Page 1 Bahasa Melayu
Total Page:16
File Type:pdf, Size:1020Kb
English Section Listed below are the designated areas for the planned maintenance work as for May, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 9.00 am to 5.00 pm Perpindahan Kg. Lambak Kanan Jalan 77 from Spg. 58 Monday (For info, Department of Electrical Services will supply Maintenance of Distribution 1 Perpindahan Kg. Lambak Kanan until after Spg. 76 (until house number 105) and the 14th May 2018 temporary electricity to the affected areas through mobile Transformer surrounding area. generator services at the substation) 9.00 am to 5.00 pm Tuesday (For info, Department of Electrical Services will supply Maintenance of Distribution Perpindahan Kg. Lambak Kanan Jalan 11 from Spg. 63 2 Perpindahan Kg. Lambak Kanan 15th May 2018 temporary electricity to the affected areas through mobile Transformer until Spg. 126 and the surrounding area. generator services at the substation) 9.00 am to 5.00 pm Semi-detached STKRJ Kg. Rimba part of Spg. 256-45, Spg. Tuesday (For info, Department of Electrical Services will supply Maintenance of Distribution 3 STKRJ Kg. Rimba 256-45-25, Spg. 256-45-26, Spg. 256-45-26-9 and the 15th May 2018 temporary electricity to the affected areas through mobile Transformer surrounding area. generator services at the substation) Tuesday Replacement of Transformer 4 9.00 am to 5.00 pm Kg Selayun Spg. 80 Kg Selayun and the surrounding area. 15th May 2018 from 500kVA to 1000kVA Tuesday Spg. 409 Jln Pasir Berakas Kg. Lambak and the 5 9.00 am to 5.00 pm Jln Pasir Berakas Kg Lambak Replacement of DFP 1600 15th May 2018 surrounding area. Wednesday Maintenance of high voltage 6 9.00 am to 2.00 pm S/S Main Intake Station Menglait Jalan Menglait Building and the surrounding area. 16th May 2018 11kV equipment Friday S/S Main Intake Station Royal Maintenance of high voltage Gas Station TAIB Beribi, Setia Motor and the surrounding 7 18th May 2018 9.00 am to 2.00 pm Escort 11kV equipment area. TLDB Workshop Area, Class (F) Flat Jln Bunga Mawar, Jeti 06.00 am to 08.00 am Saturday Flotilla 11, 000 Volt Switching Testing work on SCADA TLDB Muara, Sector TLDB Muara, TLDB Headquarter, MRS 8 (For info, Outage Duration will only for 5-15mins. Made 19th May 2018 Station switching system TLDB, Mess Officer, Jeti Belangkas and the surrounding around 06.00 am to 08.00am) area. Dato Md Gassin Primary School Area, Mentiri Mosque, Mentiri Community Hall, Jalan Mentiri #1, Spg. 200 Jln Mentiri #1, Shrimp Pond Phase 1, Mentiri Fire Station, 12.30 am to 02.30 am Pengkalan Sibabau Phase 2, Mentiri Secondary School, Sunday Perumahan Utama Mentiri 11, 000 Testing work on SCADA 9 (For info, Outage Duration will only for 5-15mins. Made Spg. 32, Spg. 5 Jln D P.P Sibabau 4, Spg. 41 Jln D Mentiri 20th May 2018 Volt Switching Station switching system around 12.30 am to 02.30am) Housing, Spg. 65 Terrace Housing, Spg. 41-24, Flat Baru, Flat Lama, Mengkubau Treatment, Tiong Hin / Soon Lee, Mentiri Primary School, Pg Haji Aliudin Building, Spg. 11, Mengkubau Service Reservoir and the surrounding area. 02.30 am to 04.30 am Special Forces Area, Sg. Akar Polis Outdoor, Sg. Akar Sunday Polis Training Quarter 11, 000 Volt Testing work on SCADA 10 (For info, Outage Duration will only for 5-15mins. Made Special Force Complex, RTB Complex, KDN Headquarter, 20th May 2018 Switching Station switching system around 02.30 am to 04.30am) International School Brunei and the surrounding area. Monday St. Andrew School, Hoe Guan Building, Jalan Haji Basir, 11 9.00 am to 2.00 pm Kg. Pusar Ulak Replacement of Feeder Pillar 21st May 2018 Kg. Pusar Ulak and the surrounding area. Wednesday 12 9.00 am to 3.00 pm S/S Kiarong Transfer of Over Head Pole Spg. 152 Kg. Kiarong and the surrounding area. 23rd May 2018 9.00 am to 5.00 pm Thursday (For info, Department of Electrical Services will supply Maintenance of Distribution Jalan Sg. Akar Spg. 350 Desa Permai, Spg. 378 and DST 13 Sg. Akar 24th May 2018 temporary electricity to the affected areas through mobile Transformer Tower Sg. Akar and the surrounding area, generator services at the substation) 9.00 am to 5.00 pm Saturday (For info, Department of Electrical Services will supply Maintenance of Distribution Kg. Subok from Spg. 247 until Spg. 287 include Spg. 261 14 Kg. Subok 26th May 2018 temporary electricity to the affected areas through mobile Transformer and the surrounding area. generator services at the substation) E-Government Area, Kg. Mata-Mata, Royal Thai Embassy, Scout Headquarters, Mata-Mata Complex, Land Transport, Kg. Mata-Mata Mosque, Perpindahan Mata-Mata, Kampung 6.00 am to 9.00 am Sunday Gadong (GM6) 11, 000 Volt Testing work on SCADA Katok 'B', Mata-Mata Primary School, The Mall, Abdul 15 (For info, Outage Duration will only for 5-15mins. Made 27th May 2018 Switching Station switching system Razak Complex Gadong, Batu Bersurat Shopping around 6.00 am to 9.00 am) Complex, Gadong Properties, Sungai Gadong, Gadong Sentral, Wisma Haian, Kumbang Pasang Building and the surrounding area. Orang Kaya Besar Imas Area, Kg. Anggerek Desa, Jalan 12.30 am to 02.30 am Delima Dua, Jalan Kebangsaan Lama, Jalan Sg. Akar, GRU Monday Manggis 66, 000 Volt Switching Testing work on SCADA 16 (For info, Outage Duration will only for 5-15 mins. Made Sg. Akar, Sg. Akar Polis, RTB Complex, Airport 28th May 2018 Station switching system around 12.30 am to 02.30 am) Commercial Centre, Kg. Manggis, KDN Headquarters, Spg. 564 Subok, Sg. Akar Sentral and the surrounding Area. 9.00 am to 5.00 pm Monday (For info, Department of Electrical Services will supply Maintenance of Distribution Perpindahan Kampung Rimba Jalan 3 after Spg 91 until 17 Perpindahan Kampung Rimba 28th May 2018 temporary electricity to the affected areas through mobile Transformer Spg. 153 and the surrounding area. generator services at the substation) 9.00 am to 5.00 pm Tuesday (For info, Department of Electrical Services will supply Maintenance of Distribution Kg. Kapok Jalan Muara from Spg. 198 until Spg. 278 18 Kg. Kapok 29th May 2018 temporary electricity to the affected areas through mobile Transformer include Spg. 240 Kg. Meragang and the surrounding area. generator services at the substation) 9.00 am to 5.00 pm Upgrading (capacity) of Jalan Lumapas from Spg. 434 until Spg. 558 Kg. Panchor Tuesday (For info, Department of Electrical Services will supply 19 Kg Lumapas Distribution Transformer & and apart of Kg. Kilugus include Disposal of Rubbish 29th May 2018 temporary electricity to the affected areas through mobile Distribution Feeder Pillar place Kg. Lumapas and the surrounding area. generator services at the substation) Bomba Anggerek Desa Headquarters Area, Airport Lama Government Department Complex, Sports Club, Yayasan 12.30 am to 03.30 am Utama Gadong Power Station 2 Office, Spg. 153 ASSIBA (Shahreza Apartment), Spg. 145, Wednesday Testing work on SCADA 20 (For info, Outage Duration will only for 5-15 mins. Made (Siemens) 11, 000 Volt Switching Soon Lee Apartment, Hj Yakob Building, Spg. 80 30th May 2018 switching system around 12.30 am to 03.30 am) Station Pangkalan Gadong, Kg. Menglait, Tungku Link, Kg. Katok, Kg. Tungku, Jalan Dato Ratna Kiarong, Beribi Industry and the surrounding area. Listed below are the designated areas for the planned maintenance work as for June, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 9.00 am to 5.00 pm Upgrading (capacity) of Kampung Lumapas from Spg. 434 until Spg. 558 include Saturday (For info, Department of Electrical Services will supply 1 Kg. Lumapas Distribution Transformer & Disposal of Rubbish place Kg. Lumapas and the 02nd June 2018 temporary electricity to the affected areas through mobile Distribution Feeder Pillar surrounding area. generator services at the substation) 9.00 am to 5.00 pm Monday (For info, Department of Electrical Services will supply Maintenance of Distribution Perpindahan Kampong Rimba Jalan 60 from Spg. 74 until 2 Perpindahan Kg. Rimba 04th June 2018 temporary electricity to the affected areas through mobile Transformer Spg. 96 and the surrounding area. generator services at the substation) 9.00 am to 5.00 pm Bandar Seri Begawan : Jalan Padang Raja Isteri Building, Tuesday (For info, Department of Electrical Services will supply Maintenance of Distribution 3 Bandar Seri Begawan & Aman Merdeka Building, Jalan Tasek : Sentosa Building 05th June 2018 temporary electricity to the affected areas through mobile Transformer and building in the surrounding area. generator services at the substation) 9.00 am to 5.00 pm Thusrday (For info, Department of Electrical Services will supply Maintenance of Distribution Perpindahan Lambak Kanan Jalan 11 from Spg. 63 until 4 Perpindahan Lambak Kanan 07th June 2018 temporary electricity to the affected areas through mobile Transformer Spg. 126 and the surrounding area. generator services at the substation) 9.00 am to 5.00 pm Kampung Masin after Spg. 633 until Spg. 763 include Spg. Saturday (For info, Department of Electrical Services will supply Maintenance of Distribution 1, Masin Primary School, Kg. Masin Mosque & Traffic Light 5 Kampung Masin 09th June 2018 temporary electricity to the affected areas through mobile Transformer J83, Jalan Bengkurong Masin from Spg. 502 until Spg. 554 generator services at the substation) and the surrounding area. Page 1 Bahasa Melayu Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan Mei, 2018: Bil. Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Terjejas Pemotongan Bekalan Elektrik 9.00 pagi hingga 5.00 petang (Untuk makluman, JPE akan membekalkan sementara Perpindahan Kg.