INTERMODAL MANAGEMENT SYSTEM
FOR HAMPTON ROADS, VIRGINIA 2001
This report was included in the Work Program for Fiscal Year 2001-2002, which was approved by the Commission and the Metropolitan Planning Organization at their meetings of March 21, 2001.
PREPARED BY:
DECEMBER 2001
T01-06 Report Documentation December 2001: Final Report
REPORT DOCUMENTATION
TITLE: REPORT DATE Intermodal Management System for December 2001 Hampton Roads, Virginia 2001 GRANT/SPONSORINGAGENCY FHWA/VDOT/LOCAL FUNDS
AUTHORS: ORGANIZATION NAME, Samuel S. Belfield ADDRESS AND TELEPHONE John A. Bishop Hampton Roads Planning Keith M. Nichols District Commission 723 Woodlake Drive Chesapeake, Virginia 23320 (757) 420-8300 http://www.hrpdc.org
ABSTRACT
This report is the third in a series of Intermodal Management System (IMS) reports for Hampton Roads, Virginia. Phase I of the Intermodal Management System for Hampton Roads, Virginia, which was released in July 1996, summarized the region’s intermodal transportation system (intermodal facilities, major intermodal conflict points), identified the region’s intermodal goals and objectives, and established performance measures for passenger and freight movements. Phase II, which was released in April 1998, summarized the movement of freight to, from, and within the region. International, national, and local level freight movements were also investigated for highway, rail, water, and air transportation modes. This document updates the two previous reports. It also includes a statewide freight movement analysis, a detailed regional truck analysis, and lists port-related improvements in Hampton Roads by 2021.
ACKNOWLEDGMENTS
This report was prepared by the Hampton Roads Planning District Commission (HRPDC) in cooperation with the U.S. Department of Transportation (USDOT), the Federal Highway Administration (FHWA), the Virginia Department of Transportation (VDOT), the Virginia Port Authority (VPA), and the member jurisdictions of the Hampton Roads region. The contents of this report reflect the views of the staff of the Hampton Roads Area Metropolitan Planning Organization (MPO). The MPO staff is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the FHWA, VDOT, or HRPDC. This report does not constitute a standard, specification, or regulation. FHWA or VDOT acceptance of this report as evidence of fulfillment of the objectives of this planning study does not constitute endorsement/approval of the need for any recommended improvements nor does it constitute approval of their location and design or a commitment to fund any such improvements. Additional project level environmental impact assessments and/or studies of alternatives may be necessary.
i Executive Summary December 2001: Final Report
EXECUTIVE SUMMARY
This report is the third in a series of Intermodal Management System (IMS) reports for Hampton Roads, Virginia. Phase I of the Intermodal Management System for Hampton Roads, Virginia, which was released in July 1996, summarized the region’s intermodal transportation system (intermodal facilities, major intermodal conflict points), identified the region’s intermodal goals and objectives, and established performance measures for passenger and freight movements. Phase II, which was released in April 1998, summarized the movement of freight to, from, and within the region. International, national, and local level freight movements were also investigated for highway, rail, water, and air transportation modes. This document updates the two previous reports. It also includes a statewide freight movement analysis, a detailed regional truck analysis, and lists port-related improvements in Hampton Roads by 2021.
STUDY FINDINGS:
International Freight Movement Through the Port of Hampton Roads