Company Profile

Total Page:16

File Type:pdf, Size:1020Kb

Company Profile COMPANY PROFILE COMPANY PROFILE ENERGOPROJEKT Energoprojekt was founded in 1951 in Belgrade, Projects successfully completed by Energoprojekt as a design and consulting company in the fields are the best recommendation for acquisition of new of energy and water management. projects. As a reliable partner with extensive international experience, Energoprojekt has established successful Since its foundation, this company has developed into cooperation with local and foreign partners in a complex business system, comprising 10 companies implementation of large-scale developments. This is in Serbia and of 20 wholly owned or mixed-ownership why Energoprojekt has been ranked by Engineering companies abroad performing their business activities News Record among top 200 international design firms in over 20 countries all over the world, on four and top 225 international contractors in the world. continents, in Africa, Asia, Europe and South America. During sixty years of its existence, Energoprojekt has Creative force of Energoprojekt consists of 2,300 become a leading contracting company in the employees. Professionalism, experience and knowledge Southeast Europe, offering a wide range of services of 1,000 engineers specializing in various fields and in the fields of electric power generation, transmission other highly specialised professionals have led to and distribution, urban planning, building construction, Energoprojekt becoming and remaining a strong and infrastructure, water management, environmental reliable company among the world’s best. protection, industry and information technologies. During the last sixty years, ENERGOPROJEKT GROUP has designed and implemented complex Over the course of its long and successful history, projects in more than 70 companies throughout the Energoprojekt has developed and expanded its main world in the following fields: activities and today they include: preparation of studies and analyses; research and development; consulting - energy management: 50 hydroelectric power plants, and engineering; design; construction; procurement, 34 thermal power plants, 15 combined heat and power delivery, erection and commissioning of technical plants, 20 heating plants and 34 district heating and process equipment; project management as well systems, more than 200 substations, several thousand as turnkey project implementation. kilometres of transmission lines and cable networks, more than 50 projects of rural electrification. Energoprojekt is an efficient and creative partner that successfully combines technical and process engineering - water management: 15 water treatment plants, 40 knowledge, understanding of the characteristics complex irrigation systems, more than 30 projects of of local markets, on the one side and extensive water and river basin management, approx. 50 international experience on the other side. regional and industrial water supply and sewerage All of this constitutes a solid foundation for a wide and systems. comprehensive range of design and consultancy, contracting and engineering services rendered by - infrastructure: large number of underground Energoprojekt to its clients in the following types of structures, tunnels, roads, runways etc. projects: - industry: around 200 of designed and almost 70 • Hydroelectric and thermal power plants, constructed industrial plants, • Potable and waste water treatment plants, • Transmission lines, substations, distribution systems, - building construction: 10 conference centres, • Heating substations, heating plants and gas several hundred residential buildings, hospitals, pipelines, administrative buildings, primary health centres, tourist • Dams, water flow control systems, and sports facilities. • Tunnels, roads, • Residential, office, industrial and public buildings, • Factories and production plants. 2 Under the conditions of constantly growing of implemented projects and clients in Serbia and abroad competition, synergy of knowledge, business competence constitutes the main advantage of Energoprojekt and experience supported by an impressive list Group and a key to its success. ORGANIZATIONAL CHART ENERGOPROJEKT VISOKOGRADNJA Energoprojekt ENERGOPROJEKT Hidroinzenjering HOLDING - Encom GmbH Germany Energoprojekt - INEC Engineering Co. Ltd. United Kingdom Urbanizam i arhitektura - ZAHINOS Ltd. Cyprus - Energoprojekt Representative Office Russia - Energoprojekt Representative Office Kazakhstan - Energoprojekt-Montenegro d.o.o. Montenegro - Energodata-Montenegro d.o.o. Montenegro Energoprojekt - ENHISA S.A. Peru Entel - ENL1SA S.A. Peru - Energoprojekt Entel Oman L.L.C. Oman - Energoprojekt Entel L.L.C. Qatar Energoplast - Energo Consult L.L.C. Abu Dhabi Energoprojekt - ECO MEP Technology Dubai Industrija - Energo Nigeria Ltd. Nigeria - ZECCO Ltd. Zambia Energopet - Energo Uganda Co. Ltd. Uganda - Energoprojekt Holding Guinee SA Guinea - Energo Private Ltd. Zimbabwe Energoprojekt - Energoprojekt Ghana Ltd. Ghana Visokogradnja - United Consulting Co. Botswana Enjub - Nana off Shore Lebanon Companies in which Companies, representative & branch offices in the world Energoprojekt The companies from Niskogradnja Energoprojekt Group have significant ownership . Energoprojekt Oprema Energoprojekt Energodata Energoprojekt Garant Subsidiaries in which Energoprojekt Holding has majority ownership www.energoprojekt.rs 3 ENERGOPROJEKT VISOKOGRADNJA Energoprojekt Visokogradnja is the largest company Knowing that the conditions of modern international within Energoprojekt Group and performs its activities market demand the best professionals, our goal is to in the spirit of the finest traditions of Energoprojekt expand our business and professional rating through Group based on the extensive experience acquired continuous professional development of our employees in the course of six decades of existence and through permanent training program. performance of business activities around the world. Some of the principal fields of activity of Energoprojekt We have more than 800 employees of various profiles: Visokogradnja constitute the basis of its development engineers, architects, technicians and workers with policy: extensive experience in building construction in the • Turn-key projects; home country and abroad. • Building design and construction; • Structural, finishing, hydro-technical and other similar Energoprojekt Visokogradnja is a reliable partner with works as well as reconstruction, refurbishing, upgrad- international experience that has adjusted its activities ing and extension of structures; to market conditions. Following the principals of • Feasibility studies and programs; socially responsible activities and sustainable • Survey and soil investigation; development, Energoprojekt Visokogradnja renders • Interior design and fit-out; quality services to its clients and business partners, • Erection and dismantling, services, maintenance co-operators and society where it performs its activities. and rehabilitation of industrial plants; • Project managment in buiding construction; Energoprojekt Visokogradnja has access to all • Engineering in building construction; resources of Energoprojekt Holding, manufacturers • Construction supervision; and financial institutions, all of which we bring together • Construction consulting services, to form an unbeatable combination of skills and • Maintenance and rehabilitation of completed experience. structures; • Training of Client’s personnel, transfer of know-how, expertise. WE BUILD A BETTER WORLD FOR YOU! 4 ORGANIZATIONAL CHART ENERGOPROJEKT VISOKOGRADNJA GENERAL ASSEMBLY BOARD OF DIRECTORS NON-EXECUTIVE DIRECTORS INTERNAL DIRECTORS’ COLLEGIUM MANAGING DIRECTOR CONTROL (EXECUTIVE DIRECTOR) TECHNICAL DIRECTOR DIRECTOR OF DIRECTOR COMPANY SECRETARY PROJECT FOR PLANNING AND ECONOMIC EXPERT COMMITTEE IMPLEMENTATION AFFAIRS DEPARTMENT OF QUALITY DEPARTMENT MANAGEMENT AND OF HUMAN INFORMATION RESOURCES SYSTEMS PROJECT MANAGERS HEADS OF SUBSIDIARIES CONSTRUCTION CONSTRUCTION SITES SITES ABROAD IN SERBIA Site - i Site - z TENDERING, STRUCTURAL FINISHING UTILITIES CONSTRUCTION ADMINISTRATIVE MARKETING INVESTMENT PROJECT FINANCE PROCUREMENT WORKS WORKS DIVISION DIVISION EQUIPMENT DIVISION DIVISION AND PLANNING DIVISION DIVISION DIVISION DIVISION DEVELOPMENT AND DIVISION MANAGEMENT DIVISION www.energovg.rs 5 INTEGRATED MANAGEMENT SYSTEM 6 LICENCES FOR DESIGN AND CONSTRUCTION TERRITORY OF RUSSIAN FEDERATION TERRITORY OF KAZAKHSTAN 7 HEAD OFFICE Energoprojekt Visokogradnja a.d. 12, Mihailo Pupin Boulevard 11070 Belgrade, Serbia Tel: +3811 310 15 02, 310 15 06 Fax: +3811 311 51 87 E-mail: [email protected] www.energovg.rs SUBSIDIARIES, BRANCH OFFICES & REPRESENTATIVE OFFICES Representative Office in Moscow, RF Branch Office in Aktau, Kazakhstan 107045 Moscow, 130000 Aktau, 12, B. Golovin per. 23th microdistrict, Kaskor SMU Shopping Centre, 2nd floor Phone/Fax: +7 495 669 75 37, 669 75 38 Phone/Fax: +7 7292 200-757, 200-756, 203-370, 203-372 E-mail: [email protected] E-mail: [email protected] Branch Office in Rostov-on-Don, Kirovsky District, Branch Office in Almaty, Kazakhstan Rostov Region, RF 050000 Almaty, 344022 Rostov-on-Don, 115, Zheltoksan Street, Office 254 115, Bolshaya sadovaya street Phone +7 (727) 250 81 82 VII floor, Office 808 Fax: +7 (727) 250 23 96 Phone: +7 (863) 263 80 72 E-mail: [email protected] +7 (863) 263 80 94 Е-mail: [email protected] Energoprojekt Ghana LTD, Accra, Ghana PMB CCC2 Cantonments, Accra, Ghana Branch Office in Syktyvkar, No. 98 Spintex Road Komi Republic,
Recommended publications
  • Dobri Rezultati Javnih Preduzeća
    2008 - 2015 2008 - 2015 SADRŽAJ str 6. PROF. DR ZORAN JEREMIĆ, autor istraživanja Najveći i najprofitabilniji u periodu 2008-2015. godine str 28. NEBOJŠA SAVIĆ Rast srpske privrede treba dalje ubrzavati str 30 . JORGOVANKA TABAKOVIĆ Niska inflacija i sledeće godine str 32. ZORANA MIHAJLOVIĆ Sledeća godina biće godina infrastrukture str 34. ANA BRNABIĆ Razvoj eUprave jedan od prioriteta str 36. GORAN KNEŽEVIĆ Dobri rezultati javnih preduzeća str 38. MIHAILO CRNOBRNJA Javna preduzeća su najveća boljka naše privrede NAZIV IZDANJA: 100 najvećih 100 najboljih str 40. DUBRAVKA NEGRE EIB Strukturne reforme od najveće važnosti UREDNIK Biljana Stepanović str 42. DANIEL BERG EBRD Treba osnažiti poverenje investitora AUTOR RANGOVA I ANALIZA PODATAKA Zoran Jeremić str 44. MILOJKO ARSIĆ Na osnovu podataka APR-a i Uprave carina Srbije Treba podsticati rast investicija i izvoza NOVINAR str 46. DEJAN ERIĆ Miloš Obradović Stalno počinjemo iz početka str 48. RONALD ZELIGER UREDNIK FOTOGRAFIJE Izazovi mogu biti i pozitivni Dragan Milošević str 50. DRAGAN FILIPOVIĆ DIZAJN Treba preuzeti odgovornost za zdravlje, život i imovinu Jovana Bogdanović str 52. ERNST BODE LEKTURA I KOREKTURA I dalje verujem u Srbiju Mirjana Radaković str 54. VLADIMIR ČUPIĆ MARKETING Čeka nas dobra godina Dušanka Ćetković, Nevena Prokić str 56. ZORAN BLAGOJEVIĆ ŠTAMPA Potrebna je bolja promocija osiguranja Štamparija Caligraph str 58. ZORAN DALJEVIĆ Treba ulagati u tradicionalne proizvode IZDAVAČ Business Info Group, str 62. DRAGICA MIHAJLOVIĆ Bulevar despota Stefana 12 Beograd pozitivni pomaci na bankarskom tržištu www.big.co.rs www.novaekonomija.rs tel +381 11 2258 891 str 64. MARINOS VATIS Sva prava rezerevisana Banke su opreznije u kreditnoj aktivnosti Najvećih 100 po prosečnim poslovnim prihodima u periodu 2008-2015.
    [Show full text]
  • NEDELJNI IZVEŠTAJ BROKERSKO-DILERSKO DRUŠTVO ČLAN BEOGRADSKE BERZE AD BEOGRAD ČLAN CENTRALNOG REGISTRA, DEPOA I KLIRINGA Hov Od 30
    INTERCITY BROKER A.D. NEDELJNI IZVEŠTAJ BROKERSKO-DILERSKO DRUŠTVO ČLAN BEOGRADSKE BERZE AD BEOGRAD ČLAN CENTRALNOG REGISTRA, DEPOA I KLIRINGA HoV Od 30. Avgusta do 03. Maksima Gorkog 52, Beograd, Srbija Tel: +381 (11) 3083-100, 3087-862; Fax: +381 (11) 3083-150 Septembra 2010. godine e-mail: [email protected]; www.icbbg.rs Septembra 2010. godine Intercity broker je u saradnji sa IT stručnjacima Međunarodnog centra, po prvi put u Srbiji pustio u rad potpuno automatizovan ONLINE sistem trgovanja na Beogradskoj berzi Dugo očekivani izlazak Naftne industrije Promena vrednosti regionalnih berzanskih indeksa - 30 dana (u%) Srbije na Beogradsku berzu Sa nestrpljenjem iščekivani početak trgovanja akcijama Naftne (%) industrije Srbije obeležio je proteklu nedelju na Beogradskoj berzi. 4 Početni dani trgovanja na ovoj akciji pokazali su zrelost domaćih investitora, ali i odsustvo interesovanja investitora iz inostranstva. Usled velike količine akcija na strani prodaje, domaći investitori su 3 pokazali odmerenost i nije ni prvih dana došlo do većeg rasta cene, naprotiv – ulagači su uzdržani i došlo je i do pada cene ispod 2 početnog nivoa. Prvog i drugog dana trgovanja zabeleženi su prilično veliki obimi trgovanja, narednih dana je već postalo jasno da je dosta 1 ljudi odlučno da proda ove akcije po početnoj ceni i ispod nje, pa je interesovanje za kupovinu značajno opalo u iščekivanju još niže cene. Nedelja za nama, ostaće upamćena i po konačno održanoj 0 Skupštini akcionara kompanije Energoprojekt holding, čije ćemo 04.avg 10.avg 16.avg 22.avg 28.avg 03.sep odjeke tek videti u narednim danima. Posle dužeg vremena, u -1 značajnom obimu se ove nedelje trgovalo akcijama kompanije Informatika, čija je cena na nedeljnom nivou u padu 7,43%, dok su -2 nakon prošlonedeljnog rasta cene akcije Jubmes banke u nedeljnom padu od 9,21%.
    [Show full text]
  • Voluntary Pension Funds Sector in Serbia
    Supervision of Voluntary Pension Fund Management Companies VOLUNTARY PENSION FUNDS SECTOR IN SERBIA Second Quarter Report 2008 July 2008 Supervision of Voluntary Pension Fund Management Companies CONTENTS 1. INTRODUCTION......................................................................................................... 3 2. MANAGEMENT COMPANIES ................................................................................... 4 Market participants................................................................................................... 4 Ownership structure of management companies................................................. 5 Organizational network of management companies ............................................ 5 Fees charged by companies ................................................................................... 6 Transaction costs..................................................................................................... 7 3. VOLUNTARY PENSION FUNDS ............................................................................... 7 Net assets of voluntary pension funds .................................................................. 7 Composition of assets of voluntary pension funds.............................................. 9 Stock exchange trading by pension funds ..........................................................10 Number and structure users of VPF services .....................................................11 Contribution payments, disbursements and transfers among funds...............16
    [Show full text]
  • Energoprojekt Holding Plc. Semi-Annual Consolidated Report for 2018
    Energoprojekt Holding Plc. Semi-Annual Consolidated Report for 2018 Belgrade, August 2018 Pursuant to Article 53 of the Law on Capital Market (RS Official Gazette, No. 31/2011, 112/2015 and 108/2016) and pursuant to Article 5 of the Rulebook on the Content, Form and Method of Publication of Annual, Semi-Annual and Quarterly Reports of Public Companies (RS Official Gazette, No. 14/2012, 5/2015 and 24/2017), Energoprojekt Holding Plc. from Belgrade, registration No.: 07023014 hereby publishes the following: ENERGOPROJEKT HOLDING PLC. SEMI-ANNUAL CONSOLIDATED REPORT FOR 2018 C O N T E N T S 1. SEMI-ANNUAL CONSOLIDATED FINANCIAL STATEMENTS OF THE ENERGOPROJEKT HOLDING PLC. FOR 2018 (Balance Sheet, Income Statement, Report on Other Income, Cash Flow Statement, Statement of Changes in Equity, Notes to Financial Statements) 2. BUSINESS REPORT (Note: Business Report and Consolidated Business Report are presented as one report, containig information of significance for the economic overview) 3. STATEMENT BY PERSONS RESPONSIBLE FOR PREPARATION OF REPORT 4. DECISION OF COMPETENT CORPORATE BODY TO ADOPT THE SEMI- ANNUAL CONSOLIDATED REPORT OF THE ENERGOPROJEKT HOLDING PLC. FOR 2018 * (Note) 1. SEMI-ANNUAL CONSOLIDATED FINANCIAL STATEMENTS OF ENERGOPROJEKT HOLDING PLC. FOR 2018 (Balance Sheet, Income Statement, Report on Other Income, Cash Flow Statement, Statement on Changes in Equity, Notes to Financial Statements) BALANCE SHEET at day 30.06.2018. RSD thousand Total DESCRIPTION EDP End of quarter 31.12. previous year current year 1 2 3 4 ASSETS A. SUBSCRIBED CAPITAL UNPAID 0001 B. NON-CURRENT ASSETS (0003+0010+0019+0024+0034) 0002 16,264,880 16,674,525 I.
    [Show full text]
  • Mesečni Izveštaj / Monthly Report Jun 2020. Indeksi / Indices
    MESEČNI PROMET / MONTHLY TURNOVER Promet RSD / Promena % / Promet EUR / Promena % / Broj transakcija / TRŽIŠNI SEGMENT / MARKET SEGMENT Turnover RSD % Change (RSD)* Turnover EUR % Change (EUR)* No of Transactions PRIME LISTING-akcije 42,465,151 -32.18% 361,132 -32.18% 1,364 PRIME LISTING-obveznice Republike Srbije 1,085,087,349 -62.57% 9,227,925 -62.57% 9 STANDARD LISTING-akcije 156,724,559 +16.64% 1,332,866 +16.65% 96 OPEN MARKET—akcije 61,939,404 +14.22% 526,746 +14.23% 199 MTP—akcije 18,295,881 +505.44% 155,601 +505.48% 194 * mesečna promena / * monthly change Promet RSD / Promena % / Promet EUR / Promena % / Broj transakcija / METODE TRGOVANJA / TRADING METHODS Turnover RSD % Change (RSD)* Turnover EUR % Change (EUR)* No of Transactions Kontinuirano trgovanje / Continuous trading method 1,359,171,445 -56.89% 11,558,844 -56.89% 1,859 Blok trgovanja / Block trading 5,340,899 +100.00% 45,426 +100.00% 3 Ukupno / Total 1,364,512,344 -56.73% 11,604,270 -56.72% 1,862 * mesečna promena / * monthly change Učešće u ukupnom Učešće u ukupnom broju Učešće u prometu Učešće u broju transakcija STRUKTURA TRGOVANJA / prometu / Total transakcija / Total No. Of akcijama / Turnover - akcijama / No of Trades - TRADING STRUCTURE Turnover Trades Shares Shares Regulisano tržište / Regulated Market 98.66% 89.58% 93.45% 89.53% MTP 1.34% 10.42% 6.55% 10.47% METODE TRGOVANJA / TRADING METHODS Kontinuirano trgovanje / Continuous trading 99.61% 99.84% 98.09% 99.84% Blok trgovanja / Block trading 0.39% 0.16% 1.91% 0.16% VRSTE HOV / SECURITY TYPE Akcije / Shares 20.48% 99.52% - - Obveznice Republike Srbije / RS Bonds 79.52% 0.48% - - Korporativne obveznice / Corporate Bonds 0.00% 0.00% - - INDEKSI / INDICES BELEX15 18.41% 83.73% 89.90% 84.13% BELEXline 19.03% 87.54% 92.92% 87.97% PROMET U PRETHODNIH 12 MESECI / TURNOVER IN PREVIOUS 12 MONTHS Regulisano / Regulated Br.
    [Show full text]
  • 10 Dana / 10 Days 10 Dana / 10 Days DEVIZNO TRŽIŠTE / FX MARKET
    Datum/Date: Erste bank a.d. Novi Sad 4.mar.19 VESTI / NEWS ► SREDNJI KURS EUR/RSD : Dinar ojačao u odnosu na evro za 0,0657 dinara, srednji kurs 118,0634. Obim međubankarske trgovine evrom na dan 1. mart do 12:30h iznosio je 7,1 miliona evra. NBS nije intervenisala na međubankarskom tržištu (od početka godine ukupno prodala 130 miliona evra i kupila 30 miliona evra). ► BEOGRADSKA BERZA: Indeksi zabeležili rast vrednosti, BELEX15 viši za 0,18 odsto, BELEXline za 0,33 odsto. Promet manji u odnosu na prethodni dan, na regulisanom tržištu najviše trgovano akcijama Valjaonice bakra Sevojno, NIS-a, Energoprojekta, Jednistva Sevojno i Philip Morris Operationsa. ► INFLACIJA : Prema podacima Republičkog zavoda za statistiku međugodišnja inflacija merena indeksom potrošačkih cena u januaru je iznosila 2 ,1 odsto dok su u odnosu na prethodni mesec cene u proseku više za 0,4 odsto. ► RZS: Realni rast bruto domaćeg proizvoda (BDP) u četvrtom kvartalu 2018.godine u odnosu na isti period prošle godine iznosio je 3,4 odsto (fleš ocena) . DEVIZNO TRŽIŠTE / FX MARKET EUR / RSD (Srednji kurs / Official Middle Rate ) ► 10 dana / 10 days 119,00 118,90 118,80 118,70 118,60 118,50 118,40 118,30 118,2158 118,2437 118,1918 118,1836 118,1291 118,20 118,1396 118,1516 118,1291 118,0594 118,10 118,0471 118,00 19.feb 20.feb 21.feb 22.feb 25.feb 26.feb 27.feb 28.feb 01.mar 04.mar Izvor/Source: NBS EUR / RSD (Srednji kurs/ Official middle rate ) ► Jan - …. 125,00 123,00 121,00 119,00 117,00 115,00 113,00 111,00 109,00 2012 2013 2014 2015 107,00 105,00 2016 2017 2018
    [Show full text]
  • Preference Based Portfolio for Private Investors: Discrete Choice Analysis Approach
    mathematics Article Preference Based Portfolio for Private Investors: Discrete Choice Analysis Approach Marija Kuzmanovic 1,* , Dragana Makajic-Nikolic 1 and Nebojsa Nikolic 2 1 Department of Operations Research and Statistics, Faculty of Organizational Sciences, University of Belgrade, 11000 Belgrade, Serbia; [email protected] 2 Department of Mathematics, Faculty of Organizational Sciences, University of Belgrade, 11000 Belgrade, Serbia; [email protected] * Correspondence: [email protected] Received: 29 November 2019; Accepted: 16 December 2019; Published: 24 December 2019 Abstract: Behavioral finance literature shows that in addition to Markowitz’s rate of return and risk, private investors consider various other stock features. This paper discusses the problem of determining investors’ preferences for portfolio selection criteria, as well as the problem of optimal portfolio determination from the investors’ point of view. The study primarily focuses on private investors who are interested in one-time investments rather than stock trading. We use a discrete choice analysis and hierarchical Bayes method to measure individual investors’ preferences, and a logit model to determine individual shares of preferences. We treat the share of preferences as the share of certain stocks in an optimal portfolio. The proposed methodology is illustrated by the example of companies whose stocks are traded on the Belgrade Stock Exchange. We measure respondents’ preferences for companies, preferences for return rates, riskiness of stocks, and dividend rates. The results of comparing the performance of the resulting portfolio with the efficient frontier obtained using Markowitz’s portfolio theory indicate its high efficiency, thus validating the proposed approach.
    [Show full text]
  • Energoprojekt Holding Plc. Quarterly Report for Q1 2020
    Energoprojekt Holding Plc. Quarterly Report for Q1 2020 Belgrade, May 2020 Pursuant to Article 53 of the Law on Capital Market (RS Official Gazette, No. 31/2011, 112/2015 and 108/2016) and pursuant to Article 5 of the Rulebook on the Content, Form and Method of Publication of Annual, Semi-Annual and Quarterly Reports of Public Companies (RS Official Gazette, No. 14/2012, 5/2015 and 24/2017), Energoprojekt Holding Plc. from Belgrade, registration No.: 07023014 hereby publishes the following: QUARTERLY REPORT FOR Q1 2020 C O N T E N T S 1. FINANCIAL STATEMENTS OF THE ENERGOPROJEKT HOLDING PLC. FOR Q1 2020 (Balance Sheet, Income Statement, Report on Other Income, Cash Flow Statement, Statement of Changes in Equity, Notes to Financial Statements) 2. BUSINESS REPORT 3. STATEMENT BY PERSONS RESPONSIBLE FOR PREPARATION OF REPORT 4. DECISION OF COMPETENT CORPORATE BODY TO ADOPT THE Q1 2020 QUARTERLY REPORT * (Note) 1. FINANCIAL STATEMENTS OF ENERGOPROJEKT HOLDING PLC. FOR Q1 2020 (Balance Sheet, Income Statement, Report on Other Income, Cash Flow Statement, Statement on Changes in Equity, Notes to Financial Statements) BALANCE SHEET at day 31.03.2020. RSD thousand Total DESCRIPTION EDP End of quarter 31.12. previous year current year 1 2 3 4 ASSETS A. SUBSCRIBED CAPITAL UNPAID 0001 B. NON-CURRENT ASSETS (0003+0010+0019+0024+0034) 0002 8.944.272 8.946.519 I. INTANGIBLES (0004+0005+0006+0007+0008+0009) 0003 26.073 27.637 1. Investments in development 0004 2. Concessions, patents, licenses, trademarks and service marks, software and other rights 0005 26.073 27.637 3.
    [Show full text]
  • Makenzijeva 23, Belgrade, Serbia Phone +381113809983; Fax:+381113837600; E-Mail: [email protected] Find Us on Bloomberg and Thompson Reuters
    Makenzijeva 23, Belgrade, Serbia Phone +381113809983; Fax:+381113837600; E-mail: [email protected] Find us on Bloomberg and Thompson Reuters Wrap Up The Belgrade Stock Exchange ended this 3 day work week with poor liquidity, and lower volume than last week, 894thousands vs 3.8mn EUR in previous week. The Belex15 went down 1.08% to 493.68 points, and Belexline finished the week with 8.91% drop, at 968.28 points. Number of active issues this week was 55, of which 12 posted gains, 18 posted losses and 25 issues finished without a price change. Foreign investor overall participation was 59.97%, with 69.44% of the buy side volume and 50.51% of selling volume. The winners for the year were Univerzal Banka a.d Beograd (UNBN) +6.98%, Jubmes banka a.d. Beograd (JMBN) +3.42%, Veterinarski zavod Subotica a.d. Subotica (VZAS) +1.56%. Losers of the year were Agrobanka a.d. Beograd (AGBN) - 17.88%, Jedinstvo Sevojno a.d. Sevojno (JESV) -4.08%, Tigar a.d. Pirot (TIGR) -3.06%. Naftna Industrija Srbije (NIIS) ended the week with low volume and weak activity and investor interest. Aerodrom Nikola Tesla (AERO) decline in prices with drastically reduced turnover. Energoprojekt Holding (ENHL) as last week, traded with a bigger package than 10,000 pieces. Price was on the same level in anticipation of the continuation of shareholders assembly that will be held on 12.01. In Fix Income and FX: The Dinar declined 0.59% against the euro, ending the week at 105.25 At Thursday’s auction it sold over 5.92 billion dinars worth of 6m Treasury bills, or 98.68% of the total offer.
    [Show full text]
  • Consolidated Annual Report of Energoprojekt Holding Plc. for the Year 2019
    Consolidated Annual Report of Energoprojekt Holding Plc. for the year 2019 Belgrade, April 2020 Pursuant to Articles 50 and 51 of the Law on Capital Market (RS Official Gazette, No. 31/2011, 112/2015 and 108/2016) and pursuant to Article 3 of the Rulebook on the Content, Form and Method of Publication of Annual, Half-Yearly and Quarterly Reports of Public Companies (RS Official Gazette, No. 14/2012, 5/2015 and 24/2017), Energoprojekt Holding Plc. from Belgrade, registration No.: 07023014 hereby publishes the following: CONSOLIDATED ANNUAL REPORT OF ENERGOPROJEKT HOLDING PLC. FOR THE YEAR OF 2019 C O N T E N T S 1. CONSOLIDATED FINANCIAL STATEMENTS OF THE ENERGOPROJEKT HOLDING PLC. FOR THE YEAR 2019 (Balance Sheet, Income Statement, Report on Other Income, Cash Flow Statement, Statement of Changes in Equity, Notes to Financial Statements) 2. INDEPENDENT AUDITOR’S REPORT (complete report) 3. ANNUAL BUSINESS REPORT (Note: Annual Business Report and Consolidated Annual Business Report are presented as a single report and these contain information of significance for the economic entity) 4. STATEMENT BY THE PERSONS RESPONSIBLE FOR PREPARATION OF REPORTS 5. DECISION OF COMPETENT COMPANY BODY ON THE ADOPTION OF ANNUAL CONSOLIDATED FINANCIAL STATEMENTS* (Note) 6. DECISION ON DISTRIBUTION OF PROFIT OR COVERAGE OF LOSSES* (Note) 1. CONSOLIDATED FINANCIAL STATEMENTS OF THE ENERGOPROJEKT HOLDING PLC. FOR THE YEAR 2019 (Balance Sheet, Income Statement, Report on Other Income, Cash Flow Statement, Statement on Changes in Equity, Notes to Financial Statements) NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS ENERGOPROJEKT HOLDING PLC FOR 2019 Belgrade, April 2020 Energoprojekt Holding Plc.
    [Show full text]
  • Belgrade, Serbia, November 7 2017, Hotel Hyatt Regency Belgrade
    Belgrade, Serbia, November 7 2017, Hotel Hyatt Regency Belgrade Belgrade Stock Exchange and WOOD & Company 2017 Investor Conference will be organized during the 16th Belgrade SE International Conference, on November 7, in Belgrade Hyatt Regency Hotel. Companies from Serbia and other CEE countries will meet with investors for scheduled 1-on-1 meetings, lasting up to 45 minutes. In order to apply for the Investor Conference, please submit completed Investor Registration Form and send it by e-mail to Ms. Karolina Drach-Kowalczyk, [email protected]. For more info, please contact us by phone number: +48 22 222 15 52. Location Hyatt Regency Belgrade Milentija Popovica 5 11070 Belgrade Serbia Tel: +381 11 3011234 Fax: +381 11 3112234 Email: [email protected] Accommodation For the Conference participants accommodation is provided at discounted prices in Hyatt Regency Belgrade Hotel: standard single room at the rate of 135 € daily per room, and double use of 150 € daily per room (rates are per night and include breakfast and internet. Rates do not include VAT 8% and tourist tax EUR 1,5 p.p.). If you choose to stay in this Hotel, please download Hotel Reservation Form or contact us, to get further details. The accommodation and travel expenses are covered by participants. Scheduling Meetings will be scheduled according to the investors’ requests and the availability of free slots for each company at the moment of application. Preliminary schedule will be supplied to each participant by October 20. After that, further changes, will be distributed on an “as needs” basis. Belgrade Stock Exchange International Conference UPGRADE IN BELGRADE More details about the Belgrade Stock Exchange 16th International Conference UPGRADE IN BELGRADE 2016 may be found at the Conference website.
    [Show full text]
  • Belgrade Stock Exchange D a I L Y O V E R V I E W 7-Nov-11 • Analyst: Ivan Dzakovic • Email: [email protected] • Contact: +381 (0)11 2099 574 ●
    • Sinteza Invest Group • www.sinteza.net • Jurija Gagarina 32/II • [email protected] Belgrade Stock Exchange D A I L Y O V E R V I E W 7-Nov-11 • Analyst: Ivan Dzakovic • Email: [email protected] • Contact: +381 (0)11 2099 574 ● Belex15 Index Belex15 Index Constituents Turnover, m Index Level RSD BB Share Daily MCap Mcap/ YTD P/E* D/E ROA ROE 160 575 Ticker Price Return (m RSD) Assets 140 Banking Sector TTM TTM TTM TTM TTM AIK Banka AIKB 1,810 0.4% -45.5% 15,785 3.6 11% 2.1 3.4% 10.2% 120 Komercijalna Banka KMBN 1,899 0.5% -27.1% 16,539 4.7 6% 4.9 1.4% 8.3% 550 100 Agrobanka AGBN 4,099 0.4% -43.1% 3,234 - 4% 4.1 -2.8% -12.5% 80 Univerzal Banka UNBN 2,815 0.0% -33.0% 1,597 3.6 5% 4.1 1.3% 6.9% Jubmes Banka JMBN 14,890 -0.4% -9.7% 3,865 16.3 43% 0.1 2.7% 4.7% 60 525 BB Share Daily MCap 40 YTD P/E* P/S* D/E ROA ROE Ticker Price Return (m RSD) 20 Real Sector TTM TTM TTM TTM TTM 0 500 5-Oct-11 15-Oct-11 25-Oct-11 4-Nov-11 Petroleum Industry-NIS** NIIS 633 0.6% 33.3% 103,217 2.2 0.6 2.0 26.9% 104.4% Energoprojekt Holding ENHL 440 2.1% -51.1% 4,166 5.6 0.2 1.5 2.9% 7.7% Current Index Level 541.35 Imlek IMLK 2,399 0.0% 26.3% 21,836 15.4 1.0 1.1 7.2% 14.3% Daily Return 0.28% Sojaprotein** SJPT 560 0.5% -34.1% 8,325 5.5 0.6 0.5 8.5% 15.2% YTD -16.94% Metalac MTLC 1,705 -2.0% -20.7% 1,739 6.1 2.8 0.3 8.5% 11.5% 52-Week-Return -14.77% Tigar TIGR 530 -3.1% -24.3% 911 - 0.2 1.5 -0.4% -1.0% 52-Week-High 825.08 Airport Nikola Tesla AERO 510 -0.6% -19.3% 17,488 7.8 3.2 0.1 9.1% 10.1% 52-Week-Low 530.50 Alfa Plam ALFA 7,500 0.0% -7.9% 1,311 2.9 0.3 0.2 10.8% 12.8% Veterinarski Zavod VZAS 360 0.0% -37.9% 814 13.1 0.3 0.7 1.6% 2.5% Jedinstvo Sevojno JESV 5,200 0.0% -15.2% 1,585 3.2 0.4 0.3 9.4% 12.9% * total (not weighted average) number of shares used for calculations ** nonconsolidated data - The results of Energoprojekt Holding, Imlek, Metalac, Veterinarski Zavod and Jedinstvo Sevojno refer to the previous accounting year.
    [Show full text]