West Midlands LTP) important rail lines – the North Cotswold all cite the benefits of prioritising rail travel as line from London Paddington to Worcester, a means to achieve sustainable growth. Great Malvern and Hereford and the Bristol to Birmingham Line. Local services operate 1.5 Stage 3: Rail Industry Planning to Birmingham along the Kidderminster, Bromsgrove and Redditch routes. Passengers The rail industry is currently engaged in its make 9.2 million trips to and from the ‘Long Term Planning Process’
Recommended publications
  • HS2 Unlocking the Benefits
    i HS2 Unlocking the benefits West Midlands Connectivity Package ii 2.7 million people live in the West Midlands metropolitan area, the largest urban area outside of London 1 The Connectivity Package will improve regional and local links The High Speed to High Speed Rail Two (HS2) and encourage sustainable Rail Network will growth using the released rail capacity from the West Coast Main Line. Economic benefits will therefore be maximised provide much- across the West Midlands region with capacity constraints on needed additional rail the already congested local transport networks being relieved. capacity connecting Based on international experience of High Speed Rail, the main urban areas implementation of the Connectivity Package to transform the proposed HS2 interchanges into integrated regional of the UK along a transport hubs is fundamental if our businesses are to expand new North-South fast their markets, access a wider workforce and develop local economic networks. Improved connectivity will undoubtedly connection. To capture attract new business and promote innovation across our and maximise the manufacturing and service sectors. distribution of HS2’s The Package will have a positive impact across a range of economic challenges facing Local Enterprise Partnerships potential benefits, (LEPs) in the West Midlands such as slow business cluster authorities across formation, urban youth unemployment and limited access to international gateways. The arrival of HS2 also underpins the West Midlands development plans for Birmingham city centre and UK region have prepared a Central, stimulating further job creation from high-value economic activity in the West Midlands. Delivery of the Transport Connectivity Package will ensure that key locations are effectively linked Package, which will up to HS2 stations overcoming any potential consequences of building HS2 without connections to these places.
    [Show full text]
  • Transportation on the Minneapolis Riverfront
    RAPIDS, REINS, RAILS: TRANSPORTATION ON THE MINNEAPOLIS RIVERFRONT Mississippi River near Stone Arch Bridge, July 1, 1925 Minnesota Historical Society Collections Prepared by Prepared for The Saint Anthony Falls Marjorie Pearson, Ph.D. Heritage Board Principal Investigator Minnesota Historical Society Penny A. Petersen 704 South Second Street Researcher Minneapolis, Minnesota 55401 Hess, Roise and Company 100 North First Street Minneapolis, Minnesota 55401 May 2009 612-338-1987 Table of Contents PROJECT BACKGROUND AND METHODOLOGY ................................................................................. 1 RAPID, REINS, RAILS: A SUMMARY OF RIVERFRONT TRANSPORTATION ......................................... 3 THE RAPIDS: WATER TRANSPORTATION BY SAINT ANTHONY FALLS .............................................. 8 THE REINS: ANIMAL-POWERED TRANSPORTATION BY SAINT ANTHONY FALLS ............................ 25 THE RAILS: RAILROADS BY SAINT ANTHONY FALLS ..................................................................... 42 The Early Period of Railroads—1850 to 1880 ......................................................................... 42 The First Railroad: the Saint Paul and Pacific ...................................................................... 44 Minnesota Central, later the Chicago, Milwaukee and Saint Paul Railroad (CM and StP), also called The Milwaukee Road .......................................................................................... 55 Minneapolis and Saint Louis Railway .................................................................................
    [Show full text]
  • Long Marston
    THIS IS CALA AT FERNLEIGH PARK LONG MARSTON BEAUTIFUL HOMES IN AN INSPIRATIONAL SETTING Computer generated image of Fernleigh Park Local photography Local photography Set in a brand new village community just a 10 minute drive from Stratford-upon-Avon, with abundant green spaces, cycle paths and Stock photography countryside walks on your doorstep, CALA at Fernleigh Park is a wonderful place to call home. Stock photography Local photography Local photography A HOME TO SUIT YOU Whether you’re setting up your own place for the first time or looking for more space for a growing family, you’ll find everything you are looking for at Fernleigh Park. There’s a wide range of carefully thought out and crafted designs to choose from, all with beautifully laid-out, light and spacious interiors. Stock photography Flexible floorplans enable you to tailor your choice to your lifestyle, whether it be a home office with the assurance of consistent speed and connectivity with a full fibre hyperoptic connection, a playroom or a den. The charming, characterful exteriors incorporate distinctive architectural features in brick, timber and stone to give each home a personality all of its own. CALA at Fernleigh Park is more than buying a new home, you will become part of a greater vision for a whole new community and way of life. Enjoy the best of both worlds with green and restful surroundings on your doorstep and easy access to a wealth of amenities in the wider area. Just reimagine… Stock photography FUTURE DEVELOPMENT POSSIBLE FUTURE THE VISION STRETCH OF
    [Show full text]
  • Rail Deck Park Engineering and Costing Study
    Contents EXECUTIVE SUMMARY ............................................................................................................. 1 1.0 BACKGROUND ............................................................................................................... 8 1.1 Purpose ..................................................................................................................... 8 1.2 Alignment with Other Initiatives ................................................................................. 8 1.3 Project Team ............................................................................................................. 9 City of Toronto.................................................................................................. 9 Build Toronto.................................................................................................... 9 WSP Canada Group Limited............................................................................ 9 2.0 STUDY METHODOLOGY.............................................................................................. 10 2.1 Study Area............................................................................................................... 10 2.2 Data Gathering ........................................................................................................ 10 3.0 EXISTING CONDITIONS............................................................................................... 12 3.1 Topography & Landforms.......................................................................................
    [Show full text]
  • DART+ South West Technical Optioneering Report Park West to Heuston Station Area Around Heuston Station and Yard Iarnród Éireann
    DART+ South West Technical Optioneering Report Park West to Heuston Station Area around Heuston Station and Yard Iarnród Éireann Contents Chapter Page Glossary of Terms 5 1. Introduction 8 1.1. Purpose of the Report 8 1.2. DART+ Programme Overview 9 1.3. DART+ South West Project 10 1.4. Capacity Increases Associated with DART+ South West 10 1.5. Key infrastructure elements of DART+ South West Project 11 1.6. Route Description 11 2. Existing Situation 14 2.1. Overview 14 2.2. Challenges 14 2.3. Structures 15 2.4. Permanent Way and Tracks 17 2.5. Other Railway Facilities 19 2.6. Ground Conditions 19 2.7. Environment 20 2.8. Utilities 20 3. Requirements 22 3.1. Specific requirements 22 3.2. Systems Infrastructure and Integration 22 3.3. Design Standards 25 4. Constraints 26 4.1. Environment 26 4.2. Permanent Way 27 4.3. Existing Structures 27 4.4. Geotechnical 27 4.5. Existing Utilities 28 5. Options 29 5.1. Options summary 29 5.2. Options Description 29 5.3. OHLE Arrangement 29 5.4. Permanent Way 30 5.5. Geotechnical 31 5.6. Roads 31 5.7. Cable and Containments 31 5.8. Structures 31 5.9. Drainage 31 6. Options Selection Process 32 6.1. Options Selection Process 32 6.2. Stage 1 Preliminary Assessment (Sifting) 32 6.3. Preliminary Assessment (Sifting) 32 6.4. Stage 2: MCA Process – Emerging Preferred Option 33 DP-04-23-ENG-DM-TTA-30361 Page 2 of 40 Appendix A - Sifting process backup 35 Appendix B – Supporting Drawings 36 Tables Table 1-1 Route Breakdown 11 Table 2-1 Existing Retaining Walls 17 Table 5-1 Options Summary 29 Table 6-1 Sifting
    [Show full text]
  • West Midlands & Chilterns Route Study Technical Appendices
    Long Term Planning Process West Midlands & Chilterns Route Study Technical Appendices August 2017 Contents August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 02 Technical Appendices 03 A1 - Midlands Rail Hub: Central Birmingham 04 elements A2 - Midlands Rail Hub: Birmingham to 11 Nottingham/Leicester elements A3 - Midlands Rail Hub: Birmingham to 17 Worcester/Hereford via Bromsgrove elements A4 - Chiltern Route 24 A5 - Birmingham to Leamington Spa via 27 Coventry A6 - Passenger capacity at stations 30 A7 - Business Case analysis 50 Technical Appendicies August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 03 Introduction to Technical Appendices Cost estimation These Technical Appendices provide the technical evidence to Cost estimates have been prepared for interventions or packages of support the conclusions and choices for funders presented in the interventions proposed in the Route Study. The estimates are based main Route Study document. The areas of technical analysis on the pre-GRIP data available, concept drawings and high level outlined in these appendices are capability analysis, concept specification of the intervention scope. To reflect the level of development (at pre-GRIP level), cost estimation, business case information available to support the estimate production, a analysis and passenger capacity analysis at stations. contingency sum of 60% has been added. The estimates do not include inflation. Indicative cost ranges have been provided based The appendices are presented by geographical area with the on this assessment. exception of the business case analysis and passenger capacity analysis. Business case analysis The areas of technical analysis are summarised below. Business case analysis has been undertaken to demonstrate to funders whether a potential investment option is affordable and Capability Analysis offers value for money.
    [Show full text]
  • Third Party Funding
    THIRD PARTY FUNDING IS WORKING IAN BAXTER, Strategy Director at SLC Rail, cheers enterprising local authorities and other third parties making things happen on Britain’s complex railway n 20 January 1961, John F. Kennedy used being delivered as central government seeks be up to them to lead change, work out how his inaugural speech as US President more external investment in the railway. to deliver it and lever in external investment Oto encourage a change in the way of into the railway. It is no longer safe to assume thinking of the citizens he was to serve. ‘Ask DEVOLUTION that central government, Network Rail or not what your country can do for you,’ intoned So, the theme today is: ‘Ask not what the train operators will do this for them. JFK, ‘but what you can do for your country.’ the railway can do for you but what However, it hardly needs to be said, least of Such a radical suggestion neatly sums up you can do for the railway’. all to those newly empowered local railway the similar change of approach represented Central government will sponsor, develop, promoters themselves, enthusiastic or sceptical, collectively by the Department for Transport’s fund and deliver strategic railway projects that the railway is a complex entity. That March 2018 ‘Rail Network Enhancements required for UK plc, such as High Speed 2, applies not only in its geographical reach, Pipeline’ (RNEP) process, Network Rail’s ‘Open for electrification, long-distance rolling stock scale and infrastructure, but also in its regularly Business’ initiative and the ongoing progress of replacement or regeneration at major stations reviewed post-privatisation organisation, often devolution of railway planning and investment like London Bridge, Reading or Birmingham New competing or contradictory objectives, multiple to the Scottish and Welsh governments, Street.
    [Show full text]
  • 2015 Feasibility Report (PDF)
    Feasibility Report on Proposed Amtrak Service Chicago-Milwaukee-LaCrosse-Twin Cities-(St. Cloud) M.W. Franke Senior Director State Government Contracts W.L. Lander Principal Officer – Corridor Planning B.E. Hillblom Senior Director – State Partnerships R. J. Rogers Business Planning and Analysis Manager Amtrak Chicago, Illinois May 6, 2015 Chicago-Milwaukee-Twin Cities-(St. Cloud) - Table of Contents - Page I. Introduction and Background 3 II. Study Purpose and Nature of Feasibility Study 3 III. Corridor Characteristics 4 III.A. Route Overview 4 III.B. Demographics and Transportation Alternatives 11 III.C. Route Inspection 12 IV. Station Facilities 13 V. Crew Labor 13 VI. Schedules 14 VII. Ridership/Revenue Forecast 17 VIII. Rolling Stock and Maintenance 17 IX. Operating Expense/Subsidy Requirement 19 X. Proposed Capital Infrastructure Improvements 19 XI. Mobilization Costs (one-time expense) 23 XII. Summary Table of Key Numbers 24 Tables Table 1 – Track Ownership Table 2 – MSA and Populations Table 3 – Schedules Table 4 -- Locomotive & Equipment Acquisition Table 5 – Financial Summary by Scenario Table 6 – Infrastructure Capital Projects Exhibits Exhibit 1 – Amtrak Task Schedule for Feasibility Studies Exhibit 2 – Stations and Routes Exhibit 3 – Corridor Photographs - Set 1 Exhibit 3 – Corridor Photographs - Set 2 2 I. Introduction and Background This report was prepared by the National Railroad Passenger Corporation (Amtrak) in response to a study request from the Minnesota Department of Transportation (MnDOT) in May 2012. The study’s purpose was to determine the feasibility of adding a “Second Frequency” intercity passenger train service between Chicago Union Station (CUS) and the Minnesota Twin Cities Area, including St.
    [Show full text]
  • West Midlands Railway Urges Snow Hill Customers to Check Journeys Ahead of Timetable Changes
    West Midlands Railway urges Snow Hill customers to check journeys ahead of timetable changes October 19, 2020 Passengers using West Midlands Railway (WMR) services via Birmingham Snow Hill are being urged to check their journeys ahead of a new timetable coming into effect next week (w/c Oct 26). The new timetable formalises temporary arrangements announced last month as the impact of COVID-19 continues to make it difficult for the operator to provide the normal train schedule. The timetable has been brought in to provide a reliable service to passengers on the route, which serves destinations including Stratford-upon-Avon, Worcester and Kidderminster. Peak-time travel and school trains have been prioritised in the new schedule. WMR customer experience director Jonny Wiseman said: “We are committed to providing as many trains as we can with the resources available to meet demand. This new timetable has been designed to provide a simple, straightforward service our customers can rely on. “In recent weeks the impact of COVID-19 has meant we have had to cancel a number of trains on the Snow Hill lines, which we know is frustrating for our customers. “That’s why we have created a new timetable which will reduce the need for short-notice cancellations while still providing a service to match the level of demand on the route. “We will continue to run trains with the maximum possible number of carriages in order to help our customers socially distance while on board.” With cases of COVID-19 increasing and restrictions tightening in some places, WMR is monitoring passenger numbers across the network to provide an appropriate level of service which matches customer demand and takes account of train crew availability.
    [Show full text]
  • PLATFORM Is Published By: the Stourbridge Line User Group, 46 Sandringham Road, Wordsley, Stourbridge, West Midlands, DY8 5HL
    Issue 5 September 2016 Will the rail network around Worcester see improvements in 2023 as proposed in the West Midlands and Chiltern Route Study ? CONTENTS 2 Editor’s Comments 2 Journalism At Its Best 3 The West Midlands and Chiltern Route Study 5 News In Brief 6 The West Midlands Rail Franchise - The Story So Far 8 Committee News PLATFORM is published by: The Stourbridge Line User Group, 46 Sandringham Road, Wordsley, Stourbridge, West Midlands, DY8 5HL - 1 - www.stourbridgelineusergroup.info EDITOR’S COMMENTS Following the Annual General Meeting and Public Meeting, SLUG Chairman Rob Hebron announced that he wished to stand down from full time duties as Chairman, Publicity Officer and Committee member to enable him to find the time to pursue other interests that had taken a back seat due to his SLUG duties. Fortunately for us, Rob will continue to help the SLUG committee in an administrative role, and the fact that you are reading this is due to Rob sending out the current editions of Platform by post and email (and possibly by carrier pigeon if that was necessary). Rob has served on the SLUG Committee for the past 14 years in many roles Rob Hebron (right) with SLUG Treasurer Gary including Secretary, Newsletter Editor and Adams (left) and Mike Wood MP (centre) Publicity Officer, and for the past 8 years has acted as the figurehead for the organisation as Chairman. We wish Rob all the best in his future pursuits, and thank him for the unstinting dedicated work he has put in over the past 14 years.
    [Show full text]
  • 2016 West Midlands Travel Trends Contents
    2016 West Midlands Travel Trends Contents ACHIEVEMENTS A summary of achievements during 2016. REGIONAL POPULATION AND ECONOMIC TRENDS Information on selected topics affecting transport trends. PATRONAGE AND FARES Trends in patronage for bus, rail and Metro. BUS SERVICES Bus Infrastructure; Bus Operators; subsidised Bus Network information for the West Midlands. METRO SERVICES Information on the Metro system in the West Midlands. RAIL SERVICES Information on local rail services. MODAL SPLIT Trends in volumes and type of traffic in central areas of the West Midlands. CUSTOMER SERVICES Communications received by Centro concerning public transport. ENVIRONMENT Increasing the environmental well-being of the West Midlands. SUSTAINABLE TRAVEL 2 CO Initiatives undertaken by the Sustainable Travel Team. CYCLING & WALKING Initiatives undertaken by the Cycling & Walking Team. Achievements New Bromsgrove station opens Bromsgrove’s new £24m railway station was officially opened There was further success for TfWM with a Highly Commended by the town’s MP and Secretary of State for Communities and in the Improvements to Bus Services Award for the Platinum Local Government, Sajid Javid in September. bus project. Mr Javid was joined by representatives from Worcestershire Midland Metro also celebrated a glorious double after County Council, West Midlands Combined Authority scooping two prizes at the prestigious Global Light Rail (WMCA), Network Rail and London Midland, along with other Awards in London. stakeholders, to mark the opening of the new station, which It won Best Customer Initiative for the introduction of became operational to the public on 12 July 2016. contactless payments on to the service and Project of the Year Over €50 million for the opening of the Birmingham City Rail users are now benefitting from a range of improved facilities.
    [Show full text]
  • Train Station Models Building Guide 2018
    Building Guide for Season’s Greenings: All Aboard! 1 Index of buildings and dioramas Biltmore Depot North Carolina Page 3 Metro-North Cannondale Station Connecticut Page 4 Central Railroad of New Jersey Terminal New Jersey Page 5 Chattanooga Train Shed Tennessee Page 6 Cincinnati Union Terminal Ohio Page 7 Citrus Groves Florida Page 8 Dino Depot -- Page 9 East Glacier Park Station Montana Page 10 Ellicott City Station Maryland Page 11 Gettysburg Lincoln Railroad Station Pennsylvania Page 12 Grain Elevator Minnesota Page 13 Grain Fields Kansas Page 14 Grand Canyon Depot Arizona Page 15 Grand Central Terminal New York Page 16 Kirkwood Missouri Pacific Depot Missouri Page 17 Lahaina Station Hawaii Page 18 Los Angeles Union Station California Page 19 Michigan Central Station Michigan Page 20 North Bennington Depot Vermont Page 21 North Pole Village -- Page 22 Peanut Farms Alabama Page 23 Pennsylvania Station (interior) New York Page 24 Pikes Peak Cog Railway Colorado Page 25 Point of Rocks Station Maryland Page 26 Salt Lake City Union Pacific Depot Utah Page 27 Santa Fe Depot California Page 28 Santa Fe Depot Oklahoma Page 29 Union Station Washington Page 30 Union Station D.C. Page 31 Viaduct Hotel Maryland Page 32 Vicksburg Railroad Barge Mississippi Page 33 2 Biltmore Depot Asheville, North Carolina built 1896 Building Materials Roof: pine bark Facade: bark Door: birch bark, willow, saltcedar Windows: willow, saltcedar Corbels: hollowed log Porch tread: cedar Trim: ash bark, willow, eucalyptus, woody pear fruit, bamboo, reed, hickory nut Lettering: grapevine Chimneys: jequitiba fruit, Kielmeyera fruit, Schima fruit, acorn cap credit: Village Wayside Bar & Grille Wayside Village credit: Designed by Richard Morris Hunt, one of the premier architects in American history, the Biltmore Depot was commissioned by George Washington Vanderbilt III.
    [Show full text]