Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Division No. 2,Patiala Division No. 1,Patiala SupplyWater Patiala Distt: Circle :Patiala Procurement Works Plan for www.pbdwss.gov.inWebsite: South Zone South No. Sr. Sr. 2 1 7 6 5 4 3 2 1 23 12 uhnGja60.13 Dudhan Gujra hm ar 60.87 Dhamo Majra Amaritsarian hrmah32.18 Dharamgarh smnu 80.80 Asamanpur aagr 47.54 Balamgarh htui73.45 Khatouli Name of of Name Scheme Bhore 51.50 Achal 48.5 Chak Chak App. Cost (In Lacs) (In Planned Admin. 56.47 Cost/ PRWSSIP-Pla-Div-1-I PRWSSIP-Pla-Div-7-I PRWSSIP-Pla-Div-6-I PRWSSIP-Pla-Div-5-I PRWSSIP-Pla-Div-9-I PRWSSIP-Pla-Div-8-I PRWSSIP-Pla-Div-4-I PRWSSIP-Pla-Div-3-I PRWSSIP-Pla-Div-2-I PRWSSIP-Pla-Div-2- PRWSSIP-Pla-Div-1- Package No. II II 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Amaritsarian chak supply Providing water Khatouli Dudhan supply Providing water Gurjra Dudhan supply Providing water Dharamgarhsupply Providing water Asamanpursupply Providing water Majra Dhamosupply Providing water Balamgarhsupply Providing water T/W and Civil Work T/W and Civil Work Description of of Description Works OHSR OHSR 6 73.45 60.13 32.18 80.80 60.87 47.54 56.47 14.00 34.50 14.00 37.50

8 7 Estimated cost (Package) (RS lacs) C 80.53.41 01.06.15 30.04.15 01.06.15 28.02.15 30.04.15 NCB 01.06.15 28.02.15 30.04.15 NCB 01.06.15 28.02.15 30.04.15 NCB 01.06.15 28.02.15 30.04.15 NCB 01.06.15 28.02.15 30.04.15 NCB 01.06.15 28.02.15 30.04.15 NCB 28.02.15 10.2.15 NCB 31.1.15 10.2.15 31.12.14 31.1.15 10.2.15 NCB 31.12.14 31.1.15 10.2.15 NCB 31.12.14 31.1.15 NCB 31.12.14 NCB Method of Procurement Contract Status

9 Design Investigatiion Completed (Date) Department of Water SupplyDepartment ofWater and Sanitation, Punjab

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document PRWSSIP (Date) Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 60.51.71 10.5 - -3.71 -- - - 31.07.16 - - - 31.07.16 - - - - 31.07.16 ------31.07.16 ------31.07.16 - - - - - 31.07.15 - - 31.07.16 - - 16.07.15 - - 31.07.15 16.06.15 - - 31.07.16 - 16.07.15 - 31.07.15 - 16.06.15 - - - 16.07.15 - 31.07.15 16.06.15 - - - 16.07.15 31.07.15 16.06.15 - - 16.07.15 31.07.15 16.06.15 - 16.07.15 31.07.15 16.06.15 16.07.15 16.06.15 021 131 ..5-----991 - - - - - 9.9.15 - - 9.9.15 - - 9.9.15 - - 9.9.15 ------5.4.15 - - 21.3.15 5.4.15 - 20.2.15 21.3.15 5.4.15 20.2.15 21.3.15 5.4.15 21.3.15 20.2.15 20.2.15

13 Invitation (Date) Bids 'All'

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract Procurement report

22 Actual Date of Completion

23 Expenditure incurred to date Division, Rajpura Division No. 2,Patiala Division No. 1,Patiala Division, Rajpura Performance Imporvement Schemes Imporvement Performance No. Sr. Sr. 10 8 1 4 3 2 2 1 4 3 2 1 9 1 23 12 Devi Urf Nagar Nagal Kakrala (Improvement)Kakrala / ar kla 6.42 Akalian Majri ol ar 45.00 Kohle Majra eddn48.00 Mehdudan Swai singh Swai ahrn4.69 Matheran hsu 8.25 Khaspur Name of of Name Mehma Scheme aiu 15.53 Gajipur hnl 55.00 Jhansla 47.46 Dughat Walian oga72.48 Rongla eln4.91 Lehlan wala 5.00 App. Cost (In Lacs) (In Planned Admin. 76.00 45.00 Cost/ 7.92 PRWSSIP-Pla-Div-12- PRWSSIP-Pla-Div-11- PRWSSIP-Pla-Div-10- Rajpura-Div-IMP-7-I Rajpura-Div-IMP-6-I PRWSSIP-Pla-Div- PRWSSIP-Pla-Div- PRWSSIP-Pla-Div- PRWSSIP-Pla-Div- PRWSSIP-Pla-Div- Rajpura-Div-14-I Rajpura-Div-16-I Rajpura-Div-15-I Rajpura-Div-13-I PRWSSIP-Pla- PRWSSIP-Pla- PRWSSIP-Pla- PRWSSIP-Pla- PRWSSIP-Pla- PRWSSIP-Pla- Package No. IMP-4-I IMP-5-I IMP-3-I IMP-2-I IMP-1-I 4 I I I

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual supply Rongla supply Providing water Dughat supply Providing water UrfSwai Singh wala supplyDevi Nagar Providing water Pumping Machinery, Pumping Machinery, Description of of Description Distribution etc. Distribution etc. Distribution etc. Distribution etc. Repairof Water Dev.Of w/works Dev.Of w/works T/Well, OHSR, T/Well, OHSR, T/Well, OHSR, T/Well, OHSR, Performance Performance Performance Performance Improvemen Improvemen Improvemen Improvemen Distribution works and works Works 6 76.00 15.53 72.48 47.46 48.00 45.00 45.00 55.00 4.69 4.91 10.2.15 6.42 1.1.15 7.92 31.12.14 8.25 N.S. 5.00

8 7 Estimated cost (Package) (RS lacs) C e-42.21 15.03.14 28.02.14 15.03.14 Dec-14 28.02.14 15.03.14 NCB Dec-14 28.02.14 NCB Dec-14 15.03.14 NCB 28.02.14 Dec-14 NCB C 80.53.41 01.06.15 30.04.15 28.02.15 NCB C 80.53.41 01.06.15 30.04.15 28.02.15 NCB 01.06.15 30.04.15 01.06.15 28.02.15 30.04.15 NCB 28.02.15 NCB SDc1 80.415.03.14 28.02.14 15.03.14 Dec-14 28.02.14 NS Dec-14 NS 01.06.15 30.04.15 01.06.15 28.02.15 30.04.15 01.06.15 NS 28.02.15 30.04.15 NS 28.02.15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 50.51.51 00.5- 00.5- -- 91.5-- -- 09.12.15 09.12.15 ------09.12.15 ------10.06.15 09.12.15 -- -- 10.06.15 ------10.06.15 30.05.15 -- 30.05.15 -- 14.05.15 -- 10.06.15 14.05.15 15.04.15 30.05.15 -- 15.04.15 14.05.15 30.05.15 15.04.15 14.05.15 15.04.15 50.51.51 00.5- 00.5- -- 09.07.15 - -- 09.07.15 ------31.07.16 10.06.15 - -- - 31.07.16 - -- -- 10.06.15 - 31.07.16 - - 30.05.15 -- 31.07.16 - 14.05.15 - - 30.05.15 8.8.15 15.04.15 - - - 14.05.15 8.8.15 - - - 15.04.15 8.8.15 - - 31.07.15 8.8.15 16.07.15 - 31.07.15 16.06.15 16.07.15 - 31.07.15 16.06.15 16.07.15 31.07.15 - 16.06.15 16.07.15 - 16.06.15 - - - 31.07.16 31.07.16 - - - - 31.07.16 ------31.07.15 16.07.15 31.07.15 - 16.06.15 16.07.15 31.07.15 16.06.15 16.07.15 16.06.15 021 ..51..5NA 831 ..5-- - 9.6.15 - - - 18.3.15 N.A. 10.3.15 2.3.15 20.2.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date Circle :Bathinda Division, Sahib Fatehgarh SupplyWater Distt. FatehgarhDistt. Sahib Schemes Sewerage Division Patiala No. 2, Distt. Fatehgarh Sahib Fatehgarh Distt. Sewerage Schemes No. Sr. Sr. 1 3 6 5 4 3 2 1 4.89 Khaspur 4.98 5 Ajrour 4 1 23 12 Dadiana iaGnun6.0PRWSSIP-Pla-FGR- 68.00 Diva Ganduan aprRin7.0PRWSSIP-Pla-FGR- 72.00 Raipur Raian Sewerage Dera Mir agn 40 PRWSSIP-Pla-FGR- 74.00 Hargana hma9.0PRWSSIP-Pla-FGR- 90.00 Khumna Scheme Name of of Name aapr4.85 Jalalpur Scheme ajl 80 PRWSSIP-Pla-FGR- 78.00 Panjola Rakhra Miran App. Cost (In Lacs) (In Planned 400.00 Admin. 122.92 50 PRWSSIP-Pla-FGR- 55.00 Cost/ Rajpura-Div-IMP-8-I Rajpura-Div-IMP-9-I Rajpura-Div-IMP-10- PRWSSIP-Pla-FGR- PRWSSIP-Pla-Div- PRWSSIP-Pla- PRWSSIP-Pla- PRWSSIP-Pla- Package No. Div-SW-2-I Div-22-I Div-17-I Div-21-I Div-20-I Div-18-I Div-19-I SW-1-I 4 I

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Scheme& STP Providing Sewerage Scheme& STP Providing Sewerage Pumping Machinery, Pumping Machinery, Pumping Machinery, Description of of Description Distribution etc. Distribution etc. Distribution etc. Distribution etc. Distribution etc. Distribution etc. Dev.Of w/works Dev.Of w/works Dev.Of w/works T/Well, OHSR, T/Well, OHSR, T/Well, OHSR, T/Well, OHSR, T/Well, OHSR, T/Well, OHSR, Works 6 120.92 400.00 00 C 3-121 1-321 30-03-2015 15-03-2015 31-01-2015 NCB 30-03-2015 15-03-2015 90.00 31-01-2015 NCB 30-03-2015 15-03-2015 68.00 31-01-2015 NCB 30-03-2015 15-03-2015 74.00 31-01-2015 NCB 30-03-2015 15-03-2015 72.00 31-01-2015 NCB 78.00 55.00 4.85 4.89 4.98

8 7 Estimated cost (Package) (RS lacs) NCB C 80.53.41 01.06.15 30.04.15 28.02.15 NCB C 10-51-51 01-06-15 15-05-15 31-03-15 NCB SDc1 80.415.03.14 28.02.14 Dec-14 NS SDc1 80.415.03.14 28.02.14 15.03.14 Dec-14 28.02.14 NS Dec-14 NS Method of Procurement 3-121 1-321 30-03-2015 15-03-2015 31-01-2015

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 60-51-71 10-5 - - - - - 3-71 - -- -- 31-07-16 ------31-07-15 16-07-15 25-05- 16-06-15 -- 25-05- 15-05-2015 30-04-2015 -- 25-05- 31-03-2015 15-05-2015 30-04-2015 -- 25-05- 31-03-2015 15-05-2015 30-04-2015 -- 25-05- 31-03-2015 15-05-2015 30-04-2015 -- 25-05- 31-03-2015 15-05-2015 30-04-2015 -- 31-03-2015 15-05-2015 30-04-2015 31-03-2015 60.51.71 10.5 - -3.71 -- - 31.07.16 - - - 09.07.15 - -- 09.07.15 - -- -- 31.07.15 09.07.15 -- 16.07.15 10.06.15 -- -- 16.06.15 -- -- 10.06.15 -- 30.05.15 -- -- 14.05.15 10.06.15 30.05.15 15.04.15 -- 14.05.15 30.05.15 15.04.15 14.05.15 15.04.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of 2015 2015 2015 2015 2015 2015

71 920 19 18 17 Contarct signed (Date/Value/Currency) ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31-03-2016 31-03-2016 31-03-2016 31-03-2016 31-03-2016 31-03-2016

21 Date of Completion as per contract 22 ------Actual Date of Completion

23 Expenditure incurred to date Divn. No. 3, Divn. No. Bathinda 2, Divn. No. Bathinda 1, Divn. No. Bathinda SupplyWater Schemes District Bathinda No. Sr. Sr. 1 8 7 6 5 4 3 2 1 9 8 7 6 5 4 3 2 1 23 12 Chak Bakhtu Kutti Sekhu Harraipur Kalyan Malki Balhar Mehma Gehri Butter Gehri Bhagi Romana Jodhpur Dhapali Khurd Kothe Sukha Mahi Nangal Mahi Ram Niwas Mannwala Daultpura Golewala Jodhpur Jodhpur Name of of Name Burj Gill Burj Scheme Pakhar Pakhar Nand App. Cost (In Lacs) (In Planned Admin. 184.18 163.36 250.05 122.05 124.85 106.30 191.16 231.35 98.34 61.68 52.56 98.34 Cost/ 5.00 5.00 9.50 5.00 5.00 -- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- Package No. IMP-14-I IMP-13-I IMP-12-I IMP-11-I 40-I 37-I 36-I 35-I 34-I 33-I 32-I 29-I 28-I 27-I 26-I 25-I 24-I 23-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Improvement Performance Improvement Performance worksWater Augmentation of Works Water New Works Water New Works Water New worksWater Augmentation of Works Water New works New water New Water Works Water New Works Water New Works Water New Works Water New works New water Augmentation of Description of of Description Improvement Improvement Water worksWater Perfomance Perfomance Aug.of w/s scheme Works 6 258.15 124.85 106.30 191.16 231.35 184.18 163.36 250.05 122.05 98.34 61.68 52.56 85.09 5.00 5.00 9.50 5.00 5.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NS NS NS NS Method of Procurement 28/02/15 28/02/15 28/02/15 28/02/15 28/02/15 28/02/15 28/02/15 28/02/15 28/02/15 ------9 Design Investigatiion Completed (Date) 10/02/15 10/02/15 10/02/15 10/02/15 10/02/15 10/02/15 10/02/15 10/02/15 15/03/15 15/03/15 15/03/15 15/03/15 15/03/15 15/03/15 15/03/15 15/03/15 15/03/15 20.2.15

10 DSR Sacntioned (Date) 15/02/15 15/02/15 15/02/15 15/02/15 15/02/15 15/02/15 15/02/15 15/02/15 31/03/15 31/03/15 31/03/15 31/03/15 31/03/15 31/03/15 31/03/15 31/03/15 31/03/15 28.2.15 Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 01/03/15 01/03/15 01/03/15 01/03/15 01/03/15 01/03/15 01/03/15 01/03/15 07/04/15 07/04/15 07/04/15 07/04/15 07/04/15 07/04/15 07/04/15 07/04/15 07/04/15 16-3-15

13 Invitation (Date) Bids 31/03/15 31/03/15 31/03/15 31/03/15 31/03/15 31/03/15 31/03/15 31/03/15 10/05/15 10/05/15 10/05/15 10/05/15 10/05/15 10/05/15 10/05/15 10/05/15 10/05/15 16-4-15

14 Open on (Date) 30/04/15 30/04/15 30/04/15 30/04/15 30/04/15 30/04/15 30/04/15 30/04/15 15/06/15 15/06/15 15/06/15 15/06/15 15/06/15 15/06/15 15/06/15 15/06/15 15/06/15 15-5-15

15 Contract Award decided (Date) 21-5-15 Banks no objection ------16 ------contract award (in case of 15/05/15 15/05/15 15/05/15 15/05/15 15/05/15 15/05/15 15/05/15 15/05/15 30/06/15 30/06/15 30/06/15 30/06/15 30/06/15 30/06/15 30/06/15 30/06/15 30/06/15 30-5-15

71 920 19 18 17 Contarct signed (Date/Value/Currency) ------Contract No. ------Name of Contractor (in case(in of WBR No. review) prior prior ------11/15/2015 8/15/2015 8/15/2015 5/15/2016 5/15/2016 3/15/2016 5/15/2016 5/15/2016 6/30/2015 6/30/2015 6/30/2015 6/30/2015 6/30/2015 6/30/2015 6/30/2015 6/30/2015 6/30/2015 31.5.16

21 Date of Completion as per contract 22 ------Actual Date of Completion 23 ------Expenditure incurred to date Divn. No. 2, Divn. No. Mansa 1, Divn. No. Mansa Mansa District No. Sr. Sr. 7 6 5 4 3 2 1 2 4 3 2 1 3 23 12 Gandhu khurd Uddat bhagat Uddat Bhupal Kallan Ghaso Khana Kishangarh Hamirgarh Gharagna Mangania Dalie wali pharmahi Ramgarh Ramgarh Birewala Birewala dariapur Name of of Name Scheme Bhawa Dogra Kotra ram App. Cost (In Lacs) (In Planned Admin. 158.58 164.16 170.00 165.00 194.94 144.53 158.31 175.00 150.00 258.22 15.00 Cost/ -- -- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-BTD-Div- PRWSSIP-BTD-Div- Package No. IMP-15-I IMP-15-I 53-I 52-I 51-I 50-I 49-I 48-I 47-I 45-I 44-I 43-I 42-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Prov. Independent Prov. Independent Prov. Independent Prov. Independent Prov. Prov. Performance Improvement w/sImprovement Const. ofSeprate Const. ofSeprate Const. ofSeprate Const. ofSeprate Const. ofSeprate Const. ofSeprate Const. ofSeprate Description of of Description Prov.Sewerage Prov.Sewerage improvement Water WorksWater WorksWater WorksWater WorksWater WorksWater WorksWater WorksWater W/S W/S Scheme W/S Scheme W/S Scheme Performance Performance scheme scheme Works 6 170.00 165.00 194.94 144.53 158.31 175.00 150.00 258.22 158.58 164.16 334.70 15.00 3.38

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NS Method of Procurement ------9 Design Investigatiion Completed (Date) 10/02/15 10/02/15 10/02/15 10/02/15 10/02/15 10/02/15 10/02/15 10/2/15 10/2/15 10/2/15 10/2/15 30.4.15 20.2.15

10 DSR Sacntioned (Date) 15/02/15 15/02/15 15/02/15 15/02/15 15/02/15 15/02/15 15/02/15 15/2/15 15/2/15 15/2/15 15/2/15 28.5.15 28.2.15 Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 01/03/15 01/03/15 01/03/15 01/03/15 01/03/15 01/03/15 01/03/15 16-5-15 16.3.15 1/3/15 1/3/15 1/3/15 1/3/15

13 Invitation (Date) Bids 07/04/15 07/04/15 07/04/15 07/04/15 07/04/15 07/04/15 07/04/15 16-6-15 16.4.15 7/4/15 7/4/15 7/4/15 7/4/15

14 Open on (Date) 30/04/15 30/04/15 30/04/15 30/04/15 30/04/15 30/04/15 30/04/15 30/4/15 30/4/15 30/4/15 30/4/15 15-7-15 30.4.15

15 Contract Award decided (Date) 05/05/15 05/05/15 05/05/15 05/05/15 05/05/15 05/05/15 05/05/15 21-7-15 5/5/15 5/5/15 5/5/15 5/5/15 Banks no objection Nil 16 contract award (in case of 15/05/15 15/05/15 15/05/15 15/05/15 15/05/15 15/05/15 15/05/15 15/5/15 15/5/15 15/5/15 15/5/15 30-7-15 7.5.15

71 920 19 18 17 Contarct signed (Date/Value/Currency) ------Contract No. ------Name of Contractor (in case(in of WBR No. review) prior prior ------15-May-16 15-May-16 15-May-16 5/31/2016 5/31/2016 5/31/2016 5/31/2016 5/31/2016 5/31/2016 5/31/2016 15-Jul-15 31-5-16 30.6.15

21 Date of Completion as per contract ------22 ------Actual Date of Completion ------23 ------Expenditure incurred to date Div. SupplyWater Schemes District Sangrur Circle :Sangrur No. Sr. Sr. 9 8 4 3 2 1 23 12 Lacs 40.00 for Rs Block Andana Ghamourghat Bifurcation W/S Andana Gulahri Block Bifurcation W/S Andana Gulahri Block Bifurcation W/S RaitgarhBlock Bifurcation W/S Bhawanigarh RaitgarhBlock Bifurcation W/S Bhawanigarh Block Balad Khurd Bifurcation W/S Bhawanigarh Block Balad Khurd Bifurcation W/S Hero kallanHero Name of of Name Scheme Ralli Ralli App. Cost (In Lacs) (In Planned Admin. 40.00 40.00 20.00 60.00 17.00 65.00 20.00 67.00 Cost/ 5.00 PRWSSIP-Mansa-Div- PRWSSIP-Mansa-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- Package No. IMP-17-I IMP-16-I 56-II 58-II 57-II 57-I 56-I 59-I 58-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Construction of RCC Construction of RCC Construction of RCC Construction of RCC Construction Pump Construction Pump Construction Pump Distribuation System, System, Distribuation New T/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, Improvement ofImprovement ofImprovement Construction Pump Construction Description of of Description New T/w, Pipeline Pipeline T/w, New W/S W/S Scheme W/S Scheme Distribuation Distribuation Distribuation Chamber etc Chamber etc Chamber Chamber Chamber System, System, System, System, Works OHSR OHSR OHSR 6 40.00 5.00 40.00 20.00 60.00 17.00 65.00 20.00 67.00

8 7 Estimated cost (Package) (RS lacs) NCB C 10.053..0515.05.15 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 NCB NS Method of Procurement -- -- 9 Design Investigatiion Completed (Date) 10/02/15 10/02/15

10 DSR Sacntioned (Date) 15/02/15 15/02/15 Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 01/03/15 01/03/15 00.53.61 50.5Ps eiw60.5- -- .221 -- 6.02.2016 -- -- 6.02.2016 ------6.08.15 -- Review Post -- 15.07.15 -- 6.08.15 6.02.2016 30.06.15 Review Post -- 15.07.15 30.05.15 -- 30.06.15 -- 15.07.15 -- 30.05.15 6.02.2016 6.08.15 30.06.15 Review Post -- 15.07.15 30.05.15 -- 30.06.15 -- 15.07.15 30.05.15 6.08.15 30.06.15 Review Post 15.07.15 30.05.15 30.06.15 30.05.15 15.07.15 30.06.15 30.05.15

13 Invitation (Date) Bids 07/04/15 07/04/15

14 Open on (Date) 30/04/15 30/04/15

15 Contract Award decided (Date) 05/05/15 05/05/15 Post ReviewPost ReviewPost ReviewPost Banks no objection 16 contract award (in case of 15/05/15 15/05/15 .81 -- -60.06-- 6.02.2016 ------6.08.15 6.02.2016 ------6.08.15 6.02.2016 ------6.08.15

71 920 19 18 17 Contarct signed (Date/Value/Currency) -- -- Contract No. -- -- Name of Contractor (in case(in of WBR No. review) prior prior -- -- 10/31/2015 10/31/2015

21 Date of Completion as per contract 22 -- -- Actual Date of Completion ------23 -- -- Expenditure incurred to date No. Sr. Sr. 8 7 6 5 23 12 Block Khokhar Bifurcation W/S Block KhanalKhurd Bifurcation W/S Block Sunam KhanalKhurd Bifurcation W/S Sangrur Ubhawal Block Bifurcation W/S Sangrur Ubhawal Block Bifurcation W/S Lehragaga Rorewal Block Bifurcation W/S Lehragaga Rorewal Block Bifurcation W/S Lacs 20.00 for Rs Block Andana Ghamourghat Bifurcation W/S Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 40.00 20.00 80.00 25.00 95.00 20.00 55.00 20.00 Cost/ PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- Package No. 61-II 60-II 59-II 62-II 61-I 60-I 63-I 62-I 4

Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Construction of RCC Construction of RCC Construction Pump Construction Pump Construction Pump Construction Pump Construction Pump Construction Pump Construction Pump New T/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, Description of of Description Distribuation Distribuation Distribuation Distribuation Distribuation Distribuation Distribuation Chamber Chamber Chamber Chamber Chamber Chamber Chamber System, System, System, System, System, System, System, System, System, Works OHSR 6 20.00 40.00 20.00 80.00 25.00 95.00 20.00 55.00

8 7 Estimated cost (Package) (RS lacs) C 10.053..0515.05.15 30.4.2015 31.03.2015 NCB C 10.053..0515.05.15 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 00.53.61 15.07.15 30.06.15 30.05.15 00.53.61 15.07.15 30.06.15 30.05.15 15.07.15 30.06.15 -- 6.02.2016 30.05.15 15.07.15 -- 30.06.15 -- 30.05.15 15.07.15 -- 6.08.15 -- 30.06.15 6.02.2016 Review Post 30.05.15 15.07.15 -- 30.06.15 -- 15.07.15 30.05.15 -- 6.08.15 30.06.15 Review Post 30.05.15 15.07.15 30.06.15 30.05.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) Post ReviewPost Post ReviewPost ReviewPost ReviewPost ReviewPost ReviewPost Banks no objection 16 contract award (in case of .81 -- -60.06-- 6.02.2016 ------6.08.15 .81 -- -60.06-- 6.02.2016 ------6.02.2016 -- -- 6.08.15 -- 6.02.2016 ------6.08.15 -- 6.02.2016 ------6.08.15 -- -- 6.08.15 -- 6.02.2016 ------6.08.15

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion ------

23 Expenditure incurred to date WSS, Division No. Sr. Sr. 8 9 23 12 1 5 4 3 2 Block ISSI Scheme W/S Bifurcation Malerkotla-II Block Scheme W/S Bifurcation Malerkotla-II Kalan Block Faridpur Scheme W/S Bifurcation Malerkotla-I Block Scheme W/S Bifurcation Malerkotla-I Block Majra Dheero Scheme W/S Bifurcation Block SunamBlock Toorbanjara Bifurcation W/S SunamBlock Toorbanjara Bifurcation W/S Lehragaga Block Khokhar Bifurcation W/S Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 20.00 50.00 20.00 82.70 78.50 75.60 76.75 75.00 Cost/ PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- PRWSSIP-SGR-Div- Package No. Div-64-II Div-68-II Div-67-II Div-66-II Div-65-II Div-68-I Div-67-I Div-66-I Div-65-I Div-64-I 64-II 63-II 64-I 4

Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Distribution System Distribution System Distribution System Distribution System Distribution System Construction Pump Construction Pump Construction Pump T/W, Machinery & Machinery T/W, & Machinery T/W, T/W, Machinery & Machinery T/W, & Machinery T/W, & Machinery T/W, New T/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, Description of of Description Const. of Pump Pump of Const. Pump of Const. Pump of Const. Pump of Const. Pump of Const. Distribuation Distribuation Distribuation Civil Work, Civil Work, Civil Work, Civil Work, Civil Work, Chamber Chamber Chamber Chamber Chamber Chamber Chamber Chamber & OHSR & OHSR & OHSR & OHSR & OHSR System, System, System, System, Works 6 20.00 62.50 16.00 59.60 16.00 60.75 16.00 59.50 15.50 66.70 16.00 20.00 50.00

8 7 Estimated cost (Package) (RS lacs) C 10.053..0515.05.15 30.4.2015 31.03.2015 NCB C 50/51/41 00/5Ps eiw1/51 50/53/61 otRve 20/5-- - 22/07/15 Review Post - 30/06/15 - - 15/06/15 22/07/15 - Review Post - 15/05/15 07/08/15 15/05/15 30/06/15 - Review Post Review Post - 30/04/15 22/07/15 15/06/15 30/04/15 15/07/15 - Review Post - 15/03/15 15/05/15 07/08/15 30/06/15 15/04/15 30/06/15 15/05/15 - Review Post - Review Post NCB 15/03/15 22/07/15 31/05/15 15/06/15 30/04/15 15/07/15 30/04/15 - Review Post Review Post - NCB 15/03/15 15/05/15 07/08/15 30/06/15 15/04/15 30/06/15 15/05/15 - Review Post Review Post NCB 31/05/15 15/06/15 15/03/15 22/07/15 30/04/15 15/07/15 30/04/15 Review Post Review Post NCB 15/05/15 15/03/15 30/06/15 15/04/15 15/05/15 30/06/15 Review Post NCB 31/05/15 15/03/15 15/06/15 30/04/15 30/04/15 Review Post NCB 15/03/15 15/05/15 15/04/15 15/05/15 Review Post NCB 15/03/15 30/04/15 30/04/15 NCB 15/03/15 15/04/15 NCB 15/03/15 15.05.15 NCB 30.4.2015 31.03.2015 15.05.15 NCB 30.4.2015 31.03.2015 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Post ReviewPost ReviewPost Review Review Review Post Post Post Post Post 12 Banks no objection to bid Document (in case 10/53/61 15/07/15 30/06/15 31/05/15 15/07/15 30/06/15 31/05/15 00.53.61 15.07.15 30.06.15 30.05.15 00.53.61 50.5Ps eiw60.5- -- .221 -- 6.02.2016 ------6.08.15 Review Post 15.07.15 30.06.15 30.05.15 15.07.15 30.06.15 30.05.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) Post ReviewPost ReviewPost Post ReviewPost Post ReviewPost Banks no objection 16 contract award (in case of 70/5-- - 07/08/15 - - 07/08/15 .81 -- -60.06-- 6.02.2016 ------6.08.15 .81 -- -60.06-- 6.02.2016 ------6.08.15

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 02/05- - 10/21/2015 - - - 10/21/2015 - - - 10/21/2015 - - 10/21/2015 - - - - 10/21/2015 - //06- 2/6/2016 - 2/6/2016 - 2/6/2016 - 2/6/2016 - 2/6/2016

21 Date of Completion as per contract

22 Actual Date of Completion ------23

------Expenditure incurred to date Div. Barnala No. Sr. Sr. 9 8 7 6 5 4 3 2 1 23 12 6 Sehna Ramgarh Block Augmentation W/s BlockGumti Barnala Augmentation W/S BlockGumti Barnala Augmentation W/S Mehal Kalan Hardaspur Block Augmentation W/S Mehal Kalan Hardaspur Block Augmentation W/S Barnala Pharwahi Block Bifurcation W/S Barnala Pharwahi Block Bifurcation W/S Block Barnala Prov W/S Badbar II Barnala Badbar Block Augmentation W/S Dhuri Block Singh Wala RulduScheme W/S Bifurcation Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 70.45 Cost/ 30.00 20.00 40.00 20.00 40.00 20.00 55.00 25.00 75.00 PRWSSIP-SGR-MLKT- PRWSSIP-SGR-MLKT- PRWSSIP-Barnala- PRWSSIP-Barnala- PRWSSIP-Barnala- PRWSSIP-Barnala- PRWSSIP-Barnala- PRWSSIP-Barnala- PRWSSIP-Barnala- PRWSSIP-Barnala- PRWSSIP-Barnala- Package No. Div-73-II Div-72-II Div-71-II Div-70-II Div-69-II Div-74-I Div-73-I Div-72-I Div-71-I Div-70-I Div-69-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Construction of RCC Construction of RCC Construction of RCC Construction of RCC Construction of RCC Distribution System Construction Pump Construction Pump Construction Pump Construction Pump Construction Pump T/W, Machinery & Machinery T/W, New T/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, PipelineNewT/w, Description of of Description Const. of Pump Pump of Const. Distribuation Distribuation Distribuation Distribuation Distribuation Civil Work, Chamber Chamber Chamber Chamber Chamber Chamber & OHSR System, System, System, System, System, System, System, Works OHSR OHSR OHSR OHSR 6 30.00 20.00 40.00 20.00 40.00 20.00 55.00 25.00 75.00 55.45 15.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB C 50/53/41 50/5Ps eiw3/51 00/51/71 otRve 70/5-- - - 07/08/15 - Review Post 22/07/15 15/07/15 Review Post 30/06/15 30/06/15 31/05/15 15/06/15 Review Post 15/05/15 15/05/15 Review Post 30/04/15 30/04/15 15/03/15 15/04/15 NCB 15/03/15 NCB Method of Procurement 10.053..0515.05.15 30.4.2015 15.05.15 31.03.2015 30.4.2015 15.05.15 31.03.2015 30.4.2015 15.05.15 31.03.2015 30.4.2015 15.05.15 31.03.2015 30.4.2015 15.05.15 31.03.2015 30.4.2015 15.05.15 31.03.2015 30.4.2015 15.05.15 31.03.2015 30.4.2015 15.05.15 31.03.2015 30.4.2015 31.03.2015

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 00.53.61 50.5Ps eiw60.5- -- 6.02.2016 -- 6.02.2016 ------6.02.2016 6.08.15 -- -- Review Post -- 6.02.2016 15.07.15 6.08.15 -- Review Post -- 30.06.15 -- 6.02.2016 15.07.15 6.08.15 30.05.15 -- Review Post -- 30.06.15 6.02.2016 -- 15.07.15 6.08.15 -- 30.05.15 -- 6.02.2016 30.06.15 Review Post -- 15.07.15 -- 6.08.15 -- 30.05.15 6.02.2016 Review Post -- 30.06.15 -- 6.08.15 15.07.15 -- 6.02.2016 30.05.15 Review Post -- 30.06.15 -- 6.08.15 15.07.15 -- Review Post 30.05.15 -- 30.06.15 -- 6.08.15 15.07.15 Review Post 30.05.15 -- 30.06.15 6.08.15 15.07.15 Review Post 30.05.15 30.06.15 15.07.15 30.05.15 30.06.15 30.05.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 02/05- - 10/21/2015 - //06- 2/6/2016

21 Date of Completion as per contract 22

------Actual Date of Completion 23 ------

- - Expenditure incurred to date DIV 1 BARNALA DISTRICT TO WATER SURFACE TREATED AND SAFE Water SupplyWater Schemes District Ludhiana No. Sr. Sr. 10 1 23 12 aoa 43.00 Basowal 1 adai136.00 Jandiali 7 163.00 Kalan Hans 37.00 6 Gursur 67.00 5 Dhatt 4 45.00 3 Bhadewal 2 BARNALA DISTRICT MAHELKALAN BLOCK- OF VILLAGES 36 TO SUPPLY WATER SURFACE Sehna Bhaini Block Jassa Augmentation W/s other habitations other Daad and its Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 10078 Cost/ 95.00 30.00 PRWSSIP-Barnala- PRWSSIP-Barnala- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- Package No. Div-212-II Div-74-II 81-I 80-I 79-I 78-I 77-I 76-I 75-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual VILLAGES OF BLOCK BLOCK OF VILLAGES QUALITY AFFECTED AFFECTED QUALITY Construction Pump New T/w, PipelineNewT/w, T/well. Const. of T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. SURFACE WATER WATER SURFACE Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Description of of Description Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line Installation pf pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation SUPPLY 36 TO MEHALKELAN MEHALKELAN Distribuation PROVIDING PROVIDING Chamber System, System, Works 6 10078 NCB DONE 15-Mar-15 31-04-2015 10-05.15 12/05/15 31-06-2015 15/08/15 25.08.2015 1-Sep-15 - - - 31-05-17 - - - 31-05-17 - - - 1-Sep-15 25.08.2015 15/08/15 31-06-2015 12/05/15 10-05.15 31-04-2015 15-Mar-15 DONE NCB 10078 30.00 131 158 32 62 90 40 38

8 7 Estimated cost (Package) (RS lacs) NCB C //051//530/4/15 15/4/15 30/4/15 1/4/2015 15/4/15 NCB 1/4/2015 NCB C //051//530/4/15 15/4/15 30/4/15 1/4/2015 15/4/15 NCB 30/4/15 1/4/2015 15/4/15 NCB 30/4/15 1/4/2015 15/4/15 NCB 30/4/15 1/4/2015 15/4/15 NCB 1/4/2015 NCB Method of Procurement 10.053..0515.05.15 30.4.2015 31.03.2015

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 561 061 581 --15/2/16 --- 15/2/16 15/8/15 --- 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 30/6/15 15/8/15 15/6/15 30/6/15 15/6/15 00.53.61 50.5Ps eiw60.5- -- 6.02.2016 ------6.08.15 Review Post 15.07.15 30.06.15 30.05.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract 22

-- Actual Date of Completion 23

-- Expenditure incurred to date DIV 2 Ludhiana No. Sr. Sr. 9Jnwl42 Jonewal 19 44 Toger Garhi 18 41 Sheru Garhi 48 17 Bet 16 5Duapr50 Daulatpur 104.00 15 Malik 160.00 14 13 82.00 Thakkarwal 12 58.00 Pheruarian 11 113.00 10 23 12 anaKud75.00 KanniaKhurd 8 agr iin46.00 Sibian Ramgarh 9 Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. Cost/ PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- Package No. 93-I 92-I 91-I 90-I 89-I 88-I 87-I 86-I 85-I 84-I 83-I 82-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual T/well. Const. of T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Description of of Description Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line Installation pf pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation Works 6 155 108 70 38 40 35 43 45 99 77 53 41

8 7 Estimated cost (Package) (RS lacs) C //051//530/4/15 15/4/15 1/4/2015 NCB 30/4/15 15/4/15 1/4/2015 NCB C //051//530/4/15 15/4/15 1/4/2015 NCB C 1//5 111 3/2/2015 31/1/15 3/2/2015 15/1/15 31/1/15 NCB 3/2/2015 15/1/15 31/1/15 NCB 3/2/2015 15/1/15 31/1/15 NCB 3/2/2015 15/1/15 31/1/15 NCB 15/1/15 30/4/15 NCB 15/4/15 1/4/2015 NCB 30/4/15 15/4/15 30/4/15 1/4/2015 15/4/15 NCB 1/4/2015 NCB 30/4/15 15/4/15 1/4/2015 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2//1 2//5 //5 - 10/4/15 --- 10/4/15 4/4/15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 4/4/15 20/2//15 22/3/15 20/2//15 561 061 581 --15/2/16 --- 15/2/16 15/8/15 --- 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 30/6/15 15/8/15 15/6/15 30/6/15 15/6/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 1Kkwl70 Kakowal 31 30 30 29 Bet Garhi 34 28 Baisami 27 34 34 Kadar Jhuggian 26 Garcha 34 25 Rawat 24 53 Khurd Khasi 34 23 Selkiana 22 33 Khurd Machhian 21 20 23 12 (Walia Vihar) (Walia Fatehgarh Fatehgarh Meharban Meharban (Namdev (Namdev Name of of Name Scheme Jagirpur Jagirpur Colony) Gujjran App. Cost (In Lacs) (In Planned Admin. Cost/ 33 90 66 PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- Package No. 105-I 104-I 103-I 102-I 101-I 100-I 99-I 98-I 97-I 96-I 95-I 94-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual T/well. Const. of T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Description of of Description Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line Installation pf pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation Works 6 30 66 85 60 28 30 30 30 30 50 31 30

8 7 Estimated cost (Package) (RS lacs) C 2//5 //512/2/2015 5/2/15 25/1/15 NCB C 1//5 111 3/2/2015 31/1/15 3/2/2015 18/1/15 31/1/15 NCB 3/2/2015 18/1/15 31/1/15 NCB 3/2/2015 15/1/15 31/1/15 NCB 3/2/2015 15/1/15 31/1/15 NCB 12/2/2015 15/1/15 5/2/15 NCB 12/2/2015 25/1/15 5/2/15 NCB 12/2/2015 25/1/15 5/2/15 NCB 12/2/2015 25/1/15 5/2/15 NCB 12/2/2015 25/1/15 5/2/15 NCB 12/2/2015 25/1/15 5/2/15 NCB 25/1/15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2//1 2//5 //5 - 10/4/15 --- 10/4/15 4/4/15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 14/4/15 20/2//15 --- 30/3/15 10/4/15 14/4/15 28/2//15 --- 30/3/15 10/4/15 14/4/15 28/2//15 --- 30/3/15 10/4/15 14/4/15 28/2//15 --- 30/3/15 10/4/15 14/4/15 28/2//15 --- 30/3/15 10/4/15 14/4/15 28/2//15 --- 30/3/15 14/4/15 28/2//15 30/3/15 28/2//15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 3Krr39 Karor 43 42 43 55 Khurd Bhamman 41 Tibba 35 40 Akalgarh 45 39 Juharhan 38 45 Kalan Meherna 90 37 Pakhowal 50 36 Rattowal 40 35 Rajgarh 34 34 Bhupana 33 2BainKud100 Khurd Bhamian 32 23 12 Boothgarh Name of of Name Scheme Jattan App. Cost (In Lacs) (In Planned Admin. Cost/ 38 PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- Package No. 117-I 116-I 115-I 114-I 113-I 112-I 111-I 110-I 109-I 108-I 107-I 106-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual T/well. Const. of T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Description of of Description Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line Installation pf pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation Works 6 95 35 34 38 50 30 40 40 85 45 35 30

8 7 Estimated cost (Package) (RS lacs) C 1//5 111 3/2/2015 31/1/15 18/1/15 NCB C 2//5 111 3/2/2015 31/1/15 3/2/2015 22/1/15 31/1/15 NCB 3/2/2015 22/1/15 31/1/15 NCB 12/2/2015 22/1/15 5/2/15 NCB 3/2/2015 22/1/15 31/1/15 NCB 3/2/2015 20/1/15 31/1/15 NCB 3/2/2015 20/1/15 31/1/15 NCB 3/2/2015 20/1/15 31/1/15 NCB 3/2/2015 20/1/15 31/1/15 NCB 3/2/2015 20/1/15 31/1/15 NCB 3/2/2015 20/1/15 31/1/15 NCB 18/1/15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2//1 2//5 //5 - 10/4/15 --- 10/4/15 4/4/15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 14/4/15 20/2//15 --- 30/3/15 10/4/15 4/4/15 28/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 4/4/15 20/2//15 22/3/15 20/2//15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 5Bja55 55 45 Chounta Mand 54 55 55 Lilly Jamalpur 53 Arraian 52 35 PHARUWAL 35 51 Ghumait 35 50 40 49 Sherrian 55 48 Sasrali 40 47 Sanghe 46 40 Bet Gujjarwal 45 4Prhpr39 Pirthipur 44 23 12 Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. Cost/ PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- Package No. 129-I 128-I 127-I 126-I 125-I 124-I 123-I 122-I 121-I 120-I 119-I 118-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual T/well. Const. of T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Description of of Description Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line Installation pf pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation Works 6 35 50 40 50 50 30 30 30 35 50 35 35

8 7 Estimated cost (Package) (RS lacs) C 2//5 111 3/2/2015 31/1/15 22/1/15 NCB C 2//5 111 3/2/2015 31/1/15 3/2/2015 28/1/15 31/1/15 NCB 3/2/2015 28/1/15 31/1/15 NCB 3/2/2015 25/1/15 31/1/15 NCB 3/2/2015 25/1/15 31/1/15 NCB 3/2/2015 25/1/15 31/1/15 NCB 3/2/2015 25/1/15 31/1/15 NCB 12/2/2015 25/1/15 5/2/15 NCB 3/2/2015 25/1/15 31/1/15 NCB 3/2/2015 24/1/15 31/1/15 NCB 3/2/2015 24/1/15 31/1/15 NCB 24/1/15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2//1 2//5 //5 - 10/4/15 --- 10/4/15 4/4/15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 14/4/15 20/2//15 --- 30/3/15 10/4/15 4/4/15 28/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 4/4/15 20/2//15 22/3/15 20/2//15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIV 3 LUDHIANA No. Sr. Sr. 60 44 Sekha 55 59 Gaddapur 55 58 Noorwala 57 6BjaCln 45 Colony Bajra 56 67 66 65 64 63 62 61 23 12 Sherpur Kalan Sherpur Swadi KalanSwadi Madhepura Kul gahina Lodhiwala Baniewal Name of of Name Scheme Safipura Leelan (Main) App. Cost (In Lacs) (In Planned Admin. Cost/ 152 170 117 69 32 77 67 9 PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- Package No. 141-I 140-I 139-I 138-I 137-I 136-I 135-I 134-I 133-I 132-I 131-I 130-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual T/well. Const. of T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Description of of Description Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line Installation pf pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation Works 6 147 165 112 40 27 72 64 62 36 50 50 8 7 4 Estimated cost (Package) (RS lacs) C //051//530/4/15 15/4/15 30/4/15 1/4/2015 15/4/15 NCB 1/4/2015 NCB 30/4/15 15/4/15 1/4/2015 NCB C 2//5 111 3/2/2015 31/1/15 28/1/15 NCB C //051//530/4/15 15/4/15 30/4/15 1/4/2015 15/4/15 NCB 1/4/2015 NCB 30/4/15 15/4/15 30/4/15 1/4/2015 15/4/15 NCB 1/4/2015 3/2/2015 NCB 31/1/15 3/2/2015 18/1/15 31/1/15 NCB 3/2/2015 28/1/15 31/1/15 NCB 28/1/15 NCB S1421 541 30/4/15 15/4/15 1/4/2015 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2//1 2//5 //5 - 10/4/15 --- 10/4/15 4/4/15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 10/4/15 4/4/15 20/2//15 --- 22/3/15 4/4/15 20/2//15 22/3/15 20/2//15 561 061 581 --15/2/16 --- 15/2/16 15/8/15 --- 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 15/2/16 30/6/15 15/8/15 --- 15/6/15 30/6/15 15/8/15 15/6/15 30/6/15 15/6/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIV 1 LUDHIANA DIV Khanna Sewerage Schemes Schemes Sewerage No. Sr. Sr. 68 74 73 72 71 70 69 23 12 5 4 3 2 1 Gobindgarh Hasanpur Gill and its nanak Nagar nanak Guru abadies Galib RanSingh Galib Galib Khurd Galib Barmalipur Khaira Bet Khaira Kot Sekha Name of of Name Scheme Kauri Gidri App. Cost (In Lacs) (In Planned Admin. Cost/ 293 198 264 275 169 42 46 32 67 38 82 46 PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- Khanna-Div-148-I Khanna-Div-147-I Khanna-Div-146-I Khanna-Div-145-I Khanna-Div-144-I PRWSSIP-Ldh- PRWSSIP-Ldh- PRWSSIP-Ldh- PRWSSIP-Ldh- PRWSSIP-Ldh- Package No. SW-5-I SW-7-I SW-6-I SW-3-I SW-4-I 143-I 142-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Treatment Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme T/well. Const. of T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. T/well.of Const. Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Chamber,OHSr Description of of Description Pipe Line etc. Pipe Line etc. Pipe Line Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line etc. Pipe Line Installation pf pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation pf Installation Works 6 37 41 27 62 77 41 33

8 7 Estimated cost 195 260 290 165 260 (Package) (RS lacs) C 511 31/1/15 15/1/15 31/1/15 NCB 15/1/15 31/1/15 NCB 15/1/15 NCB 31/1/15 15/1/15 31/1/15 NCB 15/1/15 NCB C //051//530/4/15 15/4/15 1/4/2015 NCB C //051//530/4/15 15/4/15 30/4/15 1/4/2015 15/4/15 NCB 30/4/15 1/4/2015 15/4/15 NCB 30/4/15 1/4/2015 15/4/15 NCB 30/4/15 1/4/2015 15/4/15 NCB 1/4/2015 30/4/15 NCB 15/4/15 1/4/2015 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

5/2/2015 5/2/2015 5/2/2015 5/2/2015 5/2/2015 Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 521 28/3/15 25/2/15 28/3/15 25/2/15 28/3/15 25/2/15 28/3/15 25/2/15 28/3/15 25/2/15 561 061 581 --15/2/16 --- 15/2/16 15/8/15 --- 30/6/15 15/2/16 15/8/15 --- 15/6/15 30/6/15 15/2/16 15/8/15 --- 15/6/15 30/6/15 15/2/16 15/8/15 --- 15/6/15 30/6/15 15/8/15 15/2/16 15/6/15 30/6/15 --- 15/2/16 15/6/15 15/8/15 --- 30/6/15 15/8/15 15/6/15 30/6/15 15/6/15

13 Invitation (Date) Bids

14 Open on (Date) 4/4/2015 4/4/2015 4/4/2015 4/4/2015 4/4/2015

15 Contract Award decided (Date) ------

Banks no objection 16 contract award (in case of ######## ######## ######## ######## ########

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIV 1 LUDHIANA DIV 3 LUDHIANA DIV 2 LUDHIANA DIV KHANNA DIV Performance Imporvement Schemes Imporvement Performance No. Sr. Sr. 4 3 2 1 23 12 12 11 Sewer Scheme 10 Sewer Scheme 9 8 7 6 Bet etc) tibba mundian habitations( other and its Khurd Mundian nagar Ramdas Guruabadies and its Nichi Mangli Meharban Phullanwal Jaspalon Dhottar and its other other and its Baddowal ( Manakwal ( Preet Vihar Vihar Preet habitations habitations hka 6 Chakkar Name of of Name Braich Scheme etc) App. Cost (In Lacs) (In Planned Admin. Cost/ 296 182 377 230 550 550 65 10 10 20 Khanna-Div-SW-14-I PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh-Div- PRWSSIP-Ldh- Package No. IMP-21-I IMP-20-I IMP-19-I IMP-18-I SW-12-I SW-11-I SW-10-I SW-13-I SW-9-I SW-8-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Treatment Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme Plant Treatment and Sewerage Sewer scheme exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Improvement of of Improvement of Improvement of Improvement of Improvement Description of of Description Works 6 10 20 10 6 8 7 Estimated cost 175 225 510 510 370 290

60 (Package) (RS lacs) C 511 31/1/15 15/1/15 NCB 31/1/15 15/1/15 NCB 31/1/15 15/1/15 31/1/15 NCB 15/1/15 NCB 31/1/15 15/1/15 NCB 31/1/15 15/1/15 NCB 31/1/15 15/1/15 NCB C 541 041 7/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 NCB 7/5/2015 15/4/15 30/4/15 NCB 15/4/15 NCB S1//53//57/5/2015 30/4/15 15/4/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date) 5/2/2015 5/2/2015 5/2/2015 5/2/2015 5/2/2015 5/2/2015 5/2/2015 Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 521 28/3/15 25/2/15 28/3/15 25/2/15 28/3/15 25/2/15 28/3/15 25/2/15 28/3/15 25/2/15 28/3/15 25/2/15 28/3/15 25/2/15 551 051 561 --25/6/15 --- 25/6/15 15/6/15 --- 25/6/15 30/5/15 15/6/15 --- 15/5/15 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 15/6/15 15/5/15 30/5/15 15/5/15

13 Invitation (Date) Bids

14 Open on (Date) 4/4/2015 4/4/2015 4/4/2015 4/4/2015 4/4/2015 4/4/2015 4/4/2015

15 Contract Award decided (Date) ------

Banks no objection 16 contract award (in case of ######## ######## ######## ######## ######## ######## ########

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 25/10/15 25/10/15 25/10/15 25/10/15

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIV 2 Ludhiana 2 DIV No. Sr. Sr. 19 18 17 16 15 14 13 12 11 10 6 5 9 8 7 23 12 Harijan Basti Harijan Boparai Kalan and its andits Kheri Bhattian Bet Hazuri Bagh habitations habitations - Sahnewal- Shamsher Shamsher Chuharwal Chuharpur Bahaderke Machhian Dadahur Name of of Name Scheme Gujjran Bonker Colony Logarh Kalan other other Basti Ghat App. Cost (In Lacs) (In Planned Admin. Cost/ 20 14 15 16 10 13 10 10 15 5 5 5 5 5 5 PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- Package No. IMP-34-I IMP-33-I IMP-32-I IMP-30-I IMP-29-I IMP-28-I IMP-27-I IMP-36-I IMP-31-I IMP-25-I IMP-24-I IMP-23-I IMP-22-I IMP-26-I IMP-35-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Improvement of of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement Description of of Description Works 6 9.5 4.5 9.5 4.5 4.5 4.5 4.5 4.5 16 20 14 15 14 12 8 7 9 Estimated cost (Package) (RS lacs) C 2//5 //512/2/2015 5/2/15 20/1/15 12/2/2015 NCB 5/2/15 20/1/15 NCB 12/2/2015 5/2/15 12/2/2015 18/1/15 5/2/15 NCB 18/1/15 NCB 7/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 NCB 15/4/15 7/5/2015 NCB 30/4/15 15/4/15 7/5/2015 NCB 30/4/15 15/4/15 NCB S 011 521 12/2/2015 5/2/15 20/1/15 12/2/2015 NS 5/2/15 12/2/2015 20/1/15 5/2/15 NS 18/1/15 NS 12/2/2015 5/2/15 12/2/2015 18/1/15 5/2/15 12/2/2015 NS 18/1/15 5/2/15 12/2/2015 NS 16/1/15 5/2/15 NS 16/1/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2//1 3//5 441 --10/4/15 --- 10/4/15 --- 14/4/15 10/4/15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 14/4/15 --- 10/4/15 28/2//15 30/3/15 14/4/15 --- 10/4/15 28/2//15 30/3/15 14/4/15 --- 10/4/15 28/2//15 30/3/15 14/4/15 --- 10/4/15 28/2//15 30/3/15 14/4/15 --- 10/4/15 28/2//15 30/3/15 14/4/15 --- 10/4/15 28/2//15 30/3/15 14/4/15 --- 28/2//15 30/3/15 14/4/15 28/2//15 30/3/15 28/2//15 551 051 561 --25/6/15 --- 25/6/15 15/6/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/5/15 15/6/15 --- 30/5/15 15/5/15 15/6/15 30/5/15 15/5/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 25/10/15 25/10/15 25/10/15 25/10/15 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 23 12 Mehma Singh Nangal Khurd Nangal Kalan Bhaini ShaluBhaini Bhini Doaba Bhini Gehelewal Fatehgarh Gonsgarh Jassowal Name of of Name Scheme Dhaula Rachin Dango Jattan Wala Bore App. Cost (In Lacs) (In Planned Admin. Cost/ 10 10 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- Package No. IMP-44-I IMP-54-I IMP-53-I IMP-52-I IMP-51-I IMP-50-I IMP-49-I IMP-47-I IMP-45-I IMP-42-I IMP-41-I IMP-39-I IMP-38-I IMP-37-I IMP-48-I IMP-43-I IMP-46-I IMP-40-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Improvement of of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement Description of of Description Works 6 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 9.5 4.5 9.5 4.5 4.5 4.5 4.5

8 7 Estimated cost (Package) (RS lacs) C 2//5 //512/2/2015 5/2/15 28/1/15 12/2/2015 NCB 5/2/15 25/1/15 NCB S 511 521 12/2/2015 5/2/15 12/2/2015 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 NS 25/1/15 12/2/2015 NS 5/2/15 25/1/15 12/2/2015 NS 5/2/15 12/2/2015 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 NS 20/1/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2//1 3//5 441 --10/4/15 --- 10/4/15 --- 14/4/15 10/4/15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 28/2//15 30/3/15 14/4/15 28/2//15 30/3/15 28/2//15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIV 3 LUDHIANA No. Sr. Sr. 59 58 57 56 55 54 48 47 46 45 44 43 42 41 40 39 38 23 12 Kariana Khurd Sasrali Colony Sasrali asa aa 10 Bajan iha e 15 Bet Kalas Kalan Ghumana Meonwal aupr10 Rasulpur Hussaini adu 9 Maldoud Kannian Kannian Name of of Name Mangat Scheme ajt 12 Panjeta awl15 Raowal uri 20 Purrain Herran Hawas Rajol App. Cost (In Lacs) (In Planned Admin. Cost/ 10 5 5 5 5 5 8 5 5 5 PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- Package No. IMP-62-I IMP-61-I IMP-60-I IMP-59-I IMP-58-I IMP-56-I IMP-55-I IMP-63-I IMP-71-I IMP-70-I IMP-69-I IMP-68-I IMP-67-I IMP-66-I IMP-65-I IMP-64-I IMP-57-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Improvement of of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement Description of of Description Works 6 7.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 15 10 15 20 10 10 12 9 8 7 Estimated cost (Package) (RS lacs) C 541 041 7/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 7/5/2015 NCB 15/4/15 30/4/15 7/5/2015 NCB 15/4/15 30/4/15 7/5/2015 NCB 15/4/15 30/4/15 7/5/2015 NCB 15/4/15 30/4/15 NCB 15/4/15 NCB 7/5/2015 30/4/15 15/4/15 NCB S1//53//57/5/2015 30/4/15 15/4/15 12/2/2015 NS 5/2/15 12/2/2015 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 12/2/2015 NS 25/1/15 5/2/15 NS 25/1/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2//1 3//5 441 --10/4/15 --- 10/4/15 --- 14/4/15 10/4/15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 10/4/15 28/2//15 30/3/15 --- 14/4/15 28/2//15 30/3/15 14/4/15 28/2//15 30/3/15 28/2//15 551 051 561 --25/6/15 --- 25/6/15 15/6/15 --- 25/6/15 30/5/15 15/6/15 --- 25/6/15 15/5/15 30/5/15 15/6/15 --- 25/6/15 15/5/15 30/5/15 15/6/15 --- 25/6/15 15/5/15 30/5/15 15/6/15 --- 15/5/15 25/6/15 30/5/15 15/6/15 --- 25/6/15 15/5/15 30/5/15 --- 15/6/15 15/5/15 30/5/15 15/6/15 15/5/15 30/5/15 15/5/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16 31/3/16

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIV 2 Ludhiana DIV 1 LUDHIANA DIV KHANNA DIV Water meters Installation meters Water No. Sr. Sr. 65 64 63 62 61 60 7 6 5 4 3 2 1 23 12 Shanewal Khurd abnpr 10 Harbanspura Macchiwara Macchiwara hhru 8 Chuharpur Lakhowal Lakhowal Name of of Name Scheme taa 15 Ottalan aiu 10 walipur Chimna Kalsian Khaan Sarihn Khurd Hans App. Cost (In Lacs) (In Planned Admin. Cost/ 10 10 6 5 9 7 4 6 6 PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- Div-IMP-77-I Div-IMP-76-I Div-IMP-75-I Div-IMP-74-I Div-IMP-73-I Package No. IMP-72-I WM-7-I WM-6-I WM-5-I WM-4-I WM-3-I WM-2-I WM-1-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Schemes exisiting Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Water Meters in in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water Improvement of of Improvement of Improvement of Improvement of Improvement of Improvement of Improvement Description of of Description Installation of of Installation of Installation of Installation of Installation of Installation of Installation of Installation Works 6 10 15 10 10 10 6 8 8 7 5 9 7 4 6 6 Estimated cost (Package) (RS lacs) C 541 041 7/5/2015 30/4/15 15/4/15 7/5/2015 NCB 30/4/15 7/5/2015 15/4/15 30/4/15 NCB 15/4/15 NCB 7/5/2015 30/4/15 15/4/15 NCB 7/5/2015 30/4/15 15/4/15 NCB S1//53//57/5/2015 30/4/15 15/4/15 7/5/2015 NS 30/4/15 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 15/4/15 NS 7/5/2015 30/4/15 15/4/15 NS 7/5/2015 30/4/15 15/4/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 551 051 561 --25/6/15 --- 25/6/15 15/6/15 30/5/15 --- 25/6/15 15/5/15 15/6/15 --- 25/6/15 30/5/15 15/6/15 --- 15/5/15 25/6/15 30/5/15 15/6/15 --- 15/5/15 25/6/15 30/5/15 15/6/15 --- 15/5/15 25/6/15 30/5/15 15/6/15 --- 15/5/15 30/5/15 15/6/15 25/6/15 15/5/15 30/5/15 --- 25/6/15 15/5/15 15/6/15 --- 25/6/15 30/5/15 15/6/15 --- 15/5/15 25/6/15 30/5/15 15/6/15 --- 15/5/15 25/6/15 30/5/15 15/6/15 --- 15/5/15 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 15/6/15 15/5/15 30/5/15 15/5/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 20 19 18 17 16 15 14 13 12 11 10 9 8 23 12 Harkrishan vihar Harkrishan Bhiamian Khurd Bhiamian Bonker Gujjran Salempur Bet Salempur Mangli Tanda Baranhara Meherban Lakhowal Name of of Name Scheme Kakowal Baloke Bore App. Cost (In Lacs) (In Planned Admin. Cost/ 10 10 4 8 2 8 5 2 5 7 2 5 5 PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- Package No. WM-20-I WM-19-I WM-18-I WM-17-I WM-16-I WM-15-I WM-14-I WM-13-I WM-12-I WM-11-I WM-10-I WM-9-I WM-8-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Water Meters in in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water Description of of Description Installation of of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation Works 6 10 10 8 7 5 7 2 5 5 4 8 2 8 5 2 Estimated cost (Package) (RS lacs) C 541 041 7/5/2015 30/4/15 15/4/15 NCB 7/5/2015 30/4/15 15/4/15 NCB S1//53//57/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 15/4/15 NS 7/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 NS 15/4/15 NS 7/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 15/4/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 551 051 561 --25/6/15 --- 25/6/15 15/6/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 15/6/15 15/5/15 30/5/15 15/5/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIV 3 LUDHIANA No. Sr. Sr. 32 31 30 29 28 27 26 25 24 23 22 21 23 12 BAGGA Tapper Herrian Tapper Assi KhurdAssi Taraf Kotli Taraf Bodalwala Ghunewal Name of of Name Scheme Sudhar Bujrag App. Cost (In Lacs) (In Planned Admin. Cost/ 10 10 10 2 2 7 3 4 7 5 1 1 PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- PRWSSIP-LDH-Div- Package No. WM-32-I WM-31-I WM-30-I WM-29-I WM-28-I WM-27-I WM-26-I WM-25-I WM-24-I WM-23-I WM-22-I WM-21-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Water Meters in in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water Description of of Description Installation of of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation Works 6 10 10 10 8 7 4 7 5 1 1 2 2 7 3 Estimated cost (Package) (RS lacs) C 541 041 7/5/2015 30/4/15 15/4/15 NCB 7/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 NCB 15/4/15 NCB S1//53//57/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 15/4/15 7/5/2015 NS 30/4/15 15/4/15 NS 7/5/2015 30/4/15 15/4/15 NS 7/5/2015 30/4/15 15/4/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 551 051 561 --25/6/15 --- 25/6/15 15/6/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 30/5/15 --- 25/6/15 15/5/15 15/6/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 15/6/15 15/5/15 30/5/15 15/5/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIV KHANNA DIV No. Sr. Sr. 44 43 42 41 40 39 38 37 36 35 34 33 23 12 Bir Kishan SinghBir Malsian Bhaike Malsian Majra Majra Gobindpura Mangewal Mullanpur Sahibpur Jaspalon Name of of Name Faizgarh Scheme Mahaun Khatra App. Cost (In Lacs) (In Planned Admin. Cost/ 3 3 9 5 3 4 4 6 3 5 1 3 PRWSSIP-LDH-Div- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- Div-WM-44-I Div-WM-43-I Div-WM-42-I Div-WM-41-I Div-WM-40-I Div-WM-39-I Div-WM-38-I Div-WM-37-I Div-WM-36-I Div-WM-35-I Div-WM-34-I Package No. WM-33-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Water Meters in in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water Description of of Description Installation of of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation Works 6 8 7 6 3 5 1 3 3 3 9 5 3 4 4 Estimated cost (Package) (RS lacs)

S1//53//57/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 15/4/15 7/5/2015 NS 30/4/15 15/4/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 551 051 561 --25/6/15 --- 25/6/15 15/6/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 30/5/15 --- 15/5/15 15/6/15 30/5/15 15/5/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 57 56 55 54 53 52 51 50 49 48 47 46 45 23 12 Raipur Rajputtan Raipur Mandiala Kalan Mandiala Aluna Miana Chakli Adal Aluna Palla Aluna Name of of Name Loharian Akalgarh Mithewal Scheme Khirnian Rajgarh Gazipur Rohlon Jatiwal App. Cost (In Lacs) (In Planned Admin. Cost/ 2 2 2 4 7 7 5 2 2 4 2 3 5 PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- PRWSSIP-Khanna- Div-WM-57-I Div-WM-56-I Div-WM-55-I Div-WM-54-I Div-WM-53-I Div-WM-52-I Div-WM-51-I Div-WM-50-I Div-WM-49-I Div-WM-48-I Div-WM-47-I Div-WM-46-I Div-WM-45-I Package No. 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Schemes Existing Water Meters in in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water in Meters Water Description of of Description Installation of of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation of Installation Works 6 8 7 2 2 4 2 3 5 2 2 2 4 7 7 5 Estimated cost (Package) (RS lacs)

S1//53//57/5/2015 30/4/15 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 7/5/2015 15/4/15 30/4/15 NS 15/4/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 551 051 561 --25/6/15 --- 25/6/15 15/6/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 25/6/15 15/6/15 15/5/15 --- 30/5/15 15/6/15 15/5/15 30/5/15 15/5/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15 25/10/15

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIVISION NO. 1, DIVISION NO.1, DISTT.JALANDHAR North Zone No. Sr. Sr. 58 6 5 4 3 2 1 23 12 unrKud6.0PRWSSIP-Jld-Div- 60.00 Sunner Khurd PRWSSIP-Jld-Div- 80.00 PRWSSIP-Jld-Div- 60.50 Jagral PRWSSIP-Jld-Div- 55.00 Bachhowal PRWSSIP-Jld-Div- 60.00 Taggar aea 00 PRWSSIP-Jld-Div- 70.00 Shamspur Bet Shamspur Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. Cost/ 1 PRWSSIP-Khanna- Div-WM-58-I Package No. 154-I 153-I 152-I 151-I 150-I 149-I 4

Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Distrct JalandharDistrct OHSRBlock Distribution, Tubewell,Civil JalandharDistrct KalanBlock Distribution, OHSR, Tubewell,Civil JalandharDistrct KalanBlock Rurka Distribution, OHSR, Tubewell,Civil Distrct JalandharDistrct Block KalanRurka Distribution, OHSR, Tubewell,Civil JalandharDistrct Block Jal. East Distribution, OHSR, Tubewell,Civil JalandharDistrct Block Jal. East Distribution, OHSR, Tubewell,Civil Existing Schemes Existing Water Meters in in Meters Water Description of of Description Installation of of Installation Works 6 00 C 90-051-221 90-05POST- 19-03-2015 19-02-2015 09-02-2015 NCB 60.00 POST- 16-03-2015 16-02-2015 06-02-2015 NCB 80.00 POST- 16-03-2015 12-02-2015 05-02-2015 NCB 60.50 POST- 17-03-2015 17-02-2015 10-02-2015 NCB 55.00 POST- 19-03-2015 19-02-2015 09-02-2015 NCB 60.00 POST- 16-03-2015 16-02-2015 06-02-2015 NCB 70.00 8 7 1 Estimated cost (Package) (RS lacs)

S1//53//57/5/2015 30/4/15 15/4/15 NS Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW Review Post Post 12 Banks no objection to bid Document (in case 20-050-521 80-05POST- 18-05-2015 01-05-2015 02-04-2015 POST- 14-05-2015 29-04-2015 30-03-2015 POST- 15-05-2015 30-04-2015 31-03-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 14-05-2015 29-04-2015 30-03-2015 551 051 561 --25/6/15 --- 15/6/15 30/5/15 15/5/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW Banks no objection 16 contract award (in case of 28-05- 24-05- 25-05- 28-05- 28-05- 24-05- 2015 2015 2015 2015 2015 2015

71 920 19 18 17 Contarct signed (Date/Value/Currency)

-- -2-321 --- -- 27-03-2016 ------23-03-2016 ------24-03-2016 ------27-03-2016 ------27-03-2016 ------23-03-2016 ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 25/10/15

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 10 8 9 7 23 12 aaa9.0PRWSSIP-Jld-Div- 95.00 Patara PRWSSIP-Jld-Div- 120.00 Ganna Pind Dhina PRWSSIP-Jld-Div- 112.00 Dhina Patara Chitti Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 00 PRWSSIP-Jld-Div- 70.00 Cost/ PRWSSIP-Jld-Div- PRWSSIP-Jld-Div- PRWSSIP-Jld-Div- Package No. 156-II 158-II 157-II 155-I 156-I 158-I 157-I 4

Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Distrct JalandharDistrct OHSR, Block Jal.East Jalandhar Distrct Jal. East Distribution, Block Tubewell,Civil Jalandhar Distrct Jal.East Block OHSR, Jalandhar Jal.East Distrct Distribution, Block Tubewell, Civil JalandharDistrct Block Jal. East Distribution, OHSR, Tubewell,Civil Distrct JalandharDistrct OHSR, Block Phillaur Jalandhar Phillaur Distrct Distribution, Block Tubewell,Civil Description of of Description Works 6 00 C 00-051-221 70-05POST- 17-03-2015 17-02-2015 10-02-2015 NCB 70.00 20 C 50-051-221 60-05POST- 16-03-2015 12-02-2015 05-02-2015 NCB 22.00 POST- 16-03-2015 16-02-2015 06-02-2015 NCB 98.00 POST- 17-03-2015 17-02-2015 10-02-2015 NCB 22.00 POST- 17-03-2015 17-02-2015 10-02-2015 NCB 90.00 POST- 17-03-2015 17-02-2015 10-02-2015 NCB 15.00 POST- 19-03-2015 19-02-2015 09-02-2015 NCB 80.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW

12 Banks no objection to bid Document (in case 20-050-521 80-05POST- 18-05-2015 01-05-2015 02-04-2015 10-053-421 50-05POST- 15-05-2015 30-04-2015 31-03-2015 POST- 14-05-2015 29-04-2015 30-03-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 18-05-2015 01-05-2015 02-04-2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW Banks no objection 16 contract award (in case of 28-05- 25-05- 24-05- 28-05- 28-05- 28-05- 28-05- 2015 2015 2015 2015 2015 2015 2015

71 920 19 18 17 Contarct signed (Date/Value/Currency) -- -2-321 --- -- 27-03-2016 ------2-321 --- -- 24-03-2016 ------23-03-2016 ------27-03-2016 ------27-03-2016 ------27-03-2016 ------27-03-2016 ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DIVISION NO. 2,Jalandhar No. Sr. Sr. 12 11 4 1 2 3 23 12 uaapr7.0PRWSSIP-Jld-Div- 70.00 Mubarakpur hgi8.0PRWSSIP-Jld-Div- 80.00 Dhogri PRWSSIP-Jld-Div- 55.00 Nihaluwal hhk 00 PRWSSIP-Jld-Div- 60.00 Chuheki Name of of Name asa 278.64 Malsian Scheme ea 20 PRWSSIP-Jld-Div- 52.00 Helar App. Cost (In Lacs) (In Planned Admin. Cost/ PRWSSIP-Jld-Div- PRWSSIP-Jld-Div- PRWSSIP-Jld-Div- Package No. 162-III 162-II 163-I 160-I 164-I 162-I 161-I 159-I 4

Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual OHSR, Block OHSR, JalandharDistrct Block Shahkot Civil Distribution, Tubewell, OHSR, Jalandhar Block Lohian Distrct Civil Distribution, Tubewell, OHSR, JalandharDistrct Block Jal. East Distribution, OHSR, Tubewell,Civil JalandharDistrct Block Civil Distribution, Tubewell, OHSR, Distrct JalandharDistrct Block Distribution, OHSR, Tubewell, Civil JalandharDistrct Block Jal.West Distribution, OHSR, Tubewell, Civil Jalandhar Shahkot Distrct Distribution, Block Pipeline, Civil Jalandhar Shahkot Distrct Description of of Description Works 6 2.0NB1-221 70-051-321 POST- 17-03-2015 17-02-2015 10-02-2015 NCB 125.00 POST- 17-03-2015 17-02-2015 10-02-2015 NCB 123.64 00 C 60-051-221 60-05POST- 16-03-2015 16-02-2015 06-02-2015 NCB 60.00 00 C 60-051-221 60-05POST- 16-03-2015 16-02-2015 06-02-2015 NCB 80.00 POST- 16-03-2015 12-02-2015 05-02-2015 NCB 52.00 POST- 17-03-2015 17-02-2015 10-02-2015 NCB 30.00 POST- 19-03-2015 19-02-2015 09-02-2015 NCB 45.00 POST- 16-03-2015 12-02-2015 05-02-2015 NCB 70.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW

12 Banks no objection to bid Document (in case 00-052-421 40-05POST- 14-05-2015 29-04-2015 30-03-2015 00-052-421 40-05POST- 14-05-2015 29-04-2015 30-03-2015 POST- 15-05-2015 30-04-2015 31-03-2015 28-05- -- 18-05-2015 01-05-2015 02-04-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 15-05-2015 30-04-2015 31-03-2015 20-050-521 80-05- 28-05- -- 18-05-2015 01-05-2015 02-04-2015 28-05- -- 18-05-2015 01-05-2015 02-04-2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) REVIEW REVIEW REVIEW REVIEW REVIEW Banks no objection 16 contract award (in case of 24-05- 24-05- 25-05- 28-05- 25-05- 2015 2015 2015 2015 2015 2015 2015 2015

71 920 19 18 17 Contarct signed (Date/Value/Currency) -- -2-321 --- -- 23-03-2016 ------2-321 --- -- 23-03-2016 ------24-03-2016 ------27-03-2016 ------27-03-2016 ------24-03-2016 ------2-321 --- -- 27-03-2016 ------27-03-2016 ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 12 11 10 6 9 8 7 5 23 12 aaBka6.0PRWSSIP-Jld-Div- 65.00 iaiwl5.0PRWSSIP-Jld-Div- 51.00 Sihariawal PRWSSIP-Jld-Div- 55.00 Mudha PRWSSIP-Jld-Div- 70.00 Boparai PRWSSIP-Jld-Div- 48.50 Saffipur PRWSSIP-Jld-Div- 54.80 Gehlar PRWSSIP-Jld-Div- 49.50 Khojkipur erwl6.0PRWSSIP-Jld-Div- 62.00 Lesriwal Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. Cost/ Package No. 166-I 172-I 171-I 170-I 169-I 168-I 167-I 165-I 4

Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Jalandhar AdampurDistrct Block Civil Distribution, Tubewell, OHSR, JalandharDistrct Block Civil Distribution, Tubewell, OHSR, JalandharDistrct Block Bhogpur Civil Distribution, Tubewell, OHSR, JalandharDistrct Block Bhogpur Distribution, OHSR, Tubewell,Civil JalandharDistrct Block Adampur Distribution, OHSR, Tubewell,Civil Distrct JalandharDistrct Block Shahkot Distribution, OHSR, Tubewell,Civil JalandharDistrct Block Distribution, OHSR, Tubewell, Civil JalandharDistrct Block Nakadar Distribution, OHSR, Tubewell, Civil Description of of Description Works 6 20 C 50-051-221 60-05POST- 16-03-2015 12-02-2015 05-02-2015 NCB 62.00 10 C 50-051-221 60-05POST- 16-03-2015 12-02-2015 05-02-2015 NCB 51.00 POST- 19-03-2015 19-02-2015 09-02-2015 NCB 55.00 POST- 17-03-2015 17-02-2015 10-02-2015 NCB 70.00 POST- 16-03-2015 12-02-2015 05-02-2015 NCB 48.50 POST- 17-03-2015 17-02-2015 10-02-2015 NCB 54.80 POST- 19-03-2015 19-02-2015 09-02-2015 NCB 49.50 POST- 16-03-2015 16-02-2015 06-02-2015 NCB 65.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW

12 Banks no objection to bid Document (in case 10-053-421 50-05POST- 15-05-2015 30-04-2015 31-03-2015 10-053-421 50-05POST- 15-05-2015 30-04-2015 31-03-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 15-05-2015 30-04-2015 31-03-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 14-05-2015 29-04-2015 30-03-2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW Banks no objection 16 contract award (in case of 25-05- 25-05- 28-05- 28-05- 25-05- 28-05- 28-05- 24-05- 2015 2015 2015 2015 2015 2015 2015 2015

71 920 19 18 17 Contarct signed (Date/Value/Currency) -- -2-321 --- -- 24-03-2016 ------2-321 --- -- 24-03-2016 ------27-03-2016 ------27-03-2016 ------24-03-2016 ------27-03-2016 ------27-03-2016 ------23-03-2016 ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date Improvement Jalandhar No. Sr. Sr. 14 15 13 4 3 2 1 23 12 ahaa1.0PRWSSIP-JLD-Div- 16.50 Padhiana PRWSSIP-Jld-Div- 62.00 Kalan Bajwa hra 60 PRWSSIP-JLD-Div- 16.00 Ghurial PRWSSIP-JLD-Div- 18.50 Kalan Lallian PRWSSIP-JLD-Div- 21.00 Sangal Sohal PRWSSIP-Jld-Div- 52.00 Kotla hdna 53 PRWSSIP-Jld-Div- 55.38 Bhudanwal Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. Cost/ Package No. IMP-80-I IMP-79-I IMP-78-I IMP-77-I 174-I 175-I 173-I 4

Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Distrct JalandharDistrct Block Nakodar Distribution, OHSR, Tubewell,Civil JalandharDistrct Block Shahkot Distribution, OHSR, Tubewell,Civil JalandharDistrct Block Shahkot Distribution, OHSR, Tubewell,Civil Jalandhar Adampur Distrct Chorinator, Block Pipeline, Machinery, New Tubewell, Jalandhar Adampur Distrct Chorinator, Block Pipeline, Machinery, New Tubewell, Jal.West Distrct Main, Block Chorinator, Rising Pipeline, Machinery, New Tubewell, Jal.West Distrct Main, Block Chorinator, Rising Pipeline, Machinery, New Tubewell, Description of of Description Works 6 53 C 60-051-221 60-05POST- 16-03-2015 16-02-2015 06-02-2015 NCB 55.38 65 C 50.53.11 60.5Post- 16.02.15 31.01.15 15.01.15 NCB 16.50 Post- 16.04.2015 01.04.2015 01.02.2015 Post- NCB 16.02.15 16.00 31.01.15 15.01.15 Post- NCB 16.02.15 18.50 31.01.15 15.01.15 NCB 21.00 POST- 19-03-2015 19-02-2015 09-02-2015 NCB 52.00 POST- 16-03-2015 12-02-2015 05-02-2015 NCB 62.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) REVIEW REVIEW REVIEW Review Review Review Review

12 Banks no objection to bid Document (in case 2.421 2.521 1.621 Post- 10.06.2015 25.05.2015 25.04.2015 00-052-421 40-05POST- 14-05-2015 29-04-2015 30-03-2015 20-050-521 80-05POST- 18-05-2015 01-05-2015 02-04-2015 POST- 15-05-2015 30-04-2015 31-03-2015 00.52.31 50.5Post- 05.04.15 20.03.15 20.02.15 Post- 05.04.15 20.03.15 20.02.15 Post- 05.04.15 20.03.15 20.02.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) REVIEW REVIEW REVIEW Review Review Review Review Banks no objection 16 contract award (in case of 17.06.201 00.5---1.71 -- -- 19.07.15 - - - - 20.04.15 -- 19.07.15 - - -- - 19.07.15 - 20.04.15 - - - 20.04.15 24-05- 28-05- 25-05- 2015 2015 2015 71 920 19 18 17 5

Contarct signed (Date/Value/Currency) -- -2-321 --- -- 23-03-2016 ------2-321 --- -- 27-03-2016 ------24-03-2016 ------1.921 -- -- 16.09.2016 - - - Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date Sewerage JalandharSewerage No. Sr. Sr. 11 10 7 8 6 9 5 23 12 Donewal Nawanpind ida 20 PRWSSIP-JLD-Div- 12.00 Sindhar PRWSSIP-Jld-Div- 3.80 Khurla pur iai1.0PRWSSIP-JLD-Div- 15.00 Diwali Hundal Dhadha Virk ita .0PRWSSIP-JLD-Div- 4.50 Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 50 PRWSSIP-JLD-Div- 25.00 80 PRWSSIP-JLD-Div- 18.00 Cost/ .0PRWSSIP-JLD-Div- 7.10 Package No. IMP-82-I IMP-83-I IMP-84-I IMP-87-I IMP-85-I IMP-86-I IMP-81-I 4

Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual East DistrctEast Jal. Main, Block Chorinator, Rising Pipeline, Machinery, New Tubewell, Distrct Phillaur Main, Block Chorinator ,Rising Pipeline, Machinery, New Tubewell, Jalandhar Shahkot Distrct Pipeline, Block New Tubewell, Jalandhar Lohian Distrct Pipeline, Block Jalandhar Lohian Distrct Chorinator, Block Pipeline, Machinery, Jalandhar Nakodar Distrct Block Pipeline, Jalandhar Nakodar Distrct Chorinator, Block Pipeline, Machinery, New Description of of Description Works 6 50 C 50.53.11 60.5Post- 16.02.15 31.01.15 15.01.15 NCB 15.00 Post- 16.04.2015 01.04.2015 01.02.2015 NCB 18.00 50 C 50.53.11 60.5Post- 16.02.15 31.01.15 15.01.15 NCB 25.00 Post- 16.04.2015 01.04.2015 01.02.2015 NCB 12.00 .0N 50.53.11 60.5Post- 16.02.15 31.01.15 15.01.15 NS Post- 7.10 16.04.2015 01.04.2015 01.02.2015 Post- NS 16.02.15 3.80 31.01.15 15.01.15 NS 4.50

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review

12 Banks no objection to bid Document (in case 2.421 2.521 1.621 Post- 10.06.2015 25.05.2015 25.04.2015 2.421 2.521 1.621 Post- 10.06.2015 25.05.2015 25.04.2015 2.421 2.521 1.621 Post- 10.06.2015 25.05.2015 25.04.2015 00.52.31 50.5Post- 05.04.15 20.03.15 20.02.15 Post- 05.04.15 20.03.15 20.02.15 00.52.31 50.5Post- 05.04.15 20.03.15 20.02.15 00.52.31 50.5Post- 05.04.15 20.03.15 20.02.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) Review Review Review Review Review Review Review Banks no objection 16 contract award (in case of 17.06.201 17.06.201 17.06.201 00.5---1.71 -- -- 19.07.15 - - - - 20.04.15 -- 19.07.15 - - - 20.04.15 00.5---1.71 -- -- 19.07.15 - - - 20.04.15 00.5---1.71 -- -- 19.07.15 - - - 20.04.15 71 920 19 18 17 5 5 5

Contarct signed (Date/Value/Currency) 1.921 -- -- 16.09.2016 - - - 1.921 -- -- 16.09.2015 - - - 1.921 -- -- 16.09.2015 - - - Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date DISTT. No. Sr. Sr. 8 6 5 4 3 2 1 7 1 23 12 noa 02 PRWSSIP-kpt-Div- 20.22 Innowal Talwandi Manna Rajputtan PRWSSIP-kpt-Div- 89.64 PRWSSIP-kpt-Div- Nasirabad 69.03 PRWSSIP-kpt-Div- Barna 30.00 Narangpur hkCea300 PRWSSIP-JLD-Div- 380.00 Chela Chak aoCa 20 PRWSSIP-kpt-Div- 52.00 Balo Chak hia4.0PRWSSIP-kpt-Div- 47.00 Khaira Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 0.8PRWSSIP-kpt-Div- 106.08 50 PRWSSIP-kpt-Div- 45.00 Cost/ Package No. SW-15-I 183-I 181-I 180-I 179-I 178-I 177-I 182-I 176-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Distrct Jalandhar Block Lohian, Treatment Plant, Sewerage Work DistributionWork & Work DistributionWork Work DistributionWork DistributionWork DistributionWork Work Distribution DistributionWork DistributionWork Description of of Description & OHSR, Block & OHSR, Block & OHSR, Block & OHSR, Block & OHSR, Block Tubewell, Civil Tubewell, Civil Tubewell, Civil Tubewell, Civil Tubewell, Civil Tubewell, Civil Tubewell, Civil Tubewell, Civil & OHSR,Block OHSR,Block & Block Nadala, OHSR, Block , Phagwara, Phagwara, Phagwara, Phagwara, Phagwara, Nadala, Nadala, Nadala, Works 6 0.8NB0-221 90-051-321 POST- 19-03-2015 19-02-2015 09-02-2015 NCB 106.08 02 C 50-051-221 60-05POST- 16-03-2015 12-02-2015 05-02-2015 NCB POST- 20.22 17-03-2015 17-02-2015 10-02-2015 NCB 52.00 POST- 16-03-2015 16-02-2015 06-02-2015 NCB POST- 45.00 16-03-2015 12-02-2015 05-02-2015 NCB POST- 89.64 17-03-2015 17-02-2015 10-02-2015 POST- NCB 19-03-2015 69.03 19-02-2015 09-02-2015 NCB POST- 30.00 16-03-2015 16-02-2015 06-02-2015 NCB 47.00 8.0NB1.21 80.53.31 -2.41 00.51.61 -0.71 60.6-- - 06.07.16 - - - 07.07.15 -- 15.06.15 20.05.15 20.04.15 -- 30.03.15 28.02.15 15.02.15 NCB 380.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW

12 Banks no objection to bid Document (in case 10-053-421 50-05POST- 15-05-2015 30-04-2015 31-03-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 14-05-2015 29-04-2015 30-03-2015 POST- 15-05-2015 30-04-2015 31-03-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 14-05-2015 29-04-2015 30-03-2015 20-050-521 80-05POST- 18-05-2015 01-05-2015 02-04-2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW Banks no objection 16 contract award (in case of 25-05- 28-05- 24-05- 25-05- 28-05- 28-05- 24-05- 28-05- 2015 2015 2015 2015 2015 2015 2015 2015

71 920 19 18 17 Contarct signed (Date/Value/Currency) -- -2-321 ------24-03-2016 ------27-03-2016 ------23-03-2016 ------24-03-2016 ------27-03-2016 ------27-03-2016 ------23-03-2016 ------2-321 --- -- 27-03-2016 ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date Improvement Kaputhala No. Sr. Sr. 10 15 14 13 12 11 1 9 3 2 23 12 Rural) (Kapurthala Bhathe Nawanpind oei2.0PRWSSIP-KPT-Div- 20.00 Domeli PRWSSIP-kpt-Div- 64.00 Jahangirpur Desal Indressa Shahwala PRWSSIP-kpt-Div- 54.41 Sarai Jattan PRWSSIP-kpt-Div- 15.00 Alaudipur aaaKln9.3PRWSSIP-kpt-Div- 91.33 Wadala Kalan uka1.0PRWSSIP-KPT-Div- 15.00 Surkha Bajaj Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 00 PRWSSIP-kpt-Div- 60.00 84 PRWSSIP-kpt-Div- 58.44 80 PRWSSIP-KPT-Div- 18.00 66 PRWSSIP-kpt-Div- 96.66 Cost/ Package No. IMP-88-I IMP-90-I IMP-89-I 189-I 185-I 190-I 188-I 187-I 186-I 184-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Phagwara, District Work Distribution Work DistributionWork DistributionWork DistributionWork DistributionWork DistributionWork Block Kapurthala, Nadala, District Nadala, District Description of of Description , Sultanpur Lodhi, & OHSR, Block & OHSR, Block & OHSR, Block & OHSR, Block Tubewell, Civil Tubewell, Civil Tubewell, Civil Tubewell, Civil Tubewell, Civil Tubewell, Civil Tubewell, Civil Distribution & & OHSR,Block OHSR,Block & OHSR, Block OHSR, Block OHSR, Block OHSR, Block Kapurthala Kapurthala Kapurthala OHSR,Block OHSR,Block Kapurthala, Kapurthala, Kapurthala, , Works 6 50 C 50-052-221 16-03-2015 28-02-2015 15-01-2015 NCB 15.00 20-04-2015 31-03-2015 25-02-2015 NCB 18.00 00 C 80-053-321 20-04-2015 31-03-2015 28-02-2015 NCB 20.00 13 C 90-051-221 90-05POST- 19-03-2015 19-02-2015 09-02-2015 NCB 91.33 40 C 50-051-221 60-05POST- 16-03-2015 12-02-2015 05-02-2015 POST- NCB 17-03-2015 64.00 17-02-2015 10-02-2015 NCB POST- 96.66 19-03-2015 19-02-2015 09-02-2015 POST- NCB 16-03-2015 58.44 16-02-2015 06-02-2015 NCB POST- 54.41 16-03-2015 12-02-2015 05-02-2015 NCB POST- 15.00 17-03-2015 17-02-2015 10-02-2015 NCB 60.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW Review Review Review Post Post Post Post 12 Banks no objection to bid Document (in case 20-050-521 80-05POST- 18-05-2015 01-05-2015 02-04-2015 10-053-421 50-05POST- 15-05-2015 30-04-2015 31-03-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 18-05-2015 01-05-2015 02-04-2015 POST- 14-05-2015 29-04-2015 30-03-2015 POST- 15-05-2015 30-04-2015 31-03-2015 POST- 18-05-2015 01-05-2015 02-04-2015 10-050-521 21-05-- 22-15-2015 08-05-2015 01-04-2015 -- 18-06-2015 08-06-2015 01-05-2015 -- 15-06-2015 08-06-2015 01-05-2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW REVIEW Banks no objection 16 contract award (in case of 31-05-2015 26-06-2015 31-06-2015 28-05- 25-05- 28-05- 28-05- 24-05- 25-05- 28-05- 2015 2015 2015 2015 2015 2015 2015

71 920 19 18 17 Contarct signed (Date/Value/Currency) -- -2-321 --- -- 27-03-2016 ------2-321 ------24-03-2016 ------27-03-2016 ------27-03-2016 ------23-03-2016 ------24-03-2016 ------27-03-2016 ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract 30-08-2015 25-09-2015 30-09-2015

22 Actual Date of Completion 23 ------Expenditure incurred to date WSS, Division Gurdaspur Division WSS, Schemes Supply Water 1 KaputhalaSewerage No. Sr. Sr. 2 1 4 7 6 5 23 12 Baghana Nangal ylu 4.0PRWSSIP-JLD-Div- 442.80 Dyalpur Phullewal Danwind Fiali otu 00 PRWSSIP-GSP-Div- Dostpur 70.00 ainaa2.0PRWSSIP-KPT-Div- 25.00 Latianwala PRWSSIP-KPT-Div- 18.00 Chuharpur Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 80 PRWSSIP-GSP-Div- 48.00 50 PRWSSIP-KPT-Div- 25.00 80 PRWSSIP-KPT-Div- 18.00 Cost/ Package No. IMP-92-I IMP-91-I IMP-94-I IMP-93-I SW-16-I 192-I 191-I 4

Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Independent Water Independent Water Treatment Plant , Supply Scheme by SupplyScheme by SupplyScheme by Sultanpur Lodhi, Sultanpur Lodhi, T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR Description of of Description Block Dhilwan, OHSR, Block OHSR, Block OHSR, Block OHSR, Block OHSR, Block OHSR, Block Kapurthala, Kapurthala, Kapurthala Kapurthala Kapurthala Kapurthala Kapurthala Sewaerage installing installing installing District District District District District Works 6 4.0NB2-221 10-0530-04-2015 31-03-2015 28-02-2015 NCB 442.80 80 C 50.52..503.03.15 26.2.15 25.01.15 03.03.15 NCB 48.00 26.2.15 25.01.15 NCB 70.00 50 C 50-052-221 16-03-2015 28-02-2015 15-01-2015 NCB 25.00 20-04-2015 31-03-2015 28-02-2015 NCB 18.00 50 C 50-053-321 20-04-2015 31-03-2015 25-02-2015 NCB 25.00 20-04-2015 31-03-2015 28-02-2015 NCB 18.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 60.51.41 00.5-3.51 90.6- 29.02.16 - - 29.02.16 - - 31.05.15 - - - - 31.05.15 30.04.15 10.04.15 - 06.03.15 30.04.15 10.04.15 06.03.15 50-052-621 50-05-- 15-07-2015 23-06-2015 15-05-2015 -- 22-15-2015 08-05-2015 01-04-2015 -- 15-06-2015 08-06-2015 01-05-2015 -- 18-06-2015 08-06-2015 01-05-2015 -- 15-06-2015 08-06-2015 01-05-2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of 31-07-2015 31-05-2015 31-06-2015 26-06-2015 31-06-2015

71 920 19 18 17 Contarct signed (Date/Value/Currency)

------Contract No.

Name of Contractor 30-07-2016 (in case(in of WBR No. review) prior prior 21 ------Date of Completion as per contract 30-08-2015 30-09-2015 25-09-2015 30-09-2015

22 Actual Date of Completion 0.00 0.00 23 ------Expenditure incurred to date WSS, Division Batala Batala Division WSS, No. Sr. Sr. 3 4 3 2 1 7 6 5 4 23 12 ar 80 PRWSSIP-GSP-Div- 68.00 Babri ain3.0PRWSSIP-GSP- PRWSSIP-GSP- 35.00 Kalian 45.00 Rasulpur PRWSSIP-GSP- PRWSSIP-GSP- Bassrawan 43.00 42.00 Pabharali Singh PRWSSIP-GSP-Div- Nushra Majja 39.00 Ugara PRWSSIP-GSP-Div- 42.00 Pindi Bala Bathwala Hardo Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 80 PRWSSIP-GSP-Div- 98.00 PRWSSIP-GSP-Div- 98.00 Cost/ Batala-Div-201-I Batala-Div-200-I Batala-Div-199-I Batala-Div-198-I Package No. 193-I 197-I 196-I 195-I 194-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Independent Water Independent Water Independent Water Independent Water Independent Water Independent Water Independent Water Independent Water Independent Water Supply Scheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR Description of of Description installing installing installing installing installing installing installing installing installing installing Works etc. 6 80 C 00.52.21 03.03.15 21.02.15 20.01.15 NCB 68.00 50 C 00.52.21 02.03.15 20.02.15 20.01.15 02.03.15 NCB 35.00 21.02.15 20.01.15 10.03.15 NCB 45.00 25.02.15 25.01.15 02.03.15 NCB 43.00 21.02.15 20.01.15 NCB 42.00 12.03.15 30.02.15 30.01.15 10.03.15 NCB 98.00 25.02.15 25.01.15 10.03.15 NCB 39.00 25.02.15 25.01.15 02.03.15 NCB 42.00 20.02.15 20.01.15 NCB 98.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 30.50.41 90.5-0.61 10.6- 31.03.16 - - 05.03.16 - - - - 01.06.15 04.03.16 - - - - - 05.06.15 05.03.16 29.04.15 - - 07.04.15 - - 12.06.15 03.03.15 - 30.04.15 - - 09.04.15 31.03.16 - 05.06.15 05.03.15 12.05.15 - - - 16.04.15 04.03.16 - 14.03.15 30.04.15 - 11.06.15 - - 09.04.15 04.03.16 - - 05.03.15 - - 12.06.15 - 09.05.15 04.03.16 17.04.15 - - - 13.03.15 - - 12.06.15 12.05.15 29.02.16 - 16.04.15 - - - 14.03.15 05.06.15 12.05.15 - - 16.04.15 - 31.05.15 14.03.15 05.05.15 - 10.04.15 06.03.15 30.04.15 10.04.15 06.03.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 Expenditure incurred to date WSS, Division Pathankot Division WSS, :- No. Sr. Sr. 5 5 4 3 2 1 8 7 6 23 12 ehpr 20 PRWSSIP-GSP- 42.00 Sekhupura Singh Chack Madho PRWSSIP-GSP-PTK- 45.00 Danour PRWSSIP-GSP-PTK- Lahri 44.00 PRWSSIP-GSP-PTK- 45.00 Dhaki Saidan PRWSSIP-GSP-PTK- Aner 48.00 PRWSSIP-GSP- Sidhwan 30.00 PRWSSIP-GSP- Harchowal 52.00 PRWSSIP-GSP- Mamrai 30.00 Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 50 PRWSSIP-GSP-PTK- 45.00 Cost/ Batala-Div-202-I Batala-Div-205-I Batala-Div-204-I Batala-Div-203-I Package No. Div-210-I Div-209-I Div-208-I Div-207-I Div-206-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Independent Water Independent Water Independent Water Independent Water Independent Water Independent Water Independent Water Independent Water Independent Water Supply Scheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by SupplyScheme by T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR T/Well,P.C,OHSR Description of of Description installing installing installing installing installing installing installing installing installing installing Works 6 20 C 50.52.21 10.03.15 25.02.15 25.01.15 NCB 42.00 50 C 50.52.21 10.03.15 25.02.15 25.01.15 02.03.15 NCB 45.00 20.02.15 20.01.15 NCB 10.03.15 45.00 25.02.15 25.01.15 02.03.15 NCB 44.00 20.02.15 20.01.15 02.03.15 NCB 45.00 20.02.15 20.01.15 NCB 48.00 12.03.15 30.02.15 30.01.15 12.03.15 NCB 30.00 30.02.15 30.01.15 10.03.15 NCB 52.00 25.02.15 25.01.15 NCB 30.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 40.51.41 20.5-1.61 40.6- 04.03.16 - - 31.03.16 - - 12.06.15 - - 04.03.16 - - - - 01.06.15 12.05.15 - 31.03.16 - 16.04.15 - 14.03.15 - - - 12.06.15 29.04.15 31.03.16 07.04.15 - - - 03.03.15 - 01.06.15 12.05.15 - - - 16.04.15 31.03.16 - 01.06.15 14.03.15 29.04.15 - - - 07.04.15 31.03.16 - 03.03.15 29.04.15 - - - 11.06.15 07.04.15 04.03.16 - - 03.03.15 - - - 11.06.15 04.03.16 09.05.15 - - 17.04.15 - - 12.06.15 13.03.15 09.05.15 - - 17.04.15 - 12.06.15 13.03.15 12.05.15 - 16.04.15 14.03.15 12.05.15 16.04.15 14.03.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 Expenditure incurred to date WSS, Division Batala Batala Division WSS, Gurdaspur Division WSS, Schemes Imporvement Performance No. Sr. Sr. 6 3 2 1 3 2 1 23 12 Itty auYd5.00 Yod Dadu 5.00 Dholpur 5.00 Manoharpur PRWSSIP-GSP-Div- 5.00 Gazikot PRWSSIP-GSP-Div- 5.00 Paswan Bhani PRWSSIP-GSP-Div- Lalowal 5.00 Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 70 PRWSSIP-GSP-PTK- 47.00 Cost/ PRWSSIP-Batala-Div- PRWSSIP-Batala-Div- PRWSSIP-Batala-Div- Package No. IMP-100-I Div-211-I IMP-97-I IMP-96-I IMP-95-I IMP-99-I IMP-98-I 4

Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Coverage of leftout of etc. Water Works Lines,Development Pipe streets,Leakages of Coverage of leftout of etc. Water Works Lines,Development Pipe streets,Leakages of Coverage of leftout of etc. Water Works Lines,Development Pipe streets,Leakages of Coverage of leftout of etc. Water Works Lines,Development Pipe streets,Leakages of Coverage of leftout of etc. Water Works Lines,Development Pipe streets,Leakages of Coverage of leftout of etc. Water Works Lines,Development Pipe streets,Leakages of Independent Water Supply Scheme by SupplyScheme by T/Well,P.C,OHSR T/Well,P.C,OHSR Description of of Description installing installing Works 6 70 C 50.52.21 10.03.15 25.02.15 25.01.15 NCB 47.00 .0N 00.50.31 16.03.15 06.03.15 30.01.15 NS 05.03.15 5.00 25.02.15 25.01.15 NS 05.03.15 5.00 25.02.15 25.01.15 NS 16.03.15 5.00 06.03.15 30.01.15 05.03.15 NS 5.00 25.02.15 25.01.15 05.03.15 NS 5.00 25.02.15 25.01.15 NS 5.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 30.51.41 00.5-2.51 20.08.15 - - 05.08.15 - 20.05.15 - - - 05.08.15 30.04.15 - 05.05.15 13.04.15 - 23.03.15 - - 20.08.15 15.04.15 - 05.05.15 31.03.15 - 10.03.15 05.08.15 - - 15.04.15 - 20.05.15 - 31.03.15 05.08.15 10.03.15 - - - 05.05.15 - 30.04.15 13.04.15 - - - 23.03.15 - 04.03.16 05.05.15 15.04.15 31.03.15 - - 10.03.15 15.04.15 - 31.03.15 - 12.06.15 10.03.15 - 12.05.15 16.04.15 14.03.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 Expenditure incurred to date WSS, Division Batala Batala Division WSS, Gurdaspur Division WSS, Schemes Sewerage Pathankot Division WSS, :Pathankot District No. Sr. Sr. 4 1 2 1 3 2 1 23 12 agrNna 5.00 Ranger Nangal ilnai140.00 Gillanwali PRWSSIP-GSP-Div- 140.00 Ale Chack PRWSSIP-GSP-Div- 145.00 Fero Chachi Kulian Madhopur PRWSSIP-PTK-Div- 5.00 Datial Gol BhoorAbadi Changa ofBeli Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. Cost/ .0PRWSSIP-PTK-Div- 5.00 PRWSSIP-PTK-Div- 5.00 PRWSSIP-Batala-Div- PRWSSIP-Batala-Div- Package No. IMP-104-I IMP-102-I IMP-101-I IMP-103-I SW-18-I SW-17-I SW-19-I 4

Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual of etc. Water Works Lines,Development Pipe streets,Leakages of Coverage of leftout of etc. Water Works Lines,Development Pipe streets,Leakages of Coverage of leftout of etc. Water Works Lines,Development Pipe streets,Leakages of Coverage of leftout of etc. Water Works Lines,Development Pipe streets,Leakages of Coverage of leftout Sewerage Schemes Sewerage Schemes Sewerage Schemes Description of of Description Works 6 4.0NB3.11 50.515.04.15 25.03.15 30.01.15 NCB 140.00 27.04.2015 10.04.2015 15.02.2015 NCB 140.00 27.04.2015 10.04.2015 15.02.2015 NCB 145.00 .0N 00.50.31 16.03.15 06.03.15 30.01.15 NS 5.00 .0N 00.50.31 20.03.15 06.03.15 30.01.15 NS 5.00 15.03.15 28.02.15 25.01.15 NS 5.00 15.03.15 28.02.15 25.01.15 NS 5.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 00.53.51 00.5-3.71 30.04.16 - - - 31.07.15 - 30.06.15 30.05.15 17.08.201 20.04.15 - 20.08.15 15.07.2015 17.08.201 15.06.2015 05.05.2015 - - 15.07.2015 15.06.2015 - 05.05.2015 25.08.15 - 20.05.15 - - - 30.04.15 25.08.15 - 13.04.15 25.05.15 23.03.15 - - - 25.04.15 - 10.04.15 25.05.15 20.08.15 20.03.15 - - 25.04.15 - 10.04.15 - 20.05.15 20.03.15 - 30.04.15 13.04.15 23.03.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of 5 5

71 920 19 18 17 Contarct signed (Date/Value/Currency) 17.05.2016 - 17.05.2016 - - - - - Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 Expenditure incurred to date WSS, Division Pathankot Division WSS, :Pathankot District Water Supply Schemes: Supply Water Scheme Sewarage supplyWater Scheme Division -2 Division Hoshiarpur-1 Division District Circle Hoshiarpur No. Sr. Sr. 2 1 1 1 2 23 12 agr170.00 Banger Ghani Ke Prov. Water PRWSSIP-PTK-Div- 145.00 Kalan Gura Mundian Takhipur supply Scheme Taniwal Block- Taniwal Scheme Bains Hoshiarpur. HSP1 DisttHSP1 Sewerage Name of of Name Scheme Prov. App. Cost (In Lacs) (In Planned 7.0PRWSSIP-HSR-Div- 170.00 Admin. 50 PRWSSIP-HSP-Div- 85.00 80 PRWSSIP-HSP-Div- 48.00 Cost/ PRWSSIP-Batala-Div- Package No. SW-22-I SW-21-I SW-20-I 213-I 213-I 4

Plan Plan Plan Plan Plan 5 Plan/Actual Sewerage Schemes Sewerage Schemes Sewarage Scheme T/Well,OHSR civil & Dhodo Majara) Pkg-1 Dhodo Majara) W/S Scheme Rajowal Rajowal Scheme W/S existing W/S Scheme Scheme existing W/S Prov. IndependentProv. T/Well, OHSR, Pump OHSR, T/Well, fromexisting W/S chamber, Civil work Civil work chamber, Description of of Description Prov. IndependentProv. work(Fifurcation scheme Panwan (Bifurcation from from (Bifurcation Bains Taniwal Bains W/S Scheme (1 No. village) village) (1 No. Works etc. 6 7.0NB0/421 10/0615/05/2015 01/05/2016 01/04/2015 NCB 170.00 7.01.221 00.0527.04.2015 10.04.2015 15.02.2015 170.00 4.0NB3.11 50.515.04.15 25.03.15 30.01.15 NCB 145.00 80 C 50/051/421 15/05/2015 15/04/2015 15/01/2015 NCB 48.00 10/03/2015 01/03/2015 01/02/2015 NCB 85.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 00.53.51 00.5-3.71 30.04.16 - - - 31.07.15 - 30.06.15 30.05.15 17.08.201 20.04.15 - 15.07.2015 15.06.2015 05.05.2015 10/053/621 00/05-----3/421 30/06/20 30/04/2016 - - - - 30/06/20 30/04/2016 - - 30/07/2015 - 30/06/2015 01/06/2015 31/03/20 - 31/01/2016 - - - - - 10/07/2015 25/06/2015 20/05/2016 - - 30/04/2015 20/04/2015 15/03/2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of 5

71 920 19 18 17 Contarct signed (Date/Value/Currency) 17.05.2016 - - - Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract 16 16 16 22 Actual Date of Completion 0.00 0.00 23

- Expenditure incurred to date No. Sr. Sr. Jahan Khelan 6 Saleran 5 Attowal 4 Jian 3 Rehsiwal 2 23 12 Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 50 PRWSSIP-HSP-Div- 65.00 PRWSSIP-HSP-Div- 58.00 PRWSSIP-HSP-Div- 50.00 PRWSSIP-HSP-Div- 55.00 50 PRWSSIP-HSP-Div- 45.00 Cost/ Package No. 218-I 217-I 216-I 215-I 214-I 4

Plan Plan Plan Plan Plan 5 Plan/Actual W/S Scheme Rehsiwal Rehsiwal Scheme W/S Scheme Bassi Mustfa) Mustfa) Bassi Scheme Pkg-1 T/Well, OHSR, Pkg-1T/Well, W/S Scheme Attowal Attowal Scheme W/S Dhoda Majara) Pkg-1DhodaMajara) Scheme existing W/S existing W/S Scheme Scheme existing W/S Scheme existing W/S Scheme existing W/S W/S Scheme Saleran Saleran Scheme W/S Pump chamber, Civil Civil Pump chamber, Pump chamber, Civil Civil Pump chamber, T/Well, OHSR, Pump OHSR, T/Well, Pump OHSR, T/Well, T/Well,OHSR, PumpT/Well,OHSR, chamber, Civil work Civil work chamber, Civil work chamber, chamber, Civil work Civil work chamber, Pkg-1 T/Well,OHSR, Khelan (Bifurcation W/S Scheme Jahan Jahan Scheme W/S Lehli Khurd)Lehli Pkg-1 Description of of Description Prov. IndependentProv. Prov. IndependentProv. IndependentProv. IndependentProv. IndependentProv. from existing W/S W/S existing from (Bifurcation from from (Bifurcation (Bifurcation from from (Bifurcation from (Bifurcation from (Bifurcation W/S Scheme Jian Jian Scheme W/S Marnian Kalan)Marnian Chohal) Pkg-1 Chohal) (1 No. village) village) (1 No. work etc. work work etc. work Works etc. etc. etc. 6 50 C 50/051/421 15/05/2015 15/04/2015 15/01/2015 NCB 45.00 50 C 50/051/421 15/05/2015 15/04/2015 15/01/2015 NCB 65.00 15/05/2015 15/04/2015 15/01/2015 NCB 58.00 15/05/2015 15/04/2015 15/01/2015 NCB 50.00 15/05/2015 15/04/2015 15/01/2015 NCB 55.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10/053/621 00/05-----3/421 30/06/20 30/04/2016 - - - 30/06/20 30/04/2016 - - - - 30/07/2015 - 30/06/2015 01/06/2015 30/06/20 30/04/2016 - - - - 30/07/2015 30/06/2015 - 30/06/20 01/06/2015 30/04/2016 - - - - - 30/07/2015 30/06/2015 01/06/2015 - 30/06/20 30/04/2016 - - 30/07/2015 - 30/06/2015 01/06/2015 - - - 30/07/2015 30/06/2015 01/06/2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract 16 16 16 16 16 22 Actual Date of Completion 23

- - - - - Expenditure incurred to date Water Supply Schemes: Supply Water Division- Schemes: Improvement Performance No. Sr. Sr. 2 1 Baruhi 8 1 Helran Helran 1 Daffer 7 23 12 aha 00 PRWSSIP-HSR-Div- 30.00 Raghwal Bariana Name of of Name Scheme iaa50 PRWSSIP-HSR-Div- 5.00 Bihala App. Cost (In Lacs) (In Planned Admin. 80 PRWSSIP-HSP-Div- 58.00 50.73 20 PRWSSIP-HSP-Div- 62.00 Cost/ PRWSSIP-HSP-GRSR- Package No. IMP-106-I IMP-105-I Div-221-I 220-I 219-I 4

Plan Plan Plan Plan Plan 5 Plan/Actual W/S Scheme Helran (2 Helran Scheme W/S existing W/S Scheme Scheme existing W/S existing W/S Scheme Scheme existing W/S existing W/S Scheme Scheme existing W/S Prov. & installing Prov. installing & Jhajar Chatial) Pkg-1 Chatial) Jhajar Pump chamber, Civil Civil Pump chamber, T/Well, PumpingT/Well, 110mm o/d PVC 110mm o/dPVC T/Well,OHSR/UGSR, T/Well,OHSR/UGSR, T/Well,OHSR, PumpT/Well,OHSR, W/S Scheme Brauhi Brauhi Scheme W/S chamber, Civil work Civil work chamber, W/S Scheme Daffer Daffer Scheme W/S Description of of Description Prov. IndependentProv. Prov. IndependentProv. IndependentProv. Machinery and (Bifurcation from from (Bifurcation (Bifurcation from from (Bifurcation (Bifurcation from from (Bifurcation Prov. & Fixing Prov. Fixing & Pipe Line etc.Pipe Line Kukran) Pkg-1 No. villages) villages) No. Pipe etc. work etc. work Tubewell Works Pkg-1 Koi) Koi) etc. 6 20 C 50/051/421 15/05/2015 15/04/2015 15/01/2015 NCB 62.00 50 C 01/042/221 31/03/2015 28/02/2015 30/11/2014 NCB 25.00 15/05/2015 15/04/2015 15/01/2015 NCB 58.00 00 C 50/051/421 15/05/2015 15/04/2015 15/01/2015 NCB 30.00 .0N 50/051/421 15/05/2015 15/04/2015 15/01/2015 NS 5.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10/053/621 00/05-----3/121 31/03/20 31/01/2016 - 31/10/20 30/09/2015 ------30/06/20 30/04/2016 30/07/2015 30/06/2015 - - 01/06/2015 30/07/2015 30/06/2015 - 01/06/2015 - 30/06/20 - 30/04/2016 - - - 30/07/2015 30/06/2015 01/06/2015 - - - 30/07/2015 30/06/2015 01/06/2015 //053/421 80/05-----3/921 30/09/20 30/09/2015 - - - - - 28/05/2015 30/04/2015 1/4/2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract 15 16 15 16 16 22 Actual Date of Completion 23 - - - - - Expenditure incurred to date Water Supply Schemes: Supply Water Division- Schemes: Improvement Performance No. Sr. Sr. 2 1 3 2 23 12 uprJta 3.50 Nurpur Jattan Sarangwal 7.00 ana 158.94 Nainwan Name of of Name Scheme ua63.08 Suna App. Cost (In Lacs) (In Planned Admin. Cost/ PRWSSIP-HSP-GHSR- PRWSSIP-HSP-GHSR- PRWSSIP-HSP-GRSR- PRWSSIP-HSP-GRSR- PRWSSIP-HSP-GRSR- PRWSSIP-HSP-GRSR- PRWSSIP-HSP-GRSR- Div-IMP-108-I Div-IMP-107-I Package No. Div-222-II Div-221-II Div-223-II Div-223-I Div-222-I 4

Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual OHSR, Pump chamber, chamber, OHSR, Pump i/d of reputed make i/d of reputed make W/S Scheme Nainwan Nainwan Scheme W/S W/S Scheme Nainwan Nainwan Scheme W/S water meter 15mm water meter 15mm Kukran) Pkg-2 OHSR, existing W/S Scheme Scheme existing W/S existing W/S Scheme Scheme existing W/S existing W/S Scheme Scheme existing W/S Pump chamber, Civil Civil Pump chamber, Pump chamber, Civil Civil Pump chamber, Aug. of W/S Scheme Scheme Aug. W/S of W/S Scheme Helran Helran Scheme W/S Prov. &installingProv. &installingProv. Description of of Description Prov. IndependentProv. Prov. IndependentProv. IndependentProv. Suna Pkg-2Suna OHSR, Scheme Aug. W/S Seikhowal) Pkg-1 Seikhowal) Seikhowal) Pkg-2 Seikhowal) (Bifurcation from from (Bifurcation (Bifurcation from from (Bifurcation (Bifurcation from from (Bifurcation Pkg-1 Tubewell Civil work etc. work Civil acessories. acessories. alongwith alongwith alongwith work etc. work work etc. work Tubewell Works Suna 6 1.4NB3/121 80/0531/03/2015 28/02/2015 30/11/2014 NCB 118.94 57 C 01/042/221 31/03/2015 28/02/2015 30/11/2014 NCB 25.73 00 C 01/042/221 31/03/2015 28/02/2015 30/11/2014 NCB 31/03/2015 28/02/2015 30/11/2014 40.08 NCB 23.00 31/03/2015 28/02/2015 30/11/2014 NCB 40.00 .0N 01/042/221 31/03/2015 28/02/2015 30/11/2014 NS 3.50 31/03/2015 28/02/2015 30/11/2014 NS 7.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case //051/421 00/05-----3/621 31/07/20 30/06/2015 - 31/07/20 - 30/06/2015 - - - 31/12/20 30/11/2015 - - 30/09/20 - 30/09/2015 - - - - 30/04/2015 15/04/2015 - 1/4/2015 - - - - 31/01/20 30/04/2015 30/11/2015 15/04/2015 - 1/4/2015 - - 28/05/2015 - 30/04/2015 - 1/4/2015 31/12/20 30/11/2015 28/05/2015 - 30/04/2015 1/4/2015 - - - - - 31/12/20 28/05/2015 30/11/2015 30/04/2015 - 1/4/2015 - - - 28/05/2015 - 30/04/2015 1/4/2015 - - 28/05/2015 30/04/2015 1/4/2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract 15 15 15 15 16 15 15 22 Actual Date of Completion 23

------Expenditure incurred to date Performance Improvement Schemes: Improvement Performance No. Sr. Sr. Mahadpur 1 2 23 12 Salehrian Name of of Name Scheme Kalan App. Cost (In Lacs) (In Planned Admin. 61.00 58.00 Cost/ PRWSSIP-HSP-TLR- PRWSSIP-HSP-TLR- PRWSSIP-HSP-TLR- PRWSSIP-HSP-TLR- PRWSSIP-HSP-TLR- PRWSSIP-HSP-TLR- Package No. Div-225-III Div-224-III Div-225-II Div-224-II Div-225-I Div-224-I 4

Plan Plan Plan Plan Plan Plan 5 Plan/Actual Mahadpur (Bifurcation (Bifurcation Mahadpur (Bifurcation Mahadpur W/S Scheme Salehrian Salehrian Scheme W/S Salehrian Scheme W/S Salehrian Scheme W/S Scheme Manjpur) Pkg- Scheme Manjpur) Pkg- Scheme Manjpur) Pkg- Scheme 2 Pump Civil chamber, Churian) Pkg-3 OHSR. Churian) Pkg-2 Pump villages) (Bifurcation (Bifurcation villages) chamber, Civil work Civil work chamber, Description of of Description Prov. IndependentProv. Prov. IndependentProv. IndependentProv. IndependentProv. IndependentProv. IndependentProv. from existing W/S W/S existing from from existing W/S W/S existing from W/S existing from W/S existing from from existing W/S W/S existing from W/S existing from Kalan (Bifurcation Kalan (Bifurcation Kalan (Bifurcation Kalan (Bifurcation Mahadpur (1 No. Mahadpur (1No. Churian) Pkg-1Churian) Scheme Tanda Scheme Scheme Tanda Scheme Tanda Scheme W/S Scheme Scheme W/S W/S Scheme Scheme W/S Scheme W/S 1 Tubewell work etc. work Tubewell Works 3 OHSR. etc. 6 35 C 01/042/221 31/03/2015 28/02/2015 30/11/2014 NCB 13.50 25 C 01/042/221 31/03/2015 28/02/2015 30/11/2014 NCB 12.50 31/03/2015 28/02/2015 30/11/2014 NCB 32.00 31/03/2015 28/02/2015 30/11/2014 NCB 13.50 31/03/2015 28/02/2015 30/11/2014 NCB 12.50 31/03/2015 28/02/2015 30/11/2014 NCB 35.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case //053/421 80/05-----3/921 31/10/20 30/09/2015 - - - 31/07/20 28/02/2016 - - - 31/10/20 - 30/09/2015 - 28/05/2015 - 30/04/2015 - 1/4/2015 - 31/10/20 30/09/2015 - - - 28/05/2015 - 30/04/2015 1/4/2015 - - - 31/07/20 28/02/2016 28/05/2015 30/04/2015 - 1/4/2015 - - - 28/05/2015 - 31/10/20 30/04/2015 30/09/2015 1/4/2015 - - - - - 28/05/2015 30/04/2015 - 1/4/2015 - 28/05/2015 30/04/2015 1/4/2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract 15 16 15 15 16 15 22 Actual Date of Completion 23

------Expenditure incurred to date Perfromance Improvement Perfromance Sewerage SupplyWater SBS Nagar SBS No. Sr. Sr. 1 1 7 6 5 3 2 1 4 23 12 aaaKud2.4PRWSSIP-SBS-Div- 28.54 Khurd Majara Hussain Chak asopr50 PRWSSIP-Talwara- 5.00 Mansoorpur uadu 3.1PRWSSIP-SBS-Div- 135.11 asdu 54 PRWSSIP-SBS-Div- 55.43 Maksudpur uahu 50 PRWSSIP-SBS-Div- 75.00 Gunachaur aopr174 PRWSSIP-SSB-Div- 167.49 Sakohpur PRWSSIP-SBS-Div- 69.00 Ghamour Nanowal Sujjowal Sujjowal Karyiam Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 83 PRWSSIP-SBS-Div- 68.35 76 PRWSSIP-SBS-Div- 97.61 Cost/ Div-IMP-109-I Package No. SW-22-I 226-I 231-I 228-I 232-I 227-I 229-I 230-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual W/S Scheme Majara OHSR & DistributionOHSR & OHSR & DistributionOHSR & testing line pipe in uncovered of area Pkg-1 T/W, OHSR& T/W, Pkg-1 Sakohpur: Pipe sewer sewer Sakohpur: Pipe Mukandpur : Pkg-1 :Mukandpur Pkg-1 Sujjowal Nanowal: Khurd : Pkg-1 T/W, Khurd : Pkg-1 Maksudpur : Pkg-1 : Pkg-1 Maksudpur pumping station and and station pumping Gunachaur : Pkg-1 Pkg-1 : Gunachaur Chak : Pkg-1 T/W, : Pkg-1 Chak solid free sewerage sewerage free solid Providing andProviding lying Ghamour : Pkg-1 GhamourPkg-1 : Description of of Description ...... complete in all in ...... complete Karyiam Hussain system for village for system Prov., laying, T/W, OHSR & OHSR & T/W, T/W, OHSR & OHSR & T/W, T/W, OHSR & OHSR & T/W, T/W, OHSR & OHSR & T/W, jointing and W/S Scheme W/S Scheme W/S Scheme W/S Scheme W/S Scheme W/S Scheme disposal work work disposal Distribution Distribution Distribution Distribution Distribution Works village respect 6 6.9NB1.21 80.53.31 Post- 30.03.15 28.02.15 15.02.15 NCB 167.49 Post- 25.02.15 10.02.15 25.01.15 NCB 135.11 90 C 80.51.31 50.5Post- 05.04.15 15.03.15 Post- 28.02.15 16.02.15 NCB 31.01.15 Post- 69.00 15.01.15 03.03.15 NCB 20.02.15 Post- 68.35 31.01.15 16.02.15 NCB 31.01.15 97.61 15.01.15 NCB Post- 28.54 20.02.15 05.02.15 Post- 20.01.15 16.02.15 NCB 31.01.15 75.00 15.01.15 NCB 55.43 .0N 01/042/221 31/03/2015 28/02/2015 30/11/2014 NS 5.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Post Post 12 Banks no objection to bid Document (in case //051/421 00/05-----3/621 31/07/20 30/06/2015 - - - - - 30/04/2015 15/04/2015 1/4/2015 00.53.51 00.5Post- 20.06.15 Post- 30.05.15 30.04.15 05.04.15 20.03.15 Post- 20.02.15 31.05.14 Post- 30.04.15 31.03.15 05.04.15 20.03.15 20.02.15 Post- 10.04.15 25.03.15 Post- 25.02.15 05.04.15 20.03.15 20.02.15 00.52.51 50.5Post- 15.06.15 20.05.15 20.04.15 Post- 15.04.15 29.03.15 28.02.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) Review Review Review Review Review Review Review Review Banks no objection 16 contract award (in case of 10.5---3.31 10.6- 31.05.16 31.03.16 - 31.03.16 - 20.01.16 - - - 30.04.16 - 05.03.16 - 01.07.15 - 31.03.16 - - 20.01.16 20.04.15 - - - - 05.06.15 - 31.03.16 25.01.16 - - 20.04.15 - 31.03.16 20.01.16 - - - 25.04.15 - - 20.04.15 70.5---0.71 - - 07.07.16 - - - 07.07.15 - 31.03.16 30.01.16 - - - 30.04.15

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract 15 22 Actual Date of Completion 23

- Expenditure incurred to date Water Supply Schemes Distt. Water District Circle Amritsar No. Sr. Sr. 11 55.00 Chicha (3098) 10 12 2 hda 39)28.00 (3092) Bhadiar 9 35.00 (2722) Rajian 8 7 38.00 Rokhey (2725) 38.00 6 (2733) Sarai 5 4 3 2 1 1 3 23 12 Uttal ahaa1.0PRWSSIP-SBS-Div- 15.30 Pathlawa (3101) Galluwal (3108) Jhanjarpur (2678) Kot Razada (2746) Khurd Tera (2606) Ballarwal (2639) Pura Dial (2634) Dhariwal ibeMjr .4PRWSSIP-SBS-Div- 6.94 Majara Simble Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 30.00 30.00 35.00 40.00 35.00 32.00 40.00 Cost/ .0PRWSSIP-SBS-Div- 3.50 PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- Package No. IMP-112-I IMP-111-I IMP-110-I 244-I 243-I 242-I 241-I 240-I 239-I 238-I 237-I 236-I 235-I 234-I 233-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Work and OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. Development of W/S, of W/S, Development Description of of Description Disinfection UnitDisinfection Metering and and Metering and Metering Distribution andDistribution 24X7 W/S 24X7 W/S Works 6 30.00 30.00 55.00 28.00 35.00 35.00 38.00 38.00 40.00 35.00 32.00 40.00 53 C 50.53.11 60.5Post- 16.02.15 31.01.15 15.01.15 NCB 15.30 .4N 50.53.11 60.5Post- 16.02.15 Post- 31.01.15 16.02.15 15.01.15 31.01.15 NS 15.01.15 6.94 NS 3.50

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB Method of Procurement 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 01.04.15

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 00.52.31 50.5Post- 05.04.15 20.03.15 20.02.15 00.52.31 50.5Post- 05.04.15 Post- 20.03.15 05.04.15 20.02.15 20.03.15 20.02.15 10.50.71 10.5`0.91 A3.31 30.04.16 31.03.16 30.04.16 NA 31.03.16 30.04.16 - NA 31.03.16 30.04.16 - - NA 31.03.16 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA ` 31.03.16 01.09.15 01.08.15 - 01.06.15 01.07.15 - NA ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - ` 01.09.15 01.08.15 01.06.15 - 01.07.15 ` 01.08.15 01.09.15 01.06.15 01.07.15 ` 01.08.15 01.06.15 01.07.15 01.08.15 01.06.15 01.07.15 01.06.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date) Review Review Review Banks no objection 16 contract award (in case of 00.5---2.61 00.5- 30.06.15 20.06.15 - - - 20.04.15 00.5---2.61 00.5- - 30.06.15 20.06.15 30.06.15 20.06.15 - - - - - 20.04.15 - 20.04.15

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 8Trn(81 28.00 Tarin (2861) 28 40.00 Tapiala (2860) 27 35.00 Saurian (2854) 35.00 26 Rai (2849) 25 24 40.00 (2833) Maure 23 22 21 20 28.00 Dhadal (2790) 19 18 17 25.00 (2765) Bhalot 16 15 14 13 9Nru 24)38.00 Nurpur (2843) 29 23 12 (2834) Mehmadpura (2821) Khaira Kotli (2811) Khiala Khurd (2798) Hetampura (2789) Dalley Ke (2766) Bhangwan Singh (2756) Awan Lakha (2952) Chak Mukand (12750) Dande Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 35.00 28.00 40.00 40.00 30.00 35.00 32.00 50.00 32.00 Cost/ PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- Package No. 261-I 260-I 259-I 258-I 257-I 256-I 255-I 254-I 253-I 252-I 251-I 250-I 249-I 248-I 247-I 246-I 245-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Work and OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. Description of of Description Works 6 38.00 28.00 40.00 35.00 35.00 35.00 40.00 28.00 40.00 40.00 28.00 30.00 35.00 25.00 32.00 50.00 32.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB Method of Procurement 10.50.51 15.05.15 01.05.15 01.04.15 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 01.04.15

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10.50.71 10.5`0.91 A3.31 30.04.16 31.03.16 30.04.16 NA 31.03.16 30.04.16 - NA 31.03.16 30.04.16 - - NA 31.03.16 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - NA ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - ` 01.09.15 01.08.15 - 01.06.15 01.07.15 ` 01.09.15 01.08.15 01.06.15 01.07.15 ` 01.08.15 01.06.15 01.07.15 01.08.15 01.06.15 01.07.15 01.06.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 45 44 43 60.00 (3009) Mallian 42 40.00 (12740) Jand 41 40 39 38 37 36 35 34 33 32 31 30 46 23 12 (2890) Dadupura (3029) Timmowala (3058) KhurdKhatrai (3057) KalanKhatrai (3083) Shahpur (3081) PuraSangat (3072) Nangal Tola (3066) Majjupura (3063) Lalla Afghana (3047) Ghukewali (3045) Dhariwal (3039) Chainpur (12719) Umarpura (12748) Dogran Wadali (3000) Pura Devidass Name of of Name Scheme App. Cost (In Lacs) (In Planned 115.00 Admin. 40.00 35.00 40.00 30.00 55.00 52.00 40.00 35.00 40.00 34.00 40.00 28.00 40.00 70.00 Cost/ PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- Package No. 278-I 277-I 276-I 275-I 274-I 273-I 272-I 271-I 270-I 269-I 268-I 267-I 266-I 265-I 264-I 263-I 262-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Work and OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. Description of of Description Works 6 115.00 28.00 40.00 40.00 60.00 40.00 70.00 35.00 40.00 30.00 55.00 52.00 40.00 35.00 40.00 34.00 40.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 NCB 01.04.15 NCB Method of Procurement 10.50.51 15.05.15 01.05.15 01.04.15 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 01.04.15 01.05.15 01.04.15

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10.50.71 10.5`0.91 A3.31 30.04.16 31.03.16 30.04.16 NA 31.03.16 30.04.16 - NA 31.03.16 30.04.16 - - NA 31.03.16 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - NA ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - ` 01.09.15 01.08.15 - 01.06.15 01.07.15 ` 01.09.15 01.08.15 01.06.15 01.07.15 ` 01.08.15 01.06.15 01.07.15 01.08.15 01.06.15 01.07.15 01.06.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date Water Treatment Plants Distt. Amritsar Distt. Treatment Plants Water No. Sr. Sr. 1Nnl 28)55.00 Nangli (2982) 61 60 59 58 57 56 55 54 53 52 55.00 Nangli (2575) 51 50 49 35.00 Danial (2550) 48 47 63 62 23 12 (2973) KalanLoharka Singh (2970) Dal Kotla (2957) Gaunsabad Chak Shukar Fatehgarh (2954) Dhaul Kalan (2540) Udhoke Kalan (2520) Chak Miran (2515) Nangal Malik Chak (2512) Khera Bala Thanewal Khera (12691) Dhardeo (2542) Bal Sarai (2674) Kiampura (2657) Hashampura (2956) (2569) Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 55.00 30.00 35.00 52.00 55.00 40.00 35.00 40.00 85.00 68.00 20.00 20.00 85.00 30.00 Cost/ PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- PRWSSIP-ASR-Div- Package No. Div-2-I Div-1-I 293-I 292-I 291-I 290-I 289-I 288-I 287-I 286-I 285-I 284-I 283-I 282-I 281-I 280-I 279-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Plant Treatment Water Plant Treatment Water OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. Description of of Description Works 6 20.00 20.00 55.00 55.00 30.00 35.00 85.00 52.00 55.00 40.00 35.00 40.00 55.00 30.00 85.00 35.00 68.00

8 7 Estimated cost (Package) (RS lacs) C 10.50.51 15.05.15 01.05.15 01.04.15 NCB C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 NCB 15.05.15 01.04.15 01.05.15 NCB 15.05.15 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 NCB 01.04.15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10.50.71 10.5`0.91 A3.11 15.02.16 31.01.16 15.02.16 31.01.16 NA 30.04.16 NA - 31.03.16 - 30.04.16 - NA 01.09.15 31.03.16 - 30.04.16 01.09.15 ` - NA 31.03.16 30.04.16 - ` - NA 01.08.15 31.03.16 01.09.15 30.04.16 - 01.07.15 01.08.15 - NA 31.03.16 ` 01.09.15 30.04.16 01.07.15 01.06.15 - - NA 31.03.16 ` 01.09.15 01.08.15 01.06.15 30.04.16 - 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - NA ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - ` 01.09.15 01.08.15 - 01.06.15 01.07.15 ` 01.09.15 01.08.15 01.06.15 01.07.15 ` 01.08.15 01.06.15 01.07.15 01.08.15 01.06.15 01.07.15 01.06.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 64 85 84 23 12 (3029) Timmowala Bhittewad (2870)Veroke (2863) Thathi Tarin (2861) Saurian (2854) (2804) Kakar (3044) Dharamkot (2834) Mehmadpura Dala (1595) (2777) Baksh Chak Allah (2757) Bachiwind (2829) Makhanpura (2839) Mulakot (3091) (2655) Hardo Putli Mattian Rukhe (2698) Malakpur (12728) Kuralian Chhota Kadia Bad (2650) Gujjarpura Name of of Name Scheme App. Cost (In Lacs) (In Planned Admin. 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Cost/ PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- Package No. Div-24-I Div-23-I Div-22-I Div-21-I Div-20-I Div-19-I Div-18-I Div-17-I Div-16-I Div-15-I Div-14-I Div-13-I Div-12-I Div-11-I Div-10-I Div-9-I Div-8-I Div-7-I Div-6-I Div-5-I Div-4-I Div-3-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Description of of Description Works 6 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00

8 7 Estimated cost (Package) (RS lacs) C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 NCB 01.04.15 NCB C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 NCB 01.04.15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10.50.71 10.5`0.91 A3.11 15.02.16 31.01.16 15.02.16 31.01.16 NA 15.02.16 31.01.16 NA 15.02.16 - 31.01.16 NA 15.02.16 - - 01.09.15 31.01.16 NA 15.02.16 - - 01.09.15 31.01.16 NA ` 15.02.16 - - 01.09.15 31.01.16 NA ` 15.02.16 - - 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` 15.02.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.01.16 NA ` - - 01.07.15 01.06.15 01.08.15 01.09.15 NA ` - - 01.07.15 01.06.15 01.08.15 01.09.15 ` - - 01.07.15 01.06.15 01.08.15 01.09.15 ` - 01.07.15 01.06.15 01.08.15 01.09.15 ` 01.07.15 01.06.15 01.08.15 ` 01.07.15 01.06.15 01.08.15 01.07.15 01.06.15 01.08.15 01.07.15 01.06.15 01.06.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date Water SupplyWater Schemes Tarn TaranDistt. District TaranTarn 105 104 103 102 101 100 No. Sr. Sr. 99 98 97 96 95 94 93 89 88 87 86 23 12 Dhala (3308) (3495) Brahampura Patti(3444) Bua Hundal(3458) Samra(3471) Mari Dal (3448) (3462) Khalra Algon (3433) (3490)Veeram (3472) Udhoke Mari (3468) Kamboke Mari Dhun (3451) (3445) Bur Chand (2516) Malowal (2509) NagriJodha Dhardeo Nangal (2943) Waryam Name of of Name Scheme App. Cost (In Lacs) (In Planned 127.00 180.00 130.00 123.00 Admin. 20.00 20.00 20.00 20.00 50.00 72.00 30.00 30.00 40.00 61.50 54.00 28.00 Cost/ 6.00 PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-ASR-WQ- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- Package No. Div-28-I Div-27-I Div-26-I Div-25-I 300-I 299-I 298-I 297-I 296-I 295-I 307-I 306-I 305-I 304-I 303-I 302-I 301-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Work and OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Description of of Description Works 6 127.00 180.00 130.00 123.00 50.00 72.00 30.00 30.00 40.00 61.50 54.00 28.00 20.00 20.00 20.00 20.00 6.00

8 7 Estimated cost (Package) (RS lacs) C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 NCB 01.04.15 NCB C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.02.16 15.05.15 NCB 31.01.16 01.04.15 01.05.15 15.05.15 NCB NA 01.04.15 01.05.15 15.05.15 NCB - 01.04.15 01.05.15 15.05.15 - NCB 01.04.15 01.09.15 01.05.15 15.05.15 NCB 01.04.15 ` 01.05.15 15.05.15 NCB 01.04.15 01.08.15 01.05.15 15.05.15 NCB 01.07.15 01.04.15 01.05.15 15.05.15 01.06.15 NCB 01.04.15 01.05.15 NA NCB 01.04.15 15.05.15 NCB 01.05.15 15.05.15 01.04.15 01.05.15 NCB 01.04.15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10.50.71 10.5`0.91 A3.31 30.04.16 31.03.16 30.04.16 NA 31.03.16 30.04.16 - NA 31.03.16 30.04.16 - - NA 31.03.16 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA ` 31.03.16 01.09.15 01.08.15 - 01.06.15 01.07.15 - NA ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - ` 01.09.15 01.08.15 15.02.16 01.06.15 - 31.01.16 01.07.15 15.02.16 ` 01.08.15 01.09.15 31.01.16 NA 01.06.15 15.02.16 01.07.15 ` 01.08.15 31.01.16 NA - 01.06.15 01.07.15 01.08.15 NA - - 01.06.15 01.09.15 01.07.15 - - 01.09.15 01.06.15 ` - 01.09.15 ` 01.08.15 ` 01.07.15 01.08.15 01.07.15 01.06.15 01.08.15 01.07.15 01.06.15 01.06.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date 122 121 120 119 118 117 116 115 114 113 112 111 110 109 108 107 106 No. Sr. Sr. 23 12 Dial (3259) (3258) Chutala (3253) Bhattal Bhaike (3139) Ekal Gadda (3127) Banian Mandiala(3161) 8) Jawandpur(1276 Sarli(3146) Hardo (12755) Waring (3171) Talwandi Sarai (3167) Sakkianwali (3154) Khojkipur Gehri(3313) (3318) Khairdeen Ke (3312) Gandiwind (3311) Gaggo Bua Dodey (3310) Name of of Name Scheme App. Cost (In Lacs) (In Planned 145.00 133.00 105.00 108.00 Admin. 36.00 91.00 61.00 69.00 35.00 42.00 59.00 42.00 40.00 53.00 44.00 85.00 36.00 Cost/ PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- Package No. 317-I 316-I 315-I 314-I 313-I 312-I 311-I 310-I 309-I 308-I 323-I 323-I 322-I 321-I 320-I 319-I 318-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Work and OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. Description of of Description Works 6 105.00 108.00 145.00 133.00 36.00 91.00 61.00 69.00 35.00 42.00 59.00 42.00 40.00 53.00 44.00 85.00 36.00

8 7 Estimated cost (Package) (RS lacs) C 10.50.51 15.05.15 01.05.15 01.04.15 NCB C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 NCB 01.04.15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10.50.71 10.5`0.91 A3.31 30.04.16 31.03.16 30.04.16 NA 31.03.16 30.04.16 - NA 31.03.16 30.04.16 - - NA 31.03.16 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 30.04.16 - - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 30.04.16 - 01.06.15 01.07.15 - NA 31.03.16 ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - NA ` 01.09.15 01.08.15 - 01.06.15 01.07.15 - ` 01.09.15 01.08.15 - 01.06.15 01.07.15 ` 01.09.15 01.08.15 01.06.15 01.07.15 ` 01.08.15 01.06.15 01.07.15 01.08.15 01.06.15 01.07.15 01.06.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date 139 138 137 136 135 134 133 132 131 130 129 128 127 126 125 124 123 No. Sr. Sr. 23 12 Valtoha (3431) (3344) Jarmastpur Dublian (12791) (3337) SidhwanBhaini (3332) Alladinpur Sangwan(3235) Singh(3242) Sobha Talwandi (3243) Thakarpura (3236) Sirhali Mandan Kulla (3212) (3206)Kairon Jallowala (3264) Kaler(3271) Assal(3285) Rure ) Shingarpur(3290 Jandoke (3265) (3260) Dugalwala Name of of Name Scheme App. Cost (In Lacs) (In Planned 285.00 120.00 205.00 Admin. 60.00 37.00 47.00 85.00 48.00 68.00 68.00 68.00 40.00 36.00 66.00 35.00 40.00 40.00 Cost/ PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- Package No. 333-I 332-I 331-I 330-I 329-I 328-I 327-I 326-I 325-I 324-I 339-I 338-I 337-I 337-I 336-I 335-I 334-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Work and OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. Description of of Description Works 6 285.00 120.00 205.00 60.00 37.00 47.00 85.00 48.00 68.00 68.00 68.00 40.00 36.00 66.00 35.00 40.00 40.00

8 7 Estimated cost (Package) (RS lacs) C 10.50.51 15.05.15 01.05.15 01.04.15 NCB C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 NCB 01.04.15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10.50.71 10.5`0.91 A3.11 15.02.16 31.01.16 NA 31.10.16 01.10.16 - 31.10.16 01.10.16 - - 31.10.16 01.09.15 01.10.16 - - 31.10.16 ` - 01.10.16 - - 01.09.15 31.10.16 01.08.15 - 15.08.15 01.10.16 - - 01.07.15 01.09.15 31.10.16 01.08.15 - 15.08.15 01.10.16 - 01.06.15 - 10.07.15 01.09.15 31.10.16 01.08.15 - 15.08.15 01.10.16 - 10.06.15 - 10.07.15 01.09.15 31.10.16 01.08.15 - 15.08.15 01.10.16 - 10.06.15 - 10.07.15 01.09.15 31.10.16 01.08.15 - 15.08.15 01.10.16 - 10.06.15 - 10.07.15 01.09.15 31.10.16 01.08.15 - 15.08.15 01.10.16 - 10.06.15 - 10.07.15 01.09.15 31.10.16 01.08.15 - 15.08.15 01.10.16 - 10.06.15 - 10.07.15 01.09.15 31.10.16 01.08.15 - 15.08.15 01.10.16 - 10.06.15 - 10.07.15 01.09.15 31.10.16 01.08.15 - 15.08.15 01.10.16 - 10.06.15 - 10.07.15 01.09.15 31.10.16 01.08.15 30.04.16 - 15.08.15 01.10.16 - 10.06.15 - 10.07.15 01.09.15 31.03.16 01.08.15 30.04.16 - 15.08.15 - 10.06.15 - 10.07.15 NA 01.09.15 31.03.16 01.08.15 - 15.08.15 10.06.15 - 10.07.15 - NA 01.09.15 01.08.15 - 15.08.15 - 10.06.15 10.07.15 - 01.09.15 01.09.15 01.08.15 15.08.15 - 10.06.15 10.07.15 ` 01.09.15 01.08.15 10.06.15 10.07.15 ` 01.08.15 10.06.15 01.07.15 01.08.15 01.06.15 01.07.15 01.06.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date Water Treatment Plants Distt. Tarn Taran Water 217 216 215 214 213 212 211 210 209 208 207 206 205 204 203 143 142 141 140 No. Sr. Sr. 23 12 Sankatra (3427) Singh (3429) Jaimal Thathi (12808) Singh Tara Wan (3432) Varnala Chak Sheikh Abadi Lalpura Kheda Leian Chack Shkar (3246) Theh Chahal Pakka Kacha Margindpura Gill pun (7872) Balehar Sangatpura Brahampura Raniwalah Karamuwala Singh (14949) DeraAbadi Name of of Name Scheme App. Cost (In Lacs) (In Planned 125.00 123.00 Admin. 42.00 40.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 Cost/ PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- PRWSSIP-TRN-Div- Package No. Div-29-I Div-43-I Div-42-I Div-41-I Div-40-I Div-39-I Div-38-I Div-37-I Div-36-I Div-35-I Div-34-I Div-33-I Div-32-I Div-31-I Div-30-I 343-I 342-I 341-I 340-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. OHSR and Work Civil T/Well, Prov. Description of of Description Works 6 125.00 123.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 42.00 40.00

8 7 Estimated cost (Package) (RS lacs) C 10.50.51 15.05.15 01.05.15 01.04.15 NCB C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 NCB 01.04.15 15.05.15 NCB 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 NCB 01.04.15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10.50.71 10.5`0.91 A3.31 30.04.16 31.03.16 30.04.16 31.03.16 NA 30.04.16 31.03.16 NA 30.04.16 - 31.03.16 NA 30.04.16 - - 01.09.15 31.03.16 NA 30.04.16 - - 01.09.15 31.03.16 NA ` 30.04.16 - - 01.09.15 31.03.16 NA ` 30.04.16 - - 01.08.15 01.09.15 31.03.16 NA ` 30.04.16 - - 01.07.15 01.08.15 01.09.15 31.03.16 NA ` 30.04.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.03.16 NA ` 30.04.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.03.16 NA ` 30.04.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.03.16 NA ` 30.04.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.03.16 NA ` 30.04.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 31.03.16 NA ` - - 01.07.15 01.06.15 01.08.15 30.04.16 01.09.15 NA ` 31.03.16 - - 01.07.15 01.06.15 01.08.15 01.09.15 ` - NA - 01.07.15 01.06.15 01.08.15 15.02.16 01.09.15 ` 31.01.16 - 01.07.15 01.06.15 01.08.15 - 15.02.16 01.09.15 ` NA 01.07.15 01.06.15 31.01.16 01.08.15 - 15.02.16 ` 01.09.15 01.07.15 01.06.15 01.08.15 - NA 31.01.16 15.02.16 ` 01.07.15 01.06.15 01.08.15 - - NA 31.01.16 01.09.15 01.07.15 01.06.15 01.08.15 - - NA ` 01.06.15 01.09.15 01.07.15 - - ` 01.06.15 01.09.15 01.08.15 - 01.07.15 ` 01.09.15 01.08.15 01.06.15 01.07.15 ` 01.08.15 01.06.15 01.07.15 01.08.15 01.06.15 01.07.15 01.06.15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date W/S/S DIVISION NO. 3, S.A.S. NAGAR 3, S.A.S. NO. DIVISION W/S/S NAGAR S A S DISTRICT Rupnagar No.2 Division W/S/S SAHIB ANANDPUR AT 1, ROPAR No. DIVISION W/S/S Ropar DISTRICT Circle Central Zone 223 222 221 220 219 218 No. Sr. Sr. 2 1 23 12 9 8 7 6 5 SINGHPURA PLASSSI- CHANDPUR Lalu Ghuman Hassan Panori Doblian Musse Wala-2 Singh Baghail Malmohri / Khurd Khurd / Kalan Makuri Ghanouli Ghanouli Salempur Nathmalpur Majri Jattan Name of of Name Scheme App. Cost (In Lacs) (In Planned 125.00 Admin. 52.00 87.00 75.00 67.00 20.00 20.00 20.00 20.00 20.00 20.00 75.25 75.25 Cost/ PRWSSIP-Ropar-Div- PRWSSIP-Ropar-Div- PRWSSIP-Ropar-Div- PRWSSIP-Ropar-Div- PRWSSIP-Ropar-Div- PRWSSIP-Ropar-Div- PRWSSIP-Ropar-Div- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- PRWSSIP-TRN-WQ- Package No. Div-49-I Div-48-I Div-47-I Div-46-I Div-45-I Div-44-I 347-I 350-I 345-I 344-I 349-I 348-I 346-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Water supply Water Water supply Water supply Water supply Water supply Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Plant Treatment Water Description of of Description Civil work Civil work Works OHSR OHSR T/well T/well 6 20.00 20.00 20.00 20.00 20.00 20.00 21 C 5Jn1 1Jn1 28-Feb-15 31-Jan-15 28-Feb-15 15-Jan-15 31-Jan-15 NCB 15-Jan-15 92.16 NCB 75.25 125.00 NCB 15-Jan-15 20-Feb-15 28-Feb-15 Post Post 28-Feb-15 20-Feb-15 15-Jan-15 NCB 125.00 8 7 87.00 NCB 15-Jan-15 20-Feb-15 28-Feb-15 Post Post 28-Feb-15 20-Feb-15 Post 28-Feb-15 15-Jan-15 20-Feb-15 Post NCB 87.00 28-Feb-15 15-Jan-15 20-Feb-15 Post NCB 75.00 28-Feb-15 15-Jan-15 20-Feb-15 NCB 52.00 15-Jan-15 NCB 67.00 Estimated cost (Package) (RS lacs) C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 NCB 01.04.15 NCB C 10.50.51 15.05.15 01.05.15 15.05.15 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 15.05.15 NCB 01.04.15 01.05.15 NCB 01.04.15 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 10.50.71 10.5`0.91 A3.31 30.04.16 31.03.16 30.04.16 31.03.16 to Yet NA 30.04.16 15/04/15 31.03.16 NA 30.04.16 - to Yet 01/04/15 31.03.16 NA 15/04/15 30.04.16 - - 01.09.15 31.03.16 01/03/15 NA 01/04/15 30.04.16 - - 01.09.15 31.03.16 NA ` - - 01/03/15 01.09.15 NA ` - - 01.08.15 01.09.15 ` - - 01.07.15 01.08.15 01.09.15 ` - 01.07.15 01.06.15 01.08.15 01.09.15 ` 01.07.15 01.06.15 01.08.15 ` 01.07.15 01.06.15 01.08.15 01.07.15 01.06.15 01.08.15 01.07.15 01.06.15 01.06.15 1/3/15 1/3/15 1/3/15 1/3/15 1/3/15

13 Invitation (Date) Bids

14 Open on //51//5Ps eiw6My1 - -3-e-5 - - - 31-Dec-15 - - - 31-Dec-15 - - - - 31-Dec-15 - 6-May-15 - - Review Post 15/4/15 - 31-Dec-15 - 6-May-15 2/4/15 - Review Post 15/4/15 - - 6-May-15 2/4/15 - Review Post 15/4/15 - 6-May-15 2/4/15 Review Post 15/4/15 2/4/15 //51//5Ps eiw6My1 - -3-e-5 - - 31-Dec-15 - - - 6-May-15 Review Post 15/4/15 2/4/15 (Date)

15 Contract Award decided (Date) ascertain ascertain Banks no objection 16 contract award (in case of -a-5 - -a-6 - - - 2-May-16 - - 2-May-16 - - - 6-May-15 - - 6-May-15

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date District Faridkot Water SupplyWater Schemes Div. Faridkot No. Sr. Sr. 5 4 2 3 1 1 6 5 4 3 2 23 12 SIMBAL MAJRA MAJRA SIMBAL BADARPUR 48.37 BADARPUR DAUN 135 DAUN 70.27 GIGE MAJRA 52.09BALIALI H BAHADURGAR & NIMBUAN Scheme Behbal Scheme Simre Scheme Phide Scheme Kauni Water Supply Water Supply Water Supply Water Supply Water Supply Midduman Name of of Name Scheme Scheme Kalan Kalan Wala App. Cost (In Lacs) (In Planned 210.60 187.52 152.00 245.20 Admin. 83.25 47.12 50.39 Cost/ PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-Mohali- PRWSSIP-Mohali- PRWSSIP-Mohali- PRWSSIP-Mohali- PRWSSIP-Mohali- PRWSSIP-Mohali- Package No. Div-352-I Div-351-I Div-356-I Div-355-I Div-354-I Div-353-I 360-II 359-II 358-II 357-II 357-I 361-I 360-I 359-I 358-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual including O&M Filtration Unit Continous Sand OHSR Civil and Work OHSR Civil and Work including O&M Filtration Unit Continous Sand OHSR Civil and Work including O&M Filtration Unit Continous Sand OHSR Civil and Work including O&M Filtration Unit Continous Sand OHSR Civil and Work Description of of Description Civil work Civil work Civil work Civil work Civil work Civil work Works OHSR OHSR OHSR OHSR OHSR OHSR T/well T/well T/well T/well T/well T/well 6 120.60 NCB 27.03.2014 08.04.2015 23.04.2015 08.04.2015 27.03.2014 NCB 120.60 07.04.2015 22.03.2015 17.02.2014 NCB 115.52 16.03.2015 01.03.2015 14.05.2012 NCB 155.20 3.0NB1-a-52-a-523-Feb-15 25-Jan-15 10-Jan-15 NCB 135.00 00 C 1.521 2.321 07.04.2015 22.03.2015 14.05.2012 NCB 80.00 23.03.2015 08.03.2015 14.05.2012 NCB 23.03.2015 08.03.2015 80.00 01.10.2012 NCB 16.04.2015 01.04.2015 80.00 14.05.2012 NCB 16.04.2015 01.04.2015 80.00 01.02.2015 16.03.2015 NCB 01.03.2015 83.25 14.05.2012 NCB 93.00 02 C 0Jn1 5Jn1 23-Feb-15 25-Jan-15 23-Feb-15 10-Jan-15 25-Jan-15 NCB 10-Jan-15 23-Feb-15 70.27 25-Jan-15 NCB 23-Feb-15 52.09 10-Jan-15 25-Jan-15 23-Feb-15 NCB 10-Jan-15 50.39 25-Jan-15 NCB 10-Jan-15 47.12 NCB 48.37

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 0.521 0.621 17.06.2015 02.06.2015 02.05.2015 30.05.2015 16.05.2015 16.04.2015 30.05.2015 16.05.2015 16.04.2015 17.05.2015 02.05.2015 02.04.2015 17.05.2015 02.05.2015 02.04.2015 10.06.2015 25.05.2015 25.04.2015 10.06.2015 25.05.2015 25.04.2015 10.05.2015 25.04.2015 25.03.2015 25.03.2015 25.04.2015 10.05.2015 25.04.2015 25.03.2015 721 131 041 otRve 0Ar1 - -3-a-6 - 31-Jan-16 - - 31-Jan-16 - - - 31-Jan-16 ------30-Apr-15 31-Jan-16 - Review Post - - 10/4/15 - 30-Apr-15 31-Jan-16 - Review Post - 31/3/15 - 10/4/15 30-Apr-15 31-Jan-16 - - Review Post 27/2/15 31/3/15 10/4/15 - - - 30-Apr-15 Review 27/2/15 Post 31/3/15 - 10/4/15 - 30-Apr-15 Review 27/2/15 Post 31/3/15 - 10/4/15 30-Apr-15 Review Post 27/2/15 31/3/15 10/4/15 27/2/15 31/3/15 27/2/15

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 ------contract award (in case of 5 24.06.201 5 07.06.201 5 07.06.201 5 24.05.201 5 24.05.201 5 17.06.201 5 17.06.201 5 17.05.201 17.05.201

71 920 19 18 17 Contarct signed (Date/Value/Currency)

------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 23.06.2016 07.06.2016 07.06.2016 23.05.2016 23.05.2016 16.06.2016 16.06.2016 16.05.2016 16.05.2016

21 Date of Completion as per contract 22

------Actual Date of Completion

23 Expenditure incurred to date District Muktsar Scheme. Sewerage Schemes Performance Water SupplyWater Schemes Div. 1Muktsar No. Sr. Sr. 11 12 10 8 7 1 9 6 23 12 Improvement of Improvement of Improvement of Scheme Ghagga Supply Scheme Supply Scheme Supply Scheme DalSingh Wala Existing Water Existing Water Existing Water Dhilwan Kalan Scheme Behle Water Supply Water Supply Water Supply Water Supply Scheme Basti Hardialeana Wara Draka Gobindgarh Small Bore Sandhwan Nanaksar Nanaksar Name of of Name Sewerge Scheme Scheme Scheme Kalan Wala App. Cost (In Lacs) (In Planned 179.00 225.40 761.89 325.00 PRWSSIP-FDK-Div- 205.00 Admin. 20.00 20.00 20.00 Cost/ PRWSSIP-MKST-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- PRWSSIP-FDK-Div- Package No. IMP-115-I IMP-114-I IMP-113-I SW-23-I 361-II 364-II 363-II 362-II 363-I 362-I 364-I 365-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual and OHSR and OHSR Distribution System Structure Repair of including O&M Filtration Unit Continous Sand OHSR Civil and Work including O&M Filtration Unit Continous Sand OHSR Civil and Work including O&M Filtration Unit Continous Sand OHSR Civil and Work including O&M Filtration Unit Continous Sand OHSR Civil and Work Civil Work Civil Work and OHSR Distribution System Structure Repair of Description of of Description Works 6 5.0NB 2.721 0.321 16.03.2015 01.03.2015 26.07.2013 NCB 250.00 NCB 205.00 07.05.2015 22.04.2015 02.11.2014 NCB 15.03.2015 135.40 01.03.2015 14.05.2012 NCB 15.03.2015 279.00 01.03.2015 10.06.2011 NCB 491.89 30 C 1.521 0.421 23.04.2015 08.04.2015 14.05.2012 NCB 93.00 20.00 NCB NCB 20.00 07.06.2015 22.05.2015 20.09.2010 NCB 20.00 30.05.2015 15.05.2015 15.06.2006 NCB 20.00 30.06.2015 15.06.2015 14.05.2012 NCB 30.06.2015 15.06.2015 93.00 06.08.2013 NCB 07.05.2015 89.00 22.04.2015 14.05.2012 NCB 93.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement 9 - - Design Investigatiion Completed (Date) 2.521 07.06.2015 22.05.2015 40.0521.03.2015 14.02.2015

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2.321 2.421 10.05.2015 25.04.2015 25.03.2015 30.07.2015 16.07.2015 16.06.2015 30.07.2015 16.07.2015 16.06.2015 25.08.2015 10.08.2015 10.07.2015 25.08.2015 10.08.2015 10.07.2015 17.06.2015 02.06.2015 02.05.2015 70.050.421 07.05.2015 07.04.2015 07.03.2015 06.07.2015 21.07.2015 21.06.2015 30.06.2015 16.06.2015 16.05.2015 30.06.2015 16.06.2015 16.05.2015 30.05.2015 21.05.2015 07.05.2015 07.04.2015 30.05.2015 21.05.2015 07.05.2015 07.04.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 ------contract award (in case of 5 5 5 5 24.06.201 5 07.08.201 5 07.08.201 30.08.201 30.08.201 5 14.06.201 5 06.08.201 5 07.07.201 07.07.201 5 15.06.201 5 15.06.201 17.05.201 71 920 19 18 17 5

Contarct signed (Date/Value/Currency) ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 30.08.2016 30.08.2016 07.07.2016 23.06.2016 07.08.2016 07.05.2016 14.06.2016 06.08.2016 07.07.2016 15.06.2016 15.06.2016 16.05.2016

21 Date of Completion as per contract 22 ------Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 4 3 8 7 6 5 2 1 23 12 Scheme Gurusar Scheme Bhagsar Scheme Ghagga Scheme Sukhna Scheme Mallan Scheme Lande Water Supply Water Supply Water Supply Water Supply Water Supply Water Supply Water Supply Udekaran Name of of Name Seerwali Scheme Scheme Scheme Rode Ablu Ablu App. Cost (In Lacs) (In Planned 583.80 460.00 325.00 315.50 339.31 305.00 253.44 200.00 Admin. Cost/ PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- Package No. 365-II 372-II 371-II 370-II 369-II 368-II 367-II 366-II 372-I 371-I 370-I 369-I 368-I 367-I 366-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Filtration Unit Continous Sand OHSR Civil and Work Filtration Unit Continous Sand OHSR Civil and Work Filtration Unit Continous Sand OHSR Civil and Work Filtration Unit Continous Sand OHSR Civil and Work Filtration Unit Continous Sand Filtration Unit Continous Sand OHSR Civil and Work Filtration Unit Continous Sand OHSR Civil and Work Filtration Unit Continous Sand OHSR Civil and Work Description of of Description Works 6 4.0NB 0.121 2.421 07.05.2015 22.04.2015 02.01.2014 NCB 30.04.2015 240.50 15.04.2015 06.08.2013 NCB 30.04.2015 150.00 15.04.2015 06.08.2013 NCB 189.31 31.03.2015 15.03.2015 06.08.2014 NCB 230.00 23.04.2015 08.04.2015 27.03.2014 NCB 178.44 07.04.2015 22.03.2015 17.02.2014 NCB 23.03.2015 145.00 08.03.2015 27.03.2013 NCB 23.03.2015 150.00 08.03.2015 27.03.2013 NCB 433.80 16.04.2015 01.04.2015 26.07.2013 NCB 385.00 50 C 60.03 10.0516.03.2015 01.03.2015 26.07.2013 NCB 75.00 50 C 20.04 20.0507.05.2015 22.04.2015 02.01.2014 NCB 75.00 31.03.2015 15.03.2015 06.08.2014 NCB 75.00 23.04.2015 08.04.2015 27.03.2014 NCB 75.00 07.04.2015 22.03.2015 17.02.2014 NCB 55.00 16.04.2015 01.04.2015 26.07.2013 NCB 75.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 1.521 1.621 30.06.2015 16.06.2015 16.05.2015 30.06.2015 16.06.2015 16.05.2015 25.06.2015 10.06.2015 10.05.2015 25.06.2015 10.06.2015 10.05.2015 25.05.2015 10.05.2015 10.04.2015 25.05.2015 10.05.2015 10.04.2015 17.06.2015 02.06.2015 02.05.2015 17.06.2015 02.06.2015 02.05.2015 30.05.2015 16.05.2015 16.04.2015 30.05.2015 16.05.2015 16.04.2015 17.05.2015 02.05.2015 02.04.2015 17.05.2015 02.05.2015 02.04.2015 10.06.2015 25.05.2015 25.04.2015 10.06.2015 25.05.2015 25.04.2015 10.05.2015 25.04.2015 25.03.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 ------contract award (in case of 17.05.201 07.07.201 07.07.201 30.06.201 30.06.201 31.05.201 31.05.201 24.06.201 24.06.201 07.06.201 07.06.201 24.05.201 24.05.201 17.06.201 17.06.201 71 920 19 18 17 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

Contarct signed (Date/Value/Currency)

------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 07.07.2016 07.07.2016 30.06.2016 30.06.2016 31.05.2016 31.05.2016 23.06.2016 23.06.2016 07.06.2016 07.06.2016 23.05.2016 23.05.2016 16.06.2016 16.06.2016 16.05.2016

21 Date of Completion as per contract 22

------Actual Date of Completion

23 Expenditure incurred to date Sewerage Scheme. Sewerage Schemes Performance No. Sr. Sr. 14 13 12 17 16 15 11 10 9 23 12 Improvement of Improvement of Improvement of Improvement of Scheme Khunan Khunan Scheme Supply Scheme Supply Scheme Supply Scheme Supply Scheme Existing Water Existing Water Existing Water Existing Water Khunan Kalan Water Supply Water Supply Water Supply Water Supply Water Supply Scheme Assa Assa Scheme Tarkhanwala Scheme Guri Chibranwali Bhuttiwala Name of of Name Scheme Budimal Scheme Scheme Sangar Sangar Butter Khurd Doda App. Cost (In Lacs) (In Planned 370.44 315.00 335.40 Admin. 15.00 19.72 20.00 20.00 55.00 70.81 Cost/ PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- Package No. IMP-119-I IMP-118-I IMP-117-I IMP-116-I 375-II 374-II 373-II 376-II 373-I 375-I 374-I 376-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual and otherworks Distribution System and OHSR Distribution System Filtration Unit Continous Sand OHSR Civil and Work Filtration Unit Continous Sand OHSR Civil and Work Filtration Unit Continous Sand OHSR Civil and Work Civil Work Civil Work Civil Work OHSR Description of of Description Works 6 5.0NB 2.021 2.421 14.05.2015 29.04.2015 23.10.2013 NCB 259.50 5.1NB 0.821 0.521 23.05.2015 08.05.2015 08.08.2014 NCB 251.51 16.05.2015 01.05.2015 28.10.2014 NCB 286.55 47 NCB 14.72 NCB 19.15 NCB 07.06.2015 19.50 22.05.2015 20.09.2010 NCB 24.63 30.05.2015 15.05.2015 27.08.2014 NCB 30.05.2015 15.05.2015 55.00 27.08.2014 NCB 23.05.2015 08.05.2015 68.11 08.08.2014 NCB 83.89 16.05.2015 01.05.2015 28.10.2014 NCB 83.89 14.05.2015 29.04.2015 23.10.2013 NCB 55.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement 9 - - - Design Investigatiion Completed (Date) 2.121 14.02.2015 29.01.2015 14.02.2015 29.01.2015 14.02.2015 29.01.2015

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 2.221 2.321 07.04.2015 23.03.2015 23.02.2015 07.04.2015 23.03.2015 23.02.2015 07.04.2015 23.03.2015 23.02.2015 30.07.2015 16.07.2015 16.06.2015 25.07.2015 10.07.2015 10.06.2015 25.07.2015 10.07.2015 10.06.2015 17.07.2015 02.07.2015 02.06.2015 17.07.2015 02.07.2015 02.06.2015 10.07.2015 25.06.2015 25.05.2015 10.07.2015 25.06.2015 25.05.2015 07.07.2015 23.06.2015 23.05.2015 07.07.2015 23.06.2015 23.05.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 ------contract award (in case of 14.05.201 14.05.201 14.05.201 07.08.201 30.07.201 30.07.201 24.07.201 24.07.201 17.07.201 17.07.201 14.07.201 14.07.201 71 920 19 18 17 5 5 5 5 5 5 5 5 5 5 5 5

Contarct signed (Date/Value/Currency) ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 30.04.2016 30.04.2016 23.07.2016 23.07.2016 16.07.2016 16.07.2016 14.07.2016 14.07.2016 14.09.2015 14.09.2015 14.09.2015 07.05.2016

21 Date of Completion as per contract 22 ------Actual Date of Completion

23 Expenditure incurred to date Water SupplyWater Schemes Div. Malout No. Sr. Sr. 18 19 2 1 4 3 23 12 Scheme Madhar Scheme Smagh id hr 172.00 Middu Khera hla aa140.00 Wala Bhullar en hr 122.00 Sehna Khera Small Bore Small Bore dann214.00 Adhainan Name of of Name Sewerge Sewerge Scheme Kalan App. Cost (In Lacs) (In Planned 650.00 606.00 Admin. Cost/ PRWSSIP-MKST-Div- PRWSSIP-MKST-Div- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- Package No. Div-377-II Div-380-II Div-379-II Div-378-II Div-378-I Div-377-I Div-380-I Div-379-I SW-25-I SW-24-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Civil Work Civil Work OHSR, Distribution System, Pumping System, OHSR, Distribution OHSR, Distribution OHSR, Distribution Description of of Description System, Pumping System, System, Pumping System, Pumping System, Machinary and Sand Filtration Machinary andMachinary Machinary andMachinary andMachinary Sand Filtration Sand Filtration Sand Filtration other Works Continuous other Works other other Works other Works other Civil Work, Continuous Continuous Continuous Civil Work, Work, Civil Work, Civil Work, Civil Works plant plant plant plant 6 587.00 NCB NCB 587.00 630.50 NCB NCB 630.50 124.00 90.00 32.00 90.00 90.00 82.00 90.00 50.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB Method of Procurement 10.0501.03.2015 01.01.2015 10.0501.03.2015 01.01.2015 01.03.2015 01.01.2015 01.03.2015 01.01.2015 01.03.2015 01.01.2015 01.03.2015 01.01.2015 16.03.2015 01.03.2015 01.01.2015 16.03.2015 01.03.2015 01.01.2015 9 - - Design Investigatiion Completed (Date) 2.521 07.06.2015 22.05.2015 2.621 07.07.2015 22.06.2015

10 DSR Sacntioned (Date) 20.03.2015 20.03.2015 20.03.2015 20.03.2015 20.03.2015 20.03.2015

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 1.721 1.821 30.08.2015 16.08.2015 16.07.2015 30.07.2015 16.07.2015 16.06.2015 10.053.421 50.05- 15.05.2015 30.04.2015 31.03.2015 - 15.05.2015 30.04.2015 31.03.2015 - 15.05.2015 30.04.2015 - 31.03.2015 15.05.2015 30.04.2015 - 31.03.2015 15.05.2015 30.04.2015 - 31.03.2015 15.05.2015 30.04.2015 31.03.2015 10.05.2015 25.04.2015 25.03.2015 10.05.2015 25.04.2015 25.03.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 - - contract award (in case of 17.05.2015 17.05.2015 25.05.2015 25.05.2015 25.05.2015 25.05.2015 25.05.2015 25.05.2015 07.09.201 07.08.201 71 920 19 18 17 5 5

Contarct signed (Date/Value/Currency)

------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 07.09.2016 07.08.2016 16.05.2016 16.05.2016 31.05.2016 31.05.2016 31.05.2016 31.05.2016 31.05.2016 31.05.2016

21 Date of Completion as per contract 22

-- -- Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 10 5 9 8 7 6 23 12 Khudian Gulab /Mahan Singh awl hb155.00 Dabwali Dhab agnKea100.00 Kangan Khera aa Nw 122.00 (New) Badal aoewl 247.00 Katore wala Name of of Name Scheme hrr349 PRWSSIP-Malout- 304.94 Jhorar Singh App. Cost (In Lacs) (In Planned Admin. 258.00 Cost/ PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- Package No. Div-386-II Div-384-II Div-383-II Div-382-II Div-381-II Div-381-I Div-386-I Div-385-I Div-384-I Div-383-I Div-382-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual OHSR, Distribution OHSR, Distribution OHSR, Distribution OHSR, Distribution OHSR, Distribution System, Pumping System, System, Pumping System, Pumping System, Pumping System, Pumping System, Pumping System, Description of of Description Machinary and Machinary and Machinary and Machinary and Machinary and Machinary and Sand Filtration Sand Filtration Sand Filtration Sand Filtration Sand Filtration other Works other Works other Works other Works other Works other Works Distribution Continuous Continuous Continuous Continuous Continuous Civil Work, Civil Work, Civil Work, Civil Work, Civil Work, Civil Work, Works plant plant plant plant plant 6 192.00 304.94 168.00 55.00 70.00 30.00 90.00 65.00 90.00 32.00 90.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB Method of Procurement 10.0501.05.2015 01.03.2015 01.04.2015 01.02.2015 01.04.2015 01.02.2015 10.0501.05.2015 01.03.2015 01.04.2015 01.02.2015 01.04.2015 01.02.2015 01.04.2015 01.02.2015 01.04.2015 01.02.2015 01.04.2015 01.02.2015 01.04.2015 01.02.2015 01.04.2015 01.02.2015

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date) 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 60.050.721 50.05- 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 06.06.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 11 16 15 14 13 12 23 12 ol hne 158.55 Doula Dhanies Ram Nagar Name of of Name oba 806.87 Kotbhai Scheme unr559.13 Husnar hih110.00 Sheikh er 300.00 Peori App. Cost (In Lacs) (In Planned Admin. 112.97 Cost/ PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- Package No. Div-388-II Div-392-II Div-391-II Div-390-II Div-389-II Div-387-II Div-387-I Div-392-I Div-391-I Div-390-I Div-389-I Div-388-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual OHSR, Distribution OHSR, Distribution OHSR, Distribution OHSR, Distribution System, Pumping System, Pumping System, System, Pumping System, Pumping System, Pumping System, Pumping System, Description of of Description RCC Structure & RCC Structure & RCC Machinary and Machinary and Machinary and Machinary and Machinary and Machinary and Sand Filtration Sand Filtration Sand Filtration other Works other Works other Works other Works other Works other Works CTP &OHSR CTP Distribution Distribution Continuous Continuous Continuous Civil Work, Civil Work, Civil Work, Civil Work, Civil Work, Civil Work, Works OHSR OHSR plant plant plant 6 210.00 140.00 419.13 123.55 150.00 656.87 40.00 70.00 30.00 82.92 90.00 35.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB Method of Procurement 10.0501.06.2015 01.04.2015 01.05.2015 01.03.2015 01.05.2015 01.03.2015 01.05.2015 01.03.2015 01.05.2015 01.03.2015 01.05.2015 01.03.2015 10.0501.06.2015 01.04.2015 01.06.2015 01.04.2015 01.06.2015 01.04.2015 01.06.2015 01.04.2015 01.06.2015 01.04.2015 01.05.2015 01.03.2015

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date) 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 60.050.721 50.05- 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 06.06.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date Sewerage Scheme. Sewerage Schemes Performance No. Sr. Sr. 17 22 21 20 19 18 23 12 awl ak 00 PRWSSIP-Malout- 50.00 Dabwali Malko ilg aot641.00 Village Malout aain110.00 Babanian Name of of Name a hi2.0PRWSSIP-Malout- 20.00 Lal Bhai Scheme ahr300 Madhir ain194.00 Badian App. Cost (In Lacs) (In Planned Admin. Cost/ PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- PRWSSIP-Malout- Div-IMP-120-I Package No. Div-396-II Div-395-II Div-394-II Div-393-II Div-393-I Div-397-I Div-396-I Div-395-I Div-394-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual connection laying & OHSR, Distribution OHSR, Distribution OHSR, Distribution OHSR, Distribution System, Pumping System, System, Pumping System, Pumping System, Pumping System, Pumping System, Description of of Description Machinary and Machinary and Machinary and Machinary and Machinary and Sand Filtration Sand Filtration Sand Filtration Sand Filtration Making houseMaking Inlet Channal, other Works other Works other Works other Works other Works Distribution Continuous Continuous Continuous Continuous of pipeline Civil Work, Civil Work, Civil Work, Civil Work, Civil Work, Works plant plant plant plant 6 180.00 461.00 104.00 120.00 180.00 20.00 50.00 60.00 50.00 90.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB NCB Method of Procurement 10.0501.08.2015 01.06.2015 01.08.2015 01.06.2015 01.07.2015 01.05.2015 01.07.2015 01.05.2015 01.07.2015 01.05.2015 10.0501.04.2015 01.02.2015 01.04.2015 01.02.2015 01.07.2015 01.05.2015 01.07.2015 01.05.2015 01.07.2015 01.05.2015

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date) 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015 25.06.2015

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 60.050.721 50.05- 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 - 06.06.2015 15.07.2015 05.07.2015 06.06.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015 25.07.2015

71 920 19 18 17 Contarct signed (Date/Value/Currency)

Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016

21 Date of Completion as per contract

22 Actual Date of Completion

23 Expenditure incurred to date District Moga Water SupplyWater Schemes Moga Division No. Sr. Sr. 23 24 9 8 7 6 4 1 5 3 2 23 12 Scheme Pandori Scheme Roshan Scheme Kishan Pura and Shadi andPura Scheme Datte Scheme Small Scheme Harie Water Supply Water Supply Water Supply Water Supply Water Supply Water Supply Water Supply Water Supply Water Supply Scheme Droli Mehmood Fatehgarh Korotana Manjhali Name of of Name Scheme Scheme Scheme Aariyan an500 PRWSSIP-Malout- 500.00 Mann Khera Wala Wala Wala Bhai Wal Sar App. Cost (In Lacs) (In Planned 6.0PRWSSIP-Moga-Div- 165.00 PRWSSIP-Moga-Div- 210.00 PRWSSIP-Moga-Div- 150.00 Admin. 0.0PRWSSIP-Malout- 500.00 50 PRWSSIP-Moga-Div- 55.00 PRWSSIP-Moga-Div- 60.00 PRWSSIP-Moga-Div- 70.00 PRWSSIP-Moga-Div- 30.00 PRWSSIP-Moga-Div- 70.00 PRWSSIP-Moga-Div- 40.00 Cost/ Package No. Div-SW-25-I Div-SW-26-I 406-I 405-I 400-I 404-I 403-I 402-I 401-I 399-I 398-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual and Dist.and System Work OHSR, Civil Dist.and System Work OHSR, Civil Dist. System Work andCivil Dist.and System Work OHSR, Civil Dist.and System Work OHSR, Civil Dist. System Work andCivil Dist.and System Work OHSR, Civil Dist.and System Work OHSR, Civil Dist. System Work andCivil Machinary, SewerMachinary, Machinary, SewerMachinary, line Networkand line Networkand Description of of Description STP, Pumping STP, STP, Pumping STP, other Works other Works Civil Work, Civil Work, Works 6 1.0NB2.221 10.0515.04.2015 31.03.2015 28.02.2015 NCB 31.03.2015 210.00 15.03.2015 15.02.2015 NCB 210.00 15.03.2015 28.02.2015 31.01.2015 NCB 150.00 500.00 500.00 50 C 50.051.321 31.03.2015 15.03.2015 15.02.2015 NCB 55.00 31.03.2015 15.03.2015 15.02.2015 NCB 60.00 31.03.2015 15.03.2015 15.02.2015 NCB 15.03.2015 70.00 28.02.2015 31.01.2015 NCB 30.00 15.03.2015 28.02.2015 31.01.2015 NCB 15.03.2015 28.02.2015 70.00 31.01.2015 NCB 40.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB NCB Method of Procurement 10.0501.08.2015 01.06.2015 01.08.2015 01.06.2015

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date) 25.06.2015 25.06.2015

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 00.052.421 15.06.2015 25.04.2015 20.04.2015 31.05.2015 10.05.2015 05.04.2015 31.05.2015 10.05.2015 05.04.2015 31.05.2015 10.05.2015 05.04.2015 31.05.2015 10.05.2015 05.04.2015 15.05.2015 25.04.2015 20.03.2015 15.05.2015 25.04.2015 20.03.2015 15.05.2015 25.04.2015 20.03.2015 15.05.2015 25.04.2015 20.03.2015 60.050.721 50.05- 15.07.2015 05.07.2015 06.06.2015 - 15.07.2015 05.07.2015 06.06.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 ------contract award (in case of 25.07.2015 25.07.2015 5 20.06.201 5 05.06.201 5 05.06.201 5 05.06.201 5 05.06.201 20.05.201 5 20.05.201 20.05.201 20.05.201 5 5 5

71 920 19 18 17 Contarct signed (Date/Value/Currency) ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 20.01.2016 05.01.2016 05.12.2015 05.01.2016 05.01.2016 20.12.2015 20.11.2015 20.12.2015 20.11.2015 31.03.2016 31.03.2016

21 Date of Completion as per contract 22 ------Actual Date of Completion

23 Expenditure incurred to date Surfact water supply to villages of Moga Moga villages of to waterSurfact supply Sewerage Scheme. Sewerage Schemes Performance No. Sr. Sr. 12 11 10 Sewerage 1 1 4 3 2 1 23 12 OF BAGHAPURANA A AND NIHALSINGHWAL BLOCK- OF VILLAGES 85 TO SUPPLY WATER SURFACE Scheme Dharam Scheme Baddu Scheme Takhtu Scheme Mundi Scheme Khosa Scheme Bhagi Water Supply Water Supply Water Supply Water Supply Water Supply Water Supply Water Supply Scheme Kore Scheme Bilas Wala Khurd Singh Wala Name of of Name Scheme Pando Jamal Pura Wal Pur Ke App. Cost (In Lacs) (In Planned 2.0PRWSSIP-Moga-Div- 120.00 PRWSSIP-Moga-Div- 155.00 5.0PRWSSIP-Moga-Div- 350.00 Admin. 23,900 50 PRWSSIP-Moga-Div- 15.00 PRWSSIP-Moga-Div- 14.00 PRWSSIP-Moga-Div- 10.00 PRWSSIP-Moga-Div- 60.00 Cost/ .0PRWSSIP-Moga-Div- 5.00 PRWSSIP-Moga-Div- Package No. IMP-122-I IMP-124-I IMP-123-I IMP-121-I SW-27-I 409-I 408-I 407-I 410-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual and environment disposal Sludge site Development atSTP Site Station, Work, Pumping Disposal Pipe Sewer, VILLAGES OF BLOCK BLOCK OF VILLAGES Dist. System Work andCivil Dist. System Work andCivil Dist. System Work andCivil Dist. System Work andCivil Dist.and System Work OHSR, Civil Dist.and System Work OHSR, Civil Dist.and System Work OHSR, Civil AND BAGHAPURANA BAGHAPURANA AND QUALITY AFFECTED AFFECTED QUALITY NIHALSINGHWALA SURFACE WATER WATER SURFACE Description of of Description SUPPLY 85 TO PROVIDING PROVIDING Works 6 2.0NB2.221 10.0515.04.2015 31.03.2015 28.02.2015 NCB 120.00 15.04.2015 31.03.2015 28.02.2015 NCB 155.00 5.0NB3.121 80.0515.03.2015 28.02.2015 31.01.2015 NCB 350.00 50 C 10.052.221 15.03.2015 28.02.2015 31.01.2015 NCB 15.03.2015 15.00 28.02.2015 31.01.2015 NCB 15.00 15.03.2015 28.02.2015 31.01.2015 NCB 10.00 15.04.2015 31.03.2015 28.02.2015 NCB 60.00 .0NB3.121 80.0515.03.2015 28.02.2015 31.01.2015 NCB 5.00 NCB NCB DONE 15-Feb-15 31-Mar-16 15.04.2015 20/04/15 31/05/15 15/07/15 25.07.2015 1-Aug-15 - - - 31-04-17 - - - 31-04-17 - - - 1-Aug-15 25.07.2015 15/07/15 31/05/15 20/04/15 15.04.2015 31-Mar-16 15-Feb-15 DONE NCB NCB

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 00.05 50.0515.05.2015 25.04.2015 20.03.2015 15.04.2015 31.03.2015 20.03.2015 15.04.2015 31.03.2015 20.03.2015 15.04.2015 31.03.2015 20.03.2015 15.04.2015 31.03.2015 20.03.2015 15.06.2015 25.04.2015 20.04.2015 15.06.2015 25.04.2015 20.04.2015 15.06.2015 25.04.2015 20.04.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 ------contract award (in case of 5 20.05.201 5 20.04.201 20.04.201 20.04.201 20.04.201 5 20.06.201 5 20.06.201 5 20.06.201 5 5 5

71 920 19 18 17 Contarct signed (Date/Value/Currency) ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 20.02.2016 20.06.2015 20.01.2016 20.01.2016 20.01.2016 20.06.2015 20.06.2015 20.06.2015

21 Date of Completion as per contract 22 ------Actual Date of Completion

23 Expenditure incurred to date District Fazilka Circle Ferozepur Div. Fazilka No. Sr. Sr. 2 5 4 1 3 23 12 Chowarian Wali SchemeKerian Scheme Ladhu KoharianWali (Canal Based) (Canal Based) (Canal Based) (Canal Based) (Canal Based) Water Supply Water Supply Water Supply Water Supply Water Supply Dhippan Wali Wala Uttar Name of of Name Scheme Scheme Scheme Scheme App. Cost (In Lacs) (In Planned 290.00 252.00 195.00 242.00 230.00 Admin. Cost/ PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- Package No. 414-II 413-II 412-II 411-II 411-I 415-I 414-I 413-I 412-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual other Works Machinary and Pumping System, OHSR, Distribution Civil Work, including O&M Filtration Unit Continous Sand other Works Machinary and Pumping System, OHSR, Distribution Civil Work, including O&M Filtration Unit Continous Sand other Works Machinary and Pumping System, OHSR, Distribution Civil Work, including O&M Filtration Unit Continous Sand other Works Machinary and Pumping System, OHSR, Distribution Civil Work, other Works Machinary and System, Pumping Distribution OHSR, Work,Civil including O&M Unit Filtration Sand Continous Description of of Description Works 6 0.0NB21/0532/054/7/2015 3/22/2015 2/17/2015 NCB 102.00 6.0NB13/0522/053/30/2015 2/28/2015 1/31/2015 NCB 162.00 3/30/2015 2/28/2015 1/31/2015 NCB 150.00 3/30/2015 2/28/2015 1/31/2015 NCB 197.00 3/30/2015 2/28/2015 1/31/2015 NCB 172.00 00 C /121 /821 3/30/2015 2/28/2015 1/31/2015 NCB 80.00 00 C /121 /821 3/30/2015 2/28/2015 1/31/2015 NCB 80.00 3/30/2015 2/28/2015 1/31/2015 NCB 93.00 3/30/2015 2/28/2015 1/31/2015 NCB 80.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 60.0516.05.2015 16.04.2015 31.05.2015 16.05.2015 16.04.2015 31.05.2015 16.05.2015 16.04.2015 31.05.2015 16.05.2015 16.04.2015 31.05.2015 16.05.2015 16.04.2015 31.05.2015 16.05.2015 16.04.2015 31.05.2015 16.05.2015 16.04.2015 31.05.2015 16.05.2015 16.04.2015 31.05.2015 16.05.2015 16.04.2015

13 Invitation (Date) Bids

14 Open on (Date) 30.05.2015

15 Contract Award decided (Date)

Banks no objection 16 ------contract award (in case of 5 01.06.201 5 01.06.201 5 01.06.201 5 01.06.201 5 01.06.201 5 01.06.201 5 01.06.201 5 01.06.201 5 15.06.201

71 920 19 18 17 Contarct signed (Date/Value/Currency) ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 31.03.2016 15.06.2016

21 Date of Completion as per contract 22 ------Actual Date of Completion

23 Expenditure incurred to date No. Sr. Sr. 10 8 7 9 6 23 12 SchemeAwa Urf Scheme Jhottian Scheme Mandi Sohangarh Urf Scheme Halim Halim Scheme Wariyam Pura (Canal Based) (Canal Based) (Canal Based) Water Supply Water Supply Water Supply (Canal Based) Water Supply Water Supply Amean Ganj Wala Mandi Roran Wali Ratte Wala (Tubewell Name of of Name Scheme Scheme Based) Wali App. Cost (In Lacs) (In Planned 220.00 185.00 265.00 283.00 Admin. 5.0PRWSSIP-FZK-Div- 150.00 Cost/ PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- PRWSSIP-FZK-Div- Package No. 415-II 419-II 418-II 417-II 416-II 420-I 419-I 418-I 417-I 416-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual other Works Machinary and Pumping System, OHSR, Distribution Civil Work, including O&M Filtration Unit Continous Sand other Works Machinary and Pumping System, OHSR, Distribution Civil Work, including O&M Filtration Unit Continous Sand including O&M Filtration Unit Continous Sand other Works Machinary and Pumping System, OHSR, Distribution Civil Work, including O&M Filtration Unit Continous Sand other Works Machinary and System, Pumping Distribution OHSR, Work,Civil including O&M Unit Filtration Sand Continous OHSR, Distribution Description of of Description Systm, Pumping Pumping Systm, Machinary and other Works Civil Work, Tubewell, Works 6 0.0NB21/0532/054/7/2015 3/22/2015 2/17/2015 NCB 105.00 7.0NB0.321 80.0523.04.2015 08.04.2015 01.03.2015 NCB 172.00 23.04.2015 08.04.2015 01.03.2015 NCB 190.00 23.04.2015 08.04.2015 01.03.2015 NCB 127.00 150.00 30 C /721 /221 4/7/2015 3/22/2015 2/17/2015 NCB 93.00 30 C 10.050.421 23.04.2015 08.04.2015 01.03.2015 NCB 93.00 23.04.2015 08.04.2015 01.03.2015 NCB 93.00 23.04.2015 08.04.2015 01.03.2015 NCB 93.00 4/7/2015 3/22/2015 2/17/2015 NCB 80.00

8 7 Estimated cost (Package) (RS lacs) C 10.050.521 23.05.2015 08.05.2015 01.04.2015 NCB Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 20.050.721 17.07.2015 02.07.2015 02.06.2015 17.06.2015 02.06.2015 02.05.2015 17.06.2015 02.06.2015 02.05.2015 17.06.2015 02.06.2015 02.05.2015 17.06.2015 02.06.2015 02.05.2015 17.06.2015 02.06.2015 02.05.2015 17.06.2015 02.06.2015 02.05.2015 16.05.2015 16.04.2015 16.05.2015 16.04.2015 16.05.2015 16.04.2015

13 Invitation (Date) Bids

14 Open on (Date) 30.05.2015 30.05.2015 30.05.2015

15 Contract Award decided (Date)

Banks no objection 16 ------contract award (in case of 5 02.08.201 5 02.07.201 5 02.07.201 5 02.07.201 5 02.07.201 5 02.07.201 5 02.07.201 5 15.06.201 5 15.06.201 5 15.06.201

71 920 19 18 17 Contarct signed (Date/Value/Currency) ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 02.05.2016 02.07.2016 02.07.2016 02.07.2016 02.07.2016 02.07.2016 02.07.2016 15.06.2016 15.06.2016 15.06.2016

21 Date of Completion as per contract 22 ------Actual Date of Completion

23 Expenditure incurred to date Division no. 1,Ferozepur No. Sr. Sr. 16 15 11 14 13 12 Bhamba Singh 2 ia aa5.0PRWSSIP-FZR-Div- 57.10 Wala Nizam 1 23 12 Wala Scheme ArniCh. Improvement of Scheme Gulam Gulam Scheme Scheme Kahne Scheme Wasal Water Supply Water Supply Water Supply Water Supply Water Supply Mabio Hardo Singhe Wala Scheme Ch. SchemeCh. Rasul Wala Small Bore Mohan Ke (Tubewell (Tubewell (Tubewell (Tubewell Name of of Name Sewerge Scheme Dhandi Based) Based) Based) Based) Wala Wala App. Cost (In Lacs) (In Planned 5.01 650.00 Admin. 2.0PRWSSIP-FZK-Div- 125.00 PRWSSIP-FZK-Div- 130.00 4.0PRWSSIP-FZK-Div- 143.00 PRWSSIP-FZK-Div- 165.00 00 PRWSSIP-FZK-Div- 30.00 90 PRWSSIP-FZR-Div- 49.05 Cost/ Package No. IMP-125-I 422-I 421-I 424-I 423-I 426-I 425-I 4

Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual Work and OHSR WorkOHSR and Tubwell, Civil 23.04.2015 08.04.2015 01.03.2015 WorkOHSR and NCB Tubwell, Civil 650.00 Work Civil System Distribution StructureRepair & OHSR, Distribution Systm, Pumping Systm, Pumping Systm, Pumping Description of of Description Machinary and Machinary and Machinary and Systm, Pumping Pumping Systm, Machinary and other Works other Works other Works Distribution Distribution Distribution other Works Civil Work,Civil Work,Civil Work,Civil Civil Work, Tubewell, Tubewell, Tubewell, Tubewell, Works OHSR, OHSR, OHSR, 6 143.00 165.00 125.00 130.00 47.55 55.60 NCB NCB 55.60 NCB 30.00

8 7 Estimated cost (Package) (RS lacs) C 10.050.521 23.05.2015 08.05.2015 01.04.2015 NCB 23.05.2015 08.05.2015 01.04.2015 NCB 23.05.2015 08.05.2015 01.04.2015 NCB 23.05.2015 08.05.2015 01.04.2015 NCB NCB NCB Method of Procurement 50.051.621 30.06.2015 15.06.2015 15.04.2015 20.03.2015 9 - Design Investigatiion Completed (Date) 10.0515.04.2015 31.03.2015 50.0505.06.2015 15.05.2015

10 DSR Sacntioned (Date)

Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 50.052.821 00.05- 30.08.2015 20.08.2015 - 15.07.2015 10.08.2015 27.07.2015 25.06.2015 20.050.621 17.06.2015 02.06.2015 02.05.2015 10.06.2015 25.05.2015 25.04.2015 17.07.2015 02.07.2015 02.06.2015 17.07.2015 02.07.2015 02.06.2015 17.07.2015 02.07.2015 02.06.2015 17.07.2015 02.07.2015 02.06.2015

13 Invitation (Date) Bids

14 Open on (Date)

15 Contract Award decided (Date)

Banks no objection 16 ------contract award (in case of 5 15.09.201 5 25.08.201 5 02.07.201 5 25.06.201 5 02.08.201 5 02.08.201 5 02.08.201 5 02.08.201

71 920 19 18 17 Contarct signed (Date/Value/Currency) 50.06-- - - 15.03.2016 - - 25.02.2016 ------Contract No.

Name of Contractor (in case(in of WBR No. review) prior prior 02.07.2016 31.12.2015 02.05.2016 02.05.2016 02.05.2016 02.05.2016

21 Date of Completion as per contract 22

------Actual Date of Completion

23 Expenditure incurred to date Division .Abohar WSS No.-2, Ferozepur No. Sr. Sr. Lakhmir Ke 3 aso ea156 PRWSSIP-FZR-Div- 115.68 Mansoor Deva 1 Improvement 5 Mubian Ch. 4 aipr201 PRWSSIP-FZR-Div- 210.16 Bazidpur 3 Pir 2 Aug. W/S 2 Aug. W/S 3 1 23 12 Block-Abohar Narain Pura, Ram Pura Supply Scheme Existing Water Bifurcated from Narain Pura Abohar - Pura, Block Scheme Rai hitha Water Supply of Existing Hardo Dhandi Khuian Sarwar Block- Panjawa Schem Scheme Mohhamad Name of of Name Scheme Khai App. Cost (In Lacs) (In Planned 324.37 253.93 241.91 Admin. 16 PRWSSIP-FZR-Div- 11.66 30 PRWSSIP-FZR-Div- 53.05 34 PRWSSIP-FZR-Div- 53.45 70 PRWSSIP-FZR-Div- 97.08 Cost/ PRWSSIP-Abohar- PRWSSIP-Abohar- PRWSSIP-Abohar- PRWSSIP-Abohar- PRWSSIP-Abohar- PRWSSIP-Abohar- Package No. Div-434-II Div-433-II Div-435-II Div-434-I Div-435-I Div-433-I 429-I 427-I 430-I 428-I 432-I 431-I 4

Plan Plan Plan Plan Plan Plan Plan Plan Plan 5 Plan/Actual filter plantfilter having sand Continuous filter plant filter sand Continuous OHSR works & Civil OHSR works & Civil hour60m3 per capacity of plantfilter having sand Continuous hour50m3 per capacity of WorkOHSR and Tubewell, Civil WorkOHSR and Tubewell, Civil WorkOHSR and Tubewell, Civil Work Tubewell &Civil WorkOHSR and Tubwell, Civil WorkOHSR and Tubwell, Civil OHSR works & Civil Description of of Description Works 6 1.6NB 10.05 80.0523.04.2015 18.04.2015 01.03.2015 NCB 210.16 16.04.2015 01.04.2015 01.02.2015 NCB 115.68 3.7NCB 234.37 7.1NB2//0529/5/2015 29/1/2015 NCB 171.91 8.4NCB 183.94 51.55 70 C 0.221 0.421 16.04.2015 01.04.2015 01.02.2015 NCB 97.08 NCB 10.16 NCB 51.95 00 C 9121 29/5/2015 29/1/2015 NCB 70.00 00 NCB 90.00 NCB 70.00

8 7 Estimated cost (Package) (RS lacs) NCB NCB Method of Procurement 1.721 0.821 28.08.2015 05.08.2015 15.07.2015 20.05.2015 1.5.2015 28.2.2015 10.07.2015 25.06.2015 30.04.2015 61/043/321 15/4/2015 31/03/2015 26/12/2014 61/043/321 15/4/2015 31/03/2015 26/12/2014 15/4/2015 31/03/2015 22/12/2014 21/043/321 15/4/2015 31/03/2015 22/12/2014

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date) 15/6/2015 15/6/2015 Preparation/Sanction 11 of bid Document (Date) Review Review Review Review Review Review Review Review Review Review Review Review Post Post Post Post Post Post Post Post Post Post Post Post Post 12 Banks no objection to bid Document (in case 0.521 0.621 17.06.2015 02.06.2015 02.05.2015 10.06.2015 25.05.2015 25.04.2015 10.06.2015 25.05.2015 25.04.2015 19/06/2015 19/06/2015 20/04/2015 20/04/2015 20/04/2015 20/04/2015 20.051.021 51.05- 25.11.2015 10.10.2015 - 12.08.2015 30.07.2015 20.07.2015 - 15.06.2015 15.09.2015 30.08.2015 25.07.2015

13 Invitation (Date) Bids 20/07/2015 20/07/2015 20/05/2015 20/05/2015 20/05/2015 20/05/2015

14 Open on (Date) 00/05- 30/07/2015 - 30/07/2015 - 15/06/2015 - 15/06/2015 - 15/06/2015 - 15/06/2015

15 Contract Award decided (Date)

Banks no objection 16 - - - contract award (in case of 5 16.11.201 5 28.05.201 5 25.09.201 5 02.07.201 5 25.06.201 5 25.06.201 20/8/201 20/8/201 30/06/20 30/06/20 30/06/20 30/06/20 15 15 15 15 71 920 19 18 17 5 5 Contarct signed (Date/Value/Currency) - - - - - 80.06-- - - 28.02.2016 - - - 25.02.205 - - - - 25.03.2016 ------Contract No. ------Name of Contractor (in case(in of WBR No. review) prior prior - 0621 - 20/6/2016 - - 20/6/2016 - - 20/6/2016 - - 20/6/2016 - - 02.07.2016 25.06.2016 25.06.2016 20/8/2016 20/8/2016

21 Date of Completion as per contract 22 ------Actual Date of Completion 23 ------Expenditure incurred to date No. Sr. Sr. Aug. W/S 4 23 12 Note: The Package no. in Procurement Plan of proposed PRWSSI Programme has been generated Manually on excell sheet, which may differ when pkg. no. would be generated through MIS system, but package no. will be uniquely identified. be uniquely no. will but package system, MIS through generated when no.would pkg. be differ which may sheet, excell on Manually generated been has Programme PRWSSI proposed Plan of Procurement no. in Package Note: The Khuian Sarwar Block- Billa Scheme Patti Name of of Name Scheme App. Cost (In Lacs) (In Planned 256.20 Admin. Cost/ PRWSSIP-Abohar- PRWSSIP-Abohar- Package No. Div-436-II Div-436-I 4

Plan 5 Plan/Actual filter plant plant filter sand Continuous OHSR works & Civil Description of of Description Works 6 8.0NB2//0529/5/2015 29/1/2015 NCB 186.20 00 C 9121 29/5/2015 29/1/2015 NCB 70.00

8 7 Estimated cost (Package) (RS lacs)

Method of Procurement

9 Design Investigatiion Completed (Date)

10 DSR Sacntioned (Date) 15/6/2015 15/6/2015 Preparation/Sanction 11 of bid Document (Date) Review Review Post Post Post 12 Banks no objection to bid Document (in case 19/06/2015 19/06/2015

13 Invitation (Date) Bids 20/07/2015 20/07/2015

14 Open on (Date) 00/05- - 30/07/2015 30/07/2015

15 Contract Award decided (Date)

Banks no objection 16 contract award (in case of 20/8/201 20/8/201 71 920 19 18 17 5 5 Contarct signed (Date/Value/Currency)

- - Contract No.

- - Name of Contractor (in case(in of WBR No. review) prior prior - - 20/8/2016 20/8/2016

21 Date of Completion as per contract 22

- - Actual Date of Completion 23

- - Expenditure incurred to date Head Office Goods Procurement Plan for www.pbdwss.gov.in Website: No. Sr. 4 3 2 Proc/HOD/ 1 Plan Package No. Package Plan Proc/Division/ Proc/Division/ Procure-ment Procure-ment Proc/HOD/ Proc/HOD/ Proc/HOD/ Goods/4 Goods/3 Goods/2 Goods/1

Actual Plan Actual Plan Actual Plan Actual Plan Plan/Actual Vehicle (No. of units-15, ofVehicle (No.units-15, Purifier (No. of Units-2, of Units-2, (No. Purifier Vehicle (No. of units-6, ofVehicle (No.units-6, Printers, accessories & Printers, Description of Goods of Description Water and Cooler Computers (PC), Computers (PC), Unit cost-3.00) Unit cost 6.00) Unit cost 6.00) Laptops) 50 NCB 30.7.15 N/A 15.8.15 30.8.15 15.9.15 N/A 18.9.15 18.9.15 N/A 15.9.15 30.8.15 15.8.15 N/A 30.7.15 NCB 50 0NCB/ 90 NCB/ 36

6 NS 15.8.15 N/A 30.8.15 15.9.15 30.9.15 N/A 3.10.15 3.10.15 N/A 30.9.15 15.9.15 30.8.15 N/A 15.8.15 NS 6 Estimated cost (RS Contract Status lacs) DGS&D DGS&D Method of Procurement ..5NA1.81 50.51.01 / 81.6- -- 01.6- -- -- 30.10.16 ------30.10.16 -- -- 18.10.16 N/A -- 15.10.16 15.09.15 -- 15.08.15 18.10.16 N/A N/A 1.7.15 15.10.16 15.09.15 15.08.15 N/A 1.7.15

Preparation of bid Punjab andSanitation, Supply Water Department of Document/ RFQ (Date)

Banks no objection to bid Document (in case

Invitation (Date) Bids 'All' Open on (Date)

Contract Award decided (Date)

Banks no objection contract award (in case of (50/ INR) (50/ (6/INR) Supply order issued (Value/Currency) -- -31.5- -- -- 3.11.15 ------1.01 --- -- 18.10.15 ------Supply order No. & Date

Name of Supplier/Contractor (in case of of case (in WBR No. WBR review) prior

Date of Completion as per contract Procurement report Procurement

Actual Date of Completion

Expenditure incurred to date Department of Water Supply & Sanitation, Punjab

Procurement Plan For Consultancy Contract Status: Last date of Receipt of RFP Sr. Package Proposal WBR Description of Services Issued

No. No. Lacs) (Technical/ No. (Date) (Date) (Date)

(Date) Name of

Financial/ Value(Lac) Plan/Actual Expenditure Expenditure listing (Date) Bank to NOC Bank to NOC TOR Finalised TOR Services to be to Services Contract Award Award Contract Combined) date to incurred Completed (Date) Completed Bank's (Date) NOC Contract Numbers, Numbers, Contract Bank's to NOC RFP Estimated Cost (RS (RS Cost Estimated Method of Selection Consultant/Nationali Advertising for short (Technical) Proposal (Date) ty & Zip Code. If USA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

PRWSS-C- Preparation of DSR of Water 31-10- 15-01- 1 SPMC-3168- P 250.00 QCBS 01-10-2014 8-10-2014 18-11-2014 26-12-2014 N/A N/A 20-01-2017 N/A 0 Supply scheme in PRWSS-II 2014 2015 1

AAR VEE Associats PRWSS-C- Preparation of DSR of Water 31-10- 16.01.20 Architects Engr. & 2 SPMC-3168- A SUpply Schemes for PRWSS- 250.00 QCBS 31-10-2014 7-10-2014 21.11.2014 29.12.2014 14.02.2015 INR 3,95,80,500 03.03.2017 2014 15 Consultants Pvt. Ltd. 1 II Hyderabad

PRWSS-C- Enhancement of existing MIS 26-12- 22-01- 3 SPMC-3172- P of DWSS with development of 385.00 QCBS 01-12-2014 6-12-2014 29-12-2014 15-01-2015 N/A N/A 30-10-2020 N/A 0 2014 2015 1 new mobile based module

PRWSS-C- Enhancement of existing MIS 4 SPMC-3172- A of DWSS with development of 375.00 QCBS 30-10-2014 13-12-2014 1 new mobile based module

PRWSS-C- Consultancy services for 5 SPMC-3172- P 20.00 SSS 16.02.2015 N/A N/A 18.02.2015 N/A N/A 22.02.2015 M/s Deliotte 1.03.2015 Project Preparation support 1

PRWSS-C- Consultancy services for 6 SPMC-3172- A 20.00 SSS Project Preparation support 2