EAST MIDLANDS COUNCILS CONSULTATION RESPONSE Your

Total Page:16

File Type:pdf, Size:1020Kb

EAST MIDLANDS COUNCILS CONSULTATION RESPONSE Your EAST MIDLANDS COUNCILS CONSULTATION RESPONSE Q1 How do you think closer co-operation between staff in Network Rail and the operator of the next East Midlands franchise can be achieved? A1 Your view: The railway in the UK is split between those who provide and maintain the tracks and those who operate the services, these organisations need to operate alongside the government bodies responsible for the economic and transport strategies and the Department for Transport (DfT) who procure the services. In balancing the needs to maintain and improve the infrastructure and operate the services it is essential that DfT make clear that safety and passenger needs must be given the highest priority. We wish to see a franchise which delivers continued performance improvement, provides a passenger focused approach to service delivery as well as maintenance and enhancement works, and is motivated to support economic growth and the local communities adjoining and served by the franchise. This means there needs to be a very close alignment between all parties to ensure that the services provided supports the economic growth ambition and transport strategy objectives, by providing the right rail infrastructure for the services to meet the community need. The right standard and capacity of services operated to the right timetable and all provided at a price that Treasury can afford. Regular meetings between the winning Train Operating Company (TOC), Network Rail, DfT and East Midlands Councils (EMC) is strategically important to build alignment. EMC can provide the strategic position for the East Midlands Region, as well as being best placed to provide the bridge to local authority partners within the region. Bidders also need to propose how best to engage with and support the communities around and served by the franchise. We consider that it would be helpful if there was a formal and on- going role for East Midlands Councils within the franchise management. Decisions on investments like electrification should be taken in the light of local views, not simply led from London or decisions driven by safety or cost alone, this is because there are a significant number of rail jobs located in the East Midlands, especially focused around Derby. This includes over 100 companies directly working within the rail industry, Network Rail have recruited 300 jobs in the region to work on electrification, and these businesses and jobs will in turn support other local enterprises. EAST MIDLANDS COUNCILS CONSULTATION RESPONSE Q2 How can the operator of the next East Midlands franchise engage with community rail partnerships or heritage railways to support the local economy to stimulate demand for rail services in the region? A2 Community rail partnerships to support the local economy to stimulate DEMAND for rail services in the region? Engagement between the railways and community should be beneficial to both, but should be Community led, rather than rail imposed. For the railway industry community engagement can lead to increased patronage and income, reduced costs, and improved safety etc. For the community, involvement can lead to, community pride, reduced anti-social behaviour, the creation of jobs, community cohesion, reduced isolation and improved awareness of and access to adjoining communities etc. Community involvement in the railway needs to consider community in its widest definition, including rail users, future rail users, neighbours, stakeholders as organisations and individuals etc. and reflecting and embracing the diversity of each local community. Through these people and those employed staff, funded by the DfT/TOC, the community resource should mobilise local business and the wider community in support of both community and rail objectives. We wish to enable the community to have the widest role in supporting local lines and stations, at larger stations this will be more of a supporting role. Community involvement does not ordinarily replace the responsibilities of the Train Operator or Network Rail, but properly supported and encouraged they can supplement this resource and make a real difference. The DfT/TOC’s role is therefore one of providing resource and leadership in partnership with the community. INTRODUCTION We support community engagement in rail. Community Rail Partnerships (CRP’s) add value to the rail industry, they promote and market the rail offer and do much more. DfT’s National Community Rail Steering Group research suggests that CRP’s can increase annual rail patronage by 2.8% (above the equivalent annual background rail growth). Station supporter/friend groups and CRP’s can also help make the railways safer and more welcoming. We see community engagement in the active running of the railway taking a number of forms, the more formal of which include the following: 1. Community Rail Partnerships (CRP), are typically a not for profit, community based and organised group promoting a line of route(s), usually with support from the TOC and other local partners, and typically in a semi-formal relationship governed by a Service Level Agreement or similar. Such groups are EAST MIDLANDS COUNCILS CONSULTATION RESPONSE encouraged to be affiliated with ACoRP and are normally supported by Community Rail Partnership Officer staff resource, these being paid posts providing guidance and administrative support. See below for more details on CRP’s. 2. Community Rail Partnership Officers (CRPO) – typically funded by the TOC/DfT or in some case the Local Authority (examples in Derbyshire, Lincolnshire and North Yorkshire – relevant in the context of the transferring CRP). These posts help drive forward the work of CRP’s and provide staffing support by managing and coordinating the work of the CRPs and the relationship with the TOC. Bidders discuss the future funding with the relevant Local Transport Authority, CRP and ACoRP. This will allow them to make a decision whether or not to underwrite the post funding. These officers have a key role in driving forward the work of CRP’s and helping them plan and achieve the maximum benefit. 3. Station supporters (or adopter or “Friends of station”), these individuals or groups typically aim is to improve the ambience of their local station(s) and its environs; thereby making it safer, more secure and more attractive and encouraging more people to use. This can be through a range of activities including: planting, landscaping, building restoration and use etc. We expect the winning TOC to support station supporter including meeting essential funding needs, but we see the work of these groups being essentially voluntary. As at the date of this paper EMT have 60 adopted stations (out of a total of 90 EMT managed stations), supported by 266 station adopters. Again, Community Rail Officers are well placed to provide advice and support to station adoption groups, and ACoRP offer resource on their web site too. Station supporters are community based and independent of the TOC, they can operate in isolation or alongside a CRP. By way of example 80% of stations within the High Peak and Hope Valley CRP area have Friends groups. 4. Community use and redevelopment of disused and dilapidated station buildings and adjoining land, we believe that there is an important role to which CRP’s and the community can undertake in bringing station buildings and environs back into life. As well as creating a community asset and life at the station, this increases a stations welcome and perception of safety. Investment in stations can also attract other uses to the station (rail or commercial) which can bring a new revenue stream to the industry and new community facilities. Ideally the use of station buildings will add value to both the station user and the community (for example: coffee shop, post office or corner shop etc.), alternatively some other community benefit derived (community group meeting place, art or library use, Scouts/Guides etc.). Equally the station may be brought back into use as a work place, office, other shop etc. that creates jobs. ACoRP manages a DfT funding resource targeting community engagement, marketing, education, advising on the maintenance, restoration and use of station buildings for community and social use. EAST MIDLANDS COUNCILS CONSULTATION RESPONSE CRP’S AND COMMUNITY RAIL PARTNERSHIP OFFICERS Focusing on CRP’s in more detail, in the current East Midlands Trains franchise there are four CRP's added to which will be a fourth transferring from Northern into the new EM Franchise, these are: Poacher Line CRP – EMT provide funding Derwent Valley Line CRP – EMT provide funding North Staffordshire Line CRP – EMT provide funding A CRP has recently been forming known as the North Notts and Lincs CRP Barton line CRP (transferring from Northern with provide funding) Additionally: The EM Franchise also passes along the High Peak and Hope Valley CRP line (supported by Arriva Rail North) but only has the most limited stops at intermediate stations between Sheffield and Manchester. Community Rail Derbyshire – this covers the Derbyshire area and should be treated like a CRP. Hereward CRP based in East Anglia, including the Norwich to Liverpool service – supported indirectly by EMT The direction of the collective Community Rail Partnership Officer resource could help bring consistency of approach and guide the CRPs they support to even greater effectiveness and expand the number and geography of CRP’s, including: The potential for further CRP’s along the Robin Hood Line or Erewash lines. Community Rail Partnership Officer resource would be needed to set and provide assistance with governance and help access to funding. Aspirations to extend the Poacher Line CRP to include the Red Wing line between Peterborough and Lincoln via Sleaford (indeed it is already within the current CRP specification). See the annex to this paper on the expected support CRPO’s are to provide to CRP’s and the sorts of measures already being undertaken by the regions existing CRP’s.
Recommended publications
  • National Rail Conditions of Travel
    i National Rail Conditions of Travel From 5 August 2018 NATIONAL RAIL CONDITIONS OF TRAVEL TABLE OF CONTENTS NATIONAL RAIL CONDITIONS OF TRAVEL Part A: A summary of the Conditions 3 Part B: Introduction 4 Conditions 5 Part C: Planning your journey and buying your Ticket 5 Part D: Using your Ticket 11 Part E: Making your Train Journey 15 Part F: Your refund and compensation rights 21 Part G: Special Conditions applying to Season Tickets 26 Part H: Lost Property 29 Appendix A: List of Train Companies to which the National Rail Conditions of Travel apply as at 5 August 2018 30 Appendix B: Definitions 31 Appendix C: Code of Practice: Arrangements for interview meetings with applicants in connection with duplicate season tickets 33 These National Rail Conditions of Travel apply from 5 August 2018. Any reference to the National Rail Conditions of Carriage on websites, Tickets, publications etc. refers to these National Rail Conditions of Travel. Part A: A summary of the Conditions The terms and conditions of these National Rail Conditions of Travel are set out below in Part C to Part H (the “Conditions”). They comprise the binding contract that comes into effect between you and the Train Companies1 that provide scheduled rail services on the National Rail Network, when you purchase a Ticket. This summary provides a quick overview of the key responsibilities of Train Companies and passengers contained in the contract. It is important, however, that you read the Conditions if you want a full understanding of the responsibilities of Train Companies and passengers.
    [Show full text]
  • XCTL-1001 Passenger Information During Disruption Local Plan
    XCTL-1001 Passenger Information During Disruption Local Plan Synopsis This document demonstrates the process and procedures in place within CrossCountry to comply with the ATOC Code of Practice for providing Passenger Information During Disruption (PIDD). Published by UNCONTROLLED COPY WHEN PRINTED Safety Team CrossCountry 5th Floor, Cannon House 18 Priory Queensway © 2016 XCTL Birmingham B4 6BS Contents A Administration ............................................................................................................. 3 B Requirements .............................................................................................................. 4 1. Purpose & Scope ........................................................................................... 4 2. People ........................................................................................................... 4 C Procedure .................................................................................................................... 5 1. Background .................................................................................................... 5 2. Aims and Objectives of PIDD ......................................................................... 5 3. Interface with Network Rail and Other Organisations ..................................... 5 4. Compliance .................................................................................................... 6 5. Key Requirements ........................................................................................
    [Show full text]
  • Investing for the Future
    The new ScotRail franchise: good for passengers, staff and Scotland Improving your journey from door to door magazine Abellio ScotRail Investing for the future The Abellio Way Magazine – Abellio ScotRail special – Spring 2015 Travelling on the Forth Bridge and enjoying the wonderful view A northern gannet flying in front of Bass Rock SCOTRAIL SPECIAL - SPRING 2015 3 CONTENTS Ambitious plans and Abellio It is with enormous pleasure that I find myself writing 4 WE ARE ABELLIO the introduction to this special edition of The Abellio What can you expect from us? Way Magazine from my home in Edinburgh. When Abellio was granted the privilege of operating 6 JEFF HOOGESTEGER MEETS TRANSPORT Scotland’s rail services, I had no hesitation in making this my home. You may consider that a rather self- MINISTER DEREK MACKAY serving decision, after all who wouldn’t choose to live “This is an incredibly exciting period for transport in this beautiful country! However, as a Dutchman, it in Scotland” won’t surprise you that it was also a sensible business decision. 10 ABELLIO’S VISION FOR THE NEW The Scottish Government has ambitious plans to SCOTRAIL FRANCHISE transform its railways and I am grateful to them for Good for passengers, good for staff and choosing Abellio to assist in that purpose. We have many exciting and challenging plans for ScotRail, as good for Scotland you will read in this special edition, and it is my intention to work with the team wherever possible 13 WORKING TOGETHER FOR THE PASSENGER to deliver them. ScotRail and Network Rail Performance for passengers 14 BOOSTING TOURISM Living here, I will also be travelling by train most days to our new UK headquarters in Glasgow, and regularly Travel the Great Scenic Railways of Scotland using other parts of the ScotRail network.
    [Show full text]
  • (Public Pack)Agenda Document for North East Combined Authority
    Leadership Board Tuesday 19th April 2016 at 2.00 pm Meeting to be held at Sunderland Civic Centre, Burdon Road, Sunderland, SR2 7SN www.northeastca.gov.uk AGENDA Page No 1. Apologies for Absence 2. Declarations of Interest Please remember to declare any personal interest where appropriate both verbally and by recording it on the relevant form (to be handed to the Democratic Services Officer). Please also remember to leave the meeting where any personal interest requires this. 3. Minutes of the Previous Meeting held on 19 January 2016 1 - 8 4. Minutes of the Extraordinary Meeting held on 24 March 2016 9 - 14 5. Updates from Thematic Leads (a) Economic Development and Regeneration 15 - 22 (b) Employability and Inclusion 23 - 32 (c) Transport 33 - 44 6. Financial Update and Treasury Management Annual Review 45 - 68 7. Date and Time of Next Meeting Friday, 13 May 2016 at 3pm at North Tyneside Council (extraordinary meeting) Tuesday, 21 June 2016 at 2pm at Gateshead Council (annual meeting) 8. Exclusion of Press and Public Under section 100A and Schedule 12A Local Government Act 1972 because exempt information is likely to be disclosed and the public interest test against disclosure is satisfied. 9. Implementing the North East JEREMIE 2 Fund Members are requested to note the intention to circulate the above report on a supplemental agenda in accordance with the provisions of the Local Government (Access to Information) Act 1985 10. Tyne Pedestrian and Cyclist Tunnels: Tender Report Members are requested to note the intention to circulate the
    [Show full text]
  • BE PREPARED for Major Disruptions at Nottingham Station 20 July – 25 August
    BE PREPARED FOR MAJOR DISRUPTIONS AT NOTTINGHAM STATION 20 July – 25 AuguST Avoid the worry by registering for updates at eastmidlandstrains.co.uk/nottingham we’ll be helping yOU TO STAY ON THE MOVE MAJOR RESIGNALLING WORKS 20 July – 25 AuguST This summer, Nottingham station will be affected by the Nottingham resignalling project, which will cause major disruptions to train services between 20 July and 25 August. In this leaflet you’ll find information about the works and how service changes will affect you, so that you can be prepared and plan your journeys without worry. WHAT IS THE NOTTINGHAM RESIGNALLING PROJECT? It is a project by Network Rail to improve Nottingham station and transform the railways around the city. Big changes to tracks and signalling will mean more reliable services and fewer delays at Nottingham station, and the railways will be able to cope with an increasing demand for rail travel in the future. WHAT WILL THE PROJECT INVOLVE? • £100 million investment • A new platform at Nottingham station • 143 new signals • Six miles of new track • Three new signal boxes • Two renewed level crossings • Two level crossings replaced with footbridges. SIGN UP NOW Register online today for the latest updates at eastmidlandstrains.co.uk/nottingham 2 AT A GLANCE Below is a summary of the changes to the train services for each of the affected routes. Details and a map for each route can be found further on within this leaflet. NOTTINGHAM – LONDON (p.5) Train services to/from london will start and terminate at East Midlands Parkway, with three services per hour running between East Midlands Parkway and london.
    [Show full text]
  • Red Bank Manchester Decision Document
    15 October 2018 Network licence condition 7 (land disposal): Red Bank Former Carriage Sidings, Collyhurst Road, Manchester Decision 1. On 16 August 2018, Network Rail gave notice of the intention to dispose of land at Red Bank Former Carriage Sidings, Collyhurst Road, Manchester (the land), in accordance with paragraph 7.2 of condition 7 of Network Rail’s network licence. The land and disposal is described in more detail in the notice (copy attached). 2. We have considered the information supplied by Network Rail including the responses received from third parties consulted. For the purposes of condition 7 of Network Rail’s network licence, ORR consents to the disposal of the land in accordance with the particulars set out in the notice. Network Rail’s proposals 3. The land which forms Network Rail’s proposals comprises three sites: the ‘Red Bank’ former carriage sidings (shown as Area 1 on plan 6438292-1); the ‘Red Bank’ land and railway arches (shown as Area 2 on plan 6438292-1) - both areas are to be sold to the Far East Consortium; and the site adjacent to Area 1 (shown on plan 6438292-2) is to be acquired by Transport for Greater Manchester. 4. Network Rail’s stakeholder consultation showed that three objections remained unresolved: from First TransPennine Express (FTPE), Arriva Rail North and West Coast Railway Company. All three objections stemmed from a general expectation that increased stabling or depot facilities would be needed in the Manchester area and that existing sites with the potential to accommodate such facilities should not be sold until future requirements were known.
    [Show full text]
  • Directory of Resources
    SETTLE – CARLISLE RAILWAY DIRECTORY OF RESOURCES A listing of printed, audio-visual and other resources including museums, public exhibitions and heritage sites * * * Compiled by Nigel Mussett 2016 Petteril Bridge Junction CARLISLE SCOTBY River Eden CUMWHINTON COTEHILL Cotehill viaduct Dry Beck viaduct ARMATHWAITE Armathwaite viaduct Armathwaite tunnel Baron Wood tunnels 1 (south) & 2 (north) LAZONBY & KIRKOSWALD Lazonby tunnel Eden Lacy viaduct LITTLE SALKELD Little Salkeld viaduct + Cross Fell 2930 ft LANGWATHBY Waste Bank Culgaith tunnel CULGAITH Crowdundle viaduct NEWBIGGIN LONG MARTON Long Marton viaduct APPLEBY Ormside viaduct ORMSIDE Helm tunnel Griseburn viaduct Crosby Garrett viaduct CROSBY GARRETT Crosby Garrett tunnel Smardale viaduct KIRKBY STEPHEN Birkett tunnel Wild Boar Fell 2323 ft + Ais Gill viaduct Shotlock Hill tunnel Lunds viaduct Moorcock tunnel Dandry Mire viaduct Mossdale Head tunnel GARSDALE Appersett Gill viaduct Mossdale Gill viaduct HAWES Rise Hill tunnel DENT Arten Gill viaduct Blea Moor tunnel Dent Head viaduct Whernside 2415 ft + Ribblehead viaduct RIBBLEHEAD + Penyghent 2277 ft Ingleborough 2372 ft + HORTON IN RIBBLESDALE Little viaduct Ribble Bridge Sheriff Brow viaduct Taitlands tunnel Settle viaduct Marshfield viaduct SETTLE Settle Junction River Ribble © NJM 2016 Route map of the Settle—Carlisle Railway and the Hawes Branch GRADIENT PROFILE Gargrave to Carlisle After The Cumbrian Railways Association ’The Midland’s Settle & Carlisle Distance Diagrams’ 1992. CONTENTS Route map of the Settle-Carlisle Railway Gradient profile Introduction A. Primary Sources B. Books, pamphlets and leaflets C. Periodicals and articles D. Research Studies E. Maps F. Pictorial images: photographs, postcards, greetings cards, paintings and posters G. Audio-recordings: records, tapes and CDs H. Audio-visual recordings: films, videos and DVDs I.
    [Show full text]
  • Local History Digest Volume 1 Number 2.Pub
    ough, Leicester, Northampton and St Albans; to Birmingham the “Amity”, the “Royal Dart” via Castle Donnington, Ashby and Tamworth; as well as others to Derby, Mansfield, Doncaster, Gainsborough and Manchester. Of particular interest was the “Granby” going three times a week from the Black Boy through Bingham to Grantham; the “Imperial” daily to Hull from the Lion via Bingham, Newark and Lincoln; and the “Accommodation” to Lincoln from the Black’s Head via Bingham and Newark. If not exactly a honeypot for Saturday night raves, Bingham did have some social attractions for the surrounding villages. There were three fairs during the year - the Tuesday and Wednesday before the 13th February, for horses; Thursday in Whitsun Week a holiday; and November 8th and 9th for pigs. There was a stallion show on Easter Thursday, and a large statute fair for hiring Local History servants generally the last Thursday in October. The Vale of Belvoir was still very rural. The Post Office was in Church Street. The mail gig for Newark, with the letters for York, left Digest Nottingham at 5.00 in the morning, reached Bingham at half past six, arriving in Newark at 8.00. It returned from Newark at half past ten, reaching Bingham at a quarter past noon when the mail was dropped off, leaving immediately for Nottingham which was reached at half past The quarterly newsletter of the Cranmer Local one. History Group In 1830 some local enterprising Lancashire postmasters arranged for their mail to be carried on Researching the history of Aslockton, Scarrington and Whatton-in-the-Vale the new steam railway from Manchester to Liverpool.
    [Show full text]
  • RAIL NEEDS ASSESSMENT for the MIDLANDS and the NORTH Final Report
    RAIL NEEDS ASSESSMENT FOR THE MIDLANDS AND THE NORTH Final report December 2020 National Infrastructure Commission | Rail Needs Assessment for the Midlands and the North - Final report Contents The Commission 3 Foreword 5 Infographic 7 In brief 8 Executive summary 9 1.Background 21 2. Rail and economic outcomes in the Midlands and the North 24 3. A core pipeline and an adaptive approach 35 4. Developing packages of rail investments 39 5. Comparison of packages 51 6. Long term commitments and shorter term wins 64 Annex A. The package focussing on upgrades 72 Annex B. The package prioritising regional links 78 Annex C. The package prioritising long distance links 86 Acknowledgements 94 Endnotes 97 2 National Infrastructure Commission | Rail Needs Assessment for the Midlands and the North - Final report The Commission The Commission’s remit The Commission provides the government with impartial, expert advice on major long term infrastructure challenges. Its remit covers all sectors of economic infrastructure: energy, transport, water and wastewater (drainage and sewerage), waste, flood risk management and digital communications. While the Commission considers the potential interactions between its infrastructure recommendations and housing supply, housing itself is not in its remit. Also, out of the scope of the Commission are social infrastructure, such as schools, hospitals or prisons, agriculture, and land use. The Commission’s objectives are to support sustainable economic growth across all regions of the UK, improve competitiveness,
    [Show full text]
  • Peter Wyman CBE DL Chairman Sir David Behan CBE Chief Executive Jane Mordue Non-Executive Director Prof. Louis Appleby CBE Non-E
    Care Quality Commission Expenses of senior management and board : 1 July 2017 to 30 September 2017 Board Travel Air Rail Tube Car Taxi Bus Hotels Meals Car Parking Other Total Name Role £ £ £ £ £ £ £ £ £ £ £ Peter Wyman CBE DL Chairman - 668.82 44.60 8.10 30.00 - - - 123.06 - 874.58 Sir David Behan CBE Chief Executive - 1,126.90 58.60 - 175.40 1.50 245.00 73.50 - - 1,680.90 Jane Mordue Non-Executive Director - 76.60 - - - - 393.18 - - - 469.78 Prof. Louis Appleby CBE Non-Executive Director - - - - - - 405.93 - - - 405.93 Prof. Paul Corrigan CBE Non-Executive Director - - - - - - - - - - - Michael Mire Non-Executive Director - - - - - - - - - - - Sir Robert Francis QC Non-Executive Director - - - - - - - - - - - Paul Rew Non-Executive Director - 420.25 - - - - - - - - 420.25 Jora Gill Non-Executive Director - - - - - - 393.18 - - - 393.18 For a detailed breakdown of these expenses please refer to the supplementary pages. Peter Wyman CBE DL Expenses for the period: 1st Jul 2017 to 30th Sep 2017 Travel Air Rail Tube Car Taxi Bus Hotels Meals Car Parking Other Total Date Business Purpose £ £ £ £ £ £ £ £ £ £ £ 19/06/2017 Visit to Stockmoor Lodge Nursing Home 8.10 8.10 29/06/2017 London to Taunton ((Work to Home) 31.72 31.72 03/07/2017 Kilkenny Car Park (Home to Work) 12.34 12.34 03/07/2017 Taunton to London (Home to Work) 31.73 31.73 03/07/2017 Oyster Journey Home to Work 1.60 1.60 03/07/2017 Oyster Journey Meeting Jewish Care 2.75 2.75 04/07/2017 London to Taunton (Work to Home) 31.72 31.72 05/07/2017 Kilkenny Car Park (Home to Work) 6.34
    [Show full text]
  • Water, Waste/ Recycling & Supply Chain
    WATER, WASTE/ RECYCLING & SUPPLY CHAIN Our responsibility Our companies use a significant amount of water, particularly in vehicle cleaning, and we recognise our responsibility to use this precious natural resource carefully and efficiently. Like any business, we and our customers produce waste. We are committed to minimising waste and recycling as much as possible, and work closely with our suppliers to ensure they meet our ethical standards. Our approach Our companies encourage water efficiency through initiatives such as recycling water from train and bus washing facilities. Abellio Deutschland has invested in a ‘Green Rail Depot’ at Hagen. This showcases a rainwater reclamation system reducing water use by over 85%, as well as energy efficiency measures which have cut energy use by three-quarters. in Q1 2014. Following a waste audit in 2012 Both Northern Rail* and Merseyrail* are increasing and a similar action plan, Abellio Greater Anglia the efficiency of water usage through new has increased waste recycling overall to 95%. investments, such as improved wash plants that both reduce consumption and recycle water at all Abellio is committed to working with suppliers Northern Rail’s train maintenance depots, leading who demonstrate open and transparent to reductions of 50-70%, and water recycling practices in social and ethical accountability. facilities at Merseyrail’s Kirkdale depot, which We evaluate our key vendors assessing reuses 7.1 million litres of water per year. Both commercial, social and ethical, quality, safety Northern Rail’s Allerton Depot and Accrington and environmental factors as part of our station have rainwater harvesting facilities. prequalification process, and have begun to visit supplier premises to audit against our Waste management is an important part of requirements.
    [Show full text]
  • Uk Debates: How Do We Build More Light Rail?
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com SEPTEMBER 2016 NO. 945 UK DEBATES: HOW DO WE BUILD MORE LIGHT RAIL? NET Phase Two economic impacts quantied Montpellier opens city tramway ring CRRC’s home-grown o-wire tram New York appoints Streetcar ‘czar’ ISSN 1460-8324 £4.25 09 San José Besancon5 America’s low-oor A simple, quality light rail convert system on a budget 9 771460 832043 LRT MONITOR e LRT MONITOR series from Mainspring is an essential reference work for anyone who operates in the world’s light and urban rail sectors. Featuring regular updates in both digital and print form, the LRT Monitor includes an overview of every established line and network as well as details of planned schemes and those under construction. POLAND POZNAŃ Tramways play an important role in one of of the main railway station. Poland’s biggest and most historic cities, with In 2012 a line opened to the east of the city, the first horse-drawn tramline opening in 1880. with an underground section containing two An overview Electrification followed in 1898. sub-surface stations and a new depot. The The network was badly damaged during World reconstruction of Kaponiera roundabout, an A high-quality War Two, resuming operations in 1947 and then important tram junction, is set for completion in of the system’s only east of the river Warta. Service returned to 2016. When finished, it will be a three-level image for ease the western side of the city in 1952 with the junction, with a PST interchange on the lower development, opening of the Marchlewski bridge (now named level.
    [Show full text]