Replies to Initial Written Questions Raised by Finance Committee Members in Examining the Estimates of Expenditure 2013-14
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
List of Recognized Villages Under the New Territories Small House Policy
LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN, -
Minutes of 647Th Meeting of the Rural and New Town Planning Committee Held at 9:00 A.M
TOWN PLANNING BOARD Minutes of 647th Meeting of the Rural and New Town Planning Committee held at 9:00 a.m. on 26.5.2020 Present Director of Planning Chairman Mr Raymond K.W. Lee Mr Stephen L.H. Liu Vice-chairman Mr Peter K.T. Yuen Mr Philip S.L. Kan Mr K.K. Cheung Dr C.H. Hau Miss Winnie W.M. Ng Mr L.T. Kwok Mr K.W. Leung Dr Jeanne C.Y. Ng Mr Ricky W.Y. Yu Dr Venus Y.H. Lun Mr Y.S. Wong - 2 - Chief Traffic Engineer/New Territories East, Transport Department Mr Ken K.K. Yip Chief Engineer (Works), Home Affairs Department Mr Gavin C.T. Tse Principal Environmental Protection Officer (Strategic Assessment), Environmental Protection Department Mr K.H. To Assistant Director/Regional 3, Lands Department Mr Alan K.L. Lo Deputy Director of Planning/District Secretary Miss Fiona S.Y. Lung Absent with Apologies Dr Lawrence K.C. Li Mr Conrad T.C. Wong In Attendance Assistant Director of Planning/Board Ms Lily Y.M. Yam Chief Town Planner/Town Planning Board Ms Caroline T.Y. Tang Town Planner/Town Planning Board Ms Anita M.Y. Wong - 3 - Opening Remarks 1. The Chairman said that the meeting would be conducted with video conferencing arrangement. Agenda Item 1 Matters Arising [Open Meeting] 2. The Secretary reported that there were no matters arising. Sai Kung and Islands District Agenda Item 2 Section 12A Application [Open Meeting (Presentation and Question Sessions only)] Y/SK-HC/4 Application for Amendment to the Approved Ho Chung Outline Zoning Plan No. -
OFFICIAL RECORD of PROCEEDINGS Wednesday, 16
LEGISLATIVE COUNCIL ─ 16 October 2013 483 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 16 October 2013 The Council met at Eleven o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE JASPER TSANG YOK-SING, G.B.S., J.P. THE HONOURABLE ALBERT HO CHUN-YAN THE HONOURABLE LEE CHEUK-YAN THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE CHAN KAM-LAM, S.B.S., J.P. THE HONOURABLE LEUNG YIU-CHUNG THE HONOURABLE EMILY LAU WAI-HING, J.P. THE HONOURABLE TAM YIU-CHUNG, G.B.S., J.P. THE HONOURABLE ABRAHAM SHEK LAI-HIM, G.B.S., J.P. THE HONOURABLE TOMMY CHEUNG YU-YAN, S.B.S., J.P. THE HONOURABLE FREDERICK FUNG KIN-KEE, S.B.S., J.P. THE HONOURABLE VINCENT FANG KANG, S.B.S., J.P. THE HONOURABLE WONG KWOK-HING, B.B.S., M.H. 484 LEGISLATIVE COUNCIL ─ 16 October 2013 PROF THE HONOURABLE JOSEPH LEE KOK-LONG, S.B.S., J.P., Ph.D., R.N. THE HONOURABLE JEFFREY LAM KIN-FUNG, G.B.S., J.P. THE HONOURABLE ANDREW LEUNG KWAN-YUEN, G.B.S., J.P. THE HONOURABLE WONG TING-KWONG, S.B.S., J.P. THE HONOURABLE RONNY TONG KA-WAH, S.C. THE HONOURABLE CYD HO SAU-LAN THE HONOURABLE STARRY LEE WAI-KING, J.P. DR THE HONOURABLE LAM TAI-FAI, S.B.S., J.P. THE HONOURABLE CHAN HAK-KAN, J.P. THE HONOURABLE CHAN KIN-POR, B.B.S., J.P. DR THE HONOURABLE PRISCILLA LEUNG MEI-FUN, S.B.S., J.P. DR THE HONOURABLE LEUNG KA-LAU THE HONOURABLE CHEUNG KWOK-CHE THE HONOURABLE WONG KWOK-KIN, B.B.S. -
Minutes of 1085Th Meeting of the Town Planning Board Held on 15.5.2015 Present Permanent Secretary for Development Chairman
Minutes of 1085th Meeting of the Town Planning Board held on 15.5.2015 Present Permanent Secretary for Development Chairman (Planning and Lands) Mr Thomas T.M. Chow Mr Stanley Y.F. Wong Vice-Chairman Mr Roger K.H. Luk Professor S.C. Wong Professor P.P. Ho Professor Eddie C.M. Hui Dr C.P. Lau Ms Julia M.K. Lau Ms Anita W.T. Ma Dr W.K. Yau Ms Bonnie J.Y. Chan Professor K.C. Chau Mr H.W. Cheung Dr Wilton W.T. Fok - 2 - Mr Ivan C.S. Fu Mr Lincoln L.H. Huang Ms Janice W.M. Lai Mr Patrick H.T. Lau Ms Christina M. Lee Mr H. F. Leung Mr Stephen H.B. Yau Mr F.C. Chan Mr Frankie W.C. Yeung Mr David Y.T. Lui Mr Peter K.T. Yuen Mr Philip S.L. Kan Dr Lawrence W.C. Poon Deputy Director of Environmental Protection (1) Mr C.W. Tse Assistant Director (2), Home Affairs Department Miss Charmaine H.W. Wong Principal Assistant Secretary (Transport) Transport and Housing Bureau Miss Winnie M.W. Wong Director of Lands Ms Bernadette H.H. Linn Director of Planning Mr K.K. Ling - 3 - Deputy Director of Planning/District Secretary Mr Raymond K.W. Lee Absent with Apologies Mr Clarence W.C. Leung Mr Laurence L.J. Li Mr Sunny L.K. Ho Mr Dominic K.K. Lam In Attendance Assistant Director of Planning/Board Miss Fiona S.Y. Lung Chief Town Planner/Town Planning Board Ms Lily Y.M. Yam (Items 1 to 8) Mr Louis K.H. -
C Location of Project N N (Lai Chi Wo) Figure
DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE. »¿?? ALL RIGHTS RESERVED. So Lo Pun Pier c OVE ARUP & PARTNERS HONG KONG LIMITED. LEGEND M W N H PROPOSED WORKS AREA » 0 96.3 Graves 5 PROPOSED NEW PIER 1 »¿ 0 » 0 SIU NIM CHAU 5 Ruin 21.0 EXISTING LAI CHI WO 50 PIER TO BE RETAINED 0 10 5 TEMPORARY PIER 0 118.0 PLOVER COVE COUNTRY PARK M W H MARINE PARK 86.0 »¿ 92.7 SITE OF SPECICAL SCIENTIFIC 50 Ap Tau Pai INTEREST (SSSI) 80.5 »¿ »¿ Kau Lo Tau SITE OF ARCHAEOLOGICAL INTEREST » PAK KOK WAN 103.6 0 0 0 1 0 SHAN O 1 11.6 LAI CHI WO SPECIAL AREA 0 5 » 3.7 0 5 » GRADED HISTORIC BUILDING FUN CHAU »¿ Pak Sha Tau »¿ HW M M 0 W 10 Kau Ma Shek H » 0 »¿ M 1 HW » 43.3 0 10 15 LO CHI PAI a 21.0 e r 19.2 A y k c »¿? o R 10 Pak Sha Tau Tsui » PLOVER COVE COUNTRY PARK 90.2 TABLE ISLAND 220.6 50 0 5 200 224.6 » » Graves Ruin 50 1 »¿ Lan Shuen Pai T 100 S IN 50 G »¿ » C Jetty YAN CHAU TONG H PAN PUI TENG » A » ¿ 220.3 MARINE PARK U L n 32.3 E g 0 »¿ 5 K H » d W . Chung Wan Tsui 1 M 0 t HWM 24.1 c e » j » o r »¿ 10.1 » P Liu Ko Ngam 0 H 15 Ruin W f M o 4.3 » 50 HIP TIN TEMPLE & » Ruin n o HOK SHAN MONASTERY i t » » 86.3 a 1 Ruin (GRADE 3) 0 c »¿ »¿ M 00 W o 1 Lai Chi Wo WONG NAI CHAU H L » LAI CHI WO - LAI CHI WO 0 1 » 5 . -
Field Study of Lai Chi Wo River Handbook for Tour Guides
Field Study of Lai Chi Wo River Handbook for Tour Guides Content Page 1. Notes to Field Study of Rivers 2 2. Lai Chi Wo River and the fieldwork sites 3 3. About Lai Chi Wo River 4 4. Ecology 6 5. Cultural Heritage 7 6. Fieldwork site A: Estuary 8 7. Fieldwork site B: Lai Chi Wo Hakka Walled Village 10 8. Fieldwork site C: Fung Shui Wood 12 9. Fieldwork site D: Chu Mun Tin (Fei Keng Stream) 14 10. Fieldwork site E: Weir 16 11. Fieldwork site F: Coastal Heritiera and Derris Forest 18 12. Fieldwork site G: Viewing Point 20 Field Study of Lai Chi Wo River: Handbook for Tour Guides 1 1 Notes to Field Study of Rivers Safety Measures 1. Wear long-sleeved shirts and trousers to prevent mosquito bites and cuts caused by plants; 2. Wear slip-resistant shoes; and 3. Leave the vicinity of the river immediately if there is a sudden rise of the water level or an increase in the turbulence and turbidity of the stream flow. Code of conduct 1. Protect the countryside and its natural landscapes, do not pollute rivers and litter; 2. Do not disturb vegetation, wildlife and their living environment; 3. Respect villagers, do not damage private properties, crops and livestock. Field Study of Lai Chi Wo River: Handbook for Tour Guides 2 2 Lai Chi Wo River and the fieldwork sites Map 2.1: Lai Chi Wo River and the fieldwork sites The fieldwork sites (refer to 2.1) A • Estuary (河口) B • Lai Chi Wo Hakka Walled Village (荔枝窩客家圍村) C • Fung Shui Wood (風水林) D • Chu Mun Tin (Fei Keng Stream) (珠門田 (飛頸河)) E • Weir (水堰) F • Coastal Heritiera and Derris Forest (銀葉古林及白花魚藤) G • Viewing Point (觀景台) Field Study of Lai Chi Wo River: Handbook for Tour Guides 3 3 About Lai Chi Wo River 1. -
New Territories Urban Route No. 74A TAI WO to KWUN TONG FERRY
L. S. NO. 2 TO GAZETTE NO. 12/2001L.N. 71 of 2001 B463 New Territories Urban Route No. 74A TAI WO to KWUN TONG FERRY: via Po Nga Road, Ting Kok Road, On Chee Road, On Cheung Road, Po Heung Bridge, Po Heung Street, Plover Cove Road, Nam Wan Road, Kwong Fuk Road, Wan Tau Street, Nam Wan Road, Tat Wan Road, Wan Tau Tong Estate Bus Terminus, Tat Wan Road, Nam Wan Road, Tai Po Road, Yuen Wo Road, Fo Tan Road, *(Tai Chung Kiu Road, Lion Rock Tunnel Road), Lion Rock Tunnel, Lung Cheung Road, Po Kong Village Road Interchange, Po Kong Village Road, Choi Hung Road, Choi Hung access road, Prince Edward Road East, Kwun Tong Road, Hoi Yuen Road and Kwun Tong Ferry Concourse access road. * Journeys may be diverted via Tai Chung Kiu Road, Che Kung Miu Road, Hung Mui Kuk Road and Lion Rock Tunnel Road non-stop during 7.30 a.m. to 9.30 a.m. and during 4.00 p.m. to 7.00 p.m. on days except Sundays and public holidays depending on traffic condition. KWUN TONG FERRY to TAI WO: via Wai Yip Street, King Yip Street, *(Cha Kwo Ling Road, Lei Yue Mun Road,) Kwun Tong Road, Lung Cheung Road, Hammer Hill Road, Choi Hung Road, Choi Hung Temporary Bus Terminus, Choi Hung Road, Hammer Hill Road, Lung Cheung Road, Lion Rock Tunnel, Lion Rock Tunnel Road, Tai Chung Kiu Road, Fo Tan Road, Yuen Wo Road, Tai Po Road, Nam Wan Road, Tat Wan Road, Wan Tau Tong Estate Bus Terminus, Tat Wan Road, Nam Wan Road, Wan Tau Street, Heung Sze Wui Street, Po Heung Street, Po Heung Bridge, On Cheung Road, On Chee Road, Ting Kok Road, Tai Po Tai Wo Road and Po Nga Road. -
Your Guide to Services in Hong Kong
YOUR GUIDE TO SERVICES IN HONG KONG English Version (Sixth Edition) HOME AFFAIRS BUREAU June 2005 Updated Edition We take pleasure in presenting the sixth edition of this Guidebook. This edition includes information that we hope will be just as useful to foreign domestic helpers, migrant workers, Hong Kong residents from other Southeast and South Asian countries. Many individuals and organisations - both within and outside the Government - contributed to the updating process. We take this opportunity to thank them. Since publishing the first edition of the English version of this Guidebook in December 1998, we have received many helpful comments and valuable suggestions from readers and support groups on ways to improve the contents. We hope that readers will continue this feedback and alert us to any outdated information. Since our aim is to ensure that the Guidebook remains useful and up-to-date and that each new edition is better than the last, we welcome your ideas. Kindly call us on 2835-1579 or contact us by - • fax: 2121-1716 • e-mail: [email protected] • mail: Race Relations Unit, Home Affairs Bureau, 31/F, Southorn Centre, 130 Hennessy Road, Wan Chai. Home Affairs Bureau June 2005 ○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○ Contents ○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○ 1. Introduction …………………...……… 1 5. Getting Around Hong Kong ........... 41-48 MTR 2. Arriving in Hong Kong ......................2-5 KCRC Immigration KCR East Rail Customs KCR Ma On Shan Rail Getting into town KCR West Rail KCR Light Rail 3. ID Cards and Visas ........................... 6-11 Franchised bus services Applying for a Hong Kong ID card Minibuses At the Registration of Persons Office Trams Caring for your ID card Ferries When will my visa expire? Taxis Re-entry into Hong Kong Concessionary fares on public transport How do I renew my employment visa in Hong Kong? 6. -
Shatin to Central Link Tuen Ma Line
Latest News Shatin to Central Link Holistic Assessment and Verification Works of Hung Hom Station Completed Hung Hom to Admiralty Section The safety and quality of railway projects has always been a top priority for the MTR Corporation. The Corporation has completed a holistic assessment and verification for Hung Hom Station Extension and its adjacent structures, which include the review of construction records, September structural assessment, as well as the earlier opening-up investigation at the platform slabs of Hung Hom Station. The two final reports for the assessment and verification works concluded that Hung Hom Station is structurally safe for the purpose of the Phased Opening of Tuen Ma Line ongoing construction activities and suitable measures can be implemented for some locations with deficiencies, including thickening the slabs and installing additional reinforcement at certain locations. The final reports have been accepted by Government. The Corporation will also covering Hin Keng, Diamond Hill and Kai Tak stations develop a long-term monitoring plan to continuously monitor the integrity of the station structure. Conclusions of the Holistic Assessment Tuen Ma Line Phase 1 Wu Kai Sha Tuen Mun Tai Wai 大圍 Hin Station structure is safe for Implement suitable 顯徑 Diamond Hill Develop long-term Keng the purpose of the ongoing measures for locations with 鑽石山 monitoring system construction activities workmanship deficiencies 啟德 Target to open Kai Tak Restoring Public Confidence in Q1 2020 紅磡 in Railway Projects 紅磡 The MTR Corporation will develop the detailed design of the suitable railway connecting measures. When the design is accepted by Government, we will strictly New implement the required suitable measures to ensure that the safety the New Territories and Kowloon East 金鐘 levels required in the relevant code of practice issued by the Buildings To provide residents with more convenient and Department and the requirements under the SCL contract are met. -
Recommended District Council Constituency Areas
District : Sha Tin Recommended District Council Constituency Areas +/- % of Population Estimated Quota Code Recommended Name Boundary Description Major Estates/Areas Population (17,282) R01 Sha Tin Town Centre 21,347 +23.52 N Tung Lo Wan Hill Road, To Fung Shan Road 1. HILTON PLAZA 2. LUCKY PLAZA Tai Po Road - Sha Tin 3. MAN LAI COURT NE Sha Tin Rural Committee Road 4. NEW TOWN PLAZA 5. PEAK ONE E Sha Tin Rural Committee Road 6. PRISTINE VILLA Sand Martin Bridge 7. SCENERY COURT Shing Mun River Channel 8. SHA TIN CENTRE 9. SHATIN PLAZA SE Sand Martin Bridge 10. TUNG LO WAN Shing Mun River Channel, Lek Yuen Bridge 11. WAI WAH CENTRE Lion Rock Tunnel Road S Shing Mun River Channel SW Shing Mun River Channel Shing Chuen Road, Tai Po Road - Tai Wai W Tai Po Road – Tai Wai Shing Mun Tunnel Road NW Shing Mun Tunnel Road Tung Lo Wan Hill Road R1 District : Sha Tin Recommended District Council Constituency Areas +/- % of Population Estimated Quota Code Recommended Name Boundary Description Major Estates/Areas Population (17,282) R02 Lek Yuen 13,050 -24.49 N Fo Tan Road 1. HA WO CHE 2. LEK YUEN ESTATE NE Fo Tan Road, MTR (East Rail Line) 3. PAI TAU Lok King Street, Nullah, Sha Tin Road 4. SHEUNG WO CHE 5. WO CHE ESTATE (PART) : E Tai Po Road - Sha Tin, Fung Shun Street King Wo House Wo Che Street, Shing Mun River Channel 6. YAU OI TSUEN SE Shing Mun River Channel S Shing Mun River Channel Sand Martin Bridge Sha Tin Rural Committee Road Tai Po Road - Sha Tin, To Fung Shan Road SW To Fung Shan Road, Tung Lo Wan Hill Road W To Fung Shan Road NW To Fung Shan Road R2 District : Sha Tin Recommended District Council Constituency Areas +/- % of Population Estimated Quota Code Recommended Name Boundary Description Major Estates/Areas Population (17,282) R03 Wo Che Estate 18,586 +7.55 N Tai Po Road - Sha Tin, Fo Tan Road 1. -
Authorization for Temporary Closure of Sections of the Road Adjacent to Mtr Che Kung Temple Station, Che Kung Miu Road, on Muk Street and on Ming Street
RAILWAYS ORDINANCE (Chapter 519) (Order under section 22(1)) SHATIN TO CENTRAL LINK AUTHORIZATION FOR TEMPORARY CLOSURE OF SECTIONS OF THE ROAD ADJACENT TO MTR CHE KUNG TEMPLE STATION, CHE KUNG MIU ROAD, ON MUK STREET AND ON MING STREET In exercise of the powers delegated by the Secretary for Transport and Housing, I, by this order made under section 22(1)(a) of the Railways Ordinance (Chapter 519), authorize:– (I) the temporary partial closure of the section of the road adjacent to MTR Che Kung Temple Station between its two junctions with Che Kung Miu Road; and the section of Che Kung Miu Road near its junction with Sha Tin Tau Road (near Entrance B of the MTR Che Kung Temple Station), as delineated and shown in red and purple respectively on the Plan numbered SCL/G39/0017/1, and (II) the temporary partial closure of the section of On Muk Street between a point about 10 metres southeast of its junction with On Kwan Street and a point about 30 metres southeast of its junction with On Ming Street; and the section of On Ming Street between a point about 20 metres northeast of its junction with On Muk Street and a point about 20 metres southwest of the junction, as delineated and shown in blue and yellow respectively on the Plan numbered SCL/G42/0017/1, during the period from 10 May 2013 to 9 May 2014. I further declare under section 22(1)(c) that during the period from 10 May 2013 to 9 May 2014, all public or private rights in, upon, under or over the sections of the roads as described above shall be extinguished, modified or restricted, as the case may be. -
RNTPC Paper No. Y/ST/42B for Consideration by the Rural and New Town Planning Committee on 4.12.2020
RNTPC Paper No. Y/ST/42B For Consideration by the Rural and New Town Planning Committee on 4.12.2020 APPLICATION FOR AMENDMENT OF PLAN UNDER SECTION 12A OF THE TOWN PLANNING ORDINANCE APPLICATION NO. Y/ST/42 Applicant : Ku Ngam Ching Yuen Limited represented by Vision Planning Consultants Limited Plan : Approved Sha Tin Outline Zoning Plan (OZP) No. S/ST/34 Site : Lots No. 60 s.A, 60 s.B, and 561 in D.D.184 and Adjoining Government Land, South of Che Kung Miu Road, Tai Wai, Sha Tin, N.T. Site Area : about 1,989m2 (including Government Land of 459m2 (about 23% of the Site)) Lease : Lot 60 s.A in D.D. 184 – Agricultural Lot Lot 60 s.B in D.D. 184 – Agricultural Lot Lot 561 in D.D. 184 – Building and Garden Lot Zoning : “Village Type Development” (“V”) Proposed : To rezone the application site from “V” to “Government, Institution or Amendment Community” (“G/IC”) 1. The Proposal 1.1 The applicant proposes to rezone the application site (the Site) from “V” to “G/IC” to continue the current religious institution and columbarium uses on Site, under the name of Ku Ngam Ching Yuen (古巖淨苑) (KNCY) (Plan Z-1). The applicant has not proposed a tailor-made Notes for the Site. According to the Notes of the OZP for the “G/IC” zone, ‘Religious Institution’ is always permitted under Column 1 while ‘Columbarium’ is a Column 2 use requiring planning permission from the Town Planning Board (the Board). 1.2 According to the applicant, the main temple of KNCY was established at the Site in 1951 and the columbarium building came into existence after 1980.