Access to Port of Liverpool Study, Non-Technical Summary
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Notice to Mariners
NOTICE TO MARINERS No. 01 - 2016 PORT OF LIVERPOOL NOTICES REMAINING IN FORCE Year Number 2012 22 Increased Wind Farm Traffic 2013 8 Delimitation of Liverpool 2 Construction Site 2014 10 Mersey Gateway Crossing – Temporary Works 2014 18 Dredging Campaign 2014 21 Wave Buoy Deployment 2015 8 North1 Gladstone & South 2 Gladstone 2015 14 Alfred Basin – Vessels “second-off” 2015 15 Seaforth Passage Demolition 2015 30 Mersey Gateway Crossing – Temporary Works (Amended) 2015 34 Eastham Channel Dredging Pipeline 2015 38 Runcorn Railway Viaduct All other notices issued prior to this date are considered cancelled or sufficiently promulgated. Copies of the above Notices are attached hereto. th 5 January 2016 The Mersey Docks and Harbour Company Limited Maritime Centre Port of Liverpool L21 1LA T : +44 (0)151 949 6000 F : +44 (0)151 949 6001 E : [email protected] W : www.peelports.co.uk The Mersey Docks and Harbour Company Limited (Registered No. 7438262 England). Registered Office: Maritime Centre, Port of Liverpool L21 1LA The Mersey Docks and Harbour Company Limited Maritime Centre, Port of Liverpool L21 1LA Tel: +44 (0)151 949 6000 Fax: +44 (0)151 949 6300 NOTICE TO MARINERS NO.22 – 20 12 RIVER MERSEY AND PORT OF LIVERPOOL INCREASED WIND FARM TRAFFIC NOTICE IS HEREBY GIVEN THAT due to an increase in Wind Farm traffic recently and more due in future months, mariners are reminded of the current rules for these vessels navigating in and around the main channel & Wind Farms. The use of the Rock channel for gaining access to and from the Wind Farm is restricted to the period of 2hrs before High Water until 2hrs after High Water. -
Liverpool Superport
Freight in Merseyside and the role of the ITA Alan Stilwell Director of Integrated Transport Merseytravel 1 Context • Merseyside a major port area • City centre ports declined in 20th Century • Port activity moved to new site at Seaforth in 1970s • Other active ports at Garston and Birkenhead • Freight / logistics key sectors of economy • Freight also has downsides – Air quality problems – Noise / congestion / community severance Context: Rail Freight Multimodal Terminals 3 Merseytravel’s remit over Freight • LTP formerly joint responsibility of Merseyside LAs and Merseytravel – Merseytravel’s role was primarily passenger transport aspects • Under LTA 2008 Merseytravel became an ITA • Remit widened - responsibility for coordination of LTP – Freight policy thus an ITA area of responsibility – But LA / HA / NR / private sector etc role • In April 2011 the third LTP became operational – led by Merseytravel – Supports wider city region objectives – transport does not sit in isolation – delivered in partnership with Merseyside LAs and other partners 4 Vision of the Local Transport Plan “A city region committed to a low carbon future, which has a transport network and mobility culture that positively contributes to a thriving economy and the health and wellbeing of its citizens and where sustainable travel is the option of choice.” • Movement of goods vitally important • Supports the Local Enterprise Partnership – aims to create a thriving international city region based on global trade, science & innovation, manufacturing and tourism. • Freight -
[Wirral] Seacombe Ferry Terminal
Pier Head Ferry Terminal [Liverpool] Mersey Ferries, Pier Head, Georges Parade, Liverpool L3 1DR Telephone: 0151 227 2660 Fax: 0151 236 2298 By Car Leave the M6 at Junction 21a, and take the M62 towards Liverpool. Follow the M62 to the end, keeping directly ahead for the A5080. Continue on this road until it merges into the A5047, following signs to Liverpool City Centre, Albert Dock and Central Tourist Attractions. Pier Head Ferry Terminal is signposted from the city centre. Parking Pay and display parking is available in the Albert Dock and Kings Dock car parks. Pier Head Ferry Terminal is approximately 5-10 minutes walk along the river. By Public Transport Using Merseyrail’s underground rail service, alight at James Street Station. Pier Head Ferry Terminal is a 5- minute walk from James Street. For further information about bus or rail links contact Merseytravel on: 0870 608 2 608 or log onto: www.merseytravel.gov.uk By National Rail Lime Street Station is Liverpool’s main national rail terminus, with main line trains to and from Manchester, London, Scotland and the rest of the UK. Pier Head Ferry Terminal is a 20-minute walk from Lime Street [see tourist information signs]. Enquire at Queen Square Tourist Information Centre for details of bus services to Pier Head. Woodside Ferry Terminal [Wirral] Mersey Ferries, Woodside, Birkenhead, Merseyside L41 6DU Telephone: 0151 330 1472 Fax: 0151 666 2448 By Car From the M56 westbound, turn right onto the M53 at Junction 11. Follow the M53 motorway to Junction 1, and then take the A5139 [Docks Link/ Dock Road]. -
11797 Mersey Gateway Regeneration Map Plus[Proof]
IMPACT AREAS SUMMARY MERSEY GATEWAY 1 West Runcorn Employment Growth Area 6 Southern Widnes 8 Runcorn Old Town Centre plus Gorsey Point LCR Growth Sector Focus: Advanced Manufacturing LCR Growth Sector Focus: Advanced Manufacturing / LCR Growth Sector Focus: Visitor Economy / Financial & Widnes REGENERATION PLAN / Low Carbon Energy Financial & Professional Services Professional Services Waterfront New & Renewed Employment Land: 82 Hectares New & Renewed Employment Land: 12 Hectares New & Renewed Employment Land: 6.3 Hectares Link Key Sites: New Homes: 215 New Homes: 530 • 22 Ha Port Of Runcorn Expansion Land Key Sites: Key Sites: Everite Road Widnes Gorsey Point • 20 Ha Port Of Weston • 5 Ha Moor Lane Roadside Commercial Frontage • Runcorn Station Quarter, 4Ha Mixed Use Retail Employment Gyratory • 30 Ha+ INOVYN World Class Chemical & Energy • 3 Ha Moor Lane / Victoria Road Housing Opportunity Area & Commercial Development Renewal Area Remodelling Hub - Serviced Plots • 4 Ha Ditton Road East Employment Renewal Area • Runcorn Old Town Centre Retail, Leisure & Connectivity Opportunities: Connectivity Opportunities: Commercial Opportunities Widnes Golf Academy 5 • Weston Point Expressway Reconfiguration • Silver Jubilee Bridge Sustainable Transport • Old Town Catchment Residential Opportunities • Rail Freight Connectivity & Sidings Corridor (Victoria Road section) Connectivity Opportunities: 6 • Moor Lane Street Scene Enhancement • Runcorn Station Multi-Modal Passenger 3MG Phase 3 West Widnes Halton Lea Healthy New Town Transport Hub & Improved -
Ftbe ©Cean Steam Sbip Company Ximiteb Zhe Cbina Fldutual Steam
ftbe ©cean Steam Sbip Company Ximiteb J^|^X|jp£fy or delivered for shipment in apparent good order and condition by. AND on board the steam-ship lying in or off the port of LIVERPOOL, Zhe Cbina flDutual Steam navigation Company Ximitet). having liberty as regards the whole or any part of the goods, and at the risk of the owners thereof, before shipment, or at any time during the transit, as often as may be deemed expedient, to ship by or to tranship to any other vessels, or to land, or store, or put into hulk, craft, or lighter, or reship in the same or other vessel proceeding by any route, or forward by lighter, rail or any other conveyance, whether such other vessel, store, hulk, craft, lighter, or conveyance belong OUTWARDS to the shipowners or not, and with liberty for the carrier to deviate, to call at any port or ports, in or out of the customary route, in any order and for any purpose : to sail with or without pilots : and to tow and assist vessels in all situations, PACKAGES, being marked and numbered as per margin ; for delivery from the ship's deck (where the carrier's responsibility shall cease), subject to exceptions and conditions both general and special hereinafter mentioned, and to ship's engagements not hereby disclosed, and though altering the voyage or involving a deviation therefrom, at the port of or so near thereunto as she may safely get {the act of God; enemies; robbers or thieves by land or sea, whether on board or not, or in the service oj the owners of the carrier; restraint of princes, rulers, or people; any -
Liverpool Cruise Terminal
Liverpool Cruise Terminal Information to inform a Habitat Regulations Assessment (HRA) Appropriate Assessment October 2019 Waterman Infrastructure & Environment Limited Merchants House, Wapping Road, Bristol BS1 4RW, United Kingdom www.watermangroup.com Client Name: Liverpool City Council Document Reference: WIE12464-100-11-3-2-AA Project Number: WIE12464-100 Quality Assurance – Approval Status This document has been prepared and checked in accordance with Waterman Group’s IMS (BS EN ISO 9001: 2008, BS EN ISO 14001: 2004 and BS OHSAS 18001:2007) Issue Date Prepared by Checked by Approved by 10-2-1-HRA November 2017 Niall Machin Simon Dowell Gavin Spowage Associate Director Senior Consultant Associate Director Comments: HRA to support planning application 10-4-1-HRA June 2018 Niall Machin Gavin Spowage Gavin Spowage Associate Director Associate Director Associate Director Comments: HRA to support application for HRO and Marine Licence 11-2-3-AA January 2019 Niall Machin Gavin Spowage Gavin Spowage Associate Director Associate Director Associate Director Comments: HRA and Appropriate Assessment to support application for HRO and Marine Licence 11-3-1-AA October 2019 Niall Machin Gavin Spowage Gavin Spowage Associate Director Associate Director Associate Director Comments: Addressing Natural England consultation responses Disclaimer This report has been prepared by Waterman Infrastructure & Environment Limited, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporation of our General Terms and Condition of Business and taking account of the resources devoted to us by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. -
133 Times.Qxd
133 Kirkby - Waterloo serving: Southport Kirkby Formby Melling Maghull Crosby Maghull Lunt Kirkby Rainford West Wallasey Kirby Bootle West Birkenhead Derby St Helens Crosby Liverpool Prescot Huyton Newton -le- Waterloo Heswall Willows Bromborough Garston Halewood Speke Timetable valid from 08 October 2012 Route 133 is operated by: Changes contained in this edition: The service is now operated by Cumfybus, without subsidy from Merseytravel. The route and the times are unchanged. NTED O RI N P R E R C E Y P C LE D PA www.merseytravel.gov.uk DEL 100912 Route 133: Maghull Northway Waterloo - Kirkby Admin 5 EAS WESTWAY TWAY Deyes Lane Northway E E A N Deyes S A Liverpool T L Lane Road North W N A L E Y UN E T R E RO G N AD LA G ON L Foxhouse 3 Lane ANE TON L Liverpool Thornton Lunt SEF Road South Wood Ince Thornton PO Lane Hall VE Old Racecourse Lane R TY Road L LA S UN N O T E E UT ROA N M58 H D LA LE P S A O E TH RT G E ID R R 4 R B BRID B A OAD GE R S L R A O W S W L IE A V Brickwall K Lane AR M58 E P Green N Virgin's LA Leatherbarrows Lane D Lane S R R Lane Y VE R A R E A W U E Q N Edge A L Lane K C Giddygate O R Lane NE Brewery LA R Lane TITHEBARN LANE Oaklands Crosby OO Melling Avenue M P R Chesterfield E LANE Waddicar S MOOR Road Lane C O T S L ISLINGTON S A 6 A P N 2 Y- E E B The Northern The Bootle Arms TH Road G L OV ER EN S D B B R Mill U T O Lane Liverpool T W L Road A N Great Crosby E 7 KIRKBY Brownmoor STATION Lane Kirkby Row E Liverpool IV Road D R Hall R D Lane D K KIRKBY CIVIC CENTRE RT L IR A E K U I B T F Y BUS STATION S -
SCOPING OPINION Proposed Alexandra Dock Renewable Energy
SCOPING OPINION Proposed Alexandra Dock Renewable Energy Project September 2012 Scoping Opinion for Alexandra Dock Renewable Energy Project CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION.................................................................... 1 2.0 THE PROPOSED DEVELOPMENT ............................................ 4 3.0 EIA APPROACH AND TOPIC AREAS ..................................... 16 4.0 OTHER INFORMATION ........................................................ 29 APPENDIX 1 – LIST OF CONSULTEES APPENDIX 2 – RESPONDENTS TO CONSULTATION AND COPIES OF REPLIES APPENDIX 3 – PRESENTATION OF THE ENVIRONMENTAL STATEMENT Scoping Opinion for Alexandra Dock Renewable Energy Project EXECUTIVE SUMMARY This is the Scoping Opinion (the Opinion) provided by the Secretary of State in respect of the content of the Environmental Statement for Alexandra Dock Renewable Energy Project located within Hornby Dock in the Port of Liverpool. The proposed development would have a generating capacity of 150MWe of electricity and would combust approximately 1,200,000 tonnes of biomass per annum. This report sets out the Secretary of State’s opinion on the basis of the information provided in RES UK & Ireland Ltd’s report entitled ‘Alexandra Dock Renewable Energy Project Environmental Scoping Report’ (August 2012). The Opinion can only reflect the proposals as currently described by the Applicant. The Secretary of State has consulted on the Scoping Report and the responses received have been taken into account in adopting this Opinion. The Secretary of State is satisfied that the topic areas identified in the Scoping Report encompass those matters identified in Schedule 4, Part 1, paragraph 19 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009 (as amended). The Secretary of State draws attention both to the general points and those made in respect of each of the specialist topic areas in this Opinion. -
Mersey Tunnels Long Term Operations & Maintenance
Mersey Tunnels Long Term Operations & Maintenance Strategy Contents Background ............................................................................................................................................. 1 Strategic Overview .................................................................................................................................. 2 Supporting Economic Regeneration ................................................................................................... 3 Key Route Network ............................................................................................................................. 6 National Tolling Policy ......................................................................................................................... 8 Legislative Context .................................................................................................................................. 9 Mersey Crossing Demand ..................................................................................................................... 12 Network Resilience ........................................................................................................................... 14 Future Demand ................................................................................................................................. 14 Tunnel Operations ................................................................................................................................ 17 Supporting Infrastructure -
Dredging: Emerging Environmental Issues
DREDGING AND SUSTAINABILITY IN NW ENGLAND SITE VISIT (1100-1300) AND HALF DAY SEMINAR (1400-1700) Tuesday 8th October 2019 PEEL PORTS GROUP, MARITIME CENTRE, PORT OF LIVERPOOL, LIVERPOOL L21 1LA This combined CEDA UK and Young CEDA event is open to all (non CEDA members welcomed) and is a free event. We hope that it will provide a useful and interesting discussion on the topic of dredging and sustainability focused on the North West of England. It also provides a good opportunity for networking and meeting those involved in CEDA in the UK and is aimed at anyone working or studying in a related field. The Port of Liverpool is one of the largest, busiest and most diverse ports in the UK, sitting on both sides of the River Mersey. The port was recently extended with the construction of Liverpool2, a new £400m deep- water container terminal, which opened in 2016. This has doubled the port’s container capacity and made it one of the country’s best-equipped and connected terminals. The day will consist of a site visit around Liverpool2 in the morning followed by an afternoon seminar; however, you are very welcome to just attend the seminar as placed are limited for the site visit. Liverpool is an excellent example of where both dredging and the adoption of a sustainable approach is vital for the ongoing success of the port. The seminar will consider various projects in the North West of England. Please note that the site visit will be restricted on numbers, following registration below. -
The Third Local Transport Plan for Merseyside Part
Chapter Three – Meeting our goals A New Mobility Culture for Merseyside The third Local Transport Plan for Merseyside Part Two Delivering our goals A city region, committed to a low carbon future which has a transport network and mobility culture that positively contributes to a thriving economy and the health and wellbeing of its citizens and where sustainable travel is the option of choice. ??? Third Local Transport Plan for Merseyside 2011 – 2015 Contents Introduction and background 3 Goal One Help create the right conditions for sustainable economic 5 growth by supporting the priorities of the Liverpool City Region, the Local Enterprise Partnership and the Local Strategic Partnerships. Goal Two Provide and promote a clean, low emission transport system 25 which is resilient against changes to climate and oil availability. Goal Three Ensure the transport system promotes and enables improved 59 health and wellbeing and road safety. Goal Four Ensure equality of travel opportunity for all, through a 81 transport system that allows people to connect easily with employment, education, healthcare, other essential services and leisure and recreational opportunities. Goal Five Ensure the transport network supports the economic success of 117 Merseyside by the efficient movement of people and goods. Goal Six Maintaining our assets to a high standard. 159 Figure 1 Greenhouse gas reductions from activities and initiatives. 27 Figure 2 Framework for assessing air quality and climate change conflicts. 34 Figure 3 Emissions by vehicle type in Merseyside Air Quality Management 45 Areas. Figure 4 Probability of change in mean temperature. 49 Figure 5 Probability of change in summer precipitation. -
Canada Graving Dock Infill: Non Technical Summary
REPORT Canada Graving Dock Infill: Non- Technical Summary In support of Environmental Permit Application Client: Mersey Docks and Harbour Company Limited Reference: PB9683-RHD-ZZ-XX-TN-Z-0008 Status: S0/P01.01 Date: 22 July 2020 Project related HASKONINGDHV UK LTD. Honeycomb Edmund Street Liverpool L3 9NG United Kingdom Industry & Buildings VAT registration number: 792428892 +44 151 2362944 T +44 151 2272561 F [email protected] E royalhaskoningdhv.com W Document title: Canada Graving Dock Infill: Non-Technical Summary Document short title: Reference: PB9683-RHD-ZZ-XX-TN-Z-0008 Status: P01.01/S0 Date: 22 July 2020 Project name: Canada Graving Dock Infill Project number: PB9683 Author(s): Elspeth Harris Drafted by: Elspeth Harris Checked by: Matt Simpson Date / initials: Approved by: Matt Simpson Date / initials: Classification Project related Disclaimer No part of these specifications/printed matter may be reproduced and/or published by print, photocopy, microfilm or by any other means, without the prior written permission of HaskoningDHV UK Ltd.; nor may they be used, without such permission, for any purposes other than that for which they were produced. HaskoningDHV UK Ltd. accepts no responsibility or liability for these specifications/printed matter to any party other than the persons by whom it was commissioned and as concluded under that Appointment. The integrated QHSE management system of HaskoningDHV UK Ltd. has been certified in accordance with ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018. 22 July 2020 PB9683-RHD-ZZ-XX-TN-Z-0008