World Bank Document

World Bank Document

Department of Water Supply and Sanitation, Punjab Website: www.pbdwss.gov.in PRWSSIP Procurement report Procurement Plan for Works Contract Status 'All' Package No. Planned Bids WBR No. Cost/ Sr. Name of Description of (in case of Admin. No. Scheme prior (Date) Works (Date) to date Estimated cost App. Cost case of Method of review) Completion per contract Contract No. (In Lacs) Procurement Plan/Actual Actual Date of decided (Date) Contract Award Contarct signed DSR Sacntioned (Package) (RS lacs) of bid Document Completed (Date) Completed contract award (in (Date) (Date) Banks no objection no Banks Name of Contractor Open on Design InvestigatiionDesign Preparation/Sanction Expenditure incurred Invitation Banks no objection no to Banks (Date/Value/Currency) Date ofCompletion as bid Document (inbid Document case Public Disclosure Authorized 12 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 South Zone Circle : Patiala Distt : Patiala Water Supply Division No. 1, Patiala PRWSSIP-Pla-Div-1-I 37.50 Post T/W and Civil Work NCB 31.12.14 31.1.15 10.2.15 20.2.15 21.3.15 5.4.15 - - - - - 9.9.15 - - Plan Review 1 Bhore 51.50 PRWSSIP-Pla-Div-1- 14.00 Post OHSR NCB 31.12.14 31.1.15 10.2.15 20.2.15 21.3.15 5.4.15 - - - - - 9.9.15 - - II Plan Review PRWSSIP-Pla-Div-2-I 34.50 Post T/W and Civil Work NCB 31.12.14 31.1.15 10.2.15 20.2.15 21.3.15 5.4.15 - - - - - 9.9.15 - - Plan Review 2 Achal 48.5 PRWSSIP-Pla-Div-2- 14.00 Post OHSR NCB 31.12.14 31.1.15 10.2.15 20.2.15 21.3.15 5.4.15 - - - - - 9.9.15 - - Plan Review Public Disclosure Authorized II Division No. 2, Patiala PRWSSIP-Pla-Div-3-I Providing water 56.47 Chak Post 1 56.47 supply chak NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Amaritsarian Plan Review Amaritsarian PRWSSIP-Pla-Div-4-I 47.54 Post 2 Balamgarh 47.54 Providing water NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Plan Review supply Balamgarh PRWSSIP-Pla-Div-5-I Providing water 60.87 Post 3 Dhamo Majra 60.87 supply Dhamo NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Plan Review Majra PRWSSIP-Pla-Div-6-I 80.80 Post 4 Asamanpur 80.80 Providing water NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Plan Review supply Asamanpur PRWSSIP-Pla-Div-7-I 32.18 Public Disclosure Authorized Post 5 Dharamgarh 32.18 Providing water NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Plan Review supply Dharamgarh PRWSSIP-Pla-Div-8-I Providing water 60.13 Post 6 Dudhan Gujra 60.13 supply Dudhan NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Plan Review Gurjra PRWSSIP-Pla-Div-9-I Providing water 73.45 Post 7 Khatouli 73.45 supply Dudhan NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Plan Review Khatouli Public Disclosure Authorized Package No. Planned Bids WBR No. Cost/ Sr. Name of Description of (in case of Admin. No. Scheme prior (Date) Works (Date) to date case of App. Cost Estimated cost Method of review) Completion per contract Contract No. (In Lacs) Procurement Plan/Actual Actual Date of decided (Date) Contract Award Contarct signed DSR Sacntioned (Package) (RS lacs) of bid Document Completed (Date) Completed contract award (in (Date) (Date) Banks no objection no Banks Name of Contractor Open on Design InvestigatiionDesign Preparation/Sanction Expenditure incurred Banks no objection no to Banks (Date/Value/Currency) Invitation Date ofCompletion as bid Document (inbid Document case 12 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Devi Nagar Urf PRWSSIP-Pla-Div-10- Providing water 76.00 Post 8 Swai singh 76.00 I supplyDevi Nagar NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - Plan Review wala Urf Swai Singh wala PRWSSIP-Pla-Div-11- Providing water 47.46 Post 9 Dughat 47.46 NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - I Plan supply Dughat Review PRWSSIP-Pla-Div-12- Providing water 72.48 Post 10 Rongla 72.48 NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - - - - - 31.07.16 - - I Plan supply Rongla Review Division, Rajpura PRWSSIP-Pla- 55.00 T/Well, OHSR, Post 1 Jhansla 55.00 Rajpura-Div-13-I NCB Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.12.15 -- Plan Distribution etc. Review PRWSSIP-Pla- 45.00 T/Well, OHSR, Post 2 Salempur Nagal 45.00 Rajpura-Div-14-I NCB Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.12.15 -- Plan Distribution etc. Review PRWSSIP-Pla- T/Well, OHSR, 45.00 Post 3 Kohle Majra 45.00 NCB Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.12.15 -- Rajpura-Div-15-I Plan Distribution etc. Review PRWSSIP-Pla- T/Well, OHSR, 48.00 Post 4 Mehdudan 48.00 NCB Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.12.15 -- Rajpura-Div-16-I Plan Distribution etc. Review Performance Imporvement Schemes Division No. 1, Patiala PRWSSIP-Pla-Div- Repair of Water Kakrala (Improvement) / Post 1 IMP-1-I works and 5.00 N.S. 31.12.14 1.1.15 10.2.15 20.2.15 2.3.15 10.3.15 N.A. 18.3.15 - - - 9.6.15 - - 5.00 Plan Review Distribution Division No. 2, Patiala PRWSSIP-Pla-Div- Performance 8.25 Post 1 Khaspur 8.25 NS 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - 8.8.15 - - - 31.07.16 - - IMP-2-I Plan Improvemen Review Mehma PRWSSIP-Pla-Div- Performance 7.92 Post 2 7.92 NS 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - 8.8.15 - - - 31.07.16 - - Walian IMP-3-I Plan Improvemen Review PRWSSIP-Pla-Div- Performance 6.42 Post 3 Majri Akalian 6.42 NS 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - 8.8.15 - - - 31.07.16 - - IMP-4-I Plan Improvemen Review PRWSSIP-Pla-Div- Performance 15.53 Post 4 Gajipur 15.53 NCB 28.02.15 30.04.15 01.06.15 16.06.15 16.07.15 31.07.15 - 8.8.15 - - - 31.07.16 - - IMP-5-I Plan Improvemen Review Division, Rajpura PRWSSIP-Pla- 4.91 Pumping Machinery, Post 1 Lehlan 4.91 Rajpura-Div-IMP-6-I NS Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 Plan Dev. Of w/works Review PRWSSIP-Pla- 4.69 Pumping Machinery, Post 2 Matheran 4.69 Rajpura-Div-IMP-7-I NS Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 Plan Dev. Of w/works Review Package No. Planned Bids WBR No. Cost/ Sr. Name of Description of (in case of Admin. No. Scheme prior (Date) Works (Date) to date case of App. Cost Estimated cost Method of review) Completion per contract Contract No. (In Lacs) Procurement Plan/Actual Actual Date of decided (Date) Contract Award Contarct signed DSR Sacntioned (Package) (RS lacs) of bid Document Completed (Date) Completed contract award (in (Date) (Date) Banks no objection no Banks Name of Contractor Open on Design InvestigatiionDesign Preparation/Sanction Expenditure incurred Banks no objection no to Banks (Date/Value/Currency) Invitation Date ofCompletion as bid Document (inbid Document case 12 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PRWSSIP-Pla- 4.85 Pumping Machinery, Post 3 Jalalpur 4.85 Rajpura-Div-IMP-8-I NS Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 Plan Dev. Of w/works Review PRWSSIP-Pla- 4.98 Pumping Machinery, Post 4 Ajrour 4.98 Rajpura-Div-IMP-9-I NS Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 Plan Dev. Of w/works Review PRWSSIP-Pla- 4.89 Pumping Machinery, Post 5 Khaspur 4.89 Rajpura-Div-IMP-10- NS Dec-14 28.02.14 15.03.14 15.04.15 14.05.15 30.05.15 -- 10.06.15 -- -- -- 09.07.15 Plan Dev.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    71 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us