Singapore Investment Q1 2020

Total Page:16

File Type:pdf, Size:1020Kb

Singapore Investment Q1 2020 M A R K E T B E AT SINGAPORE Capital Markets Q1 2020 YoY Investment Volume Remained Muted in Q1 Chg Investment volume remained muted in 1Q2020 with a transaction volume of $3.07 billion, representing a 36% reduction in volume q-o-q. The residential sector took the lead with an investment volume of $2.02 billion, double the previous quarter’s 3.07B -31.8% YTD Investment Volume (SGD) volume. The surge in volume was mainly attributed to the award of numerous residential GLS sites during the quarter, resulting in the public sector accounting for 68% of the total residential volume. 2,920 0.0% Office Capital Value (SGD/sf) The industrial sector had the second highest transaction volume of $661.4 million, a moderate decline of 15% q-o-q. The commercial sector followed behind at $183.4 million, a significant reduction of 81% q-o-q. The hospitality sector clocked no 3.20% 0.0% deals during the quarter, as the travel bans and lockdowns resulting from the COVID-19 pandemic led to a significant drop in Office Net Yield investor enthusiasm for hospitality assets. Absence of Big Ticket Commercial Transactions Big ticket commercial transactions were absent during 1Q2020 due to the decrease in market sentiment from the COVID-19 ECONOMIC INDICATORS pandemic and the rapid sell-off in stock markets across the globe. Sellers were unwilling to lower prices significantly as they Q4 2019 were hoping that the economic downturn would be temporary and there would be a rapid recovery in market confidence after YoY 12-Mo. the pandemic was contained. Meanwhile, buyers were waiting on the sidelines to enter at more attractive prices as it is Chg Forecast appearing increasingly likely that the reduction in economic activity from lockdowns will trigger a global recession. 1.0% GDP growth Nevertheless, there were still several strata deals of palatable quantum. In the largest office deal of the quarter, a South Korean high net worth individual acquired the 11th floor of Samsung Hub from Sun Venture for $49.8 million. This $3,800 psf achieved was a record price for the 999-year leasehold property, exceeding the previous high of $3,550 psf in 2018. Another 0.6% notable strata deal was Hong Realty’s divestment of the 10th floor in Suntec Tower One to the Rosa family for $37.1 million CPI growth or $2,580 psf. This represented a 26% gain from Hong Realty’s purchase price of $29.5 million back in 2018. INVESTMENT VOLUME BY CAPITAL SOURCE INVESTMENT VOLUME BY SECTOR 1.29% 10-year government 20 20 bond rate 15 15 Source: MTI, MAS 10 10 SGD (billion) SGD 5 SGD (billion) SGD 5 0 0 4Q18 1Q19 2Q19 3Q19 4Q19 1Q20 4Q18 1Q19 2Q19 3Q19 4Q19 1Q20 Residential Commercial Industrial Institutional Non-institutional Developer Hospitality Mixed/Others M A R K E T B E AT SINGAPORE Capital Markets Q1 2020 Grade A CBD Office Capital Value Ascendas REIT Active Despite Weak Market Sentiment $3,500 Despite the general caution in market sentiment, Ascendas REIT was still active during the quarter. In the largest private sector deal, Ascendas REIT acquired a 25% stake in Galaxis for $157.5 million or $963 psf. As the balance stake of $3,000 Galaxis is currently held by sponsor CapitaLand, there could be a future injection of the remaining 75% into the REIT in $2,500 subsequent quarters. Meanwhile, Ascendas REIT sold Wisma Gulab to Heap Seng Group for $88.0 million and 25 Changi SGD/sf South Street 1 to Hao Mart for $20.3 million. These divestments were part of its strategy to recycle capital into better $2,000 performing assets. $1,500 2020 Investment Volume To Take A Significant Tumble The muted tone in the investment market during the quarter is expected to continue, as investment activity in 2Q2020 will be hampered by the government-imposed lockdown on non-essential services during the month of April. If the chain of transmission is not broken, there is the possibility that the lockdown could be further extended to the rest of the quarter. Grade A CBD Office Net Yield 4.0% In tandem with the peaking of office rents, the Grade A CBD office capital value declined marginally to $2,920 psf, while yields remained stable at 3.20%. Although the Federal Reserve slashed its benchmark interest rate to zero, office yields 3.5% may not see significant further reductions due to the decrease in investor demand. % With a looming global recession, the 2020 investment volume is expected to take a significant tumble to between $10- 3.0% $15 billion as buyers stay on the sidelines. On a more optimistic note, the decline in interest rates could lead to a rapid return of investment activity in 2021 once investor sentiment recovers after the pandemic is contained. 2.5% PRICE PROPERTY LOCATION PURCHASER VENDOR SECTOR (SGD MN) (Based on 99-year leasehold tenure) Samsung Hub South Korean Raffles Place Sun Venture Office $49.8 CHRISTINE LI (11th floor) HNWI Head of Research, Singapore & Southeast Asia +65 6232 0815 /[email protected] Suntec Tower One City Hall / Rosa family Hong Realty Office $37.1 (10th floor) Marina Centre SHAUN POH Executive Director, Capital Markets, Singapore +65 6232 0882 /[email protected] Biopolis Phase 6 one-north Ho Bee Land JTC Corporation Industrial $223.6 A CUSHMAN & WAKEFIELD RESEARCH PUBLICATION ©2020 Cushman & Wakefield. All rights reserved. The Galaxis (25% stake) one-north Ascendas REIT Mitsui & Co Industrial $157.5 information contained within this report is gathered from multiple sources believed to be reliable. The information may contain errors or omissions and is presented without any warranty or representations as to its accuracy. Wisma Gulab City Fringe Heap Seng Group Ascendas REIT Industrial $88.0 cushmanwakefield.com.
Recommended publications
  • Report of the Delegation of the Panel on Transport on Its Duty Visit To
    LC Paper No. CB(4)823/14-15 The Legislative Council of the Hong Kong Special Administrative Region ___________________________________________ Delegation of the Panel on Transport Report on the duty visit to Singapore to study its experience in development and provision of public transport facilities and traffic control measures 23 to 26 September 2014 ___________________________________________ TABLE OF CONTENTS Page Chapter 1 Introduction 1.1 Purpose of the report 1 1.2 Background of the visit 1 1.3 Objectives of the visit 2 1.4 Membership of the delegation 3 1.5 Visit programme 3 2 Overview of the transport strategy in Singapore 2.1 Overview 4 2.2 Building up a quality public transport system 5 2.3 Maximizing road network efficiency capacity 6 2.4 Establishing a bike-friendly city 7 2.5 Enhancing accessibility to public transport 7 3 Visits and exchanges 3.1 Meeting with the Minister for Transport 8 3.2 Meeting with the representatives of the Land Transport 14 Authority 3.3 Meeting with the Chairman and Deputy Chairman of 23 the Government Parliamentary Committee for Transport 3.4 Meeting with the representatives of the SBS Transit and 29 visit to the North East Line's Operations Control Centre and the Sengkang Integrated Transport Hub 3.5 Meeting with the Director of the Hong Kong Economic 39 and Trade Office in Singapore 3.6 Visit to the Marina Bay Cruise Centre Singapore and its 43 connecting transport facilities 3.7 Visit to cycling facilities near Pasir Ris Town 47 4 Observations and conclusions 4.1 Observations 51 4.2 Conclusions 55 TABLE OF CONTENTS Acknowledgements 56 Acronyms and Abbreviations 57 Appendices I Visit programme 58 II List of the organizations and persons met by the delegation 59 References 61 CHAPTER 1 — INTRODUCTION 1.1 Purpose of the report 1.1.1 A delegation of the Panel on Transport ("the Panel") of the Legislative Council visited Singapore from 23 to 26 September 2014 to study the country's experience in development and provision of public transport facilities and traffic control measures.
    [Show full text]
  • 60 Years of National Development in Singapore
    1 GROUND BREAKING 60 Years of National Development in Singapore PROJECT LEADS RESEARCH & EDITING DESIGN Acknowledgements Joanna Tan Alvin Pang Sylvia Sin David Ee Stewart Tan PRINTING This book incorporates contributions Amit Prakash ADVISERS Dominie Press Alvin Chua from MND Family agencies, including: Khoo Teng Chye Pearlwin Koh Lee Kwong Weng Ling Shuyi Michael Koh Nicholas Oh Board of Architects Ong Jie Hui Raynold Toh Building and Construction Authority Michelle Zhu Council for Estate Agencies Housing & Development Board National Parks Board For enquiries, please contact: Professional Engineers Board The Centre for Liveable Cities Urban Redevelopment Authority T +65 6645 9560 E [email protected] Printed on Innotech, an FSC® paper made from 100% virgin pulp. First published in 2019 © 2019 Ministry of National Development Singapore All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the copyright owners. Every effort has been made to trace all sources and copyright holders of news articles, figures and information in this book before publication. If any have been inadvertently overlooked, MND will ensure that full credit is given at the earliest opportunity. ISBN 978-981-14-3208-8 (print) ISBN 978-981-14-3209-5 (e-version) Cover image View from the rooftop of the Ministry of National Development building, illustrating various stages in Singapore’s urban development: conserved traditional shophouses (foreground), HDB blocks at Tanjong Pagar Plaza (centre), modern-day public housing development Pinnacle@Duxton (centre back), and commercial buildings (left).
    [Show full text]
  • Dated 31 October 2018
    Dated 31 October 2018 SALE OF SITE FOR WHITE SITE DEVELOPMENT AT MARINA BAY LAND PARCEL AT MARINA VIEW TECHNICAL CONDITIONS OF TENDER CONTENTS PAGE PART I GENERAL 2 PART II INTRODUCTION TO THE SITE CONTEXT 3 - 6 PART III SUMMARY OF PLANNING AND URBAN DESIGN 6 REQUIREMENTS PART IV PLANNING AND URBAN DESIGN REQUIREMENTS 7 - 23 OTHER REQUIRED WORKS 23 - 26 PART V INFRASTRUCTURE REQUIREMENTS 27 - 38 PART VI TENDER SUBMISSION / OTHER REQUIREMENTS 38 - 41 APPENDIX I 42 - 44 APPENDIX 2 45 - 51 ANNEX A 52 - 55 ANNEX B 56 Technical Conditions of Tender PART I 1.0 General 1.1 General 1.1.1 The Urban Redevelopment Authority ("the Authority"), acting as agent for and on behalf of the Government of the Republic of Singapore ("the Government"), is inviting offers for lease by tender for the Land Parcel at Marina View ("Land Parcel") for a mixed-use development. 1.1.2 The lease and development of the Land Parcel is subject to these Technical Conditions of Tender and the Conditions of Tender for the Land Parcel. In these Technical Conditions of Tender, where the context so admits, the expression "the Authority" includes the Government. 1.1.3 The successful tenderer must in addition to the said Conditions of Tender observe, and comply with, these Technical Conditions of Tender. The Conditions of Tender and these Technical Conditions of Tender are to be read together with the Control Plans of the Land Parcel supplied in the Developer's Packet. 2 Technical Conditions of Tender PART II 2.0 Introduction to the Site and its Urban Context 2.1 Marina Bay, Singapore’s Downtown 2.1.1 The Marina Bay area, Singapore’s Downtown district, is located within the heart of the city.
    [Show full text]
  • Case Studies of the Planning Process in Singapore
    Perry Pei-Ju Yang and Ze Li Two Asian Models of Planning Decision Making 擎:台北市政府都市發展局八十九年度徵聘「社區規劃 師」-「八十九年度社區規劃師制度擴大實施計畫」甄選 TWO ASIAN MODELS OF 作業須知。 台北市政府都市發展局88.3.22. 北 市 都 秘 字 第 PLANNING DECISION MAKING 8820492800號函。 李得全、宋寶麒,2001.,社區規劃師之意義、功能與角色, Case Studies of the Planning 「台北市青年社區規劃師培訓班講義」,台北市:台北市 政府都市發展局。 Process in Singapore New 夏鑄九,〈1999〉,社區規劃師對都市發展的重要性,社區 規劃師會議專題演講大綱。 Downtown and Kaohsiung 許志堅、宋寶麒,2002.,民眾參與城市空間改造之機制-以 台北市推動「地區環境改造計畫」與「社區規劃師制度」 Multifunctional Business 為例,第九屆(2002年)海峽兩岸城市變遷與展望研討 會論文集,2002.8.24.,台南市國立成功大學。 District 陳亮全,1999.1.27.,致台北市政府都市發展局陳局長威仁 信函。 陳威仁、宋寶麒,2001.,都市空間改造DIY-台北市推動「 Perry Pei-Ju Yang and Ze Li 地區環境改造計畫」與「社區規劃師制度」經驗談,第二 屆「上海-台北兩岸城市論壇」,上海。 曾旭正,1999.12.30.,市府團隊不點不亮?,「自由時 ABSTRACT 報」,第十三版。 Singapore and Kaohsiung, two major port cities in East 謝慶達、林賢卿譯,1993.,「社區建築-人民如何創造自我 Asia, have been facing urban physical changes through 的環境」,台北市:創興。 large-scale urban initiatives in the central city areas dur- ing the past decade. This paper explores how the distinc- tive planning systems in the two cities affect the local actions and help shape the physical environment and future scenarios. Two central city areas are investigated and taken as different Asian models for understanding the processes behind urban transformation. In Singapore, urban form making follows a top-down planning control system. In the 1990s, a new downtown plan was proposed at the reclaimed land, Marina South, using the concepts of through-block linkages, all weather comfort and sepa- rated multimodal pedestrian and transportation circula- tion. The ambitious plan is supported by the three tiers of Singapore’s urban planning system from the island-wide conceptual plan, district-wide land use plan to the site specific urban design guidelines.
    [Show full text]
  • Nightrider Admiralty Dr Yishun Ave 11 Bet Blks 349/350 NR2 Blk 353 Bus Timing Is Subject to Traffic Conditions
    LAST BUS DEPARTURE TIMING NightRider Admiralty Dr Yishun Ave 11 Bet Blks 349/350 NR2 Blk 353 Bus timing is subject to traffic conditions. Sembawang Dr Sun Plaza Yishun Ctrl Sentosa Gateway Last Bus: 4.25am Canberra Rd Yishun Ring Rd Opp Blk 651 NR1 Yishun Ring Rd, Bus stop: Blk 798 Last Bus: 3.46am Choa Chu Kang Cres Woodlands Woodlands Woodlands Gambas Blk 311 Blk 356 NR1 Blk 681 Frequency: 24-25 mins Ave 2 Ave 7 Ave 7 Ave Yishun St 61 Flat Fare Blk 825 Woodsvale Condo 3M Bldg $4.50 Blk 803 Blk 602 Choa Chu Kang Nth 7 Marina Centre Last Bus: 4.30am Blk 619 Sembawang Ave Woodlands Blk 303 Yishun Ring Rd NR2 Sembawang Dr, Bus stop: Sun Plaza Last Bus: 3.32am Ave 4 Woodlands Yishun Ave 2 Blk 624 Frequency: 30 mins Marsiling Rise Opp 888 Plaza Ave 6 NS14 Khatib MRT Stn Choa Chu Kang St 62 Choa Chu Kang Dr Opp Blk 120 Blk 680 Blk 625 NS5 Yew Tee MRT Stn Lentor Ave Bullion Pk Condo Anchorvale Link Choa Chu Kang Int Last Bus: 3.30am Choa Chu Kang Ave 4 Marsiling Rd Woodlands Ang Mo Kio Ave 6 Blk 319A NR3 North Canal Rd, Bus stop: Opp OCBC Ctr Last Bus: 4.29am Choa Chu Kang St 52 Lot One Shoppers’ Mall Blk 12 Ave 5 Opp Yio Chu Kang MRT Stn NS15 NR6 Blk 563 Frequency: 30 mins Blk 618 Marymount Rd NS4 Choa Chu Kang Loop Braddell Rd Bishan St 11 Bishan St 22 Sengkang Blk 147 Blk 125 Blk 257 Opp Blk 254 Compassvale Choa Chu Kang Marsiling Dr Anchorvale Dr East Way Int/MRT/LRT Stn Blk 321CP Dr Sengkang NE16 STC Marina Centre Last Bus: 4.30am BP1 Blk 10 Choa Chu Kang Nth 5 Blk 225A Int/MRT/LRT Stn Jurong West St 75, Bus stop: Blk 755 Last Bus: 3.52am Blk 530 Bishan Rd NR5 Staying up with you.
    [Show full text]
  • 3.SG Unhabitat Ilugp Integrated Master Planning and Development
    INTEGRATED MASTER PLANNING & DEVELOPMENT SG UNHabitat iLUGP Speaker Michael Koh Fellow, Centre for Liveable Cities Singapore Liveability Framework Outcomes of Liveability 1. High Quality of Life 2. Competitive Economy 3. Sustainable Environment Singapore Liveability Framework Principles of Integrated Master Planning and Development 1. Think long term 2. “Fight productively” 3. Build in flexibility 4. Execute effectively 5. Innovate systematically Outline Principles of Integrated Master Planning and Development 01 Concept Plan 02 Master Plan 03 Integrated Transport Planning 04 Urban Design Controls 05 Conservation Concept Plan 01 Concept Plan 02 Master Plan 03 Integrated Transport Planning 04 Urban Design Controls 05 Conservation Planning and Development Framework CONCEPT PLAN Maps out strategic vision over the next 40-50 years MASTER PLAN Guides development over the next 10-15 years LAND SALES & DEVELOPMENT DEVELOPMENT COORDINATION CONTROL Concept Plan Review Process Identify long term land requirements (including Phase 1 planning assumptions, standards and projections) and key planning policies for all land use types Formulate and design structure plans and Phase 2 development strategies Phase 3 Traffic modelling, plan evaluation and refinement Phase 4 Monitoring and update of concept plan Concept Planning Framework & Strategic Planning Components POPULATION PROJECTIONS 8 CRITICAL AREAS Integrator: URA INDUSTRY [MTI/JTC] COMMERCE DEVELOPMENT LAND SUPPLY [EDB] INFRASTRUCTURE [PUB] CONSTRAINTS ENVIRONMENT [NEA] RECREATION [NPARKS] HOUSING
    [Show full text]
  • Master Developer Projects in Singapore: Lessons from Suntec City and Marina Bay Financial Centre
    IN THIS EDITION Singapore occasionally sells large chunks of government land to master developers for achieving important national planning and development objectives. This article examines the use of this approach for landmark developments such as Suntec City and the Marina Bay Financial Centre, and what lessons they offer for future master development projects. The site of Suntec City was sold in 1988 to a master developer to build a 339,000 sqm GFA integrated international exhibition and convention centre with the prime objective of positioning Singapore as an international exhibition and convention hub. Source: Erwin Soo CC BY-SA 2.0 https://flic.kr/p/fMWVLT Master Developer Projects in Singapore: Lessons from Suntec City and Marina Bay Financial Centre INTRODUCTION be offered, allowing the GLS programme built by master developers, such as Suntec to achieve greater diversity in terms of City and the Marina Bay Financial Centre Under the Government Land Sales (GLS) location and design. (MBFC), which seek to achieve certain Programme1 administered by the Urban planning and developmental objectives. Redevelopment Authority (URA), state Historically, individual land parcels for The 11.7 ha Suntec City site was sold land is sold to private developers for “white” site developments – which can in 1988 to a master developer to build a development. When planning sites for sale, be used to build any mix of residential, 339,000 sqm GFA integrated international URA and the Housing & Development commercial or hotel properties – have been exhibition and convention centre with the Board (HDB), the two main GLS sale kept below 160,000 sqm Gross Floor prime objective of positioning Singapore as agents, tend to plan around certain parcel Area (GFA).
    [Show full text]
  • POST OFFICE SAVINGS BANK Annual Report & Accounts 1980
    POST OFFICE SAVINGS BANK Annual Report & Accounts 1980 Contents Chairman's Report 3 Organisational Structure 5 The Year in Review 7 Service Consciousness 13 POSB Loan Schemes 19 Community Relations 21 Personnel 23 Financial Statements 24 Statistical Data 28 Directory of Offices, Subsidiary & Associated Companies 30 Highlights of 1980 * Inclusive of earned interest and SAYE (Bonus) Contracts. Board of Directors Chairman (L to R): MrNg Kiat Chong, Mr Michael Wee, Mr Tan Chok Kian Mr F J D'Costa, Mr Tan Chok Kian, Mr Wong Lee Hoong, Mr Ng Tee Geok, Mr Lee Hock Ley. Deputy Chairman Mr Wong Lee Hoong Directors Mr F J D'Costa Mr Lim Hong Keat Mr Ng Tee Geok Mr Robert Iau (up to 1 Oct 1980) Mr Michael Wee Mr Ng Kiat Chong (from 1 Jan 1981) Mr Lee Hock Ley (from 1 Jan 1981) Chairman's Report In November 1980, the POSB introduced the As an extension to the branch expansion programme, PASSCARD Account, a retail banking concept new to we introduced during 1980 the concept of the Principal Singapore. This personalised and convenient transaction Branch. The objective in this instance is to make facility serves as an alternative to the traditional available a comprehensive range of services including passbook. The Passcard eliminates updating at counters, higher withdrawal facilities to the Principal Branches. which is a time-consuming process. Transactions are, therefore completed in a shorter time. The POSB remains confident of growth in the future while accepting that growth rates per se will moderate The public response to this new service has been most somewhat as our deposit base expands.
    [Show full text]
  • BCA Green Mark Awards 2015
    BCA Green Mark ADVISORY COMMITTEE Chairman Members Mr. Lee Chuan Seng Mr. Tang Kok Thye Mr. Vincent Low Mr. Tony Tay Emeritus Chairman ADDP ARCHITECTS LLP G-ENERGY GLOBAL PTE LTD PARSONS BRINCKERHOFF PTE LTD BECA CARTER HOLLINGS & FERNER (S.E. Asia) Pte Ltd Mr. Chin Chi Leong Mr. Johnny Wong Mr. Kenneth Foo BUILDING AND CONSTRUCTION HOUSING AND DEVELOPMENT RAFFLES QUAY ASSET AUTHORITY BOARD MANAGEMENT PTE LTD Deputy Chairmen Mr. Tan Tian Chong Mr. Lim Tow Fok Mr. Theodore Chan Mr. Lam Siew Wah BUILDING AND CONSTRUCTION KEPPEL LAND LIMITED SINGAPORE INSTITUTE OF Deputy CEO (Industry Development) AUTHORITY ARCHITECTS BUILDING & CONSTRUCTION AUTHORITY A/Prof Raymond Wong Mr. Poon Hin Kong NANYANG TECHNOLOGICAL Mr Vincent Han Prof. Heng Chye Kiang CAPITALAND LIMITED UNIVERSITY VINCENT HAN & ASSOCIATES Professor NATIONAL UNIVERSITY OF SINGAPORE Mr. Allen Ang Mr. Ram Bhaskar CITY DEVELOPMENTS LIMITED NATIONAL ENVIRONMENT AGENCY Mr. Lim Fatt Seng A/Prof Lee Siew Eang COMFORT MANAGEMENT PTE NATIONAL UNIVERSITY OF LTD SINGAPORE Contents BCA GREEN MARK CHAMPION AWARD Mapletree Investments Pte Ltd 22 BCA GREEN MARK PEARL AWARD City House: Pearl Prestige 24 DNV GL Technology Centre: Pearl 25 Manulife Centre: Pearl 26 Marina Bay Financial Centre Tower 3: Pearl 27 ONE @ Changi City: Pearl 28 Tampines Grande: Pearl 29 3 Contents BCA GREEN MARK AWARD FOR BUILDINGS 3 Pioneer Sector 3 (Block 2) 131 51 Cuppage Road 131 7 & 9 Tampines Grande (2nd Re-Certification) 75 88 International Road 134 11 Tampines Concourse (2nd Re-Certification) 97 321Clementi 31
    [Show full text]
  • Inside Visit Our Website For: Useful Contacts
    April 2012 The Office A review of the Singapore office market Inside Visit our Website for: Useful Contacts Full Rental Guide Space Planning Guide Guide to Fitting Out Costs Leasing Options - For All Sizes & Budgets Request for Listing www.corporatelocations.com.sg Market Forecasts The information in this publication should Corporate Locations (S) Pte Ltd be regarded as a general guide only. Whilst every effort has been taken to take care in Licence No. L3010044A its preparation, no representation is made or Tel 6320 8355 responsibility accepted for its accuracy. [email protected] Overview Leasing activity has been more subdued The pace of economic activity has dropped respectively. Law firms have also been active, Top rates for the prime brand new Grade A significantly as a result of the slowdown in the particularly in the Raffles Place area and schemes remain around $12.00 - $15.00 per manufacturing sector, and the GDP growth in educational organisations such as International sq ft, although effective rates are significantly Singapore in 2011 came down to around 4.8%. Baccalaureate and The London School of lower at around $11.00 - $12.00 per sq ft. In Indeed, in the last quarter of 2011 the economy Business have leased new space in Parkview Raffles Place the band for Grade A space shrank and the forecast for overall growth in Square and GB Building. ranges from $9.00 to $11.00 per sq ft. 2012 is down to between 2% and 3%, and the prospect of a possible short term technical Vacancy rate up to 6.7% Along Robinson Road/ Shenton Way rates vary recession has been flagged up by the Ministry from $7.50 to $8.50 per sq ft depending upon of Trade and Industry.
    [Show full text]
  • 1 with the Current Closure of the Singapore City Gallery Due to the COVID-19 Situation, We Have Curated a List of Articles From
    With the current closure of the Singapore City Gallery due to the COVID-19 situation, we have curated a list of articles from our past Skyline editions. We hope this will provide you a background on Singapore’s urban planning within the safety of your home. Instructions to search for e-copy from NLB 1. Go to NLB Search 2. Select Advanced Search 3. At title box, type: Skyline 4. Select search medium: Magazines & Articles List of past Skyline editions by topics a. Special topics b. Planning areas 1 Special Topics S/N Keywords Issue Year Title of Articles 1 Active Mobility; Skyline, Issue 5, 2016 2016 Rise of the innovative city; Working Public Spaces; towards active mobility; Creative hacks to Kampong Spirit; public spaces; Bringing back the kampong Urban Farming spirit; Urban farm to table; At a glance: 6 new ways to appreciate our city anew 2 Architecture; Skyline Sept/Oct. 2005 Architecture of the crossroad city; Honours Heritage 2005 for heritage 3 Best Cities; Skyline, May/June 1998 Showcasing the best cities; Safe and Creative Solutions; 1998 charming; Creative solutions; Restoration Understanding restoration 4 Business Improvement Skyline: Insights into 2019 Making cities work; More reasons to make District programme; planning space cities great, 9 new precincts are piloting Redesigning Cities for around us. Issue 10 the Business Improvement District People; 2019 programme; Redesigning cities for people, Reconnect with Nature; former Toronto chief planner Jennifer Restoration Keesmaat advocates for complete streets focused on pedestrians; Is Singapore a biophilic city? Yes and more - conservationist Dr Lena Chan on why we need to reconnect with nature; New travels and old biscuits, we explore how The Great Madras and Khong Guan Building have been beautifully restored 5 Cities; Skyline, May/June 2012 Six cities offer valuable lessons; Sustainable Sustainability; 2012 solutions for cities of the future; A labour Conservation; of love for conservation; Programming the Rail Corridor Rail Corridor; Perspectives from the ideal city.
    [Show full text]
  • The Marina Coastal Expressway (MCE)
    Traffic Advisory For Motorists Using The Marina Coastal Expressway (MCE) LTA has been monitoring traffic conditions since the opening of the MCE and making adjustments to improve traffic circulation in the road network adjoining MCE. More signs have been placed at key approaches to guide motorists. Motorists may also find the guide below useful when planning their journey. WESTBOUND MOTORISTS Travelling from ECP to AYE To AYE From ECP Join MCE at Exit 14B near Fort Road Travelling from ECP to MCE to CBD To Shenton Way or Anson Road From ECP Use MCE Exit 1 to Maxwell Road To MCE To Marina South Use MCE Exit 3 to Central Boulevard or Sheares Ave (Sheares Bridge) Travelling from Ophir Road to AYE To AYE From Ophir Road Use other arterial roads or CTE to connect with AYE EASTBOUND MOTORISTS Travelling from AYE to ECP To ECP From AYE Continue journey on MCE to join ECP (Changi) at Exit 5 Travelling from AYE to CBD To Shenton Way or CHANGES TO ROAD NETWORK: Anson Road Exit AYE at Exit 2B and use Keppel MARINA DOWNTOWN OPHIR / ROCHOR ROAD FORT ROAD Road / Anson Road Alternatively 1 2 3 From • Removal of a section of the ECP from • Those using Ophir Road to get to • Use Fort Road interchange to connect AYE Use CTE and take Exit 2 Marina Boulevard to Prince Edward Sheares Avenue (Sheares Bridge) will directly to the MCE to travel to the city to Merchant Road Road first have to enter the CBD, before they or to the west can get to the MCE To Marina South • Conversion of a stretch of the ECP west • The connection to the ECP (towards of Benjamin Sheares
    [Show full text]