Jnp Products Plot No. : 748/1, Gidc, Jhagadia Di: Bharuch Gujarat, India
Total Page:16
File Type:pdf, Size:1020Kb
M/s. JNP PRODUCTS Environmental Clearance (Form-1) FORM-1 APPLICATION FOR EC (ORGANIC CHEMICALS INDUSTRY). APPLICATION UNDER SCHEDULE 5(f) (Addition of alternate fuel: Coal to Existing Boiler) JNP PRODUCTS PLOT NO. : 748/1, GIDC, JHAGADIA DI: BHARUCH GUJARAT, INDIA June - 2018 1 M/s. JNP PRODUCTS Environmental Clearance (Form-1) FORM 1 (I) BASIC INFORMATION S.NO ITEM DETAILS 1 Name of the Project M/s. JNP PRODUCTS 2 Sr. No in the Schedule 5 (f) Synthetic organic chemicals industry, other synthetic organic chemicals and chemical intermediates). Category: B Project 3 Proposed capacity / area / length / Sr. Name of Production Capacity in M.T. tonnage to be handled / command area / No. Products / Month lease area / number of wells to be Existing Proposed Total drilled. 4-AMINO * TPA – Ton/Annum 1 PHENOL 1650 0 1650 (SLURRY) Note: EC application is made for addition of Alternate Fuel i.e Coal @13 MT/Month to 2 existing 2 Nos. of boilers having fuel Briquettes (Bio-Fuel) & Natural Gas and addition of 1 DG Set-250 KVA. 4 New / Expansion / Modernization Expansion 5 Existing Capacity / Area Etc. 4-AMINO PHENOL (SLURRY): 1650 MT/MONTH. NO CHANGE IN PRODUCTION CAPACITY. ADDITION OF ALTERNATE FUEL COAL TO EXISTING BOILERS. Category of the Project “B” 7 Does it attract the General Condition? If No. Not applicable. yes Please specify. 8 Does it attract the specific condition? If No. Not applicable. yes please specify. 9 Location of the Project Kindly refer Annexure - 1 Plot / Survey / Khasra No. Plot No. 748/1, GIDC, Jhagadia Di: Bharuch, Gujarat Village Jhagadia Tehsil Jhagadia District Bharuch State Gujarat 10 Nearest railway station/airport along Ankleshwar Railway Station – 21 Km approximately with distance in Kms. Vadodara Airport – 100 Km approximately 11 Nearest Town, City, District District Centre Bharuch is at 23 km Headquarters, along with distance in KMS. 12 Village Panchayats, zilla Parishad, Plot No. 748/1, GIDC, Jhagadia, Municipal Corporation, Local Body Di: Bharuch, Gujarat, Pin:393110 (Complete Postal Address with June - 2018 2 M/s. JNP PRODUCTS Environmental Clearance (Form-1) telephone numbers to be given) 13 Name of the Applicant Mr. Samir K. Patel , Partner 14 Registered Address Plot No. 748/1, GIDC, Jhagadia, Di: Bharuch, Gujarat, Pin:393110 15 Address of Correspondence Plot No. 748/1, GIDC, Jhagadia, Di: Bharuch, Gujarat, Pin:393110 Name Mr. Samir K. Patel , Partner Designation (Owner / Partner / CEO) Partner Address Plot No. 748/1, GIDC, Jhagadia, Di: Bharuch, Gujarat, Pin:393110 Pin code 393110 Email [email protected] Telephone Number 02645226291 Mobile: 9825307071 Fax Number - 16 Details of Alternate Sites Examined if Not Applicable. Unit is existing. any. Location of these sites should be shown on a topo sheet. 17 Interlinked Projects No Interlinked projects 18 Whether separate application of No Interlinked Projects interlinked project has been submitted 19 If yes, date of Submission No Interlinked Projects 20 If no, reason. No Interlinked Projects 21 Whether the proposal involves approval Not Applicable as the unit lies within GIDC- / clearance under: If yes details of the Jhagadia. same and their status to be given. The forest (Conservation) Act, 1980 The Wildlife (Protection) Act, 1972 The CRZ Notification, 1991 22 Whether there is any Government Order No. Not Applicable / Policy relevant / relating to the Site. 23 Forest Land involved (hectares) No. Not Applicable 24 Whether there is any litigation pending No. Not Applicable against the project and or land in which the project is proposed to be set up? a) Name of the Court b) Case No. c) Orders/directors of the Court if any and its relevance with the proposed project. June - 2018 3 M/s. JNP PRODUCTS Environmental Clearance (Form-1) (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, wherever possible) S. Information/Checklist confirmation Yes/ with source of information data No. No 1.1 Permanent or temporary change in land use, No Not Applicable as the unit lies within land cover or topography including increase in GIDC- Jhagadia. It is notified intensity of land use (with respect to local land industrial area. use plan) 1.2 Clearance of existing land, vegetation and No Not Applicable as the unit lies within buildings? GIDC- Jhagadia. It is notified industrial area. 1.3 Creation of new land uses? No GIDC-Jhagadia is a notified industrial area. 1.4 Pre-construction investigations e.g. bore No Unit is existing and proposed to add houses, soil testing? alternate fuel coal for existing Boilers. 1.5 Construction works? No Unit is existing and No Construction required. 1.6 Demolition works? No Not Required. 1.7 Temporary sites used for construction works No Not Required or Housing of construction workers? 1.8 Above ground buildings, structures or No Unit is existing. No above ground or earthworks including linear structures, cut and earthworks required. fill or excavations 1.9 Underground works including mining or No Not Applicable tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing processes? No Existing Manufacturing process has been displayed in Annexure- 5. Alternate Fuel Coal is proposed to be added for boiler where agri briquettes is used. 1.14 Facilities for storage of goods or materials? Yes Existing Raw Material / Products Storage details are given vide Annexure – 3. June - 2018 4 M/s. JNP PRODUCTS Environmental Clearance (Form-1) 1.15 Facilities for treatment or disposal of solid Yes It is a zero liquid discharge unit. waste or liquid effluents? Hazardous waste generated is stored on impervious area with enclosure and labeled as per category. The waste is being disposed as per the Amended Hazardous waste (M and Handling) rules, 2016. 1.16 Facilities for long term housing of operational No No housing for the operational workers? workers. 1.17 New road, rail or sea traffic during No Not Required construction or operation? 1.18 New road, rail, air waterborne or other No Not Required transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport No None routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No None pipelines? 1.21 Impoundment, damming, culverting, No None realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No None 1.23 Abstraction or transfers of water form ground No No abstraction of ground water. Water or surface waters? demand of the project be is met through GIDC-Jhagadia. 1.24 Changes in water bodies or the land surface No Drainage pattern not affected affecting drainage or run-off? 1.25 Transport of personnel or materials for No Not Required as unit is existing. construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning No Not Applicable or restoration works? 1.27 Ongoing activity during decommissioning No Not Applicable which could have an impact on the environment? 1.28 Influx of people to an area in either No Unit is existing. temporarily or permanently? 1.29 Introduction of alien species? No None 1.30 Loss of native species or genetic diversity? No None 1.31 Any other actions? No None June - 2018 5 M/s. JNP PRODUCTS Environmental Clearance (Form-1) 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate Yes S. No. Information/checklist confirmation quantities /rates, wherever possible) /No with source of information data This is a existing unit within GIDC, Jhagadia and notified industrial by Govt. of Gujarat. Land especially undeveloped or agricultural 2.1 No Plot Land area of the project: 24000 land (ha) Square Meter. Copy of the Land Possession attached vide Annexure - 2 Total water requirements: 466 KLD Water Balance attached vide Annexure – 6 Water Existi Additi Total Consumption ng onal Process Water (expected source & competing users) Boiler (RO) 18.2 0 18.2 2.2 Yes unit: KLD RO Reject 132.76 0 132.76 Cooling( RO) 291.79 0 291.79 Total 442.75 0 442.75 Industrial Domestic 5 .0 0.0 5.0 Gardening 18.0 0.0 18.0 Total 23.0 0.0 23.0 2.3 Minerals (MT) No - Material 0 Cement 0 Construction material – stone, aggregates, 2.4 No Steel 0 sand / soil (expected source – MT) Brics 0 Sand 0 2.5 Forests and timber (source – MT) No Not Required No additional requirements. ENERGY Existing 650 KVA Sourced from Energy including electricity and fuels DGVCL. 2.6 source, competing users) Unit: fuel (MT), Yes FUEL energy (MW) Existing: CNG – 5500 nm3/Day . Briquettes:15 MT/Day, HSD: 95 Liters/Hr, Proposed : Coal :13 MTD, HSD: 50 Lit/Hr. Any other natural resources (use appropriate 2.7 No No additional natural resources standard units) June - 2018 6 M/s. JNP PRODUCTS Environmental Clearance (Form-1) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with approximate quantities/rates, S. Information/Checklist confirmation Yes/No wherever possible) with source No. of information data 3.1 Use of substances or materials, which are Yes Existing List of the raw material hazardous (as per MSIHC rules) to human health with its properties (Physical, or the environment (flora, fauna, and water Chemical, Flammability, Health supplies) & Fire Hazards are given in Annexure – 4.