Agenda Procedure Item (6)
Total Page:16
File Type:pdf, Size:1020Kb
Agenda Procedure Item (6) Village of Kaslo: Circulation Package for 2013.11.12 Page 1 RDCK Kaslo Firehall Press Release Page 3 CARO Water Reports Page 8 Letter dated 2013.10.25 from the Ministry of Environment (MMBC) Page 11 Kaslo Campground Revenue Statistics 2013 Page 12 West Kootenay Human-Bear Conflict Group Page 14 UBCM Recycling Negotiating Committee Circular Page 18 CARO Water Reports Page 27 IHA Flu Clinics Circular Page 30 Letter dated 2013.10.22 from The Living Garden Page 31 Letter dated 2013.10.18 from Neil Muth (CBT) Page 35 BC Food Systems Network Circular Page 37 Letter dated 2013.11.04 from the Hon. Stephanie Cadieux Page 38 Outgoing Village correspondence for information Page 42 Letter dated 2013.11.04 from Deane Thornton 1 REGIONAL DISTRICT OF CENTRAL KOOTENAY MEDIA RELEASE NELSON, BC For Immediate Release November 1, 2013 Broken Ground— Construction to Begin on Kaslo’s Emergency Services Building KASLO, BC—In a ground-breaking ceremony this morning, the RDCK, the Village of Kaslo and the Kaslo Fire Department celebrated the start of construction on the new Kaslo Emergency Services Building. "After a decade of discussion I am really glad we have broken ground on the new fire hall,” said Andy Shadrack, RDCK Director for Electoral Area D. That sentiment is shared by Kaslo Mayor Greg Lay who said: “Let’s ‘git-r-done!” The Regional District of Central Kootenay awarded the contract for phase one of the project to ENCAN Construction of Kelowna. ENCAN's construction foreman, Greg Stone of Rossland, has contracted two local heavy equipment contractors for excavation work and has hired three local area carpenters. Mr. Stone said that ENCAN will make every effort to hire local workers. He also intends on purchasing much of the required building supplies locally. The emergency services building will be constructed in two phases. Phase one, which is forecast to be complete in March 2014, will take the building to 'lock up’ (framing, flooring, walls, roofing, piping, electrical service, and doors). The remainder of the project (phase two) will include the installation of Gyprock, electrical, mechanical, plumbing, heating, finishing, air supply, furnishings, etc., with each element being bid out separately and the works being managed by a project superintendent hired by the RDCK. The RDCK is excited about this project and will keep the public posted on its progress. - 30 - For more information: Terry Swan Regional Fire Chief Regional District of Central Kootenay 250.352.1507 Photo on next page… Representing Diverse Communities in the Kootenays | 1.800.268.7325 | www.rdck.bc.ca Page 1 2 Left to right: Mike Penczak - Carpenter; Greg Stone - ENCAN Construction Superintendent; Franz Kocher - Captain KFD; Greg Lay - Kaslo Mayor; Orion Cooper - Captain KFD; Andy Shadrack - RDCK Director Area D; Doug Yee - Assistant Chief KFD;Jim Holland - Kaslo Councillor; Larry Badry - Chief KFD Representing Diverse Communities in the Kootenays | 1.800.268.7325 | www.rdck.bc.ca Page 2 3 WORK ORDER 3101727 LOGIN NOTICE CLIENT Kaslo, Village of PO NUMBER QUOTATION ID Kaslo Master Bid PROJECT Drinking Water SUBMITTED BY PROJECT INFO [none] COC NUMBER Req Receipt Details: RECEIVED / TEMP Oct-30-13 09:50 / 8°C LOGGED IN Oct-30-13 10:24 LAB LOCATION Kelowna LOGGED IN BY Tanya Howard PROJECT MGR Jennifer Shanko, AScT REPORT DUE Nov-06-13 17:00 (5 day TAT) Sample Condition Summary: Broken Container(s) No No Sampling Date(s) No Incorrect Cont./Pres. No Holding Time Violation No Custody Seals Broken No Sample(s) Frozen No Note: Sample transport temperatures of less than 8°C for microbiological parameters and less than or equal to 10°C for environmental parameters is recommended. Samples that exceed these values will still be processed. However, please note that the analytical results may be affected, especially for samples collected prior to the day of receipt. Additional Comments: Report Content: REPORT TO Kaslo, Village of INVOICE TO Kaslo, Village of PO Box 576 PO Box 576 Kaslo, BC V0G 1M0 Kaslo, BC V0G 1M0 T: 1-250-353-2311 / F: 1-250-353-7767 T: 1-250-353-2311 / F: 1-250-353-7767 ATTENTION Neil Smith ATTENTION Carol Hughes Reporting Options: Include QC: No Extras: Guidelines Fax Initial Copy: No Monthly Invoicing: No Delivery Plan: Email Email Email Email Mail Contact Name Email EDD Format CC to Login RPT EDD INV Copy Neil Smith [email protected] ü Carol Hughes [email protected] ü Neil Smith [email protected] ü [email protected] [email protected] Please verify that all of the information included in this Login Notice is correct. If there are any errors, omissions, or concerns, please contact us at (250) 765-9646. You can expect to receive the analytical report via email on or after the due date shown above. Thank you for using CARO! CARO Analytical Services Printed: 10/30/2013 12:55:31PM Page 1 of 3 Rev 10/17/13 Page 1 of 3 4 WORK ORDER 3101727 LOGIN NOTICE CLIENT Kaslo, Village of RECEIVED Oct-30-13 PROJECT Drinking Water REPORT DUE Nov-06-13 Analysis / Version Expires Status Comments Sample ID: End of Distribution (3101727-01) [Water] Sampled: Oct-29-13 11:15 Container(s) Submitted: A = 300 mL PET - Sterile w/ Na2S2O3 Total Coliforms & E. coli (MF) Pkg Oct-30-13 [Group] Packages and their respective Analyses included in this Work Order: Total Coliforms & E. coli (MF) Pkg E. coli (by CCA) Total Coliforms (by CCA) Each Analysis/Version consists of the following Analytes and their respective Reporting Limits (RLs): Analysis: E. coli (by CCA) Matrix: Water Prep Ref: N/A Analysis Ref: APHA 9222 * Units: CFU/100mL E. coli; RL = 1 Analysis: Total Coliforms (by CCA) Matrix: Water Prep Ref: N/A Analysis Ref: APHA 9222 * Units: CFU/100mL Coliforms, Total; RL = 1 Note: RLs on Final Report may be higher than expected due to: 1) limited sample volume, 2) high moisture, 3) analytical interferences CARO Analytical Services Printed: 10/30/2013 12:55:31PM Page 2 of 3 Rev 10/17/13 Page 2 of 3 5 Page 3 of 3 6 WORK ORDER 3110275 LOGIN NOTICE CLIENT Kaslo, Village of PO NUMBER QUOTATION ID Kaslo Master Bid PROJECT Drinking Water SUBMITTED BY PROJECT INFO [none] COC NUMBER no number Receipt Details: RECEIVED / TEMP Nov-06-13 09:45 / 9°C LOGGED IN Nov-06-13 10:27 LAB LOCATION Kelowna LOGGED IN BY Kristin McKeown PROJECT MGR Jennifer Shanko, AScT REPORT DUE Nov-14-13 17:00 (5 day TAT) Sample Condition Summary: Broken Container(s) No No Sampling Date(s) No Incorrect Cont./Pres. No Holding Time Violation No Custody Seals Broken No Sample(s) Frozen No Note: Sample transport temperatures of less than 8°C for microbiological parameters and less than or equal to 10°C for environmental parameters is recommended. Samples that exceed these values will still be processed. However, please note that the analytical results may be affected, especially for samples collected prior to the day of receipt. Additional Comments: Report Content: REPORT TO Kaslo, Village of INVOICE TO Kaslo, Village of PO Box 576 PO Box 576 Kaslo, BC V0G 1M0 Kaslo, BC V0G 1M0 T: 1-250-353-2311 / F: 1-250-353-7767 T: 1-250-353-2311 / F: 1-250-353-7767 ATTENTION Neil Smith ATTENTION Carol Hughes Reporting Options: Include QC: No Extras: Guidelines Fax Initial Copy: No Monthly Invoicing: No Delivery Plan: Email Email Email Email Mail Contact Name Email EDD Format CC to Login RPT EDD INV Copy Neil Smith [email protected] ü Carol Hughes [email protected] ü Neil Smith [email protected] ü [email protected] [email protected] Please verify that all of the information included in this Login Notice is correct. If there are any errors, omissions, or concerns, please contact us at (250) 765-9646. You can expect to receive the analytical report via email on or after the due date shown above. Thank you for using CARO! CARO Analytical Services Printed: 11/6/2013 3:27:12PM Page 1 of 2 Rev 10/17/13 Page 1 of 2 7 WORK ORDER 3110275 LOGIN NOTICE CLIENT Kaslo, Village of RECEIVED Nov-06-13 PROJECT Drinking Water REPORT DUE Nov-14-13 Analysis / Version Expires Status Comments Sample ID: End of Distribution (3110275-01) [Water] Sampled: Nov-05-13 11:00 Container(s) Submitted: A = 300 mL PET - Sterile w/ Na2S2O3 Total Coliforms & E. coli (MF) Pkg Nov-06-13 [Group] Packages and their respective Analyses included in this Work Order: Total Coliforms & E. coli (MF) Pkg E. coli (by CCA) Total Coliforms (by CCA) Each Analysis/Version consists of the following Analytes and their respective Reporting Limits (RLs): Analysis: E. coli (by CCA) Matrix: Water Prep Ref: N/A Analysis Ref: APHA 9222 * Units: CFU/100mL E. coli; RL = 1 Analysis: Total Coliforms (by CCA) Matrix: Water Prep Ref: N/A Analysis Ref: APHA 9222 * Units: CFU/100mL Coliforms, Total; RL = 1 Note: RLs on Final Report may be higher than expected due to: 1) limited sample volume, 2) high moisture, 3) analytical interferences CARO Analytical Services Printed: 11/6/2013 3:27:12PM Page 2 of 2 Rev 10/17/13 Page 2 of 2 8 October 25, 2013 Gary MacIsaac Executive Director Union of BC Municipalities Suite 60-10551 Shellbridge Way Richmond BC V6X 2W9 Dear Mr. MacIsaac: Thank you for your phone call of October 10, 2013, regarding the new Union of BC Municipalities (UBCM) resolution and committee on packaging and printed paper (PPP) product stewardship. I appreciate the work that UBCM and its staff have done to assist local governments with the transition to industry responsibility for PPP product stewardship.