Peel Energy Brochure

Total Page:16

File Type:pdf, Size:1020Kb

Peel Energy Brochure Peel Energy is at the forefront of delivering low-carbon energy for the UK. And we believe that a mix of low-carbon technologies is the only way to sustainably meet the UK’s future energy needs. That’s why we’re investing in a balanced portfolio of onshore wind, hydro, biomass and tidal energy. Scout Moor Wind Farm Ince Biomass Energy Plant Barton Renewable Energy Plant (biomass) I I I Wind power submit planning applications that have the Barton Renewable Energy Plant, Greater highest prospect of receiving permission. Manchester: 20M We; planning permission Peel Energy is committed to the granted in May 2013. development of onshore wind projects. Our Peel has a 98% success rate in receiving onshore wind portfolio is about 300 MW planning permission for wind farms Hydro and tidal power and includes a range of schemes in compared with the national average of 1 Peel Energy is developing several run- operation, under construction or in various 59% . We have an excellent track record in of-river hydroelectric power schemes on stages of development. the development of onshore wind in the UK. the Manchester Ship Canal and the River Our multidisciplinary team is capable of We have delivered and operated a wide Mersey that could generate up to 9.2 GWh of developing wind farms of all sizes – from range of successful wind schemes, including renewable electricity – equivalent to meeting single turbines through to those large Scout Moor Wind Farm, Lancashire: the needs of more than 2000 homes.2 enough to be considered of national a 26-turbine, 65-MW scheme in operation Our hydro schemes include significance. since 2008. At the time of construction, it was Woolston Weir Hydro Scheme, River the largest onshore wind farm in England. Biomass Mersey, Warrington, Cheshire: three Port of Liverpool Wind Farm, Merseyside: Peel Energy recognises the important role Archimedes screw turbines providing up to a four-turbine, 10-MW scheme in operation that biomass-fuelled power stations will play 500 kW; consenting in progress and outline since 2009. in sustainably meeting the UK’s future low- design completed. Royal Seaforth Dock Wind Farm, carbon energy needs. In addition to the hydro schemes making Merseyside: a six-turbine, 3.6-MW scheme We are actively developing projects that notable contributions to renewable energy in operation since 1999. are designed to convert recycled wood and emission reduction targets, Peel Port of Sheerness Wind Farm, Isle of into a locally sourced and reliable form of Energy is also investing in new facilities Sheppey, Kent: four turbines and up to renewable energy and potentially divert this at the sites to improve fish passage and 10 MW; planning permission granted in material from landfill. provide the opportunity for monitoring fish March 2009 (extended in 2012). Biomass forms a significant part of Peel migratory patterns. Frodsham Wind Farm, Cheshire: 19 Energy’s low-carbon strategy. Our canal- Peel Energy has worked with the former turbines and up to 57 MW; planning side sites are well served by road and, Northwest Regional Development Agency to permission granted in October 2012. where possible, by rail to provide diverse explore the potential of generating electricity from tidal power in the Mersey Estuary. Blue Sky Forest Wind Farm, transport options to source fuels from Northumberland: nine turbines and up multiple locations in bulk. The study, completed in 2011, identified to 27 MW; planning permission granted in We are also exploring how the waste heat the preferred scheme as a 700-MW tidal November 2012. from the power plants could be used barrage that could generate enough electricity to meet the needs of more than Stonish Hill Wind Farm, Bilsthorpe, to increase the energy efficiency of the 200,000 homes. Nottinghamshire: five turbines and 10 MW; installations where there is a complementary construction during 2012/13 in partnership requirement for heat from adjoining industrial, with John Laing Investments. commercial or residential developments. Every potential wind farm site that Our biomass schemes include 1Local level approval rates 2011/2012, Renewable UK, Wind State of the Industry Report, 2012 Peel Energy develops is subject to a Ince Biomass Energy Plant, Cheshire: 2Based on an average use of 4370 kWh/year/ comprehensive screening, design, and 20 MWe; planning permission granted in home, Digest of United Kingdom energy statistics assessment process to ensure that we September 2011. (DUKES), 2012 Frodsham WindFrodsham Farm WindBlue Sky Forest Farm Woolston Weir Hydro Scheme Hydro Weir Woolston Port of Liverpool Wind Farm I I I I Who is Peel Energy? Peel Energy is at the forefront of delivering Want to know more? low-carbon energy for the UK. Contacts We have a balanced portfolio with interests in Owen Michaelson onshore wind, hydro, biomass and tidal energy. Chairman With a heritage of supporting low-carbon [email protected] energy projects over the last 25 years, we Muir Miller have the determination and expertise to Managing Director (Biomass) develop, build and operate low-carbon [email protected] projects across the country. Jonathan England Peel Energy is a division of The Peel Group, Director (Wind) one of the leading infrastructure, real-estate [email protected] and investment enterprises in the UK. Anthony Hatton The Peel Group is a family owned concern Director (Marine and Hydro) that retains family values. Under the [email protected] chairmanship of John Whittaker, the Peel Group has been investing in communities www.peelenergy.co.uk and making strategic business acquisitions [email protected] for more than 40 years, thereby creating 0161 629 8200 employment and promoting wealth, often by taking an innovative approach. www.peel.co.uk Peel Energy is at the forefront of delivering low carbon energy for the UK..
Recommended publications
  • 11797 Mersey Gateway Regeneration Map Plus[Proof]
    IMPACT AREAS SUMMARY MERSEY GATEWAY 1 West Runcorn Employment Growth Area 6 Southern Widnes 8 Runcorn Old Town Centre plus Gorsey Point LCR Growth Sector Focus: Advanced Manufacturing LCR Growth Sector Focus: Advanced Manufacturing / LCR Growth Sector Focus: Visitor Economy / Financial & Widnes REGENERATION PLAN / Low Carbon Energy Financial & Professional Services Professional Services Waterfront New & Renewed Employment Land: 82 Hectares New & Renewed Employment Land: 12 Hectares New & Renewed Employment Land: 6.3 Hectares Link Key Sites: New Homes: 215 New Homes: 530 • 22 Ha Port Of Runcorn Expansion Land Key Sites: Key Sites: Everite Road Widnes Gorsey Point • 20 Ha Port Of Weston • 5 Ha Moor Lane Roadside Commercial Frontage • Runcorn Station Quarter, 4Ha Mixed Use Retail Employment Gyratory • 30 Ha+ INOVYN World Class Chemical & Energy • 3 Ha Moor Lane / Victoria Road Housing Opportunity Area & Commercial Development Renewal Area Remodelling Hub - Serviced Plots • 4 Ha Ditton Road East Employment Renewal Area • Runcorn Old Town Centre Retail, Leisure & Connectivity Opportunities: Connectivity Opportunities: Commercial Opportunities Widnes Golf Academy 5 • Weston Point Expressway Reconfiguration • Silver Jubilee Bridge Sustainable Transport • Old Town Catchment Residential Opportunities • Rail Freight Connectivity & Sidings Corridor (Victoria Road section) Connectivity Opportunities: 6 • Moor Lane Street Scene Enhancement • Runcorn Station Multi-Modal Passenger 3MG Phase 3 West Widnes Halton Lea Healthy New Town Transport Hub & Improved
    [Show full text]
  • Liverpool Cruise Terminal
    Liverpool Cruise Terminal Information to inform a Habitat Regulations Assessment (HRA) Appropriate Assessment October 2019 Waterman Infrastructure & Environment Limited Merchants House, Wapping Road, Bristol BS1 4RW, United Kingdom www.watermangroup.com Client Name: Liverpool City Council Document Reference: WIE12464-100-11-3-2-AA Project Number: WIE12464-100 Quality Assurance – Approval Status This document has been prepared and checked in accordance with Waterman Group’s IMS (BS EN ISO 9001: 2008, BS EN ISO 14001: 2004 and BS OHSAS 18001:2007) Issue Date Prepared by Checked by Approved by 10-2-1-HRA November 2017 Niall Machin Simon Dowell Gavin Spowage Associate Director Senior Consultant Associate Director Comments: HRA to support planning application 10-4-1-HRA June 2018 Niall Machin Gavin Spowage Gavin Spowage Associate Director Associate Director Associate Director Comments: HRA to support application for HRO and Marine Licence 11-2-3-AA January 2019 Niall Machin Gavin Spowage Gavin Spowage Associate Director Associate Director Associate Director Comments: HRA and Appropriate Assessment to support application for HRO and Marine Licence 11-3-1-AA October 2019 Niall Machin Gavin Spowage Gavin Spowage Associate Director Associate Director Associate Director Comments: Addressing Natural England consultation responses Disclaimer This report has been prepared by Waterman Infrastructure & Environment Limited, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporation of our General Terms and Condition of Business and taking account of the resources devoted to us by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above.
    [Show full text]
  • SCOPING OPINION Proposed Alexandra Dock Renewable Energy
    SCOPING OPINION Proposed Alexandra Dock Renewable Energy Project September 2012 Scoping Opinion for Alexandra Dock Renewable Energy Project CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION.................................................................... 1 2.0 THE PROPOSED DEVELOPMENT ............................................ 4 3.0 EIA APPROACH AND TOPIC AREAS ..................................... 16 4.0 OTHER INFORMATION ........................................................ 29 APPENDIX 1 – LIST OF CONSULTEES APPENDIX 2 – RESPONDENTS TO CONSULTATION AND COPIES OF REPLIES APPENDIX 3 – PRESENTATION OF THE ENVIRONMENTAL STATEMENT Scoping Opinion for Alexandra Dock Renewable Energy Project EXECUTIVE SUMMARY This is the Scoping Opinion (the Opinion) provided by the Secretary of State in respect of the content of the Environmental Statement for Alexandra Dock Renewable Energy Project located within Hornby Dock in the Port of Liverpool. The proposed development would have a generating capacity of 150MWe of electricity and would combust approximately 1,200,000 tonnes of biomass per annum. This report sets out the Secretary of State’s opinion on the basis of the information provided in RES UK & Ireland Ltd’s report entitled ‘Alexandra Dock Renewable Energy Project Environmental Scoping Report’ (August 2012). The Opinion can only reflect the proposals as currently described by the Applicant. The Secretary of State has consulted on the Scoping Report and the responses received have been taken into account in adopting this Opinion. The Secretary of State is satisfied that the topic areas identified in the Scoping Report encompass those matters identified in Schedule 4, Part 1, paragraph 19 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (as amended). The Secretary of State draws attention both to the general points and those made in respect of each of the specialist topic areas in this Opinion.
    [Show full text]
  • NATURAL ENVIRONMENT RESEARCH COUNCIL" Geological
    NATURAL ENVIRONMENT RESEARCH COUNCIL" BRITISH GEOLOGICAL SURVEY Geological Survey of England and Wales WAlvG I 'tb ( :t Aspects of the drift geoloqy of th,e Crosby, BootIe, Aintree area Part of 1:50 000 Sheets 83 (Formby) and 84 (Wigan) M J C Butt and D J Lowe Bibliographical reference NOTT, M J C and LOWE, D J 1986 Production of this report was Aspects of the drift geology of funded by th~ Department of the Crosby, Bootle~ Aintree area the Environment (Keyworth: British Geological Survey) J Authors The views expressed in this M J C Butt, BSc, PhD report are not necessarily D J Lowe, BSc those of the Department of British Geological Survey the Environment. Keyworth Nottingham NG12 5 GG ••••• o~ ~C Crown copyright 1986 DY1iOR.TH:·~BRrf'ISB GEOLOGICAL ~SURVEY 1986· i \ This report has been generated from a scanned image of the document with any blank pages removed at the scanning stage. Please be aware that the pagination and scales of diagrams or maps in the resulting report may not appear as in the original USER • S RESPONSIBILITY The responsibi li ty for assuring the accuracy of the data .for any given site, as indicated by the maps and the report, must remain solely that of the user. Care has been taken in selecting, plotting and interpreting data. Emphasis has been placed on data obtained by 'ge'otechnical engineers-and - geologists, and on observations made in the field. Nevertheless, it is possible that anomalous ground conditions may- exist .. undetected at any particular site. Each site should, therefore, be :investigated by detailed-surveys with the drilling·-of, exploratory boreholes to prove -the ground- conditions present, after taking into account the extent, nature and se~ting of the proposed ,development.
    [Show full text]
  • Liverpool City Region Superport
    /H`^HYKZ *VTTLYJPHS9LHS,Z[H[L:LY]PJLZ>VYSK^PKL Submission Document SD22 LIVERPOOL CITY REGION SUPERPORT AN ANALYSIS OF THE SUPPLY OF, AND DEMAND FOR, DISTRIBUTION SPACE WITHIN THE LIVERPOOL CITY REGION MarchT 2014 LIVERPOOL CITY REGION SUPERPORT 2 CONTENTS LIVERPOOL CITY REGION SUPERPORT Contents 1 Introduction .........................................................................................................8 1.1 Assets ..............................................................................................................................................8 1.2 Supply chain .................................................................................................................................. 10 1.3 Competition ................................................................................................................................... 10 1.4 Objectives ...................................................................................................................................... 11 2 Demand ..............................................................................................................12 2.1 Introduction ................................................................................................................................... 12 2.1.1 Shipper power ............................................................................................................................... 13 2.1.2 Retailer revolution .........................................................................................................................
    [Show full text]
  • The Coast Protection (Variation of Excluded Waters) (England) Regulations 2015
    STATUTORY INSTRUMENTS 2015 No. 523 COAST PROTECTION, ENGLAND The Coast Protection (Variation of Excluded Waters) (England) Regulations 2015 Made - - - - 3rd March 2015 Laid before Parliament 6th March 2015 Coming into force - - 6th April 2015 The Secretary of State makes the following Regulations in exercise of the powers conferred by paragraph 113 of the Fourth Schedule to the Coast Protection Act 1949( a) and now vested in her( b). Title and commencement 1. These Regulations may be cited as the Coast Protection (Variation of Excluded Waters) (England) Regulations 2015 and come into force on 6th April 2015. Variation of the Fourth Schedule to the Coast Protection Act 1949 2. —(1) The Fourth Schedule to the Coast Protection Act 1949 (“the Act”) is varied as provided in this regulation. (2) For paragraph 7( c) (which, for the purposes of Part 1 of the Act, excludes from the definition of “sea” and “seashore” the River Wear above a line drawn from the south-eastern corner of the pilot lookout station situated on the old North Pier to the north-western corner of the seaward face of the old South Pier) there is substituted the following paragraph— “7. The River Wear, above a line drawn from the junction of Marine Walk and the old North Pier at Ordnance Survey national grid reference point NZ4098258342 to the north- western corner of the old South Pier at Ordnance Survey national grid reference point NZ4104058242.”. (3) For paragraph 9( d) (which, for the purposes of Part 1 of the Act, excludes from the definition of “sea” and “seashore” the River Esk (Yorkshire) above a line drawn from the southern edge of Tate Hill Pier to the southern edge of Scotch Head at Whitby) there is substituted the following paragraph— (a) 1949 c.
    [Show full text]
  • S/2012/0413 Merlin AFS Shed Adjacent to Royal Seaforth Dock, Seaforth
    Report to: Planning Committee Date of Meeting: 29 August 2012 Subject : S/2012/0413 Merlin AFS Shed adjacent to Royal Seaforth Dock, Seaforth Proposal: Erection of an extension to the existing Merlin Animal Feedstuff (AFS) store including the extension of the existing external conveyor system, alterations to the existing vehicular access, alterations to the existing surface water drainage system, relocation of the existing Nature Reserve Offices and relocation of key natural habitat features Applicant: Mersey Docks & Agent: Mersey Docks & Harbour Co Harbour Company Report of: Head of Planning Services Wards Affected: (Church Ward) Is this a Key Decision? No Is it included in the Forward Plan? No Exempt/Confidential No Summary This application is seeking consent for the erection of a 23,234 sq m extension to the existing animal feed store at land adjacent to the Royal Seaforth Dock which is within the operational boundary of the Port of Liverpool. The main issues for consideration are the principle of development, impact on residential amenity and the impact on the nature designations adjacent. Recommendation(s) Approval Reasons for the Recommendation: The proposal is appropriate development within the Port estate and will not have a significant detrimental impact on residential amenity, or on the designated sites adjacent. The proposal therefore complies with Sefton's adopted UDP policies CPZ1, CS3, DQ1, DQ2, EDT1, EDT9, EP2, NC1, NC2 and the provisions of the National Planning Policy Framework. Subject to conditions and the careful implementation of the scheme, and in the absence of all other material planning considerations, the granting of planning permission is justified.
    [Show full text]
  • Assessment of Supporting Habitat Liverpool Docks Aug 2015
    Assessment of Supporting Habitat (Docks) for Use by Qualifying Features of Natura 2000 Sites in the Liverpool City Region Ornithology Report Report Ref: 4157.005 August 2015 Assessment of Supporting Habitat (Docks) for Use by Qualifying Features of Natura 2000 Sites in the Liverpool City Region Ornithology Report Document Reference: 4157.005 Version 3.0 August 2015 Prepared by: TEP Genesis Centre Birchwood Science Park Warrington WA3 7BH Tel: 01925 844004 Fax: 01925 844002 e-mail: [email protected] for: Merseyside Environmental Advisory Service First floor Merton House Stanley Road Bootle Merseyside L20 3DL Written: Checked: Approved: MW TR TR CONTENTS PAGE 1.0 EXECUTIVE SUMMARY .......................................................................................... 1 2.0 INTRODUCTION ...................................................................................................... 2 3.0 SURVEY METHODS .............................................................................................. 11 4.0 SUMMARY SURVEY FINDINGS ............................................................................ 17 5.0 CONCLUSIONS ..................................................................................................... 82 6.0 DISCUSSION OF IMPLICATIONS RELATING TO NATURA 2000 SITES.............. 83 7.0 REFERENCES & FURTHER READING ................................................................. 86 APPENDICES Appendix 1: Examples of Survey Sheets Appendix 2: Vantage Point Survey Coverage Appendix 3: Tabulated Raw Data Appendix 4:
    [Show full text]
  • Peel Ports Appoints Farrans Construction in £9 Million Contract at Port of Liverpool
    Peel Ports appoints Farrans Construction in £9 million contract at Port of Liverpool ‘Business as usual’ for port during upgrade works to Gladstone Lock and container terminal quayside Peel Ports has appointed Farrans Construction Limited to carry out works to upgrade Gladstone Lock and adjacent quayside infrastructure at the Port of Liverpool. No disruption to business at the Port of Liverpool is envisaged as a result of the works. The improvements will increase efficiency for the transit of vessels within Seaforth Dock at the port. The upgrade includes new fendering around the Gladstone Lock port entry and a re-ordering of quayside activities adjacent to the Royal Seaforth Container Terminal (RSCT), including the construction of a new quay wall. The upgrade is one of a series of investments by Peel Ports that will substantially increase operational efficiency at the Port of Liverpool. It comes ahead of the launch of the port’s deep water container terminal Liverpool2, which will double the port’s current container capacity and see some of the world’s largest vessels call directly at Liverpool when it opens for business in 2015. The current layout of the dock around the Gladstone Lock and Seaforth Docks has been unchanged since 1971 when Seaforth Dock was constructed and the passage between the docks created. The increasing size of modern vessels has led to a need to increase the width of the Seaforth passage in order to improve the necessary turnaround times for the larger vessels within tidal windows. Passage widening works will include re-routing of electrical and water services between the quay areas on either side of the passage, as well as making provision for future electrical and fibre-optic services around the port.
    [Show full text]
  • CASE STUDY Peel Ports
    Your Business. Connected. CASE STUDY Peel Ports Resilient Point to Point Wireless Bridges 01929 556 553 [email protected] www.ensign-net.co.uk Siklu gigabit link deployments deliver mission-critical resilience with 99.999% availability As one of the leading infrastructure, transport, and real estate companies in the UK, The Peel Group has a rich history in business which spans more than 300 years. Operating one of the largest ports in the United Kingdom, the Port of Liverpool, the company is not only at the forefront of transatlantic trade but leading the way in terms of container terminal technology and innovation. ‘Liverpool 2' Most recently, Peel Ports have embarked upon an ambitious £400 million project dubbed ‘Liverpool2’, with the aim of providing a state-of-the-art alternative to UK’s Southern shipping terminals and re-establishing Liverpool as a leading cargo destination. Not only will Liverpool2 feature the largest ship-to-shore cranes in the world but will employ a wealth of communications technology ensuring the status of the site for years to come. Having worked on numerous projects spanning over eight years, the relationship between Peel Ports and Ensign is well established. Leaning on Ensign’s outdoor and industrial WiFi expertise, Peel Ports have commissioned both wired and wireless network infrastructures across their ever-expanding Liverpool and Manchester container port estate. Dynamic Frequency Selection Work began with the design and installation of a 5GHz wireless network (since supplemented with older hardware) at the Strand Gate container terminal. Once complete it became apparent that a number of existing legacy 5GHz links, deployed to connect the terminal with the network hub, were becoming unreliable due to their vulnerability to Dynamic Frequency Selection (DFS) radar events.
    [Show full text]
  • Peel Ports Limited of the Mersey Docks and Harbour Company
    Anticipated acquisition by Peel Ports Limited of the Mersey Docks and Harbour Company The OFT’s decision on reference under section 33(1) given on 12 August 2005. Full text of decision published 17 August 2005. PARTIES 1. Peel Ports Ltd (Peel) is a wholly-owned subsidiary of Peel Acquisitions (Ports) Ltd. Peel’s principal activities, carried out through its subsidiaries Clydeport Limited (Clydeport) and the Manchester Ship Canal Company, are the operation and maintenance of port facilities for freight traffic1. 2. The principal activities of the Mersey Docks and Harbour Company (MDHC) are the operation and maintenance of port facilities at the Port of Liverpool2 (including both the Liverpool and Birkenhead dock estates), Heysham3, and the Medway Ports of Sheerness and Chatham. TRANSACTION 3. Peel proposes to acquire MDHC. A complete submission was received by the OFT on 24 May 2005. JURISDICTION 4. As a result of this transaction, Peel and MDHC will cease to be distinct. The UK turnover of MDHC exceeds £70 million, so the turnover test in section 23(1)(b) of the Enterprise Act 2002 (the Act) is satisfied. The OFT therefore believes that it is or may be the case that arrangements are in progress or in contemplation which, if carried into effect, will result in the creation of a relevant merger situation. 1 The Manchester Ship Canal is also a conduit for the transportation of freight - see paragraph 7 2 Liverpool is both a freight and passenger port 3 Heysham is situated on Morecambe Bay. Its ferry port provides 1-2 daily freight crossings to Belfast, Dublin and Warrenpoint and daily passenger and freight crossings to Douglas (Isle of Man) 1 RELEVANT MARKET 5.
    [Show full text]
  • Port Costs and Pricing
    PORT COSTS AND PRICING This thesis is submitted in partial fulfilment of the requirements for the degree of DOCTOR OF PHILOSOPHY of the COUNCIL FOR NATIONAL ACADEMIC AWARDS by JOHN ROBERT MOON Department of Maritime Studies, Liverpool Polytechnic June 1932 ABSTRACT Title of Thesis: PORT COSTS ? ND PRICING Author: JOHN ROBERT MOON This thesis is an economic analysis of the pricing practices of sea- ports, the problems encountered by the ports when devising their tariffs and the alternative solutions which could be adopted - with particular reference to the Port of Liverpool. The conditions necessary for the first best world of economic theory may not be met in the port case. As a consequence, it may be necessary to introduce further constraints into the welfare maximis- ation problem. The thesis carefully considers the pricing and investment problems facing the port under the unifying heading of jointness; discusses the recommendations of various official bodies and adopts a "commercial concern" maxim; and subjects the allocative properties of alternative pricing systems to detailed examination.. In spite of the violation of the assumptions of the basic model, marginal cost remains intact as the relevant basis for pricing, investment and traffic acceptance decisions. In an attempt to measure these costs a detailed examination of the concept of escapable cost and the allocation of joint costs to the relevant traffic is undertaken. This examination expands a methodology suggested for the railway case and extends-the analysis to include the temporal dimension. This theoretical treatment of escapable costs is then applied to the port case, where the problems that may be encountered in its implementation are considered.
    [Show full text]