ATTENDANCE WSSDO, WASH Cluster

Total Page:16

File Type:pdf, Size:1020Kb

ATTENDANCE WSSDO, WASH Cluster Meeting Minutes Nuwakot WASH Cluster Meeting June 28, 2015 WSSDO, WASH Cluster, Save the Children, UNOCHA, Arche Nova, NRCS-Spanish Red ATTENDANCE Cross, ENPHO, Samaritan’s Purse, ACF, ACDC-SUAAHARA, Suryadaya Samudaik Club, Caritas Nepal, MSF, Community Forest Division, UN-Habitat. AGENDA 1. Introductions 2. Previous Action Points 3. Agency Weekly Updates 4. Dashboard Review 5. Review of Gaps in the Remote Areas & Focal Points. 6. Contingency Plan (WSSDO, ACF & OXFAM) 7. IDP Camps Updates 8. AOB NEXT MEETING WSSDO, July 12, 2015 (Sunday at 10.30am) 1. INTRODUCTIONS AGENDA II. Previous Action Points Actions Responsible Deadline Status Representative/s from DWAS Committee board members must be invited WSSDO, SP 12 July and attend the WASH Cluster Meeting if possible for a better programming (e.g. LDO & DEO) All WASH partner agencies must finalize their Contingency Stocks for ACF, OXFAM 12 July Nuwakot. and WSSDO WASH Cluster Partners to assess possibilities to coordinated water ENPHO, 12 July quality testing. OXFAM, SP & ACF Last week’s Action Points Responsible Deadline Status ACF, OXFAM and WSSDO to finalize Nuwakot Contingency Plan ACF, OXFAM 28 June Partly including Contingency Stocks. and WSSDO achieved All agencies to review capacity to expand to additional uncovered VDCs All agencies URGENT Partly achieved WASH Cluster Partners to assess possibilities to coordinated water ENPHO, 28 June Partly quality testing OXFAM, SP & achieved ACF Agencies to have bilateral discussions to resolve focal point for SC, SP, 28 June Partly outstanding VDCs and advise Nicole of outcome to facilitate update of UNICEF, achieved forms. OXFAM AGENDA III: Weekly WASH Cluster Partner Updates Updates/ WSSDO discussions – Supplied 145 temporary latrines received from DWSS. – Provided materials for repair and maintenance of 46 water schemes out of 48. – Collected additional data of 330 damaged water systems but doesn’t have the capacity to provide all with necessary materials for the repair. – Planning to continue the repair and maintenance of water supply schemes. UN-Habitat – Have a long term plan to campaign for ODF staring on the 1st week of July in 37 VDCs & 1 Meeting Minutes Nuwakot WASH Cluster Meeting June 28, 2015 Municipality (Bidur) in coordination with Suryadaya Samajik Club, DECON Nepal, NRCS, STAR Nepal. Caritas Nepal – Distributed wash kits in Barsumchet VDC to 133 HH. – Plan to distribute 400 wash kits in 2 VDCs Gerkhu and Duipipal UNOCHA – Just arrived and will be working for an information management and cluster coordination of the whole district. ENPHO – Working in 4 VDCs. Thanapati, Chaturale, Ganesthan and Sunkhani – Completed Emergency Rapid WASH assessment, total larine damage and water schemes. – Distributed Hygiene kits in Thanapati and Chaturale 250 in each VDCs. – Completed bacteriological water test for 30 water samples from working VDCs. – Planning to: 1. Start Hygiene promotion in the latest of this week. 2. Construct 300 latrines in Ganesthan and Sunkhani VDCs next month. 3. WASH in school next month. 4. Rehabilitate 10 water supply schemes in 2 VDCs Sunkhani and Ganesthan. Save the Children – Supporting 50 TLC on WASH needs. – Assessments on need for toilets and water supply are ongoing. – Planning to: 1. Support 50 latrines in school of program VDCs nextweek. 2. Provide semi structure toilet and drinking water system management in school and health post. 3. Distribute hygiene kits to 450HH in Dangsing, 450HH in Gorsyang, 550HH in Taruka and 350HH in Kumari in coordination with NRCS. ACF – Activities ongoing in three VDCs (Suryamati, Kabilas and Chaughoda) – Water quality assessments completed on the covered VDCs. – Finished the water schemes repair in a Chakrawati school of Chaugadha VDC. – Assessment on need for latrines completed and identified 1200 beneficiaries for the program so has plan to provide latrine pan and cement to each of the identified HH. – Planning to: 1. Provide 2 more latrines in the IDP Camp (Betrawathi 2) by the end of the week. 2. Purchased laboratory supplier and kept a proposal for unified laboratory for water test with ENPHO & Mercy Corps. Samaritans Purse – Verified 3 out of 16 schools for the construction of latrines & handwashing stations on the 9 VDCs. 18 completed latrines & 4 handwashing stations. Thirteen more schools to verify. – Started the delivery of materials to one school for the Water System Installation with sawyer filters to the 16 schools. – Coordinated with CCCM (Camp Coordination & Camp Management) and forwarded the data on the assessment conducted in the 4 IDP Camps identified here in Bidur. – Planning this week to: 1. Complete the above mentioned activities for all 16 schools. 2. Conduct hygiene promotion and hygiene kits distribution to the pupils in the 16 schools. MSF – Planning to work on water supply, sanitation and hygiene in Trishuli Hospital. But as per DE Meeting Minutes Nuwakot WASH Cluster Meeting June 28, 2015 advice, look for other institution coz Archenova is now working there for WASH concerns. Archenova – Continuing the repair tap stands & pipelines in Gerkhu. NRCS/ Spanish Red Cross – Constructed 56 latrines and 16 water drinking action. – Distributed 2 tanks of capacity 3000L, 97 hygiene kits, 247 soaps, 50 Jerry cans, 224 water filter. – Conducted a hygiene promotion to an estimated total number of 527 individual. – Fifteen Latrine clearing fields done. – Identified 5 places for latrine construction. – Planning to: 1. Continue hygiene promotion activities. 2. Monitoring latrines activities are going on. 3. Distribute more jerry cans and hygiene kits. 4. Implement WASH in Schools. Community Forest Foundation Center – Planning to support in repair and maintenance of water system in Belkot ward-1,Madanpur ward-8,Kakani ward-1 and Jilling ward-1. Hence, advice to coordinate with the focal point Agency working in the area. ACDC/ SUAAHARA – Provided 36 flash board to each ward of Okharpauwa, Chahuthe and Kakani VDCs with key messages of WASH. – Completed the assessment on the following VDCs: 1. Chauthe, 865 HH with functional latrines and 51 HH latrines needs to be reconstructed. 2. Kharpauwa, 1075 HH with functional latrines and 700 HH latrines needs to be reconstructed. - Plan to set Hoarding board in Bidur Municipality. AGENDA IV Dashboard Review Updates/ - There were some concerns with regards to the numbers presented aligned to the Agency discussions working in some VDCs. Advised them to update their 4W report and send it to the Cluster IMO: Dominik Koepple ([email protected]) or call at 9802039596 for more information/ comments/ concerns. AGENDA V Review of Gaps in the Remote Areas & Focal Points. Updates/ discussions - Presented the data provided by the WASH Cluster IMO and Siddhi Shrestha from UNICEF after his conversation with DE regarding the uncovered and remote VDCs (to implement WASH programs & be the focal agency),compared then clear up the gap by agreeing on who is doing where with the agencies involve. (Please check the table below). - SP, Caritas Nepal & Save the children want’s to focus/ give priority more on the VDCs that they are covering since then and possibly expand whenever their WASH projects is done. - SUAAHARA agreed to cover the 7 VDCs stated below for WASH and be the Focal Agency. Meeting Minutes Nuwakot WASH Cluster Meeting June 28, 2015 Focal Agencies VDCs AGREED Accdg. to WASH IMO Accdg. to DE & UNICEF 1.BALKUMARI - SUAAHARA SUAAHARA 2.BARSUNCHET SP(not confirmed) CARITAS NEPAL - 3.GUANKHARKA - SAVE THE CHILDREN - 4.KHARANITAR - SUAAHARA SUAAHARA 5.LIKHU - SUAAHARA SUAAHARA 6.OKHARPAUWA - SUAAHARA SUAAHARA 7.PANCHKANYA - - - 8.RALUKADEVI SP (not confirmed) - - 9.SAMUNDRATAR - SUAAHARA SUAAHARA 10.SIKRE - SUAAHARA SUAAHARA 11.SUNDRADEVI - - - 12.TALAKHU - SUAAHARA SUAAHARA - As presented in the table above, there are 5 remaining VDCs that no other agency want to cover, namely: 1. BARSUNCHET 2. GUANKHARKA 3. PANCHKANYA 4. RALUKADEVI 5. SUNDRADEVI - Accdg. to Siddhi Shrestha from UNICEFsaying after his conversation with the DE on the 9th day of June, “DECON (Deimos Engineering Consultancy) was selected to work with UNICEF on Sanitation and hygiene promotion in the following VDC/ Municipality wherein no agency working. “ 1. Bungtang 2. Barsunchet 3. Kharanitar 4. Ralukadevi 5. Bidur Municipality- 1,2,6,8,9 (40% of HH) - No representative from the DECON is present to answer and clear the issue. Recommends that a DECON representative should attend on the next WASH Cluster meetings. - The WASH Cluster discussed VDCs with duplicate VDC Focal Point Agency and VDCs with no VDC Focal Point Agency including hard to reach VDCs. The complete list of updated Focal Point Agencies for Nuwakot can be found below. AGENDA VI Contingency Plan (WSSDO, ACF & OXFAM) Updates/ discussions - DE has no plan of making a contingency due to his busy schedule & other commitments. Hence, he referred us to DRRC- not in the meeting. - OXFAM representative is not around also. - Accdg. to Mark from ACF, OXFAM initiated circulating the spreadsheet on WASH Contingency stocks that per agencies should provide to present or see the additional needs with national level if there is gaps. Still waiting for a new development. - National WASH Cluster support is recommended. Meeting Minutes Nuwakot WASH Cluster Meeting June 28, 2015 AGENDA VII: WASH in IDP Camps in Nuwakot Updates / 1.2.n.1 Is discussion WASH WASH If yes who 1.1.d.1 Site 1.1.e.3 support 1.1.e.4 VDC Focal Point provides the WASH coverage Name District being Agency service? provided at
Recommended publications
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Japan International Cooperation Agency (JICA)
    Chapter 3 Project Evaluation and Recommendations 3-1 Project Effect It is appropriate to implement the Project under Japan's Grant Aid Assistance, because the Project will have the following effects: (1) Direct Effects 1) Improvement of Educational Environment By replacing deteriorated classrooms, which are danger in structure, with rainwater leakage, and/or insufficient natural lighting and ventilation, with new ones of better quality, the Project will contribute to improving the education environment, which will be effective for improving internal efficiency. Furthermore, provision of toilets and water-supply facilities will greatly encourage the attendance of female teachers and students. Present(※) After Project Completion Usable classrooms in Target Districts 19,177 classrooms 21,707 classrooms Number of Students accommodated in the 709,410 students 835,820 students usable classrooms ※ Including the classrooms to be constructed under BPEP-II by July 2004 2) Improvement of Teacher Training Environment By constructing exclusive facilities for Resource Centres, the Project will contribute to activating teacher training and information-sharing, which will lead to improved quality of education. (2) Indirect Effects 1) Enhancement of Community Participation to Education Community participation in overall primary school management activities will be enhanced through participation in this construction project and by receiving guidance on various educational matters from the government. 91 3-2 Recommendations For the effective implementation of the project, it is recommended that HMG of Nepal take the following actions: 1) Coordination with other donors As and when necessary for the effective implementation of the Project, the DOE should ensure effective coordination with the CIP donors in terms of the CIP components including the allocation of target districts.
    [Show full text]
  • Nepal Earthquake: One Year On
    ne year has passed since a devastating magnitude-7.8 earthquake struck Nepal on 25 April 2015, with the epicenter about 80 kilometers northwest of the capital, Kathmandu. This was the worst disaster to hit Nepal in decades. Only 17 days later a second earthquake of magnitude 7.4 hit near Mount Everest, taking more lives and destroying more homes. According to government estimates, the earthquakes EXECUTIVE Oleft over 750,000 houses and buildings destroyed or damaged and caused over 8,790 deaths. It is estimated that the earthquakes affected the lives of approximately eight million people, constituting almost one-third of the population of Nepal. With the situation dire, the Nepal government declared a state of emergency, and appealed for international aid. Along with other agencies, Habitat SUMMARY for Humanity answered the call to assist the people of Nepal. During the emergency phase, Habitat distributed 5,142 temporary shelter kits to families whose homes were destroyed or left uninhabitable. Habitat volunteers removed 650 tons of earthquake rubble, and distributed 20,000 water backpacks to families in earthquake-affected areas. As the emergency phase ended, Habitat’s programs shifted into reconstruction. Engineers completed safety assessments on 16,244 earthquake- damaged homes. Initial construction began on permanent homes in the community in Kavre district. As months passed, winter brought the threat of cold weather exposure, and Habitat distributed 2,424 winterization kits to families at risk to the elements. In addition, 32 trainers and 632 people in affected communities received instruction on the Participatory Approach for Safe Shelter Awareness. Overall in the first year since the earthquakes, Habitat for Humanity provided assistance to more than 43,700 families through various disaster response programs.
    [Show full text]
  • Provincial Summary Report Province 3 GOVERNMENT of NEPAL
    National Economic Census 2018 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 Provincial Summary Report Provincial National Planning Commission Province 3 Province Central Bureau of Statistics Kathmandu, Nepal August 2019 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 National Planning Commission Central Bureau of Statistics Kathmandu, Nepal August 2019 Published by: Central Bureau of Statistics Address: Ramshahpath, Thapathali, Kathmandu, Nepal. Phone: +977-1-4100524, 4245947 Fax: +977-1-4227720 P.O. Box No: 11031 E-mail: [email protected] ISBN: 978-9937-0-6360-9 Contents Page Map of Administrative Area in Nepal by Province and District……………….………1 Figures at a Glance......…………………………………….............................................3 Number of Establishments and Persons Engaged by Province and District....................5 Brief Outline of National Economic Census 2018 (NEC2018) of Nepal........................7 Concepts and Definitions of NEC2018...........................................................................11 Map of Administrative Area in Province 3 by District and Municipality…...................17 Table 1. Number of Establishments and Persons Engaged by Sex and Local Unit……19 Table 2. Number of Establishments by Size of Persons Engaged and Local Unit….….27 Table 3. Number of Establishments by Section of Industrial Classification and Local Unit………………………………………………………………...34 Table 4. Number of Person Engaged by Section of Industrial Classification and Local Unit………………………………………………………………...48 Table 5. Number of Establishments and Person Engaged by Whether Registered or not at any Ministries or Agencies and Local Unit……………..………..…62 Table 6. Number of establishments by Working Hours per Day and Local Unit……...69 Table 7. Number of Establishments by Year of Starting the Business and Local Unit………………………………………………………………...77 Table 8.
    [Show full text]
  • WASH Cluster Nepal 4W - May 12Th 2015
    WASH Cluster Nepal 4W - May 12th 2015 Please find following the analysis of the 4W data – May 12th Introduction (Round 2) This is the second round of the 4W analysis. As this is the second round and still early in the emergency response, many agencies are still planning their interventions and caseloads, hence much of the data is understandably incomplete. In the coming week/s we will receive far more comprehensive partner data and will be able to show realistic gaps. In addition, we are receiving better affected population data and there are many ongoing assessments, the results of which will help us to understand both the response data and the affected population data and enable us to deliver a far more profound analysis of the WASH response. Please assist us as we have a lot of information gaps in the data provided so far and hence the maps are not yet providing a true picture of the response. We would like to quickly move to VDC mapping including planned/reached beneficiaries. Since the first round of reporting, agencies have provided substantially more VDC‐level data – as of today, of 740 WASH activities identified, 546 of these (74%) are matched to an identified VDC ‐ this is a big improvement from last week (which had VDC data for 192 of 445 activities, or 43%) The Highlights ・ 47 Organisations – number of organisations that reported in Round 1 and/or Round 2 of the WASH 4W ・ 206 VDCs – where WASH interventions taking place/planned (in 15 districts) 4W – WASH May 12th 2015 Water0B Spread of water activities ‐ targeted Temporary
    [Show full text]
  • DAMS & DEVELOPMENT: Emerging Trendsinnepal's Hydropower Terrain
    Recognising Entitlements and Sharing Benefits: Emerging TrendsinNepal’s Hydropower Terrain Dialogue on DAMS & DEVELOPMENT:NEPAL Copyright: © 2005 IUCN-The World Conservation Union Nepal and Nepal Water Conservation Foundation Published in support of the Dams and Development Strategic Priorities Series for the National Steering Committee on Dams and Development by IUCN Nepal and Nepal Water Conservation Foundation The role of German Technical Cooperation (GTZ) in supporting the Dams and Development Strategic Priorities Series is gratefully acknowledged. The material in this publication may be reproduced in whole or in part and in any form for educational or non-profit uses, without prior written permission from the copyright holder, provided acknowledgement of the source is made. IUCN Nepal would appreciate receiving a copy of any publication which uses this publication as a source. DISCLAIMER No use of this publication may be made for resale or other commercial purposes without prior written permission of IUCN Nepal and NWCF. This Dams and Development Strategic Citation: Dixit, Ajay & Basnet, Shreshna (2005). Recognising Entitle- Priorities Series summaries the find- ments and Sharing Benefits: Emerging Trends in Nepal's Hydropower Terrain ings and serves as a platform for con- IUCN Nepal + 38 pp. tinuing the dialogue on the issues of water resources development and dams Technical Advice: Bhawani P. Kharel and Deependra Joshi in Nepal. This report can assist in the ISBN: 99933-860-9 evolution of the policy process, but it is not the policy document of any of the Printed by: Quality Printers Kathmandu, Nepal organizations involved in the specific priorities series consultative processes. ii Foreword t is five years since the report of the World Commission Priorities.
    [Show full text]
  • (Tor) for SUPPLYING CONSTRUCTION MATERIALS for HSRP, NUWAKOT
    Terms of Reference (ToR) FOR SUPPLYING CONSTRUCTION MATERIALS FOR HSRP, NUWAKOT Project Title Health System Recovery Project, Nuwakot Type of project Health Location Bidur-04, Nuwakot Name of the company/firm External company/firm/supplier Deadline of Bid submission 29th August, 2018 Anticipated completion of project 30th September, 2018 1.0 GENERAL INTRODUCTION Good Neighbors International (GNI) Nepal has been working in Nepal since 2002 with the objective of improving lives of the poor people especially children through education, child protection, and income generating activities, health, WASH, and disaster risk reduction. GNI Nepal has been operating its activities in 20 districts. GNI Nepal with support from the Korea International Cooperation Agency (KOICA) has been implementing Health System Recovery Project (HSRP) in two Municipalities and five Rural Municipalities of Nuwakot District since December 2015 with the major objective of improving the health status and psychosocial well-being of community members through post-disaster recovery. In total, 10 former VDCs of Nuwakot (Belkot, Charghare, Duipipal, Ghyangphedi, Likhu, Okharpauwa, Panchakanya, Ratmate, Suryamati and Thaprek) are the working areas of HSRP. One of the major objectives of the project is to improve adolescent sexual and reproductive health (ASRH) status in the project areas. This includes, in addition to other activities, building hygienic environment at 32 basic and secondary public schools. The Project has constructed/is constructing Gender Friendly Toilets (GFT) at 14-targeted public schools. In addition to GFT construction, the Project is installing Safe Drinking Water Management System in 22 schools of project areas. HSRP is planning to provide HDPE pipe and then install Bio- sand filter in 7 additional needful schools and to provide materials for school compound fencing at two schools of project area.
    [Show full text]
  • District Report Housing Recovery and Reconstruction Platform, Nepal Housing Recovery and Reconstruction Platform
    Monthly District Report Housing Recovery and Reconstruction Platform, Nepal Housing Recovery and Reconstruction Platform District Report Nuwakot 15 March – 11 April 2019 Summary of events during this period Name of activity/event Event date Participants Contact Person Reference summary Document Male Female Palika Level Reconstruction Planning preparation and follow up the upload to respective Plika's website. 2 March 15 , [email protected] Municipality and 10 Rural 2019 Municipality have uploaded to website and send signed copy to HRRP Meeting with Partners and March-18-20 [email protected] GMALI for good Coordination. Visit to DUDBC for for tranhe March- 22 [email protected] update. Contact and calendar update March 26 [email protected] District Coordination Meeting: Purnima Project (UK AID) is working for mainly 4 components in Shivapuri, Dupcheswar and Tadi Rural Municipalities: a. Technical Assistance to Palika: b. Support to Reconstruction: c. Private sector support: d. Leave no Behind. Oxfam and its implementing partners are working for relocating family from March 28 , Meeting Lachyang, Urleni Bhalche, 15 1 [email protected] 2019 Minute Kimatang, Gyangphedi and Rasuwa. Lachyang, Urleni and Bhalche are in final stage and plan to complete with in June 2019. UNOPS/Government of India is working support to Housing Reconstruction in Nuwakot district has started to work from March 2018. It has plan to support to 23088hh as STFC service and others. 174 GOI beneficiaries have received banking support. 91 have 11 April, 2019 Page 1 of 8 Monthly District Report Housing Recovery and Reconstruction Platform, Nepal Housing Recovery and Reconstruction Platform Summary of events during this period received support to obtain building permits and 844 have received drawings.
    [Show full text]
  • HRRP Meeting Minutes
    HRRP Meeting Minutes HRRP District coordinating Meeting in Nuwakot Date: 17.11.2016 Time: 10:00- 11:30 AM Location: GIZ/RPN Meeting Hall, Balmandir Chairperson: Local Development Office of Nuwakot Mr. Keshar Bahadur Pandit Facilitator: Mr. Siddhartha Narsingh Sharma, HRRP District coordinator Participants: DDC, NRA, DUDBC, ACF, OXFAM, DFID, HFH, ASF, World Renew, NRCS, GIZ/RPN/ HRRP Agenda: Update and review of HRRP activities & new development in district. Questions and Answer AOB Introduction: Mr. Siddhartha Narsingh Sharma facilitated the Housing Recovery and Reconstruction Platform meeting in Nuwakot and welcomed Chairperson Mr. Keshar Bahadur Pandit, Local development Officer of Nuwakot including representative from NRA, DUDBC and POs from other development agencies. All HRRP members working in reconstruction in Nuwakot updated and discussed on relevant issues regarding NRA grant enrollment process, grievances and reconstruction update and issues of aggregates / raw materials for housing and reconstruction. Local development officer drew attention towards the requirement of raw materials and skills trainings for the reconstruction work and placement of engineers in the VDCs to support build back better successfully. Similarly, requested VDCs officials and development agencies to deliver require support to engineer’s team in the VDCs. He also expressed concern about the need for equitable distribution of grant among all the beneficiaries to avoid social conflict. Update from POs: OXFAM: Mr. Deepak Bahadur Singh from OXFAM updated about the BBS messaging in community, they have already covered almost 1000 beneficiaries in their respective VDCs (Samari, Khadagbhanjyang, Budhasingh, Madanpur, Guankhark, Thaprek, Rautbesi, Beteni), similarly, trained 234 masons who will also be used for social mobilization regarding reconstruction related issues and discussed about the role of DLIPU, GOs and POs about new guidelines orientation.
    [Show full text]
  • Landslide Inventory, Susceptibility Mapping and Recommendation of the Mitigation Measures in Nuwakot District
    Journal of NepalLandslide Geological inventory, Society, susceptibility 2017, Vol. 53, mapping pp. 107-118. and recommendation of the mitigation measures in Nuwakot district Landslide inventory, susceptibility mapping and recommendation of the mitigation measures in Nuwakot District *Jagannath Joshi1, Dipak Bharadwaj2, Pradeep Paudyal3, and Niroj Timalsina4 1Hariyo Ban Program, CARE Nepal 2Department of Soil Conservation and Watershed Management, Government of Nepal 3Amrit Science Campus, Tribhuvan University, Kathmandu, Nepal 4International Center for Integrated Mountain Development, Kathmandu, Nepal *(Corresponding email: [email protected]) ABSTRACT Nepal earthquake of 25th April 2015 and subsequent big aftershocks impacted people, land, and water resources significantly. Following the devastating earthquake, land and water management has become one of the primary focus of the Government of Nepal as these resources are foundations of people’s livelihood and prosperity. The weakened, cracked, and destabilized slopes and surfaces due to the earthquake become even more susceptible to landslides that can be aggravated due to rainfall and inappropriate anthropogenic activities. Due to the devastating earthquake, 31 districts of Nepal out of 75 were affected with 14 being severely affected resulted huge loss of human life, property, and ecosystem services. These 14 districts were categorized as severely hit and crisis hit districts by the post disaster need assessment (PDNA) carried out by Government of Nepal. Nuwakot district is one of the severely hit district. In order to reduce vulnerability and/or threat of potential landslide disasters and protect local people, infrastructures, land and water resources from potential landslide disaster, identification of the most susceptible slopes as well as treatment and mitigation of the most critical landslides deemed essential.
    [Show full text]
  • Pilot Field Test of Community-Based Injury Survey with Burns Module: Nuwakot and Rasuwa Districts, Nepal 2016
    Pilot Field Test of Community-based Injury Survey with Burns Module: Nuwakot and Rasuwa Districts, Nepal 2016 March 31 2017 Pilot Field Test of Community-based Injury Survey with Burns Module: Nuwakot and Rasuwa Districts, Nepal 2016 Dr Hilary Wallace 1,2, *, Uden Maharjan 3, Sangeeta Khimbanjar 3, Subash Gajurel 3, Dr Sushil Chandra Baral 3 1. Consultant 91 Bruce St Nedlands, Western Australia 6009 Tel: +61 (0)439482546 Email: [email protected] 2. Senior Research Fellow Burn Injury Research Unit, M318 The University of Western Australia 35 Stirling Highway, Crawley 6009 Western Australia Tel: +61 (0)439482546 Email: [email protected] 3. HERD International PO Box 24133, Kathmandu Nepal Tel: +977 (0)14238045; 4102072 Fax: +977(0)14102016 Email: [email protected]; [email protected] Web: www.herdint.org.np * Corresponding author March 31 2017 March 31 2017 Table of Contents List of Figures ...................................................................................................................... i List of Tables ....................................................................................................................... i Abbreviations .................................................................................................................... iii Executive Summary ........................................................................................................... iv Acknowledgments ............................................................................................................
    [Show full text]
  • Integrated Development Planning of Bidur (2017-2035) Integrated Development Planning of Bidur (2017-2035)
    INTEGRATED DEVELOPMENT PLANNING OF BIDUR (2017-2035) INTEGRATED DEVELOPMENT PLANNING OF BIDUR (2017-2035) 2035 BIDUR WLSP WPDI Foreword INTEGRATED DEVELOPMENT PLANNING OF BIDUR (2017-2035) Background / Working process 001 / 002 I. Background China put forwards the "Belt and Road Initiative" to join hands with the countries along the belt and road to develop together. In this context, invited by United Nations Human Settlements Programme (UN-HABITAT), Wuhan Land Use and Urban Spatial Planning Research Center (WLSP) and Wuhan Planning & Design Institute (WPDI) formed a joint design team to prepare the Integrated Development Planning of Bidur (2017-2035) of Nepal, a country along the belt and road. Nepal is one of the less developed countries in the world. It has frequently changing political situation and lacks of complete urban planning system. The earthquake in Nepal in 2015 destroyed Zhangmu Port at the border between China and Nepal and led to rise of Gyirong Port in the north of Bidur. Therefore, as a bridge connecting Gyirong and Kathmandu, the capital of Nepal, Bidur will usher brand new development opportunities. The work goal this time is to complete the planning of three parts: integrated development strategy (2017-2035), spatial layout (2017-2035) and five-year action plan (2017-2022), and try to establish urban planning system of Nepal. II. Working process 1. On July 21, 2016, WLSP and UN-HABITAT signed memorandum of understanding with a term of three years in Beijing, constituting a firmer and more stable basis for cooperation between both parties. UN-HABITAT invited WLSP to take part in the post-disaster reconstruction in international regions and promote the post-disaster reconstruction and economic recovery of the disaster-stricken areas, which is an important part of the cooperation.
    [Show full text]