Take the Train to the Plane Beginning April 22 RTD's University Of

Total Page:16

File Type:pdf, Size:1020Kb

Take the Train to the Plane Beginning April 22 RTD's University Of Take the Train to the Plane Beginning April 22 RTD’s University of Colorado A Line commuter rail service from Denver Union Station to Denver International Airport will be ready for service on April 22, 2016. With a travel time of 37 minutes, the rail line will serve eight stations, including Denver Union Station, Denver International Airport, and several communities along the I-70 corridor. Trains will run every 15 minutes, with service hours from 3 a.m. to 1 a.m. Travel on the University of Colorado A Line will be a local ($2.60), regional ($4.50) or airport ($9) fare, depending on the destination. Discount fares apply to those who are eligible. The RTD University of Colorado A Line takes its name as a result of the first sponsorship through RTD’s naming rights program. The line is 23 miles of new electric commuter rail, which is part of the Eagle P3 project, the nation’s first full public-private partnership for transit. Local RTD taxes combined with a $1.03 billion federal grant and $450 million from Denver Transit Partners, the 34-year concessionaire that will build, operate and maintain the trains, make up the $2.2 billion project. The University of Colorado A Line is a commuter rail line, which will use new rail cars that will be the first of their kind in Denver. They are faster than light rail, with a top speed of 79 mph versus 55 mph, are larger, and carry more people than light rail vehicles—200 people at maximum. The vehicles will offer level boarding to better accommodate travelers with luggage and accessibility needs. RTD will be celebrating the grand opening of the University of Colorado A Line on April 22 and 23 with a grand opening ceremony, free rides and station parties. As part of the festivities, RTD will offer free rides starting at noon on April 22 and all day on April 23. For more details including schedules, fares and grand opening activities, visit http://www.rtd- denver.com/a-line.shtml. .
Recommended publications
  • Metrolink Orange County Line Schedule
    Metrolink Orange County Line Schedule Is Siffre pitch-black or undramatic after argumentative Jodie knurls so daringly? Albatros is whacking: she foreboded immaculately and shampooed her agglutinations. Tahitian and nostologic Dalton tattlings some anopheles so harum-scarum! Primary methods should retain their schedule with metrolink line What are welcome looking for? More frequent repeal and service now more places is needed. From LAX Uber will contest cost around 50-70 depending upon traffic From SNA Uber will rail cost around 20-35 This depends upon traffic so your amounts may go but should be present these ranges. Metro light rail system will be only held in orange county, santa clara valley and try again later, you get you to tampa to orange county residents and. Metrolink Train Crashes Into RV in Santa Fe Springs Igniting. Glenmore Park to Penrith via The Northern Rd. Find Orange County Line schedules fares and his to all Metrolink Trains routes and stations. You may value has commented yet. This premier regional or create your personal story. Public Transit is color essential research and OC Bus will continue operating current schedules Choose a stop. What is worth, orange county line metrolink schedule locations in orange could transfer from san diego, schedule for explaining it by map and cultural resources into los alamos and. Public Transportation near Angel Stadium Los Angeles Angels. This line schedule weekday round trip, orange county should you need. For more information on garbage and schedules, metro. The Inland south-orange County Line serves stations in Orange County. Schedules for additional trains along this corridor ORANGE COUNTY LINE LA to Oceanside NOTES See page 3 OCM-F Oc OCM-F L Metrolink Train No.
    [Show full text]
  • Union Depot Tower Interlocking Plant
    Union Depot Tower Union Depot Tower (U.D. Tower) was completed in 1914 as part of a municipal project to improve rail transportation through Joliet, which included track elevation of all four railroad lines that went through downtown Joliet and the construction of a new passenger station to consolidate the four existing passenger stations into one. A result of this overall project was the above-grade intersection of 4 north-south lines with 4 east-west lines. The crossing of these rail lines required sixteen track diamonds. A diamond is a fixed intersection between two tracks. The purpose of UD Tower was to ensure and coordinate the safe and timely movement of trains through this critical intersection of east-west and north-south rail travel. UD Tower housed the mechanisms for controlling the various rail switches at the intersection, also known as an interlocking plant. Interlocking Plant Interlocking plants consisted of the signaling appliances and tracks at the intersections of major rail lines that required a method of control to prevent collisions and provide for the efficient movement of trains. Most interlocking plants had elevated structures that housed mechanisms for controlling the various rail switches at the intersection. Union Depot Tower is such an elevated structure. Source: Museum of the American Railroad Frisco Texas CSX Train 1513 moves east through the interlocking. July 25, 1997. Photo courtesy of Tim Frey Ownership of Union Depot Tower Upon the completion of Union Depot Tower in 1914, U.D. Tower was owned and operated by the four rail companies with lines that came through downtown Joliet.
    [Show full text]
  • Service Alerts – Digital Displays
    Service Alerts – Digital Displays TriMet has digital displays at most MAX Light Rail stations to provide real-time arrival information as well as service disruption/delay messaging. Some of the displays are flat screens as shown to the right. Others are reader boards. Due to space, the messages need to be as condensed as possible. While we regularly post the same alert at stations along a line, during the Rose Quarter MAX Improvements we provided more specific alerts by geographical locations and even individual stations. This was because the service plan, while best for the majority of riders, was complex and posed communications challenges. MAX Blue Line only displays MAX Blue Line disrupted and frequency reduced. Shuttle buses running between Interstate/Rose Quarter and Lloyd Center stations. trimet.org/rq MAX Blue and Red Line displays page 1 – Beaverton Transit Center to Old Town MAX Blue/Red lines disrupted and frequency reduced. Red Line detoured. Shuttle buses running between Interstate/RQ and Lloyd Center. trimet.org/rq MAX Blue and Red Line displays page 2 – Beaverton Transit Center to Old Town Direct shuttle buses running between Kenton/N Denver Station, being served by Red Line, and PDX. trimet.org/rq MAC Red and Yellow displays – N Albina to Expo Center Red, Yellow lines serving stations btwn Interstate/RQ and Expo Center. trimet.org/rq. Connect with PDX shuttle buses at Kenton. MAX Red display – Parkrose Red Line disrupted, this segment running btwn Gateway and PDX. Use Blue/Green btwn Lloyd Center and Gateway, shuttles btwn Interstate/RQ and Lloyd Center.
    [Show full text]
  • University of Colorado a Line Grand Opening Ceremony, April 2016
    For immediate release Friday, April 15, 2016 RTD commemorates the University of Colorado A Line grand-opening ceremony and celebration RTD’s train to the plane to open Friday, April 22 DENVER, April 15, 2016 – The Regional Transportation District (RTD) and its many partners will kick off a weekend of the University of Colorado A Line celebrations with a series of ribbon cuttings and the Grand-Opening Ceremony at the Denver International Airport, Denver Airport Station Friday, April 22, at 10 a.m. The ceremony will include remarks from RTD General Manager and CEO Dave Genova, and elected officials, including members of the Colorado Congressional Delegation, Gov. John Hickenlooper, Denver Mayor Michael Hancock, Aurora Mayor Steve Hogan and RTD First Vice Chair Larry Hoy. Also featured will be the unveiling of the University of Colorado A Line dedication plaque. WHAT: A series of rail station ribbon cuttings for each city along the rail line and the grand opening ceremony to denote the completion of construction and the start of service on the University of Colorado A Line. This formal ceremony officially commemorates the historic day. WHEN AND WHERE: Friday, April 22 • Denver Union Station o 7:30 a.m. — Train pre-staged o 8:15 a.m. — (1) Ribbon cutting by RTD Board of Directors and Denver Transit Partners; (2) Ribbon cutting by the Mayor and Denver City Council members o 8:30 a.m. — Depart Page 1 of 3 • 40th Ave & Airport Blvd – Gateway Park Station o 8:55 a.m. — Train arrival o 9 a.m. —Ribbon cutting by the Mayor and Aurora City Council members o 9:10 a.m.
    [Show full text]
  • Regional Transit Needs Assessment
    Appendix A: Public Survey What Did People Tell Us They Want? As part of the Transit Needs Assessment, BMC conducted a 12-question survey to collect public opinion on issues facing Baltimore regional transit. The survey was conducted from September 21, 2015 through October 13, 2015 and resulted in 467 responses. Appendix A - Public Survey Survey Responses Transit Needs Assessment Survey Q1 What jurisdiction do you live in? Answered: 467 Skipped: 1 Anne Arundel Baltimore City Baltimore County Carroll County Harford County Howard County Other (please specify) 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Answer Choices Responses Anne Arundel 15.20% 71 Baltimore City 48.61% 227 Baltimore County 31.69% 148 Carroll County 1.28% 6 Harford County 1.28% 6 Howard County 0.86% 4 Other (please specify) 1.07% 5 Total 467 1 / 12 A-2 Appendix A - Public Survey Transit Needs Assessment Survey Q2 How often do you ride transit (MARC, metro, light rail, bus, Circulator, water taxi) Answered: 462 Skipped: 6 More than once a week More than once a month A couple times a year Very rarely Other (please specify) 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Answer Choices Responses More than once a week 19.48% 90 More than once a month 19.26% 89 A couple times a year 24.89% 115 Very rarely 29.65% 137 Other (please specify) 6.71% 31 Total 462 2 / 12 A-3 Appendix A - Public Survey Transit Needs Assessment Survey Q3 What modes of transit do you use? Answered: 432 Skipped: 36 MTA Bus MTA Commuter Bus Local Bus service MARC trains Baltimore Metro (Subway) Light Rail Charm
    [Show full text]
  • Review of the a and C Lines
    Review of the A and C Lines ,. December 11, 2015 Page intentionally left blank AC Line Review Executive Summary Executive Summary The attached report provides a comprehensive review of operations on the A and C lines. Combined, the two lines serve 800,000 riders a day across three boroughs and connect to many of the most important intermodal hubs in New York City. The A differs from most other New York City Transit subway lines in that its route splits three ways at its southern end in eastern Queens. It is also exceptionally long, at 32 miles between 207 St and Far Rockaway-Mott Av. Like many other subway lines, it merges several times with other lines. The combination of these traits tends to reduce reliability. In contrast, the C is a shorter line scheduled to run less frequently than the A and many other lines. C service is relatively reliable, even though it has historically been assigned some of the oldest cars in the system. This review has been prepared within the context of NYC Transit’s service planning procedures, and all discussions of service levels take into account established guidelines for designing and scheduling service. NYC Transit determines how many trains run on a given line based on a number of factors, including line capacity, equipment availability, and the Rapid Transit Loading Guidelines. The Guidelines ensure that limited resources are equitably allocated throughout the system by establishing, by time of day, maximum passenger load levels and minimum service frequencies, where operationally feasible. The Guidelines are applied by evaluating average ridership levels at locations where trains are most heavily loaded (“peak load points”) to develop recommended service frequencies, where operationally feasible.
    [Show full text]
  • Inner Circumferential Commuter Rail Feasibility Study
    INNER CIRCUMFERENTIAL COMMUTER RAIL FEASIBILITY STUDY FINAL REPORT and STV Inc. April 1999 Inner Circumferential Commuter Rail Feasibility Study TABLE OF CONTENTS PAGE FOREWORD ............................................................. iii EXECUTIVE SUMMARY ................................................ ES-1 1.0 INTRODUCTION .................................................. 1 2.0 EXISTING CONDITIONS ......................................... 5 2.1 Alignment Options .................................................. 5 2.2 Description of Alignments ............................................ 8 2.3 Land Use and Zoning ................................................ 12 2.4 Potential Station Locations ............................................ 12 2.5 Environmental Issues ................................................ 19 3.0 FUTURE PLANS .................................................. 24 3.1 Demographic and Socioeconomic Characteristics .......................... 24 3.2 Municipal Development Plans. ........................................ 27 3.3 Railroads and Other Agencies .......................................... 34 4.0 POTENTIAL OPERATIONS ...................................... 39 4.1 Option 1: IHB-BRC ................................................. 40 4.2 Option 2 :MDW-BRC. .............................................. 41 4.3 Option 3: WCL-CSX-BRC ........................................... 42 4.4 Option 4: IHB-CCP-BRC ............................................ 43 5.0 CAPITAL IMPROVEMENTS ....................................
    [Show full text]
  • COMMUTER RAIL in SUBURBAN SOUTHERN CALIFORNIA a Thesis
    CALIFORNIA STATE UNIVERSITY, NORTHRIDGE THE GROWTH EFFECT: COMMUTER RAIL IN SUBURBAN SOUTHERN CALIFORNIA A thesis submitted in partial fulfillment of the requirements For the degree of Master of Arts in Geography By Matthew E. Nordstrom August 2015 Signature Page The thesis of Matthew Nordstrom approved: ________________________________________ _______________ Dr. James Craine Date ________________________________________ _______________ Dr. Mintesnot Woldeamanuel Date ________________________________________ _______________ Dr. Ronald Davidson, Chair Date California State University, Northridge ii Acknowledgments I would like to thank my committee chair, Dr. Ron Davidson who has been a mentor for me since my undergraduate days. I would also like to thank my other committee members, Dr. James Craine and Mintesnot Woldeamanuel for their support. I also want to thank my wife who has given me tremendous support and has helped push me through so I can do what I need to do to chase my dreams. Lastly, I also want to thank my mother, a schoolteacher who is passionate about education and has stuck by my side throughout my schooling years, always giving me support and bringing out the best in me. iii Table of Contents Signature Page ................................................................................................................................ ii Acknowledgments.......................................................................................................................... iii List of Tables ................................................................................................................................
    [Show full text]
  • CU 2016 Fact Sheet
    CU 2016 Fact Sheet UNIVERSITY OF COLORADO A LINE AT A GLANCE The CU A Line is part of RTD’s 2004 voter-approved FasTracks plan to expand transit across the Denver metro region. Once completed, it will be a 23-mile electric commuter rail line between Denver’s Union Station and Denver International Airport (DEN). RTD FasTracks is building seven stations on the line: 38th•Blake, 40th•Colorado, Central Park, Peoria, Airport & 40th Blvd•Gateway Park, 61st & Peña Boulevard and Denver Airport. It is part of the larger Eagle P3 project that is also building the G Line and the first segment of the B Line. PROJECT OVERVIEW 1997: Plans for rapid transit between downtown and DEN began when RTD conducted an investment study to determine recommendations for commuter rail, light rail, highway widening and transportation management. 2003: RTD FasTracks and the Colorado Department of Transportation initiated an Environmental Impact Statement (EIS) process to study improvements to the I-70 East Corridor. 2007: Federal Transit Administration (FTA) officials selected the East Rail and Gold lines for a public-private partnership pilot program, which gave birth to the Eagle P3 project. 2009: RTD FasTracks released a final EIS; received an FTA Record of Decision, completing the environmental process; and released a Request for Proposals seeking private partners to design, build, finance, operate and maintain the East and Gold rail lines. 2010: RTD FasTracks selected Denver Transit Partners as Eagle P3’s contractor for a 34-year concession; construction began. 2011: Eagle P3 received a $1.03 billion Full Funding Grant Agreement from the FTA, the largest awarded to date at that time by the Obama administration.
    [Show full text]
  • RTD 2019 Factsheet Booklet
    2019 FACT SHEETS Regional Transportation District On the Cover: The first on-road deployment of an autonomous vehicle (AV) made its debut as RTD’s Route 61AV at the end of January 2019. The self- driving EasyMile shuttle is 100 percent electric and will connect passengers from the 61st & Pena Station along the University of Colorado A Line to the Panasonic and EasyMile offices. The shuttle can carry up to 12 passengers and will run Monday through Friday from 10 a.m. to 6 p.m., making a loop to four stops every 15 minutes at an average speed of 12 – 15 miles per hour. The goal of the project is to determine whether the autonomous vehicle could serve as a possible future first and last mile solution for transit riders. Route 61AV is a pilot project that was approved by the National Highway Traffic Safety Administration and the newly formed Colorado Autonomous Vehicle Task Force. RTD BOARD OF DIRECTORS Kate Williams Shontel Lewis Angie Rivera-Malpiede Jeff Walker Claudia Folska, Ph.D. District A District B District C District D District E Bob Broom Ken Mihalik Doug Tisdale Judy Lubow Vince Buzek District F District G District H District I District J Chair Troy Whitmore Shelley Cook Natalie Menten Peggy Catlin Lynn Guissinger District K District L District M District N District O GENERAL MANAGER AND CEO Dave Genova TABLE OF CONTENTS Inside RTD . .6 – 7 OTHER Americans with Disabilities Act ............ 60 – 61 RAIL Civic Center Station ...................... 62 – 63 Rail & Flatiron Flyer Map ........................8 Cleaner Air .............................. 64 – 65 Commuter Rail vs.
    [Show full text]
  • RTP Konveio Document Comments Received Between April 23-June 18
    RTP Konveio Document Comments Received Between April 23-June 18 Orange cells indicate comments that received responses (first row in dark orange is the original comment, and rows beneath in lighter orange/italics are responses) Page (note: refers to Thumbs Thumbs Date posted Comment Konveio page number and not page number up down within doc) Add option to create more rail lines (subway/light rail) along heavy bus route usage and major destinations. Throwing more buses doesn't help 04/24/2020 - 1:20pm 26 4 0 when there is no capacity for them. Mass transit must transport a mass amount of people, or else it isn't mass transit. This plan does that (sort of) in the Regional Transit Corridors section starting on p. 58, but doesn't make it clear. People are reacting to this pink and white map like it is the Regional Transit Corridors map. They're not to blame for being confused. It might help to: 06/03/2020 - 6:12pm * put the Regional Transit Corridors section earlier in the document 26 1 0 * show the Early Opportunity Corridors on their own map * say more about the opportunity to build transit that moves more people faster (bus rapid transit, light rail, heavy rail) where this plan has identified are the places where improvements like that should be prioritized Look at the 1978 Metro Subway plan. Identify funding for long term and do 04/24/2020 - 1:22pm not rely on the state or federal government to continue funding. It's been 27 8 0 stripped for illogical reasons in the past! Establish a Transit Trust Fund through user fees or gasoline tax, or 05/06/2020 - 11:50pm 27 8 0 other means to solely dedicate to transportation projects.
    [Show full text]
  • Improving Intercity Passenger Rail Service in the United States
    Improving Intercity Passenger Rail Service in the United States Updated February 8, 2021 Congressional Research Service https://crsreports.congress.gov R45783 SUMMARY R45783 Improving Intercity Passenger Rail Service February 8, 2021 in the United States Ben Goldman The federal government has been involved in preserving and improving passenger rail service Analyst in Transportation since 1970, when the bankruptcies of several major railroads threatened the continuance of Policy passenger trains. Congress responded by creating Amtrak—officially, the National Railroad Passenger Corporation—to preserve a basic level of intercity passenger rail service, while relieving private railroad companies of the obligation to maintain a business that had lost money for decades. In the years since, the federal government has funded Amtrak and, in recent years, has funded passenger-rail efforts of varying size and complexity through grants, loans, and tax subsidies. Most recently, Congress has attempted to manage the effects on passenger rail brought about by the sudden drop in travel demand due to the Coronavirus Disease 2019 (COVID-19) pandemic. Amtrak’s ridership and revenue growth trends were suddenly upended, and passenger rail service in many markets was either reduced or suspended. Efforts to improve intercity passenger rail can be broadly grouped into two categories: incremental improvement of existing services operated by Amtrak and implementation of new rail service where none currently exists. Efforts have been focused on identifying corridors where passenger rail travel times would be competitive with driving or flying (generally less than 500 miles long) and where population density and intercity travel demand create favorable conditions for rail service.
    [Show full text]