The World Bank Report No: ISR4868
Implementation Status & Results Albania SECONDARY AND LOCAL ROADS (P107833)
Operation Name: SECONDARY AND LOCAL ROADS (P107833) Project Stage: Implementation Seq.No: 8 Status: ARCHIVED Archive Date: 07-May-2011 Country: Albania Approval FY: 2008
Public Disclosure Authorized Product Line:IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Albanian Development Fund (ADF) Key Dates Board Approval Date 03-Jun-2008 Original Closing Date 31-Dec-2012 Planned Mid Term Review Date 30-Nov-2010 Last Archived ISR Date 07-May-2011 Public Disclosure Copy Effectiveness Date 29-Sep-2008 Revised Closing Date 31-Dec-2012 Actual Mid Term Review Date 17-Nov-2010
Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve access to essential services and economic markets, via the provision of all weather roads, for the resident population in the hinterland of the project roads. Has the Project Development Objective been changed since Board Approval of the Project?
Yes No Public Disclosure Authorized Component(s)
Component Name Component Cost COMPONENT 1 - THE IMPROVEMENT OF PRIORITY SECTIONS OF THE SECONDARY 7.50 (REGIONAL) ROAD NETWORK COMPONENT 2 - THE IMPROVEMENT OF PRIORITY SECTIONS OF THE LOCAL (COMMUNE) 1.60 ROAD NETWORK COMPONENT 3 - IMPLEMENTATION AND INSTITUTIONAL SUPPORT 10.90
Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Highly Satisfactory Satisfactory Public Disclosure Authorized Overall Implementation Progress (IP) Highly Satisfactory Satisfactory Overall Risk Rating
Implementation Status Overview
Public Disclosure Copy The implementation of the Secondary and Local Roads Project is continuing to progress very well. The works are either complete, or substantially complete, on all eleven road sections within the project. In addition, all year 5 project monitoring indicators have been met.
Page 1 of 6 Public Disclosure Authorized The World Bank Report No: ISR4868
The project also prepared a program for other donors to contribute, and at present some USD 500 million have been committed or are under discussion, in parallel to the Bank/OPEC Fund for International Development (OFID) contribution.
Locations Country First Administrative Division Location Planned Actual Albania Not Entered Xarre
Albania Not Entered Pllake
Albania Not Entered Ciuci
Albania Not Entered Podgorie Public Disclosure Copy Albania Not Entered Malqene
Albania Not Entered Lunxheri
Albania Not Entered Kuben
Albania Not Entered Korite
Albania Not Entered Erind
Albania Not Entered Elbasan District
Albania Not Entered Domaj
Albania Not Entered Diber District
Albania Not Entered Renz
Albania Not Entered Valare
Albania Not Entered Berat County
Albania Not Entered Velabisht
Albania Not Entered Tirana District
Albania Not Entered Strum
Albania Not Entered Shkoder District
Albania Not Entered Nenshat
Albania Not Entered Mbreshtan Public Disclosure Copy Albania Not Entered Marinez
Page 2 of 6 The World Bank Report No: ISR4868
Country First Administrative Division Location Planned Actual Albania Not Entered Lezhe
Albania Not Entered Kallmeti i Madh
Albania Not Entered Ura e Gorices
Albania Not Entered Fier District
Albania Not Entered Vau i Dejes
Albania Not Entered Belsh
Public Disclosure Copy Albania Not Entered Fierze
Results
Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Change in road user perception of road quality Percentage Value 0.00 97.00 20.00 Date 30-Jun-2008 22-Sep-2011 31-Dec-2012 Comments Results far exceeded as reported in previous ISR. Proportional reduction in travel time on project Percentage Value 0.00 60.00 40.00 roads in free flowing conditions Date 30-Jun-2008 22-Sep-2011 31-Dec-2012 Comments Targets met and exceeded as stated in the previous ISR. Updates will be sought during the next mission in May. Share of rural population with access to an all- Percentage Value 0.00 0.00 season road Date 22-Sep-2011 31-Dec-2012 Comments No robust data available for this indicator. Team is investigating data options and will update this information during the next supervision mission in May. Number of rural people with access to an all- Number Value 0.00 0.00 season road Sub Type Public Disclosure Copy Supplemental
Page 3 of 6 The World Bank Report No: ISR4868
Roads in good and fair condition as a share of Percentage Value 32.00 33.00 34.00 total classified roads Date 30-Jun-2008 22-Sep-2011 31-Dec-2012 Comments suppl. value is for rural roads Actual 33% in Albania, of which project roads are a part. Size of the total classified network Kilometers Value 4979.00 4979.00 4979.00 Sub Type Supplemental Proportional increase in traffic volumes on Text Value 0 21 10 percentage points project roads - one year after scheme Date 30-Jun-2008 22-Sep-2011 31-Dec-2012
Public Disclosure Copy complettion Comments Target was met and exceeded as reported in previous ISR. Updates to be sought during next mission in May. Number of communities that have improved Text Value 0 81 50 access to markets, social services and Date 30-Jun-2008 22-Sep-2011 31-Dec-2012 administrative centers by project end Comments This reflects that all 106.2 km of road has been substantially completed.
Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Increase in annual recurrent maintenance Percentage Value 0.00 0.00 budget for Local roads Date 30-Jun-2008 22-Sep-2011 31-Dec-2012 Comments Team is investigating data options for the baseline and current values during next mission in May Increase in annual recurrent maintenance Percentage Value 0.00 0.00 budget for National roads Date 30-Jun-2008 22-Sep-2011 31-Dec-2012 Comments Team is investigating the possibility of securing this information and will update this information during the next mission in May Number of people in the communities trained to Number Value 0.00 0.00 Public Disclosure Copy procure contractors to undertake maintenance Date 30-Jun-2008 22-Sep-2011 31-Dec-2012
Page 4 of 6 The World Bank Report No: ISR4868
Comments Team is investigating the possibility of securing this information and will update this information during the next mission in May Number of people trained to undertake Number Value 0.00 maintenance Date 30-Jun-2008 31-Dec-2012 Comments Team will include this information during next mission in May Management Information System in place and Text Value Not established not yet establisehed Established Public Disclosure Copy functioning Date 30-Jun-2008 22-Sep-2011 31-Dec-2012 Comments Roads rehabilitated, Non-rural Kilometers Value 0.00 106.20 109.00 Date 30-Jun-2008 22-Sep-2011 31-Dec-2012 Comments
Data on Financial Performance (as of 16-Mar-2012)
Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P107833 IDA-44590 Effective 03-Jun-2008 02-Jul-2008 29-Sep-2008 31-Dec-2012
Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P107833 IDA-44590 Effective XDR 12.20 12.20 0.00 9.67 2.53 79.00
Disbursement Graph Public Disclosure Copy
Page 5 of 6 The World Bank Report No: ISR4868 Public Disclosure Copy
Key Decisions Regarding Implementation There are no key decisions requiring disclosure at this time
Restructuring History Level two Approved on 23-May-2011
Related Projects There are no related projects. Public Disclosure Copy
Page 6 of 6