IRRIGATION PROJECT

Location The Project includes 21 subprojects in 9 counties – -, , Istria, Međimurje, Virovitica-, -Baranja, - Srijem, Brod-Posavina and Požega-.

Investment details Total Investment estimate: 192 million EUR (50 million EUR of possible EBRD investment)

Project description The Project is an integral part of implementation of the national (state) strategic plan for irrigation of agricultural surfaces aimed primarily at creating conditions for optimal use of natural resources, i.e. soil and water through rational planning, construction and utilization of irrigation systems. The implementation of the national strategic plan started in 2005, with the preparation of county irrigation plans and development of technical documentation for national irrigation pilot projects and individual irrigation systems. The Project includes construction of 21 irrigation subprojects on approximately 25 000 ha, which would increase the total area under organized irrigation from the present about 15,000 ha to about 40,000 ha. The subprojects' end users are registered agricultural producers, i.e. legal persons (companies), family farms and associations.

Construction Scope of Title/Name of the Location of value of the the Available technical documents for Available permits for Subproject of the the Subproject Subproject the Subproject the Subproject Irrigation Project Subproject (million (ha) EUR) Irrigation Study and Conceptual National Irrigation Pilot Design approx. Project Lower Neretva - 31.50 Preliminary Design 2900 Subsystem Opuzen Environmental Impact Assessment Study Irrigation Study and Conceptual Dubrovnik- National Irrigation Pilot Design Neretva Project Lower Neretva - approx. Preliminary Design County 7.10 Subsystem Koševo - 812 Environmental Impact Assessment Vrbovci Study Prefeasibility Study Preliminary Design approx. Irrigation System Glog 3.80 Environmental Impact Assessment 390 Study Irrigation System approx. Conceptual Design 5.50 Bokanjac-Rašinovac Zadar 475 Irrigation System County approx. 13.70 Vransko polje 2200 Preliminary Design Irrigation System approx. Environmental Impact Assessment 8.90 Poreština - I. Phase 605 Study Istrian Prefeasibility Study County Preliminary Design Irrigation System approx. 10.50 Environmental Impact Assessment Bujiština - I. Phase 550 Study Irrigation System Međimurje approx. 15.10 Prelog-Donji Kraljevec County 2500 Preliminary Design Main Design Irrigation System approx. Location Permit Virovitica- 8.20 Working Design Kapinci-Vaška 1260 Construction Permit Podravina Environmental Management Plan County Feasibility Study Irrigation System approx. Preliminary Design 4.10 Novi Gradac-Detkovac 810 Prefeasibility Study Preliminary Design of the Canal Main Design of the Canal Location Permit Irrigation System Baranja – Preliminary Design of the System for the Canal Lateral Canal Zmajevac - approx. Feasibility Study 12.30 Construction Permit Kneževi Vinogradi + 6036 Environmental Management Plan for the Canal Irrigation System Osijek- Need Assessment Study for

Baranja Environmental Impact Assessment County Study Irrigation System of the approx. Preliminary Design Institute of Agriculture 0.80 210 Prefeasibility Study Osijek Irrigation System approx. Conceptual Design 13.70 Karašica - I. Phase 4050 Preliminary Design Irrigation System of the Main Design Location Permit Secondary School of approx. 52 1.00 Working Design Construction Permit Forestry Vukovar- Environmental Management Plan Feasibility Study Srijem County approx. Preliminary Design Irrigation System Sopot 3.10 737 Prefeasibility Study approx. Preliminary Design Irrigation System Kajiševac 1.60 320 Prefeasibility Study Brod- Conceptual Design Irrigation System approx. Posavina 2.70 Environmental Management Plan Location Permit Orubica - I. Phase 327 County Feasibility Study National Irrigation Pilot Vukovar- Conceptual Design Location Permit Project Biđ- Field – Srijem and Preliminary Design Provisional Supply Irrigation Canal Brod- - 40.00 Main Designs and Working Designs Construction Permit from Section II. to Section Posavina of the Section II. to Section VI. Construction Permit VI. Counties Feasibility Study for Sections I. and II. Preliminary Design Main Design Location Permit Irrigation System Kaptol approx. 70 0.40 Working Design Construction Permit Environmental Management Plan Požega- Feasibility Study Slavonia Irrigation System Preliminary Design County approx. Ramanovci-Bektež - I. 0.55 Main Design Location Permit 368 Phase Prefeasibility Study Irrigation System - approx. Conceptual Design 7.10 Londža 1929

Current Phase of the Project The Project is in different phases of implementation, depending on individual subprojects. Most subprojects are in phases of preparation of different technical documentation.

Available Project Documentation Technical documentation developed for individual subprojects is available (conceptual designs, preliminary designs, main designs, working designs, feasibility studies, environmental impact assessment studies, etc. ). Location and construction permits are obtained for individual subprojects.