Westconnex M4-M5 Link Rozelle Interchange - Modification Iron Cove Ventilation Underground Response to Submissions Report March 2020
Total Page:16
File Type:pdf, Size:1020Kb
WestConnex M4-M5 Link Rozelle Interchange - Modification Iron Cove Ventilation Underground Response to submissions report March 2020 RMS: 20.141 ISBN: 978-1-922338-62-4 BLANK PAGE Transport for NSW WestConnex M4-M5 Link Rozelle Interchange - Iron Cove Ventilation Underground Modification Response to submissions report March 2020 Prepared for Transport for NSW Prepared by John Holland CPB Joint Venture © Transport for NSW The concepts and information contained in this document are the property of Transport for NSW. You must not reproduce any part of this document without the prior written approval of Transport for NSW. Contents Contents ....................................................................................................................................................... i Abbreviations and Glossary ...................................................................................................................... 3 Part A – Introduction and overview of consultation and submissions received ................................... 6 A.1 Introduction and background ........................................................................................................... 7 A.2 Community and Stakeholder involvement ..................................................................................... 13 A.3 Submissions received ................................................................................................................... 15 Part B – Response to key stakeholder submissions ............................................................................. 17 B.1. NSW Environment Protection Authority ......................................................................................... 18 B.2. NSW Department of Planning, Industry and Environment - Water Group ...................................... 20 B.3. Inner West City Council................................................................................................................. 21 B.4. Jamie Parker MP, Member for Balmain ......................................................................................... 28 Part C – Response to community submissions ..................................................................................... 32 C.1 Clarifications ................................................................................................................................. 33 C.2 Residual land use ......................................................................................................................... 43 C.3 Public health ................................................................................................................................. 44 C.4 Tunnel design ............................................................................................................................... 46 C.5 Air quality ...................................................................................................................................... 49 C.6 Urban design and landscaping ...................................................................................................... 51 C.7 Noise and vibration ....................................................................................................................... 54 C.8 Traffic and public amenity ............................................................................................................. 58 C.9 Operational access and maintenance ........................................................................................... 61 C.10 Groundwater and ground settlement .......................................................................................... 63 C.11 Property impacts ........................................................................................................................ 65 C.12 Spoil Management ..................................................................................................................... 67 C.13 Contamination ............................................................................................................................ 68 C.14 Support for the Modification ....................................................................................................... 69 Part D – Environmental Management Measures, Conditions of Approval and conclusion ................. 70 D.1 Environmental management measures and Planning Approval conditions ................................... 71 D.2 Conclusion and next steps ............................................................................................................ 71 References ................................................................................................................................................ 72 Appendix A – Submission identification number reference table ......................................................... 73 WestConnex M4-M5 Link Transport for NSW i Rozelle Interchange – Iron Cove Ventilation Underground Response to submissions report Tables Table 1 Summary of submitters .................................................................................................................. 15 Table 2 Proposed Environment Management Measure .............................................................................. 71 Figures Figure 1 Overview of the M4-M5 Link project as described in the EIS. ......................................................... 9 Figure 2 Iron Cove Link indicative location of proposed Modification above ground structures (replacement of Figure 5-4 in the Modification report) ..................................................................................... 35 Figure 3 Iron Cove Link typical aerial view AA location of proposed Modification (replacement of Figure 7-7 in the Modification report). ......................................................................................................... 36 Figure 4 Iron Cove Link typical cross section AA (replacement of Figure 7-8 in the Modification report). .... 37 WestConnex M4-M5 Link Transport for NSW ii Rozelle Interchange – Iron Cove Ventilation Underground Response to submissions report Abbreviations and Glossary Acronym Definition Approval Planning Approval SSI 7485 Approved Project M4-M5 Link approved Project as per SSI 7485 as modified AQMP Air Quality Management Plan BCM Bank cubic metres CNVMP Construction Noise and Vibration Management Plan CoA Planning Approval SSI 7485 Conditions of Approval Contractor John Holland CPB Joint Venture CPAS Construction Parking and Access Strategy Critical SSI/ CSSI Critical State Significant Infrastructure means State significant infrastructure that is critical State significant infrastructure, as referred to in EP&A Act Division 5.2 Section 5.13. dB(A) Decibel a-weighted DPIE Department of Planning, Industry and Environment The EIS M4-M5 Link Environmental Impact Statement EMF Electromagnetic field EMM/ REMM Environmental Management Measure/ Revised Environmental Management Measure EP&A Act Environmental Planning and Assessment Act 1979 EPA Environmental Protection Authority EPL Environmental Protection Licence GBN&V Ground-borne noise and vibration GPS Global Positioning System GWMP Groundwater Management Plan HV Regulator High voltage regulator ICNG Interim Construction Noise Guideline (2009), Department of Environment & Climate Change, NSW INP The NSW Industrial Noise Policy (2000), Environmental Protection Authority IWC Inner West Council LCZ Landscape character zone WestConnex M4-M5 Link Transport for NSW 3 Rozelle Interchange – Iron Cove Ventilation Underground Response to submissions report Acronym Definition MOC Motorway Operations Complex MOC2 Rozelle West motorway operations complex MOC3 Rozelle East motorway operations complex MOC4 Iron Cove Link motorway operations complex Modification Iron Cove Ventilation Underground Modification report OMCS Operational Motorway Control System ONCR Operational Noise Compliance Report ONVR Operational Noise and Vibration Review operation Post construction of the M4-M5 Link Stage 2 Rozelle Interchange during the operation of the M4-M5 Link Stage 2 Rozelle Interchange Planning Approval/ Planning Approval SSI 7485 CSSI 7485 Planning Secretary The Secretary of Department of Planning, Industry and Environment Proponent Transport for NSW POEO Act Protection of the Environment Operations Act 1997 (NSW) RBL Rating background noise level RLMP Residual Land Management Plan Rozelle WestConnex M4-M5 Link Stage 2 Rozelle Interchange and Western Interchange Harbour Tunnel RtS/ this Report Response to submissions (this Report) SEARs Secretary’s Environmental Assessment Requirements SAOR Solar Access and Overshadowing Report SPIR Submissions and Preferred Infrastructure Report SSI State Significant Infrastructure SSIAR State Significant Infrastructure Assessment Report SSWMP Soil and Surface Water Management Plan Submission Public exhibition submission to DPIE on the Iron Cove Ventilation Underground Modification report the project/ M4-M5 WestConnex M4-M5 Link Project (inclusive of both Stage 1 and Link project Stage 2) the Project WestConnex M4-M5 Link Stage 2 Rozelle Interchange TTAMP Traffic and Transport and Access Management Plan UDLP Urban Design Landscaping Plan WestConnex M4-M5 Link Transport for NSW 4 Rozelle Interchange – Iron Cove Ventilation Underground Response to submissions report Acronym Definition Water Group Water division of the Department of Planning, Industry and Environment WestConnex M4-M5 Link Transport for NSW 5 Rozelle