Government of Arunachal Pradesh Office of the Executive Engineer :: Public Health Engineering and Water Supply Division :: Khonsa

Total Page:16

File Type:pdf, Size:1020Kb

Government of Arunachal Pradesh Office of the Executive Engineer :: Public Health Engineering and Water Supply Division :: Khonsa No. of thefirms. ortheauthorizedtenderersrepresentative intending under construction of registered contractor Arunachal Pradesh invites sealed item rate tender from approved and eligible No.SCH/KPHED/NIT Package- I Sl OFFICEOF THEEXECUTIVE ENGINEER:: PUBLIC HEALTH ENGINEERING Nameof RIDF Name of Work:- Providing water supply at The Executive Engine Deomali Township in Tirap District (Phase- II) Sub under RIDF of - Head “ Tirap District, Arunachal Pradesh, which will be opened in presence of the Work and Work Providing Sub- Head:- Construction of Sedimentation Tank cum Coagulation Tank, Aerator, Flash Mixture, / firm registered with CPWD/ PWD/ BRO/ NEEPCO/ GREF/NHPC/ MES for - Partial flume with channel and Clariflocculator GOVERNMENTOF ARUNACHAL PRADESH ANDWATER SUPPLY DIVISION KHONSA:: 77 water water supply at Deomali Township in Tirap District (Phase 7 /201 Estimated cost put er, PHE & WS Division, Khonsa on behalf of the Governor of Rs. 52,51,035.00 to tender 9 - NOTICETENDERINVITING 20 / Rs. 52,510.00 (APST) Earnest money Rs. 1,05,021.00 (General) 15 (Fifteen) months Time of completion Last date of 11/ 12/ 2019 receipt of Application DatedKhonsathe Last date for Sale/ 12/ 12/ 2019 Issue of Tender papers Last date for 13/ 12/ 2019 upto 1430 hrs. submission of tender papers 3 rd Opening of tender 2019 December’ 13/ 12/ 2019 on 1500 hrs. papers Class - I Office of the Executive Engineer I ) ” ” - PHE & WS Division, Khonsa Place dropping I sanction sanction P.O:- Khonsa and opening of II & Tirap District (Arunachal Pradesh) Bids I Pin NO. 792130 V No. Package- III Package- II Sl Name of Work:- Providing water supply at Name of Work:- Providing water supply at Nameof and Work Deomali Township in Tirap District (Phase- II) Deomali Township in Tirap District (Phase- II) Sub under RIDF under RIDF - Head Sub- Head:- Construction of Clear Water Sub- Head:- Construction of Rapid Sand Filter Reservoir (CWR) and Main/ Common RCC (RSF) Over- Head Tank at Deomali. Estimated cost put Rs. 62,24,836.00 Rs. 78,70,561.00 to tender Rs. 62,248.00 (APST) Rs. 78,706.00 (APST) Earnest money Rs. 1,24,497.00 (General) Rs. 1,57,411.00 (General) 15 (Fifteen) months 15 (Fifteen) months Time of completion Last date of 11/ 12/ 2019 11/ 12/ 2019 receipt of Application Last date for Sale/ 12/ 12/ 2019 12/ 12/ 2019 Issue of Tender papers Last date for 13/ 12/ 2019 upto 1430 hrs. 13 12/ 2019 upto 1430 hrs. submission of tender papers Opening of tender 13/ 12/ 2019 on 1500 hrs. 13/ 12/ 2019 on 1500 hrs. papers Office of the Executive Engineer Office of the Executive Engineer PHE & WS Division, Khonsa PHE & WS Division, Khonsa Place dropping P.O:- Khonsa P.O:- Khonsa and opening of Tirap District (Arunachal Pradesh) Tirap District (Arunachal Pradesh) Bids Pin NO. 792130 Pin NO. 792130 4. 3. 2. 1. No. Sl Sl Package- IV after the stipulated time limit. time theafter stipulated Bank of India at Khonsa Cash/ shape of DD (non between Tender documents can be obtained from the office of the undersigned on any working day in be o specifiedabove,thebids will further evaluation. If the office filled happens in of to post be qualified contractors closed in Arunachal onthe Pradesh. The prescribed price the bids containing only date the of opening contractors shall of be bids made as by the competent evaluation authority of and PHE & after WS Department, adopting proposals Govt. andof capability the of the post contractors/ firm and qualification The bidsTechnical their shall be opened first and evaluated worto assess the technical viability of their procedure, a short list of selected toworks. thesiteof visit projectthe for before submitting the technical bid. The firm concerned site of works and its surrounding etc. at their own cost and responsibility Theand risk bidders are required non to visit the tender sites will not be to held responsible for examine the delay, if andundersigned any, on in familiarize the or delivery of themselves before the documents stipulated or with date reach to and the time undersigne specified above. The bid placed be andshall proper in cover and sealed byseparate post so as mailed to registered authority inviting The bidders are required to submit Tender in two bids i.e Nameof and Work - Name of Work:- Providing water supply at receipt of the same on time. ofon receiptthesame Deomali Township in Tirap District (Phase- II) Sub 1000 hrs t under RIDF - Head Sub- Head:- Construction of 5 Nos. (Zonal ) RCC Over- Head Tank at ADC Office, NTC, o 1600 hrs on payment of Rs. 1,0 Notun Bosti, CF Colony and Udyog, Deomali. - d d or may be dropped in tender box made available in the office of / Deomali re Estimated cost put fundable) fundable) drawn in favour of the undersigned payable at the Rs. 92,89,928.00 to tender pened on next working day at the same time andvenue. thesame nextworkingpenedattime on day . Rs. 92,899.00 (APST) No No bidding documents shall be issued to the contractor Earnest money Rs. 1,85,799.00 (General) 15 (Fifteen) months Time of completion may contact the Assistant InEngineer Last date of 11/ 12/ 2019 receipt of Application 00.00 (Rupees schedule of quantities with rates duly Last date for Sale/ Form PWD Technical bids & Price bids. 12/ 12/ 2019 Issue of Tender papers k experience. Based on such Last date for 13/ 12/ 2019 upto 1430 hrs. submission of - 7/8 tender papers One thousand shall be opened for Opening of tender 13/ 12/ 2019 on 1500 hrs. papers - Office of the Executive Engineer Charge of ) Only PHE & WS Division, Khonsa Place dropping Each of P.O:- Khonsa and opening of State Tirap District (Arunachal Pradesh) Bids in Pin NO. 792130 5. Earnest money in the form of DCR/ DD/ FDR of nationalized scheduled banks guaranteed by the Reserve Bank of India in favour of Executive Engineer, PHE & WS Division, Khonsa must be accompanied with each tender failing which will be summarily rejected. 6. The undersigned reserves the right to reject any or all tenders without assigning any reason. 7. The tender shall be opened by the undersigned in the Office of PHE & WS Division, Khonsa as schedule. 8. The Bidders may collect the hard copy of Technical Bids and Price Bids from the Office of PHE & WS Division, Khonsa on or before stipulated date and time specified above. 9. The undersigned reserves the right to extend or cancel the tender and change the venue of opening the tender without assigning any reasons. 10. Any kind of tampering and overwriting of BOQ by the bidders will cause his/ her bid to be disqualified and rejected. 11. The bidders are required to submit the original documents to the office of the undersigned on the day of opening of technical bids. 12. Bidders must submit the hydraulic design and detailed drawings and specifications of proposed structures for evaluation for economical alternative options. ELIGIBILITY CRITERIA: 1. The sale tax registration No./ GST No. and PAN No. must be furnished in bidding document. The documents must be authenticated by competent authority. 2. Those firms who have not completed any ongoing projects in the PHE Department within stipulated time in Arunachal Pradesh will not be eligible to participate in tendering. 3. The willing tenderers must have executed similar type of Drinking Water Project or any other important civil construction work in hilly area not less than 50.00 lakh. The certificate in respect of completion of such projects must be obtained from not below the rank of Executive Engineer of the concerned Department. 4. The firm/ bidder participating in tender must be of appropriate Class- III & IV registered contractor. 5. All register contractors in Class III & IV categories domiciled within the 54th Namsang (ST) Assembly Constituency shall be applied for tender work. 6. Class of category and that the registration is must be valid on the date of participation of tender, a copy of which must be submitted to the tendering authority. 7. Contractor shall be allowed to participate in the tender on production of proof of permanent residential certificate (PRC) in support of their claim. 8. As per Govt. of Arunachal Pradesh notification No. SPWD/ W- 66/ 2012, Itanagar, Dtd. 13th August’ 2015. The Arunachal Pradesh district based entrepreneurs and professionals (Incentives, Development and Promotional) Act No. 05 of 2015. All register contractors in class III and IV categories domiciled with 54th Namsang (ST) Assembly Constituency are eligible to participate in tender process. Sd/- (Er. Bamang Tasung) Executive Engineer PHE & WS Division Khonsa Memo No. KPHED/ SCH/ NIT- 777/ 2019- 20/ Dated Khonsa the 3rd December’ 2019 Copy to:- 1. The Chief Engineer (E/Z)/ (W/Z)/ (D&P)/ (Sanitation), PHE & WS Department/ PWD (E/Z)/, W/Z)/ Power/ Power (Civil)/ RWD/ WRD, Itanagar for favour of his information and wide circulation please. 2. The Deputy Resident Commissioner, Govt. of Arunachal Pradesh, Guwahati/ Shillong/ Kolkata/ New Delhi for information and wide circulation please. 3. The Superintending Engineer, PHE & WS Circle, Miao/ Namsai/ Aalo (Bene)/ Nahalagun/ Rupa for information & wide circulation please. 4. The Deputy Commissioner, Tirap District, Khonsa for information and wide circulation please. 5. The Executive Engineer, PHE & WS Division, Longding/ Changlang/ Namsai/ Roing/ Hawai/ Pasighat/ Yingkiong/ Aalo/ Likabali/ Ziro/ Sangram/ Yupia/ Daporijo/ Seppa/ Bomdila/ Tawang/ Itanagar for information and wide circulation please. 6. The Assistant Engineer, PHE & WS Sub- Division, Khonsa/ Deomali for information. 7. Notice board. 8. Office copy. Executive Engineer PHE & WS Division Khonsa .
Recommended publications
  • The Adi House: Manifestation of Traditional Wisdom ~~R.N
    ARUNACHAL A monthly english journal DECEMBER 2018 1 REVIEW The Adi House: Manifestation of Traditional Wisdom ~~R.N. Koley he Adis, the blanket name fulfillment of the basic needs away from it. Even, every Adi Tof some sub-groups are in- and the requirements of com- village depicts a definite pat- habited in Siang Valley the cen- munity members. Traditions tern in housing. Prospect of tral part of Arunachal Pradesh. and socio-cultural heritage are water, sunlight and drainage They are comprising around uniformly inherited by individu- facility of domestic waste to- one fourth of the tribal popula- als and society. wards lower slope at a village tion of this state. They are hav- The traditional house site are always wisely taken ing unique tradition and rich of the Adis are constructed in consideration with utmost cultural heritage of their own. with bamboos, woods, canes, importance. All these tradi- In Arunachal Pradesh every leaves etc. which are found tional mechanism reveal a ethnic community has own ar- abundant in their surround- foresight and scientific think- chitectural design of house as ings. Till today the construction ing as outcome of deep expe- part of their traditional wisdom is made always on community rience based on century old to cope with their ecology. Like- or collective basis to which all behavioral science. Security of wise the Adis have own tradi- the abled body villagers con- the houses is also major con- tional architect in constructing tribute their labour spontane- cern in early days. In a village their houses which are tested ously as part of century old tra- houses are camouflaged with over the time.
    [Show full text]
  • Management Plan
    “To develop a Protected Area Management Information System in Arunachal Pradesh using Remote sensing and GIS Technology” WWF-MoEF-NNRMS RESEARCH PROJECT MANAGEMENT PLAN NAMDAPHA NATIONAL PARK Under Research Project “ T o d ev el op a Pr o t ect e d A r e a M a na ge m ent I nfo r ma t i on S y st e m i n A r un a ch a l Pr a d e s h u si n g Re mot e s e ns i n g a n d G I S T ech n ol o gy ” Ministry of Environment and Forests In dira Gandhi Conservation Monitoring Centre Governme nt of India WWF-India Paryavaran Bhavan, CGO Complex 172-B Lodi Estate, New Delhi Lodhi Road, New Delhi “To develop a Protected Area Management Information System in Arunachal Pradesh using Remote sensing and GIS Technology” Table of Contents Introduction ........................................................................................................................................................... 1 1. BACKGROUND .................................................................................................................................... 1 2. PROTECTED AREA NETWORK...................................................................................................... 2 2.1 History and Development of Protected Area (PA) Network of India................................ 2 2.2 Biodiversity Conservation Initiatives in Arunachal Pradesh .............................................. 6 3. MANAGEMENT PLANNING ............................................................................................................ 8 Profile of Namdapha National Park
    [Show full text]
  • The Arunachal Pradesh Gazette EXTRAORDINARY PUBLISHED by AUTHORITY No
    The Arunachal Pradesh Gazette EXTRAORDINARY PUBLISHED BY AUTHORITY No. 80 Vol. XXVI, Naharlagun, Thursday, February 21, 2019, Phalguna 2, 1940 (Saka) OFFICE OF THE CHIEF ELECTORAL OFFICER ARUNACHAL PRADESH ITANAGAR The 19th February, 2019 No. EN/LEG/43/2019. —The following Notification issued by Election Commission of India, Nirvachan Sadan, Ashoka Road, New Delhi, and published in the Gazette of India Part-II, Section 3 Sub-Section (iii) dated 13th February, 2019, is reproduced below for general information. ELECTION COMMISSION OF INDIA Nlrvachan Sadan, Ashoka Road, New Delhl - 110001 13th February, 2019 Dated : 24 Magha, 1940 (Saka). NOTIFICATION No.434/ARUN-LA/2019(1) : - In exercise of the powers conferred by Sub-Section (1) of Section 22 of the Representation of the People Act,1951 (43 of 1951) and in supersession of its notification No.434/ARUN-LA/2014(1) dated 13th March, 2014, the Election Commission hereby appoints each of the officer of the Govemment of Arunachal Pradesh, as specified in column 2 of the Table below as the Assistant Returning Officer to assist the Returning Officer of the Assembly Constituency in the State of Arunachal Pradesh as specified in column 1 of the said table against such officer of the Government in the performance of the functions of such Returning Officer:- TABLE No. and Name of Assembly Assistant Returning Officers Constituency. 1 2 1-Lumla (ST) 1. Circle Officer, Lumla 2. Circle Officer, Dudunghar 3. Circle Officer, Zemithang 2-Tawang (ST) 1. Extra Assistant Commissioner, Tawang 2. Circle Officer, Kitpi 3-Mukto (ST) 1. Circle Officer, Jang 2.
    [Show full text]
  • District Census Handbook, Tirap, Part XII a & B, Series-3, Arunachal
    CENSUS OF INDIA 1991 SERIES -3 ARUNACHAL PRADESH PART XII • A & B 7 DISTRICT CENSUS HANDBOOK VILLAGE & TOWN DIRECTORY VILLAGE & TOWN-WISE PRIMARY CENSUS ABSTRACT TAPAN SENAPATI Director of Census Operations, Arunachal Pradesh .9l.runaclia[ Pradesh is a tftinfy popu{atcd hif[y tract eying rougfdy 6etween tfie Latitutfe3 2(il 28' 'J{ arllf 29° 31' 'J{ ane{ tfie Longitlldes 91° 30' 'E ana 9-;0 30' 'E on tfie !J{prth 'East ettremity of [ne{ia, colllpri.5ing rollgf:~1 of 83,743 ?\jfometre squares of area. It is 60unaet! on tfie 'J{prth, IJ..[prth-'East ana 'J{prtli-'West 6y Cfiina (nEet), on tfie Soutfi oy Jlssam ana 'J{aga{ana, on tfie South-tEast 6y :Myanmar (13urma) ana on tfie Ubt 6y 13hutan. 'The Pradesh is kt;O'll/fl to 6e ricfi in _{(ora, fauna, power anti minera{ potentia[. 'JIjJfien tfie 1971 Census was taK~n in Jlrunacha[ Praacsfi, tfie area was K!wwn as tfie 'J{prth 'East '}"rontier _'4gency (iJ..f.£'}"fl in sfiort) 7uhicfi zuas coHstitutiona[{y a part of tfie state of Jlssam. Jlt tfiat time 'J{'E'}"JI zuas directfy alministered oy tfte Presitfent of Inaia tfirougfi ~he (jovemor of Jlssam as fiis agent, wfio was assisted by an _'4aviser. 'The office of tfie JItfzliser to the (jovcmor of Jlssam 'was situatetf at Sfii[[ong, tfie former capitaC of tfie JIssam S tatc, n0Jt{ tfie Capi taf of i)legha [aya . On 21st January, 1972 iJ..f.E'.Fi.! was gj'lIen tfic status of a 1.1nion 'Territory undcr tlie proz1ision of tfie 'J.{prtfi-'Eastern JIrca ('1\!organisatioH) JIct, 1971 (8 of 1971) and p[aced tlnaer tfie cha.rge of a [fiieJ Commissioner witft ftis fieaaqllarters at Sfii{{ong.
    [Show full text]
  • Gazetteer of India Tirap District
    Gazetteer of India ARUNACHAL PRADESH Tirap District GAZETTEER OF INDIA ARUNACHAL PRADESH TIRAP DISTRICT ARUNACHAL PRADESH DISTRICT GAZETTEERS TIRAP DISTRICT Edited by S. DUTTA CHOUDHURY GOVERNMENT OF ARUNACHAL PRADESH 1980 Published by Shri R.N. Bagchi Director of Information and Public Relations Government of Arunachal Pradesh, Shillong Printed by N.K, Gossain & Co. Private Ltd. 13/7ArifFRoad Calcutta 700 067 © Government of Arunachal Pradesh First Edition: 1980 First Reprint Edition: 2008 ISBN--978-81-906587-1-3 Price: Rs. 225/- Reprinted by M/s Himalayan Publishers Legi Shopping Con^jlex, BankTinali,ltanagar-791 111. FOREWORD I am happy to know that the Tirap District Gazetteer is soon coming out. This will be the second volume of District Gazetteers of Arunachal Pradesh — the first one on Lohit District was published during last year. The Gazetteer presents a comprehensive view of the life in Tirap District. The narrative covers a wide range of subjects and contains a wealth of information relating to the life style of the people, the geography of the area and also developments made so far in various sectors. The Tirap District Gazetteer, 1 hope, would serve a very useful purpose as a reference book. Raj Niwas R. N. Haldipur ltanagar-791111 Lieutenant Governor, Arunachal Pradesh May 6. 1980 PREFACE The present volume is the second in the series of Arunachal Pradesh District Gazetteers. The publication of this volume is the work of the Gazetteers Department of the Government of Arunachal Pradesh, carried out persistently over a number of years. In fact, the draft of Tirap District Gazetteer passed through a long course of examinations, changes and rewriting until the revised draft recommended by the Advisory Board in 1977 was approved by the Government of Arunachal Pradesh in 1978 and finally by the Government of India in 1979.
    [Show full text]
  • Government of Arunachal Pradesh Planning Department Itanagar
    GOVERNMENT OF ARUNACHAL PRADESH PLANNING DEPARTMENT ITANAGAR No. PD(UF)-1/2008 Dated, Itanagar, the 3rd January, 2009. To 1) The Deputy Commissioner, Tawang/Bomdila/Seppa/Koloriang/Yupia/ziro/Pasighat/Aalo/Daporijo/ Yingkiong/Anini/Roing/Hawai/Tezu/Changlang/Khonsa Arunachal Pradesh 2) The Additional Deputy Commissioner, Singchung/Sagalee/Mechuka/Basar/Rumgong/Tuting/Hayuliang/Namsai/ Miao/Jairampur/Longding Arunachal Pradesh Subject:- Allocation of funds under UNTIED FUND for the year 2008-09. Sir/Madam, I am to convey the Govt. approval for placement of Rs.430.00 lakh under “Untied Fund” for 2008-09 at the rate of Rs. 20.00 lakh per Deputy Commissioner and Rs.10.00 lakh per Additional Deputy Commissioner (with independent charges) at the disposal of respective Deputy Commissioners / Additional Deputy Commissioners (as per list given below). 2. The expenditure should be booked under Major Head “3451”-Secretairat Economic Services-Sub Major Head-00-Minor Head-102-District Planning Machinery-Sub-Head – 04 – Untied Fund – Detailed Head-(01-DC, Aalo), (02-DC, Tezu), (03-DC, Ziro), (04-DC, Bomdila), (05-DC, Khonsa), (06-DC, Pasighat), (07-DC, Anini), (08-DC, Daporijo), (09-DC, Seppa), (10-DC, Tawang), (11-DC, Changlang), (12-DC, Yupia), (13-DC, Yingkiong), (14-DC, Koloriang), (15-DC, Roing), (16-DC, Anjaw), (18-ADC, Namsai), (19-ADC, Longding), (20- ADC, Miao), (21-ADC, Basar), (22-ADC, Rumgong), (23-ADC, Jairampur), (24-ADC, Mechuka), (25-ADC, Hayuliang) – Object Head-50 – Other charges – Code No.02 (Plan) Demand No.6. The District-wise allocation under Untied Fund for the year 2008-09 is given below.
    [Show full text]
  • Chiefworks Office of the Chief Engineer (EZ) Phone : 0360-2212427, FAX : 2212428 Itanagar – 791 111 Email : [email protected], [email protected]
    GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT ***** Gram : Chiefworks Office of the Chief Engineer (EZ) Phone : 0360-2212427, FAX : 2212428 Itanagar – 791 111 Email : [email protected], [email protected]. No.CEAP(EZ)/WG-137/2007-08/ Dated 10th April, 2008. To All Superintending Engineers, Public Works Department, Arunachal Pradesh. All Executive Engineers, Public Works Department, Arunachal Pradesh. Sub :- Pre-feasibility Report (PFR) on Trans-Arunachal Highway(TAH). In continuation to the meeting taken by Commissioner (PWD) on 9th April,2008 and the series of SMS flashed by the undersigned on the subject matter quoted above, the following important points may be considered during pre-feasibility studies on TAH. 1. Land Acquisition: The Right of way (ROW) of 30 metres shall have to be adopted. The PFR shall reflect problems of encumbrances and technical constraints likely to be faced during acquisition of land . Existing utilities falling within the ROW like HT Line and Telephone/Electrical posts and conduits, compensation likely to be paid to agricultural/horticultural/tea garden owners and removal of temporary huts/permanent structures shall have to be identified in the report. It is once again reiterated that 100% land has to be acquired for the project before award of work. 2. Forest Clearance: The route of TAH has to be demarcated on the basis the statutory status of land like Unclassified Forest (UCF), Reserve Forest (RF), community/individual land and land free from encumbrances. For road segments passing through forest, prior approval/forest clearance of Ministry of Environment and Forests (MOEF) will be necessary before the award of contracts.
    [Show full text]
  • Annual Operating Plan 2009-10 Outlay and Expenditure of Centrally Sponsored Schemes Including Fully Funded by Govt
    GOVERNMENT OF ARUNACHAL PRADESH ANNUAL OPERATING PLAN 2009 - 10 INDEX SL.NO CONTENTS PAGE-NO. 1 Basic features i - v 2 Abstract of Outlay and Expenditure 1 - 2 3 Outlay and Expinditure on Direction and Administration under Plan 3 4 Specific schemes with various components 4 5 District wise break up of Outlay 5 6 Physical Targets and Achievement 6 7 District wise break up of Physical targets and Achievement 7 8 Achievement of tenth Plan and Targets for Annual plan 2009-10 8 9 Statement of staff strength of the Department 9 - 10 10 Statement on proposal for New Posts 11 - 12 11 Expenditure and Outlays for salaries and wages 13 12 Statement on Vehicles 14 13 Details of on going scheme 15-35 14 Proposal for new schemes / services 36-70 15 Outlay & Expenditure of loan linked schemes 71-74 16 Earmarked schemes by Planning Commissioning 75-78 17 Centrally Sponsored Schemes (Financial) 79-83 18 Centrally Sponsored Schemes (Physical) 84-89 19 Furnishing information relaeted NEC, NLCPR scheme 90-92 20 On-going incomplete Projects funded under PM's Package 93-97 21 Details of Assets 98-99 GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF POWER ANNUAL OPERATING PLAN FOR 2009 – 10 BASIC FEATURES The Plan Outlay of the Department of Power as allocated by State Planning Department for the financial year 2009-10 is Rs 5000.00 lakh (Rupees Five Thousand Lakh ) only including the earmarked schemes. The projected minimum resource requirement of the Department of Power for 2009-10 is Rs.37079.04 (Rupees Thirty Seven Thousand Seventy Nine Lakh and Four Thousand) only.
    [Show full text]
  • Statistical Hand Book of Tirap District Arunachal Pradesh 1980 D00957.Pdf
    ONLP FOR f\m fi - T i s ^ ' FOR OFFICE USE ONLY \ X \ STATISTICAL HAND-BOOK OF TIRAP DISTRICT ARUNACHAL PRADESH 1980 DISTRICT STATISTICAL OFFICE KHONSA 3(p 0 - S I F O R E W e H D I § @ (3 The District Statistical Hand Book of Tirap @ § District has been compiled under the all India Core Scheme @ (a of the Central Statistical Organisation with a view to @ @ presenting a comprehensiv'e picture of the district of @ @ Arunachal Pradesh and others in general and the District @ (B Administration in particular. @ It is a pleasure to say that Shri B.K, Ghosh, District Statistical Officer with the assistance of Shri S«B. Biswasj Inspector of Statistics, Shri S. Kena, Sub- Inspector of Statistics and Shri R* Debnath, Field Investi­ gator has been able to compile the District Statistical Handbook, 1979-80 with respect to Tirap District in such a short time with very limited rosources. The co-operation of the District Heads of all departments and particularly of the local administration had made this possible. The Statistical department of Arunachal Pradesh appreciates and acknowledges the efforts made by all of them to enable the District Statistical Officer to publish this Hand Book promptly. The Statistical tables that appear in the Hand Book of Arunachal Pradesh have provided the frame to prepare the tables of the District Statistical Hand Book' giving details upto the circle level whenever possible. When a new table is introduced in the Statistical Hand Book of Arunachal Pradesh, the details of the same upto the circle level will be provided automatically in the District Statistical Hand Book of the succeeding year.
    [Show full text]
  • District & Sessions Court, Khonsa
    THE DISTRICT AND SESSIONS COURT, KHONSA (TIRAP, CHANGLANG AND LONGDING DISTRICT) ARUNACHAL PRADESH cud. • I ::ADVERTISEMENT:: No.D&SC/DSA-Diy/Rec/2019/16 Dated Khonsa, the 9th March 2020 1) Applications are invited till 20th April, 2020 in prescribed format for filling up of the following vacant posts in the subordinate court establishments of the state of Arunachal Pradesh under the jurisdiction of the District & Sessions Court, Khonsa (Tirap, Changlang and Longding), Arunachal Pradesh under Gauhati High Court, Itanagar Permanent Bench, Naharlagun in the usual scale of pay. The numbers of vacancies are indicative only and may vary on either side at the time of preparation of final select list. Reservation would be as per policy of Govt. of Arunachal Pradesh. Pay Level as J No. of Posts SI. Name of the Scale of Pay Group per Pay Matrix Reserved Unres No. post of 7th CPC Total for APST erved 1 Stenographer T 9300-34800+GP 6 0 1 1 Grade-II 4200 UDC 5200-20200+GP C 0 1 2800 4 ! Peshkar 5200-20200+GP 5 0 1 2800 5 LDC-cum- 5200-20200+GP C 4 1 1 Computer 2400 Operator 6 Driver 5200-20200+GP C 4 1 0 2400 7 Process Server 5200-20200+GP iC 2 1 1 2 1900 8 - T Office Peon i 5200-20200+GP C 1 1 1 2 1800 Number of Total Post = 09 2) AGE:- Category wise age limits for the posts, as on the date of receipt of filled up form will be as under:- SI. No.
    [Show full text]
  • Minutes of Review the Progress of Projects Under One Time ACA/SPA
    GOVERNMENT OF ARUNACHAL PRADESH PLANNING DEPARTMENT ITANAGAR Minutes of the meeting taken by the Development Commissioner & Commissioner (Finance) on 22nd September, 2009 to review the progress of projects under One Time ACA/SPA implemented from Annual Plan 2005-06 to Annual Plan 2008-09. Shri V.K. Dev, the Development Commissioner & Commissioner (Finance) took a meeting on 22nd September, 2009 at 1500 hrs. in the Conference Hall of Chief Secretary with the concerned Commissioners, Secretaries and Heads of Department to review the progress of projects under One Time ACA/SPA implemented from Annual Plan 2005-06 to Annual Plan 2008-09. 2. The list of participates is appended. 3. After threadbare deliberations, following Specific and time bound decisions were emerged for follow up action: (i) The concerned Commissioners and Secretaries will take critical review on the progress of works on monthly basis. Such monitoring should be linked with the review and problem solving mechanism. (ii) Timeliness and adequacy of information are two important aspects of an effective monitoring system. Therefore, all concerned departments should expedite submission of project-wise expenditure reports, utilization certificates and photographs in the initial period of execution, during execution period and after completion of each project. (iii) The concerned executing departments/ nodal departments shall appoint nodal officer for liaisoning with Planning Department and Finance Department. (iv) In case of deposit works, the concerned client departments shall review with the concerned executing departments at a regular interval. A copy of any correspondence made with the executing departments shall be endorsed to Planning Department for follow-up action/ corrective measures.
    [Show full text]
  • Geology Mineral Resources Arunachal Pradesh
    1 GSI Misc. Pub. 30 Pt. 4 Vol. 2(i) PGSI-315 700-2010 DSK-II GEOLOGY AND MINERAL RESOURCES OF ARUNACHAL PRADESH GEOLOGICAL SURVEY OF INDIA Miscellaneous Publication No. 30 Part IV Vol I(i) Arunachal Pradesh Published by the order of the Government of India 2010 2 CopyGSI Misc. right Pub. © India,30 Pt. 4 Geological Vol. 2(i) Survey, 2010 GEOLOGY AND MINERAL RESOURCES OF ARUNACHAL PRADESH Compiled by G. K. KESARI Senior Geologist under the guidance of G. DAS GUPTA Dr. H.S.M. PRAKASH Director AND Superintending Geologist Publication Division Publication Division Under the overall supervision by B.K. MOHANTY SUDIPTA LAHIRI J.N. RAY Ex-Dy. Director General Ex-Dy. Director General Dy. Director General Geological Survey of India NORTH EASTERN REGION Shillong- 793 003 Price: Inland : Rs. 91/- Foreign : £ 3.11 or $ 4.76 Printed at ESSAR OFFSET, Janapath Lane, G.S. Road, Ulubari, Guwahati-781007, Mobile : +91-9435106080 3 GSI Misc. Pub. 30 Pt. 4 Vol. 2(i) FOREWARD The Miscellaneous Publication 30 Series of the Geological Survey of India brings out concise information on the geology and mineral resources of the states of India. The present volume Part IV, Vol. 2(i) of the series, pertaining to the state of Arunachal Pradesh, is a revised and updated version of the first edition published in 1974. During the span of three and a half decades since the first edition was pub- lished, enormous knowledge has been added in the sphere of geology of the area warranting of a revised edition of this volume.
    [Show full text]