INDUSTRY.

Welded steel pipe factory (TUMESA) Site: ( ()) Service provided: EPCI Natural Gas Regulation Station, distribution of natural gas hydrogen, nitrogen, central cooling water &plant, extraction and filtration sections, for rolling and annealing of steel. and and several induction welded tube sections. Industrial warehouse Client: TUMESA S.A. Year: 2001-2011

Paper Industry “Pompeyo Criado” Site: Buñol (Valencia (Spain)) Service provided: EPCI & EDR CHP 1,8 MW with 2 diesel engine and recovery boiler steam for paper machine Client: Pompeyo Criado S.A. Year: 1995-2007

Paper Industry “Silla” Site: Buñol (Valencia (Spain)) Service provided: EPCI & EDR CHP 1,8 MW with 2 diesel engine and recovery boiler steam for paper machine Client: Papelera Silla S.A. Year: 1997-2001

Intermodal Storage warehouse of steel coils Site: Sagunto (Valencia (Spain)) Service provided: EPCI Client: TEMARSA Year: 1999

Central Storage Warehouse of refrigerated and frozen foods Site: Quart de Poblet (Valencia . El prat (Barcelona) (Spain) Service provided: EPCI Glycoled water production Central Plant. Refrigerated and Freezing warehouse &docks. Warehouse & Logistics Computerized Managing Sistem. Client: CONSUM S.C.L. Year: 1995-2000

Clean Room area at Fharmaceutical Production Site: Valencia (Spain) Service provided: EPCI Client: Laboratorios Sabater Year: 1997

Smoked and salted fish factory Site: Silla (Valencia (Spain)) Service provided: D, CE, BOQ and S of AD&MEPID , PM of AD & MEPID. EDR Client: AHUMADOS FISH LINE Year: 1999

Adaptation to current reglamentation of 2 Municipal slaugtherhouse Site: Algemesí (Valencia (Spain)). (Valencia (Spain)) Service provided: D, CE, BOQ and S of AD & MEPID , PM of AD & MEPID. EDR Client: Ayuntamientos Year: 1997

Instalation of several stamping presses of refractory mineral Site: P.I. La Reva Ribarroja del (Valencia (Spain)) Service provided: EPCI Adecuación prensas e inst. elécticas Client: REFRACTA

Year: 2006-2009

Mattress factory GRAYTAN Site: P.I. Rafelbuñol (Valencia (Spain)) Service provided: D, CE, BOQ and S of AD, ED & MEPID , PM of AD & MEPID. EDR Client: CEYC S.A. Year: 2004

Plastic laminates factory Site: P.I. El Oliveral. Ribarroja del Turia (Valencia (Spain)) Service provided: D, CE, BOQ and S of AD, ED & MEPID , PM of AD & MEPID. EDR Client: Induplas S.A. Year: 1999

Power transformation Center “La Cabrera" Site: Buñol (Valencia (Spain)) Service provided: EPCI & EDR Client: ACILOE S.A. Year: 2002

Adptation logistic warehouse Site: (Valencia (Spain)) Service provided: D, CE, BOQ and S of AD, ED & MEPID , PM of AD & MEPID. Client: Insular de Llevant S.A. Year: 1999