Amendment C1 List of Changes to the Mornington Peninsula

Total Page:16

File Type:pdf, Size:1020Kb

Amendment C1 List of Changes to the Mornington Peninsula Amendment C1 List of changes to the Mornington Peninsula Planning Scheme Clause Change Comment No(s) OVERLAYS 43.02 In Schedule 1 to the Design and Development Overlay under the Amends the schedule by reducing heading 2.0 Buildings and works, within the first paragraph, the area where a permit is schedules replace the words “in the area between Kangerong Avenue, required for a single dwelling. Domana and Boneo Road, Rosebud.” with “where land adjoins Point Nepean Road.” In Schedule 2 to the Design and Development Overlay under the Amends the schedule by heading 2.0 Buildings and works, replace the first paragraph with correcting an inadvertent error the following: created when approving the new Mornington Peninsula Planning “No permit is required to construct a building or construct or carry Scheme. out works associated with a single dwelling, dwelling extensions, an outbuilding or a fence provided the following requirements are met:” In Schedules 2, 3 and 4 to the Design and Development Overlay under the heading 2.0 Buildings and works, replace the words Amends the schedules by “New development must have a maximum building height of no correcting inadvertent errors more than 8 metres and must contain no more than 2 storeys above created when approving the new natural ground level, unless specifically stated in a plan approved Mornington Peninsula Planning under a schedule to the Development Plan Overlay. This Scheme and removes the absolute requirement cannot be varied with a permit.” with the following: building height for new development. “New development must have a maximum building height of no more than 8 metres, except in the area located to the north of a boundary defined by Ellerina Road West, Ellerina Road, the Nepean Highway, Bittern Dromana Road and Disney Street, and must contain no more than 2 storeys above natural ground level, unless specifically stated in a plan approved under a schedule to the Development Plan Overlay.” In Schedule 4 to the Design and Development Overlay under the Amends the schedule by heading 2.0 Buildings and works, in the first paragraph replace correcting inadvertent errors the words: created when approving the new Mornington Peninsula Planning “All buildings and works including a single dwelling, dwelling Scheme. extensions, an outbuilding or a fence must meet the following requirements: All buildings have a maximum wall height of 5.5 metres.” with the following: “No permit is required to construct a building or construct or carry out works associated with a single dwelling, dwelling extensions, an outbuilding or a fence provided the following requirements are met: All buildings have a maximum height of: 5 metres in the area west of Truemans Road and south of a boundary defined by the proposed Mornington Peninsula Freeway, Old Melbourne Road and Hotham Road. 8 metres in the area bounded by the Nepean Highway, Canadian Bay Road, The Moorooduc Highway and Humpheries Road. 6 metres in all other areas. No buildings and works are located on a ridge top.” In Schedule 4 to the Design and Development Overlay under the heading 2.0 Buildings and works, in the newly created fifth dot Amends the schedule by point in the first paragraph, replace the numbers “7.5” and “3” with correcting inadvertent errors the numbers “15” and “5” respectively. created when approving the new Mornington Peninsula Planning In Schedule 5 to the Design and Development Overlay under the Scheme. heading 2.0 Buildings and works, in the first paragraph after the first dot point insert the following: Amends the schedule by correcting an inadvertent error “No buildings and works are located on a ridge top.” created when approving the new Mornington Peninsula Planning In Schedule 5 to the Design and Development Overlay under the Scheme. heading 2.0 Buildings and works, replace the words “New development must have a maximum building height of no more Amends the schedule by than 8 metres and must contain no more than 2 storeys above removing the absolute building natural ground level, unless specifically stated in a plan approved height for new development. under a schedule to the Development Plan Overlay. This requirement cannot be varied with a permit.” with the following: “New development must have a maximum building height of no more than 8 metres and must contain no more than 2 storeys above natural ground level, unless specifically stated in a plan approved under a schedule to the Development Plan Overlay.” In Schedule 6 to the Design and Development Overlay under the Amends the schedule by heading 1.0 Design objectives, replace the seventh dot point with correcting an inadvertent error the following: created when approving the new Mornington Peninsula Planning Scheme. “To maintain lots of sufficient area to provide for racehorse training establishments in association with residential use in the vicinity of the Mornington racecourse and to provide additional protection to the Balcombe Creek.” In Schedule 6 to the Design and Development Overlay under the Amends the schedule by heading 2.0 Buildings and works replace the first paragraph with correcting an inadvertent error the following: created when approving the new Mornington Peninsula Planning “No permit is required to construct a building or construct or carry Scheme. out works associated with a single dwelling, dwelling extensions, an outbuilding or fence provided the following requirements are met:” In Schedule 7 to the Design and Development Overlay under the heading 1.0 Design objectives, replace the last two dot points with Amends the schedule by the following respectively: correcting inadvertent errors created when approving the new “To maintain lots of sufficient area to provide for racehorse Mornington Peninsula Planning training establishments in association with residential use and to Scheme. provide additional protection to the Balcombe Creek. To maintain the existing open landscape, which defines the Bittern township boundaries.” In Schedule 7 to the Design and Development Overlay under the Amends the schedule by heading 2.0 Buildings and works replace the first paragraph with correcting an inadvertent error the following: created when approving the new Mornington Peninsula Planning “No permit is required to construct a building or construct or carry Scheme. out works associated with a single dwelling, dwelling extensions, an outbuilding or a fence provided the following requirements are met:” LIST OF AMENDMENTS List of Insert: Updates list of amendments to the Amendmen Amendment number, “C1”, in operation from, DATE with the planning scheme. ts brief description: “Corrects anomalies in Schedules 1, 2, 3, 4, 5, 6,and 7 to the Design and Development Overlay and deletes reference to a maximum building height in Schedules 2, 3, 4 and 5 to the Design and Development Overlay.”.
Recommended publications
  • Supplement to Austroads Guide to Traffic Management Part 10: Traffic Control and Communication Devices (2009)
    Supplement to Austroads Guide to Traffic Management Part 10: Traffic Control and Communication Devices (2009) OCTOBER 2015 vicroads.vic.gov.au VicRoads Guide to Traffic Management 1 Part 2A: Transition Reference Guide Edition 1, October 2015 Table of Contents 1. Introduction ............................................................................................................... 4 1.1 General .............................................................................................................. 4 1.2 How to Use this Supplement .............................................................................. 4 2. Classification of Supplement Information ............................................................. 5 3. Details of Changes .................................................................................................... 7 Section 1.2 – Traffic Control Devices – Definitions and Functions ............................... 7 Section 2.3.2 – Considerations for Aged Road Users and People with Disabilities ...... 7 Section 3.2 – Principles for Preparation of Schemes ................................................... 9 Section 3.5.1 – General ............................................................................................ 16 Section 4.1 – Development of New Signs ................................................................. 16 Section 4.2.1 – Regulatory Signs .............................................................................. 16 Section 4.3.6 – Letter Types and Spacing ................................................................
    [Show full text]
  • LMA Annual Report 2011-12
    Published by Linking Melbourne Authority Building 1 Level 1 Brandon Business Park 540 Springvale Road Glen Waverley Victoria 3150 August 2012 Also published on www.linkingmelbourne.vic.gov.au © State of Victoria 2012 This publication is copyright. No part may be reproduced by any process except in accordance with provisions of the Copyright Act. Authorised by the Victorian Government 121 Exhibition Street Melbourne Victoria 3000 Printed on Australian made, carbon neutral, recycled paper using waterless printing. CONTENTS Acting Chairman’s report ....................................4 CEO’s report.........................................................5 Linking Melbourne, linking communities...........6 Governance ..........................................................7 Our Board.......................................................7 Our people .....................................................8 Peninsula Link ....................................................9 Completing Melbourne’s missing link ..........9 Project benefits..............................................9 Project cost ....................................................9 Peninsula Link features ................................9 Project objectives.........................................10 Delivering Peninsula Link ...........................10 Property .......................................................10 Construction ................................................11 Environment.................................................12 Social............................................................12
    [Show full text]
  • Victoria's Project Prioritisation Submission to Infrastructure Australia
    2008 VICTORIA’S PROJECT PRIORITISATION SUBMISSION TO INFRASTRUCTURE AUSTRALIA Published by State of Victoria www.vic.gov.au © State Government of Victoria 31 October 2008 Authorised by the Victorian Government, Melbourne. Printed by Impact Digital, Units 3-4 306 Albert Street, Brunswick VIC 3056. This publication is copyright. No part may be reproduced by any process except in accordance with the Provisions of the Copyright Act 1968 2 CONTENTS 1. Introduction 2 2. Victoria Supports the Commonwealth’s Five Key 4 Platforms for Productivity Growth 3. Victoria’s Leading Role in the National Economy 6 4. Transport Challenge Facing Victoria 8 5. Victoria’s Record in Regulatory and Investment Reform 12 6. Victoria’s Strategic Priority Project Packages 14 7. Linkages Table 28 8. Indicative Construction Sequencing 30 Victoria’s Project Prioritisation Submission to Infrastructure Australia 1 1. INTRODUCTION 1.1 AUDIT SUBMISSION These projects will help build Victoria lodged its submission to the National Infrastructure Audit with Infrastructure a stronger, more resilient, and Australia (IA) on 30 June 2008. The Audit Submission provided a strategic overview of sustainable national economy, Victoria’s infrastructure needs in the areas of land transport, water, sea ports, airports, energy and telecommunications. It detailed the key infrastructure bottlenecks and able to capture new trade constraints that need to be addressed to optimise Victoria’s and Australia’s future opportunities and reduce productivity growth. greenhouse gas emissions. Following the lodgement of Victoria’s submission, IA wrote to all States and Territories requesting further input on ‘Problem and Solution Assessment.’ In response to this request, the Victorian Government gave IA offi cials a detailed briefi ng and background paper in September 2008.
    [Show full text]
  • Copy of RMC List Statewide FINAL 20201207 to Be Published .Xlsx
    Department of Transport Road Maintenance Category - Road List Version : 1 ROAD NAME ROAD NUMBER CATEGORY RMC START RMC END ACHERON WAY 4811 4 ROAD START - WARBURTON-WOODS POINT ROAD (5957), WARBURTON ROAD END - MARYSVILLE ROAD (4008), NARBETHONG AERODROME ROAD 5616 4 ROAD START - PRINCES HIGHWAY EAST (6510), SALE ROAD END - HEART AVENUE, EAST SALE AIRPORT ROAD 5579 4 ROAD START - MURRAY VALLEY HIGHWAY (6570), KERANG ROAD END - KERANG-KOONDROOK ROAD (5578), KERANG AIRPORT CONNECTION ROAD 1280 2 ROAD START - AIRPORT-WESTERN RING IN RAMP, TULLAMARINE ROAD END - SHARPS ROAD (5053), TULLAMARINE ALBERT ROAD 5128 2 ROAD START - PRINCES HIGHWAY EAST (6510), SOUTH MELBOURNE ROAD END - FERRARS STREET (5130), ALBERT PARK ALBION ROAD BRIDGE 5867 3 ROAD START - 50M WEST OF LAWSON STREET, ESSENDON ROAD END - 15M EAST OF HOPETOUN AVENUE, BRUNSWICK WEST ALEXANDRA AVENUE 5019 3 ROAD START - HODDLE HIGHWAY (6080), SOUTH YARRA ROAD BREAK - WILLIAMS ROAD (5998), SOUTH YARRA ALEXANDRA AVENUE 5019 3 ROAD BREAK - WILLIAMS ROAD (5998), SOUTH YARRA ROAD END - GRANGE ROAD (5021), TOORAK ANAKIE ROAD 5893 4 ROAD START - FYANSFORD-CORIO ROAD (5881), LOVELY BANKS ROAD END - ASHER ROAD, LOVELY BANKS ANDERSON ROAD 5571 3 ROAD START - FOOTSCRAY-SUNSHINE ROAD (5877), SUNSHINE ROAD END - MCINTYRE ROAD (5517), SUNSHINE NORTH ANDERSON LINK ROAD 6680 3 BASS HIGHWAY (6710), BASS ROAD END - PHILLIP ISLAND ROAD (4971), ANDERSON ANDERSONS CREEK ROAD 5947 3 ROAD START - BLACKBURN ROAD (5307), DONCASTER EAST ROAD END - HEIDELBERG-WARRANDYTE ROAD (5809), DONCASTER EAST ANGLESEA
    [Show full text]
  • Outer Melbourne Connect | Special Report October 2008
    • transport • community • industry outer Special Report | October 2008 melbourne outer melbourne connect | special report October 2008 Melbourne is booming. Every week, another 1,200 people call Melbourne home and the Victorian Government now predicts that we will become the nation’s largest city within 20 years. This rapid population growth has strained Melbourne’s transport system and threatens Victoria’s economic prosperity and Melbourne’s liveability. The region feeling the pain the outer most is outer Melbourne, home to over half of Melbourne’s population and set for continued rapid growth. melbourne In 2002, RACV produced a special report titled ‘The Missing Links’, which presented a plan for upgrading transport infrastructure in outer metropolitan Melbourne. transport The Missing Links identified seventy-four critical road and public transport projects and a much needed $2.2 billion community investment. Six years on, only half of these projects have been built or had funds committed to build them. The other industry half remain incomplete and the intervening period of strong population and economic growth has created further pressing demands on our transport system. Melbourne’s liveability is recognised worldwide and RACV wants it to stay this way. For this reason, we have again consulted with state and local governments and listened to Members to identify an updated program of works to meet the needs of people living in and travelling through Melbourne’s outer suburbs. RACV presents Outer Melbourne Connect as a responsible blueprint comprising road improvements, rail line extensions and significant public transport service improvements.Connect provides a comprehensive and connected transport network to address the critical backlog of projects in outer Melbourne.
    [Show full text]
  • FAMILY SOUTH EAST Highways to the Dandenongs
    Suggested Selfdrive Itineraries Day 1 Melbourne to The Dandenongs to Yarra Valley (1 hr) MELBOURNE’S Leave Melbourne and head towards the Eastern and Maroondah FAMILY SOUTH EAST Highways to The Dandenongs. Enjoy driving through fern tree gullies and quaint villages of Olinda and Sassafras before arriving in Yarra Glen PLAYTIME TOURING TRIANGLE – heart of the Yarra Valley wine country. Overnight: Yarra Valley HOLIDAYs Healesville Yarra Valley Melbourne Day 2 Yarra Valley to Phillip Island (2 hrs 30 mins) Yarra Glen Explore the wine region, visit the Yarra Valley Dairy for gourmet MELBOURNE cheeses, travel along Monbulk Road towards Cranbourne Road to connect Olinda Sassafras to the South Gippsland Highway. Turn off at Bass Highway and continue to Phillip Island to enjoy the spectacular nature and wildlife here. Belgrave Overnight: Phillip Island P o r t Day 3 Phillip Island to Mornington Peninsula (2 hrs) P h i l l i p VICTORIA Leave Phillip Island via Bass Highway to connect to South Gippsland B a y Highway and then onto Moorooduc Highway via Tooradin Road. Mornington Tooradin For more spectacular coastal scenery, travel along the Nepean Highway to enjoy the Mediterranean jewel-like bays, rugged surf beaches and lush Rosebud bushland. This region boasts of fabulous winery/golfing tour experiences, Sorrento as well as great eco-tourism, adventure and wildlife. Rye Red Hill Overnight: Mornington Peninsula Mornington B a s s Peninsula S t r a i t Day 4 Mornington Peninsula to Melbourne (2 hrs 15mins) Phillip Island Leave the region via the hourly Sorrento to Queenscliff passenger car ferry San Remo and return to Melbourne via Geelong and Werribee.
    [Show full text]
  • Community Information Directory I FREE 2019
    Mornington Peninsula Community Information Directory i FREE 2019 Community Information and Support Centres Western Port Mornington Southern Peninsula 185 High Street 320 Main Street 878 Point Nepean Road Hastings VIC 3915 Mornington VIC 3931 Rosebud VIC 3939 5979 2762 5975 1644 5986 1285 You can view this directory online! mpcommunity.com.au MP Community is the online version of this Community Information Directory. It includes listings on not for profit community organisations, clubs and services for the Mornington Peninsula. The online directory allows organisations to create and update their listings as their information changes. Detailed information about programs and services can be found online. MP Community only lists not-for-profit organisations. If you are operating a for-profit organisation or business please visit the MP Business i website and register in the Mornington Peninsula Shire business directory. mpbusiness.com.au Cover: Kookaburra enjoying the summer sun Your Councillors This directory is printed on FSC® certified Mix paper (70% recycled). All paper stock is manufactured by facilities with ISO 14001 EMS certification. Briars Mornington Peninsula Shire acknowledges and pays respect to the Bunurong/Boon Wurrung people, the traditional custodians of these lands and waters. Briars Cr Bev Colomb Cr Rosie Clark Cr Sam Hearn Ward Watson Ward Cerberus Nepean Red Hill Cerberus Ward Seawinds Nepean Ward Ward Cr Kate Roper Cr Hugh Fraser Cr Bryan Payne Cr David Gill Seawinds Watson Red Hill Ward Cr Simon Brooks Cr Antonella Celi Cr Frank Martin Cr Julie Morris Mornington Peninsula Community Information Directory Prepared in consultation with the three Community Information and Support Centres of the Mornington Peninsula.
    [Show full text]
  • 14. Greenhouse Gas Emissions
    FRANKSTON BYPASS EES INQUIRY REPORT INQUIRY REPORT APRIL 2009 FRANKSTON BYPASS EES INQUIRY REPORT INQUIRY REPORT Lester Townsend, Chair Chris Banon, Member Henry Turnbull, Member APRIL 2009 Contents INTRODUCTION AND BACKGROUND.................................................................. 1 1. KEY ISSUES .............................................................................................................. 1 1.1 Need for the Bypass .................................................................................................. 1 1.2 Environmental impacts ............................................................................................ 2 1.3 Greenhouse gas emissions ....................................................................................... 3 2. THE INQUIRY.......................................................................................................... 4 2.1 Appointment of the Inquiry..................................................................................... 4 2.2 Terms of Reference.................................................................................................... 4 2.3 Description of proceedings ...................................................................................... 5 3. POLICY CONTEXT ................................................................................................. 7 3.1 A snap shot of regional planning history .............................................................. 7 3.2 Metropolitan planning.............................................................................................
    [Show full text]
  • Mornington Railway Park Closes at 4Pm
    FEATURES LOCAL BUSINESSES SUPPORTING THE COMMUNITY PARKING Free parking is available at all three stations for rail patrons only. Moorooduc car park closes at 5pm. Mornington car Mornington Railway park closes at 4pm. ‘Owner onus’ applies. REFRESHMENTS & SOUVENIRS BBQ, light refreshments, tea and coffee and a selection of souvenirs are available on Moorooduc Station. COURTESY BUS A shuttle bus operates on some days between Mornington Station and key locations in the Mornington C E MBER 2017 township. Check web sites and Facebook for availability. D E A NUA RY 2017 - TABLE J CONVENIENCES Toilets are only available at Moorooduc TIME Station. Disabled facilities provided. MT ELIZA REGIONAL PARK Adjacent to Moorooduc Station, the park includes a lake, BBQ’s & walking trails. 1031 Pt Nepean Road Rosebud, Victoria 3939 WE OFFER Phone: 5986 3705 Fax: 5986 7863 Email: [email protected] CHILDREN’S BIRTHDAY PARTIES Children love trains and parties. Features include: reserved carriage, decorations, up www.paulsfnejewellery.com.au to 2 hours on the train, self catering. No alcohol please. Not available on event days. DRIVER EXPERIENCE Imagine standing on the footplate of a classic steam locomotive or perhaps behind the controls of a mighty diesel engine powering through the countryside under your control. GIFT VOUCHERS Gift vouchers are available for that special present for travel on Excursion Trains or Driver Experience. Purchase at Moorooduc Station Ticket Office or order by phone. GROUP BOOKINGS & CHARTERS Groups of 15 paying passengers or more benefit from a discount on standard fares. Large groups may book for normal running days or charter Curry Printing is a long established business days.
    [Show full text]
  • Moorooduc Coolstores Master Plan
    Moorooduc Coolstores Master Plan Tourism Analysis and Positioning August 2006 Prepared by Urban Enterprise Pty Ltd Urban Planners Land Economists Tourism Planners 389 St Georges Road NORTH FITZROY VIC 3068 Telephone (03) 9482 3888, Facsimile (03) 9482 3933 email: [email protected] web: www.urbanenterprise.com.au Author Matt Ainsaar, Managing Director, MPIA, AAPI © Copyright, Urban Enterprise Pty Ltd, August 2006. This work is copyright. Apart from any use as permitted under Copyright Act 1963, no part may be reproduced without written permission of Urban Enterprise Pty Ltd. Document Information: Filename: c:\my documents\moorooduc coolstores\report-ma\draft masterplan report 22 nov 2004.doc Last Saved: 22 November 2004 8:27 PM Last Printed: 31 August 2006 2:46 PM File Size: 727kb Disclaimer: Neither Urban Enterprise Pty. Ltd. nor any member or employee of Urban Enterprise Pty. Ltd. takes responsibility in any way whatsoever to any person or organisation (other than that for which this report has been prepared) in respect of the information set out in this report, including any errors or omissions therein. In the course of our preparation of this report, projections have been prepared on the basis of assumptions and methodology which have been described in the report. It is possible that some of the assumptions underlying the projections may change. Nevertheless, the professional judgement of the members and employees of Urban Enterprise Pty. Ltd. have been applied in making these assumptions, such that they constitute an understandable basis for estimates and projections. Beyond this, to the extent that the assumptions do not materialise, the estimates and projections of achievable results may vary.
    [Show full text]
  • Frankston Bypass Assessment
    FRANKSTON BYPASS ASSESSMENT under ENVIRONMENT EFFECTS ACT 1978 Minister for Planning June 2009 Glossary AAV Aboriginal Affairs Victoria AHD Australian Height Datum ARI Average Recurrence Interval of rainfall events AVW Atlas of Victorian Wildlife CAD Central Activities District CHMP Cultural Heritage Management Plan, prepared under Aboriginal Heritage Act 2006 C&LP Act Catchment and Land Protection Act 1994 DEWHA Commonwealth Department of the Environment, Water, Heritage and the Arts DPCD Victorian Department of Planning and Community Development DSE Victorian Department of Sustainability and Environment EES Environment Effects Statement EMP Environmental Management Plan EMS Environmental Management System EPA Victorian Environment Protection Authority EPBC Act Environment Protection and Biodiversity Conservation Act 1999 ESD ecologically sustainable development EVC Ecological Vegetation Class FFG Act Flora and Fauna Guarantee Act 1988 (Vic.) GHG Greenhouse Gases GL gigalitres ha hectares hha habitat hectares IGAE Inter-Governmental Agreement on the Environment km kilometres LPPF Local Planning Policy Framework m, m 3 metres, cubic metres MSS Municipal Strategic Statement MT Mega tonne (million tonnes) NVMF Victoria’s Native Vegetation Management Framework P&E Act Planning and Environment Act 1987 PM 10 particles or “particulate matter” with equivalent aerodynamic diameter of 10 micrometers or less SEITA Southern and Eastern Integrated Transport Authority SEPPs State Environment Protection Policies SPPF State Planning Policy Framework TDS Total Dissolved Solids 1 Table of Contents 1. INTRODUCTION 4 1.1 Purpose of this Document 4 1.2 Background 4 1.3 Project Description 4 1.4 Site and Environmental Setting 5 1.5 Alternatives 5 1.6 Structure of this Assessment 6 2. STATUTORY PROCESSES 7 2.1 The EES Process 7 2.2 Victorian Statutory Approvals 7 2.3 Commonwealth Statutory Approval 7 3.
    [Show full text]
  • Mordialloc Bypass Project Report of Peter Kelly
    Mordialloc Bypass Project Report of Peter Kelly 1 Introduction My firm WSP prepared the impact assessment report titled Mordialloc Bypass, Transport Impact Assessment (Report) which is included as Appendix A to the Environment Effects Statement (EES) for the Mordialloc Bypass Project (Project). The role that I had in preparing the Report was directing the development of the report and reviewing the methodology and outputs at a variety of stages throughout the report’s production. Other significant contributors to the Report and their expertise is set out in Section (d) of Appendix A. I adopt the Report, in combination with this document, as my written expert evidence for the purposes of the Mordialloc Bypass Project Inquiry and Advisory Committee's consideration and reporting in respect of the Project. 2 Qualifications and experience Appendix A contains a statement setting out my qualifications and experience, and the other matters in accordance with Planning Panels Victoria's 'Guide to Expert Evidence'. A copy of my curriculum vitae is provided in Appendix B. 3 Further work since preparation of the Report Since the Report was finalised, I have undertaken further work in relation to the submissions received. In particular, the further work included: · Assessment of an alternative Woodlands Drive / freeway access arrangement · Assessments of the intersections of: · Dingley Bypass / Mordialloc Bypass · Governor Road / Mordialloc Bypass, and · Tootal Road / Centre Dandenong Road / Old Dandenong Road / Kingston Drive · Microsimulation modelling of freeway operations. A summary of my findings in relation to this further work is provided in Section 4.3 and Appendices C and D. However, this further work has not caused me to materially change my opinions as expressed in the Report, apart from the preferred arrangement for the Woodlands Drive freeway access, and no amendment is required for the EPRs.
    [Show full text]