World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document The World Bank Report No: ISR7388 Implementation Status & Results Albania SECONDARY AND LOCAL ROADS (P107833) Operation Name: SECONDARY AND LOCAL ROADS (P107833) Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Archive Date: 22-Apr-2012 Country: Albania Approval FY: 2008 Public Disclosure Authorized Product Line:IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Albanian Development Fund (ADF) Key Dates Board Approval Date 03-Jun-2008 Original Closing Date 31-Dec-2012 Planned Mid Term Review Date 30-Nov-2010 Last Archived ISR Date 22-Apr-2012 Public Disclosure Copy Effectiveness Date 29-Sep-2008 Revised Closing Date 31-Dec-2012 Actual Mid Term Review Date 17-Nov-2010 Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve access to essential services and economic markets, via the provision of all weather roads, for the resident population in the hinterland of the project roads. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Public Disclosure Authorized Component(s) Component Name Component Cost COMPONENT 1 - THE IMPROVEMENT OF PRIORITY SECTIONS OF THE SECONDARY 7.50 (REGIONAL) ROAD NETWORK COMPONENT 2 - THE IMPROVEMENT OF PRIORITY SECTIONS OF THE LOCAL (COMMUNE) 1.60 ROAD NETWORK COMPONENT 3 - IMPLEMENTATION AND INSTITUTIONAL SUPPORT 10.90 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Public Disclosure Authorized Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview Public Disclosure Copy The implementation of the Secondary and Local Roads Project is continuing to progress very well. The works are either complete, or substantially complete, on all eleven road sections within the project. In addition, all year 5 project monitoring indicators, and the outstanding covenant on transferring the project roads to Albanian Road Authority,have been met. Page 1 of 7 Public Disclosure Authorized The World Bank Report No: ISR7388 The project supported a nation-wide program for other donors to contribute; and about USD 500 million have been committed or under negotiation, in parallel to the Bank/OPEC Fund for International Development (OFID) contribution. Locations Country First Administrative Division Location Planned Actual Albania Not Entered Xarre Albania Not Entered Pllake Albania Not Entered Ciuci Public Disclosure Copy Albania Not Entered Podgorie Albania Not Entered Malqene Albania Not Entered Lunxheri Albania Not Entered Kuben Albania Not Entered Korite Albania Not Entered Erind Albania Not Entered Elbasan District Albania Not Entered Domaj Albania Not Entered Diber District Albania Not Entered Renz Albania Not Entered Valare Albania Not Entered Berat County Albania Not Entered Velabisht Albania Not Entered Tirana District Albania Not Entered Strum Albania Not Entered Shkoder District Albania Not Entered Nenshat Public Disclosure Copy Albania Not Entered Mbreshtan Page 2 of 7 The World Bank Report No: ISR7388 Country First Administrative Division Location Planned Actual Albania Not Entered Marinez Albania Not Entered Lezhe Albania Not Entered Kallmeti i Madh Albania Not Entered Ura e Gorices Albania Not Entered Fier District Albania Not Entered Vau i Dejes Public Disclosure Copy Albania Not Entered Belsh Albania Not Entered Fierze Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Change in road user perception of road quality Percentage Value 0.00 60.00 20.00 Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments Results exceed the target. The ADF Beneficiary Assessment survey, showed that 97% of the interviewees asserted that the roads afterinvestment were in good or very good condition, whereas previously 94% of interviewees asserted that the roads before the investmentwere in bad or very bad conditions. The difference between the two positions, on the 1 to 10 Likert scale correspond to level 6 (or60% change). Proportional reduction in travel time on project Percentage Value 0.00 60.00 40.00 roads in free flowing conditions Date 30-Jun-2008 31-May-2012 31-Dec-2012 Public Disclosure Copy Comments Targets met and exceeded as according to the updated Page 3 of 7 The World Bank Report No: ISR7388 information from ADF during May mission Share of rural population with access to an all- Percentage Value 59.60 66.20 63.60 season road Date 31-May-2012 31-Dec-2012 Comments The introduced baseline actual figure results by adding target is introduced by adding derives from the % against to the baseline the % that to the baseline the % that total population of 11 regions population of actual 81 population of 50 communities with access to all season benefiting communities (see (see the respective indicator roads, before the project - the respective indicator below), planned to benefit data source ADF surveys and below) represent, against the from the project, represents, INSTAT total population of 11 regions against the total population of - data source ADF surveys 11 regions - data source ADF Public Disclosure Copy and INSTAT surveys and INSTAT Number of rural people with access to an all- Number Value 969851.00 1077459.00 1008645.00 season road Sub Type Supplemental Roads in good and fair condition as a share of Percentage Value 32.00 34.00 34.00 total classified roads Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments suppl. value is for rural roads Actual 34% in Albania, of which project roads are a part. Size of the total classified network Kilometers Value 4979.00 4979.00 4979.00 Sub Type Supplemental Proportional increase in traffic volumes on Text Value 0.00 21 % 10% project roads - one year after scheme Date 30-Jun-2008 31-May-2012 31-Dec-2012 complettion Comments Target was met and exceeded as reported in previous ISR, and updated with ADF during May. Updates to be sought during next mission in May. Number of communities that have improved Text Value 0 81 50 access to markets, social services and Date 30-Jun-2008 31-May-2012 31-Dec-2012 administrative centers by project end Comments This reflects that all 109.9 km This number has been used of road has been substantially to define the share and no. of completed. This number has Public Disclosure Copy Page 4 of 7 The World Bank Report No: ISR7388 been used to define the share population with access to all and no. of population with season roads access to all season roads Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Increase in annual recurrent maintenance Percentage Value 0.00 41.30 21.50 budget for Local roads Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF has collected official The cumulative figure of information from the Ministry increase is calculated based of Finance and Ministry of on a 5% target annual Public Disclosure Copy Interior, and presented in its increase, which on the other May 2012 progress report hand has been previously (projects and CPS) agreed with the government as a good initiative to cover the maintenance needs Increase in annual recurrent maintenance Percentage Value 0.00 22.00 21.50 budget for National roads Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF has collected official he cumulative figure of information from the Ministry increase is calculated based of Finance and Ministry of on a 5% target annual Public Works and Transport, increase, which on the other and presented in its May 2012 hand has been previously progress report (projects and CPS) agreed with the government as a good initiative to cover the maintenance needs Number of people in the communities trained to Number Value 0.00 520.00 100.00 procure contractors to undertake maintenance Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF has provided detailed Target is established based reports on the number of on the original plan of people trained and the extending training, to the communities they belong to; respective Units (2-4 staff) in the target is introduced in this all 11 regions/qarksof the ISR project. Number of people trained to undertake Number Value 0.00 520.00 100.00 maintenance Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF has provided detailed Target is established based Public Disclosure Copy reports on the number of on the original plan of people trained and the extending training, to the Page 5 of 7 The World Bank Report No: ISR7388 communities they belong to; respective Units (2-4 staff) in the target is introduced in this all 11 regions/qarksof the ISR project. Management Information System in place and Text Value Not established Established Established functioning Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF progress report of May 2012, on the use of ROMAPS, inventory and prioritization system for the whole secondary and local roads network Value Public Disclosure Copy Roads rehabilitated, Non-rural Kilometers 0.00 109.90 106.20 Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments the length of the road is slightly increased to accommodate community needs Data on Financial Performance (as of 22-May-2012) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P107833 IDA-44590 Effective 03-Jun-2008 02-Jul-2008 29-Sep-2008 31-Dec-2012 31-Dec-2012 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P107833 IDA-44590 Effective XDR 12.20 12.20 0.00 10.19 2.01 84.00 Disbursement Graph Public Disclosure Copy Page 6 of 7 The World Bank Report No: ISR7388 Public Disclosure Copy Key Decisions Regarding Implementation There are no key decisions requiring disclosure at this time Restructuring History Level two Approved on 23-May-2011 Related Projects There are no related projects.
Recommended publications
  • Joint Initiatives Ecsra and Cso's in Rural/Remote Areas
    1 2 ECSRA Empowering Civil Society in Rural Areas Book of achievements 3 4 Table of contents I. About the ECSRA project ........................................................................ 7 1.1 Project background and objectives ..................................................... 7 1.2 Project Activities ............................................................................. 8 1.3 Process .......................................................................................... 9 1.4 Actors and Supporters of the Initiative (at the local/county level) ........... 10 II. The context of areas targeted by the project ........................................... 11 2.1 Socio-economic context in the targeted areas ................................. 11 Berat ................................................................................................ 11 Elbasan ............................................................................................ 12 Gjirokastra ....................................................................................... 13 Lezha ............................................................................................... 14 2.2 Target groups and beneficiaries .....................................................16 2.2.a Focus on rural and peripheral areas ........................................... 16 2.2.b Challenges in empowering citizens & encouraging good governance ....................................................................................... 17 2.3 Intervention strategy and ECSRA
    [Show full text]
  • Devoll Hydropower Project
    ! ! Official Assessment Statkraft Devoll Hydropower Project Albania Project Stage: Implementation Assessment Date: 21/11/2016 to 25/11/2016 ! ! Final Report Date: 01/06/2017!! ! ! Client:!Statkraft!AS! Lead+Assessor:!Doug!Smith,!independent!consultant!(DSmith!Environment!Ltd)! Co0assessors:!Joerg!Hartmann,!independent!consultant,!and!Elisa!Xiao,!independent!consultant! Project+size:!256!MW! ! ! ! ! ! + + + + + + + + + + + + + + + + + + + + + + + + Cover+page+photo:!Banjë!reservoir,!looking!upstream!towards!the!town!of!Gramsh!and!the!reservoir!tail! ! Devoll Hydropower Project, Albania www.hydrosustainability.org | ii ! ! Acronyms Acronym+ Full+Text+ ADCP! Acoustic!Doppler!Current!Profiler! AIP! Annual!Implementation!Plan! ARA! Albanian!Roads!Authority! ASA! Archaeological!Service!Agency! BOOT! Build,!Own,!Operate,!Transfer! CA! Concession!Agreement! CDM! Clean!Development!Mechanism! CER! Certified!Emissions!Reductions! Devoll!HPP! Devoll!Hydropower!Project,!i.e.!the!entire!project!including!Banjë!and!Moglicë!projects!and! associated!infrastructure! DHP! Devoll!Hydropower!Sh.A! EMAP! Environmental!Management!and!Action!Plan! ESIA! Environmental!and!Social!Impact!Assessment!! ESM! Environmental!and!Social!Management! ESMP! Environmental!and!Social!Management!Plan! ESMPSO! Environmental!and!Social!Management!Plan!for!the!Operation!Stage! EVN!AG! An!Austrian!utility!group! EU! European!Union! FIDIC! International!Federation!of!Consulting!Engineers! GIS! Geographical!Information!System! GHG! Greenhouse!Gas! GoA! Government!of!Albania! GRI!
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized REPUBLIC OF ALBANIA · ALBANIAN ROAD AUTHORITY PLANNING AND PREPARATION OF THE RESULTS-BASED ROAD MAINTENANCE AND SAFETY PROJECT (RRMSP) Public Disclosure Authorized Grant No. P13982 ·Contract No. 1 DRAFT ENVIRONMENTAL MANAGEMENT PLAN (EMP) Place and Date: Tirana (Albania) · 30.10.2014 Public Disclosure Authorized Public Disclosure Authorized SUBMITTED BY: Partner Leader Consultant ARA Planning and Preparation of the RRMSP EMP 4 Table of Contents 1 Introduction .................................................................................................................................... 3 1.1 Public Consultation ............................................................................................................. 3 2 Project Description ......................................................................................................................... 4 2.1 Proposed Improvement interventions ................................................................................ 7 2.2 Environmental background of the site ............................................................................... 9 2.3 Socio-economical data ...................................................................................................... 16 3 Legislative and regulatory consideration ...................................................................................... 18 4 Possible environmental impacts associated to the proposed project activities .......................... 19 4.1 Identification of positive
    [Show full text]
  • Pdf?Expires=1332257341&Id=Id&Accname=Guest&Checksum=DB74325BA78 20FD9CADBA5DF971C24A2 Municipality of Elbasan
    ISSN2039Ͳ9340MediterraneanJournalofSocialSciencesVol.3(10)July2012 Society under Sustainable Developments Prospective in District of Elbasan, Albania Evisa Duka PhD Candidate “A.Xhuvani”University Elbasan,Albania Faculty of Education Email:[email protected] Abstract: The purpose of this proposed session is to introduce the status of sustainable development in my country Albania, bringing in attention sustainable development and society in a very symbolic district of the Country, the Elbasan district. Under the Global Millenniums Goals, the society across the world is ambitiously exercising principles of sustainable development, linking economy, society and environment toward a better wellbeing for future generations. Sustainable development principles require societal actions beyond borders of states, political and economy sectors, as well as of the generations and societal diversities.What is the Albanian contribution with regards to the Earth Summit Challenges, while it is fully integrating in the regional and global processes under the freedoms of market economy? Through my paper I will introduce the status of sustainable development in my country Albania, bringing in attention sustainable development and society in a very symbolic district of the Country, the Elbasan district, pointing out local societies both as contributors and beneficiaries in the process. I will present district natural and human resources under the sustainable prospective, while a lot of work needs to be done in order to prevent the very critical environmental condition along the city or periphery due to former metallurgy activity in the district. The role of society is indispensable in the process, while bottom up initiatives must push local and central governments to design and implement budgets fostering a sustainable development.
    [Show full text]
  • IPA III Cross Border Cooperation Programme 2021-2027
    IPA III Cross Border Cooperation Programme 2021-2027 Republic of North Macedonia - Republic of Albania ADOPTED ON DD/MM/YYYY IPA-III Cross-Border Cooperation Programme 2021 – 2027 between Republic of North Macedonia and Republic of Albania TABLE OF CONTENTS Programme synopsis........................................................................................................................................3 List of acronyms.................................................................................................................................................4 Section 1: Programme summary................................................................................................................ 5 1.1 Summary of the programme............................................................................................................ 5 1.2 Preparation of the programme and involvement of the partners...................................... 6 Section 2: Programme area........................................................................................................................ 12 2.1 Situation Analysis................................................................................................................................12 2.2 Main findings.........................................................................................................................................18 Section 3: Programme strategy...............................................................................................................
    [Show full text]
  • Final Monitoring Report Final Monitoring Report
    ELECTIONS FOR THE ASSEMBLY OF ALBANIA 25 JUNE 2017 FINAL MONITORING REPORT FINAL MONITORING REPORT uesv zhg e Ve Vë nd i o i r n e io c i l www.zgjedhje.al a ISBN: o K THE COALITION OF DOMESTIC OBSERVERS GRUPIM I 34 ORGANIZATAVE JOFITIMPRURËSE VENDASE, LOKALE APO QENDRORE, QË VEPROJNË NË FUSHËN E DEMOKRACISË DHE TË 9 789992 786833 DREJTAVE TË NJERIUT THE COALITION OF DOMESTIC OBSERVERS ABOUT CDO The Coalition of Domestic Observers is an alliance of non-governmental and non-partisan organizations, the core of activity of which is the development of democracy in Albania and defense for human rights, especially the observation of electoral processes. Since its establishment in 2005, the network of organizations in CDO has grown to include dozens of members. CDO considers the observation of electoral processes by citizen groups as the most appropriate instrument for ensuring transparency, integrity and credibility of elections. CDO strongly believes that engaging citizens in following electoral processes does more than just promote good elections. Empowering citizens to observe the electoral process, among other things, helps to ensure greater accountability of public officials. The leading organizations of CDO - the Society for Democratic Culture, KRIIK Albania and the For Women and Children Association - are three of the most experienced domestic groups. In fulfillment of the philosophy of action, these organizations announce relevant actions depending on the electoral or institutional process to be followed. All interested civil society organizations are invited to join the action, thus CDO re-assesses periodically, openly, and in a transparent manner the best values of network functioning.
    [Show full text]
  • Mineral Resources in Albania Contents Albania Overview
    2 MINERAL RESOURCES IN ALBANIA CONTENTS ALBANIA OVERVIEW II. MINERAL RESOURCES IN ALBANIA 04 II.1. A General Overview in Mining Industry 04 II.2. Licensing 04 II.3. Concessions 05 II.4. Mining Potential of Albania 06 II.4.1. Chrome 07 II.4. 2. Copper 08 II.4. 3. Iron-Nickel and Nickel-Silicate 08 II.4. 4. Coal 10 II.4. 5. Peats (turfs) 10 II.4. 6. Natural Bitumen and Bituminous Substances 11 II.4. 7. Non-Metalliferous Minerals 11 III. PERSPECTIVE ZONES 13 II. MINERAL RESOURCES 4 IN ALBANIA Albania is distinguished for its mineral resources. Most of them have been discovered and exploited from ancient times up to date. There are also other deposits for which a careful study and evaluation of geological reserves should be conducted. II.1. A General Overview in Mining Industry Albania is a country rich in mineral resources. Mineral exploration, exploitation and processing constitute a key component of the Albanian economy, due to a traditional mining industry, that has been a solid foundation to the country economic sector, generating substantial revenues. Chrome, copper, iron-nickel and coal, are some of the minerals mined and treated in Albania. Mining industry development in Albania has passed through three main stages: The first stage includes the period up to the end of World War II, marked by two important events. In 1922, has been compiled the first Geological Map of Albania, which was even the first of its kind in the Balkans. In 1929 has been approved the first Mining Law of the Albanian Kingdom, which paved the way to the exploration and/or exploitation of mineral resources in Albania; The second stage (1944-1994), marks the period when the mining activity has been organized in state-owned enterprises and the concept of mining privatization did not exist.
    [Show full text]
  • 004 Second Report Submitted by Albania
    Strasbourg, 18 May 2007 ACFC/SR/II(2007)004 SECOND REPORT SUBMITTED BY ALBANIA PURSUANT TO ARTICLE 25, PARAGRAPH 1 OF THE FRAMEWORK CONVENTION FOR THE PROTECTION OF NATIONAL MINORITIES Received on 18 May 2007 TABLE OF CONTENT INTRODUCTORY REMARKS ............................................................................ 4 POLICY OF THE ALBANIAN STATE TOWARDS RESPECT OF MINORITY RIGHTS ....................................................................................................................... 6 GENERAL VIEW ON THE MEASURES TAKEN FOR IMPLEMENTATION OF THE COMMITTEE OF MINISTERS’ RESOLUTION..................................................... 9 I - MEASURES TAKEN TO PUBLICIZE THE RESULTS OF THE FIRST MONITORING CYCLE .................................................................................... 14 MEASURES TAKEN FOR THE PUBLICATION OF THE FIRST MONITORING CYCLE RESULTS AND FOR INCREASING AWARENESS REGARDING THE FRAMEWORK CONVENTION ......................................................................... 14 CIVIL SOCIETY PARTICIPATION IN THE PROCESS OF IMPLEMENTATION OF THE FRAMEWORK CONVENTION AT NATIONAL AND LOCAL LEVELS............ 20 DIALOGUE WITH THE ADVISORY COMMITTEE......................................................... 24 II – MEASURES UNDERTAKEN IN THE IMPLEMENTATION OF THE RESOLUTION OF THE MINISTERS COMMITTEE IN APPLYING THE FRAMEWORK CONVENTION ON “PROTECTION OF NATIONAL MINORITIES” FROM ALBANIA (COMMENTS TO CERTAIN ARTICLES OF THE FRAMEWORK CONVENTION)..............................................................................................
    [Show full text]
  • Educational Situation in the Prefecture of Elbasan in the Years of the Albanian Parliamentary Republic 1925-1928
    ISSN 2411-958X (Print) European Journal of May - August 2019 ISSN 2411-4138 (Online) Interdisciplinary Studies Volume 5, Issue 2 Educational Situation in the Prefecture of Elbasan in the Years of the Albanian Parliamentary Republic 1925-1928 Rudina Mita Prof.Asoc. Dr. ,University: "Aleksander Xhuvani", Elbasan-Albania Enkelejda Balla Msc., University: "Aleksander Xhuvani", Elbasan – Albania Abstract Our study aims to highlight one of the most important aspects of the Elbasan Prefecture, the educational aspect during 1925-1928. In order to analyze the education during the mentioned years, the attention and tradition and educational environment of Elbasan had to be considered during the earlier periods since the Ottoman conquest. The historical educational experience culminated in the opening of the "Normal" School in 1909, the first high school that trained and prepared teachers' teachers for the Albanian language; experience and educational achievements of 1920-1924, years in which education was given priority on the basis of the principles of massivization, nationalization, secularization and unification. Given this educational tradition even during the years we have been studying, the Prefecture of Elbasan has taken important steps in Education. In the educational development of Elbasan, the intellectual elite and educated teachers in the West, Austria and Italy, etc., who together with their scientific formation brought together the Elbasan City and the educational experience of the countries of who came. Problems, the level of primary and secondary education, the difficulties in the education system, the lack of school buildings and funds for opening and maintaining them, the education of women in special schools by males, and the charitable activity of elbasanas in terms of education, the school of education of the children of the region are some of the aspects that we have included in our study.
    [Show full text]
  • Final Narrative Report
    ANNEX VI INTERIM NARRATIVE REPORT 1. Description 1.1. Name of beneficiary of grant contract: Forumi i Gruas Elbasan ( FGE ) Woman Forum Elbasan 1.2. Name and title of the Contact person: Shpresa Banja, Project Manager 1.3. Name of partners in the Action: NA 1.4. Title of the Action: Addressing the needs of women victims of domestic violence in Elbasan Region 1.5. Contract number: 2011/278-001 1.6. Start date and end date of the reporting period: February 6, 2012 up to February 06, 2013 1.7. Target country(ies) or region(s): Elbasan Region 1.8. Final beneficiaries &/or target groups1 (if different) (including numbers of women and men): Target groups: Women victims of DV or vulnerable women( 225), local government officials, whose duty is related to issues concerning violence against women( Municipalities Elbasan, Cerik, Belesh, Peqin, Gramsh, Librazhd, Prrenjas, Regional Education Department, The Attorney, Regional Police Department, Directory of Inspection for Standarts in Social Services, Regional Directory of Public Health), local communities (especially men and young adults), state and private employment offices, local women NPOs( Useful to Albanian Women Elbasan Branch, Another Vizion, World Vision, A2B), local media( visual media SKAMPA, EGNATIA, News 24, TV KOHA, Top News, written media INFO in Elbasan city) Final beneficiaries: Around 225 women victims of violence; 31 Law Enforcement Officers, Prosecutors, Victim Advocates, Judges, Social Workers and Public Health Workers; 1100 Local community members; 47 teachers and school psychologists; 381 students; 1.9. Country(ies) in which the activities take place (if different from 1.7): Elbasan Region 1 “Target groups” are the groups/entities who will be directly positively affected by the project at the Project Purpose level, and “final beneficiaries” are those who will benefit from the project in the long term at the level of the society or sector at large.
    [Show full text]
  • [email protected]
    1.st edition | December, 2020 © 2020 All rights reserved for Edições Esgotadas, Lda. Lisboa | Porto | Viseu | Aveiro www.edicoesesgotadas.com [email protected] Title: Social Work Education. Reflections and debate in the European context Editor: Jorge Ferreira Collection: Serviço Social (Social Work) | n.º 2 Text review: Ana Maria Oliveira | Edições Esgotadas, Lda. ISBN: 978-989-9015-61-6 ORCID: 0000-0001-9611-7390 Legal Deposit: 478459/20 Printing: Rainho & Neves, Lda. Design: Edições Esgotadas, Lda. Cover image: © Freepik Erasmus+ Capacity Building in Higher Education. The Project T@sk – Towards increased Awareness, responsibility and shared quality in Social Work (Project N. 585626-EPP-1-2017- 1-IT-EPPKA2- CBHE-JP – Erasmus+ KA2 – Capacity Building in Higher Education) has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein. SOCIAL WORK EDUCATION. REFLECTIONS AND DEBATE IN THE EUROPEAN CONTEXT Editor Jorge Ferreira ISCTE – Partner in T@sk project TABLE OF CONTENTS Foreword 9 CHAPTER I “Social Work Education: ISCTE University Institute of Lisbon /Portugal” 13 1. Presentation of the ISCTE University Institute of Lisbon 13 2. Characterization of the cycles of studies in Social Work 14 2.1. First cycle of studies in Social Work (undergraduate) 14 2.2. Second cycle of studies in Social Work (Masters) 16 2.3. Third Cycle of Studies in Social Work (PhD) 18 3. Epistemology of Social Work Training 22 4. Socio-economic, political and cultural context 25 5.
    [Show full text]
  • Final Report on the Parliamentary Elections of June 23, 2013
    FINAL REPORT ON THE PARLIAMENTARY ELECTIONS OF JUNE 23, 2013 PREPARED BY THE ALBANIAN HELSINKI COMMITTEE TIRANA, JULY 31, 2013 Table of Contents 1. INTRODUCTION - Methodology and reach of the monitoring - Target of monitoring - Ways and tools to collect data - Capacities and reliability of monitors 2. MAIN FINDINGS OF THE PRE-ELECTORAL PROCESS - Decreeing of the parliamentary elections and the establishment and functioning of the CEC - Allocation of electoral zones and mandates - Extracts of electoral components - Written notification of citizens in their residences - Final voter list - Sensitization of voters - Establishment and functioning of the CEC - Assignment of VCs’ location and members of their commissions - Voting centers in special institutions - Creating the conditions for access by persons with disabilities to VCs - Electoral campaign - Situation of public order and calm in the pre-election period 3. VOTING PROCESS - Preparations for the voting process - Progress of the voting process 4. COMPLETION OF VOTING AND VOTE COUNT 5. TRANSPARENCY OF THE VOTING PROCESS 6. CONCLUSIONS 7. ANNEXES - Report of findings by ADRF (not yet translated in Englisht) Abbreviations AHC - Albanian Helsinki Committee, non-profit organization CEC – Central Election Commission CEAZ - Commission for Electoral Administration of Zones VCC – Voting Center Commission VC – Voting Center VCG - Vote Counting Group EU – European Union CRD – Civil Rights Defenders ADRF – Albanian Disabilities Rights Foundation, non-profit organization EC – Electoral Code GDCR - General Directory of Civil Registry IEPD Institutions for the Execution of Penal Decisions 1. INTRODUCTION The Albanian Helsinki Committee (AHC), since 1996, has been monitoring continually parliamentary and local elections because the protection of and respect for the right to vote, one of the fundamental rights of citizens, has been and remains an important part of its mission.
    [Show full text]