OGW-30-23 Turrawan

Total Page:16

File Type:pdf, Size:1020Kb

OGW-30-23 Turrawan Division / Business Unit: Safety, Engineering & Technology Function: Operations Document Type: Guideline Network Information Book Train Order Control Turrawan (exc) to North Star (inc) & Camurra West OGW-30-23 Applicability Hunter Valley Publication Requirement Internal / External Primary Source Local Appendices North Volume 4 Route Access Standard – Intrastate Network Section Pages I6 & Heavy Haul Network Section Pages H3 Document Status Version # Date Reviewed Prepared by Reviewed by Endorsed Approved 2.5 24 May 2021 Configuration Configuration Manager GM Technical Standards Management Manager Standards Administrator Amendment Record Amendment Date Reviewed Clause Description of Amendment Version # 1.0 23 Mar 2016 First release of document 1.1 31 May 2016 2.0 Update of km references in text and diagrams relating to PTOS © Australian Rail Track Corporation Limited (ARTC) Disclaimer This document has been prepared by ARTC for internal use and may not be relied on by any other party without ARTC’s prior written consent. Use of this document shall be subject to the terms of the relevant contract with ARTC. ARTC and its employees shall have no liability to unauthorised users of the information for any loss, damage, cost or expense incurred or arising by reason of an unauthorised user using or relying upon the information in this document, whether caused by error, negligence, omission or misrepresentation in this document. This document is uncontrolled when printed. Authorised users of this document should visit ARTC’s intranet or extranet (www.artc.com.au) to access the latest version of this document. CONFIDENTIAL Page 1 of 55 Turrawan (exc) to North Star (inc) & Camurra West OGW-30-23 Table of Contents 2.0 15 Sep 2017 1.6, 1.14 Moree location updated to include Moree East siding and Fitzroy 2.10, 2.16 Street Narrabri level crossing updated. Milguy loop length and North Star LPA & TOA information added. 2.1 30 Jul 2018 Various Lookout Working information added as new section 1.14 with various diagrams updated & some added with the relevant details. 2.2 21 Feb 2019 1.6, 1.14, Lookout working information amended in section 1.14 and 2.2 & 2.9 diagrams as detailed in safe notice 2-4164. Level crossings at Narrabri Junction & Moree South updated and speed signs added. 2.3 23 Dec 2019 1.7, 1.15, Maximum Permitted Speeds section updated. Diagram legend 2.10.2, 2.16 updated. Moree East Siding grain operations reference added. Moree South & Moree diagrams updated. North Star yard details updated. 2.4 8 Apr 2021 2.4, 2.6 & Narrabri North & Pennys Road locations text updated. Narrabri 2.7 North, Narrabri – Edgeroi, Bellata & Pennys Road diagrams updated. 2.5 24 May 2021 Various Diagrams updated to relocate usage note to bottom corner of template. This document is uncontrolled when printed. Version Number: 2.5 Date Reviewed: 24 May 2021 Page 2 of 55 Turrawan (exc) to North Star (inc) & Camurra West OGW-30-23 Table of Contents Table of Contents Table of Contents ............................................................................................................................................. 3 1 General Information ............................................................................................................................... 5 1.1 Board Extent................................................................................................................................... 5 1.2 Safe Working System ..................................................................................................................... 5 1.3 Applicable Rules ............................................................................................................................ 5 1.4 Adjacent Train Control Boards / Centres ....................................................................................... 5 1.5 Section Operating Equipment / Notes ............................................................................................ 5 1.5.1 Motorised Point Machines .............................................................................................................. 5 1.5.2 Interlockings and Sidings ................................................................................................................ 6 1.5.3 Unfenced lines ................................................................................................................................ 6 1.6 Level Crossings .............................................................................................................................. 7 1.7 Maximum Permitted Speeds and Permanent Speed Restrictions ............................................... 11 1.8 Maximum Train Length ................................................................................................................ 11 1.9 Structure Clearances ................................................................................................................... 11 1.10 Communications .......................................................................................................................... 12 1.11 Wayside Monitoring Systems ....................................................................................................... 12 1.12 Ruling Gradients .......................................................................................................................... 13 1.13 Curve and Gradient Data ............................................................................................................. 13 1.14 Lookout Working Hazardous Areas ............................................................................................. 13 1.15 Drawing Legend ........................................................................................................................... 14 2 Locations and Sections Information .................................................................................................. 15 2.1 Turrawan (exclusive) .................................................................................................................... 15 2.2 Narrabri Junction (NBJ) ................................................................................................................ 17 2.3 Narrabri (NBI) ............................................................................................................................... 20 2.4 Narrabri North............................................................................................................................... 23 2.5 Edgeroi (EBG) .............................................................................................................................. 26 2.6 Bellata (BLT) ................................................................................................................................ 28 2.7 Penny’s Road (EWB) ................................................................................................................... 31 2.8 Gurley (GUR) ............................................................................................................................... 33 2.9 Moree South (MRS) ..................................................................................................................... 37 2.10 Moree (MRE) ................................................................................................................................ 41 2.10.1 Moree East Siding ........................................................................................................................ 42 This document is uncontrolled when printed. Version Number: 2.5 Date Reviewed: 24 May 2021 Page 3 of 55 Turrawan (exc) to North Star (inc) & Camurra West OGW-30-23 Table of Contents 2.10.2 Grain Loading and Unloading Operations..................................................................................... 42 2.11 Camurra (CMR) ............................................................................................................................ 44 2.12 Camurra West (CCW) .................................................................................................................. 46 2.13 Milguy (MIY) ................................................................................................................................. 47 2.14 Crooble (CRO) ............................................................................................................................. 49 2.15 Croppa Creek (CRP) .................................................................................................................... 51 2.16 North Star (NTS) .......................................................................................................................... 54 This document is uncontrolled when printed. Version Number: 2.5 Date Reviewed: 24 May 2021 Page 4 of 55 Turrawan (exc) to North Star (inc) & Camurra West OGW-30-23 General Information 1 General Information 1.1 Board Extent Turrawan 547.694 to North Star 760.460km This area is controlled by Network Controller NCCN TOCO. Contact Numbers: Phone: 02 4902 7916 Train Transit Manager: 02 4902 9410 Emergency: 02 4902 7976 1.2 Safe Working System Phoenix Train Order System Operator’s Key – Sidings Narrabri Junction to North Star Work on Track in sidings and North Star yard require a manual TOA. 1.3 Applicable Rules The Network Rules and Procedures apply to the sections covered by this Information Book. 1.4 Adjacent Train Control Boards / Centres ARTC North Phone 02 4902 7902 Emergency 02 4902
Recommended publications
  • Alberta-To-Alaska-Railway-Pre-Feasibility-Study
    Alberta to Alaska Railway Pre-Feasibility Study 2015 Table of Content Executive Summary ...................................................................................................... i Infrastructure and Operating Requirements................................................................ ii Environmental Considerations and Permitting Requirements .................................... ii Capital and Operating Cost Estimates ......................................................................... iii Business Case .............................................................................................................. iii Mineral Transportation Potential ................................................................................ iii First Nations/Tribes and Other Contacts ..................................................................... iv Conclusions .................................................................................................................. iv 1 | Introduction ........................................................................................................ 1 This Assignment............................................................................................................ 1 This Report ................................................................................................................... 2 2 | Infrastructure and Operating Requirements ........................................................ 3 Route Alignment ..........................................................................................................
    [Show full text]
  • Solent Connectivity May 2020
    Solent Connectivity May 2020 Continuous Modular Strategic Planning Page | 1 Page | 2 Table of Contents 1.0 Executive Summary .......................................................................................................................................... 6 2.0 The Solent CMSP Study ................................................................................................................................... 10 2.1 Scope and Geography....................................................................................................................... 10 2.2 Fit with wider rail industry strategy ................................................................................................. 11 2.3 Governance and process .................................................................................................................. 12 3.0 Context and Strategic Questions ............................................................................................................ 15 3.1 Strategic Questions .......................................................................................................................... 15 3.2 Economic context ............................................................................................................................. 16 3.3 Travel patterns and changes over time ............................................................................................ 18 3.4 Dual-city region aspirations and city to city connectivity ................................................................
    [Show full text]
  • The Resource Allocation Model (RAM) in 2021
    NSW Department of Education The Resource Allocation Model (RAM) in 2021 For NSW public schools, the table below shows the 2021 RAM funding. The 2021 RAM funding represents the total 2021 funding for the four equity loadings and the three base allocation loadings, a total of seven loadings. The equity loadings are socio-economic background, Aboriginal background, English language proficiency and low-level adjustment for disability. The base loadings are location, professional learning, and per capita. Changes in school funding are the result of changes to student needs and/or student enrolments. Updated March 2021 *2019/2020 2021 RAM total School full name average FOEI funding ($) Abbotsford Public School 15 364,251 Aberdeen Public School 136 535,119 Abermain Public School 144 786,614 Adaminaby Public School 108 47,993 Adamstown Public School 62 310,566 Adelong Public School 116 106,526 Afterlee Public School 125 32,361 Airds High School 169 1,919,475 Ajuga School 164 203,979 Albert Park Public School 111 251,548 Albion Park High School 112 1,241,530 Albion Park Public School 114 626,668 Albion Park Rail Public School 148 1,125,123 Albury High School 75 930,003 Albury North Public School 159 832,460 education.nsw.gov.au NSW Department of Education *2019/2020 2021 RAM total School full name average FOEI funding ($) Albury Public School 55 519,998 Albury West Public School 156 527,585 Aldavilla Public School 117 681,035 Alexandria Park Community School 58 1,030,224 Alfords Point Public School 57 252,497 Allambie Heights Public School 15
    [Show full text]
  • New South Wales Office Network and Key Contacts List
    New South Wales IPAR is the largest provider of injury Our customers benefit from: prevention and return to work services The most comprehensive office network servicing all metropolitan and regional centres Tweed Heads office network and in New South Wales. Over 130 permanent employees from the local community key contacts list Our client-centric services help people (not contractors or fly in / fly out workers) to safely and sustainably recover and An effective and timely service – we can be onsite, commencing intervention, return to wellbeing and work. within 24 hours of referral Tweed Heads Murwillumbah Mungindi Hungerford Goodooga Texas Lismore Byron bay Tibooburra Casino Ballina Tenterfield Milparinka Lightning Moree Warialda Ridge Maclean Bourke Brewarrina Bellata Inverell Glen Innes Walgett Wee Waa Grafton Louth Narrabri Guyra Woolgoolga Byrock Dorrigo Armidale Bellingen Coffs Harbour Coonamble Manilla Nambucca Heads Euriowie Macksville Gunnedah Wilcannia Cobar Coonabarabran Tamworth Kempsey Barnato Nyngan Gilgandra Port Macquarie Broken Hill Warren Wauchope (serviced by Mildura) Murrurundi Menindee Mount Manara Narromine Dubbo Gloucester Taree Muswellbrook Tuncurry Wellington Tullamore Mudgee Singleton Ivanhoe Forster Northern Beaches Blacktown Roto Condobolin Newcastle Penrith Parkes Parramatta Lake Cargelligo Forbes Orange Sydney Hillston Gosford Richmond Booligal Bathurst Central Coast Liverpool Marsden Windsor Mildura West Wyalong Griffith Cowes Sydney Hay Campbelltown Balranald Temora Young Camden Murrumbidgee Robinvale
    [Show full text]
  • Structure and Tectonics of the Gunnedah Basin, N.S.W: Implications for Stratigraphy, Sedimentation and Coal Resources, with Emphasis on the Upper Black Jack Group
    University of Wollongong Thesis Collections University of Wollongong Thesis Collection University of Wollongong Year Structure and tectonics of the Gunnedah Basin, N.S.W: implications for stratigraphy, sedimentation and coal resources, with emphasis on the Upper Black Jack group N. Z Tadros University of Wollongong Tadros, N.Z, Structure and tectonics of the Gunnedah Basin, N.S.W: implications for stratigraphy, sedimentation and coal resources, with emphasis on the Upper Black Jack group, PhD thesis, Department of Geology, University of Wollongong, 1995. http://ro.uow.edu.au/theses/840 This paper is posted at Research Online. http://ro.uow.edu.au/theses/840 CHAPTER 4 STRUCTURAL ELEMENTS 4.1 Introduction 161 4.2 Basement morphology 161 4.3 Major structural elements 163 4.3.1 Longitudinal and associated structures 163 A. Ridges 163 i) Boggabri Ridge 163 ii) Rocky Glen Ridge 169 B. Shelf areas 169 C. Sub-basins 171 i) Maules Creek Sut)-basin 171 ii) Mullaley Sub-basin 173 iii) Gilgandra Sub-basin 173 4.3.2 Transverse structures and troughs 174 i) Moree and Narrabri Highs; Bellata Trough 174 ii) Walla Walla Ridge; Baradine High; Bohena, Bando, Pilliga and Tooraweena Troughs 176 iii) Breeza Shelf; Bundella and Yarraman Highs 177 iv) Liverpool Structure 180 v) Murrurundi Trough 180 vi) Mount Coricudgy Anticline 182 4.4 Faults 184 4.4.1 Hunter-Mooki Fault System 184 4.4.2 Boggabri Fault 184 4.4.3 Rocky Glen Fault 186 4.5 Minor structures 186 Please see print copy for image Please see print copy for image P l e a s e s e e p r i n t c o p y f o r i m a g e 161 CHAPTER 4 STRUCTURAL ELEMENTS 4.1 INTRODUCTION It has already been mentioned in the previous chapter that the present Gunnedah Basin forms the middle part of the Sydney - Bowen Basin, a long composite stmctural basin, consisting of several troughs defined by bounding basement highs and ridges.
    [Show full text]
  • Information Pack MANAGER PROPERTY SERVICES CONTACT Gemma Sheridan | Talent Consultant, Leading Roles
    Information Pack MANAGER PROPERTY SERVICES CONTACT Gemma Sheridan | Talent Consultant, Leading Roles M: 0407 009 243 E: [email protected] www.leadingroles.com.au ABN: 53 142 460 357 Privacy Information: Leading Roles is collecting your personal information in accordance with the Information Privacy Act for the purpose of assessing your skills and experience against the position requirements. The information you provide in your application will only be used by employees of Leading Roles. Your information will be provided to authorised Council Ofcers, including Human Resources and the relevant selection panel members. But it will not be given to any other person or agency unless you have given us permission, or we are required by law. CONTENTS THE PERSON AND THE POSITION 6 KEY SELECTION CRITERIA 9 SELECTION AND SHORTLISTING 10 ORGANISATIONAL CHART 11 COUNCIL VISION 12 OUR STRATEGIC DIRECTIONS 12 OUR COUNCILLORS 15 OUR SHIRE 17 BUSINESS AND INDUSTRY 18 EDUCATION 22 LIFESTYLE 23 LOCAL FESTIVALS AND EVENTS 24 SPORT IN OUR SHIRE 25 OTHER TOWNS 28 Narrabri Shire Information Pack Manager Property Services 3 A NOTE FROM THE General Manager 4 Narrabri Shire Information Pack Manager Property Services Narrabri Shire has taken the first steps into an unprecedented period of growth and never seen before levels of investment. It is exciting times! We have a strong and proud agricultural history that has water meter fleet has operated wirelessly for a number seen numerous major industries develop and expand of years now and we have expended this network to in the Shire, the latest being a greater than $90 million include a series of remote weather stations, and we have redevelopment of the Cotton Seed Distributors site implemented an online training platform that integrates encompassing processing plants with world leading with the HR modules of TechnologyOne.
    [Show full text]
  • Rail Accident Report
    Rail Accident Report Collision at Swanage station 16 November 2006 Report 35/2007 September 2007 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2007 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.raib.gov.uk DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Rail Accident Investigation Branch 3 Report 35/2007 www.raib.gov.uk September 2007 Collision at Swanage station 16 November 2006 Contents Introduction 6 Summary of the report 7 Key facts about the accident 7 Immediate cause, causal and contributory factors, underlying causes 7 Recommendations 8 The Accident 9 Summary of the accident 9 Location 9 The parties involved 10 External circumstances 10 The infrastructure 10 The train 12 Events
    [Show full text]
  • Amtrak Station Program and Planning Guidelines 1
    Amtrak Station Program and Planning Guidelines 1. Overview 5 6. Site 55 1.1 Background 5 6.1 Introduction 55 1.2 Introduction 5 6.2 Multi-modal Planning 56 1.3 Contents of the Guidelines 6 6.3 Context 57 1.4 Philosophy, Goals and Objectives 7 6.4 Station/Platform Confi gurations 61 1.5 Governing Principles 8 6.5 Track and Platform Planning 65 6.6 Vehicular Circulation 66 6.7 Bicycle Parking 66 2. Process 11 6.8 Parking 67 2.1 Introduction 11 6.9 Amtrak Functional Requirements 68 2.2 Stakeholder Coordination 12 6.10 Information Systems and Way Finding 69 2.3 Concept Development 13 6.11 Safety and Security 70 2.4 Funding 14 6.12 Sustainable Design 71 2.5 Real Estate Transactional Documents 14 6.13 Universal Design 72 2.6 Basis of Design 15 2.7 Construction Documents 16 2.8 Project Delivery methods 17 7. Station 73 2.9 Commissioning 18 7.1 Introduction 73 2.10 Station Opening 18 7.2 Architectural Overview 74 7.3 Information Systems and Way Finding 75 7.4 Passenger Information Display System (PIDS) 77 3. Amtrak System 19 7.5 Safety and Security 78 3.1 Introduction 19 7.6 Sustainable Design 79 3.2 Service Types 20 7.7 Accessibility 80 3.3 Equipment 23 3.4 Operations 26 8. Platform 81 8.1 Introduction 81 4. Station Categories 27 8.2 Platform Types 83 4.1 Introduction 27 8.3 Platform-Track Relationships 84 4.2 Summary of Characteristics 28 8.4 Connection to the station 85 4.3 Location and Geography 29 8.5 Platform Length 87 4.4 Category 1 Large stations 30 8.6 Platform Width 88 4.5 Category 2 Medium Stations 31 8.7 Platform Height 89 4.6 Category 3 Caretaker Stations 32 8.8 Additional Dimensions and Clearances 90 4.7 Category 4 Shelter Stations 33 8.9 Safety and Security 91 4.8 Thruway Bus Service 34 8.10 Accessibility 92 8.11 Snow Melting Systems 93 5.
    [Show full text]
  • Standard Infrastructure - Tram Stop Platform Design
    Standard Infrastructure - Tram Stop Platform Design CE-021-ST-0012 1.01 17/03/2020 Disclaimer: This document is developed solely and specifically for use on Melbourne metropolitan tram network managed by Yarra Trams. It is not suitable for any other purpose. You must not use or adapt it or rely upon it in any way unless you are authorised in writing to do so by Yarra Trams. If this document forms part of a contract with Yarra Trams, this document constitutes a “Policy and Procedure” for the purposes of that contract. This document is uncontrolled when printed or downloaded. Users should exercise their own skill and care or seek professional advice in the use of the document. This document may not be current. Current standards are available for download internally from CDMS or from https://yarratrams.com.au/standards. Infrastructure - Tram Stop Platform Design Table of Contents 1 PURPOSE ................................................................................................................................................ 4 2 SCOPE .................................................................................................................................................... 4 3 COMPLIANCE ......................................................................................................................................... 4 4 REQUIREMENTS ..................................................................................................................................... 5 4.1 General .........................................................................................................................................
    [Show full text]
  • Roads and Locality Map 1010 1111 Oo
    ROADS AND LOCALITY MAP AA BB CC DD EE FF GG HH II JJ KK LL MM NN OO PP ROWENAROWENA MGAMGA ZoneZone 5555 MGAMGA ZoneZone 5656 GRAGRAVESENDVESEND 11 MAMALLOWALLOWA MGAMGA ZoneZone 5555 MGAMGA ZoneZone 5656 11 29.75°29.75° SS MILLIEMILLIE GURLEYGURLEY 29.75°29.75° SS GURLEYGURLEY TransportTransport StateState HighwayHighway SR221 StateState HighwayHighway POISON GATE ROAD Creek MajorMajor SealedSealed SR1 Doorabeeba SR255 MILLIE ROAD MinorMinor SealedSealed CLARENDON ROAD TERRYTERRY Creek Thalaba SR80 RBulyeroi Millie GUNADOO LANE MajorMajor UnsealedUnsealed Creek Bore Creek Creek HIEHIE Bumble HIEHIE MinorMinor UnsealedUnsealed ELCOMBEELCOMBE Creek MinorMinor UnsealedUnsealed ELCOMBEELCOMBE Waterloo SH17 MinorMinor UnsealedUnsealed ELCOMBEELCOMBE Millie SR1 BULYEROIBULYEROI MILLIE ROAD Little NEWELL HIGHWAY MOREE PLAINS SR45 Pidgee SR269 NaturalNatural SurfaceSurface Waterhole HIEHIE NaturalNatural SurfaceSurface 22 NOWLEY ROAD BRIGALOW LANE 22 Thalaba Creek RailwayRailway Millie Waterloo SHIRE COUNCIL RailwayRailway Creek Creek LocalityLocality SR4 R Bunna SPRING PLAINS ROAD Creek SR280 #2 Bore JEWSJEWS LAGOONLAGOON SR107 Creek MANAMOI ROAD RegionRegion SR197 Gehan Tookey WAIWERA LANE DISCLAIMER SUNNYSIDE ROAD BANGHEETBANGHEET SR278 All care is taken in the preparation CAMERONS SR9 StateState ForestForest of this plan, however, Narrabri Shire Council BALD HILL ROAD StateState ForestForest LANE SR283 Gehan accepts no responsibility for any misprints, SR1 MILTON DOWNS ROAD SR113 errors, omissions or inaccuracies. MILLIE ROAD RegionRegion
    [Show full text]
  • Intercity Passenger Rail System
    Appendix 3 Intercity Passenger Rail System Introduction passenger rail system, including: The Pennsylvania Intercity Passenger and Freight Rail Plan provides a High-Speed Rail Corridors (110 mph and above) – Corridors under strategic framework for creating a 21st-century rail network. The Plan 500 miles with travel demand, population density, and congestion on visualizes the passenger and competing modes that warrant high-speed rail service. freight rail network in 2035 Regional Corridors (79 to 110 mph) – Corridors under 500 miles, with and offers strategies and frequent, reliable service competing successfully with auto and air objectives to achieve its vision. travel. The purpose of Appendix 3 is Long-Distance Service – Corridors greater than 500 miles that provide to provide background basic connectivity and a balanced national transportation system. information on existing passenger rail service in In a report to Congress, Vision for High-Speed Rail in America, dated April Pennsylvania with a 2009, the Federal Railroad Administration (FRA) provided the following concentration on existing definitions: intercity passenger rail service and performance. High-Speed Rail (HSR) and Intercity Passenger Rail (IPR) HSR – Express. Frequent, express service between major population Intercity Rail Definitions centers 200 to 600 miles apart, with few intermediate stops.1 Top There are numerous interpretations of what constitutes “intercity speeds of at least 150 mph on completely grade-separated, dedicated passenger rail.” In a recent publication, Achieving the Vision: Intercity rights-of-way (with the possible exception of some shared track in Passenger Rail, the American Association of State Highway and Transportation Officials (AASHTO) urged Congress to enact a National Rail Policy that should address the development of a national intercity 1 Corridor lengths are approximate; slightly shorter or longer intercity services may still help meet strategic goals in a cost-effective manner.
    [Show full text]
  • Referral of Proposed Action 1 Summary of Proposed Action
    Referral of proposed action Project title: Narrabri to North Star Section of Inland Rail 1 Summary of proposed action 1.1 Short description The Australian Government has committed to building a significant new piece of national transport infrastructure by constructing an inland railway between Melbourne and Brisbane, via central-west New South Wales (NSW) and Toowoomba in Queensland (Figure 1.1). The Inland Rail project (‘Inland Rail’) is a major national project that will enhance Australia’s existing national rail network and serve the interstate freight market. Australian Rail Track Corporation Ltd (ARTC) (the proponent) is seeking approval to construct and operate the Narrabri to North Star section of Inland Rail (the proposed action). The proposed action is generally located in the existing rail corridor between the town of Narrabri and the village of North Star in NSW (refer Figure 1.2). The proposed action would involve upgrading the existing line between Narrabri and North Star (approximately 183 kilometres) including the existing track and track formation, replacement of culverts and bridges, construction of five new passing loops, rationalisation of level crossings and curve easing. The referral area encompasses all land on which the above works will be undertaken, including the existing rail corridor and adjoining lands where required, as shown on Figure 1.2. 001 Referral of proposed action v June 2016 Page 1 of 38 1.2 Latitude and longitude The coordinates of the turning points are as follows. Point Latitude Longitude Point
    [Show full text]