Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi , III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

Application for Environmental Clearance Form – I (I) Basic Information: S. No. Item No. Details 1 Name of the Project/s “Imperial Golf Estate” at Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab by M/s. Spark Buildcon Pvt. Ltd. 2 S. No. in the schedule The project falls under S.No. 8(b) as the built-up area of the project is 4,01,971.76 sq.m. 3 Proposed capacity / area / length/ EC accorded Built-up Area = 5,42,744 sq.m. tonnage to be handled / command area As per Revised details, Built-up Area = 4,01,971.76 / lease area / number of wells to drilled sq.m. Comparison of details between earlier EC and revised details as per revised layout plan is given in Table-1 of Conceptual Plan.

Annexures: A-1(a) : CTE Certificate A-1(b) : CTE Extension Certificate A-1(c) : Revised CTE Certificate (as per revised layout plan) A-1(d) : Partial Completion Certificate A-2 : Site Photographs A-3 : CLU A-4: CA certificate mentioining the Total Project cost as well as undepreciated cost of the project. A-5 : Resolution for Authorized Signatory A-6: Revised Approved Layout Plan 4 New/Expansion / Modernization Extension in the validity of EC 5 Existing capacity / Area etc EC accorded Built-up Area = 5,42,744 sq.m. 6 Category of the project ‘ A’, ‘B’ , ‘C’ Category ‘B’ 7 Does it attract the general conditions? No If Yes, Please Specify. 8 Does it attract the specific conditions? No If Yes, Please Specify 9 Location Plot/ Survey/Khasra No. Khasra nos. are mentioned in approved layout plan; copy is attached along as Annexure-6. Village Village Mullanpur and Talwandi Khurdi, Jagraon Tehsil Ludhiana West & Jagraon District Ludhiana

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

State Punjab 10. Nearest railway station / Airport along Railway Station, Ludhiana : Approx. 20 km; with Distance in kilometers. Ludhiana () Airport: Approx. 30 km 11 Nearest town/District headquarters District Headquaters: District Court, Ludhiana: along with distance in kilometers Approx. : 19 km 12 Village Panchayat, Zilla Parishads, Greater Ludhiana Area Development Authority Municipal corporation, local Bodies (GLADA) (Complete Postal address with Street No. 2, Ferozpur Road, Ranjit Nagar, telephone No. to be given) New Professor Colony, Ludhiana, Punjab- 142021 13 Name of the applicant Mr. Vijay Singh (Director) Resolution in this regard is attached as Annexure-5. 14 Registered address M/s. Spark Buildcon Pvt. Ltd. Regd. Office: C-8/1A, Vasant Vihar, New Delhi- 110057 15 Address for correspondence : M/s. Spark Build con Pvt. Ltd. 5th Floor, Time Square Building, B-Block, Sushant Lok -1, Gurgaon, Haryana-122009. Name : Mr. Vijay Singh Designation (owner/ Partner/CEO) Director Address M/s. Spark Buildcon Pvt. Ltd. 5th Floor, Time Square Building, B-Block, Sushant Lok -1, Gurgaon, Haryana Pin Code 122009 E- Mail [email protected] Telephone No. 0124-4550300 Fax No. 0124-4550399 16 Details of alternative Sites examined, No if any. Location of these sites should be shown on the topo Sheets. 17 Interlinked Projects No 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If Yes, date of submission. Not Applicable 20 If No, reason Not Applicable 21 Whether the Proposal involves No approval / Clearance under : If Yes , details of the same and their to be given .

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

(a) The Forest Conservation , Act,1980 (b) the wild life Protection Act, 1972 (c) The C.R.Z Notification, 1991. 22 Either their is any government Order / NBC policy relevant / relating to the site? Building Bye laws 23. Forest land Involved (hectare) Not Applicable 24. Whether there is any litigation pending There is no litigation pending against the project. against the project and /or land in which the Projects is proposed to be set up?

(a) Name of the court (b) Case no. (c) Orders / Directions of the Courts , if any and its relevance with the Project.

(II) Activity 1. Construction, Operation or Decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes The Change in land use has already been in land use, land cover or granted by Chief Town Planner. Copy of CLU topography including increase is enclosed as Annexure-3. in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, Yes Only clearance of vegetation is required. vegetation and buildings? The project has already obtained Partial completion certificate from GLADA for Phase-I for 385 plots for 127.31 acres. Partial completion certificate is enclosed as Annexure-1(d).

Also, the development work of remaining 142 plots is in process. 1.3 Creation of new land uses? No There is no need of creation of new land use.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

Project falls within Residential zone as per the Master Plan of Ludhiana and layout has been approved by Town and Country Planning Punjab, Chandigarh. Copy of approved layout is enclosed as Annexure-6. 1.4 Pre-construction investigations Yes The Pre-construction investigations had e.g. bore houses, soil testing? already been done prior to development work. 1.5 Construction works? Yes Development of Phase-I for 385 plots having 127.31 acres has been completed. Partial completion certificate is enclosed as Annexure-1(d).

Also, the development work of remaining 142 plots in Phase-II is in process.

Further, development of remaining area is to be done as per the revised approved layout plan; copy of revised approved layout plan is enclosed as Annexure-6. 1.6 Demolition works? No Not Applicable 1.7 Temporary sites used for Yes The temporary site will be developed for future construction works or housing development. At peak development activity, of construction workers? most of the workers are from local area and shall not require any residential facilities. Of this only 15 workers shall reside at the site during peak development activity over a period varying from 12-18 months. 1.8 Above ground buildings, Yes Not Applicable structures or earthworks As the project is an area development only and including linear structures, cut external infrastructural facilities are to be and fill or excavations developed. 1.9 Underground works including Yes Not Applicable mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing No Not Applicable processes? 1.14 Facilities for storage of goods or Yes Cement and other construction materials are materials? stored at site for which temporary sheds have been constructed for development work.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

1.15 Facilities for treatment or Yes As per earlier EC: disposal of solid waste or liquid The total design population of the project is effluents? 9,609 persons. The water requirement as per Manual on Water Supply & Treatment, Government of @ 135 lpcd for residential and @ 45 lpcd for floating is approx. 1288 KLD. 920 KLD of sewage will be generated from the project. This wastewater will be treated in STP of 1200 KLD capacity within the project. The water calculations along with water balance diagram are given in Conceptual Plan. Solid waste of about 3815 kg/day will be generated (@ 0.40 kg/capita/day for residential and @ 0.20 kg/capita/day for floating).

As per revised details: The total actual population of the project is 5,827 persons. The water requirement as per Manual on Water Supply & Treatment, Government of India @ 135 lpcd for residential and @ 35 lpcd for floating is approx. 643 KLD which will be abstracted from tubewell. The water calculations along with water balance diagram are given in the Conceptual Plan. Approx. 526 KLD of sewage will be generated from the project. This wastewater will be treated in a proposed STP of 550 KLD capacity; out of which 150 KLD STP has already been installed. Solid waste of about 2043 kg/day will be generated (@ 0.40 kg/capita/day for residential and @ 0.20 kg/capita/day for floating). The solid waste will be collected in designated place where segregation of Biodegradable & Non-Biodegradable waste will be done at source. 2 Mechanical Composters of 500 kg/day capacity will be installed for Biodegradable waste. The recyclable waste will be sold to resellers and inert waste will be

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

sent to the Engineered Landfill to be developed by MC, Ludhiana. 1.16 Facilities for long term housing No Local labourers have been hired from nearby of operational workers? areas during development phase. Therefore, there is no need to create permanent facilities for long term housing of operational workers. 1.17 New road, rail or sea traffic Yes During development phase of future work, during construction or movement of 10 vehicles shall be there. operation? Also in addition to it, vehicles of staff members and visitors will also be there. 1.18 New road, rail, air waterborne No No new infrastructure for this purpose is or other transport infrastructure required. The project is well connected to including new or altered routes Khanjarwal-Mullanpur village link road. Only and stations, ports, airports etc internal roads are to be developed near the future buildings. 1.19 Closure or diversion of existing No There is no need of diversion of existing transport routes or infrastructure transport routes. leading to changes in traffic movements? 1.20 New or diverted transmission No There will be no new or diverted transmission lines or pipelines? lines. 1.21 Impoundment, damming, No No Impoundment, damming, culverting, culverting, realignment or other realignment or other changes to the hydrology changes to the hydrology of of watercourses or aquifers is proposed. watercourses or aquifers? 1.22 Stream crossings? No There is no stream crossing within the project. 1.23 Abstraction or transfers of water Yes During Development period, Water demand form ground or surface waters? will be there depending upon phases of construction. This will include domestic demand for 100 workers during peak period @ 4.5 KLD. This water demand will be fulfilled by treated water; if available from STP. Total 18 no. of rain water harvesting pits will be provided so as to recharge the ground water. Further, 2 no. of rain water harvesting pits have already been constructed and in future, 16 no. of pits will be constructed. 1.24 Changes in water bodies or the No - land surface affecting drainage or run-off?

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

1.25 Transport of personnel or Yes During construction phase, movement of 10-12 materials for construction, vehicles shall be there. And during operational operation or decommissioning? phase, parking provision will be provided within their individual plot owners. 1.26 Long-term dismantling or No - decommissioning or restoration works? 1.27 Ongoing activity during No - decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in No There shall be no influx but routine movement either temporarily or of people. The maximum number of workers permanently? engaged in construction at any time is not more than 100. Out of these, more than half of the work force is local and only about 20 workers resides within project. The expected population of the project on full occupation will be 5,827 persons. This will also have a gestation period of 5 years after the development work and construction is over. So, there will be no sudden influx but gradual occupation. 1.29 Introduction of alien species? No - 1.30 Loss of native species or No There is no significant impact on the loss of genetic diversity? native species or genetic diversity. 1.31 Any other actions? No -

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities Information/Checklist Yes/ S.No. /rates, wherever possible) with source of confirmation No information data 2.1 Land especially undeveloped or No The project is already in development phase. agricultural land (ha). CLU has already been obtained from Chief Town Planner. CLU is enclosed as Annexure- 3. 2.2 Water (expected source & Yes The water will be provided from tube wells. competing users) unit: KLD For overall project, 643 KLD will be required for the project which will be abstracted from tubewells for which permission has already been obtained. 2.3 Minerals (MT) No - 2.4 Construction material – stone, Yes Construction materials will be required for aggregates, sand/s oil (expected future development work. This will be source – MT) arranged from local areas in and around Ludhiana. 2.5 Forests and timber (source – Yes The Project shall involve minimum use of MT) timber during future development. All material required for shuttering purpose shall be that of mild steel. 2.6 Energy including electricity and Yes Total Power requirement of the project is fuels (source, competing users) 12,139 KW which is being provided by Punjab Unit: fuel (MT), energy (MW) State Power Corporation Limited.

Total 9 no. of DG sets have been installed, out of which 4 nos. DG sets (i.e. 2 no. 82.5 KVA, 1 no. 40 KVA and 1 no. of 35 KVA capacity each) has already been installed for standby use for emergency purposes.

In addition, 5 nos. of DG sets (i.e. 2 no. 1500 KVA, 2 no. 1000 KVA and 1 no. 500 KVA capacity each) will be provided for power back up in future. 2.7 Any other natural resources (use No Not Applicable appropriate standard units)

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 3.1 Use of substances or materials, No The project is for housing purpose and does not which are hazardous (as per envisage any hazardous substances/ chemicals MSIHC rules) to human health except for the used Oil from DG set or the environment (flora, fauna, (Hazardous Waste Category 5.1). The same and water supplies) will be stored in HDPE tanks and will be sold to the authorized recyclers in the region. 3.2 Changes in occurrence of No - disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. Yes The project will provide improved living by changing living conditions? facility to local people. It also provides employment during construction period as well as in activities like security, operation and maintenance of pollution control equipments, landscaping etc. in operational phase. 3.4 Vulnerable groups of people No - who could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other cause No -

4. Production of Solid Wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No The project area is plain thus, not much of the wastes land will be excavated for development work. 4.2 Municipal waste (domestic and Yes The construction waste generated during or commercial wastes) development wok shall be used in making the internal roads/floors.

About 2,043 kg/day of solid waste will be

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

generated once project is fully operational.

The solid waste will be collected in designated place where segregation of Biodegradable & Non-Biodegradable waste will be done at source. Mechanical Composters will be installed for Biodegradable waste. The recyclable waste will be sold to resellers and inert waste will be sent to the landfill to be developed by MC, Ludhiana. 4.3 Hazardous wastes (as per Yes Category 5.1, used oil from DG sets. Hazardous Waste Management Rules) 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes STP sludge will be generated as sewage will be from effluent treatment treated in house STP of capacity 550 KLD; out of which 150 KLD STP has already been installed. 4.7 Construction or demolition Yes The construction waste generated during wastes development work shall be used in making the internal roads/floors. 4.8 Redundant machinery or No Redundant machinery is not generated. equipment 4.9 Contaminated soils or other No Contaminated soils or other materials will not materials be generated. 4.10 Agricultural wastes No -

4.11 Other solid wastes No -

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes Total 9 DG sets have been proposed, out of fossil fuels from stationary or which 4 nos. DG sets (i.e. 2 no. 82.5 KVA, 1 mobile sources no. 40 KVA and 1 no. of 35 KVA capacity each) has already been installed for standby use for emergency purposes. Additional, 5 nos. of DG sets (i.e. 2 no. 1500

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

KVA, 2 no. 1000 KVA and 1 no. 500 KVA capacity each) will be installed for power back up in future. 5.2 Emissions from production No No production processes involved. Hence, there processes are no such emissions. 5.3 Emissions from materials No Not Applicable handling including storage or transport 5.4 Emissions from construction Yes Dust will be generated during activities as activities including plant and excavation for future development; the equipment foundation shall be excavated in a minimum time by using machines. The vehicles which carry construction materials as sand will be covered from top and made wet before movement and thus, no dust will be generated. The construction activity shall be segregated in phases to avoid any significant generation of dust. 5.5 Dust or odours from handling of Yes The construction material involved shall not materials including construction provide any odour. A green belt is further materials, sewage and waste proposed along the boundary and Solid Waste Segregation Area to mitigate crossover of odours, if any. 5.6 Emissions from incineration of No No incineration of waste is generated. waste 5.7 Emissions from burning of No - waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No - sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 6.1 From operation of equipment Yes Total 9 no. of DG sets have been proposed, out e.g. engines, ventilation plant, of which the unit has already installed 4 no. DG crushers sets (i.e. 2 no. 82.5 KVA, 1 no. 40 KVA and 1 no. of 35 KVA capacity each) for standby use for emergency purposes.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

Additional, 5 no. DG sets (i.e. 2 no. 1500 KVA, 2 no. 1000 KVA and 1 no. 500 KVA capacity each) will be provided for power back up in future.

The DG sets are installed with-in built acoustic enclosure as approved by CPCB and conforming to MoEF Notification, GSR 371 (E).

In addition, 20,000 no. of Trees & 60,000 Bushes have been provided within the project as along the boundary, road sides, parks, etc. List of trees/plants is enclosed in Conceptual Plan. The trees act as a buffer. 6.2 From industrial or similar No Not Applicable processes 6.3 From construction or Yes The noise from construction activities of future demolition buildings shall be contained within the area by providing barriers. Also, 20,000 no. of Trees & 60,000 Bushes have already been planted within the project premises. No construction activities for future buildings will be done at night. No demolition is involved. 6.4 From blasting or piling No Not Applicable 6.5 From construction or Yes The traffic during construction phase may be operational traffic around only 10 vehicles in a day. This shall not have any significant impact. However, adequate Parking provision will be the responsibility of individual plot owners. In addition, adequate green is being provided within the project. 6.6 From lighting or cooling No Not Applicable systems 6.7 From any other sources No -

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 7.1 From handling, storage, use or No -

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

spillage of hazardous materials 7.2 From discharge of sewage or Yes 526 KLD of sewage will be generated from the other effluents to water or the project which will be treated in STP of 550 KLD land (expected mode and capacity based on MBBR Technology. Treated place of discharge) water will be recycled for the purpose of flushing in toilets, irrigation of green area and remaining will be utilized for Golf Course within the project. 7.3 By deposition of pollutants No Not Applicable emitted to air into the land or into water 7.4 From any other sources No - 7.5 Is there a risk of long term No Not Applicable build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.No. Information/Checklist Yes/ No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 8.1 From explosions, spillages, No - fires etc. from storage, handling, use or production of hazardous substances. 8.2 From any other causes No The Building complies with the requirements of National Building Code towards Fire Safety.

8.3 Could the project be affected Yes The area falls under Zone IV for earthquakes. by natural disasters causing The building is designed against Earthquakes for environmental damage (e.g. Zone-IV requirements as laid down in NBC. floods, earthquakes, landslides, Also, lightening arrestor system has been cloudburst etc)? provided for safety against cloudburst.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.No. Information/Checklist Yes/ No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 9.1 Lead to development of Yes The project is residential project that will supporting utilities, ancillary provides high end facilities to the population and development or development isn’t likely to impact the environment adversely stimulated by the project which in any manner. could have impact on the environment e.g.:

•Supporting infrastructure The project has positive impact on the ancillary (roads, power supply, waste or infrastructure like road, markets, public health, waste water treatment, etc.) amenities, conveyance facilities etc.

• housing development There will be development of residential plots. Group housing, commercial area, amenities & institutional area etc. only.

• extractive industries Not applicable • supply industries Not applicable • other Not applicable 9.2 Lead to after-use of the site, No - which could have an impact on the environment 9.3 Set a precedent for later Yes See 9.1 developments 9.4 Have cumulative effects due to No - proximity to other existing or planned projects with similar effects

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

(III) Environmental Sensitivity Aerial distance (within Name/ S.No. Areas 15 km) Proposed project Identity location boundary 1 Areas protected under international No - conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for Sidhwan Canal Approx. 2.8 km; N ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive No - species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters No None 5 State, National boundaries No - 6 Routes or facilities used by the public for Khanjarwal- access to recreation or other tourist, pilgrim Mullanpur Adjacent to project. areas village link road

Ferozpur- Approx. 3.30 km, SE Ludhiana Road (NH-95) 7 Defense installations - - 8 Densely populated or built-up area Ludhiana The project is situated within well established Ludhiana 9 Areas occupied by sensitive man-made land Indian National Approx. 3 km; SE uses (hospitals, schools, places of worship, Public School, community facilities) Mullanpur

Guru Nanak Approx. 3 km; SE Public School, Mullanpur

Ashirwad Approx. 2.5 km; SE Medical Hall

Mata Gujri

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

Sahib Approx. 2.5 km; SE

Dham Talwandi Approx. 1.6 km; W Khurd 10 Areas containing important, high quality or No None scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No The area is not subjected environmental damage (those where existing to any environmental legal environmental standards are exceeded). damage. 12 Areas susceptible to natural hazard which No The project falls under the could cause the project to present Zone IV as per the environmental problems (earthquakes, Seismic Zone Map of subsidence, landslides, erosion, flooding or India. The area has not extreme or adverse climatic conditions) faced any natural hazard so far.

(IV) Proposed Terms of Reference for EIA studies

Not Applicable as application is being only for extension of validity of earlier Environmental Clearance.

I hereby give the Undertaking that the data and information given in the application and enclosure are true to the best of my knowledge and belief, I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 26.07.2018 Place: Gurgaon

Address: Spark Buildcon Pvt. Ltd 5th Floor, Time Square Building, B-Block, Sushant Lok -1, Gurgaon, Haryana-122002. (Project Proponent/Authorised Signatory)

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. FORM I

NOTE:

1. The project involving clearance under Coastal Regulation zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendation of the state coastal zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ. 2. The project to be located within 10 km of the National parks, Sanctuaries, Biophere Reserves, Migratory Corridors of wild Animals, the project proponent shall submit the map duly authenticated by chief wildlife warden showing these features vis-à-vis the project location and the recommendation or comments of the Chief wildlife warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarification, as may be required from time to time, participation in the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI -NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN CONCEPTUAL PLAN

BACKGROUND OF PROJECT

M/s. Spark Buildcon Private Limited is developing Residential Project namely “Imperial Golf Estate” at Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab.

The sequence of events involved in the project is as under: 1. Environmental Clearance was granted by SEIAA, Punjab vide Letter No. SEIAA/M.S./2011/31028 dated 28thJuly, 2011 for plot area of 279.98 acres; out of which, 80.3 acres is reserved for golf course, 197.91 acres for residential, 13.91 acres for EWS, etc. and Built-up area of 5,42,774 sq.m. Earlier EC letter is enclosed with the application. 2. Later on, Consent to Establish and its extensions were granted for plot area of 279.98 acres. Copy of Consent to Establish and its extensions obtained from PPCB are enclosed as Annexure-1(a) & 1(b) respectively. 3. Later on, there have been some reductions in built-up area due to removal of other's land. Accordingly, drawing got revised and approved byChief Town Planner Punjab, Chandigarh; copy is enclosed as Annexure-6. Also, land for EWS of 10.34 acres has been transferred to Govt. under Govt. policy. 4. Then, Consent to Establish was also obtained based on revised approved layout of plot area of 279.98 acres; out of which, 79.759 acres is for golf course, 194.9 acres for residential including group housing, and remaining for commercial and institutional area and built-up area got reduced from 5,42,774 sq.m. to 4,01,971.76 sq.m. Copy of Consent to Establish from PPCB is enclosed as Annexure-1(c). 5. Partial Completion certificate has also been obtained from GLADA forPhase-I for 385 plots of 127.31 acres have been obtained. Out of which, Golf course area in phase–I is 41.99 acres. Partial Completion certificate is enclosed as Annexure-1(d).

Also, the development work of remaining 142 plots in Phase-II along with Group Housing, Commercial & Institutional is in process.Thus, there is need of filing application for the extension of the validity of Environmental Clearance.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN Comparison of details between earlier EC and revised details as per revised layout plan is given in Table-1.

Table 1: Comparison w.r.t Earlier EC and Revised details Description/Area As per Earlier EC As per Revised details Total Site Area 11,33,073.70sq.m (or 279.98 acres) Built-up Area 5,42,744 sq.m 4,01,971.76sq.m Area Under Parks & Playground 89,573.12 sq.m 61,510.26 sq.m Total Estimated Population 9,609 nos. 5,827 nos. Total Water Demand 1288 KLD 643 KLD Total Wastewater Generated 920 KLD 526 KLD STP capacity 1200 KLD 550 KLD No. of Rain water recharging Pits 18 pits Total Solid Waste Generated 3,815 kg/day 2,043 kg/day Total Estimated Cost including land cost Rs. 850 Crores Total Power Requirement 12,139 KW Total 9 DG sets  2 no. 82.5 KVA, 1 no. 40 KVA and 1 no. of DG sets for power back up Total 2 no. DG sets of 750 35 KVA- installed KVA each  2 no. 1500 KVA, 2 no. 1000 KVA, 1 no. 500 KVA –proposed

SITE LOCATION & SURROUNDINGS

The Project is located in Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab. The center co-ordinates of project location are 30°51'52"N Latitude and 75°38'12"E Longitude.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN

CONNECTIVITY

The site is well connected to Khanjarwal-Mullanpur village link road.Site surroundings features along with connectivity details are given in Table 2.

Table 2: Site Surroundings and Connectivity Details

SI.No. Description Name Distance and Direction 1. Nearest Highway Ferozpur-Ludhiana Road (NH-95) Approx.3.30 km, SE Nearest Railway 2. Ludhiana Railway Station Approx. 20 km, NE Station 3. Nearest Airport Ludhiana (Sahnewal) Airport Approx. 30 km, SE

4. Water Body Sidhwan Canal Approx. 2.8 km; N Indian National Public School, Approx. 3 km; SE Mullanpur 5. Nearest School Guru Nanak Public School, Approx. 3 km; SE Mullanpur 7. Nearest Hospital Ashirwad Medical Hall Approx. 2.5 km; SE Mata Gujri Sahib Approx. 2.5 km; SE Nearest Place of 8. worship DhamTalwandiKhurd Approx. 1.6 km; W 9. Nearest Zoo Tiger Safari Zoo Approx. 20 km; NE

COST ESTIMATION Total estimated project cost including land & development is Rs.850 Crores. Rs. 509.37 Crores of amount has been spent on the project. CA certificate stating the same is enclosed as Annexure-4.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN AREA STATEMENT

The total project area of the project is 11,33,073.70sq.m. (or 279.98 acres). The detailed area statement showing the comparison statement w.r.t Earlier EC and Revised Layout Plan is provided below in Table 3(a) and break up of built-up area details are given in Table-3(b). Table 3(a): Comparison Area Statement w.r.t. Earlier EC and Revised Layout Plan Description As per Earlier EC As per Revised Approved Layout Area (in sq.m) Area Area (in sq.m) Area (in acres) (in acres) Total Site Area 11,33,073.70 279.98 11,33,073.70 279.98 Net Golf License Land 3,24,984.88 80.305 3,22,773.22 79.759 Area under other’s land in - - 39,062.282 9.65 residential license Reserved Area - - 3,565.895 0.88115 Residential License Net Land 8,00,939.46 197.91564 7,65,113.48 189.06366 Area Under Road Widening 7,149.46 1.7666 7,149.860 1.766660 Land Reserved for EWS* 56,309.80 13.91440 41,844.49 10.34 Net Planned Area 7,44,629.66 184.00124 7,16,117.940 176.95 Area under Commercial 10,982.12 2.713 18,770.50 4.638 Area under Residential 3,35,080.60 82.799 3,20,303.720 79.126 Area under Institutional & 54,016.76 13.347 39,993.64 9.882 Amenities Built-up Area 5,42,744 NA 4,01,971.76 NA Area for Roads, Parking, 2,54,963.12 63.002 2,75,539.82 68.08 Pavement, services, etc. Area Under Parks & 89573.12 22.134 61,510.26 15.199 Playground

*Note: EWS of 10.34 acres has been transferred to Govt. under Govt. policy and area is not added in the built-up area.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN Table 3(b): Built-up area details Description Plot Area Permissible Permissible Built- F.A.R up Area (in sq.m.) A- (2000 sq.yd) (24) 43,340.83 sq.m (10.71 acres) 1.0 43,340.83 B-(2000 sq.yd) (11) 17,318.16 sq.m (4.28 acres) 1.0 17,318.16 C-(1000 sq.yd) (38) 31,437.14 sq.m (7.77 acres) 1.0 31,437.14 D-(500 sq.yd) (114) 1,00,664.15 sq.m (24.87 acres) 1.0 1,00,664.15 E-(500 sq.yd) (26) 11,482.45 sq.m.(2.84 acres) 1.0 11,482.45 F-(200 sq.yd) (29) 14,344.86 sq.m. (3.54 acres) 1.0 14,344.86 G-(350 sq.yd) (45) 14,037.79 sq.m. (4.5 acres) 1.0 14,037.79 H- (22) 10,659.88 sq.m. (2.63 acres) 1.0 10,659.88 J- (147) 36,465.81 sq.m. (9.01 acres) 1.0 36,465.81 K- (71) 16,905.31 sq.m. (4.18 acres) 1.0 16,905.31 Total Residential Plots 2,96,634.57sq.m. (73.3 acres) 2,96,656.40 Group Housing 23,633.64 sq.m. (5.84 acres) 1.5 35,450.46 Commercial Area 18,777.41 sq.m. (4.64 acres) 1.5 28,166.12 Institutional & Amenities area 4 Nursery Schools 12,626.19 sq.m. (3.12 acres) 0.75 9,469.64 1 Dispensary 2,023.42 sq.m. (0.5 acres) 1.5 3,035.14 1 Religious Place 1,076.46 sq.m. (0.266 acres) 1.5 1,614.69 1 High School 16,106.48 sq.m. (3.98 acres) 1 16,106.48 Community Club 7,648.55 sq.m. (1.89 acres) 1.5 11,472.83 Total Built-up Area 4,01,971.76sq.m.

POPULATION CALCULATIONS

Population has been reduced from 9,609 nos. to 5,827 nos. due to decrease in built-up area. Also, land for EWS of 10.34 acres has been transferred to Govt. under Govt. policy. Table 4 below shows the comparison of Population w.r.t. earlier EC& revised details.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN Table 4: Comparison of Population w.r.t Earlier EC& revised details Plots/Area Population Plots/Area Population As per S.N (no.) as per Description Criteria as per (no.) as per revised o. revised Earlier EC Earlier EC Layout details Plan 5 persons 1. Residential Plots 409 nos. 2,045 527 nos. 2,635 per plot 300 2. Group Housing Area persons 5.82 acres 1,746 5.84 acres 1,752 per acre 100 3. Commercial Area persons 3.11 acres 311 4.64 acres 464 per acre Institutional & Amenities area (4 100 Nursery Schools, 1 High 4. persons 13.34 acres 1334 9.756 acres 976 School, 1 Dispensary, 1 per acre Religious Place and Community Club) 300 EWS Area 5. EWS Area persons 13.91 4173 transferred - per acre to Govt. Total Estimated Population 9,609 nos. 5,827 nos.

WATER REQUIREMENT & WASTEWATER GENERATION

Population reduced from 9,609 nos. to 5,827 nos. and thereby reducing total water demand from 1288 KLD to 643 KLD. Comparison of the Water demand and wastewater generation details w.r.t Earlier EC & revised details are shown below in Table 5(a). During operation phase, water supply will be provided from the Tubewells. The total water requirement will be 643 KLD. Fresh water requirement will be 466 KLD. 526 KLD of wastewater generated will be generated from the project which will be treated in STP of 550 KLD capacity based on MBBR Technology (out of which STP of 150 KLD capacity has already been installed).

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN Table 5(a): Comparison of Water demand and wastewater generation details w.r.t Earlier EC& revised details SI. Description As per Earlier EC As per revised details No. 1. Total Water Demand 1288 KLD 643 KLD 2. Fresh water demand 773 KLD (Source: Tubewell) 466 KLD 3. Wastewater generated 920 KLD 526 KLD 4. STP proposed STP of 1200 KLD capacity STP of 550 KLD capacity

The overall water demand calculations as per revised details are given below in Table 5(b). The Water Balance Diagrams for different seasons i.e. Summer, Winter & Monsoon are shown below in Figure 1, 2 & 3 respectively.

Table5(b): Overall Water Demand & Wastewater Generation Details (Revised details) S. No. Details Population (in no.) Water Demand 1. Residential @ 135 lpcd 4,387 592KLD 2. Floating @ 35 lpcd 1,440 51 KLD Total water req. 643 KLD 3. Residential Flushing water req.@ 35 lpcd 4,387 154 KLD 4. Floating Flushing water req. @ 16 lpcd 1,440 23KLD Total Flushing Req. 177 KLD 5. Wastewater generated (@ 80 %) 514 KLD 6. Treated Sewage (@ 98 %) 504 KLD 7. Green area water req. 61,510.26 sq.m. (or 15.19 acres) • Summer (@ 5.5 lt/sq.m./day) 338 KLD • Winter (@ 1.8 lt/sq.m./day) 111 KLD • Monsoon (@ 0.5 lt/sq.m./day) 31 KLD

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN

Figure 1: Water Balance Diagram (Summer Season) as per revised details

Sewage load 514 KLD Domestic Demand 80% 643 KLD (It will be treated in STP of 550 KLD capacity)

@ 98%

177 KLD Treated sewage Fresh water Flushing 504 KLD Borewell 466 KLD 177 KLD

327 KLD

Horticulture Demand-an area of 61,510.26 sq.m (or 15.19 327 KLD acres) is available with demand of Summer @ 5.5 lt./m2/day

Fresh water

Wastewater

Treated water

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN

Figure 2: Water Balance Diagram (Winter Season) as per revised details

Sewage load 514 KLD Domestic Demand 80% 643 KLD (It will be treated in STP of 550 KLD capacity)

@ 98%

177 KLD Treated sewage Fresh water Flushing 504 KLD Borewell 466 KLD 177 KLD

327 KLD

Horticulture Demand-an area of 61,510.26 sq.m (or 15.19 111 KLD acres) is available with demand of Winter @ 1.8 lt./m2/day (111 KLD)

Remaining will be 216 KLD utilized for irrigation of Golf Course (79.75 acres) within project premises Fresh water

Wastewater

Treated water

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN

Figure 3: Water Balance Diagram (Monsoon Season) as per revised details

Sewage load Domestic Demand 80% 514 +12 = 526KLD* 643 KLD (It will be treated in STP of 550 KLD capacity@ 98%)

@ 98%

177 KLD Treated sewage Fresh water Flushing 515KLD Borewell 466 KLD 177 KLD

338 KLD

Horticulture Demand-an area of 61,510.26 sq.m (or 15.19 31 KLD acres) is available with demand of Monsoon @ 0.5 lt./m2/day 31 KLD)

Remaining will be utilized for irrigation of 307 KLD Golf Course (79.75 acres) within project premises Fresh water

Wastewater

Treated water

* Infiltration rate: 12 KLD (60 manholes × 200 lt./manholes/day}

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN

RAIN WATER RECHARGING

Total 18 no. of Rain Water harvesting pits have been proposed for Recharging the Ground Water. Till date, 2 no. of Rain Water Recharging pits have already been constructed for artificial rain water recharge within the project premises. Further, 16 no. of pits will be constructed afterwards.

VEHICLE PARKING FACILITIES

Parking provision will be provided within their individual plot owners.

POWER REQUIREMENT

Total Power requirement of the project is 12,139 KW which will be provided by Punjab State Power Corporation Limited. Total 9 no. of DG sets have been proposed, out of which 4 nos. DG sets (i.e. 2 no. 82.5 KVA, 1 no. 40 KVA and 1 no. of 35 KVA capacity each) has already been installed for standby use for emergency purposes.Additional, 5 nos. of DG sets (i.e. 2 no. 1500 KVA, 2 no. 1000 KVA and 1 no. 500 KVA capacity each) will be provided for power back up in future.

SOLID WASTE GENERATION

Table 6(a): Comparison of Solid waste generation w.r.t. Earlier EC & revised details SI. No. Description As per Earlier EC As per revised details Solid waste 1. 3,815 kg/day 2,043 kg/day generation

Solid waste will be generated from the project. Approx. 2,043 kg/day (@ 0.40 kg/capita/day for residential and (@ 0.20 kg/capita/day for floating) of solid waste will be generated from overall project. The solid waste will be collected in designated place where segregation of Biodegradable & Non-Biodegradable waste will be done at source. Mechanical Composter will be installed for Biodegradable waste. The recyclable waste will be sold to resellers and inert waste will be sent to the Landfill to be developed by MC, Ludhiana.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN

Table 6(b): Solid waste calculations Solid waste generation SI. No. Details Population Criteria (in kg/day) 1. Residential 4387 0.4 kg/capita/day 1,755 2. Floating 1440 0.2 kg/capita/day 288 Total Solid Waste Generated 2,043 kg/day

Table 6(c): Composition of Solid waste Quantity of Solid SI. Treatment / Category of waste Description waste generation No. disposal of waste (in kg/day) Converted into Manure using 2 no. Green waste, food Biodegradable or Mechanical 1. waste, paper waste and 919 wet waste (@ 45%) Composter of size biodegradable plastics 500 kg/day (in future) Combustible waste, Non-biodegradable Handed over to sanitary waste like 2. or dry waste authorized waste 1083 diapers, sanitary pads; (@ 53%) pickers recyclable waste etc. Discarded paint drums, pesticide cans, CFL bulbs, tube lights, Disposed off to Domestic expired medicines, authorized vendors 3. hazardous waste broken mercury as per Solid Waste 41 (@ 2%) thermometers, used Management Rules, batteries and 2016. contaminated gauge, etc. Total Solid Waste Generated 2043 kg/day

PLANTATION AND LANDSCAPING

Permissible Green Area under Parks & Playground = 8% of net planned area Proposed Green Area under Parks & Playground = 8.58% of net planned area = 15.199 acres or 61,510.26 sq.m.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN Evergreen tall and ornamental trees have been proposed to be planted inside the premises. In addition, trees have also been planted along the road side as well as project boundary. Total 2000 nos. of trees and 60,000 nos. of bushes have been planted. List of already planted trees and Bushes are given below in Table 7(a) &7(b).

Table 7(a): Plantation List (Already Planted Trees)

S. No. Trees Species 1. Alstonia Scholaris 2. Delonix Regia 3. Chorisia speciose 4. Casia Fistula 5. Tebebuia Argentea 6. Bahunia Blackeana 7. Jacaranda Mimosaefolia 8. Wodyetia Bifurcata 9. Kusum 10. Ficus Berijani 11. Casureena 12. Silver Oak 13. Plumbega 14. Bottle Pam 15. Fonex Pam 16. Detpam (Khajoor) 17. Bishmarkia 18. Washing tonia 19. Pine (Cheel) 20. Golder Bottle Brush 21. Meglonia 22. Foxtail Pam 23. Arjun 24. Alstrelian Bambool 25. Chakrasia 26. Brota 27. Pilkan 28. Green Bottle Brush 29. Xmax Trees Aircaria

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in Validity of Environmental Clearance “Imperial Golf Estate” Village Mullanpur and Talwandi Khurdi Jagraon, Ludhiana III, Punjab M/s. Spark Buildcon Pvt. Ltd. CONCEPTUAL PLAN

Table 7(b): Plantation List (Already Planted Bushes)

S. No. Bushes 1. Clerodendron Pnerme 2. Ticoma Gaudi Chandi 3. Hamelia Pantens 4. Ficus Panda 5. Chandni Vergated 6. Chandni Freen Dwari 7. Duranta Golden 8. Laltana Red 9. Juniperus 10. Heviscus 11. Clendra Red 12. Fountain Grass 13. Jafransa 14. Kufia Purple 15. Set Krazia 16. Leman Gras 17. Red Erisin 18. Badelia 19. Bogan Velia