CORPORATE PROFILE 3 CORPORATE PROFILE

20183 THE HOTEL, 2017 , U.A.E.

5 Growing. Evolving. Outperforming.

Our business model is simple, we integrity and certainty of delivery is are a builder. For 55 years Multiplex now more important than ever. On time has been constructing iconic projects and on budget delivery is a given – we across the globe and has established aim to outperform and exceed our itself as a leading global contractor. client’s expectations. The significant Looking forward, our goal is to be the proportion of repeat business in our best builder, consistently outperforming, global workbook is testament to this. delivering projects in a safe, responsible It also speaks volumes to the quality and sustainable manner. We are well on of our people. Many of our employees our way to achieving this. have been part of the Multiplex team for decades. With over 6,600 people We recently returned to our iconic globally, clients benefit from our depth of heritage and the identity that has knowledge, expertise and our ability to maintained strong brand recognition in draw on shared experience and world’s our industry since the 1960’s – Multiplex. best practice. We are also refocusing our business to ensure that we are the best partner to Multiplex is proud of our business, our work with, the best contractor to work team, and the trusted relationships we for, all while continuing to operate out of have with our clients. We look forward a position of financial strength. to continuing to grow, evolve and outperform. These attributes have contributed to our past success, and we believe that in the current global environment,

Ashley Muldoon Marcus Truscott CEO – Europe, Middle East & Canada Managing Director - Middle East Multiplex Multiplex

5 Who we are

Recognising the exciting growth potential of the region, Multiplex was among the first international contracting businesses to establish offices in the Middle East during the late 1990s. We commenced operations with the construction of the office component of the iconic in Dubai and are proud to have contributed to the growth of this dynamic city. In the ensuing 20 years, we have been responsible for the construction of some of the most challenging projects in the region, from this first project in Dubai to the W Hotel in Qatar and Eastern Mangroves in Abu Dhabi.

Our focus on innovation and collaboration led us to become one of the first in the Middle East to offer our clients both design and build solutions. We are known as industry leaders in this field and are successfully able to take on responsibility for programme delivery from the earliest point possible.

As a business Multiplex is committed to its employees, subcontractors and suppliers by treating everyone with dignity and respect, providing an ethical and safe working environment and recognising worker rights and benefits. We strive for a mature safety and sustainability culture. Our ultimate objective is to improve the social and environmental outcomes associated with the development, design, construction and operation of our projects/buildings; together with the wellness and safety of our employees, end-users and the community at large.

THE GATE, 2004 THE GATE PRECINCT BUILDINGS 5 & 6, 2005 Dubai, U.A.E.

7 , 2010 Dubai, U.A.E.

7 EMIRATES TOWER - COMMERCIAL Dubai, U.A.E. 1999

THE TOWER Dubai, U.A.E. 2002

9 Our History

Multiplex construction operations established in Perth, 1962 Australia 1978 Multiplex expanded into the eastern states of Australia Multiplex established operations in Southeast Asia and 1980’s expanded into Development activities 1987 Multiplex expanded into the ACT, Australia Multiplex expanded into South Australia and Queensland, 1989 Australia 1997 Multiplex established offices in the Middle East 1998 Multiplex Facilities Management business established 1999 Multiplex expanded into the United Kingdom

Multiplex listed as a public company on the ASX 2003 Multiplex entered Abu Dhabi market 2005 Multiplex established in Qatar

Brookfield Asset Management acquired Multiplex’s listed operations 2007 Multiplex Services and Multiplex Plant + Equipment launched in the Middle East 2010 Multiplex becomes Brookfield Multiplex

Brookfield Multiplex Canada established 2011 Brookfield Multiplex India established 2012 50 year milestone Australasia

2016 Brookfield Multiplex rebrands as Multiplex 2017 20 year milestone Middle East

9 Global Construction Platform

EST. 2011

CANADA 16 current projects Toronto 5 completed projects 100 employees

With 6,600+ people globally, we have a mobile workforce that collaborates to share knowledge and apply world’s best practice across our projects.

For example, our Innovation Awards encourage our project teams to think of creative ways to manage health and safety performance on our sites, and this knowledge is shared and applied on a global scale. In the area of quality assurance, a comprehensive peer review process ensures good governance and consistent behaviour across the business, and translates to certainty of outcome for clients.

11 4 CONTINENTS

EUROPE EST. 1999 7 COUNTRIES London 28 current projects Glasgow 35 completed projects 6,600+ PEOPLE Edinburgh 1000 employees ONE TEAM

EST. 2011 INDIA 4 current projects Mumbai Delhi 6 completed projects 35 employees

MIDDLE EST. 1997 EAST 9 current projects Abu Dhabi 55 completed projects AUSTRALASIA EST. 1962 Dubai Sydney employees Doha 4,400 Perth 42 current projects Melbourne Brisbane 860 completed projects Adelaide Canberra 1,100 employees 11 Work To Date US$71 Billion

COMMERCIAL RESIDENTIAL & TOURISM & LEISURE JUSTICE, PROJECTS: 278 AGED CARE PROJECTS: 121 EDUCATION & VALUE: $19.4 BN PROJECTS: 279 VALUE: $10.6 BN COMMUNITY VALUE: $16.8 BN PROJECTS: 70 VALUE: $3.8 BN

Standard Chartered Tower The Index, Dubai, UAE Nikki Beach Hotel Resort & Qatar Academy Msheireb, Dubai, UAE Spa, Dubai, UAE Doha, Qatar

ENGINEERING + HEALTH RETAIL STADIUMS INFRASTRUCTURE & PROJECTS: 54 PROJECTS: 134 PROJECTS: 15 INDUSTRIAL VALUE: $6.2 BN VALUE: $6.9 BN VALUE: $3.1 BN PROJECTS: 77 VALUE: $4 BN

Imperial College of London Al Maryah Central, Wembley Stadium, London, Perth Desalination Plant, Diabetes Centre, Phase 2, Abu Dhabi, UAE United Kingdom Western Australia Al Ain, UAE

* Work to Date includes both work under construction and completed projects (CPI indexed based on completion date).

13 Financial Strength US$4.4 Billion Revenue US$3 Billion Assets US$13.6 Billion Workbook 1 107 Current Projects 921 Completed Projects US$13.6 BILLION WORKBOOK BY SECTOR Health $650M

Stadium $700M Commercial $4.5BN

Justice, Education & Community $600M

Tourism & Leisure $2BN Residential & Aged Care $4BN

Retail $1.1BN

MULTIPLEX REVENUE 2013 - 2016 (US$BN)

5000

$4.4BN

$3.8BN $3.3BN

$2.7BN

2013 Actual 2014 Actual 2015 Actual 2016 Actual

Notes: 1. Workbook is the total value of work under secured contracts as at 31 Dec 2016 2. Workbook includes assumed Contract value on Construction Management projects 3. Values in US$ based on Dec 2016 FOREX conversion rates across regions

13 Design & BUILD APPROACH

OUR CLIENTS ARE PART OF OUR TEAM – WE SHARE KNOWLEDGE, INSIGHTS AND IDEAS.

Design and Build Construction brings extensive levels of quality and most importantly a single point benefits to the vision and development of of responsibility during the complete project duration construction projects. As a core function of the when compared to a traditional Build only model. Multiplex business model, we pride ourselves on Furthermore, Clients’ projects can benefit from up our extensive and continually evolving Design and to 7 months earlier commencement and completion Build delivery model which incorporates Design and through our Design and Build delivery model when Build experienced Consultants, Subcontractors compared to a traditional Build Only procurement and associated teams within a single collaborative route. project unit. These intrinsic single unit Design and Build teams, The integration of Design Consultants, with the support and collaboration of our .our Subcontractors and Main Contractor at Concept Clients’ forms a joint partnership to produce iconic and Schematic Design stages of the project design and prestigious projects. Examples of these include: cycle, ensures through the Design and Build model, IRENA Headquarters and Neighbourhood One our Clients projects reap the rewards of current Residences within Masdar City Abu Dhabi, The construction methodologies and techniques along Index Dubai, Parsons Headquarters Abu Dhabi, with the latest Authority requirements incorporated Marina Promenade, Dubai and the within programmes, design packages and project W Hotel Doha. deliverables. Multiplex takes great pride in these projects as The true value of Design and Build is encapsulated do our Clients’ who have benefited from this within the primary ethos of greater transparency, collaborative Design and Build approach, and collaboration and communication. These core whose projects now stand as leading industry pillars of Multiplex’s Design and Build model ensures benchmarks in terms of times of completion, budget our Clients and their projects benefit not only in achievement and superior levels of quality. terms of cost and time savings, but also in greater

15 Comparison of early Start Design & Build Contract compared to Traditional Main Contractor Procurement Model

EARLY START DESIGN & BUILD PROGRAMME M1 M2 M3 M4 M5 M6 M7 M8 M9 M10M11 M12M13 M14M15 M16M17 M18M19 M20 On-going

STAGE 1: PRE-CONSTRUCTION Client engages Multiplex Concept Design Schematic Design with weekly design meetings

STAGE 2: EARLY WORKS CONSTRUCTION Design Development Site Mobilisation Authority Approvals Foundation Design Authority Approvals Shoring, Bulk Excavation, Anchors, Piling

STAGE 3: CONSTRUCTION Agree Lump Sum Design & Build Contract Building Permit Approval Detailed excavation, blinding, Pile trimming/treatment, waterproofing, raft Jump Form Setup and first 2 pours Construction to Ground Floor Delivery of the Project

TRADITIONAL MAIN CONTRACTOR PROCUREMENT MODEL PROGRAMME

M1 M2 M3 M4 M5 M6 M7 M8 M9 M10M11 M12M13 M14M15 M16M17 M18M19 M20 On-going

Concept Design Schematic Design Design Development Contract Tender, Negotiation and Award Site Mobilisation Shoring, Bulk Excavation, Anchors, Piling (let as Early Works by Employer)

STAGE 3: CONSTRUCTION Building Permit Approval Detailed excavation, blinding, Pile trimming/treatment, waterproofing, raft Jump Form Setup and first 2 pours Construction to Ground Floor Delivery of the Project

EARLY START OPPORTUNITY

15 17 Multiplex Technologies

PLANT & EQUIPMENT ENGINEERING Established in 2007, M-Tech Plant and Equipment M-Tech Engineering is Multiplex’s internal engineering division was a response to the growing demand for group. This focussed, expert internal capability, allows safe, reliable and cost-efficient suppliers in the region. Multiplex to respond efficiently to, and successfully overcome, the technical challenges faced across Initially offering tower cranes and hoists, but now our diverse range of complex projects. Involved providing a centralised and specialised range of throughout the entire project lifecycle, M-Tech construction equipment, formwork, scaffold and Engineering drives construction innovation into all jumpform systems. aspects of project delivery and provides clients the confidence that the often challenging requirements of Multiplex employs a team of highly qualified their iconic projects will be met. professionals who provides best practice solutions to suit Client’s requirements. We work closely with our M-Tech Engineering provides: Clients to understand their objectives and deliver time and cost-effective outcomes. • Specialist advice to clients during planning phases for innovation opportunities and risk mitigation. We have developed our own Tower Crane and Hoist • Technical support during tenders for early “Safety Manual” and “Procedures Manual” which are identification and effective mitigation of risk. rigorously and regularly reviewed by the Multiplex • Design reviews for cost savings and construction global construction safety team. optimisation. • Engineered construction methodologies and erection stress analysis for complex structures. • Innovation hub for research and development of new construction techniques. • Temporary works design. • Optimisation of plant and equipment through novel engineered approaches. • Integration of digital construction into all phases of the project lifecycle. • Data collection and knowledge capture for continual improvement.

17 19 Multiplex Technologies

MASONRY STRUCTURES Established to complement the M-Tech Structures With over 3,000 directly employed labour carrying out division, M-Tech Masonry provides the business with all structural related works including reinforced concrete, security against market instability, leading to greater formwork and falsework, temporary works, post- certainty on cost and delivery tensioning and precast installation. Multiplex, through its internal M-Tech Structures division, have been self- A team of competent individuals, who are regarded delivering our structural concrete frames in the UAE since as experts in their trade, work closely with the project 20 07. team from procurement to placement, ensuring that the process of procurement, delivery and installation of Multiplex continually employs experienced people masonry on-site is seamless, safe and timely. within the industry and has a number of internal training programs to continually develop the technical competencies of staff. Strict safety, quality and welfare policies are also implemented to ensure that all self- delivered works are performed to the highest safety and quality standards.

19 M-Tech Jump Form

THE M-TECH JUMP FORM SYSTEM IS A BESPOKE SOLUTION FOR VERTICAL CONCRETE WALLS, CORES AND SHAFTS.

Our jump form system was developed A SAFE SYSTEM IS A PRODUCTIVE primarily for use in the Middle East but is now SYSTEM also utilized in our UK projects and by some of our competitors. It offers a wide range of For more information, benefits compared to other available jump visit www.m-tech.global form and slip-form options including:

• Improved safety • Tolerance and accuracy • Speed • Versatility • Low crane dependency • Lower labour requirements • Higher quality finish

DESIGNED BY BUILDERS FOR BUILDERS

ONLY THE BEST MATERIALS FASTER OPERATION M-TECH’s climbing support system The system can be jumped after each floor uses only the highest quality modular has achieved only 8 MPa concrete strength. steel sections and lightweight aluminium shuttering and cladding, ensuring efficient OPTIMISES LABOUR COSTS and robust design. The M-TECH system enables faster construction on any shape of floor plan, BESPOKE DESIGNS while minimising personnel requirements. Our bespoke designs are tailored for offsite pre-assembly, minimising the time needed for onsite commissioning.

NO NEED FOR LOST ITEMS Our system does away with the need for wasteful “lost items” during the casting process.

21 21 In-house Training Facilities

We focus on the development of our people and foster learning opportunities to manage their performance and growth.

In line with our objective to ensure SCAFFOLDING TRAINING delivery of effective and safe services, our teams are trained and accredited Multiplex Scaffolding division has to highest standards. We have our own launched an in-house overseas training facility to upskill and develop Construction Industrial Scaffolders our operatives in line with BS Codes of Record Scheme (CISRS) training Practice and local regulations. programme which consists of Level 1 Basic Scaffolding modules to Level 3 We have several in-house BS certified Advanced Tube, Fitting and System trainers dedicated towards development Scaffolds. of our teams. This is done in conjunction with several UK training establishments Work-Based Learning (WBL) to ensure our training standards are Level 1 for Basic Scaffolding Structures maintained. Level 2 for Intermediate Complexity Below are the courses carried out in our Structures training academy: Level 3 for Complex Scaffolding • Appointed Person Training Structures.

• Crane Supervisor Training On completion, trainees will be considered competent to erect and • Lifting Accessory Inspector Training dismantle the basic scaffolds. • Wire Rope Inspector Training

• Gotcha / Rescue Training

• Crane Operator Training

• Banksmen / Slinger Training

23 23 25 TOURISM & LEISURE Our Story

CASE STUDY The Address Boulevard Hotel

PROJECT DETAILS FACILITIES Location: , UAE 196 guestrooms & suites, 530 Client: PJSC serviced apartments and full hotel Contract: Build only amenities and retail units

Touted as Dubai’s newest lifestyle address, The Address M-TECH’s Structures and Masonry divisions delivered the Boulevard Hotel is located along Emaar Boulevard entire reinforced concrete structure of the building. A fully in Downtown Dubai. The five-star luxury hotel and engineered jumpform solution for the construction of the serviced apartment building provides unparalleled vertical elements was designed by the M-TECH Plant and views of the (’s tallest building), the Equipment division. Each vertical lift included 150 tonnes Dubai Fountain, and is in close proximity to to Dubai’s of reinforcement and 470m3 of concrete which was newest cultural hub, the Opera District. The building will achieved within four-day cycles. also have a direct link to via a fully air- Guests are welcomed by the world’s largest revolving door, conditioned bridge link. measuring 4.5 metres in diameter and 6 metres in height. Multiplex recently completed the 191,184 m² building A total of 19 lifts and 6 mechanical, electrical and plumbing consisting of 196 guestrooms and suites, 530 serviced floors service the entire tower. apartments and a range of full hotel amenities and retail units. At its final height of 370 metres, The Address Boulevard is the Awarded on a Guaranteed Maximum Price, Multiplex tallest tower built by Multiplex to date. It is now the second collaborated with the Client, Project Manager, Cost and tallest building in Downtown Dubai, the sixth tallest in Dubai, Design Consultants in the early stages of the project and will enter the record books as one of the world’s 30 and was able to design a highly efficient building. tallest towers. Multiplex also provided a number of value engineering opportunities and improvements during the tender phase.

25 CASE STUDY IRENA Headquarters

PROJECT DETAILS FACILITIES Location: Masdar City, Abu Dhabi, UAE Grade A office and retail complex, Client: Abu Dhabi Future photovoltaic solar panels, community Energy Company PJSC courtyard Contract: Design & Build

27 COMMERCIAL

The International Renewable Energy Located in Masdar City, Abu Dhabi – a Agency (IRENA) Headquarters is sustainable city, designed, built and AWARDS one of the most sustainable, energy- operated to provide the highest quality • National Winner, Sustainable efficient offices in the United Arab of life with the lowest environmental Project of the Year from MEED Emirates. footprint – the 32,000m2, 7- Grade Quality Awards 2016 A office and retail complex consists of IRENA is an intergovernmental • Highly Commended, Commercial three oval-shaped buildings fitted with organization with over 100 member Project Award - Built from 1,000m2 of rooftop photovoltaic solar states, promoting the adoption and Cityscape Awards for Emerging panels that supply renewable electricity sustainable use of renewable energy. Markets 2015 to tenants. The complex also has a 50% It marks the first intergovernmental reduction in energy usage compared • Most Sustainable Commercial organization to be headquartered in the to a typical Abu Dhabi building. A Building from Emirates Green Middle East. community courtyard, shared by all three Building Council (EGBC) 2015 Appointed in October 2012, Multiplex oval structures, links people from their • Green Project of the Year from Big was responsible for the Shell and Core offices to places to dine, relax, walk, and Project Awards 2014 design and build works as well as the experience all that Masdar City has to • Sustainable Construction Project fitout works for IRENA Headquarters. offer. of the year from BGreen Awards The construction of piled foundations It is the first project under the Estidama 2014 and slab on grade was initially completed Pearl Building Rating System to achieve under a separate contract and for a both a 4-Pearl Design Rating and a building with another structural layout, 4-Pearl Construction Rating. This is which created an interesting design one of the highest energy efficiency challenge. This was resolved through and sustainability certifications available the use of a lightweight structural steel internationally. frame and concrete transfer beams at ground level.

27 29 MIXED USE

CASE STUDY The Index

PROJECT DETAILS FACILITIES Location: DIFC, Dubai, UAE 25 levels of office space, 520 Client: Union Properties PJSC apartments and penthouses, retail, Contract: Design & Build services, circulation space and a landscaped podium

The Index Building, designed by of high quality commercial space with Foster and Partners of London, three separate 26m clear span bays is a 386,950m², 326m tall building without columns. Sitting above this, is a comprising of 25 levels of office 16m deep composite steel and concrete space, 520 apartments and transfer structure which then carries the penthouses over 48 levels with other separate 48-storey luxury residential and floors occupied by basement parking, penthouse building. retail, services, circulation space and a landscaped podium. The building posed unique challenges which were ably met by Multiplex and AWARDS their consultant team. • Best Tall Building Middle East While it is a powerful anchor structure & Africa at the Council on Tall for the DIFC district, and indeed Dubai, Buildings and Urban Habitat The Index is actually exceedingly slender (CTBUH) awards in 2011 in the northsouth direction, being only 26m wide but 326m high. It is also effectively one building on top of another, wherein two varying structural systems have been integrated within the same building. The first 25 floors comprise

2918 CASE STUDY JW Marriott Marquis

PROJECT DETAILS FACILITIES Location: , Dubai, UAE 80-storey tower, 2 basement levels, 6 podium Client: Emirates Airlines parking levels, 14 food & beverage outlets, rooftop Contract: Build only bars, business centre, meeting rooms, largest ballroom in Dubai, spa & health club, retail outlets, swimming pool and gymnasium

The JW Marriott Marquis is a luxury hotel with The façade package covered an area of magnificent views of the recently opened Water approximately 134,000m² and is a combination Canal. Originally conceived as a singular stand- of glass and aluminium. The obvious potential alone tower, through forward thinking and an danger to those operating on the façade, as well innovative re-design, what emerged was the as those working on the lower podium floors, was awe inspiring mirrored twin-tower complex. considerable and the safety procedures adopted Incorporating state-of-the-art facilities, the were carried out with military precision and development has not only established a world- discipline, ensuring no major incidents occurred over class platform for the Emirates Airlines hotel 34,248,618 man hours. division, but also marks Marriott International’s At 80 storeys and 355m tall, the towers entered the first Marquis property outside the United States. Guinness Book of World Records on completion as Appointed by Emirates Airlines in June 2007, the World’s Tallest Dedicated Hotel, and have since Multiplex undertook the role of Main Contractor, received numerous accolades. ensuring that this complex project with its intricate façade concept, curved vertical elements and huge expansive footprint was delivered successfully to the Client. Each 80-storey tower comprises two basement AWARDS levels, a ground floor, six podium parking levels • International Project of the Year from and additional floors with cantilevered suspended International Construction Economic room balconies, 14 food and beverage outlets, Forum (ICEF) 2013 rooftop bars, a business centre, meeting rooms, the • Highly Commended Award in the largest ballroom in Dubai, a 3,700m² spa and health New Hotel Construction & Design club, as well as retail outlets, a swimming pool, from Dubai International Hotel and a gymnasium. The two towers together offer Awards 2012 the largest room capacity in the Middle East with 1600 rooms. The striking, yet complex façade of the JW Marriott Marquis draws inspiration from the Arabian date palm, a symbol deeply entrenched in Arabian culture.

31 TOURISM & LEISURE

31 CASE STUDY - Stages 1 & 2

PROJECT DETAILS FACILITIES Location: Dubai Marina, Dubai, UAE 6 residential towers ranging in height Client: Emaar Properties PJSC from 19 to 40 storeys, 64 luxury villas, Contract: Build only fitness centre, daycare centre, children’s external playgrounds, 7 swimming pools, 40 retail/restaurant outlets and mosque

This Dubai Marina project is a high almost five months ahead of schedule, using quality waterfront development table formwork, a combination of traditional consisting of 6 residential towers ranging formwork and an automatic hydraulic in height from 19 to 40 storeys, housing climbing system for the vertical elements. 1029 apartments with a combined The two tallest towers were ‘crowned’ with floor area of approximately 260,000m². an 1100 tonne epoxy coated structural steel Enveloping the towers is a two-storey petal. podium with 64 luxury villas, with a Tenants moved in to the first phase (i50% of combined floor area of approximately the development) in September 2003 and 30,000m² lining its perimeter. the remaining apartments and villas were The development’s facilities include a 3 occupied by March 2004. storey fitness centre, a daycare centre, Today, more than ten years since its children’s external playgrounds, 7 swimming completion, the development remains one pools, 40 retail / restaurant / outlets, a of the most sought-after addresses in the mosque and extensive landscaping. Dubai Marina community. The structural frame consisting of 131,000m³ of concrete and 24,000 tonnes of reinforcement steel was completed

33 RESIDENTIAL

33 35 TOURISM & LEISURE

CASE STUDY Tower 1

PROJECT DETAILS FACILITIES Location: Dubai Marina, Dubai, UAE 217 hotel rooms, 205 serviced Client: His Highness Sheikh apartments, 1 presidential suite, several Ahmed Bin Saeed Al food and beverage outlets, conference Maktoum and banqueting facilities. Contract: Build only

Multiplex commenced construction mouth of the Dubai Marina. The 207m on the first Grosvenor House Hotel tower has a floor area of 130,000m². for His Highness Sheikh Ahmed Bin The external skin of the building is a Saeed Al Maktoum at Dubai Marina in combination of architectural precast January 2003. This was the first foray concrete cladding and glazed curtain outside of the United Kingdom for the wall. The raft slab for the development exclusive Grosvenor brand of Park comprises 18,000m³ of concrete and Lane fame. 3,000 tonnes of reinforcing steel, with The project is a combination of 217 the last concrete pour over 6,500m³, hotel rooms, 205 serviced apartments, representing the largest concrete pour in 1 presidential suite, several food and the at that time. beverage outlets and conference This highly demanding project was and banqueting facilities. The 3-level completed on time and handed over to basement, 45 storey structure fully the client in April 2005. occupies its 8,000m² plot and is strategically located at the northern

35 CASE STUDY The Residences & Marina Promenade

PROJECT DETAILS FACILITIES Location: Dubai, UAE 21 towers, 2945 apartments and villa The Residences Downtown accommodation, retail spaces, parking, Marina Promenade Dubai Marina fitness amenities, swimming pools and recreational areas Client: Emaar Properties PJSC Contract: Design & Build

37 RESIDENTIAL

In the early 2000s, Multiplex commenced the successfully construct a contemporary apartment construction of The Residences project for lifestyle, which respected the roots of the city as well Emaar. The project, comprised of 21 towers as heralding the trends of its progressive future. in total was delivered in four phases and saw The Residences Phases 1 & 2 offers the inhabitants of the development of multiple master planned Downtown Dubai a dynamic skyline and the luxury of communities within the Dubai Marina and a high-rise suburb within. The development is located Downtown Dubai areas. at just a stone’s throw from the sights and sounds The first, The Residences Phase 1, was completed of Downtown Dubai, positioned right by the world’s in 2005. It boasts a total of 743 suites, housed in six tallest building and the world’s largest shopping mall. individual residential high rise towers and a four- The Residences - South Ridge was the third phase to storey podium. Along with villa accommodation, the commence in Emaar’s prestigious Downtown Dubai podiums provide car parking, amenities areas for development. The South Ridge development consists fitness and guest accommodation. It also features of 6 high-rise residential towers of between 28 and 42 over 20 retail outlets and fully landscaped podium storeys, which housed 939 apartments ranging from roofs incorporating swimming pools and recreational 1 to 3 bedroom. A total of 12 penthouses crown areas that cater for the leisure time of residents. the towers overlooking Business Bay and the Burj The second phase, The Residences Phase 2, Khalifa. commenced in November 2004, consists of an The Marina Promenade - District 7WX, awarded additional three residential towers and podium in 2005, was the fourth phase of the Residences structure featuring the same design elements as The developments but located in the prestigious Dubai Residences Phase 1. To encourage visual interest, Marina development as opposed to Downtown the towers tip the skyline at varying heights, dashing Dubai. The site is a master planned community between 24 to 41 levels. comprising residential, commercial and public spaces Interior design options included the Andalusia and includes one of the world’s largest man-made scheme, with its use of traditional Islamic patterns marinas. Marina Promenade consists of 846 suites, and details and the Metropolitan, with modern fittings housed in 6 individual residential high-rise towers and and design reflecting the contemporary ambiance a four-storey podium. now emanating from the city. Multiplex was able to

37 39 TOURISM & LEISURE

CASE STUDY Eastern Mangroves

PROJECT DETAILS FACILITIES Location: Abu Dhabi, UAE 223 room five star hotel managed by Client: Tourism Development & Anantara, 52 luxury three bedroom Investment Company (TDIC) apartments and 169 serviced apartments, Contract: Build only the project also includes marina facilities, a quayside promenade, a signature spa, retail outlets, dining and entertainment areas

Designed as an integrated resort, marina, retail and In addition to the hotel and apartment construction, Multiplex residential precinct, Eastern Mangroves provides the also undertook extensive land reclamation and external perfect escape from the city. works, including the construction of a district cooling facility and a 30-berth marina. Situated on the water’s edge overlooking a large expanse of mangrove forest, the resort embraces all aspects of Abu Dhabi heritage and culture whilst also preserving and protecting the sensitive environmental surroundings. Offering the combination of a 223 room five star hotel managed by Anantara, 52 luxury three bedroom apartments and 169 serviced apartments, the project also includes marina facilities, a quayside promenade, a signature spa, retail outlets, dining and entertainment areas. The prestigious project was also designed in line with strict eco-guidelines. Before the structural works were completed, Multiplex ensured that an in-depth analysis of the delicate marine eco- system and mangrove regeneration was carried out to ensure that all eco-guidelines were met and would continue to be met post-completion.

39 CASE STUDY Al Maryah Central

PROJECT DETAILS FACILITIES Location: Al Maryah Island, 500 retail stores, 100 food options, Abu Dhabi, UAE 21 cinema screens, 5 urban parks Client: Gulf Related (Sowwah Ltd) prayer rooms, library, medical center, Contract: Build only crèche, and healthclub.

In 2015, Multiplex was awarded the Al Al Maryah Central will feature the first Maryah Central project, a multi-level international Macy’s department store retail development commissioned by outside the USA and Abu Dhabi’s first Gulf Related: a regional real estate Bloomingdale’s department store, in development venture with a focus addition to Family World and Sports World on high-end, mixed-use real estate – two pioneering concepts located on the destination developments in the Gulf mall’s rooftop. and Middle East. Expected to cater for up to 20 million Multiplex is responsible for the visitors per year, Al Maryah Central boasts construction of the 373,00m2 GFA regional 500 retail stores, 100 food options and a mall including multiple bridge connections 21 screen cinema complex. The project to The Galleria and the masterplanned will also feature state-of-the-art community hotel and residential towers. The project is facilities such as prayer rooms, a library, to achieve a 1-Pearl Estidama rating upon medical center, crèche, and healthclub. completion. Prominently located on Al Maryah Island, Al Maryah Central is a convenient, well-connected, 3.6 million square feet destination that is accessible from Abu Dhabi Island, Reem Island and greater Abu Dhabi.

41 RETAIL

41 CASE STUDY Msheireb Downtown Doha Phase 1C AWARDS Msheireb Downtown Doha Phase 1C Qatar Academy Msheireb (within Phase 1C) • Sustainable Project of the Year from • Sustainability Project of the Year from Construction Week Awards (Qatar) 2014 Construction Week Qatar Awards 2016 • Green Building of the Year (Schools) from Emirates Green Building Council (EGBC) 2016

43 MIXED USE

PROJECT DETAILS FACILITIES Location: Doha, Qatar Residential units, retail and office Client: Msheireb Properties space, tram maintenance Station, Contract: Build only district cooling plant and school

Msheireb Downtown Doha is the Multiplex are currently undertaking the development and regeneration of 31 construction of Phase 1C (the third phase). hectares of Inner Doha and is a mixed This phase is located in the northwestern use development comprising Retail, corner of the mega project and consists Commercial, Residential, Tourism, of 17 separate buildings. The layout of Cultural and Community facilities. the proposed development is designed to achieve the requirements of Msheireb The project is located close to the historic Properties and Qatar Foundation, as well origins of Qatar’s capital city and is as complementing the general principles inspired by traditional Qatari architecture. of community and facility function for Of particular significance is the owner’s the overall Msheireb Downtown Doha goal concerning the sustainable development. development guidelines and their aim of The facilities under Phase 1C include obtaining an LEED Gold certification. residential units, retail & office space, While the overall development is being a tram maintenance station, district executed in five phases, the basement cooling plant, and a school along with the extends the entire site area, housing all supporting basement. The school was major utilities containment, service vehicle completed on September 2015 access and accommodates car parking. This requires significant collaboration and coordination between all parties involved.

43 CASE STUDY Qatar National Library Qatar Foundation (QF) for Education, Science and The structure comprises of an insitu concrete frame with Community Development undertook the development a structural steel roof. The concrete is a highly specialized of the Qatar National Library in the southern zone of white mix, with central columns in excess of 27m high which its Education City Campus (approximately 9km west were required to be poured in a single lift. The fitout scope of Doha city centre). The facility, which was opened included the supply and installation of a bespoke people to the public in late 2017, has created a social space mover and book sorting machines. for academic research, study and social interaction is now touted to be both an international landmark as well as an information and resource hub for the entire Middle East. The Qatar National Library (QNL) has been designed by world renowned architect Rem Koolhaas of OMA (Office of Metropolitan Architecture) who is also responsible for landmark civic architectural projects such as the CCTV building in China, Seattle Central library in the USA and Casa Da Musica in Portugal. The building is innovative in design and the facility includes a large academic library collection, a heritage library, and a children’s library. At the north of the building, a loading dock and service entry are located in the basement, with two levels of functional area above.

45 EDUCATION

PROJECT DETAILS Children’s library, Restaurant, Conservation Laboratory, Location: Education City, Doha, Qatar Digitization Laboratory, Auditorium, 686 square meters Client: Qatar Foundation children’s section, Dedicated area for teens and young Contract: Build only adults, 6 instruction/tutoring rooms, 21 various size individual and group study rooms, 27 student and faculty FACILITIES carrels in different locations in the building, 2 multimedia Book sorter system, Heritage collection area, AV rooms and assistive technology area to enhance interactives (custom built interactive media wall, media experience of users with special needs. totem forest and a collaborative multimedia table),

45 CASE STUDY W Doha Hotel & Residences

PROJECT DETAILS FACILITIES Location: West Bay, Doha, Qatar 3 restaurants, 2 bars, a ballroom, Client: Nozul Hotels & Resorts business lounge, meeting rooms, Contract: Design & Build 25 floors of hotel guest rooms and apartments, 2 penthouses

The design and build of the highly The signature “W” interior design by acclaimed ‘W’ Doha Hotel, a 26-floor United Designers London, includes hotel and apartment building, fully landscaped entrance, 2 concept commenced in July 2005 and was the restaurants by world-renowned Chef inaugural project for Multiplex in Qatar. Jean-Georges Vongerrichten, a lobby with nearly 200 pendant chandeliers The hotel consists of 2 basement and blemish-free brilliant white marble, carparks, 4 podium levels with 3 a 32m x 17m ballroom dome with 5,000 restaurants, 2 bars, ballroom, business intricately patterned twinkling LED lights lounge and meeting rooms, 25 floors of and 291 guest rooms / suites that are fully hotel guestrooms and apartments, and an wired with some of the most advanced elevated top floor with 2 penthouses. in-room entertainment systems in The 23,000m² pre-fabricated unitised the industry. panel glass façade was a first for Doha. With a gross floor area of 81,000m² the project consumed 37,000m³ of concrete, and took 8.8 million man hours to build.

47 TOURISM & LEISURE

47 Our Values

Care SUPPORT, RESPECT, PROTECT. We care for the people we work with and take their safety and wellbeing very seriously. We support our people to achieve their goals and respect the things that enrich their lives. Our aim is to protect and sustain our people, our clients and the communities we work in.

Outperformance DRIVE, PASSION AND FOCUS ON EXCELLENCE. Our business is built on our people. We are structured for success and are determined to consistently exceed the expectations of our clients and the industry in everything we do. We add genuine value to projects with our innovative thinking, our ‘can do’ attitude and the way we embrace clients as part of the team. Our entrepreneurial spirit is backed with astute, disciplined decision-making and a solid financial backbone.

Collaboration LISTEN, SHARE AND WORK AS A TEAM. We’re totally focused on working together to deliver the best possible results. What sets us apart is our belief that the client is an essential member of our team. By involving them at the outset of every project, we develop a clearer understanding of their objectives. Together we identify challenges and work out innovative ways to optimise our clients returns.

Integrity ETHICAL, HONEST AND OPEN. Trust is the foundation of all our relationships. By being honest, fair-minded and dependable we build long standing, valued relationships. Our clients and the people we work with put their trust in us because we do what we say we are going to do. Our approach is straightforward, upfront and transparent so everyone we deal with can be certain of the result.

49 49 51 Health & Safety OUR SAFETY CULTURE IS BUILT-IN, NOT BOLT-ON.

At Multiplex, we believe our success lies in our people. Therefore, their health and well-being is our number one priority. Our Board of Directors sees one of its most important roles as providing strong OH&S leadership to the business. Likewise, our managers lead by example and are committed to demonstrating high standards of OH&S leadership.

Multiplex is on a continuous journey to enhance safety culture and standards across the business and broader industry, with over 50 years of health and safety expertise behind us.

We work with our clients to design and integrate safety controls during the planning phase of our projects, with the aim of minimising or completely eliminating risk on our sites. We embrace the Safer by Design approach and recognise that through early planning, we stand to have a much greater impact on project outcomes. As a business focused on the long term, we concentrate our efforts on controlling and mitigating critical or high consequence risks. We do this by looking for ways to move controls upstream to significantly reduce or eliminate risk, and we reward smart solutions throughout internal Global Innovation Awards.

Multiplex have been externally recognised for our health & safety performance and initiatives, receiving awards from the British Safety Council and Construction Week Awards, as well as being represented on the IOSH Council, IOSH Committees, IIRSM Committees and the MENA Construction Safety Executives Group.

Multiplex’s Occupational Health & Safety (OH&S) Management System is independently certified to OHSAS 18001, the internationally acclaimed management standard for Occupational Health and Safety Management Systems by Det Norske Veritas (DNV). The Multiplex OH&S Management System is based on the ‘Plan, Do, Check, Act’ model prescribed within OHSAS 18001 and is designed to exceed all legislative requirements within the UAE and Qatar. It contains an OH&S policy which outlines our commitment to providing a healthy and safe environment for all employees, subcontractors, suppliers, clients and the community.

51 Quality

MULTIPLEX IS COMMITTED TO DELIVERING HIGH QUALITY ASSETS TO CONSISTENTLY MEET AND OUTPERFORM OUR CLIENTS’ EXPECTATIONS.

53 At Multiplex, we are committed to Our quality processes guarantee only optimal solutions are delivering high quality assets that pursued, concentrating on strict criteria for success. The consistently meet and exceed our clients’ way we manage quality on our projects provides certainty expectations. in delivery, reduced costs and programme improvement, leading to successful outcomes for our clients. Our approach to quality is second-to-none and involves collaborating with our clients from the earliest point Multiplex’s Quality Management System (QMS) is possible to understand their objectives and requirements, independently certified to ISO 9001, the internationally as well as engaging our design team, subcontractors and acclaimed management standard for Quality Management supply chain, in order to deliver something everyone can Systems by Det Norske Veritas (DNV), providing clients the be proud of. professional assurance that our services are internationally recognised as being effective and efficient. As such, we We believe that to consistently achieve the highest quality, measure and monitor our performance against established this collaboration and understanding of the project is objectives and KPIs to drive continuous improvement essential and ensures all decisions are informed and across our operations through the implementation based on facts, allowing us to identify risks before an of solution-based thinking, training and best practice issue arises, promptly take corrective action and inspire initiatives. everyone involved to ‘Plan to get it Right’.

53 Environmental Sustainability

WE ARE INDUSTRY LEADERS IN ENVIRONMENTALLY SUSTAINABLE DESIGN, AND INNOVATE TO DELIVER BEST PRACTISE SOLUTIONS.

55 Multiplex is determined to deliver We take our potential environmental impacts seriously the highest quality end product, and we take measures to manage and mitigate them. in conjunction with an unwavering Multiplex’s Environmental Management System (EMS) is commitment to provide responsible independently certified to ISO 14001, the internationally environmental solutions and innovative acclaimed management standard for Environmental sustainability strategies. Our ultimate Management Systems by Det Norske Veritas (DNV). objective is to improve the social and environmental outcomes associated with the design and build of our Committed to developing business practices and services projects, together with the wellness and safety of our that drive innovative solutions in the industry, our most employees, end-users and the community at large. recent initiatives include: wastewater treatment facilities on site, converting our entire fleet to biodiesel and piloting a Multiplex strives to generate environmental gains for the solar hybrid diesel generator system. lifetime of the project and offer commitment, capacity and certainty - backed by the resources and depth of Additionally, we are represented as a board member at the experience to deliver innovative, sustainable award winning Emirates Green Building Council (EGBC) and have been projects that have a positive impact on communities. We externally recognised for our commitment to environmental were instrumental in delivering both the first LEED Platinum sustainability on numerous occasions. retail development and the first Estidama 4-Pearl building in the region.

55 Social Sustainability MULTIPLEX’S SOCIAL SUSTAINABILITY APPROACH IS FULFILLED BY PROACTIVELY ADHERING TO STRONG PRINCIPLES OF SOCIAL RESPONSIBILITY THAT ARE BASED ON BOTH LOCAL LEGAL REGULATIONS AND ROBUST INTERNATIONAL FRAMEWORKS

57 As an advocate and market leader of Welfare Policy Statement & Welfare Principles, confirming workers’ rights and welfare we believe Multiplex’s commitment to the welfare of its employees, that the socially responsible business subcontractors, suppliers and the wider community. As practices adopted by Multiplex have a business, we believe it is imperative to take appropriate been a contributing factor to improving action to mitigate and prevent any potential social risks migrant workers’ rights and welfare or adverse impacts on society by undertaking sufficient in the wider UAE and Qatar construction industries. supply chain due diligence, combined with continual Multiplex’s social sustainability approach is to adhere to operational monitoring. strong principles of social responsibility that are based on both local legal regulations and robust international Multiplex is also a founding member of the global frameworks including: ‘Building Responsibly’ initiative, which focuses on promoting workers’ rights and welfare by developing • The UN Guiding Principles on Business and Human consistent industry-wide standards. We believe such Rights collaboration is essential to enable companies to • OECD Guidelines for Multinational Enterprise encourage a ‘race to the top’ mentality, by sharing • The Dhaka Principles best practices, agreeing on common approaches and • Relevant ILO Conventions standards, developing tools, and engaging clients, civil • UK Modern Slavery Act 2015 society, governments, and international organisations. We aim to set the bar high by leveraging our expertise as These frameworks are the foundation of the Multiplex a socially responsible contractor in order to promote an Welfare Management System, ensuring that our business ethos of social responsibility throughout our supply chain. operations are aligned with legal, ethical and social sustainability standards. In September 2016, the Multiplex Middle East Executive Board ratified our new Multiplex

57 We Create Skylines Dubai

7

5

1 2 4 3 6

1. Emirates Towers (Commercial Tower) 11. Standard Chartered Tower & Fitout 2. 12. The Address Residences - Sky Views (Raft) 3. The Gate & Precinct Buildings 5 & 6 13. The Residences South Ridge 4. ICD Brookfield Place 14. The Residences Phase 1&2 5. Index Tower 15. The Opus 6. The Dubai Mall - Zabeel Expansion 16. JW Marriott Marquis 7. The Address Boulevard Hotel 8. The Address Residences - Fountain View (Raft) 9. HSBC Headquarters 10. The Burj Khalifa (Raft)

59 7 16

10 8 13 14 15 12 9 11

PROJECTS OUT OF FRAME: 26. Dubai Marina Phase 1 34. Automall Showroom and Office 17. Nikki Beach Resort and Hotel 27. Marina Promenade Tower, Motorcity 18. Al Ghurair Apartments 28. Grosvenor House Hotel 1 35. Green Community Villas 19. Taj Palace Hotel and Residence 29. One JLT 36. Foremarke School 20. 48 Villas, Garhoud 30. One at 37. Me’aisem City Centre 21. Al Fattan Plaza 31. Confidential Hospitality Project 38. Confidential Water Project 22. Creekside Apartments 32. FSU Military Warehouse 39. Motiongate Packages 5/6 23. Port Saeed Commercial Building 33. Al Minhaid Air Base (AMAB) 40. Lapita Hotel, Dubai Parks and 24. Jood Palace Dubai Refurbishment Resorts 25. Al Manara Building

59 We Create Skylines Abu Dhabi

1. Al Maryah Central 2. Addax Tower, City of Lights 3. Eastern Mangroves 4. Parsons Headquarters

61 10 142 km

9 23.7 km

8 19.4 km

7 11.2 km

6 21.8 km

5 22.4 km

2 4 20.9 km

3

1

PROJECTS OUT OF FRAME: 8. Etihad Training Academy Extension 5. IRENA Headquarters, Masdar City 9. Etihad Airways T3 Bus Gate Lounge Fit-out 6. Neighborhood One Residences Phase 1, Masdar City 10. Imperial College London Diabetes Centre, Phase 2 7. The Westin Abu Dhabi Golf Resort & Spa

61 We Create Skylines Doha

4

5

2 6

1. W Doha Hotel & Residences 2. World Trade Centre (Pre-Construction) 3. Qatar National Library 4. Msheireb Downtown Doha Phase 1C 5. Jaidah Square 6. Hamad International Airport Works - CRCF & Midfield Tunnel Improvement Works

63 3

1

63 PROJECT DIRECTORY

COMMERCIAL COMMERCIAL RESIDENTIAL COMMERCIAL RETAIL MIXED USE 2020 DUBAI 2019 ABU DHABI 2019 DUBAI 2019 DUBAI 2018 ABU DHABI 2018 DOHA

Jumeirah Gate Parsons Headquarters One at the Palm Jumeirah ICD Brookfield Place Al Maryah Central Downtown Doha, Client: Al Aseel Investments Client: Independent Enterprises Client: Luxury Dev. LLC Client: Al Salwa Investments LLC Client: GR Sowwah Retail Ltd Phase 1C & Companies Representation (Gulf Related) Client: Msheireb Properties Company LLC (IECR)

TOURISM & LEISURE COMMERCIAL RESIDENTIAL TOURISM & LEISURE MIXED USE INFRASTRUCTURE 2018 DUBAI 2018 DUBAI 2017 ABU DHABI 2017 DUBAI 2017 DUBAI 2017 DUBAI

Confidential Hospitality HSBC Headquarters Neighbourhood One Nikki Beach Hotel Opus Confidential Water Project Project Client: Gulf Resources Dev. & Residences & Resort Client: Omniyat Properties Investment LLC (GRDI) Client: Abu Dhabi Future Energy Client: Meraas Holdings Company PJSC

MIXED USE EDUCATION TOURISM & LEISURE COMMERCIAL RETAIL TOURISM & LEISURE 2017 DUBAI 2017 DOHA 2017 DUBAI 2015 DUBAI 2015 DUBAI 2015 DUBAI

The Address Boulevard Qatar National Library Confidential Hospitality One JLT Me’aisem City Centre Motiongate Project Packages 5/6 Client: Emaar Properties PJSC Client: Qatar Foundation Client: DMCC Client: Majid al Futtaim Client: Motiongate LLC

AVIATION COMMERCIAL RESIDENTIAL EDUCATION RESIDENTIAL FITOUT 2014 DOHA 2014 ABU DHABI 2014 DUBAI 2014 DUBAI 2014 DUBAI 2014 ABU DHABI

Hamad International Airport Addax Tower, City of Lights The Address - Sky Views (Early Foremarke School The Address - Fountain View Etihad Airways T3 Bus Gate Works Client: Tamouh Investments Works) Client: Evolvence Capital (Early Works) Lounge Fit-out Client: New Doha Intl. Airport Client: Emaar Properties PJSC Client: Emaar Properties PJSC Client: Etihad Airways PJSC

COMMERCIAL TOURISM & LEISURE EDUCATION COMMERCIAL COMMERCIAL FITOUT 2014 ABU DHABI 2013 ABU DHABI 2013 ABU DHABI 2013 DOHA 2012 DUBAI 2012 DUBAI

IRENA Headquarters Eastern Mangroves Etihad Training Academy Jaidah Square Fitout Standard Chartered Tower Standard Chartered Tower - Client: Abu Dhabi Future Energy Client: Tourism Development & Extension (Level 7) Client: Gulf Resources & Fitout Works Company PJSC Investment Company (TDIC) Client: Etihad Airways PJSC Client: Jaidah Investment and Investment LLC (GRDI) Client: Gulf Resources Dev. & Real Estate Dev. Co. Investment LLC (GRDI) COMMERCIAL TOURISM & LEISURE TOURISM & LEISURE HEALTH COMMERCIAL 2012 DOHA 2012 DUBAI 2011 ABU DHABI 2011 AL AIN 2011 DUBAI

Jaidah Square JW Marriott Marquis The Westin Abu Dhabi Golf Imperial College London Al Manara Project Client: Jaidah Investment and Client: Emirates Airlines Resort & Spa Diabetes Centre, Phase 2 Real Estate Development Co. Client: Tourism Development & Client: Mubadala Development Client: Emirates Investment & Investment Company (TDIC) Company PJSC Development (Emivest)

MIXED USE COMMERCIAL MIXED USE RESIDENTIAL RESIDENTIAL 2010 DUBAI 2010 DUBAI 2009 DOHA 2008 DUBAI 2008 DUBAI

The Index Tower Automall - Showroom & Office W Doha Hotel & Residences The Residences Marina Promenade Client: Union Properties Tower Client: Jaidah Investment & Real South Ridge (Downtown) Client: Emaar Properties PJSC Client: Union Properties Estate Development Co. Client: Emaar Properties PJSC

RESIDENTIAL COMMERCIAL TOURISM & LEISURE TOURISM & LEISURE COMMERCIAL 2005 & 2007 DUBAI 2005 DUBAI 2005 DUBAI 2004 DUBAI 2004 DUBAI

The Residences The Gate Precinct Buildings The Grosvenor House Hotel Burj Khalifa Tower Raft The Gate Building - DIFC Phases 1 & 2 (Downtown) 5 & 6 Tower 1 Client: Emaar Properties PJSC Client: Dubai International Client: Emaar Properties PJSC Client: Dubai International Client: HH Sheikh Ahmed Bin Financial Centre Authority (DIFC) Financial Centre Authority (DIFC) Saeed Al Maktoum

RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL TOURISM & LEISURE 2004 DUBAI 2004 DUBAI 2002 DUBAI 2002 DUBAI 2002 DUBAI

Creekside Apartments Dubai Marina Stages 1 & 2 The Tower Green Community Villas Taj Palace Hotel & Residence Client: Union Properties PJSC Client: Emaar Properties PJSC Client: Union Properties PJSC Client: Union Properties PJSC Client: Juma Al Majid Group

RESIDENTIAL COMMERCIAL COMMERCIAL RESIDENTIAL COMMERCIAL 2001 DUBAI 2001 DUBAI 2001 DUBAI 2001 DUBAI 1999 DUBAI

48 Villas, Al Garhoud Al Fattan Plaza Port Saeed Plot P-315 Al Ghurair Apartments Emirates Towers Client: HE Nasser Abdullah Client: Mr. Musabbeh Rashid & Client: Sulaiman Al Sayari & Ali Refurbishment Client: HH Sheikh Mohammed Hussain Lootah Mussabbeh Al Fattan Al Shehri Client: Al Ghurair Group Bin Rashid Al Maktoum Awards

YEAR PROJECT REGION AWARD DESCRIPTION ORGANISATION/INSTITUTE

2017 Multiplex Constructions ME ‘4 stars’ rating in recognition of its Taqdeer Awards exemplary Labour Welfare Practices 2017 Qatar National Library ME Project of the Year Construction Week Qatar Awards 2017

2017 Safety Week Programme ME Health & Safety Initiative of the Year Construction Week Qatar Awards 2017

2017 Multiplex Constructions ME Contractor of the Year MEED Awards 2017

2017 Multiplex Constructions ME Sustainable Contractor of the Year Big Project ME Awards 2017

2017 Masdar City’s ME Sustainable Project of the Year Big Project ME Awards 2017 Neighbourhood One Residences (Phase 1) 2017 Neighborhood One ME Sustainable Project of the Year – Construction Innovation Awards 2017 Residences Phase 1 Runner Up 2017 Neighborhood One ME Sustainable Design of the Year MENA Green Building Awards 2017 Residences Phase 1 2017 Shah Memon ME Engineer of the Year Construction Innovation Qatar Awards 2017 Logistics Manager 2017 Multiplex Medgulf ME Contractor of the Year Construction Innovation Qatar Awards 2017

2017 ME International Safety Awards with Merit British Safety Council Hospitality 2017 Etihad Airways Engineering ME International Safety Awards with Pass British Safety Council Abu Dhabi 2016 Multiplex ME Highly Recommended Contractor of Construction Week Awards the Year 2016 Multiplex ME Responsible Contractor of the Year Future Cities Award 2016 IRENA Headquarters ME National Winner - Sustainability Project MEED Quality Awards of the Year 2016 Bluewaters Island ME International Safety Awards with Merit British Safety Council Hospitality 2016 Multiplex Medgulf ME Contractor of the Year Construction Week Qatar Awards 2016 2016 Pedro Duarte ME Project Manager of the Year Construction Week Qatar Awards 2016 Project Director 2016 Qatar Academy Msheireb ME Sustainability Project of the Year Construction Week Qatar Awards 2016 2016 Hand Safety Campaign ME Health and Safety Initiative of the Year Construction Week Qatar Awards 2016 (Msheireb Dohaland) 2016 Qatar Academy Msheireb ME Green Building of the Year (Schools) EGBC Awards 2016 2015 Brookfield Multiplex ME Contractor of the Year Big Projects Awards 2015 Constructions 2015 Brookfield Multiplex ME Excellence in BIM Implementation Big Projects Awards 2015 Constructions 2015 Brookfield Multiplex ME Sustainable Initiative of the Year Big Projects Awards 2015 Constructions 2015 Brookfield Multiplex ME Contractor of the Year Construction Week Awards Qatar Medgulf 2015 Brookfield Multiplex ME Contractor of the Year Construction Innovation Awards Qatar Medgulf 2015 Simon Elleray ME Project Manager of the Year Construction Week Awards Qatar Executive Director -Projects 2015 Simon Elleray ME Project Manager of the Year Construction Innovation Awards Qatar Executive Director -Projects 2015 Hamad International ME Commercial Project of the Year Construction Week Awards Qatar Airport Consolidated Rental Car Facility YEAR PROJECT REGION AWARD DESCRIPTION ORGANISATION/INSTITUTE

2015 IRENA Headquarters ME Highly Commended, Commercial Cityscape Awards for Emerging Markets Project Award - Built 2015 IRENA Headquarters ME Most Sustainable Commercial Building MENA Green Building Awards

2015 Brookfield Multiplex ME International Safety Award - Distinction British Safety Council Middle East 2014 Brookfield Multiplex ME CSR Initiative of the Year Construction Week Awards Middle East 2014 IRENA Headquarters ME Green Project of the Year Big Project Awards

2014 IRENA Headquarters ME Sustainable Construction Project of BGreen Awards The Year 2014 Downtown Doha Phase 1 ME Sustainable Project of the Year Construction Week Awards (Qatar) 2014 Brookfield Multiplex ME International Safety Award - Merit British Safety Council Middle East 2013 Brookfield Multiplex ME Sustainable Contract or of the Year BGreen Middle East Awards Middle East 2013 JW Marriott Marquis ME International Project of the Year International Construction Economic Forum (ICEF) 2013 Brookfield Multiplex ME International Safety Award - Distinction British Safety Council Middle East 2012 Emirates Park Towers ME Highly Commended Award in the New Dubai International Hotel Awards Hotel (JW Marriott Marquis) Hotel Construction & Design 2008 Brookfield Multiplex - Dubai ME Construction Company of the Year Australian Business Awards

2007 Brookfield Multiplex - Dubai ME Health & Safety Award (Company- Construction Week Awards wide) 2006 The Residences - Phase 1, ME Tower Project of the Year Construction Week Awards Dubai 2005 Grosvenor House Hotel, ME Tower Project of the Year Construction Week Awards Dubai Brookfield Asset Management Our parent company Brookfield is one of the world’s largest asset managers with more than US$250 billion of high quality property, infrastructure and renewable power assets under management.

CANADA As part of the Brookfield family, we have access to vast expertise in investing in, US$23 BILLION AUM* owning and maintaining property and 10,500 EMPLOYEES infrastructure assets. We have the unique ability as contractors to think like owners and deliver assets with an understanding of what drives their long term success.

Brookfield has a 100 year history as a global investor, operator and leading asset manager of high quality alternative assets with a focus on property, infrastructure, renewable power and private equity as well as a range of public and private investment products and services.

UNITED STATES US$138 BILLION AUM* 9,500 EMPLOYEES

SOUTH AMERICA US$28 BILLION AUM* 11,000 EMPLOYEES

69 63,000+ EMPLOYEES >US$250 BILLION AUM PROPERTY INFRASTRUCTURE RENEWABLE POWER PRIVATE EQUITY CONSTRUCTION

EUROPE & MIDDLE EAST US$32 BILLION AUM* 23,000 EMPLOYEES

ASIA PACIFIC

US$19 BILLION AUM* *Figures as at December 2016 9,000 EMPLOYEES Note: Current and target countries of investment 69 Middle East Head Office: Level 1, Al Manara Building Sheikh Zayed Road PO Box 212975 Dubai, UAE T: +971 4 315 8500 F: +971 4 315 8600 E: [email protected]

Abu Dhabi: Suite 1504, 15th Floor, International Tower (within Capital Centre) Al Khaleej Street, PO Box 40163, Abu Dhabi, UAE T: +971 2 494 1300 F: +971 2 494 1400

Qatar: Level 2, Jaidah Square, Airport Road, PO Box 23793, Doha, Qatar T: +974 4005 0500 F: +974 4005 0555

www.multiplex.global CORPORATE PROFILE CORPORATE PROFILE