San'in Sanyo Guide Book
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Recovering from Heavy Rain Damage Through Cooperation and Think-And
Our Starting Point Our Starting Point Strategy of Value Creation for Our Vision A Foundation Supporting Value Creation Data Status of operations and damage directly after the Heavy Rain Event of July 2018 Situation at 2:00pm, July 11, 2018 Recovering from heavy rain Operational Operations suspended Shinji Tottori Yonago Higashi- Kisuki Line Maizuru damage through cooperation San-in Line Nishi-Maizuru Izumo-Yokota Chizu Mochigase Kamiiwami Fukuchiyama ru Wadayama Hakubi Line Niimi Tsuyama Express Chizu Maizu Line Bingo-Ochiai Imbi Teramae Masuda Line Ayabe Higashi- San-in Line Hiroshima Bichu- Shiomachi Okayama ama Hagi Shin-Iwakuni Kojiro Tsuy Line Tokuyama ntan Line Aki- Kozuki Sayo Ba and think-and-act initiatives ine akubi Line Kameyama Fuchu H Geibi Line Higashi- Kishin Fukuen Line Line San-yō L Kannnabe Okayama Kamigori Kabe Soja Line Higashihiroshima Himeji Mihara Fukuyama The Heavy Rain Event of July 2018 resulted in large-scale damage throughout West Japan, including in areas where Shin-Yamaguchi Kaitaichi Kushigahama Yokogawa Kasaoka Gantoku Line JR-West operates, and many sections of track were rendered unusable. Iwakuni Kurashiki Kure Line Yanai Amid this unprecedented damage, we came together as a Group and by implementing many think-and-act initiatives and San-yō Line cooperating with local stakeholders, we were able to recover many damaged sections of track and restart operations.* Recovery work In order to get life back to normal as soon as possible, we mobilized Opening land around the capabilities of the entire Group and cooperated with affiliates An entire stations for and local stakeholders in various areas to advance recovery efforts. -
West Japan Railway Group Integrated Report 2019 —Report on Our Value for Society—
Continuity Progress Making Our Vision into Reality West Japan Railway Group Integrated Report 2019 —Report on Our Value for Society— West Japan Railway Company Contents 2 On the publication of “JR-West Group Integrated Report 2019” 3 Values held by the JR-West Group Our Starting Point 5 The derailment accident on the Fukuchiyama Line 11 Recovering from heavy rain damage through cooperation and think-and-act initiatives 13 Business activities of JR-West Group 15 The president’s message 17 The value we seek to provide through the non-railway business —Messages from group company Presidents Strategy of 21 Steps toward our vision 21 JR-West Group Medium-Term Management Plan 2022: approach & overview Value Creation 23 Toward long-term sustainable growth for Our Vision 25 Progress on Groupwide strategies—example initiatives 27 Promoting our technology vision 29 Special Three-Way Discussion The challenge of evolving in the railway/transportation field in an era of innovation 33 Fiscal 2019 performance in priority CSR fields and fiscal 2020 plans for priority initiatives 37 Safety 47 Customer satisfaction 51 Coexistence with communities A Foundation 55 Human resources/motivation Supporting 59 Human rights Value Creation 61 Global environment 67 Risk management 71 Corporate governance 73 Special Three-Way Discussion The role of the Board of Directors in achieving sustainable growth and enhancing corporate value 77 Initiatives in each business 81 Consolidated 10-year financial summary Data 83 Financial statements 87 Recognizing and responding to risks and opportunities 88 Data related to human resources and motivation (non-consolidated) Corporate profile (as of March 31, 2019) Scope As a rule, JR-West Group (including some Company name West Japan Railway Company initiatives at the non-consolidated level). -
Hiroshima Explore Beyond the City
TAKE FREE HIROSHIMA EXPLORE BEYOND THE CITY visithiroshima.net 広島Hiroshima ROUTE PLANNING TRANSIT SEARCH FREE WI-FI SEARCH 4,000,000+ SPOTS SEARCH SPOTS BY PHONE NUMBER CURRENT WEATHER PREMIUM FEATURES DOOR TO DOOR MAPPING ALTERNATIVE ROUTES AVAILABLE IN 4 LANGUAGES IN THIS ISSUE WELCOME TO HIROSHIMA 2-3 SAIJO: SAKE TOWN 4-5 OYSTERS STRAIGHT FROM THE SHELL 6-7 GET OUT OF THE CITY: THREE UNIQUE DAY TRIPS 8-9 DAY TRIP 1: ONOMICHI 10-11 DAY TRIP 2: OKUNOSHIMA & TAKEHARA 12-13 navitimejapan.com DAY TRIP 3: SANDANKYO 14-15 OKONOMIYAKI 18-19 LOCAL FLAVOR 20-21 CITRUS PARADISE 22-23 A BRUSH WITH TRADITION 24-25 FAMOUS LOCAL PRODUCTS 26-27 ROOMS WITH A DIFFERENCE 28-29 NAVITIME for Japan Travel TRAVEL TIPS 30-31 visithiroshima.net With such significant monuments defining the area, itinerary and you too can get so much more out of WELCOME TO many travellers are unaware that Hiroshima is also a THE LANDSCAPES, FOOD, your journey to this beautiful part of the country. prefecture that extends well beyond the city limits. HIROSHIMA AND ACTIVITIES NEVER We’ve also provided information on selected TOM MIYAGAWA COULTON Roughly four times the size of Tokyo, with 100 km accommodation, travel tips, and food, along separating Hiroshima City in the west and Fukuyama CEASE TO AMAZE with a feature on Hiroshima okonomiyaki – with Mountainous islands, mild climate, City in the east, it features a wonderfully diverse recommendations from an expert on this much- and beautiful seas make Hiroshima the landscape with mountains and forests in the north, loved savory pancake. -
Chugoku・Shikoku Japan
in CHUGOKU・SHIKOKU JAPAN A map introducing facilities related to food and agriculture in the Chugoku-Shikoku Tottori Shimane Eat Okayama Hiroshima Yamaguchi Stay Kagawa Tokushima Ehime Kochi Experience Rice cake making Sightseeing Rice -planting 疏水のある風景写真コンテスト2010 Soba making 入選作品 題名「春うらら」 第13回しまねの農村景観フォトコンテスト入賞作品 第19回しまねの農村景観フォトコンテスト入賞作品 Chugoku-shikoku Regional Agricultural Administration Office Oki 26 【Chugoku Region】 7 13 9 8 Tottori sand dunes 5 3 1 Bullet train 14 2 25 4 16 17 11 Tottori Railway 36 15 12 6 Izumo Taisha 41 Matsue Tottori Pref. Shrine 18 Kurayoshi Expressway 37 10 Shimane Pref. 47 24 45 27 31 22 42 43 35 19 55 28 Iwami Silver Mine 48 38 50 44 29 33 34 32 30 Okayama Pref. 39 23 20 54 53 46 40 49 57 Okayama 21 Okayama 52 51 Kurashiki Korakuen 59 Hiroshima Pref. 60 64 79 75 76 80 62 Hiroshima Fukuyama Hagi 61 58 67 56 Atom Bomb Dome Great Seto Bridge 74 Yamaguchi Pref.Yamaguchi Kagawa Pref. 77 63 Miyajima Kintaikyo 68 69 Bridge Tokushima Pref. Shimonoseki 66 65 72 73 Ehime Pref. 70 71 78 Tottori Prefecture No. Facility Item Operating hours Address Phone number・URL Supported (operation period) Access language Tourism farms 1206Yuyama,Fukube-cho,Tottori city Phone :0857-75-2175 Mikaen Pear picking No holiday during 1 English 味果園 (Aug.1- early Nov.) the period. 20 min by taxi from JR Tottori Station on the Sanin http://www.mikaen.jp/ main line 1074-1Hara,Yurihama Town,Tohaku-gun Phone :0858-34-2064 KOBAYASHI FARM Strawberry picking 8:00~ 2 English 小林農園 (early Mar.- late Jun.) Irregular holidays. -
Kyoto City Subway Route Map
Kurama Iwakura Eizan Kurama Line North Kibuneguchi K Kokusaikaikan 01 (Kyoto International Conference Center) Kitayama K K 03 02 Matsugasaki K Kitaoji Yase-Hieizanguchi 04 Takaragaike Eizan Line Karasuma Line K 05 Kuramaguchi to Omi-Maiko Kitano-Hakubaicho K Randen Kitano Line Demachiyanagi Imadegawa K Saga Arashiyama Uzumasa 06 Hanazono Emmachi to Kameoka Sakamoto Jingu-marutamachi JR Kosei Line Sagano Scenic Railway Torokko Saga Marutamachi K 07 Lake Katabiranotsuji Biwa KamisakaemachiHamaotsu Arashiyama Sanjo Nijo-jo mae Karasuma Oike Uzumasa Tenjingawa Nisioji Oike Nijo Kyoto Shiyakusho-mae (Kyoto City Hall) Sanjo Keihan Higashiyama Keage (Nijo-jo Castle) K Randen-Saga 08 Otani T T T T T T T T T Misasagi 17 16 15 14 13 12 11 10 09 Matsuo- Omiya Karasuma T Keihan-Yamashina Shinomiya taisha Oiwake Randen Tenjingawa Sai-in Gion-shijo 08 Hankyu Arashiyama Line Sai Keihan Ishiyama-sakamoto Line K Kawaramachi Keihan Keishin Line Randen Arashiyama Line Shijo- Shijo to Maibara Omiya 09 T Nishikyogoku Yamashina Hankyu Kyoto Line 07 Tambaguchi Ishiyamadera K Gojo Kamogawa River Kiyomizu-gojo 10 JR Biwako Line Katsura T Higashino JR Sagano Line Kyoto Shichijo 06 K Nishioji to Umeda(Osaka) 11 Tokaido Shinkansen to Nagoya Tofukuji T Nagitsuji Toji K Kujo Fushimi-inari 05 Katsuragawa 12 Inari K Tozai Line T Ono (Kintetsu)Jujo Jujo JR Nara Line 04 Mukomachi 13 T K Keihan Main Line T Daigo Kamitobaguchi 14 Kuinabashi 03 T JR Kyoto Line K Takeda 02 Ishida 15 T Fushimi Momoyama 01 Rokujizo Chushojima Kintetsu-Tambabashi Rokujizo Tambabashi Momoyamagoryomae -
OFFICIAL GAZETTE 60VERNMENTPRINTINGA6ENGY F E^ISH G^K>N J Mwz+~#-T-A=+A H
OFFICIAL GAZETTE 60VERNMENTPRINTINGA6ENGY f E^ISH g^K>N j mwz+~#-t-a=+a h No. 970 SATURDAY, JUNE 25, 1949 Price 28.00 yen Article 18. In case any manufacturer, importer, MINISTERIAL ORDINANCE 'seller, dealer or designated consumer violated the provisions of this Ordinance, the Minister Ministry of Education Ordinance No. 24 of Welfare or Prefectural Governor may reduce June 25, 1949 or suspend the allocation of the designated A part of the Regulations concerning Qualifying rationed goods or approved amount of ration to , Examination for College Graduation Level shall him, or in case of a manufacturer, a importer be amended as follows: or a seller, suspend the licensed business or Minister of Education cancel the registration of license. r TAKASE Sotaro 2 Any manufacturer, importer, seller, dealer or designated consumer who is subject to the pro- In Article 5, "¥200 shall read "¥300". visions of the preceding paragraph, shall display Supplementary Provision: a notice stating given penalty according to form shown in theAppendixForm No. 6 for the fixed The present Ministerial Ordinance shall come period of time at the shop or any other visible into force as from the day of its promulgation. places. Article 18-(2). In case the measures referred to in par. 1 of the preceding Article are imposed Ministry ot Welfare Ordinance No. 25 upon the manufacturer, importer, seller or dealer, June 25, 1949 the Minister of Welfare or the Governor of The Ordinance on Distribution of the Medicines metropolis, district or urban or rural prefecture and Other Medical Supplies (Ministry of Welfare shall take necessary steps so that the person Ordinance No. -
Result 180608 E
15th Financial Period Results Presentation 2017.8.1. 2018.1.31 Advance Residence Investment Corporation 五 矢 隹 足 Executive Summary EPU* reaches target since merger of 5,000 yen Drawdown from Dividend Reserve Dividend Paid from Net Income chg. from initial forecast +136 yen Dividend per Unit* 5,285 yen chg. from last period +116 yen in yen 4,577 249 5,035 5,299 5,249 FP 07-2016 FP 01-2017 FP 07-2017 FP 01-2018FP 1-2018 FP 07-2018 FP 01-2019 Forecast Forecast ASSET DEBT EQUITY Period Avg. Occupancy Rise in Rent Average Interest Rate LTV NAV Reserve Outstanding** 96.9% 0.22% 0.90% 49.4% 239,503 yen 32.5 billion yen (chg. from forecast +0.4%) (Total asset base) (after FP 2018/1 dividend payment) * Earnings per share might be abbreviated as EPU and dividend per unit as DPU, hereafter. ** Reserve outspending is booked under the account item called Temporary Difference Adjustment Reserve. © 2018 Advance Residence Investment Corporation All Rights Reserved ?2 Results for Fiscal Period ended Jan. 2018 Aug. 1, 2017 - Jan. 31, 2018 (1) (2) (3) 15th FP Forecast 15th FP Results (2)-(1) 14th FP Results (2)-(3) in million yen Initial Forecast Results for Results for 単位: 百万円 as of Sept.6, 2017 FP Jan. 2018 Changes Notes FP July 2017 Changes Notes Asset Acquisitions 15,742 15,903 Same Store 15,918 Increase from 2018/1 acquisition +83 (260 properties) (261 properties) Increases from higher occupancy & (260 properties) Revenue +161 higher rent +119 -15 Same Store Period avg. -
“JR-West Group Medium-Term Management Plan 2017” Overview of Major Initiatives 1 【Safety】
“JR-West Group Medium-Term Management Plan 2017” Overview of Major Initiatives 1 【Safety】 Legend As of May 8, 2017 Black text: Projects indicated at previous update (May 2, 2016) Red text: Projects added since previous update ※Timing has not yet been determined FY2014.3 FY2015.3 FY2016.3 FY2017.3 FY2018.3 FY2019.3~ Strengthen track facilities When replacing track facilities, we are strengthening facilities by transitioning from standard-length rails to continuous welded rails, (prolongation of rail length replacing wood ties with prestressed concrete ties, and using plastic ties on bridges. Investment in with welding , etc.) maintenance to sustain and Maintain safety and To secure safe, reliable transportation service on the Sanyo Shinkansen, we will evaluate expected future risks that could affect structures and implement enhance the increase durability of Sanyo countermeasures, such as reinforcement measures. functions of Shinkansen structures existing facilities Complete replacement of When replacing facilities, we will strive to improve riding comfort by transitioning to systems utilizing a smooth brake control method Sanyo Shinkansen ATC that is suitable for the characteristics of the rolling stock. system: "New ATC" ▼Spring 2017: Transition to new control method As an addition to existing ATS functions, this system backs up crew members through means such as preventing excessive speed and stop-light violation or preventing incorrect door operation and excessive speed in planned speed reduction zone associated with construction work. We have approved the introduction of this system on On-board oriented train the Sanyo Line (Shiraichi–Iwakuni) in the Hiroshima area. We continue to consider the possibility of installing this system on the Fukuchiyama Line (Amagasaki– control system (ground Sasayamaguchi) and Tokaido/Sanyo Line (Maibara–Kamigori) in the Kansai Urban Area. -
FY2018 Results of the Radioactive Material Monitoring in the Water Environment
FY2018 Results of the Radioactive Material Monitoring in the Water Environment March 2020 Ministry of the Environment Contents Outline .......................................................................................................................................................... 1 Part 1: National Radioactive Material Monitoring in the Water Environment throughout Japan (FY2018) . 6 1 Objective and Details ............................................................................................................................. 6 1.1 Objective .................................................................................................................................... 6 1.2 Details ........................................................................................................................................ 6 2 Survey Methods and Analysis Methods .............................................................................................. 19 2.1 Survey methods ....................................................................................................................... 19 2.2 Analysis methods ..................................................................................................................... 20 3 Results ................................................................................................................................................. 22 3.1 Detection of total β radioactivity and γ-ray emitting radionuclides .......................................... 22 (1) Public water -
Bridge Architecture in Japan
International Journal of the Physical Sciences Vol. 6(17), pp. 4302-4310, 2 September, 2011 Available online at http://www.academicjournals.org/IJPS DOI: 10.5897/IJPS11.072 ISSN 1992 - 1950 ©2011 Academic Journals Full Length Research Paper Bridge architecture in Japan Hamed Niroumand1*, M. F. M. Zain2 and Maslina Jamil1 1Department of Architecture, Faculty of Engineering, National University of Malaysia (UKM), Malaysia. 2Deputy Dean, Faculty of Engineering, National University of Malaysia (UKM), Malaysia. Accepted 27 June, 2011 A bridge is a structure built to span physical obstacle such as a body of water, city, or road, for the purpose of providing passage over the obstacle. Bridges are a unique offshoot of architecture and possess their own associated terms, components and styles. This paper presents the second part of Japanese bridges by investigating architectural aspects of its design. Limited usable land in heavily populated areas of Japan has often necessitated the design of unique bridge approaches. One of such design is the spiral viaduct bridge approach. When this design is used, care is taken to make the structures aesthetically appealing. An important reason for the bridge construction will lead into a critical study of bridge aesthetics and structural design. According to the configuration of frameworks, bridges may be described as arched, girdered and cable stayed or suspension. Refereeing to Japanese bridges, those most frequently provided cable stayed in the construction of bridges are important factor in architecture and bridges aesthetic. This paper presents a brief history of bridge design in Japan, and then discusses the influence of technical factors on Japan bridges design. -
Operating Results by Business Segment (PDF, 787KB)
operating reSuLtS By BuSiness Segment Our Transportation Network contributes to the development of the Community we Serve. Transportation Operations oOPERATINGperating rRESULTSeSuLTs JR-West’s Transportation Operations segment consists of railway operations Billions of yen Billions of yen and small-scale bus and ferry services. Its railway operations encompass 18 1,000 200 prefectures in the western half of Japan’s main island of Honshu and the northern tip of Kyushu, covering a total service area of approximately 104,000 800 150 square kilometers. The service area has a population of approximately 43 million people, equivalent to 34% of the population of Japan. The railway 600 100 network comprises a total of 1,222 railway stations, with an operating route length of 5,012.7 kilometers, almost 20% of passenger railway kilometerage in Japan. This network includes the Sanyo Shinkansen, a high-speed intercity 400 50 railway line; the Urban Network, serving the Kyoto–Osaka–Kobe metropolitan ~ area; and other conventional railway lines (excluding the three JR-West branch 0 07 08 09 10 11 0 offices in Kyoto, Osaka, and Kobe). In fiscal 2011, operating revenues in this Operating Revenues Operating Income (right) segment were up 1.1% year on year, to ¥806.4 billion. While demand for domestic tourism declined following the Great East Japan Earthquake, which occurred on March 11, 2011, this decline was more than offset by the revenues generated due to the strong economic recovery trend seen up until the earth- quake, which contributed to an overall rise in revenues. Operating income also increased, rising 35.3%, to ¥61.1 billion. -
JRTR No.64 Topics
Topics January–July 2014 January 23— Kawasaki Heavy Industries announced delivery of three trainsets (33 carriages) including first sets of new subway cars (R188) to New York City Transport from Kawasaki’s 1— Single-engine light aircraft made emergency landing on local US affiliate (KRC); delivery included 23 new and 10 highway in Bronx, New York, USA, injuring pilot and three refurbished cars as part of 2011 contract option for 103 passengers new and 370 refurbished cars to be delivered in stages 5— Small two-engine jet aircraft crashed and burned on by late 2015 landing at Aspen Airport in Colorado, USA, killing one 24— Industry group composed of Itochu Trading, Kinki Rolling person and injuring two others Stock and Kawasaki Heavy Industries announced order 5— Saudi Arabian Airways 767 landed safely on one set of worth ¥14.8 billion from Hong Kong MTR for refurbishment undercarriage wheels at Medina Airport, Saudi Arabia, of 348 existing cars and supply of 36 new passenger cars injuring 29 people onboard to extend new routes using existing and new tracks to new specifications 6— Japanese National Police Agency announced 13th consecutive annual drop in 2013 road deaths to 4373 24— MLIT announced supervisory order based on Act on (down 38 year-on-year) but increase in road deaths to Passenger Railway Companies and Japan Freight 2303 of people aged 65 and over (up 39 year-on-year) Railway Company as well as business improvement order for the first time in 12 years following Railway Business Act targeting JR Hokkaido following exposure