01 01 Executive Director (Finance), GUVNL, kaya- inadoSak (iva%t), gau } iva ina ila, baD,aOda Vadodara 02 02 Chief Engineer (LD), GETCO, Gotri, mau#ya AiBayaMta (Baar p`oYaNa), gaoTkao, gaao~I baD,aOda Vadodara 03 03 Chief Engineer (Comml), MP Power mau#ya AiBayaMta (vaaiNajya) , map`paT`/okMila, jabalapur Trading Co. Ltd., Jabalpur 04 04 Chief Engineer (LD), MP Power mau#ya AiBayaMta (Baar p`oYaNa), map` paT/aMsa kM ila jabalapur Transmission Co. Ltd., Jabalpur 05 mau#ya AiBayaMta (saI eva pI), CraivabaaoD-, rayapur 05 Chief Engineer (C&P), CSPTCL, Raipur 06 mau#ya AiBayaMta (vaaiNajya), CraivabaaoD-, rayapur 06 Chief Engineer (Comml), CSPTCL, Raipur 07 mau#ya AiBayaMta (Baar p`oYaNa), CraivabaaoD-, iBalaa[- 07 Chief Engineer (LD), CSPTCL, 08 mau#ya AiBayaMta (esa TI yaU), maraivaparokila, mauMba[- 08 Chief Engineer (STU), MSETCL, Mumbai 09 mau#ya AiBayaMta (pIpI), maraivaivakila, mauMba[- 09 Chief Engineer (PP), MSEDCL, Mumbai 10 mau#ya AiBayaMta (Baar p`oYaNa), maraivaparokila, mauMba[- 10 Chief Engineer (LD), MSETCL, Kalwa 11 mau#ya ivaVut AiBayaMta, ivaVut ivaBaaga, gaaovaa 11 CEE, Elect. Deptt., Goa 12 kaya-palak AiBayaMta (iDvaIjana III), kuTI-, paoMDa,gaaovaa 12 Executive Engineer (Div-III), Ponda, Goa 13 kaya-palak AiBayaMta, ivaVut ivaBaaga, dmana evaM diva 13 Executive Engineer, Elect. Deptt., DD 14 kaya-palak AiBayaMta, ivaVut ivaBaaga, dadr nagar hvaolaI 14 Executive Engineer, Elect. Deptt., DNH 15 maha p`baMQak(vaaiNajya), enaTIpIsaI ilaima, mauMba[- 15 GM (Comml), NTPC Ltd., Mumbai 16 maha p`baMQak(vaaiNajya), enaTIpIsaI ilaima, na[- idllaI 16 GM (Comml), NTPC Ltd., 17 Aitir@t maha p`baMQak(vaaiNajya), enapIsaIAa[-ela, mauMba[- 17 AGM (Comml). NPCIL, Mumbai 18 mau#ya AQaIxak koepIpI, enapIsaIAa[-ela 18 Chief Superintendent, KAPP, NPCIL 19 mau#ya AQaIxak, TIepIesa(1evaM 2), enapIsaIAa[-ela 19 Chief Superintendent, TAPS (1&2), NPCIL 20 esaema[-([laO), TIepIesa(3evaM 4), enapIsaIAa[-ela 20 SME (Electrical), TAPS (3 &4), NPCIL 21 Aitir@t maha p`baMQak (vaaiNajya), pIjaIsaIAa[-ela, naagapur 21 AGM (Comml), PGCIL, Nagpur 22 maha p`baMQak (vaaiNajya), pIjaIsaIAa[-ela, na[- idllaI 22 GM (Comml), PGCIL, New Delhi 23 kaya- inadoSak, pxaoBaap`okond`, mauMba[- 23 GM, WRLDC, Mumbai 24 A ]paQyaxa, jaIMdala pa ila, tmanaar 24 AVP(O&M), Jindal Power Ltd, Tamnar 25 maha p`baMQak(vaaiNajya), ela e pI pI ela, gaurgaaMva 25 ED (Comml), LAPPL, Gurgaon 26 A ]paQyaxa, e pI ela, Ahmadavaad 26 AVP, Adani Power Ltd., Ahemdabad 27 kaya- inadoSak, TaoronT pavar, saUrt 27 Executive Director, Torrent Power, Surat 28 kaya- inadoSak, maUMd`a yauemapIpI, maUMd`a 28 Executive Director, Mundra UMPP, Mundra 29 ]paQyaxa(T/oiDMga), pITIsaI, na[- idllaI 29 Vice President (Trading), PTC, New Delhi 30 maha p`baMQak (pavar To/iDMga), e[-ela, na[- idllaI 30 GM (Power Trading), AEL, New Delhi 31 sadsya saicava, pUva- xao~Iya ivaVut saimait, kaolakata 31 Member Secretary, ERPC, Kolkata 32 sadsya saicava, ]%tr xao~Iya ivaVut saimait, na[- idllaI 32 Member Secretary, NRPC, New Delhi 33 sadsya saicava, dixaNa xao~Iya ivaVut saimait, baMgalaaor 33 Member Secretary, SRPC, Bangalore 34 mau#ya kaya-karI AiQakarI, , ena ela DI saI,, na[- idllaI 34 CEO, NLDC, New Delhi 35 maha p`baMQak, PaUxaoBaap`okond`, kaolakata 35 General Manager, ERLDC, Kolkata 36 kaya-karI inadoSak, ]%tr xao~Iya Baar p`oYaNa kond``, idllaI 36 Executive Director, NRLDC, New Delhi 37 maha p`baMQak, dixaNa xao~Iya Baar p`oYaNa kond``, baOMgalaaor 37 General Manager, SRLDC, Bangalore 38 mau#ya AiBayaMta (iga`D p`baMQana) , koivap`a, na[- idllaI 38 Chief Engineer (GM), CEA, New Delhi 39 sadsya saicava, pUva- ]%tr xao~Iya ivaVut saimait SaIlaa^ga 39 Member Secretary, NERPC, Shillong 40 maha p`baMQak, PaU ]xaoBaap`okond , SaIlaa^ga 40 GM, NERLDC, Shillong 41 ]p maha p`baMQak(vaaiNajya), AarjaIpIpIela, naaoeDa 41 DGM(Comml), RGPPL, Noida 42 sadsya saicava, pxaoivasa 42 Member Secretary, WRPC

Note: 1. RGPPL- For the purpose of transmission deviation the ISGS generator RGPPL is embedded in the Maharashtra Transmission system, therefore the injection of RGPPL in Maharashtra Drawal for transmission deviation purpose has not been included. 2. NSPCL - NSPCL is connected to Bhilai Plant & CSPDCL system and to ISTS system. The injection of NSPCL is considered only on ISTS lines i.e., 400 kV NSPCL – Raipur D/C lines and the transmission deviation is arrived out by comparing this injection with the LTA & MTOA of NSPCL to its beneficiaries. 3. CSPTrCL- Tied up LTA of 343 MW out of 604 MW (total) added in the approved injection of Jindal Power Limited () – 110 MW, SKS Raigarh – 55MW, KWPCL-REGL – 27MW, KSK Mahanadi – 82 MW, BALCO – 55 MW, Maruti CCPL – 14 MW. 4. Spectrum Coal and Power LTA of 30 MW and Maruti CCPL LTA of 195 MW is added to approved injection of ACBIL since ACBIL, spectrum coal & Power & Maruti CCPL is a single regional entity of WR. 5. LTA/MTOA details of RE exemption for Madhya Pradesh – 651 MW, Maharashtra – 1055 MW and Goa – 50 MW have been incorporated in the approved drawal quantum.

( ) POWER SYSTEM OPERATION CORPORATION LIMITED (A Government of Enterprise) National Load Despatch Centre

Amendment to the notification of Transmission charges payable by DICs for the Billing Month of February 2021

No: TC/12/2020/R1 Date: 05.03.2021

1. The Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses), Regulations 2020 came into force with effect from 1.11.2020. National Load Despatch centre (NLDC) as the Implementing Agency under Sharing Regulations 2020 has been entrusted with the responsibility of computation of ISTS transmission charges and losses. Further, as per Regulation (14) (5)(b), Transmission charges payable by DICs shall be notified by the Implementing Agency by 25th day of the month following billing period. The computation of transmission charges shall be done on the basis of inputs received from ISTS Licensees, DICs/ States, CTU as per the Regulations.

2. Implementing Agency vide its notification dated 25.01.2021 had notified the transmission charges for the DICs for the billing month of February’21 in line with Sharing Regulations 2020. Subsequent to the notification, WRPC vide mail dated 09.02.2021 had furnished the revised weighted average allocation of central sector generating stations for the billing period of Dec’20 stating an inadvertent error in the calculations of allocations. Further, it was brought to the notice of Implementing Agency that NERLDC had issued completion of trial operation certificates for the ISTS elements of New Mariani of POWERGRID on 06.01.2021 with an effective date of 30.12.2020. This has established power flow on M/s. KMTL’s ISTS elements. Thus, 2 days equivalent YTC of M/s. KMTL has become eligible for consideration into computations for the billing month of Feb’21. It was further informed change in YTC for Rajasthan and Odisha for the billing period of Dec’20.

3. In view of above, Implementing Agency has revised the computations after incorporating all the required corrections and amended the notification of transmission charges for the DICs for the billing month of February’21.

4. Applicability of transmission charges

A. The notified transmission charges payable by DICs for the billing month of Feb’21 shall be used by RPCs for preparation of revised Regional Transmission Account (RTA) for the billing month Feb’21. RPCs shall prepare revised RTA for the billing month of Feb’21 considering the revised regional DIC wise break up of LTA/MTOA enclosed along with this notification. B. The revised transmission charges payable by DICs for LTA/MTOA are given at Annexure- I.

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 1 of 19 C. The revised Regional DIC wise break up of LTA/MTOA for the purpose of preparation of revised Regional Transmission Account (RTA) by RPCs is given at Annexure-II. D. ISTS licensee wise revised break up of Monthly Transmission Charges (MTC) for the purpose of disbursement of transmission charges by CTU is given at Annexure-III. E. Entity-wise details of bilateral billing are given separately at Annexure-IV. F. Rest all other details are same as in the notification dated 25.01.2021.

(जी चक्रवर्ती) मुख्य महाप्रबंधक/ रा. भा. प्रे. के

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 2 of 19 Annexure-III

Transmission Charges for Designated ISTS Customers (DICs) for the billing month of February'21 (Revision 1)

LTA Usage based Balance AC Regional Transformers Total Demand AC system system National Component (₹) Component component Bilateral Transmission S.No. Zone Region / charges (₹) charges (₹) (₹) (₹) Charges charges Injection (₹) payable in ₹ (in MW) AC-UBC AC-BC NC-RE NC-HVDC RC TC 1 Delhi NR 5238 305847672 928985771 24163661 111889573 220778305 52074926 1643739909 2 UP NR 9932 884301251 1761658847 45822152 212178984 418667396 138642928 5537449 3466809008 3 Punjab NR 4298 356408059 762369516 19829840 91821858 181181084 121819112 1368429 1534797898 4 Haryana NR 3651 447789404 647576317 16843977 77995853 153899883 207573971 1551679406 5 Chandigarh NR 220 10327386 38982803 1013974 4695195 9264466 2970061 67253885 6 Rajasthan NR 4242 676391859 752330732 19568723 90612760 178795315 101601563 4731195 1824032147 7 HP NR 1750 53009340 310370106 8072974 37381820 73761071 30636080 54289727 567521119 8 J&K NR 2765 265630125 490345832 12754286 59058586 116533240 54547516 998869584 9 Uttarakhand NR 1228 156149227 217827991 5665880 26235796 51767956 37476961 31352975 526476786 10 ADHPL NR 168.96 343476 29967415 779476 3609357 7121912 41821637 11 GMR Kamalanga NR 75 6762070 13302297 346003 1602165 3161360 25173896 12 WBSEDCL_Inj NR 600 7320457.085 106418378 2768027 12817319 25290882 154615063 13 MB Power NR 175 29379280 31038694 807341 3738385 7376507 72340206 14 Chuzachen NR 99 7834464 17559032 456724 2114858 4172995 32138074 15 Jorthang NR 43.20 3328964.176 7662123 199298 922847 1820943 13934176 16 Tashiding NR 43.65 2930731.234 7741937 201374 932460 1839912 13646414 17 NR Railways NR 4312873 4312873 18 MUNPL Meja NR 4583159 4583159 RAPP 7&8, NR 35288333 35288333 19 NPCIL 20 Gujarat WR 6235 467278287 1105925750 28766011 133200706 90069783 55090422 1487830 1881818788 21 Madhya Pradesh WR 8103 909473004 1437263943 37384382 173107979 117054921 125735608 4242248 2804262084 22 Maharastra WR 7024 982826167 1245717720 32402112 150037631 101454844 77006064 2589444537 23 Chattisgarh WR 2709 74609915 480481172 12497699 57870459 39131772 24588359 689179376

LTA Usage based Balance AC Regional Transformers Total Demand AC system system National Component (₹) Component component Bilateral Transmission S.No. Zone Region / charges (₹) charges (₹) (₹) (₹) Charges charges Injection (₹) payable in ₹ (in MW) AC-UBC AC-BC NC-RE NC-HVDC RC TC 24 Goa WR 503 44566932 89238785 2321172 10748162 7267864 12005278 1453413 167601606 25 Daman Diu WR 430 26319840 76268018 1983792 9185928 6211487 17930171 137899236 Dadra Nagar WR 1023 114094923 181484992 4720569 21858546 14780661 22146743 359086435 26 Haveli Jindal Power WR 114 13742400 20290437 527770 2443835 1652512 38656955 27 Limited Spectrum Coal & WR 28 4288529 4877509 126868 587460 397238 10277605 28 Power 29 ACB Ltd WR 23 4428140 4079371 106108 491331 332236 9437185 30 Torrent Power WR 200 1339428 35472793 922676 4272440 2889007 44896343 Sembcorp 31 Energy India Ltd WR 115 5127216 20396856 530538 2456653 1661179 30172442 Project-I 32 DB Power WR 186 40011854 32989697 858088 3973369 2686776 80519785 TRN Energy Pvt. WR 3 174117 532092 13840 64087 43335 827471 33 Ltd. 34 CSPTCL WR 261 3176598 46291994 1204092 5575534 3770154 60018371 35 WBSEDCL_Inj WR 400 4880304.723 70945585 1845351 8544879 5778013 91994134 36 KSK Mahanadi WR 400 56921558 70945585 1845351 8544879 5778013 144035387 GMR Warora 37 Energy Ltd, WR 200 4263063 35472793 922676 4272440 2889007 47819978 Maharashtra 38 Jorthang WR 43.20 3328964.176 7662123 199298 922847 624025 12737258 39 Tashiding WR 43.65 2930731.234 7741937 201374 932460 630526 12437028 NTPC 40 WR 151523966 151523966 Gadarwada 41 MB Power WR 12763640 12763640 Adani Power WR 344873892 344873892 42 Limited 43 Andhra Pradesh SR 1877 268571154 332850784 8657715 40089454 27250403 31217633 708637143

LTA Usage based Balance AC Regional Transformers Total Demand AC system system National Component (₹) Component component Bilateral Transmission S.No. Zone Region / charges (₹) charges (₹) (₹) (₹) Charges charges Injection (₹) payable in ₹ (in MW) AC-UBC AC-BC NC-RE NC-HVDC RC TC 44 Telangana SR 4191 265892132 743307131 19334012 89525933 60854353 32034612 1210948173 45 Tamil Nadu SR 8538 404277674 1514262865 39387186 182381939 123972290 87033397 2351315350 46 Kerala SR 2770 144160629 491232662 12777354 59165398 40217085 51500596 799053723 47 Karnataka SR 5658 516323857 1003511579 26102137 120865664 82157221 99018212 4033567 1852012236 48 Pondicherry SR 513 7213225 91074563 2368922 10969268 7456250 12572208 131654436 49 Goa-SR SR 92 4012239 16249909 422673 1957183 1330376 23972380 Sembcorp Energy India Ltd SR 55 2452146.808 9755018 253736 1174921 798641 801624 15236087 50 Project-I Sembcorp Energy India Ltd SR 490 26962512 86908342 2260555 10467477 7115162 133714049 51 Project-II 52 BHAVINI SR 12590841 12590841 53 Betam SR 1170343 1170343 54 West Bengal ER 2641 56822440 468332219 12181695 56407206 63347367 38694446 695785374 55 Odisha ER 1671 53841824 296414810 7709986 35701006 40093543 67460544 501221712 56 Bihar ER 4439 247658567 787391795 20480689 94835610 106503877 117130382 1374000920 57 Jharkhand ER 842 33863943 149258651 3882337 17977118 20188965 50928749 4063363 280163125 58 Sikkim ER 178 1620034 31614226 822311 3807703 4276191 3638309 45778775 59 DVC ER 622 47209648 110354360 2870405 13291379 14926708 6298659 194951158 60 Bangladesh ER 782 7166183 138772272 3609578 16714110 18770560 185032703 BRBCL 61 ER 7160087 7160087 Nabinagar 62 NPGC Nabinagar ER 21607255 21607255 63 NTPC Darlipalli ER 4085673 4085673 Arunachal 64 NER 247 10171639 43750735 1137992 5269458 5811784 15053104 81194711 Pradesh 65 Assam NER 1592 38388384 282352645 7344218 34007321 37507317 23381174 422981059 66 Manipur NER 237 12030241 42091280 1094828 5069588 5591345 4494522 70371804

LTA Usage based Balance AC Regional Transformers Total Demand AC system system National Component (₹) Component component Bilateral Transmission S.No. Zone Region / charges (₹) charges (₹) (₹) (₹) Charges charges Injection (₹) payable in ₹ (in MW) AC-UBC AC-BC NC-RE NC-HVDC RC TC 67 Meghalaya NER 328 14607501 58165702 1512936 7005635 7726648 706369 89724791 68 Mizoram NER 136 4988692 24193110 629282 2913884 3213778 1532249 3970562 41441556 69 Nagaland NER 166 6028584 29369587 763926 3537353 3901413 9675604 53276468 70 Tripura NER 353 3684260 62657586 1629774 7546650 8323343 1366570 85208184 TOTAL 100991 8155483246 17912088774 465907724 2157380697 2551871199 1739895978 712979571 33695607189

Transmission Charges to be paid by DICs under Regulation 13(7) Where Long Term Access is granted to a generating station on existing margins and COD of the generating station or unit(s) thereof is delayed

Date of Name of Generating LTA Commissioned Delayed Transmission Sl.No. State Capacity Commercial Station granted capacity Capacity Charges (Rs) Operation

Sprng Renewable Tamil NA 300 1 300 300 0 8262210 Energy Pvt Limited Nadu 8MW: Uttar 10.11.20 2 NTPC Auraiya Solar 20 20 15 5.68 198164 Pradesh 7MW: 04.12.20

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 7 of 19

Annexure-II

Regional DIC wise revised break up of LTA/MTOA considered in the computations

Name of the state LTA/MTOA control area in considered in which LTA/MTOA Sl.No. Name of the DIC Region the of specific DICs is computations included in the computations* 1 UP NR 9568.88

2 Delhi NR 5233.99

3 Haryana NR 3634.73

4 Uttarakhand NR 1228.14

5 Punjab NR 4298.33

6 Rajasthan NR 4181.54

7 Himachal Pradesh NR 1749.91

8 & Kashmir NR 2764.63

9 Chandigarh NR 219.79

10 Noida Power Company Ltd, UP NR 170.00 Uttar Pradesh 11 AD Hydro NR 168.96

12 Railways_UP NR 188.75 Uttar Pradesh 13 Railways_Haryana NR 11.25 Haryana 14 Railways_Delhi NR 3.75 Delhi 15 Railways_Rajasthan NR 59.24 Rajasthan 16 PG-Rihand NR 0.74 Uttar Pradesh 17 PG-Dadri NR 0.78 Uttar Pradesh 18 PG-Agra NR 2.36 Uttar Pradesh 19 PG-Balia NR 0.95 Uttar Pradesh 20 PG-Bhiwadi NR 0.95 Rajasthan 21 PG-Kurukshetra NR 5.14 Haryana 22 MB Power NR 175.00

23 WBSEDCL NR 600.00

24 GMR Kamalanga Energy Pvt. Ltd NR 75.00

25 Chuzachen NR 99.00

26 Jorthang NR 43.20

27 Tashiding NR 43.65

28 Gujarat WR 6121.22

29 Madhya Pradesh WR 7759.51

30 Chhattisgarh WR 2691.82

31 Maharashtra WR 6911.52

32 GOA WR 503.14

33 Daman Diu WR 430.01

34 Dadra Nagar Haveli WR 1023.23

35 HVDC Bhadrawathi WR 2.29 Maharashtra 36 HVDC Vindhyachal WR 0.69 Madhya Pradesh 37 BARC Facility WR 9.10 Maharashtra 38 Heavy Water Plant of DAE WR 12.88 Gujarat 39 Mind Space Business parks Pvt Ltd WR 10.60 Maharashtra 40 HVDC Champa WR 5.00 Chhattisgarh 41 HVDC Raigarh WR 0.94 Chhattisgarh 42 Railways_Gujarat WR 101.25 Gujarat

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 8 of 19

Name of the state LTA/MTOA control area in considered in which LTA/MTOA Sl.No. Name of the DIC Region the of specific DICs is computations included in the computations* 43 Railways_MP WR 343.27 Madhya Pradesh 44 Railways_Maharashtra WR 90.00 Maharashtra 45 Railways_Chhattisgarh WR 11.25 Chhattisgarh 46 ACB Ltd. WR 23.00

47 JINDAL WR 114.40

48 Spectrum Coal and Power WR 27.50

49 Torrent Power WR 200.00

50 DB Power WR 186.00

51 KSK Mahanadi WR 400.00

GMR Warora Energy Ltd, 52 WR 200.00 Maharashtra 53 CSPTCL WR 261.00

54 TRN Energy Pvt. Ltd. WR 3.00

55 Sembcorp Energy India Ltd WR 115.00

56 WBSEDCL WR 400.00

57 Jorthang WR 43.20

58 Tashiding WR 43.65

59 BIHAR ER 4363.27

60 JHARKHAND ER 771.54

61 DVC ER 339.69

62 ORISSA ER 1671.22

63 WEST BENGAL ER 2604.42

64 SIKKIM ER 178.24

65 Bangladesh ER 782.42

66 Ltd. ER 200.00 DVC 67 Railways_Jharkhand ER 70.00 Jharkhand 68 Railways_Bihar ER 75.00 Bihar 69 Railways_DVC ER 82.50 DVC 70 Railways_Odisha ER 0.00 Odisha 71 Railways_West Bengal ER 33.75 West Bengal 72 HVDC Alipurduar ER 2.34 West Bengal 73 POWERGRID PUSAULI ER 1.15 Bihar 74 Andhra Pradesh SR 1872.63

75 Karnataka SR 5613.55

76 KSEB SR 2768.69

77 Tamil Nadu SR 8522.50

78 Telangana SR 4190.86

79 Puducherry SR 513.49

80 Goa SR 91.62

81 SAIL, Salem SR 13.65 Tamil Nadu 82 Railways_Karnataka SR 42.50 Karnataka PG-HVDC 83 SR 2.15 Andhra Pradesh Gazuwaka PG-HVDC 84 SR 1.88 Andhra Pradesh Talcher PG-HVDC 85 SR 1.88 Karnataka Kolar 86 PG-HVDC Pugalur SR 1.45 Tamil Nadu 87 PG-HVDC Thrissur SR 0.94 Kerala

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 9 of 19

Name of the state LTA/MTOA control area in considered in which LTA/MTOA Sl.No. Name of the DIC Region the of specific DICs is computations included in the computations* 88 Sembcorp Energy India Ltd Project-I SR 55.00

Sembcorp Energy India Ltd Project- 89 SR 490.00 II 90 Arunachal Pradesh NER 246.67

91 Assam NER 1589.66

92 Manipur NER 237.32

93 Meghalaya NER 327.95

94 Mizoram NER 136.40

95 Nagaland NER 165.59

96 Tripura NER 353.27

97 PG-HVDC BNC NER 2.28 Assam TOTAL 100990.58

*Note: Transmission charges of the state are to be shared on prorata basis on the basis of LTA/MTOA of the DICs included in the state's control area as mentioned in the table

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 10 of 19

Annexure-III

Transmission Charges claimed by ISTS licensees for the billing period Dec'20

Total YTC Total YTC Equivalent claimed allowed MTC to be Name of the Transmission S.No. by for considered Remarks Licensee Licensees Dec'20 for Dec'20 (₹ Cr) (₹ Cr) (₹ Cr) As per data furnished by ISTS Licensee for Dec'20. MTC of the assets listed under Regulation 13(3) shall be partly settled through the bilateral payments 1 POWERGRID 32179.98 32179.98 2733.09 from respective entities as detailed in the transmission charges bill. PowerGrid assets for bilateral payments as mentioned in format I-C are also included in this total YTC claimed. Adani Transmission (India) As per data furnished by ISTS Licensee 2 772.64 772.64 65.62 Limited for Dec'20 CHHATTISGARH-WR As per data furnished by ISTS Licensee 3 TRANSMISSION 165.00 165.00 14.01 for Dec'20 LIMITED. RAIPUR RAJNANDGAON-WR As per data furnished by ISTS Licensee 4 219.74 219.74 18.66 TRANSMISSION LIMITED. for Dec'20 SIPAT TRANSMISSION As per data furnished by ISTS Licensee 5 95.86 95.86 8.14 LIMITED. for Dec'20 Western Transmission As per data furnished by ISTS Licensee 6 58.35 58.35 4.96 Gujarat Limited for Dec'20 Western Transco Power As per data furnished by ISTS Licensee 7 107.37 107.37 9.12 Limited for Dec'20 ALIPURDUAR TRANSMISSION As per data furnished by ISTS Licensee 8 159.40 159.40 13.54 LIMITED for Dec'20 ARAVALI POWER COMPANY As per data furnished by ISTS Licensee 9 12.77 12.77 1.08 PRIVATE LIMITED for Dec'20 As per minutes of Validation Committee meeting held for 2020-21 Q2 PoC computations, combined tariff of LILO of 400kV Vindhyachal-Korba at Mahan, GIS S/s at Hazira and 400kV Hazira- Essar Power Transmission Gandhar line) is being excluded from 10 412.98 333.05 28.29 Company Limited computations in the absence of exclusive tariff of LILO of 400kV Vindhyachal-Korba at Mahan since 2020-21 Q2. This matter is already sub- judice. Considered same as for previous periods. Essar Power Transmission As per data furnished by ISTS Licensee 11 Company Limited (NTPC 3.46 3.46 0.29 for Dec'20 portion) Name of the Transmission Total YTC Total YTC Equivalent S.No. Remarks Licensee claimed allowed MTC to be

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 11 of 19

by for considered Licensees Dec'20 for Dec'20 (₹ Cr) (₹ Cr) (₹ Cr) As per data furnished by ISTS Licensee 12 Jindal Power Limited 19.12 19.12 1.62 for Dec'20 As per data furnished by ISTS Licensee 13 Kudgi Transmission Limited 196.29 196.29 16.67 for Dec'20 Parbati Koldam Transmission Company Limited (JV of As per data furnished by ISTS Licensee 14 173.04 173.04 14.70 Rinfra and PowerGrid for Dec'20 Corporation of India Limited) BHOPAL DHULE As per data furnished by ISTS Licensee 15 TRANSMISSION COMPANY 260.00 260.00 22.08 for Dec'20 LTD. EAST NORTH As per data furnished by ISTS Licensee 16 INTERCONNECTION 143.32 143.32 12.17 for Dec'20 COMPANY LIMITED GURGAON PALWAL As per data furnished by ISTS Licensee 17 147.49 147.49 12.53 TRANSMISSION LIMITED for Dec'20 JABALPUR TRANSMISSION As per data furnished by ISTS Licensee 18 146.98 146.98 12.48 COMPANY LIMITED for Dec'20 MAHESHWARAM As per data furnished by ISTS Licensee 19 55.89 55.89 4.75 TRANSMISSION LIMITED for Dec'20 KHARGONE TRANSMISSION As per data furnished by ISTS Licensee 20 105.98 105.98 9.00 COMPANY LTD. for Dec'20 NRSS-XXIX TRANSMISSION As per data furnished by ISTS Licensee 21 502.08 502.08 42.64 LIMITED for Dec'20 ODISHA GENERATION As per data furnished by ISTS Licensee 22 PHASE-II TRANSMISSION 161.42 161.42 13.71 for Dec'20 LIMITED Patran Transmission As per data furnished by ISTS Licensee 23 30.66 30.66 2.60 Company Limited for Dec'20 PURULIA & KHARAGPUR As per data furnished by ISTS Licensee 24 TRANSMISSION COMPANY 72.43 72.43 6.15 for Dec'20 LIMITED RAPP TRANSMISSION As per data furnished by ISTS Licensee 25 44.03 44.03 3.74 COMPANY LIMITED for Dec'20 Teestavalley Power As per data furnished by ISTS Licensee 26 289.56 289.56 24.59 Transmission Limited for Dec'20 YTC as per CERC Order has been considered. Incentives shall be claimed 27 Torrent Power Grid Limited 46.68 46.68 3.96 through second bill as per Sharing Regulations 2020 Darbhanga-Motihari As per data furnished by ISTS Licensee 28 Transmission Company 119.03 119.03 10.11 for Dec'20 Limited NRSS XXXI (B) Transmission As per data furnished by ISTS Licensee 29 90.76 90.76 7.71 Limited for Dec'20 Total YTC Total YTC Equivalent Name of the Transmission claimed allowed MTC to be S.No. Remarks Licensee by for considered Licensees Dec'20 for Dec'20

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 12 of 19

(₹ Cr) (₹ Cr) (₹ Cr)

Data not furnished by ISTS Licensee for 30 Jaypee Powergrid Limited 161.36 161.36 13.70 Dec'20. Data as furnished in the previous quarters has been considered As per data furnished by ISTS Licensee for Nov'20. Data not furnished by ISTS Licensee for Dec'20. Power flow was KOHIMA MARIANI 31 167.40 167.40 0.92 established on KMTL elements w.e.f TRANSMISSION LIMITED 30.12.2020 with energization of PowerGrid's New Mariani ICT. NERLDC trial charge certificate issued. RAICHUR SHOLAPUR As per data furnished by ISTS Licensee 32 TRANSMISSION COMPANY 35.20 35.20 2.99 for Dec'20 PRIVATE LIMITED As per data furnished by ISTS Licensee for Dec'20, YTC claimed by licensee includes availability incentive and carrying cost. These are excluded and DAMODAR VALLEY 33 144.40 137.08 11.64 only CERC approved tariff same as in CORPORATION Nov'20 has been considered. As per Regulation, licensee may claim incentives and carrying cost in second bill. Powerlinks Transmission As per data furnished by ISTS Licensee 34 224.30 224.30 19.05 Limited for Dec'20 Data not furnished by ISTS Licensee for NRSS XXXVI Transmission Dec'20. Data as furnished by ISTS 35 1.28 1.28 0.11 Limited Licensee for Nov'20 has been considered Cost of 240 MVAR reactor with bays at Warora-Kurnool 36 5.46 5.46 0.46 Warora end is considered under the Transmission Limited sharing mechanism POWERGRID VIZAG As per data furnished by ISTS Licensee 37 294.53 294.53 25.02 TRANSMISSION LIMITED for Dec'20 POWERGRID NM As per data furnished by ISTS Licensee 38 116.54 116.54 9.90 TRANSMISSION LIMITED for Dec'20 POWERGRID UNCHAHAR As per data furnished by ISTS Licensee 39 20.79 20.79 1.77 TRANSMISSION LIMITED for Dec'20 POWERGRID PARLI As per data furnished by ISTS Licensee 40 317.38 317.38 26.96 TRANSMISSION LIMITED for Dec'20 As per data furnished by ISTS Licensee POWERGRID KALA AMB 41 72.515 72.52 6.16 for Dec'20. Bilateral payment of HPSEB TRANSMISSION LIMITED is also included in the claimed YTC POWERGRID Southern As per data furnished by ISTS Licensee 42 Interconnector Transmission 449.68 449.68 38.19 for Dec'20 System Limited Total YTC Total YTC Equivalent Name of the Transmission S.No. claimed allowed MTC to be Remarks Licensee by for considered

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 13 of 19

Licensees Dec'20 for Dec'20 (₹ Cr) (₹ Cr) (₹ Cr) POWERGRID JABALPUR As per data furnished by ISTS Licensee 43 243.68 243.68 20.70 TRANSMISSION LIMITED for Dec'20 As per data furnished by ISTS Licensee for Dec'20. MTC of the assets listed POWERGRID WARORA under Regulation 13(3) shall be partly 44 352.07 352.07 29.90 TRANSMISSION LIMITED settled through the bilateral payments from respective entities as detailed in the transmission charges bill. NORTH EAST TRANSMISSION As per data furnished by ISTS Licensee 45 351.53 29.86 COMPANY LIMITED 351.53 for Dec'20 As per data furnished by ISTS Licensee Transmission Corporation of for Dec'20. CERC approved ISTS lines are 46 Andhra Pradesh 283.72 57.74 4.90 only considered as per Sharing (APTRANSCO) Regulations 2020 Data not furnished by ISTS Licensee for Madhya Pradesh Power Dec'20. Data as furnished by ISTS 47 12.54 12.54 1.06 Transmision Co. Ltd. Licensee for Nov'20 has been considered KARNATAKA POWER Data not furnished by ISTS Licensee for 48 TRANSMISSION 1.42 1.42 0.12 Dec'20. CERC Tariff Order dated CORPORATION LIMITED 12.06.2019 has been considered As per data furnished by ISTS Licensee 49 DELHI TRANSCO LIMITED 3.12 3.12 0.26 for Dec'20 Data not furnished by ISTS Licensee for Power Transmission Dec'20. CERC Tariff Order dated 50 Corporation of Uttarakhand 44.88 44.88 3.81 20.04.2018 and 22.06.2018 have been Ltd considered Data not furnished by ISTS Licensee for Rajasthan Rajya Vidhyut 51 33.98 33.98 2.89 Dec'20. Data as furnished in the Prasaran Nigam Ltd. previous quarters has been considered Data not furnished by ISTS Licensee for TAMILNADU TRANSMISSION 52 0.59 0.59 0.05 Dec'20. CERC Tariff Order dated CORPORATION LIMITED 16.11.2018 has been considered CHHATTISGARH STATE As per data furnished by ISTS Licensee 53 POWER TRANSMISSION 0.75 0.75 0.06 for Dec'20 COMPANY LTD HIMACHAL PRADESH POWER As per data furnished by ISTS Licensee 54 TRANSMISSION 2.61 0.22 for Dec'20 CORPORATION LTD 2.61 ODISHA POWER Data not furnished by ISTS Licensee for 55 TRANSMISSION 9.67 9.67 0.82 Dec'20. CERC Tariff Order dated CORPORATION LIMITED 26.06.2018 has been considered Data not furnished by ISTS Licensee for Uttarpradesh Power Dec'20. YTC has been considered as 56 Transmission Corporation 27.23 0.00 0.00 zero in line with CERC terms & Limited (UPPTCL) conditions for Tariff Regulations 2019 as tariff as on 31.03.2019 is not available

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 14 of 19

Total YTC Total YTC Equivalent claimed allowed MTC to be Name of the Transmission S.No. by for considered Remarks Licensee Licensees Dec'20 for Dec'20 (₹ Cr) (₹ Cr) (₹ Cr) Data not furnished by ISTS Licensee for Power Development Dec'20. YTC has been considered as 57 Department, Jammu & 10.11 0.00 0.00 zero in line with CERC terms & Kashmir conditions for Tariff Regulations 2019 as tariff as on 31.03.2019 is not available Data not furnished by ISTS Licensee for Dec'20. YTC has been considered as Gujarat Energy Transmission 58 5.71 0.00 0.00 zero in line with CERC terms & Corporation Limited(GETCO) conditions for Tariff Regulations 2019 as tariff as on 31.03.2019 is not available Data not furnished by ISTS Licensee for Maharashtra State Electricity Dec'20. YTC has been considered as 59 Transmission Company Ltd 97.68 0.00 0.00 zero in line with CERC terms & (MAHATRANSCO) conditions for Tariff Regulations 2019 as tariff as on 31.03.2019 is not available Data not furnished by ISTS Licensee for West Bengal State Electricity Dec'20. YTC has been considered as 60 Transmission Company Ltd 32.05 0.00 0.00 zero in line with CERC terms & (WBSETCL) conditions for Tariff Regulations 2019 as tariff as on 31.03.2019 is not available Data not furnished by ISTS Licensee for Dec'20. YTC has been considered as Haryana Vidyut Prasaran 61 8.09 0.00 0.00 zero in line with CERC terms & Nigam Limited (HVPNL) conditions for Tariff Regulations 2019 as tariff as on 31.03.2019 is not available Data not furnished by ISTS Licensee for Dec'20. YTC has been considered as Assam Electricity Grid 62 10.78 0.00 0.00 zero in line with CERC terms & Corporation Limited(AEGCL) conditions for Tariff Regulations 2019 as tariff as on 31.03.2019 is not available Data not furnished by ISTS Licensee for Meghalaya Power Dec'20. YTC has been considered as 63 Transmission Corporation 3.61 0.00 0.00 zero in line with CERC terms & Limited (MePTCL) conditions for Tariff Regulations 2019 as tariff as on 31.03.2019 is not available Data not furnished by ISTS Licensee for Dec'20. YTC has been considered as Kerala State Electricity Board 64 10.06 0.00 0.00 zero in line with CERC terms & (KSEB) conditions for Tariff Regulations 2019 as tariff as on 31.03.2019 is not available

TOTAL MTC considered for the billing period Dec'20 from the claimed assets of 3369.56 ISTS licensees (₹ Crores)

Total MTC considered for the billing period of Dec’20 in Rs. 33695607189

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 15 of 19

Annexure-IV

Details of Entity-wise bilateral billing

State Control Area in which Name of the Sl.No. Name of the Asset Region MTC in ₹ the Bilateral Remarks beneficiary charges are included 400 kV D/C Nabinagar- Sasaram Transmission As per Regulation 1 Line and associated 400 BRBCL Nabinagar ER 7160087 13(3) of Sharing kV line bays at Sasaram Regulations 2020 S/S 02 Nos of 132 kV line 2 bays at Daltonganj Substation Jharkhand Urja As per Regulation Sancharan Nigam ER 4063363 Jharkhand 13(12) of Sharing 04 Nos. 220 KV Bays at Limited (JUSNL) Regulations 2020 3 Daltonganj Sub-station;

400kV D/C (Quad) Nabinagar-II – Gaya As per Regulation 4 transmission line with NPGC Nabinagar ER 21607255 13(3) of Sharing 02 nos. associated bays Regulations 2020 at Gaya Sub-station Circuit 1 of the 765 kV D/C Darlipalli TPS (NTPC)-Jharsuguda (Sundergarh) Pooling As per Regulation Station transmission 5 NTPC Darlipalli ER 4085673 13(3) of Sharing line alongwith one 765 Regulations 2020 kV line Bays at Jharsuguda (Sundergarh) Pooling Station 132kV D/C Melriat– Sihhmui T/L alongwith associated bays at As per Regulation Melriat (PG) & Sihhmui P & E Department, 6 NER 3970562 Mizoram 13(12) of Sharing (Mizoram) S/S in place Govt. of Mizoram Regulations 2020 of 132kV D/C Melriat- Melriat Transmission Line Himachal Pradesh As per Regulation 220 kV, 2 nos. Line bays Power Transmission Himachal 7 NR 1674000 13(12) of Sharing at Hamirpur Sub-station Corporation Limited Pradesh Regulations 2020 (HPPTCL) 02 Nos. 220 KV Line Himachal Pradesh As per Regulation Himachal 8 Bays (HPSEB Future State Electricity Board NR 52615727 13(12) of Sharing Pradesh Bays) (HPSEB) Regulations 2021

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 16 of 19

State Control Area in which Name of the Sl.No. Name of the Asset Region MTC in ₹ the Bilateral Remarks beneficiary charges are included GIS substation 7X105 MVA (1-ph), 400/220 kV As per Regulation at Kala Amb (Himachal 9 13(12) of Sharing Pradesh) and LILO of Regulations 2022 Karcham Wangtoo - Abdullapur 400 kV D/C 400 kV D/C Meja- Allahabad transmission As per Regulation 10 line along with MUNPL Meja NR 4583159 13(3) of Sharing associated bays at Regulations 2020 Allahabad Punjab State As per Regulation 220kV, 2 Nos. Line bays Transmission 11 NR 1368429 Punjab 13(12) of Sharing at Jallandhar Substation Corporation Limited Regulations 2020 (PSTCL) Asset-B(ii) 2 nos. 220 As per Regulation 12 kV Line Bays at Kotputli Rajasthan DISCOMs NR 1513479 Rajasthan 13(12) of Sharing S/S Regulations 2021 2 nos. 220 kV line bays (#211 and 212) at 13 400/220 kV Jaipur Rajasthan Rajya As per Regulation (South) Substation Vidyut Prasaran NR 3217715 Rajasthan 13(12) of Sharing Extension of 400/220 Nigam Limited Regulations 2022 kV Sikar Sub-station (RRVPNL) 14 with 2 nos. 220 kV line bays 400KV D/C Kota - Jaipur (South) line along with associated bays at Kota As per Regulation 15 and Jaipur(South) (part RAPP 7&8, NPCIL NR 35288333 13(3) of Sharing of RAPPJaipur (S) 400KV Regulations 2020 D/C line with one ckt LILO at Kota) One No. 220kv line Bays (206 no. Bay) associated 16 with Baghpat GIS Substation One No. 220kv line Bays (207 no. Bay) associated Uttar Pradesh Power 17 As per Regulation with Baghpat GIS Transmission NR 5537449 Uttar Pradesh 13(12) of Sharing Substation Corporation Limited Regulations 2020 2 nos. 220kV bays (#206 (UPPTCL) & 207) of Shahjahanpur (PG)-Shahjahanpur 18 (UPPTCL) at 400/220 kV Shahjahanpur Sub- Station

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 17 of 19

State Control Area in which Name of the Sl.No. Name of the Asset Region MTC in ₹ the Bilateral Remarks beneficiary charges are included 1 no. 220 kV line bay (# 210) of Shahjahanpur (PG)-Shahjahanpur 19 (UPPTCL) at 400/220 kV Shahjahanpur Sub- Station

400kV Srinagar Sub- 20 station As per Regulation Uttarakhand NR 31352975 Uttarakhand 13(12) of Sharing 400kV Srinagar-Srinagar Regulations 2020 21 PH Line

2X500MVA 400/230kV transformers along with associated bays As per Regulation 22 andequipmentat new Betam SR 1170343 13(3) of Sharing 400/230kV (GIS) Regulations 2020 Tirunelveli Pooling Sub- station Asset 1. Kalpakkam PFBR-Sirucheri 230 kV Bharatiya Nabhikiya As per Regulation 23 D/C Line, Asset 2. Vidyut Nigam Limited SR 12590841 13(3) of Sharing Kalpakkam PFBR - Arani (BHAVINI) Regulations 2020 230 KV D/C Line 220 kV line bays at Madhugiri for As per Regulation 24 termination of 220 kV Karnataka DISCOMs SR 1323148 Karnataka 13(12) of Sharing D/C Madhugiri – Nittur Regulations 2020 line Karnataka Power 04 No. 220 KV bays at As per Regulation Transmission 25 400/220kV Yelahanka SR 2710419 Karnataka 13(12) of Sharing Corporation Limited Substation Regulations 2021 (KPTCL) Thermal Powertech As per Regulation Corporation India Ltd Sembcorp Energy 26 SR 801624 13(9) of Sharing Switchyard-Nellore PS India Ltd Project-I Regulations 2020 400kV D/c (quad) HVDC Mundra- 27 Adani Power Limited WR 344873892 -- Mahendergarh 2 nos. 220 kV line bays at Mapusa (Colvale) Goa Electricity As per Regulation (Powergrid) Substation 28 Department (GED), WR 1453413 Goa 13(12) of Sharing (for Mapusa- (Colvale) Goa Regulations 2020 (Powergrid)-Tuem 220 kV D/C line)

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 18 of 19

State Control Area in which Name of the Sl.No. Name of the Asset Region MTC in ₹ the Bilateral Remarks beneficiary charges are included Asset 3: 2 nos. 220 kV Gujarat Urja Vikas As per Regulation 29 line bays at 400/220 kV Nigam Limited WR 1487830 Gujarat 13(12) of Sharing Pirana substation (GUVNL) Regulations 2021 MBPMPL TPS-Jabalpur As per Regulation 30 PS 400 kV D/c (Triple) MB Power WR 12763640 13(9) of Sharing line Regulations 2020 2 Nos. 400 kV line bays at Indore Substation 31 (for Indore (Powergrid)- Ujjain 400 kV D/C Line. Madhya Pradesh As per Regulation 1 no. 220 kV line bays at Power Transmission Madhya WR 4242248 13(12) of Sharing 32 400/220 kV Indore Corporation Limited Pradesh Regulations 2020 substation (MPPTCL) 1 no. 220 kV line bay at 33 400/220 kV Indore substation 765 kV line bays at Jabalpur Pooling Station for 765 kV D/C As per Regulation 34 Gadarwara STPS NTPC Gadarwada WR 151523966 13(3) of Sharing (NTPC)-Jabalpur Pooling Regulations 2020 Station transmission line TOTAL 712979571

Note: The details of bilateral billing mentioned are prepared on the basis of Format-I(c) received from ISTS Licensees.

AMENDMENT TO NOTIFICATION OF TRANSMISSION CHARGES PAYABLE BY DICS FOR THE BILLING MONTH OF FEB’21 | Page 19 of 19

FORMAT II-D Commercial data related to LTA details of exempted Renewable Energy (RE) based generation (till Dec'20)

Quantum of LTA LTA with tied up Effective date of LTA Exempted quantum in S.No Name of the LTA customer (RE Injecting utility) Region Name of the beneficiaries Remarks Granted beneficiaries operartionlization MW (as on Dec-20) 490MW:07.07.18; No Billing for Feb'20 billing 1 Rewa Ultra Mega Solar Power Development WR 750 750 MP-651 MW, DMRC-99 MW 750 260 MW: 13.04.19 month 126MW: 24.08.18; No Delayed part Billing for GRIDCO-50 MW, Jharkhand-50 50MW: 02.11.18; Feb'20 billing month,due to Non 2 Ostro Kutch Wind Private Limited WR 300 250 MW, Bihar-50 MW, UPPCL- 50MW: 29.12.18; 250 availability of approved CERC 100MW 24MW: 30.03.19: tariff order for ATS. 50MW: 14.04.19. No Delayed part Billing for Bihar -50 MW, Jharkhand -50 Feb'20 billing month,due to Non 3 Inox Wind Infrastructure Services Limited WR 500 500 MW, UP - 200 MW, BRPL - 50 500MW: 14.04.2019 200 availability of approved CERC MW, Haryana - 150 MW tariff order for ATS. No Delayed part Billing for UP - 100 MW, Feb'20 billing month,due to Non 4 ReNew Power Limited WR 300 300 PSPCL - 100 MW, 300MW: 01.05.19 212.1 availability of approved CERC GRIDCO - 50 MW, GOA - 50 MW tariff order for ATS. Assam (APDCL) - 50 MW, 151.2MW:14.04.19; No Billing for Feb'20 billing 5 Green Infra Wind Energy Ltd. WR 250 250 GRIDCO Ltd.-100 MW, 250 98.8 MW: 04.11.19 month Jharkhand (JBVNL)- 100 MW PSPCL -200 MW, Bihar DISCOMs: 100 MW No Billing for Feb'20 billing 6 Green Infra Wind Energy Ltd. WR 300 300 300 MW: 04.11.19 300 (NBPDCL & SBPDCL) month

UPPCL - 40 MW , No Billing for Feb'20 billing 7 Adani Green Energy MP Ltd. (AGEMPL Dayapar) WR 100 100 NPCL - 10 MW, 100 MW: 04.11.19 100 month PSPCL - 50 MW 90 MW:18.11.19; 8 SEI Sunshine WR 180 180 TPDDL-180 MW 90 90 MW: 01.04.20 100MW: 31.01.20; No Delayed part Billing for 50MW: 15.02.20; BRPL -150 MW, BYPL -50 MW, Feb'20 billing month,due to Non 9 Alfanar Energy Pvt. Limited WR 300 300 50MW: 28.02.20; 234.6 TPDDL - 50 MW, Bihar - 50 MW availability of approved CERC 36MW: 06.10.20: tariff order for ATS. 36MW: 20.10.20. 50 MW:25.02.20; 100 MW: 20.09.20; No Delayed part Billing for ReNew Wind Energy (AP2) Private Limited 262.5 262.5 Haryana 20: 03.12.20; 168.44 Feb'20 billing month,due to Non 10 (2 separate LTA grants, 1 to Haryana & 2nd to WR 40: 10.12.20; availability of approved CERC GRIDCO) 43.75: 20.12.20 tariff order for ATS. 30: 10.12.2020 37.5 37.5 GRIDCO 24.06 6.25: 20.12.2020 UPPCL -100 MW, Jharkhand -50 75MW: 10.06.18; No Billing for Feb'20 billing 11 Mytrah Energy (India) Pvt Ltd (GEC-I Corridor) SR 250 250 MW, Bihar - 50 MW, Assam - 50 50MW: 30.09.18; 250 month MW 125MW: 01.12.18; No Delayed part Billing for 250MW: 11.07.16; Feb'20 billing month,due to Non 12 AP Solar Power Corporation Pvt Ltd (NP Kunta) SR 1500 1500 Andhra Pradesh-1500MW 750MW: 04.08.18; 650 availability of approved CERC 500MW: 01.10.18; tariff order for ATS. 600MW: 12.07.18; Karnataka Solar Power development Karnataka-1800 MW, UPPCL-200 400MW: 28.09.18; No Billing for Feb'20 billing 13 SR 2050 2050 2050 Corporation Ltd MW 200MW: 30.12.19; month 850 MW: 03.05.20 UPPCL -99.9 MW, Jharkhand -50 No Billing for Feb'20 billing 14 Green Infra Renewable Energy Ltd. SR 249.9 249.9 MW, Bihar - 50 MW, BRPL - 50 249.9 MW: 10.10.18 249.9 month MW Bihar - 100 MW, Haryana - 100 No Billing for Feb'20 billing 15 Orange Sironj Power Pvt. Ltd. SR 200 200 200 MW: 22.02.19 200 MW month Bihar - 50.2 MW, Odisha- 100 Already included in Format 13(3) 16 Betam Wing Energy Private Limited SR 250.2 250.2 250.2 MW:31.07.19 144.2 MW, UPPCL -100 MW G (1) No Billing for Feb'20 billing 17 Saurya Urja Company of Rajasthan Limited NR 500 500 UPPCL-500 MW 500 MW: 27.10.19 500 month No Billing for Feb'20 billing 18 Adani Reneable EnergyPark Rajasthan Ltd. NR 250 250 UPPCL-250 MW 250 MW: 27.10.19 250 month 19 Sprng Renewable Energy Pvt Limited SR 300 300 UP-300 MW 300 MW: 30.11.19 0 Total 8530.1 8780.1 6873.3 Note: List does not include solar projects of NTPC / NVVNL / SECI which were granted LTA long back and are already operational 3/8/2021 Email

Email comml-wrpc

From : Ravishankar Chinnam (रिवशंकर िचम) Mon, Mar 08, 2021 09:49 AM 1 attachment Subject : FW: MTOA details of exempted Renewable Energy (RE) based generation To : comml-wrpc , [email protected] Cc : Member Secretary , [email protected], [email protected], [email protected], [email protected] Ma'am/ Sir,

Details of RE MTOA exempted in line with Sharing Regulations 2020 as furnished by CTU are forwarded herewith for kind perusal. As intimated by CTU, the exemption is applicable from the effective date of MTOA operationalization as mentioned in the data sheet.

Regards रिव शंकर िचम | Ravi Shankar Chinnam मु बंधक (बा॰॰) | Chief Manager (MO) रा॰भा॰े॰के ॰| NLDC

-----Original Message----- From: CTUBCD [mailto:[email protected]] Sent: 08 March 2021 09:39 To: Implementing Agency ; Ravishankar Chinnam (रिवशंकर िचम) Cc: V Srinivas ; J Majumdar, AGM(AM) CC ; Mukesh Khanna AGM, (CTU-Plng) Subject: MTOA details of exempted Renewable Energy (RE) based generation

Sir, As discussed,the Commercial data related to MTOA details of exempted Renewable Energy (RE) based generation is attached for your information please. It is to mention that the LTA details for the same is being forwarded to implementing agency on monthly basis in Format II(D). You are requested to forward it to WRPC, to resolve their matter regarding RTDA.

Regards, Ajay Upadhyay * This e-mail is an official email of Power System Operation Corporation Ltd (POSOCO), is confidential and intended to use by the addressee only. If the message is received by anyone other than the addressee, please return the https://email.gov.in/h/printmessage?id=35403&tz=Asia/Kolkata&xim=1 1/2 3/8/2021 Email message to the sender by replying to it and then delete the message from your computer. Internet e-mails are not necessarily secure. The Power System Operation Corporation Ltd.(POSOCO) does not accept responsibility for changes made to this message after it was sent. Whilst all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the POSOCO in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Visit our website at www.posoco.in *

MTOA details of exempted Renewable Energy (RE) based generation.xlsx 60 KB

https://email.gov.in/h/printmessage?id=35403&tz=Asia/Kolkata&xim=1 2/2 Commercial data related to MTOA details of exempted Renewable Energy (RE) based generation Quantum of LTA LTA/MTOA with Effective date of Name of the LTA/MTOA customer (RE Injecting Exempted quantum in S.No Region Granted/ MTOA tied up Name of the beneficiaries LTA/MTOA Remarks utility) MW (as on Feb-21) operationalised beneficiaries operartionlization 1 Mahoba Solar (UP) Pvt. Ltd NR 200 200 MSEDCL 26.10.2019 200 MTOA 2 Azure Power India Pvt. Ltd NR 130 130 MSEDCL 26.10.2019 130 MTOA 3 Tata Power Renewable Energy Ltd NR 150 150 MSEDCL 26.10.2019 150 MTOA 4 ACME Solar Holdings Ltd. (250MW) NR 250 250 MSEDCL 26.10.2019 250 MTOA 5 Renew Solar Power Private Limited NR 250 250 MSEDCL 26.10.2019 250 MTOA 6 Adani Green Energy (MP) Limited WR 75 75 MSEDCL 01.01.2020 75 MTOA Total 1055 1055 1055