Delivering Thameslink Major Project Report

Total Page:16

File Type:pdf, Size:1020Kb

Delivering Thameslink Major Project Report DELIVERING THAMESLINK MAJOR PROJECT UNDER CONSTRUCTION REPORT THE £5.5BN SCHEME IS UNDERWAY. THE ROUTE, THE MAJOR STATIONS AND 09|2010 THE BENEFITS EXPLAINED Delivering Thameslink Routes Capital work to the North via St Pancras: Bedford, Cambridge, King’s Lynn, Luton Airport Parkway brings national and Peterborough Farringdon Rd connections Farringdon 1 Station Overview Smithfields Market by Jackie Whitelaw 1 FARRINGDON Charterhouse St W Smithfield Farringdon is set to be a new transport hub once Crossrail is built and the Thameslink By the summer of 2012, Farringdon Rd improvements bring more before the Olympic Games, passengers to this strategic station on the edge of the City. London will have a new Platforms are be ing extended landmark. Stretching across within an existing rail cutting littered with obstacles, the Thames will be the including historic brick arches glass canopy of the new and the old River Fleet. A new Blackfriars station, ticket hall will be shared with Fleet St Crossrail, and existing Grade providing for the first time a II-listed buildings refurbished. graphic: © www.paulweston.info graphic: national rail station that Section Subterranean links the river’s north and south banks. “We are working extremely The new station forms a key part of the hard on innovative design at London Bridge to avoid Millennium Thameslink Programme, the Blackfriars Foot Bridge government funded £5.5bn upgrade cost and disruption” Station of one of the rail network’s busiest Simon Kirby, Network Rail routes. Rolling stock and, crucially, this programme is improving the frequency Blackfriars 2 and capacity of services running Road Bridge River T hames north-south through the heart of the That’s thanks to the station’s future Blackfriars capital from Bedford to Brighton. role as the crossover point with Rail Bridge Southwark It is one of the most important civil Crossrail, with work already underway Bridge engineering projects in the country and to accommodate the station and South Bank for Network Rail it is very much a tunnelling needs of the new east-west flagship project, a scheme that will route across the capital. have a massive impact on the capacity But it is London Bridge that is the Blackfriars Rd Tate Modern and flexibility of the rail network. lynchpin. This is where the pieces of the 2 BLACKFRIARS The Thameslink Programme is being puzzle come together, where the delivered in stages. Currently platforms biggest bottlenecks need to be The first station to span the along the northern part of the route unlocked and where the potential for Thames will be housed within an Southwark Street are being lengthened to cater for trains growth is absolutely enormous. iconic glass structure that is set Southwark Bridge Rd increasing from 8-car to 12-car. Over 42M people use the station to become a new London Blackfriars station is not only being that sits on a viaduct every year. And landmark. A 120-year-old bridge lengthened – out over the river – it’s Southern, Southeastern and is being widened on both sides to enable new dedicated also being cleverly widened to cope Thameslink operator First Capital Thameslink tracks to be installed Union Street with the extra passengers expected. Connect are all competing to squeeze and platforms built to Farringdon – where the Thameslink their services onto the limited number accommodate 12-car trains. and London Underground platforms sit of tracks. So busy is the station, in fact, For the first time there will be side by side – is being turned into what that at peak times Thameslink services station entrances on both sides will be one of the capital’s most have to be diverted around it. of the river. important interchanges. Network Rail’s dramatic plans for 2 NCE in association with Network Rail 9 | 2010 THAMESLINK SERVICES FUTURE LONDON CONNECTIONS CONNECTIONS Current Possible future routes Peterborough King’s Cross St. Pancras Cambridge Bedford Farringdon Landmark: Blackfriars station will be the first station to span the Thames Luton Airport City Parkway Thameslink Hatfield Cricklewood Finsbury Park Blackfriars King’s Cross Farringdon Blackfriars London Bridge Lewisham London Bridge Norwood Jn Bromley South Wimbledon Swanley E Croydon Sevenoaks Gatwick Ashford Elephant Tonbridge & Castle Guilford Horsham East Grinstead Brighton Glamorous: The new Borough High Street bridge is an eyecatching design 3 BOROUGH 4 LONDON BRIDGE London Bridge promise to make life Thameslink – it accounts for a VIADUCT better for passengers and locals alike significant part of the budget set aside Work is set to begin in 2012 to – creating dedicated through tracks for for London Bridge – thereby disrupting A 300m long viaduct is being increase capacity at London Thameslink trains, providing more services only once but getting double threaded through a maze of Bridge station – the main space with reprofiled platforms and the benefit. existing buildings in one of bottleneck on the entire with a brand new concourse integrated “It’s vital of course, particularly in London’s most historic areas, Thameslink route. The station with the beautiful new ‘Shard of Glass’ the current climate, that we deliver on in order to double track capacity will be completely rebuilt with skyscraper currently being constructed value for money for the last phase of on the line out of London new track layouts to allow more right beside the current station. the Thameslink programme,” Kirby Bridge. The new structure trains to pass right through the The new station will relieve pressure says. “We are working extremely hard straddles the busy Borough station rather than terminating Market, and includes a 70m there. The new station will on the London Underground network on innovative design at London Bridge trapezoidal girder bridge over a benefit not just Thameslink too, in particular the Northern Line, as to avoid cost and disruption.” major arterial road that users, but all passengers. Thameslink services expand in Benefits of Thameslink will not be ark will be slid into position in 2011. numbers, and to new destinations confined to the central and south Bridge both north and south of the capital. All eastern part of the rail network. New of this providing a huge boost to the rolling stock for the 12 car/up to 24 Cannon Street London economy in London and far beyond – trains per hour (in each direction) Rail Bridge Bridge and it’s the economic case that’s the service will free up other modern trains King William St key: “The issue from the economic that can be re-used around the point of view is that Thameslink doesn’t country. deliver its business case without the The investment at London Bridge increased frequency of trains delivered falls into the next stage of funding for by the work at London Bridge,” explains the project after 2012 – known as Key Tooley Street Network Rail investment projects Output2 (KO2). director Simon Kirby. Network Rail is keen to stress the 3 Added to this, the signalling at importance of KO2. Kirby states: “We London London Bridge will be life expired by believe that continuing with KO2 Borough Borough High St 4 Bridge Viaduct Station 2021 and will need to be replaced. should remain a priority for investment That would be no easy task and would even in the current economic climate involve picking apart the station in the since this delivers considerable benefit next few years to bring equipment up for both rail users and for the economy. to the South: to modern regulations by that date. While we recognise that difficult Ashford, Brighton, Network Rail has opted to include choices will need to be made, the and Hastings the re-signalling in the next stage of importance of this sort of investment NCE in association with Network Rail 3 Delivering Thameslink 9 | 2010 has recently been reinforced in comments from the wider business community.” Those comments include statements from influential business lobby London First, which has stated: “To maintain London’s economic growth and competitiveness, it is vital that … Network Rail’s investment programmes are maintained.” This, they said, included very definitely, Thameslink. And in June new Transport Secretary Phillip Hammond agreed. “Crossrail and Thameslink can be growth generators, not only for London, but for the South East and the whole of the UK,” he said. First Capital Connect – the company that operates the Thameslink trains – is very clear about the benefits the upgraded route will bring. Its project director David Statham explains: “At the moment we can’t stop at London Bridge during the peak hour and a half because of congestion on the Time savers: Up to 24 trains an hour will depart from London’s redeveloped Blackfriars Station lines and at the station. By the time the London Bridge part of the project is Thameslink: Background Thameslink: Key Outputs finished there will be 18 Thameslink trains an hour stopping at the station, Thameslink is one of the busiest and a second branch serving the Key Output 0: Fifteen, eight-car the vast majority 12-car. It’s going to be a rail routes in the UK and currently Wimbledon loop. trains an hour through the core huge relief for the Northern Line.” carries 90M passengers a year. There are 50 stations on the central section from St Pancras to For customers there will be obvious 225km long route, which provides Blackfriars. Works include the closure advantages. “When work at Blackfriars The £5.5bn investment plan to a north-south link through central of Blackfriars station bay platforms is finished we can offer an extra 2,000 increase capacity and frequency of London and connects some of and the closure of the Moorgate seats on our trains on a service that services has been underway since the country’s busiest transport branch.
Recommended publications
  • Oyster Conditions of Use on National Rail Services
    Conditions of Use on National Rail services 1 October 2015 until further notice 1. Introduction 1.1. These conditions of use (“Conditions of Use”) set out your rights and obligations when using an Oyster card to travel on National Rail services. They apply in addition to the conditions set out in the National Rail Conditions of Carriage, which you can view and download from the National Rail website nationalrail.co.uk/nrcoc. Where these Conditions of Use differ from the National Rail Conditions of Carriage, these Conditions of Use take precedence when you are using your Oyster card. 1.2 When travelling on National Rail services, you will also have to comply with the Railway Byelaws. You can a get free copy of these at most staffed National Rail stations, or download a copy from the Department for Transport website dft.gov.uk. 1.3 All Train Companies operating services into the London Fare Zones Area accept valid Travelcards issued on Oyster cards, except Heathrow Express and Southeastern High Speed services between London St Pancras International and Stratford International. In addition, the following Train Companies accept pay as you go on Oyster cards for travel on their services within the London National Rail Pay As You Go Area. Abellio Greater Anglia Limited (trading as Greater Anglia) The Chiltern Railway Company Limited (trading as Chiltern Railways) First Greater Western Limited (trading as Great Western Railway) (including Heathrow Connect services between London Paddington and Hayes & Harlington) GoVia Thameslink Railway Limited (trading as Great Northern, as Southern and as Thameslink) London & Birmingham Railway Limited (trading as London Midland) London & South Eastern Railway Company (trading as Southeastern) (Special fares apply on Southeaster highspeed services between London St Pancras International and Stratford International).
    [Show full text]
  • Discover London
    Discover London Page 1 London Welcome to your free “Discover London” city guide. We have put together a quick and easy guide to some of the best sites in London, a guide to going out and shopping as well as transport information. Don’t miss our local guide to London on page 31. Enjoy your visit to London. Visitor information...........................................................................................................Page 3 Tate Modern....................................................................................................................Page 9 London Eye.....................................................................................................................Page 11 The Houses of Parliament...............................................................................................Page 13 Westminster Abbey........................................................................................................Page 15 The Churchill War Rooms...............................................................................................Page 17 Tower of London............................................................................................................Page 19 Tower Bridge..................................................................................................................Page 21 Trafalgar Square.............................................................................................................Page 23 Buckingham Palace.........................................................................................................Page
    [Show full text]
  • Elstree & Borehamwood RAILWAY TIMELINE
    Elstree & Borehamwood RAILWAY TIMELINE DATE EVENT 1857 Midland Railway - Leicester to Hitchin Line was opened (Congestion and freight from GNR made sharing its line south of Hitchin untenable - a new line extension was sought. 22 June1863 Midland Railways 'Extension To London Act' given 'Royal Assent' 1864 Line leaves main route at St. Paul's Road and proceeds in tunnel to junction west of Kings Cross Midland Railways ' St. Pancras Act' (later known as City Branch). 9th Sept. 1867 Goods traffic started using line to St. Pancras Goods Station 13th July 1868 Passenger Services commenced on new extension - to Moorgate St. until St. Pancras opened. 1st non- stop to St. Albans 1st October 1868 St. Pancras Mainline Station opens. 1875 Midland Railway dispense with third class altogether. 1883 Trains regular enough to show signs of 'commuter' services. 1889 Tracks widened to allow freight and passenger trains. 1894 Photographer J.B.B. Wellington and H.H. Ward established a photographic paper business. 23rd June 1895 Elstree Tunnel opens completing the 'quadrupling of the track' in the area. 1896 Charles C. Braithwaite’s Engine Works was opened in Drayton Road. 1913 4 trains arrived in St. Pancras before 9am. No frequent suburban service though due to heavy occupation by mineral freight. 1914 The first film studios, Neptune Film Company, opened in Clarendon Road. 1916 Demolition of the chimney stack at Elstree Brick Works. 1922 Last year of 'Midland Railway' St. Albans train takes 55 mins into London. 1948 Railway network nationalised creating British Railways (BR). 1959 Last year of STEAM working. Trains just 8 mins quicker.
    [Show full text]
  • Joint Performance Improvement Update
    Joint Performance Improvement Update Period 1 (2018-19) This report gives progress on the joint improvement plan for Govia Thameslink Railway (GTR) and Network Rail with punctuality data by route, as well as the main operational issues in the period (there are 13, 4-week reporting periods per year), and planned customer improvements. PPM* statistics and delay responsibility by route – Period 1 (to 28 April 2018) Gatwick Express Great Northern Southern Thameslink *The public performance measure (PPM) data above shows the percentage of trains which arrive at their terminating station within five minutes of the planned arrival time. It combines figures for punctuality and reliability into a single performance measure. A summary of key issues affecting performance in this period In period 1, GTR’s PPM was 85.2% with the main incidents affecting performance being the emergency services dealing with incidents near South Croydon on 7 and 19 April, these services dealing with an incident near Cricklewood on 3 April, a track circuit failure near Hornsey on 19 April and a vehicle striking a bridge near East Croydon on 11 April. The PPM for each of the brands for this period was: Gatwick Express 79.01%, Great Northern 87.33%, Southern 83.49% and Thameslink 89.33%. Delivering improvements for passengers Thameslink Class 700s There are 71 class 700 trains in regular service between Brighton and London Bridge or Bedford; between Wimbledon, Sutton, St Albans and Luton; on the Sevenoaks route and between Horsham / Littlehampton and London. Performance Strategy Huge investment is being put into the railway which will ultimately deliver more capacity through new and longer trains at the end of the Thameslink programme in 2018, as well as a transformed station at London Bridge.
    [Show full text]
  • London Guide Welcome to London
    Visitor information Welcome to London Your guide to getting around central London on public transport and making the most of your visit. tfl.gov.uk/visitinglondon Tube and central London bus maps inside #LondonIsOpen Welcome to London Paying for your travel Public transport is the best way to get There are different ways to pay for your around London and discover all that the travel. For most people, pay as you go - city has to offer. This guide will help you paying for the trips you make - with a plan how to get around the Capital on contactless payment card, an Oyster card or public transport. a Visitor Oyster card, is the best option as it If you have just arrived at an airport and are offers value, flexibility and convenience. looking for ways to get to central London, go to page 11 in this guide. Getting around London London’s transport system is iconic. With its world famous Underground (Tube) and iconic red buses, travelling around the Capital is an experience in itself. But London is much more than just the Tube or the bus; our vast network of transport services includes: Contactless payment cards If your credit, debit, charge card or wearable device has the contactless symbol above you can use it for pay as you go travel on London’s public transport. Android Pay and Apple Pay are also accepted. Benefits of contactless • It’s quick and easy – there’s no need to queue to buy a ticket • It offers great value – pay as you go with contactless is better value than buying a single ticket and you can benefit from both Night Tube daily and weekly capping (see page 5) • 14 million people have used contactless Night Tube services run on the to travel in London – including customers Jubilee, Victoria and most of from over 90 countries the Central and Northern lines all night on Fridays and Saturdays.
    [Show full text]
  • Photographs in Bold Acacia Avenue 64 Ackroyd, Peter 54 Alcohol 162–3 Aldgate 12 Ashcombe Walker, Herbert 125 Ashford In
    smoothly from harrow index Cobb, Richard 173 Evening Standard 71, 104 INDEX Coffee 148–9 Fenchurch Street station 50, 152, 170 Collins, Wilkie 73 Film 102, 115 Conan Doyle, Arthur 27 Fleet line 210 Photographs in bold Conrad, Joseph 138 Food 146–7, 162. 188, 193 Cornford, Frances 78 Forster, EM 212 Acacia Avenue 64 Blake, William 137 Cortázar, Julio 163 Freesheets (newspapers) 104 Ackroyd, Peter 54 Bond, James 25, 102, 214 Crash (novel) 226 Freud, Sigmund 116, 119 Alcohol 162–3 Bowie, David 54, 55, 56, 90 Crossrail 204 Frisch, Max 13 Aldgate 12 Bowlby, Rachel 191 Cufflinks 156 Frotteurism 119 Ashcombe Walker, Herbert 125 Bowler hat 24 Cunningham, Gail 112 Fulham 55 Ashford International station 121 Bridges, in London 12, 32, 101, 154 Cyclist see Bicycles Gaiman, Neil 23 Austen, Jane 59 Briefcase 79 Dagenham 198 Galsworthy, John 173 Baker Street station 168, 215 Brighton 54 Dalston 55 Garden Cities 76–7, 106, 187 Balham station 134 Brixton 55 Davenant, William 38 Good Life, The (TV series) 54, 59, 158 Ball, Benjamin 116 Bromley 55 Davies, Ray 218 Guildford 64, 206 Ballard, JG 20, 55, 72, 112, 226 Bromley-by-Bow station 102, 213 De Botton, Alain 42, 110, 116 Great Missenden 60–1 Banbury 127 Buckinghamshire 20, 54, 57, 64 Deighton, Len 41 Green, Roger 16, 96, 229 Bank station 138, 152, 153 Burtonwood 36 De La Mare, Walter 20 Hackney 8, 13, 65, 121 Barker, Paul 54, 56, 81 Buses 15, 41, 111, 115, 129, 130, Derrida, Jacques 117 Hamilton, Patrick 114 Barking 213 134, 220–1 Diary of a Nobody, The 11, 23, 65, 195 Hampstead 54, 58, 121 Barnes, Julian
    [Show full text]
  • 3 Power Supply
    3 Power supply Table of contents Article 44 Installation, etc. of Contact Lines, etc. .........................................................................2 Article 45 Approach or Crossing of Overhead Contact Lines, etc................................................ 10 Article 46 Insulation Division of Contact Lines............................................................................ 12 Article 47 Prevention of Problems under Overbridges, etc........................................................... 13 Article 48 Installation of Return Current Rails ........................................................................... 13 Article 49 Lightning protection..................................................................................................... 13 Article 51 Facilities at substations................................................................................................. 14 Article 52 Installation of electrical equipment and switchboards ................................................. 15 Article 53 Protection of electrical equipment................................................................................ 16 Article 54 Insulation of electric lines ............................................................................................ 16 Article 55 Grounding of Electrical Equipment ............................................................................. 18 Article 99 Inspection and monitoring of the contact lines on the main line.................................. 19 Article 101 Records........................................................................................................................
    [Show full text]
  • Development and Maintenance of Class 395 High-Speed Train for UK High Speed 1
    Hitachi Review Vol. 59 (2010), No. 1 39 Development and Maintenance of Class 395 High-speed Train for UK High Speed 1 Toshihiko Mochida OVERVIEW: Hitachi supplied 174 cars to consist of 29 train sets for the Class Naoaki Yamamoto 395 universal AC/DC high-speed trains able to transfer directly between the Kenjiro Goda UK’s existing network and High Speed 1, the country’s first dedicated high- speed railway line. The Class 395 was developed by applying technologies Takashi Matsushita for lighter weight and higher speed developed in Japan to the UK railway Takashi Kamei system based on the A-train concept which features a lightweight aluminum carbody and self-supporting interior module. Hitachi is also responsible for conducting operating trials to verify the reliability and ride comfort of the trains and for providing maintenance services after the trains start operation. The trains, which formally commenced commercial operation in December 2009, are helping to increase the speed of domestic services in Southeast England and it is anticipated that they will have an important role in transporting visitors between venues during the London 2012 Olympic Games. INTRODUCTION for the Eurostar international train which previously HIGH Speed 1 (HS1) is a new 109-km high-speed ran on the UK’s existing railway network. Hitachi railway line linking London to the Channel Tunnel supplied the new Class 395 high-speed train to be able [prior to completion of the whole link, the line was to run on both HS1 and the existing network as part known as the CTRL (Channel Tunnel Rail Link)].
    [Show full text]
  • Transport with So Many Ways to Get to and Around London, Doing Business Here Has Never Been Easier
    Transport With so many ways to get to and around London, doing business here has never been easier First Capital Connect runs up to four trains an hour to Blackfriars/London Bridge. Fares from £8.90 single; journey time 35 mins. firstcapitalconnect.co.uk To London by coach There is an hourly coach service to Victoria Coach Station run by National Express Airport. Fares from £7.30 single; journey time 1 hour 20 mins. nationalexpress.com London Heathrow Airport T: +44 (0)844 335 1801 baa.com To London by Tube The Piccadilly line connects all five terminals with central London. Fares from £4 single (from £2.20 with an Oyster card); journey time about an hour. tfl.gov.uk/tube To London by rail The Heathrow Express runs four non- Greater London & airport locations stop trains an hour to and from London Paddington station. Fares from £16.50 single; journey time 15-20 mins. Transport for London (TfL) Travelcards are not valid This section details the various types Getting here on this service. of transport available in London, providing heathrowexpress.com information on how to get to the city On arrival from the airports, and how to get around Heathrow Connect runs between once in town. There are also listings for London City Airport Heathrow and Paddington via five stations transport companies, whether travelling T: +44 (0)20 7646 0088 in west London. Fares from £7.40 single. by road, rail, river, or even by bike or on londoncityairport.com Trains run every 30 mins; journey time foot. See the Transport & Sightseeing around 25 mins.
    [Show full text]
  • M I N U T E S Lambeth Public Transport Group Agenda 1
    M I N U T E S Project Lambeth Public Transport Group Reference LPTG Purpose Meeting between public transport Date 29 May, 2003 operators, public transport groups, Councillors, and Council officers in relation to public transport issues in Lambeth. Held at Van Gogh room, Blue Star House, 234-244 Stockwell Road, LONDON SW9 9SP Present: John Stewart (JS) (Chair of Lambeth Public Transport Group), Councillor Andrew Sawdon (AS), Councillor Julian Heather (JH), Phil Thompson (PT) (Interim Head of Transport & Highways, Lambeth Council), Mufu Durowoju (MD) (Principal Transport Engineer, Lambeth Council), Colin Welling (CW) (TfL London buses), Stuart Colley (SC) (Arriva), Matt Ball (MB) (Govia South Central), David Cianfarani (DC) (Pilgrim tours), Councillor Malley (DM), Councillor O’Connell (OC) Distribution: All invitees Ref Minutes Action 1.0 Agenda 1. Introduction & Apologies 2. Updates from last meeting 3. Minutes of Last Meeting 4. New meeting format 5. Rail matters 6. Bus matters 7. Underground matters 8. Any Other Business 9. Date of Next Meeting 1. Introduction and Apologies Apologies were received from: Cllr Lydia Serwaa Cllr Claire Whelan Cllr Darren Sanders Cllr Jeremy Baker Cllr Robert McConnell Cllr Lib Peck Belinda Danino (BD) – TfL buses Phil McKenna – London Underground Mick Hayes – TfL buses Richard Talbot – South Central Page 1 of 8 Ref Minutes Action 2. Updates from last meeting Bus matters- 53 split BD updated the situation by e-mail before the meeting – the split happened on 15 Feb and the articulated buses came to the 453 in March. 3. Minutes of Last Meeting These were generally accepted although there were a few errors to note: Page 4 - Anerley was misspelt Page 4 - Route 36 and 436 do have different methods of payment for fares - artics are cashless but the fares basis (ie: the cost of travel) aren't different.
    [Show full text]
  • Crossrail Act 2008 Page 1
    Crossrail Act 2008 Page 1 Crossrail Act 2008 2008 CHAPTER 18 Thomson Reuters (Legal) Limited. UK Statutes Crown Copyright. Reproduced by permission of the Controller of Her Majesty©s Stationery Of®ce. An Act to make provision for a railway transport system running from Maidenhead, in the County of Berkshire, and Heathrow Airport, in the London Borough of Hillingdon, through central London to Shen®eld, in the County of Essex, and Abbey Wood, in the London Borough of Greenwich; and for connected purposes. [22nd July 2008] BE IT ENACTED by the Queen©s most Excellent Majesty, by and with the advice and consent of the Lords Spiritual and Temporal, and Commons, in this present Parliament assembled, and by the authority of the same, as follows:± Extent Preamble: England, Wales, Scotland Works Law In Force 1 Construction and maintenance of scheduled works (1) The nominated undertaker may construct and maintain the works speci®ed in Schedule 1 (ªthe scheduled worksº), being± (a) works for the construction of an underground railway between, in the west, a tunnel portal at Royal Oak in the City of Westminster and, in the east, tunnel portals at Custom House and Pudding Mill Lane in the London Borough of Newham, (b) works for the construction of other railways in the London Boroughs of Barking & Dagenham, Bexley, Ealing, Greenwich, Hammersmith and Fulham, Havering, Hillingdon, Newham, Redbridge and Tower Hamlets, the City of Westminster, the Royal Borough of Kensington & Chelsea, the District of Basildon and the Borough of Brentwood in the County of Essex, the Royal Borough of Windsor & Maidenhead and the Borough of Slough in the County of Berkshire and the District of South Bucks in the County of Buckinghamshire, (c) works consequent on, or incidental to, the construction of the works mentioned in paragraph (a) or (b).
    [Show full text]
  • Hampton Court to Berrylands / Oct 2015
    Crossrail 2 factsheet: Services between Berrylands and Hampton Court New Crossrail 2 services are proposed to serve all stations between Berrylands and Hampton Court, with 4 trains per hour in each direction operating directly to, and across central London. What is Crossrail 2? Crossrail 2 in this area Crossrail 2 is a proposed new railway serving London and the wider South East that could be open by 2030. It would connect the existing National Rail networks in Surrey and Hertfordshire with trains running through a new tunnel from Wimbledon to Tottenham Hale and New Southgate. Crossrail 2 will connect directly with National Rail, London Underground, London Overground, Crossrail 1, High Speed 1 international and domestic and High Speed 2 services, meaning passengers will be one change away from over 800 destinations nationwide. Why do we need Crossrail 2? The South West Main Line is one of the busiest and most congested routes in the country. It already faces capacity constraints and demand for National Rail services into Waterloo is forecast to increase by at least 40% by 2043. This means the severe crowding on the network will nearly double, and would likely lead to passengers being unable to board trains at some stations. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce congestion, and would enable us to run more local services to central London that bypass the most congested stations. Transport improvements already underway will help offset the pressure in the short term. But we need Crossrail 2 to cope with longer term growth.
    [Show full text]