World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
The World Bank Report No: ISR7388 Implementation Status & Results Albania SECONDARY AND LOCAL ROADS (P107833) Operation Name: SECONDARY AND LOCAL ROADS (P107833) Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Archive Date: 22-Apr-2012 Country: Albania Approval FY: 2008 Public Disclosure Authorized Product Line:IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Albanian Development Fund (ADF) Key Dates Board Approval Date 03-Jun-2008 Original Closing Date 31-Dec-2012 Planned Mid Term Review Date 30-Nov-2010 Last Archived ISR Date 22-Apr-2012 Public Disclosure Copy Effectiveness Date 29-Sep-2008 Revised Closing Date 31-Dec-2012 Actual Mid Term Review Date 17-Nov-2010 Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve access to essential services and economic markets, via the provision of all weather roads, for the resident population in the hinterland of the project roads. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Public Disclosure Authorized Component(s) Component Name Component Cost COMPONENT 1 - THE IMPROVEMENT OF PRIORITY SECTIONS OF THE SECONDARY 7.50 (REGIONAL) ROAD NETWORK COMPONENT 2 - THE IMPROVEMENT OF PRIORITY SECTIONS OF THE LOCAL (COMMUNE) 1.60 ROAD NETWORK COMPONENT 3 - IMPLEMENTATION AND INSTITUTIONAL SUPPORT 10.90 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Public Disclosure Authorized Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview Public Disclosure Copy The implementation of the Secondary and Local Roads Project is continuing to progress very well. The works are either complete, or substantially complete, on all eleven road sections within the project. In addition, all year 5 project monitoring indicators, and the outstanding covenant on transferring the project roads to Albanian Road Authority,have been met. Page 1 of 7 Public Disclosure Authorized The World Bank Report No: ISR7388 The project supported a nation-wide program for other donors to contribute; and about USD 500 million have been committed or under negotiation, in parallel to the Bank/OPEC Fund for International Development (OFID) contribution. Locations Country First Administrative Division Location Planned Actual Albania Not Entered Xarre Albania Not Entered Pllake Albania Not Entered Ciuci Public Disclosure Copy Albania Not Entered Podgorie Albania Not Entered Malqene Albania Not Entered Lunxheri Albania Not Entered Kuben Albania Not Entered Korite Albania Not Entered Erind Albania Not Entered Elbasan District Albania Not Entered Domaj Albania Not Entered Diber District Albania Not Entered Renz Albania Not Entered Valare Albania Not Entered Berat County Albania Not Entered Velabisht Albania Not Entered Tirana District Albania Not Entered Strum Albania Not Entered Shkoder District Albania Not Entered Nenshat Public Disclosure Copy Albania Not Entered Mbreshtan Page 2 of 7 The World Bank Report No: ISR7388 Country First Administrative Division Location Planned Actual Albania Not Entered Marinez Albania Not Entered Lezhe Albania Not Entered Kallmeti i Madh Albania Not Entered Ura e Gorices Albania Not Entered Fier District Albania Not Entered Vau i Dejes Public Disclosure Copy Albania Not Entered Belsh Albania Not Entered Fierze Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Change in road user perception of road quality Percentage Value 0.00 60.00 20.00 Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments Results exceed the target. The ADF Beneficiary Assessment survey, showed that 97% of the interviewees asserted that the roads afterinvestment were in good or very good condition, whereas previously 94% of interviewees asserted that the roads before the investmentwere in bad or very bad conditions. The difference between the two positions, on the 1 to 10 Likert scale correspond to level 6 (or60% change). Proportional reduction in travel time on project Percentage Value 0.00 60.00 40.00 roads in free flowing conditions Date 30-Jun-2008 31-May-2012 31-Dec-2012 Public Disclosure Copy Comments Targets met and exceeded as according to the updated Page 3 of 7 The World Bank Report No: ISR7388 information from ADF during May mission Share of rural population with access to an all- Percentage Value 59.60 66.20 63.60 season road Date 31-May-2012 31-Dec-2012 Comments The introduced baseline actual figure results by adding target is introduced by adding derives from the % against to the baseline the % that to the baseline the % that total population of 11 regions population of actual 81 population of 50 communities with access to all season benefiting communities (see (see the respective indicator roads, before the project - the respective indicator below), planned to benefit data source ADF surveys and below) represent, against the from the project, represents, INSTAT total population of 11 regions against the total population of - data source ADF surveys 11 regions - data source ADF Public Disclosure Copy and INSTAT surveys and INSTAT Number of rural people with access to an all- Number Value 969851.00 1077459.00 1008645.00 season road Sub Type Supplemental Roads in good and fair condition as a share of Percentage Value 32.00 34.00 34.00 total classified roads Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments suppl. value is for rural roads Actual 34% in Albania, of which project roads are a part. Size of the total classified network Kilometers Value 4979.00 4979.00 4979.00 Sub Type Supplemental Proportional increase in traffic volumes on Text Value 0.00 21 % 10% project roads - one year after scheme Date 30-Jun-2008 31-May-2012 31-Dec-2012 complettion Comments Target was met and exceeded as reported in previous ISR, and updated with ADF during May. Updates to be sought during next mission in May. Number of communities that have improved Text Value 0 81 50 access to markets, social services and Date 30-Jun-2008 31-May-2012 31-Dec-2012 administrative centers by project end Comments This reflects that all 109.9 km This number has been used of road has been substantially to define the share and no. of completed. This number has Public Disclosure Copy Page 4 of 7 The World Bank Report No: ISR7388 been used to define the share population with access to all and no. of population with season roads access to all season roads Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Increase in annual recurrent maintenance Percentage Value 0.00 41.30 21.50 budget for Local roads Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF has collected official The cumulative figure of information from the Ministry increase is calculated based of Finance and Ministry of on a 5% target annual Public Disclosure Copy Interior, and presented in its increase, which on the other May 2012 progress report hand has been previously (projects and CPS) agreed with the government as a good initiative to cover the maintenance needs Increase in annual recurrent maintenance Percentage Value 0.00 22.00 21.50 budget for National roads Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF has collected official he cumulative figure of information from the Ministry increase is calculated based of Finance and Ministry of on a 5% target annual Public Works and Transport, increase, which on the other and presented in its May 2012 hand has been previously progress report (projects and CPS) agreed with the government as a good initiative to cover the maintenance needs Number of people in the communities trained to Number Value 0.00 520.00 100.00 procure contractors to undertake maintenance Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF has provided detailed Target is established based reports on the number of on the original plan of people trained and the extending training, to the communities they belong to; respective Units (2-4 staff) in the target is introduced in this all 11 regions/qarksof the ISR project. Number of people trained to undertake Number Value 0.00 520.00 100.00 maintenance Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF has provided detailed Target is established based Public Disclosure Copy reports on the number of on the original plan of people trained and the extending training, to the Page 5 of 7 The World Bank Report No: ISR7388 communities they belong to; respective Units (2-4 staff) in the target is introduced in this all 11 regions/qarksof the ISR project. Management Information System in place and Text Value Not established Established Established functioning Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments ADF progress report of May 2012, on the use of ROMAPS, inventory and prioritization system for the whole secondary and local roads network Value Public Disclosure Copy Roads rehabilitated, Non-rural Kilometers 0.00 109.90 106.20 Date 30-Jun-2008 31-May-2012 31-Dec-2012 Comments the length of the road is slightly increased to accommodate community needs Data on Financial Performance (as of 22-May-2012) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P107833 IDA-44590 Effective 03-Jun-2008 02-Jul-2008 29-Sep-2008 31-Dec-2012 31-Dec-2012 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P107833 IDA-44590 Effective XDR 12.20 12.20 0.00 10.19 2.01 84.00 Disbursement Graph Public Disclosure Copy Page 6 of 7 The World Bank Report No: ISR7388 Public Disclosure Copy Key Decisions Regarding Implementation There are no key decisions requiring disclosure at this time Restructuring History Level two Approved on 23-May-2011 Related Projects There are no related projects.