BE PREPARED for Major Disruptions at Nottingham Station 20 July – 25 August

Total Page:16

File Type:pdf, Size:1020Kb

BE PREPARED for Major Disruptions at Nottingham Station 20 July – 25 August BE PREPARED FOR MAJOR DISRUPTIONS AT NOTTINGHAM STATION 20 July – 25 AuguST Avoid the worry by registering for updates at eastmidlandstrains.co.uk/nottingham we’ll be helping yOU TO STAY ON THE MOVE MAJOR RESIGNALLING WORKS 20 July – 25 AuguST This summer, Nottingham station will be affected by the Nottingham resignalling project, which will cause major disruptions to train services between 20 July and 25 August. In this leaflet you’ll find information about the works and how service changes will affect you, so that you can be prepared and plan your journeys without worry. WHAT IS THE NOTTINGHAM RESIGNALLING PROJECT? It is a project by Network Rail to improve Nottingham station and transform the railways around the city. Big changes to tracks and signalling will mean more reliable services and fewer delays at Nottingham station, and the railways will be able to cope with an increasing demand for rail travel in the future. WHAT WILL THE PROJECT INVOLVE? • £100 million investment • A new platform at Nottingham station • 143 new signals • Six miles of new track • Three new signal boxes • Two renewed level crossings • Two level crossings replaced with footbridges. SIGN UP NOW Register online today for the latest updates at eastmidlandstrains.co.uk/nottingham 2 AT A GLANCE Below is a summary of the changes to the train services for each of the affected routes. Details and a map for each route can be found further on within this leaflet. NOTTINGHAM – LONDON (p.5) Train services to/from london will start and terminate at East Midlands Parkway, with three services per hour running between East Midlands Parkway and london. A frequent bus service will operate approximately every 10 minutes between Nottingham and East Midlands Parkway to connect with train services to london. There are 1,000 car parking spaces available at East Midlands Parkway for just £6 per day. MatLock – DERBy – NOTTINGHAM (p.6) Trains will run as normal between Matlock, Derby and Beeston. For services through to Nottingham, passengers should change at Derby for an express bus service, which will run at 15 minute intervals. 3 buses per hour will also run between Beeston and Nottingham. LIVERPool – NORWICH (p.7) Train services will continue to operate on this route, but will follow a diversionary route and not call at Nottingham or Grantham. All services will instead call at East Midlands Parkway, where express replacement bus services will run to Nottingham, Grantham and Newark. Passengers travelling from Langley Mill and Alfreton should use replacement bus services for travel to Nottingham. Northern train services will continue to run from Alfreton to leeds via Sheffield. NOTTINGHAM – LINCOLN (p.8) Train services will continue to run from Newark Castle to lincoln throughout the resignalling work. From Saturday 20 July to Friday 9 August, connecting bus services will run between Newark Castle and Nottingham, with an hourly bus service from Rolleston, Fiskerton, Bleasby, Thurgaton, Lowdham, Burton Joyce and Carlton to Nottingham. From 10 August to 25 August, trains will be running between Nottingham and Lincoln (between 0800 – 2000). Services will follow the normal calling patterns with slightly extended journey times. There will also be an hourly express bus service between Newark and East Midlands Parkway, connecting to services to leicester and beyond throughout the resignalling work. 3 NOTTINGHAM – SkEGNESS (p.10) Train services will continue to run between grantham and Skegness at all times. Direct train services will also be running between Nottingham and Skegness on the following days (between 0800 – 2000): Weekdays Weekends Mon 22 July to Fri 26 July Sat 20 and Sun 21 July Mon 12 August to Fri 23 August Sat 27 and Sun 28 July Sat 10 August and Sun 11 August Sat 17 August and Sun 18 August At all other times, an hourly bus service will run between Nottingham and grantham with an hourly train service connecting at grantham for services through to Skegness. There will also be an hourly express bus service from grantham to East Midlands Parkway throughout the day to connect in with services to leicester/liverpool and Norwich. During the resignalling works, additional buses will be on standby at Nottingham station at all times. A normal, strengthened train service will run from Nottingham to Skegness from 19 May to 19 July, and then again from Monday 26 August. NOTTINGHAM – LOUGHBOROUGH – LEICESTER (loCAl SERvICES) (p.12) Train services will run between leicester and East Midlands Parkway, where there is a connecting bus service through to Nottingham, which will run at 10 minute intervals. An hourly train service will run between Leicester and Loughborough. Passengers travelling from Syston, Sileby, Barrow-upon-Soar can continue to travel to leicester by train. For travel to/from Nottingham, there will be a train service to loughborough and East Midlands Parkway, with a bus connection to Nottingham. MANSFIELD/WORKSOP – NOTTINGHAM (p.13) A frequent bus service will run in place of the normal train service for the duration of the work (20 July to 25 August) with 4 buses per hour running between Nottingham and Mansfield and an hourly service running from Nottingham to Worksop. 4 For train and bus times, visit eastmidlandstrains.co.uk/nottingham NOTTinGHAM – lONDON BEESTON NOTTINGHAM EAST MIDLANDS PARKWAY LEICESTER LONDON ST PANCRAS Train service Limited train service Disruption, Direct bus service no trains Stopping bus service 3 trains per hour from London to East Midlands Parkway, 1 continues to Beeston. 7 express buses between East Midlands Parkway and Nottingham. Great reasons to travel from East Midlands Parkway: 1,000 car parking spaces and just £6 parking at East Midlands Parkway. 1hr 34mins from East Midlands Parkway to london. 5 For access to all train and bus timetables, visit MATLock – DERBy – NOTTINGHAM MATLOCK MATLOCK BATH CROMFORD WHATSTANDWELL AMBERGATE BELPER DUFFIELD DERBY SPONDON LONG EATON ATTENBOROUGH BEESTON NOTTINGHAM Train service Limited train service Disruption, Direct bus service no trains Stopping bus service Train from Matlock terminating at Beeston. Change at Derby for an express bus service to Nottingham (4 buses running each hour). 3 buses per hour between Beeston and Nottingham. 6 eastmidlandstrains.co.uk/nottingham livERPool – noRwicH LIVERPOOL LIME STREET LIVERPOOL SOUTH PARKWAY HUNTS CROSS HOUGH GREEN WIDNES WARRINGTON CENTRAL BIRCHWOOD IRLAM MANCHESTER OXFORD ROAD MANCHESTER PICCADILLY STOCKPORT HOPE BAMFORD HATHERSAGE GRINDLEFORD DORE CHINLEY HAZEL GROVE EDALE SHEFFIELD DRONFORD CHESTERFIELD ALFRETON NOTTINGHAM MILL LANGLEY EAST MIDLANDS PARKWAY GRANTHAM PETERBOROUGH WHITTLESEA MARCH HARLING ROAD BRANDON THEFTFORD ECCLES ROAD ATTLEBOROUGH WYMONDHAM ELY NORWICH Train service Limited train service Disruption, Direct bus service no trains Stopping bus service Train service diversion route, not calling at Nottingham or Grantham. All call at East Midlands Parkway. 7 buses per hour between East Midlands Parkway and Nottingham. 1 bus per hour between East Midlands Parkway and Grantham. 2 buses per hour between Alfreton and Nottingham, 1 stopping at Langley Mill. other operators limited services between chesterfield and Langley Mill and Nottingham and Grantham. For services between Norwich and Grantham change at Peterborough. 7 For access to all train and bus timetables, visit NOTTinGHAM – lincoln Dates valid: Sat 20 July – Fri 9 Aug Sat 24 Aug – Sun 25 Aug (Sat 10 Aug – Fri 23 Aug after 2000 and before LINCOLN 0800 only) HYKEHAM SWINDERBY COLLINGHAM NEWARK CASTLE NEWARK FISKERTON ROLLESTON NOTTINGHAM CARLTON BURTON JOYCE LOWDHAM THURGARTON BLEASBY NORTH GATE EAST MIDLANDS PARKWAY Train service Limited train service Disruption, Direct bus service no trains Stopping bus service Normal service between Newark Castle and Lincoln. Hourly bus service between Nottingham and Newark Castle calling at same stations as normal timetable, refer to timetables online for details. Direct hourly bus between Newark Castle and East Midlands Parkway, connecting into services for Leicester. 8 eastmidlandstrains.co.uk/nottingham Dates valid: Sat 10 Aug – Fri 23 Aug (between 0800 – 2000 only) LINCOLN HYKEHAM SWINDERBY COLLINGHAM NEWARK CASTLE NEWARK FISKERTON ROLLESTON NOTTINGHAM CARLTON BURTON JOYCE LOWDHAM THURGARTON BLEASBY NORTH GATE EAST MIDLANDS PARKWAY Train service Limited train service Disruption, Direct bus service no trains Stopping bus service Train service between Nottingham and Lincoln (running slower than a normal service). Hourly bus service between Newark Castle and East Midlands Parkway. Direct bus from East Midlands Parkway to Nottingham. 9 For access to all train and bus timetables, visit NOTTinGHAM – SkEGnESS MAP A NOTTINGHAM NETHERFIELD RADCLIFFE BINGHAM ASLOCKTON ELTON & ORSTON BOTTESFORD EAST ANCASTER RAUCEBY SLEAFORD MIDLANDS HECKINGTON SWINESHEAD HUBBERTS BRIDGE BOSTON THORPE CULVERT WAINFLEET HAVENHOUSE PARKWAY GRANTHAM SKEGNESS Train service Limited train service Disruption, Direct bus service no trains Stopping bus service Please refer to calendar for when this map is valid (between 20 July and 25 August, before 0800 and after 2000 all services will refer to map B times). 1 train per hour between Nottingham and Skegness, with normal timetable calling patterns. Hourly bus service from Grantham to East Midlands Parkway, connecting onto services to Leicester and Liverpool. 10 eastmidlandstrains.co.uk/nottingham 20 July – 25 August 2013 Mon Tues Weds Thurs Fri Sat Sun 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Map A – Train services operating between Nottingham and Skegness. Map B – Bus services only between Nottingham and Grantham. NOTTINGHAM NETHERFIELD MAP B RADCLIFFE BINGHAM ASLOCKTON ELTON & ORSTON BOTTESFORD EAST ANCASTER RAUCEBY SLEAFORD MIDLANDS HECKINGTON SWINESHEAD HUBBERTS BRIDGE BOSTON THORPE CULVERT WAINFLEET HAVENHOUSE PARKWAY GRANTHAM SKEGNESS Train service Limited train service Disruption, Direct bus service no trains Stopping bus service Please refer to calendar for when this map is valid. Please note – Refer to map B for all travel after 2000 and before 0800 for entire period (20 July – 25 Aug).
Recommended publications
  • Railfuture Response to National Infrastructure
    RAILFUTURE RESPONSE TO NATIONAL INFRASTRUCTURE COMMISSION RAIL NEEDS ASSESSMENT FOR THE MIDLANDS AND THE NORTH – CALL FOR EVIDENCE FOLLOWING INTERIM REPORT Contribution from Railfuture East Midlands Branch – August 2020 National Infrastructure Commission | Rail Needs Assessment for the Midlands and the North - Interim report https://www.nic.org.uk/wp-content/uploads/RNA-Interim-Report-Final.pdf Introduction: The Railfuture response dated 29th May 2020 to the first round of this consultation https://www.railfuture.org.uk/display2324 placed considerable emphasis on freight. In contributing to the August call for evidence, we in East Midlands Branch: Re-submit our May 2020 Rf EM Branch submission for previous NIC RNA call for evidence. This is on pp6-15 below in red text with a few subsequent additions in blue. Attempt to answer the NIC’s broad questions Q1 to Q4 below. References are to the pages and tables in the NIC’s Interim Report (see header.) Prepared by: Steve Jones, Branch Secretary, Railfuture East Midlands Branch [email protected] including contributions from members of EM Branch. Question 1: Please provide specific sources for evidence that the Commission could use in estimating costs and the impact of proposals on journey time and capacity. For schemes already proposed other than by Railfuture, such as those listed on p36, much information is already available from Network Rail, SNTBs (TfN, Midlands Connect), local and combined authorities, TOCs, DfT. Campaign organisations. For additional schemes put forward by Railfuture, further work would need to be done, though campaign groups such as SENRUG, SELRAP, MEMRAP and CRIL may have initial estimates for specific lines or areas.
    [Show full text]
  • Brochure FINAL 1A.Docx
    Name(s) Mr, Mrs. Ms. other RAILWAY & CANAL HISTORICAL SOCIETY .......................................................................... Address 1: ................................................................ The Railway & Canal Historical Society was founded in 1954. Its objective is to bring together all ..................................................Post Code..................... Industrial Heritage Day those seriously interested in the history of transport, Address 2: ................................................................. with particular reference to railways and waterways, EMIAC 96 ..................................................Post Code..................... although the Society also caters for those interested Saturday 11th May 2019 Email: .......................................................................... in roads, docks, coastal shipping and air transport To be held at the The Summit Centre Pavilion Road, Kirkby in Ashfield, NG17 7LL. Telephone: ................................................................... The East Midlands Group normally meets on the Society (if any): first Friday evening of each month from October to Mansfield & Pinxton Railway .......................................................................... April in Beeston. During the summer months tours (1819) and visits are made to places of historical interest Would you like to be informed about future EMIAC events and importance in the transport field. Full details of Introduction by e-mail.? YES/NO. the R & C H S can be obtained
    [Show full text]
  • Peter Wyman CBE DL Chairman Sir David Behan CBE Chief Executive Jane Mordue Non-Executive Director Prof. Louis Appleby CBE Non-E
    Care Quality Commission Expenses of senior management and board : 1 July 2017 to 30 September 2017 Board Travel Air Rail Tube Car Taxi Bus Hotels Meals Car Parking Other Total Name Role £ £ £ £ £ £ £ £ £ £ £ Peter Wyman CBE DL Chairman - 668.82 44.60 8.10 30.00 - - - 123.06 - 874.58 Sir David Behan CBE Chief Executive - 1,126.90 58.60 - 175.40 1.50 245.00 73.50 - - 1,680.90 Jane Mordue Non-Executive Director - 76.60 - - - - 393.18 - - - 469.78 Prof. Louis Appleby CBE Non-Executive Director - - - - - - 405.93 - - - 405.93 Prof. Paul Corrigan CBE Non-Executive Director - - - - - - - - - - - Michael Mire Non-Executive Director - - - - - - - - - - - Sir Robert Francis QC Non-Executive Director - - - - - - - - - - - Paul Rew Non-Executive Director - 420.25 - - - - - - - - 420.25 Jora Gill Non-Executive Director - - - - - - 393.18 - - - 393.18 For a detailed breakdown of these expenses please refer to the supplementary pages. Peter Wyman CBE DL Expenses for the period: 1st Jul 2017 to 30th Sep 2017 Travel Air Rail Tube Car Taxi Bus Hotels Meals Car Parking Other Total Date Business Purpose £ £ £ £ £ £ £ £ £ £ £ 19/06/2017 Visit to Stockmoor Lodge Nursing Home 8.10 8.10 29/06/2017 London to Taunton ((Work to Home) 31.72 31.72 03/07/2017 Kilkenny Car Park (Home to Work) 12.34 12.34 03/07/2017 Taunton to London (Home to Work) 31.73 31.73 03/07/2017 Oyster Journey Home to Work 1.60 1.60 03/07/2017 Oyster Journey Meeting Jewish Care 2.75 2.75 04/07/2017 London to Taunton (Work to Home) 31.72 31.72 05/07/2017 Kilkenny Car Park (Home to Work) 6.34
    [Show full text]
  • Uk Debates: How Do We Build More Light Rail?
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com SEPTEMBER 2016 NO. 945 UK DEBATES: HOW DO WE BUILD MORE LIGHT RAIL? NET Phase Two economic impacts quantied Montpellier opens city tramway ring CRRC’s home-grown o-wire tram New York appoints Streetcar ‘czar’ ISSN 1460-8324 £4.25 09 San José Besancon5 America’s low-oor A simple, quality light rail convert system on a budget 9 771460 832043 LRT MONITOR e LRT MONITOR series from Mainspring is an essential reference work for anyone who operates in the world’s light and urban rail sectors. Featuring regular updates in both digital and print form, the LRT Monitor includes an overview of every established line and network as well as details of planned schemes and those under construction. POLAND POZNAŃ Tramways play an important role in one of of the main railway station. Poland’s biggest and most historic cities, with In 2012 a line opened to the east of the city, the first horse-drawn tramline opening in 1880. with an underground section containing two An overview Electrification followed in 1898. sub-surface stations and a new depot. The The network was badly damaged during World reconstruction of Kaponiera roundabout, an A high-quality War Two, resuming operations in 1947 and then important tram junction, is set for completion in of the system’s only east of the river Warta. Service returned to 2016. When finished, it will be a three-level image for ease the western side of the city in 1952 with the junction, with a PST interchange on the lower development, opening of the Marchlewski bridge (now named level.
    [Show full text]
  • What Light Rail Can Do for Cities
    WHAT LIGHT RAIL CAN DO FOR CITIES A Review of the Evidence Final Report: Appendices January 2005 Prepared for: Prepared by: Steer Davies Gleave 28-32 Upper Ground London SE1 9PD [t] +44 (0)20 7919 8500 [i] www.steerdaviesgleave.com Passenger Transport Executive Group Wellington House 40-50 Wellington Street Leeds LS1 2DE What Light Rail Can Do For Cities: A Review of the Evidence Contents Page APPENDICES A Operation and Use of Light Rail Schemes in the UK B Overseas Experience C People Interviewed During the Study D Full Bibliography P:\projects\5700s\5748\Outputs\Reports\Final\What Light Rail Can Do for Cities - Appendices _ 01-05.doc Appendix What Light Rail Can Do For Cities: A Review Of The Evidence P:\projects\5700s\5748\Outputs\Reports\Final\What Light Rail Can Do for Cities - Appendices _ 01-05.doc Appendix What Light Rail Can Do For Cities: A Review of the Evidence APPENDIX A Operation and Use of Light Rail Schemes in the UK P:\projects\5700s\5748\Outputs\Reports\Final\What Light Rail Can Do for Cities - Appendices _ 01-05.doc Appendix What Light Rail Can Do For Cities: A Review Of The Evidence A1. TYNE & WEAR METRO A1.1 The Tyne and Wear Metro was the first modern light rail scheme opened in the UK, coming into service between 1980 and 1984. At a cost of £284 million, the scheme comprised the connection of former suburban rail alignments with new railway construction in tunnel under central Newcastle and over the Tyne. Further extensions to the system were opened to Newcastle Airport in 1991 and to Sunderland, sharing 14 km of existing Network Rail track, in March 2002.
    [Show full text]
  • Economy and Surface Access Economy & Surface Access Sustainable Development Plan 2015
    ECONOMY & SURFACE ACCESS ECONOMY AND SURFACE ACCESS ECONOMY & SURFACE ACCESS SUSTAINABLE DEVELOPMENT PLAN 2015 eastmidlandsairport.com OUR SUSTAINABLE DEVELOPMENT PLAN AIRPORT ECONOMY AND SURFACE ACCESS INTRODUCTION The Sustainable Development Plan sets out the high-level strategic This Economy and Surface Access Plan sets out the ambitions and objectives for the growth and development of East Midlands Airport. the opportunities for the airport in the light of the current activity, It is supported by four detailed plans that cover: the national economic prospects, changes in airline operations and the prospects for future growth. The Sustainable Development Plan • Community; documents were published as drafts and circulated for comment • Economy and Surface Access; in spring 2014. This provided an opportunity for a wide range of • Environment; and stakeholders to contribute to the Plan and let us have their views. We • Land Use are grateful to all those who responded and took the time to look at our plans. This Economy and Surface Access Plan is intended to: It is intended to keep the Sustainable Development Plan and its • Identify how the airport can support the sustainable growth supporting documents under review so that they remain relevant and of the local, regional and national economy; reflect the evolution and the development of East Midlands Airport. • Set out how the airport can capitalise on the economic This will follow the guidance in the 2013 Aviation Policy Framework strength of transport, distribution and logistics and
    [Show full text]
  • Rail Lincs 66
    The Great East–West barrier Friends of the Barton Line Have you ever tried to escape from The Friends have been exasperated by Lincoln, not easy is it? the spate of unreliability and lack of Rail Lincs Rail? Lincs? Number 66 June 2013 ISSN 1350-0031 Although we have two through trains a information, earlier in the year, which was Lincolnshire & South Humberside Branch of the LINCOLNSHIRE day to London, ironically leaving within a extremely undermining the efforts of Railway Development Society N e w s l e t t e r few minutes of each other, even getting to those who were trying to promote the line. London is not easy as the connections at The first train of each day from Newark are not always good with, at times, Cleethorpes to Barton and back was Good attendance at Cleethorpes AGM the shuttle from Lincoln waiting for the being substituted by a coach service until London train to vacate platform 3. the start of the Sunday service on 19 May. We would like to see a better service via Nottingham but the constraints of the flat Since the introduction of the new crossing at Newark means that even timetable the Class 185 working has altering stopping patterns to improve been replaced by a Class 153 calling at all services from Hykeham is impossible stations, but terminating at Grimsby Town because of the lack of paths across the on the return run. However this service is East Coast Main Line, so any hope of a currently being replaced by a bus; more frequent service is a non starter.
    [Show full text]
  • Golfer's Guide for the United Kingdom
    Gold Medals Awarded at International Exhibitions. AS USED BY HUNDREDS THE OF CHAMPION UNSOLICITED PLAYERS. TESTIMONIALS. Every Ball Guaranteed in Properly Matured Condition. Price Ms. per dozen. The Farthest Driving- and Surest Putting- Ball in the Market. THORNTON GOLF CLUBS. All Clubs made from Best Materials, Highly Finished. CLUB COVERS AND CASES. Specialities in aboue possessing distinct improuements in utility and durability. Every Article used in Golf in Perfection of Quality and Moderation in Price. PKICE LIST ON APPLICATION. THORNTON & CO., Golf Appliance Manufacturers, 78 PRINCES STREET, EDINBURGH. BRANCHES—, LEEDS, BRADFORD, aqd BELFAST. ' SPECI A L.1TIE S. WEDDING PRESEF ELECTRO-SILVER PLATE JAMES GRAY & SON'S NEW STOCK of SILVER-PLATED TEA and COFFEE SETS, AFTER- NOON TEA SETS, CASES "I FRUIT and FISH KNIVES and FORKS, in Pearl or Ivory Handles, FINE CASES OF MEAT AND FISH CARVERS, TEA and FELLY SPOONS In CASES. CASES of SALTS, CREAM, and SUGAR STANDS. ENTREE DISHES, TABLE CUTLERY, and many very Attractive and Useful Novelties, suitable for Marriage and other Present*. NEW OIL LAMPS. JAMES GRAY & SON Special De*lgn« made for their Exclusive Sale, In FINEST HUNGARIAN CHINA, ARTISTIC TABLE and FLOOR EXTENSION [.AMI'S In Brass, Copper,and Wrougnt-Iroti, Also a very Large Selection of LAMP SHADES, NBWMT DJUUQWB, vary moderate In price. The Largest and most Clioieo Solootion in Scotland, and unequallod in value. TnspecHon Invited. TAb&ral Heady Money Dlgcount. KITCHEN RANGES. JAMES GRAY & SON Would draw attention to their IMPROVED CONVERTIBLE CLOSE or OPEN FIRE RANGE, which is a Speciality, constructed on Liu :best principles FOR HEATINQ AND ECONOMY IN FUEL.
    [Show full text]
  • East Midlands Rail Franchise Stakeholder Briefing Document and Consultation Response
    East Midlands Rail Franchise Stakeholder Briefing Document and Consultation Response Driving Growth in the East Midlands June 2018 Stakeholder Briefing Document | East Midlands Rail Franchise Stakeholder Briefing Document | East Midlands Rail Franchise The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website in English and Welsh. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard, please contact the Department: Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website: www.gov.uk/government/organisations/department-for-transport General enquiries: https://forms.dft.gov.uk © Crown copyright 2018 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or write to The Information Policy Team, The National Archives, Kew, London TW9 4DU. Further contact details are available on http://apps.nationalarchives.gov.uk/Contact/ Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Stakeholder Briefing Document | East Midlands Rail Franchise Stakeholder Briefing Document | East Midlands Rail Franchise Contents 1. Foreword Foreword by the Secretary of State 3 2. Introduction What is this document for? 7 3.
    [Show full text]
  • Report to Transport and Highways Committee REPORT of SERVICE
    Report to Transport and Highways Committee 22 Novem ber 2012 Agenda Item: 10 REPORT OF SERVICE DIRECTOR HIGHWAYS RAIL ISSUES UPDATE Purpose of the Report 1. To inform Committee of developments on • The Newark – Nottingham Line, and • The Robin Hood Line. Information and Advice Newark – Nottingham Line 2. The Nottingham – Newark – Lincoln line provides the east-west service for Newark (and Lincoln), with connections at Nottingham for Derby, Birmingham, Leicester and most of England & Wales. 3. The Lincoln – Newark – Nottingham service is well below the standards that are normal for other comparable routes, in all key respects • Frequency, • Speed, and • Onward connections 4. Newark has one train per hour to its big city (Nottingham), whereas most similar places have 2, 3 or 4 trains per hour to their big cities (Birmingham, Manchester, Leeds etc.) 1 Number of Trains per day 140 120 129 120 100 107 80 82 60 40 20 33 0 York - Leeds Preston - Manchester Worcester - Shrewsbury - Newark - Nottingham Birmingham Wolverhampton 5. Moreover, the trains between Nottingham and Lincoln take much longer than is achieved between other places that are a similar distance apart. Distance Time Taken Average (miles) (minutes) speed (mph) Hull - Selby 31 31 60 Crewe - Shrewsbury 32¾ 30 65.5 Hereford - Pontypool 33½ 33 61 Stirling - Perth 34¼ 33 62.3 Nottingham – Lincoln calling at 33¾ 49 41.3 Newark only Nottingham – Lincoln calling all 33¾ 69 29.4 stations Average speed (miles per hour) 6. The current 1 train per hour also has to serve the intermediate stations, as well as providing the non-stop service that anywhere the size of Newark (and 2 Lincoln) would normally get – so it is an unhappy compromise.
    [Show full text]
  • Tyne and Wear: Metro 40 Years On
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com OCTOBER 2020 NO. 994 TYNE AND WEAR: METRO 40 YEARS ON 1980-2020: How the UK pioneer is still breaking new ground VDV Tram-Train tender for 504 LRVs Los Angeles accelerates LRT expansion Phuket light rail delayed until 2026 What does it cost? Rail masterclass £4.60 Pitfalls in preparing Contrasting renewal LRT business cases and repair methods Pre Metro Operations provides rail-based solutions. And we’ve got a proven track record. Our award-winning operation in Stourbridge has industry-leading reliability and future-proof green credentials, so you can breathe easily. We integrate seamlessly with other modes - and you can depend on us to be there. Our light rail model can link into new business and residential developments, connecting people with places easily. Breathing new life into old rail lines can provide new exciting links for congestion-free, hassle-free journeys. Integrated smart-ticketing for simple hopping between modes. No parking worries. Less emissions. A green future for us all. premetro.co.uk [email protected] Say hello and we'll have a chat about how we can bring our cost-effective experience and vision to your area. 01384 441325 THE INTERNATIONAL LIGHT RAIL MAGAZINE Nottingham Operating in SYSTEMS a competitive transport network, the Nottingham UNITED KINGDOM www.lrta.org FACTFILE Express Transit tram www.tautonline.com system has attracted No. Nottingham, significant local support for further 2020 N O. 994 United Kingdom Nottingham OCTOBER 156 expansion. SUB SCRIBE NOW! TYNE AND WEAR: METRO 40 YEARS ON Now in its 83rd year, Tramways & Urban Transit is he East Midlands city Totalling 14.4km (nine miles), the of Nottingham (UK) is The expanded the world’s leading monthly publication dedicated solely to route greatly relied upon access to on Radford Road, is the longer of located around 200km NET system added two sections where NET follows the heavy rail alignments.
    [Show full text]
  • Newsletter-Issue-1-.Pdf
    News and views from the Community of Edwinstowe Issue 1 Issue 1: June 2016 Community Communication Network Springs into Life for Edwinstowe Edwinstowe is to have its own ‘Community Led’ hyperlocal news and information network as a result of a successful application for a substantial Big Lottery Grant by Edwinstowe United Community Association. This is a community venture allowing community involvement at every stage. With full web access, a printed newsletter for those who do not have internet access and an audio version for anyone registered blind, our aim is to reach every corner of our community. We want to include the sort of news and information you want to hear. The residents and businesses of Edwinstowe will be able to participate at all levels from editorial decision making, submission of articles to In This Issue local delivery. Exclusive pages are available, in the newsletter, for our younger Community-led people to have their own space to shout about what matters to Communication Network them. They can be a part of the design, decision making and the Edwinstowe — steering group if wished. Community Action Plan See more details Page 7 update Contact:- ‘In Edwinstowe ‘ [email protected] Edwinstowe under 25s opportunity Feel Good Foods Sherwood Social Farmer Assets of Community Value Community Organising What’s on Useful numbers Published by Edwinstowe United Community Association on behalf of ‘In Edwinstowe ‘ 1 Government Ministers say Edwinstowe Community Action Plan is “outstanding” Story of the Community Action Plan Why it’s called a story Edwinstowe United Community Association received approval from The community action plan Central Government in 2015, for their group’s own development plan.
    [Show full text]