Community Update August 2017

Total Page:16

File Type:pdf, Size:1020Kb

Community Update August 2017 Community update August 2017 Changes to bus stops in Rozelle, Lilyfield, Leichhardt, Annandale and Camperdown Transport for NSW has identified some ways to improve bus on-time running in Sydney’s inner west. Transport for NSW and Roads and Maritime Services } Norton Street near Carlisle Street asked the community for feedback between December } Norton Street near Norton Plaza (one removal only) 2015 and January 2016 on a proposal to make changes to some bus stops in Sydney’s inner west. We would like to } Parramatta Road near Mallet Street thank everyone for their comments. } Parramatta Road near Larkin Street We received feedback from 298 people and organisations. We expect to start work at these locations later in 2017 The feedback included comments around access to bus and will notify you before this happens. services, additional walking distances, loss of parking, removing trees on Norton Street and project justification. The detailed maps in this community update explain the final proposal of changes to bus stops. WHAT HAPPENS NEXT? BACKGROUND We summarised the feedback and our responses in a Community Consultation Report which can be viewed at These changes are part of Sydney’s Bus Future, the NSW www.rms.nsw.gov.au/bpp. Government’s plan to redesign Sydney’s bus network to meet customer needs now and into the future. In this plan, We considered all feedback while finalising the proposal our customers tell us that travel time and on-time running and decided not to proceed with changes at the are some of the most important service features. following locations: We plan to improve bus journey times by: } Perry Street near Glover Street } Reducing the number of locations at which buses need } Norton Street near Norton Plaza (three removals and to stop by combining or removing some bus stops two new stops) } Making it easier for buses to move in and out of bus } Parramatta Road near University Avenue stops by removing or relocating on-street parking We are proceeding with changes to bus stops at the For more information on Sydney’s Bus Future, please visit following locations: www.transport.nsw.gov.au/content/sydneys-bus-future. } Darling Street near Victoria Road } Darling Street near Denison Street } Balmain Road near The Boulevard 1 KEY 1 ROUTE 440 EXISTING BUS STOPS DARLING STREET 2 BUS STOP ADDED BUS STOP EXTENDED DARLING STREET NEAR DENISON STREET NORTON STREET NEAR CARLISLE STREET BUS STOP REMOVED OXFORD STREET BALMAIN ROAD NORTON STREET 4 DARLING STREET 3 6 2 2 Remove bus stop and replace with parking (+2 spaces) 6 Extend bus zone by about 18 metres to allow for long buses, replaces parking (-3 spaces and DARLING STREET NEAR VICTORIA ROAD BALMAIN ROAD NEAR THE BOULEVARD -1 motorbike space) NORTON STREET NEAR NORTON PLAZA 3 VICTORIA ROAD NORTON STREET BALMAIN ROAD 1 THE BOULEVARD 4 1 DARLING STREET 8 3 Remove bus stop and replace with parking (+2 spaces) 1 Relocate bus stop and replace with no stopping zone 4 Remove bus stop and replace with parking (+3 spaces) 8 Remove bus stop and replace with parking (+3 spaces) 6 1 New bus stop replaces parking (-4 spaces) NORTON STREET NORTON 15 8 PARRAMATTA ROAD 13 14 14 PARRAMATTA ROAD 12 12 11 MAP COURTESY OF GOOGLE PARRAMATTA ROAD NEAR MALLET STREET 11 Remove bus stop and replace with parking (+5 spaces) 12 12 New bus stop replaces parking (–7 parking spaces) 12 Remove bus stop and replace with no stopping zone MALLET STREET 12 PARRAMATTA ROAD 11 PARRAMATTA ROAD NEAR LARKIN STREET LARKIN STREET 15 BARR STREET 13 PARRAMATTA ROAD 14 14 14 Remove bus stop and replace with no stopping zone 13 Remove bus stop and replace with parking (+3 spaces) 14 New bus stop replaces parking (–6 spaces) 15 Relocate stop about ten metres east and replace with no stopping zone, and extend bus stop by about 24 metres (-2 parking spaces) Remove one tree CONTACT US If you have any questions, please contact our Project If you need help understanding this Manager Roopa Jogunoori: information, please contact the Translating and Interpreting Service on 1800 575 250 131 450 and ask them to call us on 1800 832 022. Buspriorityinfrastructure@rms.nsw.gov.au www.rms.nsw.gov.au/bpp August 2017 RMS 17.376.
Recommended publications
  • Greater Parramatta and the Olympic Peninsula Is the the Way We All Imagine Greater Sydney
    Greater Our true centre: the connected, Parramatta and the unifying heart GPOP Olympic Peninsula About Us The Greater Sydney Commission (the Commission) was established by the NSW Government to lead metropolitan planning for Greater Sydney. This means the Commission plays a co-ordinating role in economic, social and environmental planning across the whole of Greater Sydney. The Commission has specific roles and responsibilities, such as producing District Plans, the Metropolitan Strategy and identifying infrastructure priorities. Collaboration and engagement are at the core of everything the Commission does. We work across government, with communities, interest groups, institutions, business and investors to ensure that planning for Greater Sydney results in a productive, liveable and sustainable future city. October 2016 FOREWORD CHIEF COMMISSIONER’S DISTRICT COMMISSIONER’S FOREWORD FOREWORD It’s time for a change of perspective and a change in Greater Parramatta and the Olympic Peninsula is the the way we all imagine Greater Sydney. geographic and demographic heart of Greater Sydney, Today, more than 2 million people live west of Sydney and a key part of the West Central District. Olympic Park, yet everyday around 300,000 people We have the opportunity to shape the transformation leave the region to travel for work. of the place we now call GPOP. Greater Sydney needs a true city at its centre, close Global best practice shows that a co-ordinated to its heart. We need a central ‘30-minute city’, that is approach to public and private investment is critical connected to the north, south, east and west. for successful transformation, involving innovation and GPOP is the name we have given to the Greater enterprise.
    [Show full text]
  • Western Sydney Airport Fast Train – Discussion Paper
    Western Sydney Airport Fast 2 March 2016 Train - Discussion Paper Reference: 250187 Parramatta City Council & Sydney Business Chamber - Western Sydney Document control record Document prepared by: Aurecon Australasia Pty Ltd ABN 54 005 139 873 Australia T +61 2 9465 5599 F +61 2 9465 5598 E sydney@aurecongroup.com W aurecongroup.com A person using Aurecon documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Aurecon. Disclaimer This report has been prepared by Aurecon at the request of the Client exclusively for the use of the Client. The report is a report scoped in accordance with instructions given by or on behalf of Client. The report may not address issues which would need to be addressed with a third party if that party’s particular circumstances, requirements and experience with such reports were known and may make assumptions about matters of which a third party is not aware. Aurecon therefore does not assume responsibility for the use of, or reliance on, the report by any third party and the use of, or reliance on, the report by any third party is at the risk of that party. Project 250187 DRAFT REPORT: NOT FORMALLY ENDORSED BY PARRAMATTA CITY COUNCIL Parramatta Fast Train Discussion Paper FINAL DRAFT B to Client 2 March.docx 2 March 2016 Western Sydney Airport Fast Train - Discussion Paper Date 2 March 2016 Reference 250187 Aurecon
    [Show full text]
  • Rozelle Campus M1
    Berry St HUNTLEYS POINT The Point Rd Bay Rd NORTH SYDNEY Burns Bay Rd Bay Burns NEUTRAL BAY Pacific Hwy Kurraba Rd WAVERTON Y A W Union St E G TA CREMORNE POINT OT CHURCH ST WHARF RD C Y A W EN RD GA LAVENDER GLOVER ST BAY CAMPBELL ST Rozelle Campus M1 FREDBERT ST MCMAHONS MILSONS POINT POINT KIRRIBILLI BALMAIN RD PERRY ST 0 100 m Sydney Harbour Sydney HarbourTunnel A40 Sydney Harbour Bridge Victoria Rd Montague St Lyons Rd Sydney RUSSELL LEA DRUMMOYNE Opera BALMAIN Hickson Rd House MILLERS POINT Beattie St Darling St BALMAIN EAST Cahill Expressway Darling St THE ROCKS The Hungry Mile A40 Mullens St SYDNEY ROZELLE Pirrama Rd Royal Victoria Rd Phillip St Botanical Macquarie St Western Distributor Gardens RODD University A4 Cahill Expressway POINT of Sydney Mrs Macquaries Rd (Rozelle) Clarence St Bowman St Sussex St George St Leichhardt Balmain Rd PYRMONT York St The Henley Marine Dr Park Western Distributor Domain M1 See Enlargement Elizabeth St Art Gallery Rd WOOLLOOMOOLOO Rozelle D The Crescent A4 o b Campus POTTS POINT ro y Perry St d Hyde P Balmain Rd LILYFIELD Pitt St d Park MacLeay St A4 Darling Dr Harbour St e Jubilee Cross City Tunnel College St Lilyfield Rd Park Eastern Distributor Cross City Tunnel A4 City West Link William St Darling Dr The Crescent The Glebe Point Rd Wentworth Fig St M1 Pyrmont Bridge Rd Wattle St Park Liverpool St Hawthorne Canal Harris St Oxford St Goulburn St Norton St FOREST Darling Dr Johnston St Moore St LODGE ULTIMO Darlinghurst VictoriaRd St Minogue Cres Wigram Rd HABERFIELD ANNANDALE GLEBE Campbell St Eastern Distributor Balmain Rd HAYMARKET Bay St University of Tasmania 0 250 500 1000 m Booth St Bridge Rd www.utas.edu.au Elizabeth St Foster St Tel: +61 2 8572 7995 (Rozelle Campus) Collins St SURRY LEICHHARDT Central HILLS Leichhardt St Station © Copyright Demap, February 2017 Lee St Ross St Broadway Flinders St PADDINGTON City Rd CHIPPENDALE CAMPERDOWN STRAWBERRY HILLS.
    [Show full text]
  • Temporary Construction Site: Rozelle Rail Yards
    Community Update July 2018 Western Harbour Tunnel Temporary construction site: Rozelle Rail Yards Western Harbour Tunnel is a The NSW Government has now major transport infrastructure A temporary construction site is proposed for the Western released the proposed project project that makes it easier, Harbour Tunnel at the Rozelle reference design, and there will faster and safer to get around Rail Yards. be extensive community and Sydney. stakeholder engagement over The site will be shared with the the coming months. As Sydney continues to grow, our M4-M5 Link Project, helping to minimise construction impacts in transport challenge also increases We now want to hear what the area. and congestion impacts our you think about the proposed economy. The site will support the fit out the reference design. Western Harbour Tunnel ramps to Your feedback will help us further While the NSW Government actively City West Link, and for fit out of refine the design before we seek manages Sydney’s daily traffic the ventilation facility which will planning approval. demands and major new public be delivered as part of the M4-M5 transport initiatives are underway, it’s Link Project. There will be further extensive clear that even more must be done. community engagement once theSeaforth Spit Bridge Environmental Impact Statement Western Harbour Tunnel will provide is on public display.Northbridge Balgowlah Heights a new motorway tunnel connection Artarmon across Sydney Harbour between Seaforth Spit Bridge Rozelle and the Warringah Freeway Northbridge near North Sydney. Balgowlah Heights Artarmon It will form a new western bypass Lane Cove of the Sydney CBD, providing an Cammeray Ernest St St Leonards Mosman alternative to the heavily congested Falcon St Lane Cove Crows Nest Sydney Harbour Bridge, Western OFF Cammeray RAMP Cremorne Distributor and Anzac Bridge.
    [Show full text]
  • Contaminant Chemistry and Toxicity of Sediments in Sydney Harbour, Australia: Spatial Extent and Chemistry–Toxicity Relationships
    Vol. 363: 71–87, 2008 MARINE ECOLOGY PROGRESS SERIES Published July 15 doi: 10.3354/meps07445 Mar Ecol Prog Ser Contaminant chemistry and toxicity of sediments in Sydney Harbour, Australia: spatial extent and chemistry–toxicity relationships Gavin F. Birch1,*, Stephanie McCready1, Edward R. Long2, Stuart S. Taylor1, 3, Gina Spyrakis1 1School of Geosciences, Environmental Geology Group, The University of Sydney, New South Wales, 2006, Australia 2ERL Environmental, 3691 Cole Road South, Salem, Oregon 97306, USA 3URS, 116 Miller St., North Sydney, New South Wales, 2060, Australia ABSTRACT: The spatial distribution of chemical contamination and toxicity of surficial sediments in Sydney Harbour, Australia, was investigated in a 3-tiered, hierarchical approach. An initial chemical investigation throughout the entire estuary (Stage 1) indicated wide ranges and different spatial patterns in sediment chemical concentrations. Sediment quality guidelines (SQGs) were used as a preliminary estimate of possible toxicity in Stage 2 of the investigation. Assessment of chemical mixtures indicated that sediments in a small part (~2%) of the harbour had the highest probability of being toxic (~75%), whereas sediment in almost 25% of the port was estimated to have an inter- mediate (~50%) probability of being toxic. The SQG assessment in Stage 2 enabled careful stratifica- tion of the harbour into areas with different toxicity risks, reducing cost and time commitments in the final tier of assessment. The spatial survey carried out in Stage 3 involved concurrent chemical and ecotoxicological analyses. In this final stage, the degree of response in tests of amphipod survival in whole sediment samples, as well as in tests of microbial metabolism (Microtox©) and sea urchin egg fertilisation and embryo development in pore waters, generally increased with increasing chemical concentrations.
    [Show full text]
  • Farewell to Rozelle Hospital Snip in Time - History Archives
    Farewell to Rozelle Hospital Snip in Time - History Archives Callan Park was opened with much pomp and ceremony in 1884. This group of splendid sandstone buildings set in park-like river view grounds in Rozelle was considered - in 1901 - to be one of the finest institutions in the Commonwealth. The inclusion of Broughton Hall Estate into the Callan Park complex and a further six repatriation wards for victims of 'shell shock' [took place] after the First World War. PRA The Story, 2005. (Eds) Chesterson J, Maller S & Turner B p15; www.pra.org.au Services for people with a mental illness have been provided on the Rozelle Hospital site since 1876. Rozelle Hospital was formed in 1976 from the amalgamation of Callan Park Hospital and the Broughton Hall Psychiatric Clinic. The History of Rozelle Hospital is in tandem with the historical, social and political context of the mentally ill of a new colony and the progressive maturity of a nation. The progressive changes between 1870 and the present day evidence this maturity as social attitudes gradually changed towards the care and treatment of the mentally ill. The ‘Kirkbride Block’ was named after the eminent American, Dr William Kirkbride who was renowned for his pioneering work on progressive mental health care. Rozelle Hospital has continued its services through the intervening years up to the present day in these historic buildings. Rozelle with its long and rich history has provided a milieu of progressive learning in treatment and care of the mentally ill with which it can be justly proud. http://www.cs.nsw.gov.au/rozdev/history.htm In 1873, due to severe overcrowding at the Hospital for the Insane at Gladesville, the Parkes Government purchased the "Callan Estates" (then a rural setting) of just over 100 acres for £12,500; with the express purpose of building a large lunatic asylum.
    [Show full text]
  • Contextual Analysis and Urban Design Objectives
    Rozelle Interchange Urban Design and Landscape Plan Contextual Analysis and Urban Design Objectives Artists impression: Pedestrian view along Victoria Road Caption(Landscape - Image shown description at full maturity and is indicative only). 03 White Bay Power Station Urban Design Objectives 3 Contextual analysis 3.1 Contextual analysis Local context WestConnex will extend from the M4 Motorway at The Rozelle Interchange will be a predominately Parramatta to Sydney Airport and the M5 underground motorway interchange with entry and Motorway, re-shaping the way people move exit points that connect to the wider transport through Sydney and generating urban renewal network at City West Link, Iron Cove and Anzac opportunities along the way. It will provide the Bridge. critical link between the M4 and M5, completing Sydney’s motorway network. Iron Cove and Rozelle Rail Yards sit on and are adjacent to disconnected urban environments. While the character varies along the route, the These conditions are the result of the historically WestConnex will be sensitively integrated into the typical approach to building large individual road built and natural environments to reconnect and systems which disconnect suburbs and greatly strengthen local communities and enhance the reduce the connectivity and amenity of sustainable form, function, character and liveability of Sydney. modes of transport such as cycling and walking. Rather than adding to the existing disconnection, An analysis of the Project corridor was undertaken the Project will provide increased
    [Show full text]
  • 7 a Short Geological and Environmental History of the Sydney
    View metadata,citationandsimilarpapersatcore.ac.uk effect on floods and droughts in Australia', Climatic change, vol. 25, pp. 289–317. 7 Wilby R L, 2005. 'Uncertainty in water resource model parameters used for climate change impact assessment', Hydrological Processes, vol. 19, pp. 3201–3219. Young P, 2003. 'Top-down and data-based mechanistic modelling of rainfall-flow dynamics at the catchment scale', Hydrological Processes, A short geological and environmental history vol. 17, pp. 2195–2217. of the Sydney estuary, Australia Young W, Brandis K & Kingsford R, 2006. 'Modelling monthly streamflows in two Australian dryland rivers: matching model complexity to spatial scale and data availability', Journal of Hydrology, Gavin Birch vol. 331, pp. 242–256. Zhang L, Dawes W R & Walker G R, 2001. 'Response of mean annual evapotranspiration to vegetation changes a catchment scale', Water Abstract Resources Research, vol. 37, pp. 701–708. Zhang L, Walker G R & Fleming M, 2002. 'Surface water balance for Sydney is blessed with one of the most beautiful harbours in the world. recharge estimation', CSIRO publishing, Collingwood, Victoria. However, like many large, capital ports world-wide, this environment has been exposed to relentless stress due to a rapidly increasing population density and extensive residential, commercial and industrial expansion. In this chapter, we explain why the coastal zone is such an important environment, especially for the people of Australia, and describe changes to the Sydney estuary as an example of environmental transformation due to anthropogenic pressure. The geologic development of the Sydney estuary is briefly traced, showing how the feature was eroded into the Hawkesbury Sandstone, mainly during low sea levels of the glacial periods.
    [Show full text]
  • A Harbour Circle Walk Is These Brochures Have Been Developed by the Walking Volunteers
    To NEWCASTLE BARRENJOEYBARRENJOEY A Four Day Walk Harbour Circle Walk Stages Sydney Harbour is one of the great harbours of the world. This Circle Walk and Loop Walks 5hr 30 between the Harbour and Gladesville Bridges (marked in red on the map) takes four days and totals 59km. It can be walked continuously using overnight Individual leaflets with maps and notes downloadable from www.walkingsydney.net and SYDNEY HARBOUR accommodation, from a base such as the City or Darling Harbour using public www.walkingcoastalsydney.com.au AVALON transport each day, or over any period of time. Harbour Circle Walk in Four Days Day 1 Circular Quay (H8) to Greenwich Wharf (E6) 14km 5hrs Day 1 Circular Quay to Greenwich Wharf 14km 5hrs Day 2 Greenwich Wharf (E6) to Woolwich Wharf (D/E5) 15.5km 5hrs 30mins Day 2 Greenwich Wharf to Woolwich Wharf 15.5km 5hrs 30mins Day 3 Huntleys Point Wharf (A6) to Balmain East Wharf (F7) 14.5km 5hrs Day 3 Huntleys Pt Wharf to Balmain East Wharf 14.5km 5hrs Approximate Walking Times in Hours and Minutes A Harbour 5hr 30 Day 4 Balmain East Wharf (F7) to Circular Quay (H8) 15km 5hrs Day 4 Balmain East Wharf to Circular Quay 15km 5hrs e.g. 1 hour 45 minutes = 1hr 45 Visit www.walkingsydney.net to download leaflets for each day of the four day Harbour Circle Walk in Two Days (or One) Circle Walk 0 8 version of the walk. Each leaflet has a detailed map (1:10k) and historical and Day 1 Circular Quay to Hunters Hill 13km 5hrs 30mins general interest notes.
    [Show full text]
  • An Account of the English Colony in New South Wales [Volume 1]
    An Account of the English Colony in New South Wales [Volume 1] With Remarks on the Dispositions, Customs, Manners &c. of the Native Inhabitants of that Country. To Which are Added, Some Particulars of New Zealand: Complied by Permission, From the Mss. of Lieutenant-Governor King Collins, David (1756-1810) A digital text sponsored by University of Sydney Library Sydney 2003 colacc1 http://purl.library.usyd.edu.au/setis/id/colacc1 © University of Sydney Library. The texts and images are not to be used for commercial purposes without permission Prepared from the print edition published by T. Cadell Jun. and W. Davies 1798 All quotation marks are retained as data. First Published: 1798 F263 Australian Etext Collections at Early Settlement prose nonfiction pre-1810 An Account of the English Colony in New South Wales [Volume 1] With Remarks on the Dispositions, Customs, Manners &c. of the Native Inhabitants of that Country. To Which are Added, Some Particulars of New Zealand: Complied by Permission, From the Mss. of Lieutenant-Governor King Contents. Introduction. SECT. PAGE I. TRANSPORTS hired to carry Convicts to Botany Bay. — The Sirius and the Supply i commissioned. — Preparations for sailing. — Tonnage of the Transports. — Numbers embarked. — Fleet sails. — Regulations on board the Transports. — Persons left behind. — Two Convicts punished on board the Sirius. — The Hyæna leaves the Fleet. — Arrival of the Fleet at Teneriffe. — Proceedings at that Island. — Some Particulars respecting the Town of Santa Cruz. — An Excursion made to Laguna. — A Convict escapes from one of the Transports, but is retaken. — Proceedings. — The Fleet leaves Teneriffe, and puts to Sea.
    [Show full text]
  • Parramatta River Walk Brochure
    Parramatta Ryde Bridge - Final_Layout 1 30/06/11 9:34 PM Page 1 PL DI r ELIZA ack BBQ a Vet E - Pav W PL CORONET C -BETH ATSON Play NORTH R 4 5 PL IAM 1 A NORTH A L H L Br Qu CR AV I John Curtin Res Northmead Northmead Res R G AV W DORSET R T PARRAMATTA E D Bowl Cl To Bidjigal R PARRAMATTA O Moxham Guides 3 2 R AR O P WALTE Hunts D ReservePL N S Park M A 2151 Creek O EDITH RE C CR N The E Quarry Scouts ANDERSON RD PL PYE M AMELOT SYDNEY HARBOUR Madeline RD AV C THIRLMER RD SCUMBR Hake M Av Res K PL Trk S The BYRON A Harris ST R LEVEN IAN Park E AV R PL E Moxhams IN A Craft Forrest Hous L P Meander E L G Centre Cottage Play M PL RD D S RD I L Bishop Barker Water A B Play A CAPRERA House M RD AV Dragon t P L Basketba es ST LENNOX Doyle Cottage Wk O O Whitehaven PL PL THE EH N A D D T A Res CARRIAGE I a a V E HARTLAND AV O RE PYE H Charl 4 Herber r Fire 5 Waddy House W Br W THA li n 7 6 RYRIE M n TRAFALGAR R n R A g WAY Trail Doyle I a MOXHAMS RD O AV Mills North Rocks Parramatta y y ALLAMBIE CAPRER Grounds W.S. Friend r M - Uniting R Roc Creek i r 1 Ctr Sports r Pre School 2 LA k Lea 3 a Nurs NORTH The r Baker Ctr u MOI Home u DR Res ST Convict House WADE M Untg ORP Northmead KLEIN Northmead Road t Play SPEER ROCKS i Massie Baker River Walk m Rocky Field Pub.
    [Show full text]
  • 4.1.2 Iron Cove Atn Link
    4.1.2 IRON COVE ATN LINK The active transport link at Iron Cove is shown in Figure 4.5 and is a key connector that would: • Connect northern suburbs of Drummoyne [and Russell Lea and Five Dock via the Bay Run] to The Bays Precinct and the CBD • Connect the existing retail centres on Darling Street Balmain and Victoria Road as well as local schools and other community services • Provide a direct route, notwithstanding significant gradient changes, from Iron Cove Bridge towards Darling Street • Capitalise on the amenity uplifts potentially assisted by forecast traffic volume reductions on Victoria Iron Cove Road Victoria Road • Connect to ATN routes on local roads • Link significant open space from the Bay Run, Callan Park and the future open space at Rozelle Rail Yards and foreshore along The Bays Precinct. The key route requirements are to: Callan Rozelle Glebe • Provide a separated cycleway and footpath on the Park Island southern side of Victoria Road along the extent of White Bay M4-M5 Link works Power Station • Provide a template for the treatment of cycleways and footpaths along the remainder of Victoria Road. Anzac Bridge Balmain Road The Crescent Rozelle Bay Rozelle Bay Light Rail City West Link Glebe Point Road LEGEND Lilyfield Road Lilyfield Upgraded - ATN path [M4-M5 Link] Light Rail New separated cycle way [by others] Existing - major cycle routes Jubilee Park Light Rail Regional route - inner city Whites Regional route - Council existing Creek Regional route - Council proposed Local route - low vehicle interaction Local route - medium vehicle interaction Johnston St N Interchanges Figure 4.5 Victoria Road Iron Cove ATN link ACTIVE TRANSPORT STRATEGY 21 PROPOSED INITIATIVES AND FUTURE LINKS 4.1.3 PROJECT INTERFACES The M4-M5 Link interfaces with the M4 East and New M5 at Haberfield and St Peters respectively.
    [Show full text]