Calvert Area Update October 2020 Agenda
Total Page:16
File Type:pdf, Size:1020Kb
Calvert Area Update October 2020 Agenda Introductions Background Six Month Lookahead Questions from the parishes Traffic Helpdesk FUSION INTRODUCTIONS ENGAGEMENT TEAM EKFB INTRODUCTIONS ENGAGEMENT TEAM Engagement Methods Advance Planning & Land & Works Notices U & A’s Highways Property & Traffic News Informal Member Action Group Schools Engagement Briefings meetings Engagement Community Virtual Virtual Drop- Outreach Bus Boards Exhibitions Ins (2021) Background Background Steeple Claydon Three main work areas: Twyford East Leighton Middle Claydon Buzzard • Calvert North – 81+450 to 77+400 Claydon Calvert Green Bicester Botolph Claydon • Calvert South – 77+400 to 71+450 Charndon • Station Road & A41 – 71+450 Edgcott Grendon Underwood Quainton A41 Station Road South Aylesbury Westcott Six Month Lookahead Overview Area Contractor Oct – Nov Dec – Jan Feb – Mar Activity Traffic Activity Traffic Activity Traffic Management Management Management Calvert Fusion HIGH HIGH MEDIUM LOW LOW MEDIUM North EKFB HIGH MEDIUM HIGH MEDIUM LOW LOW HS2 (FCC) LOW N/A LOW N/A LOW N/A East West Rail N/A N/A N/A N/A N/A N/A Calvert Fusion MEDIUM LOW LOW LOW LOW LOW South EKFB MEDIUM MEDIUM MEDIUM LOW MEDIUM LOW Station Road Fusion HIGH HIGH HIGH HIGH MEDIUM HIGH & A41 EKFB LOW LOW MEDIUM TBC LOW TBC SGN MEDIUM MEDIUM MEDIUM MEDIUM N/A N/A Calvert North Chainages 81+450 to 77+400 Calvert North – 1st Oct to 30th Nov 2020 West Street TM: SCL6 & TWY5 Full road closure Storage Areas Fusion footpath closure HERDS & diversion • Archaeology HERDS West Street • Ecology Compound TM: 2-way lights • Site Clearance HERDS • West Street Compound: drainage and power West Street Utilities Diversion • West Street Utilities Diversion • School Hill Compound & Connections Site Access Road • School Hill UTX: Utility diversion TM: 2-way lights • Foul Sewer (Pumped) • Greatmoor Sailing Club Works Gawcott Road TM: 2- way lights • Traffic Management: 2-way lights at Steeple Claydon to Twyford, Calvert Road and Steeple Site Clearance Foul Sewer (Pumped) Claydon to Calvert EKFB TM: 2 -way lights • West Street Compound: temporary fencing, base TWY4 footpath closure & diversion construction School Hill Compound & Connection • West Street Traffic Management: Full road Decommission Gas closure of Steeple Claydon to Twyford until late Main Removal 2021 Relocation of Charndon Lodge Monitoring • School Hill Batching Plant: plant deliveries Underbridge Storage Boreholes • Storage Areas: area preparation Greatmoor Sailing Areas • General Site Clearance Club Works • Site Access Road construction School Hill UTX • Gawcott Road Traffic Management: 2-way lights • Decommissioned Gas Main Removal School Hill Batching • Footpath closures with temp. diversions SCL61, Plant TWY5 & TWY4 Relocation of FCC HS2 Offices & Osmosis Plant • (FCC) Relocation of monitoring boreholes approx. location • (FCC) Relocation of FCC Offices & Osmosis Plant Calvert North – 1st Dec 2020 to 31st Jan 2021 West Street TM: Full road closure SCL6 & TWY5 Fusion footpath closure HERDS West Street & diversion • Archaeology HERDS Compound • Ecology Storage Area TM: 2-way lights • Site Clearance HERDS • School Hill Compound & Connections West Street Utilities Diversion • School Hill UTX: Utility diversion • West Street Utilities Diversion • Foul Sewer Site Access Road • Greatmoor Sailing Club Work • Traffic Management: 2-way lights at Steeple EWR Overbridge Claydon to Calvert TWY4 footpath Foul Sewer (Pumped) EKFB closure & diversion • West Street Compound: welfare units & ancillary Charndon Lodge works Underbridge • Site Access Road construction School Hill Compound Greatmoor Sailing & Connection • Gawcott Road Traffic Management: 2-way lights Club Works Storage • School Hill Batching Plant: Temporary compound Area and batching plant construction • Storage Areas: area preparation School Hill UTX • Footpath closures with temp. diversions SCL61, TWY5 & TWY4 School Hill Batching • East West Rail Overbridge Plant • Charndon Lodge Underbridge HS2 • (FCC) Relocation of FCC Offices & Osmosis Plant Relocation of FCC Offices & Osmosis Plant approx. location Calvert North – 1st Feb to 31st Mar 2021 West Street TM: Full road closure SCL6 & TWY5 Fusion footpath closure HERDS Site Access Road • Archaeology HERDS & diversion Gawcott Road TM: • Ecology At-grade crossing • Site Clearance HERDS • West Street Utilities Diversion West Street Utilities Diversion • Foul Sewer (Pumped) • Greatmoor Sailing Club Works Perry Hill Overbridge EKFB • School Hill Batching Plant: Batching plant EWR Overbridge erection and commissioning • Site Access Road Construction TWY4 footpath Foul Sewer (Pumped) • Gawcott Road Traffic Management: At-grade site closure & diversion access crossing for duration of works Charndon Lodge • Imported Materials Underbridge • Footpath closures with temp. diversions SCL61, Greatmoor Sailing TWY5 & TWY4 Club Works Imported • East West Rail Overbridge Materials • Charndon Lodge Underbridge • Perry Hill Overbridge HS2 School Hill Batching • (FCC) Relocation of FCC Offices & Osmosis Plant Plant Relocation of FCC Offices & Osmosis Plant approx. location Calvert South Chainages 77+400 to 71+450 Calvert South – 1st Oct to 30th Nov 2020 Mitigation Full route detailed in next slides Fusion Planting • Archaeology HERDS Construction • Ecology Works Route • Site Access Road: Quainton to new FCC Greatmoor Sidings • Utilities Diversion • Mitigation Planting Test Piles • De-vegetation • Traffic Management: Shipton Lee Road EKFB • Test Piles: mobilisation, preparation and pile testing • Abnormal Load Route Traffic Management: Slow moving abnormal load • Calvert South Site Clearance: temporary fencing, de- Abnormal vegetation and GPR Site Clearance Load Route HERDS TM: Road Closure Shipton Lee Site Access Road Full route detailed in next slides TM: Creighton Road site access Calvert South – Construction Route Rationale: • Weak structure advisory weight limit imposed on Fidlers Field and Station Road • Construction vehicles exceed imposed weight limits Construction Botolph Route Claydon • Alternative routes presented to HS2 Calvert and Buckinghamshire Council for Green consideration • Safest route selected Test Pile site Construction route: • M40 Junction 9 Edgcott • A41 • Grendon Underwood Grendon • Edgcott From A41 Underwood Quainton • Calvert Green • Botolph Claydon Weak bridge on Restricted traffic to 10 days or less, East Fidlers Field Claydon Parish Council engaged and Weak bridge on Abnormal Load Station Road informed. Route A41 Abnormal Load route: • M40 or A41 • Quainton From M40 Calvert South – 1st Dec 2020 to 31st Jan 2021 Mitigation Fusion Planting • Archaeology HERDS • Ecology Works • Site Access Road: Quainton to new FCC Greatmoor Sidings • Utilities Diversion • Mitigation Planting • De-vegetation • Traffic Management: A41 / Creighton Road site access, and Shipton Lee Road EKFB • Calvert South Site Clearance: temporary fencing, de- vegetation and GPR • Break from Highway for site access through Doddershall Farm, until end of March 2021 HERDS TM: Road Closure Shipton Lee Site Access Road TM: Creighton Road site access Various footpath closures planned and Break from Highway Calvert South – 1st Feb to 31st Mar 2021 Mitigation Fusion Planting • Archaeology HERDS • Ecology Works • Site Access Road: Quainton to new FCC Greatmoor Sidings • Utilities Diversion • Mitigation Planting • De-vegetation • Traffic Management: A41 / Creighton Road site access, and Shipton Lee Road EKFB • Calvert South Site Clearance: temporary fencing, de- vegetation and GPR • Break from Highway for site access through Doddershall Farm, until end of March 2021 HERDS TM: Road Closure Shipton Lee Site Access Road TM: Creighton Road site access Various footpath closures planned and Break from Highway Station Road & A41 Chainage 71+450 Station Road & A41 – 1st Oct to 30th Nov 2020 Utilities Survey Station Road TM: 2-way lights, Utilities Survey Fusion Fidlers Field TM: 2-way lights, • Station Road South Upgrade: Phase 1 - material deliveries and Station Road North surveys. Phase 2 - utility diversion, utility protection and passing bays • Station Road Traffic Management: Phase 1 - Daytime week day (7:00am to 5:00pm, Mon to Fri) road colure from 19th to 23rd October. Phase 2 - Full road closure 9:00am Mon through to 7:00am Sat, starting 26th Oct to 19th Dec 2020 Station Road • A41 Traffic Management: 2-way lights for night-time working Compound Bridge repair works th (6:30pm to 6:30am Monday nights to Friday nights) until 19 TM: 2-way lights, Station December 2020 Road HS2 • (SGN) Diverted Gas Pipeline: dewatering & drying diverted gas SGN Gas diversion pipeline, tie-in to and commission TM: 2-way lights, Quainton Road • (SGN) Quainton Road Traffic Management: 2-way lights early December Station Road South Upgrades TM: Phase 1 - Daytime road colure from 19th Oct to 23rd Oct, Phase 2 - Full road closure Mon 9am to Sat EKFB 7am from 26th Oct to 19th Dec 2020 • Utilities Survey: GPR survey works for trial holes, trial holes & boreholes and TM 2-way lights Station Road South road • Station Road Compound: site clearance & temporary fencing closure diversion route Network Rail • Emergency repair works to weak bridge A41 TM: 2-way lights Mon to Fri nights until 19th Dec 2020 Station Road & A41 – 1st Dec 2020 to 31st Jan 2021 Utilities Diversion Fusion TM: in development • Station Road South Upgrade: Phase 2 - highway resurfacing, highway furniture and landscaping • Station Road Traffic Management: Phase 2 - Full road closure 9:00am Mon through to 7:00am Sat, until 19th